ROADWORKS SUMMARY
Barnhill Road, WEMBLEY, HA9 9BX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Barnhill Road, HA9 9BX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Barnhill Road, WEMBLEY, HA9 9BX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Barnhill Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Ealing logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 08:28.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2022 and 18 Dec 2024
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2022 and could run through until 18 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 09:36.

HS2 logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Bennetts Avenue

HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2023 at 09:00 and could run through until 30 September 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 2 Sep 2024 at 15:12.

Thames Water logo
LONG TERM
Between
9 Dec 2023 and 10 Dec 2024
Details
View Map
Share
Follow
Du Cane Road

Thames Water are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2023 and could run through until 10 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Nov 2023 at 14:09.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Victoria Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 08:46 and could run through until 20 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2024 at 12:55.

HS2 logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Victoria Road

HS2 are carrying out Utility asset works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 February 2024 at 00:01 and could run through until 20 September 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 12 Aug 2024 at 09:30.

London Borough Of Camden logo
LONG TERM
Until
30 Oct 2024
Details
View Map
Share
Follow
Chalk Farm Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 12:30 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Mar 2024 at 16:23.

City Of Westminster logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Fernhead Road

City Of Westminster are carrying out Highway repair and maintenance works on Fernhead Road, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 12:30 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 15 Jan 2024 at 14:17.

HS2 logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Wales Farm Road

HS2 are carrying out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 February 2024 at 00:01 and could run through until 20 September 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 12 Aug 2024 at 09:31.

London Borough Of Barnet logo
LONG TERM
Until
1 Mar 2025
Details
View Map
Share
Follow
Charcot Road

London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.

These works are categorised as Major.

The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 14:30.

London Borough Of Barnet logo
LONG TERM
Between
1 Mar 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.

HS2 logo
LONG TERM
Until
15 Oct 2024
Details
View Map
Share
Follow
Western Avenue

HS2 are carrying out Utility asset works on Western Avenue, Perivale.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 11 March 2024 at 09:30 and could run through until 15 October 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by HS2 on 12 Aug 2024 at 15:38.

HS2 logo
LONG TERM
Until
15 Oct 2024
Details
View Map
Share
Follow
West Gate

HS2 are carrying out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 00:01 and could run through until 15 October 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 28 Aug 2024 at 16:08.

HS2 logo
LONG TERM
Until
28 Oct 2024
Details
View Map
Share
Follow
Ruskin Gardens

HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 28 October 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 5 Sep 2024 at 14:42.

HS2 logo
LONG TERM
Until
28 Oct 2024
Details
View Map
Share
Follow
Brentham Way

HS2 are carrying out Utility asset works on Brentham Way, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 28 October 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 5 Sep 2024 at 14:42.

HS2 logo
LONG TERM
Until
28 Oct 2024
Details
View Map
Share
Follow
Brunswick Road

HS2 are carrying out Utility asset works on Brunswick Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 5 Sep 2024 at 14:31.

Transport for London (TfL) logo
LONG TERM
Until
5 Nov 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 14:26.

UK Power Networks Eastern & London logo
LONG TERM
Until
14 Nov 2024
Details
View Map
Share
Follow
Greencroft Gardens

UK Power Networks Eastern & London are carrying out Utility asset works on Greencroft Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 April 2024 at 08:00 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Apr 2024 at 07:01.

Thames Water logo
LONG TERM
Until
3 Nov 2024
Details
View Map
Share
Follow
College Road

Thames Water are carrying out Utility asset works on College Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 09:10 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 09:40.

HS2 logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Oxford Road

HS2 are carrying out Section 50 on Oxford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 11 October 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 29 Jul 2024 at 14:48.

HS2 logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Oxford Road

HS2 are carrying out Section 50 on Oxford Road, Maida Vale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 11 October 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 29 Jul 2024 at 13:33.

HS2 logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Greville Road

HS2 are carrying out Section 50 on Greville Road, Kilburn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 11:00 and could run through until 11 October 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 29 Jul 2024 at 14:28.

London Borough Of Barnet logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.

London Borough Of Barnet logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are carrying out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2024 at 23:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2024 at 10:16.

London Borough Of Barnet logo
LONG TERM
Until
23 Nov 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are carrying out Highway improvement works on Station Road, Hendon, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 June 2024 at 09:23 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Jun 2024 at 07:18.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

Thames Water logo
LONG TERM
Until
10 Nov 2024
Details
View Map
Share
Follow
Acton Lane

Thames Water are carrying out Utility asset works on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2024 at 07:35.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:23.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:22.

London Borough Of Barnet logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.

Cadent Gas logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.

UK Power Networks Eastern & London logo
LONG TERM
Until
19 Oct 2024
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2024 at 11:40 and could run through until 19 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 07:20.

City Of Westminster logo
LONG TERM
Until
4 Oct 2024
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are carrying out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 1 Jul 2024 at 08:53.

London Borough Of Barnet logo
LONG TERM
Until
25 Oct 2024
Details
View Map
Share
Follow
Hampstead Way

London Borough Of Barnet are carrying out Highway improvement works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

The works started on 1 July 2024 at 10:46 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Jul 2024 at 09:48.

UK Power Networks Eastern & London logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Gascony Avenue

UK Power Networks Eastern & London are carrying out Utility asset works on Gascony Avenue, Kilburn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 July 2024 at 08:00 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jul 2024 at 07:12.

Transport for London (TfL) logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:53.

Transport for London (TfL) logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
South Africa Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:54.

Thames Water logo
LONG TERM
Until
31 Oct 2024
Details
View Map
Share
Follow
Greenhill Park

Thames Water are carrying out Utility asset works on Greenhill Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 14:35 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 07:01.

UK Power Networks Eastern & London logo
LONG TERM
Until
1 Oct 2024
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on St John's Wood Park, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 July 2024 at 09:49 and could run through until 1 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jul 2024 at 09:53.

HS2 logo
LONG TERM
Until
6 Oct 2024
Details
View Map
Share
Follow
Western Avenue

HS2 are carrying out Section 50 on Western Avenue, Ealing.

These works are categorised as Major.

The works started on 17 July 2024 at 22:00 and could run through until 6 October 2024. The works will impact the footway, carriageway, cycleway, parking place and bus stop or stand.

This roadwork event was last updated by HS2 on 31 Jul 2024 at 12:35.

Cadent Gas logo
LONG TERM
Until
27 Sep 2024
Details
View Map
Share
Follow
Finchley Road

Cadent Gas are carrying out Utility asset works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 15:10 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 11:00.

Cadent Gas logo
LONG TERM
Until
20 Oct 2024
Details
View Map
Share
Follow
Cotman Gardens

Cadent Gas are carrying out Utility asset works on Cotman Gardens, Edgware.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:41 and could run through until 20 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 10:04.

London Borough Of Barnet logo
LONG TERM
Until
1 Nov 2024
Details
View Map
Share
Follow
Deans Lane

London Borough Of Barnet are carrying out Highway improvement works on Deans Lane, Mill Hill, Edgware.

These works are categorised as Major.

The works started on 2 August 2024 at 00:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Aug 2024 at 08:45.

Network Rail logo
LONG TERM
Until
13 Oct 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2024 at 23:00 and could run through until 13 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Aug 2024 at 10:34.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2024 and run through until 25 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Aug 2024 at 12:52.

Cadent Gas logo
LONG TERM
Until
27 Sep 2024
Details
View Map
Share
Follow
Chaplin Road

Cadent Gas are carrying out Utility asset works on Chaplin Road, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 09:43 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 09:27.

London Borough Of Ealing logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 20 September 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 8 Aug 2024 at 11:16.

London Borough Of Ealing logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are carrying out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:39 and could run through until 20 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 Aug 2024 at 11:55.

London Borough Of Camden logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 12 Aug 2024 at 08:53.

LONG TERM
Between
12 Aug and 15 Nov 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:39.

LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:30 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 12 Aug 2024 at 09:32.

LONG TERM
Between
12 Aug and 15 Nov 2024
Details
View Map
Share
Greenhill Way

London Borough Of Harrow were proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 12 Aug 2024 at 09:27.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Park Parade

Thames Water are carrying out Utility repair and maintenance works on Park Parade, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 11:30 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 07:16.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

Thames Water logo
LONG TERM
Until
25 Oct 2024
Details
View Map
Share
Follow
Greenford Road

Thames Water are carrying out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

The works started on 19 August 2024 at 08:00 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2024 at 09:52.

Cadent Gas logo
LONG TERM
Between
19 Aug and 7 Oct 2024
Details
View Map
Share
Follow
Stuart Avenue

Cadent Gas are proposing to carry out Utility asset works on Stuart Avenue, South Harrow.

These works are categorised as Major.

The works will start on or after 19 August 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 14:47.

LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
College Road

London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.

Thames Water logo
LONG TERM
Until
14 Oct 2024
Details
View Map
Share
Follow
Fairlight Avenue

Thames Water are carrying out Utility asset works on Fairlight Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 August 2024 at 13:00 and could run through until 14 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 13:35.

London Borough Of Ealing logo
LONG TERM
Between
21 Aug and 31 Oct 2024
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 22 May 2024 at 08:02.

Thames Water logo
LONG TERM
Until
27 Oct 2024
Details
View Map
Share
Follow
Westwick Gardens

Thames Water are carrying out Utility asset works on Westwick Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2024 at 13:45 and could run through until 27 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:40.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Mortimer Road

Thames Water are proposing to carry out Utility asset works on Mortimer Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2024 and could run through until 22 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 10:19.

Thames Water logo
LONG TERM
Until
6 Oct 2024
Details
View Map
Share
Follow
Inverness Terrace

Thames Water are carrying out Utility repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 15:00 and could run through until 6 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 10:00.

Thames Water logo
LONG TERM
Until
7 Oct 2024
Details
View Map
Share
Follow
Willow Road

Thames Water are carrying out Utility repair and maintenance works on Willow Road, Hampstead Town, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 08:50 and could run through until 7 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 11:23.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2024 at 10:23.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 11:33.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
Holland Park Roundabout

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Holland Park Roundabout, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 11:32.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 11:31.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 13:12.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 13:13.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
Holland Park Roundabout

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Holland Park Roundabout, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 15:27.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 12:09.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Maida Vale

UK Power Networks Eastern & London are proposing to carry out New service connection on Maida Vale, Maida Vale, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 20 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Jul 2024 at 11:02.

Thames Water logo
LONG TERM
Until
4 Oct 2024
Details
View Map
Share
Follow
District Road

Thames Water are carrying out Utility repair and maintenance works on District Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 15:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:15.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 26 Nov 2024
Details
View Map
Share
Follow
Brent Cross Roundabout West Bound Slip From North Circular

Transport for London (TfL) are proposing to carry out Highway improvement works on Brent Cross Roundabout West Bound Slip From North Circular, Hendon, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 September 2024 and could run through until 26 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 09:50.

Transport for London (TfL) logo
LONG TERM
Until
26 Nov 2024
Details
View Map
Share
Follow
Brent Cross Roundabout West Bound Slip From North Circular

Transport for London (TfL) are carrying out Highway improvement works on Brent Cross Roundabout West Bound Slip From North Circular, Hendon, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 2 September 2024 at 22:00 and could run through until 26 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 10:13.

London Borough Of Barnet logo
Until
27 Sep 2024
Details
View Map
Share
Follow
Lichfield Grove

London Borough Of Barnet are carrying out Highway improvement works on Lichfield Grove, Finchley, London.

These works are categorised as Major.

The works started on 3 September 2024 at 08:00 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Sep 2024 at 08:43.

HS2 logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, Maida Vale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 11 October 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 4 Sep 2024 at 11:30.

HS2 logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 11 October 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 4 Sep 2024 at 11:31.

HS2 logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 11 October 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 4 Sep 2024 at 10:32.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:09.

UK Power Networks Eastern & London logo
Until
28 Sep 2024
Details
View Map
Share
Follow
Porchester Gardens

UK Power Networks Eastern & London are carrying out Utility asset works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2024 at 08:56.

Electricity Network Company logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Albert Road

Electricity Network Company are carrying out Utility asset works on Albert Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 09:00 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Sep 2024 at 09:13.

Thames Water logo
Between
9 Sep and 7 Oct 2024
Details
View Map
Share
Follow
Mill Lane

Thames Water are proposing to carry out Utility asset works on Mill Lane, Fortune Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 13:46.

Thames Water logo
Until
7 Oct 2024
Details
View Map
Share
Follow
Mill Lane

Thames Water are carrying out Utility asset works on Mill Lane, Fortune Green, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 10:30 and could run through until 7 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 10:38.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep and 16 Oct 2024
Details
View Map
Share
Follow
Edgware Road Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road Flyover, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 09:50.

Transport for London (TfL) logo
Between
9 and 30 Sep 2024
Details
View Map
Share
Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound

Transport for London (TfL) were proposing to carry out Highway improvement works on Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 30 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:23.

Cadent Gas logo
LONG TERM
Between
9 Sep and 17 Nov 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Hendon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:52.

Cadent Gas logo
LONG TERM
Between
9 Sep and 17 Nov 2024
Details
View Map
Share
Follow
Perryfield Way

Cadent Gas are proposing to carry out Utility asset works on Perryfield Way, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:06.

Cadent Gas logo
Between
9 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Perryfield Way

Cadent Gas are proposing to carry out Utility asset works on Perryfield Way, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 09:16.

Cadent Gas logo
Between
9 Sep and 6 Oct 2024
Details
View Map
Share
Follow
Herbert Road

Cadent Gas are proposing to carry out Utility asset works on Herbert Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:59.

Cadent Gas logo
LONG TERM
Between
9 Sep and 17 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:52.

Electricity Network Company logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Booth Road

Electricity Network Company are carrying out Utility asset works on Booth Road, Colindale, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 9 Sep 2024 at 08:09.

Transport for London (TfL) logo
Between
10 Sep and 2 Oct 2024
Details
View Map
Share
St John's Wood Road

Transport for London (TfL) were proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2024 and run through until 2 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 12:55.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Rockley Road

Thames Water are carrying out Utility asset works on Rockley Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 10:00 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:16.

Transport for London (TfL) logo
LONG TERM
Between
11 Sep and 16 Oct 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Feb 2024 at 15:02.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Granville Road

Cadent Gas are carrying out Utility repair and maintenance works on Granville Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 10:17 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 18:06.

UK Power Networks Eastern & London logo
Between
13 and 30 Sep 2024
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 11:29.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Parr Road

Affinity Water are carrying out Utility repair and maintenance works on Parr Road, Stanmore.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2024 at 10:42 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 19:12.

Scottish Hydro Electric Power Dis logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Bromyard Avenue

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Bromyard Avenue, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:50 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Sep 2024 at 10:00.

UK Power Networks Eastern & London logo
Until
5 Oct 2024
Details
View Map
Share
Follow
Westbourne Grove

UK Power Networks Eastern & London are carrying out Utility asset works on Westbourne Grove, Bayswater, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 5 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2024 at 09:37.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Frampton Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Frampton Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Sep 2024 at 09:33.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Frampton Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Frampton Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 Sep 2024 at 11:51.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lisson Grove

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Aug 2024 at 17:09.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lisson Grove

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 Sep 2024 at 10:56.

UK Power Networks Eastern & London logo
Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Carlton Vale

UK Power Networks Eastern & London are proposing to carry out New service connection on Carlton Vale, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2024 at 15:30.

UK Power Networks Eastern & London logo
Between
16 and 27 Sep 2024
Details
View Map
Share
Carlton Vale

UK Power Networks Eastern & London were proposing to carry out New service connection on Carlton Vale, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 27 September 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2024 at 12:32.

Thames Water logo
Between
16 Sep and 4 Oct 2024
Details
View Map
Share
Follow
College Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 16:40.

Thames Water logo
Until
4 Oct 2024
Details
View Map
Share
Follow
College Crescent

Thames Water are carrying out Utility repair and maintenance works on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 09:16.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Iverson Road

Network Rail are proposing to carry out Works for Rail Purposes on Iverson Road, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 20 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Jun 2024 at 15:50.

Network Rail logo
Finishing
Today
Details
View Map
Share
Iverson Road

Network Rail were proposing to carry out Works for Rail Purposes on Iverson Road, West Hampstead, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 20 September 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Sep 2024 at 15:30.

UK Power Networks Eastern & London logo
Finishing
Wednesday
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 14:45.

UK Power Networks Eastern & London logo
Finishing
Wednesday
Details
View Map
Share
Follow
Canfield Gardens

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Canfield Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Aug 2024 at 15:22.

Cadent Gas logo
LONG TERM
Between
16 Sep and 22 Nov 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Hendon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:59.

Cadent Gas logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are carrying out Utility asset works on Station Road, Hendon, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:40 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:02.

Cadent Gas logo
Between
16 Sep and 9 Oct 2024
Details
View Map
Share
Follow
Perryfield Way

Cadent Gas are proposing to carry out Utility asset works on Perryfield Way, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:52.

Cadent Gas logo
Until
9 Oct 2024
Details
View Map
Share
Follow
Perryfield Way

Cadent Gas are carrying out Utility asset works on Perryfield Way, Colindale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:25 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:00.

Cadent Gas logo
Between
16 Sep and 11 Oct 2024
Details
View Map
Share
Follow
Herbert Road

Cadent Gas are proposing to carry out Utility asset works on Herbert Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:38.

Cadent Gas logo
Until
9 Oct 2024
Details
View Map
Share
Follow
Herbert Road

Cadent Gas are carrying out Utility asset works on Herbert Road, Colindale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:32 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:03.

Cadent Gas logo
LONG TERM
Between
16 Sep and 22 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:45.

Cadent Gas logo
LONG TERM
Between
16 Sep and 24 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:02.

Cadent Gas logo
LONG TERM
Between
16 Sep and 24 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 09:42.

Cadent Gas logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are carrying out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:51 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:04.

Between
16 and 27 Sep 2024
Details
View Map
Share
Pinner Park Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Park Avenue, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 27 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 Aug 2024 at 14:17.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Pinner Park Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Park Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:16.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Almond Way

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Almond Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:17.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Verwood Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Verwood Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:17.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Parkfield Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Crescent, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:17.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Parkfield Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2024 at 16:39.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Augustine Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Augustine Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2024 at 16:37.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Bancroft Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Bancroft Gardens, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:17.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Theobald Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Theobald Crescent, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:17.

UK Power Networks Eastern & London logo
Between
17 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2024 at 16:35.

Electricity Network Company logo
Between
17 Sep and 9 Oct 2024
Details
View Map
Share
Follow
Albert Road

Electricity Network Company are proposing to carry out Utility asset works on Albert Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Jul 2024 at 15:30.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 08:30.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Tempelhof Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2024 and run through until 20 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:25.

London Borough Of Barnet logo
Between
17 Sep and 12 Oct 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jun 2024 at 13:51.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Allison Road

Thames Water are carrying out Utility repair and maintenance works on Allison Road, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 09:26 and could run through until 20 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 07:40.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Allison Road

Thames Water were proposing to carry out Utility repair and maintenance works on Allison Road, Acton.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 September 2024 and run through until 24 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 07:41.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Alexander Street

Thames Water are carrying out Utility repair and maintenance works on Alexander Street, Bayswater, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 09:29 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 09:56.

UK Power Networks Eastern & London logo
Until
8 Oct 2024
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 11:00 and could run through until 8 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 11:48.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Valliere Road

Thames Water are carrying out Utility repair and maintenance works on Valliere Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 09:23 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:40.

UK Power Networks Eastern & London logo
Between
19 and 30 Sep 2024
Details
View Map
Share
Follow
Westbourne Grove

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Westbourne Grove, Bayswater, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2024 at 13:52.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Highview Road

Thames Water are carrying out Utility repair and maintenance works on Highview Road, West Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 12:10 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 14:58.

UK Power Networks Eastern & London logo
Between
19 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Granville Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Granville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jun 2024 at 08:58.

UK Power Networks Eastern & London logo
Until
2 Oct 2024
Details
View Map
Share
Follow
Granville Road

UK Power Networks Eastern & London are carrying out New service connection on Granville Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 13:45 and could run through until 2 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 13:52.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Belsize Park Gardens

Thames Water are carrying out Utility repair and maintenance works on Belsize Park Gardens, Belsize, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 06:33 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 09:53.

Transport for London (TfL) logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Cooper Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cooper Road, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 11:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2024 at 14:59.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Station Road

Affinity Water are carrying out Utility repair and maintenance works on Station Road, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 10:03 and could run through until 26 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Sep 2024 at 11:44.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 11:32.

UK Power Networks Eastern & London logo
Between
20 and 27 Sep 2024
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 10:07.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Brent Cross Roundabout West Bound Slip From Roundabout To North Circular

Transport for London (TfL) are proposing to carry out Highway improvement works on Brent Cross Roundabout West Bound Slip From Roundabout To North Circular, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 14:55.

London Borough Of Barnet logo
Between
22 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Pavilion Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Pavilion Way, Edgware.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2024 at 10:00.

Thames Water logo
Between
23 and 27 Sep 2024
Details
View Map
Share
Follow
Peel Street

Thames Water are proposing to carry out New service connection on Peel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jul 2024 at 10:37.

Thames Water logo
Between
23 and 28 Sep 2024
Details
View Map
Share
Follow
Lexden Road

Thames Water are proposing to carry out New service connection on Lexden Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 13:38.

London Borough Of Ealing logo
Between
23 and 27 Sep 2024
Details
View Map
Share
Follow
New Broadway

London Borough Of Ealing are proposing to carry out Utility asset works on New Broadway, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 13 Aug 2024 at 13:34.

London Borough Of Ealing logo
Between
23 and 27 Sep 2024
Details
View Map
Share
Follow
New Broadway

London Borough Of Ealing are proposing to carry out Utility asset works on New Broadway, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 13 Aug 2024 at 15:52.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
23 Sep and 4 Nov 2024
Details
View Map
Share
Follow
St Mark's Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on St Mark's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Sep 2024 at 12:17.

City Of Westminster logo
Between
23 Sep and 3 Oct 2024
Details
View Map
Share
Follow
Fourth Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Fourth Avenue, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:30.

City Of Westminster logo
Between
23 Sep and 3 Oct 2024
Details
View Map
Share
Follow
Fourth Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Fourth Avenue, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 19 Sep 2024 at 12:14.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Grittleton Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Grittleton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Affinity Water on 3 Sep 2024 at 16:33.

Cadent Gas logo
Between
23 Sep and 1 Oct 2024
Details
View Map
Share
Follow
Glenilla Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Glenilla Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 1 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jun 2024 at 12:34.

Cadent Gas logo
Between
23 Sep and 1 Oct 2024
Details
View Map
Share
Follow
Glenilla Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Glenilla Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 1 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 15:36.

Transport for London (TfL) logo
Between
23 and 27 Sep 2024
Details
View Map
Share
Follow
Lymington Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lymington Road, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 07:42.

Transport for London (TfL) logo
Between
23 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 14:24.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Pinner Park Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Park Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:42.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Almond Way

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Almond Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:40.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Verwood Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Verwood Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:29.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Tudor Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Affinity Water on 16 Jul 2024 at 08:37.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Parkfield Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Crescent, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:25.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Parkfield Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:21.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Augustine Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Augustine Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:14.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Bancroft Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Bancroft Gardens, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:12.

London Borough Of Barnet logo
Between
23 and 30 Sep 2024
Details
View Map
Share
Follow
Nether Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Nether Street, Ballards Lane To Dollis Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2024 at 13:52.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Theobald Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Theobald Crescent, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 09:42.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Sinclair Road

Thames Water are proposing to carry out Utility repair and maintenance works on Sinclair Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 26 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 11:52.

Transport for London (TfL) logo
Between
24 Sep and 8 Oct 2024
Details
View Map
Share
Follow
Boscobel Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Boscobel Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 8 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 12:27.

Transport for London (TfL) logo
Between
24 Sep and 8 Oct 2024
Details
View Map
Share
Follow
Frampton Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Frampton Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 8 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 12:22.

Transport for London (TfL) logo
Between
24 Sep and 8 Oct 2024
Details
View Map
Share
Follow
Orchardson Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchardson Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 8 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 12:16.

Transport for London (TfL) logo
Between
24 Sep and 8 Oct 2024
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 8 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 12:14.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Hendon Way Off Slip North Bound To Brent Cross Roundabout

Transport for London (TfL) were proposing to carry out Highway improvement works on Hendon Way Off Slip North Bound To Brent Cross Roundabout, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2024 and run through until 26 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:25.

London Borough Of Barnet logo
Finishing
Thursday
Details
View Map
Share
Follow
Woodfield Avenue

London Borough Of Barnet are proposing to carry out roadworks on Woodfield Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Sep 2024 at 13:21.

London Borough Of Barnet logo
Between
24 and 27 Sep 2024
Details
View Map
Share
Follow
Varley Parade Service Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Varley Parade Service Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 18 Sep 2024 at 13:21.

Thames Water logo
Between
25 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Poplar Grove

Thames Water are proposing to carry out New service connection on Poplar Grove, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 10:38.

Thames Water logo
Between
25 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Poplar Grove

Thames Water are proposing to carry out New service connection on Poplar Grove, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:16.

UK Power Networks Eastern & London logo
Between
25 Sep and 7 Oct 2024
Details
View Map
Share
Follow
Bridstow Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bridstow Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Aug 2024 at 15:28.

G2 Energy IDNO logo
Between
25 Sep and 24 Oct 2024
Details
View Map
Share
Follow
Old Oak Lane

G2 Energy IDNO are proposing to carry out Utility asset works on Old Oak Lane, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 28 Aug 2024 at 11:24.

Transport for London (TfL) logo
Between
25 and 27 Sep 2024
Details
View Map
Share
Renters Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Renters Avenue, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2024 and run through until 27 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:24.

UK Power Networks Eastern & London logo
Between
26 Sep and 19 Oct 2024
Details
View Map
Share
Follow
Eton Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Eton Avenue, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 19 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2024 at 15:42.

Transport for London (TfL) logo
Between
26 and 28 Sep 2024
Details
View Map
Share
Follow
Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout, Brent Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 28 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 14:55.

Transport for London (TfL) logo
Between
26 and 28 Sep 2024
Details
View Map
Share
Follow
Renters Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Renters Avenue, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 28 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 09:50.

Transport for London (TfL) logo
Between
27 Sep and 3 Oct 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Section 58 on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2024 at 09:55.

Transport for London (TfL) logo
Between
27 Sep and 3 Oct 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Section 58 on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 12:14.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 Sep and 22 Nov 2024
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Jun 2024 at 11:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 Sep and 4 Nov 2024
Details
View Map
Share
Follow
Canfield Gardens

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Canfield Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Sep 2024 at 07:32.

Transport for London (TfL) logo
Between
27 Sep and 1 Oct 2024
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 1 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2024 at 11:32.

Thames Water logo
Between
28 Sep and 13 Oct 2024
Details
View Map
Share
Coronation Road

Thames Water were proposing to carry out New service connection on Coronation Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2024 and run through until 13 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 09:14.

Affinity Water logo
Between
28 Sep and 1 Oct 2024
Details
View Map
Share
Follow
South Way

Affinity Water are proposing to carry out Permanent reinstatement on South Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2024 and could run through until 1 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Jul 2024 at 07:37.

Transport for London (TfL) logo
Between
30 Sep and 14 Oct 2024
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 14 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2024 at 16:24.

UK Power Networks Eastern & London logo
Between
30 Sep and 14 Oct 2024
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 14 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 11:33.

Thames Water logo
LONG TERM
Between
30 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Holly Bush Hill

Thames Water are proposing to carry out Utility asset works on Holly Bush Hill, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 10:14.

Thames Water logo
Between
30 Sep and 8 Oct 2024
Details
View Map
Share
Pennine Drive

Thames Water were proposing to carry out New service connection on Pennine Drive, Cricklewood, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 8 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 09:32.

Thames Water logo
Between
30 Sep and 8 Oct 2024
Details
View Map
Share
Follow
Pennine Drive

Thames Water are proposing to carry out New service connection on Pennine Drive, Cricklewood, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 8 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 09:30.

Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Rayners Lane

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Rayners Lane, Rayners Lane.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 2 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2024 at 08:53.

Between
30 Sep and 3 Oct 2024
Details
View Map
Share
Follow
West Drive

London Borough Of Harrow are proposing to carry out Highway improvement works on West Drive, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Aug 2024 at 08:48.

Between
30 Sep and 3 Oct 2024
Details
View Map
Share
Follow
West Drive

London Borough Of Harrow are proposing to carry out Highway improvement works on West Drive, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 25 Jul 2024 at 14:21.

London Borough Of Ealing logo
Between
1 and 3 Oct 2024
Details
View Map
Share
Follow
York Road

London Borough Of Ealing are proposing to carry out Highway improvement works on York Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 11 Jul 2024 at 13:58.

UK Power Networks Eastern & London logo
Between
1 and 28 Oct 2024
Details
View Map
Share
Follow
Kensington Gardens Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Kensington Gardens Square, Lancaster Gate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 12:42.

UK Power Networks Eastern & London logo
Between
1 and 18 Oct 2024
Details
View Map
Share
Kensington Gardens Square

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Kensington Gardens Square, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2024 and run through until 18 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Aug 2024 at 12:51.

UK Power Networks Eastern & London logo
Between
1 and 6 Oct 2024
Details
View Map
Share
Follow
Fairhazel Gardens

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fairhazel Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 6 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2024 at 05:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Goldhurst Terrace

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Goldhurst Terrace, Swiss Cottage, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2024 at 15:06.

Transport for London (TfL) logo
Between
1 and 6 Oct 2024
Details
View Map
Share
Follow
Edgware Road Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road Flyover, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 6 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2024 at 11:17.

Affinity Water logo
Between
1 and 3 Oct 2024
Details
View Map
Share
Masons Avenue

Affinity Water were proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2024 and run through until 3 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Aug 2024 at 13:08.

G2 Energy IDNO logo
Between
2 and 31 Oct 2024
Details
View Map
Share
Follow
Victoria Road

G2 Energy IDNO are proposing to carry out Utility asset works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 28 Aug 2024 at 11:36.

Transport for London (TfL) logo
Between
3 and 31 Oct 2024
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out roadworks on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 09:44.

Between
3 and 5 Oct 2024
Details
View Map
Share
Follow
Gordon Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Gordon Avenue, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 5 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:42.

Thames Water logo
Between
4 and 7 Oct 2024
Details
View Map
Share
Finchley Road

Thames Water were proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 7 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:19.

HS2 logo
Between
6 and 24 Oct 2024
Details
View Map
Share
Follow
Western Avenue

HS2 are proposing to carry out Utility asset works on Western Avenue, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 9 Sep 2024 at 12:21.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 7 Dec 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 13:37.

Thames Water logo
Between
7 and 14 Oct 2024
Details
View Map
Share
Follow
Rockley Road

Thames Water are proposing to carry out Utility asset works on Rockley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 14 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 12:08.

Cadent Gas logo
LONG TERM
Between
7 Oct and 19 Nov 2024
Details
View Map
Share
Boscombe Road

Cadent Gas were proposing to carry out Utility asset works on Boscombe Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 19 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 10:45.

Cadent Gas logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Northfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Northfield Avenue, West Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 15:24.

Cadent Gas logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Northfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Northfield Avenue, West Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 00:10.

Thames Water logo
Between
7 and 12 Oct 2024
Details
View Map
Share
Follow
Grove Road

Thames Water are proposing to carry out New service connection on Grove Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:08.

Thames Water logo
Between
7 and 15 Oct 2024
Details
View Map
Share
Follow
Queensway

Thames Water are proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2024 at 11:48.

Thames Water logo
Between
7 and 10 Oct 2024
Details
View Map
Share
Talbot Road

Thames Water were proposing to carry out New service connection on Talbot Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 10 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 13:10.

Thames Water logo
Between
7 and 10 Oct 2024
Details
View Map
Share
Follow
Talbot Road

Thames Water are proposing to carry out New service connection on Talbot Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 13:12.

G2 Energy IDNO logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Wales Farm Road

G2 Energy IDNO are proposing to carry out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 28 Aug 2024 at 11:36.

Virgin Media logo
Between
7 and 9 Oct 2024
Details
View Map
Share
Barlby Road

Virgin Media were proposing to carry out Utility asset works on Barlby Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 9 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Jul 2024 at 15:14.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Oct and 10 Nov 2024
Details
View Map
Share
Follow
Harrow Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Harrow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2024 at 08:57.

Virgin Media logo
Between
7 and 9 Oct 2024
Details
View Map
Share
Follow
Kingsgate Road

Virgin Media are proposing to carry out Utility asset works on Kingsgate Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 9 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Jul 2024 at 09:37.

Virgin Media logo
Between
7 and 9 Oct 2024
Details
View Map
Share
Follow
Kingsgate Road

Virgin Media are proposing to carry out Utility asset works on Kingsgate Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 9 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 17 Sep 2024 at 08:40.

UK Power Networks Eastern & London logo
Between
7 and 10 Oct 2024
Details
View Map
Share
Follow
Priory Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Priory Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 10 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2024 at 05:44.

Thames Water logo
Between
7 and 20 Oct 2024
Details
View Map
Share
Follow
Hawthorn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jul 2024 at 10:01.

Thames Water logo
Between
7 and 20 Oct 2024
Details
View Map
Share
Follow
Hawthorn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 21:00.

Transport for London (TfL) logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Follow
Arkwright Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Arkwright Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:33.

Thames Water logo
Between
7 and 20 Oct 2024
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Aug 2024 at 09:12.

London Borough Of Barnet logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Follow
Brampton Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Brampton Lane, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 Sep 2024 at 12:50.

London Borough Of Barnet logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Flight Approach

London Borough Of Barnet are proposing to carry out Highway improvement works on Flight Approach, Colindale, London.

These works are categorised as Major.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Aug 2024 at 14:09.

London Borough Of Barnet logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Flight Approach

London Borough Of Barnet are proposing to carry out Highway improvement works on Flight Approach, Colindale, London.

These works are categorised as Major.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Aug 2024 at 09:47.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 17:02.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 15:10.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 14:52.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 12:07.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 14:53.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 12:07.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 14:51.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 12:07.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 14:53.

Transport for London (TfL) logo
Between
7 and 25 Oct 2024
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 12:32.

Thames Water logo
Between
8 and 12 Oct 2024
Details
View Map
Share
Follow
Cavendish Avenue

Thames Water are proposing to carry out New service connection on Cavendish Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jul 2024 at 10:28.

UK Power Networks Eastern & London logo
Between
8 and 18 Oct 2024
Details
View Map
Share
Follow
Crossfield Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crossfield Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2024 at 14:14.

UK Power Networks Eastern & London logo
Between
9 and 23 Oct 2024
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 16:20.

Between
9 and 11 Oct 2024
Details
View Map
Share
Follow
Norwood Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Norwood Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 08:51.

Between
10 and 12 Oct 2024
Details
View Map
Share
Follow
Eastcote Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Eastcote Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

National Highways logo
Between
11 and 14 Oct 2024
Details
View Map
Share
Great West Road

National Highways were proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 October 2024 and run through until 14 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Aug 2024 at 14:44.

Transport for London (TfL) logo
Between
13 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 11:50.

Transport for London (TfL) logo
Between
13 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 11:51.

Transport for London (TfL) logo
Between
13 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 11:09.

Transport for London (TfL) logo
Between
13 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2024 at 12:37.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 25 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 14:56.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 25 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 11:50.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 25 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 08:14.

Thames Water logo
Between
14 and 19 Oct 2024
Details
View Map
Share
Follow
Lexden Road

Thames Water are proposing to carry out New service connection on Lexden Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 19 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 13:54.

G2 Energy IDNO logo
Between
14 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Leamington Park

G2 Energy IDNO are proposing to carry out Utility asset works on Leamington Park, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 28 Aug 2024 at 11:25.

Thames Water logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 10:35.

London Borough Of Camden logo
LONG TERM
Between
14 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Hermit Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Hermit Place, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Sep 2024 at 08:40.

Affinity Water logo
Between
14 and 25 Oct 2024
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Wembley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 12 Jul 2024 at 09:05.

Affinity Water logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Follow
St James Gardens

Affinity Water are proposing to carry out Utility asset works on St James Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Jul 2024 at 14:41.

UK Power Networks Eastern & London logo
Between
14 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Lancaster Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 07:21.

UK Power Networks Eastern & London logo
Between
14 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Buckland Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Buckland Crescent, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 11:51.

Transport for London (TfL) logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
Lymington Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lymington Road, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 08:29.

Thames Water logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
Crediton Hill

Thames Water are proposing to carry out New service connection on Crediton Hill, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 08:45.

Thames Water logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
Crediton Hill

Thames Water are proposing to carry out New service connection on Crediton Hill, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:45.

Thames Water logo
Between
14 and 22 Oct 2024
Details
View Map
Share
Follow
Pennine Drive

Thames Water are proposing to carry out New service connection on Pennine Drive, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 22 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jul 2024 at 12:30.

Thames Water logo
Between
14 and 22 Oct 2024
Details
View Map
Share
Pennine Drive

Thames Water were proposing to carry out New service connection on Pennine Drive, Cricklewood, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 22 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 12:18.

BT logo
Between
14 and 19 Oct 2024
Details
View Map
Share
Follow
Highview Gardens

BT are proposing to carry out Utility asset works on Highview Gardens, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 19 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Sep 2024 at 13:50.

London Borough Of Barnet logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Heybourne Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Heybourne Crescent, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 08:38.

London Borough Of Barnet logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Clayton Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Clayton Field, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2024 at 14:03.

London Borough Of Barnet logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Clayton Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Clayton Field, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2024 at 14:03.

Between
15 and 17 Oct 2024
Details
View Map
Share
Follow
Peterborough Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Jul 2024 at 09:10.

Between
17 and 19 Oct 2024
Details
View Map
Share
Follow
Pinner Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Pinner Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 19 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 29 Jul 2024 at 15:24.

UK Power Networks Eastern & London logo
Between
18 Oct and 5 Nov 2024
Details
View Map
Share
Follow
Adamson Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adamson Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2024 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jul 2024 at 15:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Hale Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Hale Lane, Mill Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jul 2024 at 09:30.

Thames Water logo
Between
21 and 26 Oct 2024
Details
View Map
Share
Sulgrave Road

Thames Water were proposing to carry out New service connection on Sulgrave Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 26 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 12:52.

Thames Water logo
Between
21 and 26 Oct 2024
Details
View Map
Share
Poplar Grove

Thames Water were proposing to carry out New service connection on Poplar Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 26 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 13:11.

Virgin Media logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Kensington Church Street

Virgin Media are proposing to carry out Utility asset works on Kensington Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Jul 2024 at 07:15.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Sep 2024 at 13:58.

Thames Water logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Broadley Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 25 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 13:44.

Thames Water logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Aug 2024 at 13:09.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:54.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

Thames Water logo
Between
21 and 24 Oct 2024
Details
View Map
Share
Follow
Well Walk

Thames Water are proposing to carry out Disconnection or alteration of supply on Well Walk, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Aug 2024 at 15:56.

Thames Water logo
Between
21 and 24 Oct 2024
Details
View Map
Share
Follow
Well Walk

Thames Water are proposing to carry out Disconnection or alteration of supply on Well Walk, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 11:50.

Thames Water logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Parliament Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Parliament Hill, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jul 2024 at 14:04.

Thames Water logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Parliament Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Parliament Hill, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 09:17.

Between
21 and 26 Oct 2024
Details
View Map
Share
Follow
Park Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Park Lane, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 11:16.

Between
21 and 24 Oct 2024
Details
View Map
Share
Follow
Peterborough Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:27.

Between
21 and 24 Oct 2024
Details
View Map
Share
Follow
Peterborough Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Aug 2024 at 14:52.

UK Power Networks Eastern & London logo
Between
21 and 28 Oct 2024
Details
View Map
Share
Follow
Hermitage Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Hermitage Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Aug 2024 at 09:21.

London Borough Of Barnet logo
Between
21 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Deans Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Deans Lane, Mill Hill, Edgware.

These works are categorised as Major.

The works will start on or after 21 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jun 2024 at 09:36.

London Borough Of Barnet logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Daws Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Daws Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2024 at 08:51.

London Borough Of Barnet logo
Between
21 and 27 Oct 2024
Details
View Map
Share
Follow
Marsh Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Marsh Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 27 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2024 at 09:08.

London Borough Of Barnet logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Highwood Hill

London Borough Of Barnet are proposing to carry out Highway improvement works on Highwood Hill, Marsh Lane To Totteridge Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2024 at 08:37.

London Borough Of Barnet logo
Between
22 and 25 Oct 2024
Details
View Map
Share
Follow
Daws Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Daws Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jun 2024 at 09:21.

UK Power Networks Eastern & London logo
Between
23 and 29 Oct 2024
Details
View Map
Share
Follow
Kensington Place

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 29 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2024 at 08:53.

Between
23 and 25 Oct 2024
Details
View Map
Share
Follow
Wargrave Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Wargrave Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

Between
24 and 26 Oct 2024
Details
View Map
Share
Follow
Whitby Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Whitby Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

UK Power Networks Eastern & London logo
Between
25 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:16.

Thames Water logo
Between
26 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Chiswick High Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 13:42.

London Borough Of Ealing logo
Between
26 and 28 Oct 2024
Details
View Map
Share
Follow
Aintree Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Aintree Road, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 16 Sep 2024 at 12:36.

Thames Water logo
Between
26 Oct and 3 Nov 2024
Details
View Map
Share
Claremont Road

Thames Water were proposing to carry out Statutory Infrastructure Works on Claremont Road, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 3 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2024 at 16:07.

Thames Water logo
Between
26 Oct and 3 Nov 2024
Details
View Map
Share
Claremont Road

Thames Water were proposing to carry out Statutory Infrastructure Works on Claremont Road, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 3 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 15:59.

Thames Water logo
Between
26 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 13:14.

Thames Water logo
Between
28 Oct and 4 Nov 2024
Details
View Map
Share
Enfield Road

Thames Water were proposing to carry out New service connection on Enfield Road, Acton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 4 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:26.

Thames Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Shepherd's Bush Green

Thames Water were proposing to carry out Utility repair and maintenance works on Shepherd's Bush Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 30 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 15:40.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct 2024 and 20 Mar 2026
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 10:17.

UK Power Networks Eastern & London logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Kensington Place

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2024 at 09:59.

Cadent Gas logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Leopold Road

Cadent Gas are proposing to carry out Utility asset works on Leopold Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 16:30.

Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Rootes Drive

Last Mile Gas are proposing to carry out Utility repair and maintenance works on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 13 Sep 2024 at 15:56.

Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Rootes Drive

Last Mile Gas are proposing to carry out Utility repair and maintenance works on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 16 Sep 2024 at 12:39.

City Of Westminster logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Elgin Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 Aug 2024 at 16:17.

London Borough Of Camden logo
LONG TERM
Between
28 Oct 2024 and 12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.

London Borough Of Barnet logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Jul 2024 at 17:18.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
North End Way

Thames Water are proposing to carry out Utility repair and maintenance works on North End Way, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2024 at 12:53.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Golders Manor Drive

Thames Water were proposing to carry out New service connection on Golders Manor Drive, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 09:00.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Golders Manor Drive

Thames Water are proposing to carry out New service connection on Golders Manor Drive, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Aug 2024 at 10:07.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Golders Manor Drive

Thames Water were proposing to carry out New service connection on Golders Manor Drive, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 13:13.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Golders Manor Drive

Thames Water are proposing to carry out New service connection on Golders Manor Drive, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 08:12.

Affinity Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Masons Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 08:10.

Affinity Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Masons Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Sep 2024 at 14:36.

Virgin Media logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Aerodrome Road

Virgin Media are proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 10:22.

Virgin Media logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Aerodrome Road

Virgin Media are proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 19 Sep 2024 at 12:24.

Cornerstone Telecommunications Infrastructure logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Weston Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 30 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 17 Sep 2024 at 10:25.

Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
College Hill Road

London Borough Of Harrow are proposing to carry out Highway improvement works on College Hill Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:07.

Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Weald Rise

London Borough Of Harrow are proposing to carry out Highway improvement works on Weald Rise, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:43.

Between
28 and 31 Oct 2024
Details
View Map
Share
Weald Rise

London Borough Of Harrow were proposing to carry out Highway improvement works on Weald Rise, Harrow Weald.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Aug 2024 at 14:54.

Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Weald Rise

London Borough Of Harrow are proposing to carry out Highway improvement works on Weald Rise, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 29 Aug 2024 at 16:30.

Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Brookshill

London Borough Of Harrow are proposing to carry out Highway improvement works on Brookshill, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:07.

London Borough Of Barnet logo
Between
28 and 29 Oct 2024
Details
View Map
Share
Follow
Prow Restricted By-way Burtonhole Lane To Partingdale Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Prow Restricted By-way Burtonhole Lane To Partingdale Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Jul 2024 at 17:25.

London Borough Of Barnet logo
Between
28 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Footpath From Hale Grove Gardens To Glendor Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Footpath From Hale Grove Gardens To Glendor Gardens, Mill Hill, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 May 2024 at 06:40.

London Borough Of Barnet logo
Between
28 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Footpath From Hale Grove Gardens To Glendor Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Footpath From Hale Grove Gardens To Glendor Gardens, Mill Hill, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Aug 2024 at 10:35.

London Borough Of Barnet logo
Between
28 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Footpath From Hale Grove Gardens To Glendor Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Footpath From Hale Grove Gardens To Glendor Gardens, Mill Hill, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Aug 2024 at 10:12.

London Borough Of Barnet logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Marsh Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Marsh Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Jul 2024 at 17:31.

Electricity Network Company logo
LONG TERM
Between
29 Oct 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Booth Road

Electricity Network Company are proposing to carry out Utility asset works on Booth Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 6 Aug 2024 at 13:20.

London Borough Of Hammersmith & Fulham logo
Between
30 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Brook Green

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Brook Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 2 Aug 2024 at 09:07.

Between
31 Oct and 3 Nov 2024
Details
View Map
Share
Follow
College Hill Road

London Borough Of Harrow are proposing to carry out Highway improvement works on College Hill Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:08.

Thames Water logo
Between
1 and 3 Nov 2024
Details
View Map
Share
Follow
Seward Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seward Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 14:36.

Thames Water logo
Between
1 and 3 Nov 2024
Details
View Map
Share
Follow
Allison Road

Thames Water are proposing to carry out Utility repair and maintenance works on Allison Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:50.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Field End Road

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Field End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Aug 2024 at 15:54.

London Borough Of Barnet logo
Between
2 and 8 Nov 2024
Details
View Map
Share
Follow
Fairmead Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Fairmead Crescent, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2024 at 12:56.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Green Man Lane

Thames Water were proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 15:50.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Green Man Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 08:59.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Green Man Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:00.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Thames Water are proposing to carry out Utility asset works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 09:51.

Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Rootes Drive

Last Mile Gas are proposing to carry out Utility repair and maintenance works on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 16 Aug 2024 at 10:52.

Transport for London (TfL) logo
Between
4 and 16 Nov 2024
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2024 at 14:53.

Virgin Media logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Standard Road

Virgin Media were proposing to carry out Utility asset works on Standard Road, Park Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Jul 2024 at 15:32.

Virgin Media logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Standard Road

Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 Aug 2024 at 15:39.

London Borough Of Ealing logo
LONG TERM
Between
4 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2024 at 14:49.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Rusland Park Road

BT are proposing to carry out Utility repair and maintenance works on Rusland Park Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 19 Sep 2024 at 09:48.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Marlborough Hill

BT are proposing to carry out Utility repair and maintenance works on Marlborough Hill, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 19 Sep 2024 at 09:47.

Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Belmont Circle

London Borough Of Harrow are proposing to carry out Highway improvement works on Belmont Circle, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:11.

Thames Water logo
Between
5 and 7 Nov 2024
Details
View Map
Share
Belsize Road

Thames Water were proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 7 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:23.

Murphy Power Distribution logo
Between
5 and 22 Nov 2024
Details
View Map
Share
Varley Parade Service Road

Murphy Power Distribution were proposing to carry out New service connection on Varley Parade Service Road, Colindale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 12 Aug 2024 at 09:20.

London Borough Of Barnet logo
Between
5 and 9 Nov 2024
Details
View Map
Share
Follow
Southover

London Borough Of Barnet are proposing to carry out Highway improvement works on Southover, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jun 2024 at 10:14.

London Borough Of Barnet logo
Between
5 and 15 Nov 2024
Details
View Map
Share
Follow
Lilley Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Lilley Lane, Manor Close To Hale Grove Gardens, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 5 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 May 2024 at 06:40.

London Borough Of Barnet logo
Between
5 and 15 Nov 2024
Details
View Map
Share
Follow
Lilley Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Lilley Lane, Manor Close To Hale Grove Gardens, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 5 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Aug 2024 at 10:12.

Thames Water logo
Between
6 and 30 Nov 2024
Details
View Map
Share
Follow
Connaught Road

Thames Water are proposing to carry out Utility asset works on Connaught Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 17:53.

Between
6 and 8 Nov 2024
Details
View Map
Share
Follow
Sudbury Hill

London Borough Of Harrow are proposing to carry out Highway improvement works on Sudbury Hill, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:21.

Thames Water logo
Between
7 and 12 Nov 2024
Details
View Map
Share
Albion Place

Thames Water were proposing to carry out New service connection on Albion Place, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 November 2024 and run through until 12 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 11:25.

Between
7 and 9 Nov 2024
Details
View Map
Share
Follow
Sudbury Hill

London Borough Of Harrow are proposing to carry out Highway improvement works on Sudbury Hill, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 27 Aug 2024 at 09:58.

London Borough Of Barnet logo
LONG TERM
Between
7 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2024 at 10:56.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 13:18.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 11:07.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:11.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:05.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:14.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Follow
Kildare Gardens

Thames Water are proposing to carry out New service connection on Kildare Gardens, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 13:26.

Thames Water logo
Between
11 and 16 Nov 2024
Details
View Map
Share
Follow
Croxley Road

Thames Water are proposing to carry out New service connection on Croxley Road, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 18:21.

UK Power Networks Eastern & London logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2024 at 09:26.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
St Albans Lane

Thames Water are proposing to carry out New service connection on St Albans Lane, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Aug 2024 at 08:43.

Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Chester Drive

London Borough Of Harrow are proposing to carry out Highway improvement works on Chester Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Aug 2024 at 23:22.

London Borough Of Barnet logo
Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
Flight Approach

London Borough Of Barnet are proposing to carry out Highway improvement works on Flight Approach, Colindale, London.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Jul 2024 at 12:10.

Thames Water logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Follow
Quex Road

Thames Water are proposing to carry out Utility repair and maintenance works on Quex Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 13:20.

London Borough Of Barnet logo
Between
12 and 30 Nov 2024
Details
View Map
Share
Follow
Wessex Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Wessex Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 11 Jul 2024 at 14:30.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Adpar Street

Thames Water are proposing to carry out New service connection on Adpar Street, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 11:28.

Murphy Power Distribution logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 21 Aug 2024 at 16:25.

Murphy Power Distribution logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 29 Aug 2024 at 15:22.

Thames Water logo
Between
18 and 28 Nov 2024
Details
View Map
Share
Follow
Andover Place

Thames Water are proposing to carry out New service connection on Andover Place, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:01.

Affinity Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Sussex Crescent

Affinity Water were proposing to carry out Utility repair and maintenance works on Sussex Crescent, Northolt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 21 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Aug 2024 at 09:51.

BT logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Winnington Road

BT are proposing to carry out Utility asset works on Winnington Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2024 at 16:07.

UK Power Networks Eastern & London logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Burnt Oak Broadway

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 15:44.

UK Power Networks Eastern & London logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Burnt Oak Broadway

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:02.

UK Power Networks Eastern & London logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Burnt Oak Broadway

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2024 at 08:47.

City Of Westminster logo
Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Gloucester Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2024 at 17:46.

BT logo
Between
21 and 25 Nov 2024
Details
View Map
Share
Follow
Woodheyes Road

BT are proposing to carry out Utility asset works on Woodheyes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Aug 2024 at 11:55.

UK Power Networks Eastern & London logo
Between
22 Nov and 17 Dec 2024
Details
View Map
Share
High Street

UK Power Networks Eastern & London were proposing to carry out New service connection on High Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2024 at 17:23.

Thames Water logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Enfield Road

Thames Water are proposing to carry out New service connection on Enfield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:04.

Thames Water logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Enfield Road

Thames Water are proposing to carry out New service connection on Enfield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 14:29.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 12:58.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Oxford Gardens

Thames Water are proposing to carry out New service connection on Oxford Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:48.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Oxford Gardens

Thames Water are proposing to carry out New service connection on Oxford Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 11:22.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Hamilton Terrace

Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 15:00.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Eliot Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Eliot Drive, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Manor Park Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Manor Park Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Burnt Oak Broadway

London Borough Of Barnet were proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 17 January 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 13:41.

Affinity Water logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Parkfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Parkfield Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Sep 2024 at 10:19.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 16:05.

London Borough Of Barnet logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Great Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Great Field, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 13:52.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
The Chase

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Chase, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:44.

UK Power Networks Eastern & London logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Wood End Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wood End Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2024 at 09:39.

Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:49.

Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Elmcroft Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Elmcroft Crescent, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

City Of Westminster logo
Between
27 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Senior Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Senior Street, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:36.

City Of Westminster logo
Between
27 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Lord Hills Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lord Hills Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:41.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Sandringham Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Sandringham Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:50.

Between
27 and 29 Nov 2024
Details
View Map
Share
Alexandra Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Alexandra Avenue, Rayners Lane.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:27.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Exeter Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Exeter Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:44.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Eastcote Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Eastcote Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Coles Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Coles Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Capthorne Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Capthorne Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:46.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Alfriston Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Alfriston Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Broadcroft Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Broadcroft Avenue, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Aug 2024 at 09:41.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Wolverton Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Wolverton Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Hathaway Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Hathaway Close, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

Between
28 and 30 Nov 2024
Details
View Map
Share
Follow
Queensbury Circle Parade

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:25.

Between
28 and 30 Nov 2024
Details
View Map
Share
Follow
Queensbury Circle Parade

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2024 at 09:38.

Between
28 Nov and 2 Dec 2024
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Ridgeway, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.

London Borough Of Barnet logo
Between
28 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Fairmead Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Fairmead Crescent, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2024 at 12:39.

Thames Water logo
Between
29 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Station Road, The Hale, Edgware.

These works are categorised as Major.

The works will start on or after 29 November 2024 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 14:14.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bulwer Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bulwer Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Electricity Network Company logo
Between
2 and 25 Dec 2024
Details
View Map
Share
Follow
Fernhead Road

Electricity Network Company are proposing to carry out Utility asset works on Fernhead Road, Harrow Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 13 Sep 2024 at 14:09.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Sep 2024 at 06:16.

UK Power Networks Eastern & London logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Monks Park

UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:32.

Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Fallowfield

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Jul 2024 at 09:08.

Between
2 and 5 Dec 2024
Details
View Map
Share
Fallowfield

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:24.

Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Fallowfield

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Sep 2024 at 15:50.

Affinity Water logo
Between
3 and 11 Dec 2024
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Sep 2024 at 15:25.

City Of Westminster logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.

Between
4 and 6 Dec 2024
Details
View Map
Share
Naresby Fold

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:42.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Naresby Fold

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 12 Sep 2024 at 11:49.

City Of Westminster logo
Between
6 and 9 Dec 2024
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Sep 2024 at 14:49.

Transport for London (TfL) logo
LONG TERM
Between
9 Dec 2024 and 2 May 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Thames Water are proposing to carry out New service connection on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 09:20.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Adelaide Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:02.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Eton Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Eton Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:05.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Nassington Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Nassington Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.

London Borough Of Camden logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Well Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Well Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.

London Borough Of Camden logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Grove Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grove Place, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hampstead Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Hampstead Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:31.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Varley Parade Service Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Varley Parade Service Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:38.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Parkfield Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Gardens, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

London Borough Of Barnet logo
LONG TERM
Between
9 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2024 at 11:02.

Cornerstone Telecommunications Infrastructure logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Weston Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 12:09.

Affinity Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 12 Sep 2024 at 11:46.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Uphill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 14:45.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Uphill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 14:52.

London Borough Of Camden logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Fortune Green Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Fortune Green Road, Fortune Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:08.

London Borough Of Barnet logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Dollis Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2024 at 17:25.

City Of Westminster logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Delamere Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Sep 2024 at 15:24.

Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 22 Dec 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:48.

Between
11 and 16 Dec 2024
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Havelock Place

London Borough Of Harrow are proposing to carry out roadworks on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 17:16.

Affinity Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Langland Crescent

Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Sep 2024 at 14:48.

Transport for London (TfL) logo
LONG TERM
Between
12 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Affinity Water logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Aug 2024 at 11:48.

BT logo
Between
13 and 17 Dec 2024
Details
View Map
Share
Follow
Lower Terrace

BT are proposing to carry out Utility asset works on Lower Terrace, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 13 Sep 2024 at 10:41.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:28.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out New service connection on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 10:24.

UK Power Networks Eastern & London logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Aylmer Parade

UK Power Networks Eastern & London are proposing to carry out New service connection on Aylmer Parade, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 11:13.


Roadworks Map near to Barnhill Road, WEMBLEY, HA9 9BX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 Sep 2024 01:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Barnhill Road, WEMBLEY, HA9 9BX (24 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Brent logo
ST DAVIDS CLOSE 
(0.2 miles)
London Borough Of Brent
Remedial works - Footway - No carriageway incursion
Planned
Scheduled: 20 Sep 2024
0.2
Details
Share
Follow
2
Cadent Gas logo
EMERGENCY
  
CHALKHILL ROAD 
(0.2 miles)
Cadent Gas
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 9 Sep 2024 14:00
(Scheduled: 9 Sep 2024 - 24 Sep 2024)
0.2
Details
Share
Follow
3
London Borough Of Brent logo
MAJOR
  
THE RISE 
(0.3 miles)
London Borough Of Brent
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 5 Aug 2024 08:00
(Scheduled: 5 Aug 2024 - 18 Oct 2024)
0.3
Details
Share
Follow
4
Cadent Gas logo
CAREY WAY 
(0.5 miles)
Cadent Gas
Disconnection or alteration of supply - Footway - Some carriageway incursion
In Progress
Since: 17 Sep 2024 16:00
(Scheduled: 16 Sep 2024 - 23 Sep 2024)
0.5
Details
Share
Follow
5
Cadent Gas logo
FOURTH WAY 
(0.5 miles)
Cadent Gas
Disconnection or alteration of supply - Footway - Some carriageway incursion
In Progress
Since: 17 Sep 2024 15:53
(Scheduled: 16 Sep 2024 - 23 Sep 2024)
0.5
Details
Share
Follow
6
FIFTH WAY 
(0.5 miles)
Last Mile Electricity (formerly Global Utility Connections)
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 11 Sep 2024 - 20 Sep 2024)
0.5
Details
Share
7
Cadent Gas logo
SOUTH WAY 
(0.5 miles)
Cadent Gas
Disconnection or alteration of supply - Footway - No carriageway incursion
In Progress
Since: 17 Sep 2024 15:58
(Scheduled: 16 Sep 2024 - 23 Sep 2024)
0.5
Details
Share
Follow
8
London Borough Of Brent logo
NORTH CIRCULAR ROAD, STONEBRIDGE 
(0.5 miles)
London Borough Of Brent
Highway repair and maintenance works - Footway, Carriageway - Lane closure
Planned
Scheduled: 19 Sep 2024 - 20 Sep 2024
0.5
Details
Share
Follow
9
FULTON ROAD 
(0.6 miles)
Last Mile Electricity (formerly Global Utility Connections)
Utility repair and maintenance works - Footway, Verge - Multi-way signals
In Progress
Since: 16 Sep 2024 08:00
(Scheduled: 16 Sep 2024 - 20 Sep 2024)
0.6
Details
Share
Follow
10
London Borough Of Brent logo
NORTH END ROAD 
(0.6 miles)
London Borough Of Brent
Highway repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 19 Sep 2024 - 20 Sep 2024)
0.6
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data