ROADWORKS SUMMARY
Clifford Road, WEMBLEY, HA0 1AF
Introduction
View current and future planned roadworks and road closures for Clifford Road, HA0 1AF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Clifford Road, WEMBLEY, HA0 1AF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Clifford Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
18 May 2025
London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 08:28.
9 Feb 2025
London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2023 at 23:01 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 20 May 2024 at 11:32.
18 Nov 2024
HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 09:00 and could run through until 18 November 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 31 Oct 2024 at 13:52.
9 Dec 2023 and 10 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2023 and could run through until 10 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 2 Nov 2023 at 14:09.
23 Nov 2024
City Of Westminster are carrying out Highway repair and maintenance works on Fernhead Road, Harrow Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 12:30 and could run through until 23 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 18 Oct 2024 at 11:53.
1 Mar 2025
London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.
These works are categorised as Major.
The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 14:30.
9 Feb 2025
London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Hammersmith Bridge, Barnes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 March 2024 at 00:00 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Mar 2024 at 07:34.
1 Mar 2024 and 9 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 11:02.
1 Mar 2024 and 9 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 10:58.
1 Mar 2024 and 1 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.
22 Nov 2024
HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 22 November 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 14:44.
22 Nov 2024
HS2 are carrying out Utility asset works on Brentham Way, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 22 November 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 14:44.
22 Nov 2024
HS2 are carrying out Utility asset works on Brunswick Road, Ealing.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 14:44.
3 Mar 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 April 2024 at 22:00 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 20:20.
Tomorrow
Thames Water are carrying out Utility asset works on College Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 April 2024 at 09:10 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 18:12.
5 May and 1 Dec 2024
London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Station Approach, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Apr 2024 at 10:20.
7 Dec 2024
HS2 are carrying out Section 50 on Oxford Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2024 at 19:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:09.
7 Dec 2024
HS2 are carrying out Section 50 on Oxford Road, Maida Vale, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2024 at 19:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:14.
7 Dec 2024
HS2 are carrying out Section 50 on Greville Road, Kilburn, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 11:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:16.
10 Oct 2025
London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.
24 Dec 2024
London Borough Of Barnet are carrying out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2024 at 23:00 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 May 2024 at 10:16.
23 Nov 2024
London Borough Of Barnet are carrying out Highway improvement works on Station Road, Hendon, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 June 2024 at 09:23 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Jun 2024 at 07:18.
4 Jun 2024 and 31 Mar 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.
2 Dec 2024
Thames Water are carrying out Utility asset works on Acton Lane, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:27.
1 Jan 2025
London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:23.
1 Jan 2025
London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:22.
31 May 2025
London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.
13 Mar 2025
Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.
12 Dec 2024
London Borough Of Ealing are carrying out Highway improvement works on Ruislip Road, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 July 2024 at 09:30 and could run through until 12 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Ealing on 4 Jul 2024 at 09:17.
31 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:53.
31 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on South Africa Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:54.
21 Nov 2024
HS2 are carrying out Utility asset works on Lynwood Road, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 July 2024 at 07:00 and could run through until 21 November 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 14:44.
2 Dec 2024
Thames Water are carrying out Utility asset works on Greenhill Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 14:35 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:28.
Thursday
Cadent Gas are carrying out Utility asset works on Cotman Gardens, Edgware.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 July 2024 at 08:41 and could run through until 14 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:24.
Friday
London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:39.
9 Dec 2024
London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 09:30 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 29 Oct 2024 at 14:57.
Friday
London Borough Of Harrow were proposing to carry out Highway improvement works on Greenhill Way, Harrow.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 12 Aug 2024 at 09:27.
15 Aug 2024 and 24 Dec 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.
Friday
Thames Water are carrying out Utility asset works on Greenford Road, Greenford.
These works are categorised as Major.
The works started on 19 August 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:38.
25 Feb 2025
London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.
2 Sep and 26 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Brent Cross Roundabout West Bound Slip From North Circular, Hendon, London.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 2 September 2024 and could run through until 26 November 2024. The works will impact the verge only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 09:50.
26 Nov 2024
Transport for London (TfL) are carrying out Highway improvement works on Brent Cross Roundabout West Bound Slip From North Circular, Hendon, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 2 September 2024 at 22:00 and could run through until 26 November 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 10:13.
9 Sep and 29 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
9 Sep and 29 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:09.
Today
London Borough Of Ealing are carrying out Highway improvement works on Broadmead Road, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Ealing on 13 Sep 2024 at 15:03.
9 Sep and 17 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Hendon, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:52.
9 Sep and 17 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Perryfield Way, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:06.
9 Sep and 17 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:52.
16 Sep and 22 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Hendon, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:59.
24 Nov 2024
Cadent Gas are carrying out Utility asset works on Station Road, Hendon, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 08:40 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:02.
16 Sep and 22 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:45.
16 Sep and 24 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:02.
16 Sep and 24 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 09:42.
24 Nov 2024
Cadent Gas are carrying out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 08:51 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:04.
19 Sep 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Cooper Road, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 11:00 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 14:17.
27 Sep and 13 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 14:55.
17 Nov 2024
Thames Water are carrying out Utility repair and maintenance works on Mount Road, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 13:40 and could run through until 17 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:51.
6 Oct and 7 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 13:37.
7 Oct and 19 Nov 2024
Cadent Gas were proposing to carry out Utility asset works on Boscombe Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 19 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 10:45.
Today
UK Power Networks Eastern & London are proposing to carry out New service connection on Harrow Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2024 at 08:57.
Today
UK Power Networks Eastern & London are carrying out New service connection on Harrow Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 08:21.
7 Oct and 18 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Flight Approach, Colindale, London.
These works are categorised as Major.
The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 15 Aug 2024 at 14:09.
18 Nov 2024
London Borough Of Barnet are carrying out Highway improvement works on Flight Approach, Colindale, London.
These works are categorised as Major.
The works started on 7 October 2024 at 08:00 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2024 at 08:39.
13 Oct and 25 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 14:56.
13 Oct and 25 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 11:50.
25 Nov 2024
Transport for London (TfL) are carrying out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 October 2024 at 22:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 13:22.
2 Dec 2024
Thames Water are carrying out Utility asset works on Connaught Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 10:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:28.
6 Dec 2024
London Borough Of Camden are carrying out Highway repair and maintenance works on Hermit Place, Kilburn, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 09:42.
Tomorrow
Cadent Gas were proposing to carry out Utility asset works on Bridgewater Road, Wembley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 10:04.
25 Nov 2024
Cadent Gas are carrying out Utility asset works on Mitchell Way, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 09:20 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 21:30.
14 Oct and 20 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, The Hale, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by London Borough Of Barnet on 11 Oct 2024 at 14:10.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Douglas Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 October 2024 at 13:53 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 10:49.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Willesden Lane, Kilburn, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 October 2024 at 13:59 and could run through until 12 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:29.
19 Oct and 21 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 10 Oct 2024 at 16:26.
21 Dec 2024
Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 October 2024 at 22:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Oct 2024 at 09:21.
21 Oct and 11 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on London Road, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 26 Sep 2024 at 07:27.
11 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on London Road, Brentford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Oct 2024 at 09:15.
21 Oct and 6 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Windmill Avenue, Southall.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 13:30.
21 Oct and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Windmill Lane, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:16.
6 Dec 2024
Cadent Gas are carrying out Utility asset works on Windmill Lane, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:24 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:42.
21 Oct 2024 and 3 Jun 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.
21 Oct 2024 and 3 Jun 2025
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensington Park Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 09:06.
Today
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fleming Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 11:10.
Today
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Fleming Road, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:30 and could run through until 10 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 09:53.
21 Oct and 20 Dec 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Kilburn Lane, Kilburn, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 18 Oct 2024 at 22:19.
20 Dec 2024
London Borough Of Brent are carrying out Highway repair and maintenance works on Kilburn Lane, Kilburn, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 22 Oct 2024 at 08:55.
21 Oct 2024 and 28 Mar 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:54.
21 Oct 2024 and 28 Mar 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 10 Oct 2024 at 11:41.
21 Oct 2024 and 28 Mar 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.
21 Oct 2024 and 28 Mar 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.
21 Oct and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Cheney Street, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:00.
12 Dec 2024
Cadent Gas are carrying out Utility asset works on Cheney Street, Eastcote.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 13:05 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:28.
22 Oct and 22 Nov 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on West End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 20 Aug 2024 at 15:13.
24 Oct and 28 Nov 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Nov 2024 at 16:20.
Thursday
London Borough Of Ealing are carrying out Highway improvement works on Aintree Road, Perivale.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 October 2024 at 08:00 and could run through until 14 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Nov 2024 at 09:30.
Today
Thames Water are carrying out Statutory Infrastructure Works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 October 2024 at 09:30 and could run through until 10 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 10:33.
20 Mar 2026
Transport for London (TfL) are carrying out Highway repair and maintenance works on Uxbridge Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 07:30 and could run through until 20 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 08:34.
Friday
Cadent Gas are proposing to carry out Utility asset works on Leopold Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 11:33.
28 Oct and 18 Nov 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:09.
28 Oct and 18 Nov 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 12:16.
28 Oct and 18 Nov 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 11:05.
28 Oct and 18 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 17:42.
28 Oct and 18 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 10:29.
28 Oct and 18 Nov 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 08:09.
28 Oct and 18 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 09:18.
28 Oct and 18 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 09:15.
18 Nov 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 14:30 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 16:16.
Wednesday
London Borough Of Hounslow are carrying out Section 50 on Station Approach Road, Chiswick, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 08:00 and could run through until 13 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 8 Nov 2024 at 13:20.
29 Oct 2024 and 21 Jan 2025
Electricity Network Company are proposing to carry out Utility asset works on Booth Road, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 6 Aug 2024 at 13:20.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:38.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Glencoe Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:58.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:57.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Greenway, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:55.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kingshill Avenue, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:50.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Owen Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:49.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Ayles Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:37.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Greenway, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:56.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Lovett Way, London.
The works started on 1 November 2024 at 12:10 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Approach, South Ruislip, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 22 Oct 2024 at 08:55.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Approach, South Ruislip, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 24 Oct 2024 at 10:53.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Field End Road, Ruislip.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 8 Aug 2024 at 15:54.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on West End Road, Ruislip.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 20 Aug 2024 at 15:01.
18 Nov 2024
Cadent Gas are carrying out Utility repair and maintenance works on Audley Road, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 17:00 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:14.
18 Nov 2024
Cadent Gas are carrying out Utility repair and maintenance works on Vivian Avenue, Hendon, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 15:16 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:14.
Today
London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Oct 2024 at 13:58.
4 and 22 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Northfield Avenue, West Ealing.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 11:33.
4 and 22 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Harrow View, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 11:23.
4 and 22 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Harrow View, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:34.
25 Nov 2024
Cadent Gas are carrying out Utility asset works on Harrow View, Hayes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 17:01 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:33.
Friday
Last Mile Gas are proposing to carry out Utility repair and maintenance works on Rootes Drive, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Gas on 16 Aug 2024 at 10:52.
26 Nov 2024
Electricity Network Company are carrying out Utility asset works on Fernhead Road, Harrow Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 11:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 11:48.
4 and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 16:02.
4 and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 10:22.
4 Nov and 5 Dec 2024
London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 12:36.
4 Nov 2024 and 31 Jan 2025
Thames Water are proposing to carry out Utility asset works on Lydford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.
4 and 18 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Pennine Drive, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Oct 2024 at 13:15.
18 Nov 2024
London Borough Of Barnet are carrying out Highway improvement works on Pennine Drive, Cricklewood, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 00:00 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 5 Nov 2024 at 09:25.
4 and 18 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 13:14.
18 Nov 2024
London Borough Of Barnet are carrying out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 00:00 and could run through until 18 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 5 Nov 2024 at 09:25.
Today
London Borough Of Ealing are carrying out Highway improvement works on Millway Gardens, Northolt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 08:00 and could run through until 10 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Nov 2024 at 11:24.
5 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 18 Oct 2024 at 09:46.
5 and 22 Nov 2024
Murphy Power Distribution were proposing to carry out New service connection on Varley Parade Service Road, Colindale, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 12 Aug 2024 at 09:20.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Netheravon Road, Chiswick, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 10:03 and could run through until 12 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 14:41.
26 Nov 2024
Thames Water are carrying out Utility repair and maintenance works on Godolphin Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 12:45 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:12.
Thursday
Cadent Gas are carrying out Utility repair and maintenance works on Leighton Road, West Ealing.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 09:22 and could run through until 14 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 10:50.
25 Nov 2024
UK Power Networks Eastern & London are carrying out New service connection on High Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 10:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 11:21.
5 Dec 2024
London Borough Of Camden are carrying out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 08:00 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 6 Nov 2024 at 09:23.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Chambers Lane, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 11:51 and could run through until 12 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 12:09.
6 Nov 2024 and 13 Mar 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Shirehall Lane, Hendon, London.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2024 and run through until 13 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:37.
Tuesday
Thames Water were proposing to carry out New service connection on Albion Place, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 November 2024 and run through until 12 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Aug 2024 at 11:25.
7 Nov and 6 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 29 Oct 2024 at 14:59.
Thursday
London Borough Of Camden are carrying out Highway repair and maintenance works on Gondar Gardens, Fortune Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 08:00 and could run through until 14 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Nov 2024 at 10:12.
Today
London Borough Of Harrow are carrying out Highway improvement works on Sudbury Hill, Sudbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 20:00 and could run through until 10 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 Nov 2024 at 08:45.
7 Nov 2024 and 13 Jan 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2024 at 10:56.
Wednesday
Affinity Water are carrying out Utility repair and maintenance works on Draycott Avenue, Harrow.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 09:15 and could run through until 13 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 10:06.
8 Nov 2024 and 3 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 13:18.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.
8 Nov 2024 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:38.
8 Nov 2024 and 3 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 11:07.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.
8 Nov 2024 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:38.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:11.
8 Nov 2024 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:35.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.
8 Nov 2024 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:37.
Thames Water carried out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.
A lane was closed for some or all of the period.
The works were originally planned between 8 Nov 2024 and 14 Nov 2024 and were actually completed between 8 Nov 2024 (17:05) and 10 Nov 2024 (08:30). The works impacted the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Nov 2024 at 09:59.
11 Nov and 6 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on St Christophers Close, Isleworth.
These works were categorised as Major.
The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 08:51.
11 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Footpath From London Road To Brent Lea, Brentford.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 13:11.
11 Nov and 22 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 15:43.
11 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:57.
11 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 15:36.
Friday
Thames Water were proposing to carry out New service connection on Bloemfontein Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 15:55.
Thursday
London Borough Of Ealing are proposing to carry out Highway improvement works on Laurel Gardens, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Nov 2024 at 13:57.
Saturday
Thames Water are proposing to carry out New service connection on Croxley Road, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 16 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 18:21.
Saturday
Thames Water are proposing to carry out New service connection on Croxley Road, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 16 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 11:34.
11 Nov and 6 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2024 at 09:26.
11 Nov 2024 and 28 Feb 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 18 Oct 2024 at 10:14.
11 and 29 Nov 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Park Lane, Wembley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 31 Oct 2024 at 23:12.
11 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 25 Oct 2024 at 09:41.
11 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 25 Oct 2024 at 13:25.
Friday
London Borough Of Harrow were proposing to carry out Highway improvement works on Chester Drive, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Oct 2024 at 12:26.
11 Nov and 6 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Eaton Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 16 Oct 2024 at 14:45.
11 and 25 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Flight Approach, Colindale, London.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Jul 2024 at 12:10.
Friday
Thames Water are proposing to carry out New service connection on Enfield Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 14:06.
Friday
Thames Water are proposing to carry out New service connection on Enfield Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 15:03.
Thursday
Thames Water are proposing to carry out Utility repair and maintenance works on Quex Road, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 13:20.
12 and 30 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Wessex Gardens, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Jul 2024 at 14:30.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Penzance Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:48.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Penzance Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:20.
15 and 21 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Shepherd's Bush Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 11:06.
15 and 21 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Shepherd's Bush Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 15:49.
15 and 21 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Shepherd's Bush Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 12:38.
18 and 22 Nov 2024
Thames Water are proposing to carry out New service connection on Station Approach Road, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 14:48.
18 Nov and 2 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Nov 2024 at 15:24.
18 Nov and 2 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Great West Road, Brentford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Nov 2024 at 15:12.
18 and 30 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Butterwick, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 16:45.
18 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Northfield Avenue, West Ealing.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 10:57.
18 Nov and 2 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 11:04.
18 Nov and 2 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:11.
18 and 22 Nov 2024
Thames Water are proposing to carry out New service connection on Coronation Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:01.
18 Nov and 6 Dec 2024
Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 21 Aug 2024 at 16:25.
18 Nov and 6 Dec 2024
Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 29 Aug 2024 at 15:22.
18 and 22 Nov 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 20:26.
18 Nov 2024 and 31 Jan 2025
Thames Water are proposing to carry out Utility asset works on Lydford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 14:44.
18 and 21 Nov 2024
Affinity Water were proposing to carry out Utility repair and maintenance works on Sussex Crescent, Northolt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 21 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 16 Aug 2024 at 09:51.
18 and 21 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Brent Cross Roundabout East Bound Slip From North Circular To Roundabout, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 14:38.
18 and 21 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Brent Cross Roundabout, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 14:37.
18 and 21 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 14:36.
18 Nov and 6 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Bolton Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:19.
18 Nov and 6 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Bolton Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 08:57.
18 and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 15:44.
18 and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:02.
18 and 29 Nov 2024
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 08:12.
19 and 22 Nov 2024
Affinity Water are proposing to carry out Utility asset works on Hawthorn Farm Avenue, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 14:38.
19 and 22 Nov 2024
Affinity Water are proposing to carry out Utility asset works on Hawthorn Farm Avenue, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 4 Sep 2024 at 10:48.
21 and 25 Nov 2024
BT are proposing to carry out Utility asset works on Woodheyes Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 22 Aug 2024 at 11:55.
22 Nov and 17 Dec 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on High Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2024 at 17:23.
23 and 29 Nov 2024
Thames Water are proposing to carry out Statutory Infrastructure Works on Chiswick High Road, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 12:21.
25 and 28 Nov 2024
Thames Water were proposing to carry out New service connection on Epworth Road, Isleworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:56.
25 Nov and 2 Dec 2024
Thames Water are proposing to carry out New service connection on Enfield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:04.
25 Nov and 2 Dec 2024
Thames Water are proposing to carry out New service connection on Enfield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:16.
25 and 29 Nov 2024
Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 12:58.
25 and 29 Nov 2024
Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:18.
25 and 28 Nov 2024
Thames Water were proposing to carry out New service connection on Talbot Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 09:47.
25 and 28 Nov 2024
Thames Water are proposing to carry out New service connection on Talbot Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 11:39.
25 and 28 Nov 2024
Thames Water are proposing to carry out New service connection on Oxford Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:48.
25 and 28 Nov 2024
Thames Water are proposing to carry out New service connection on Oxford Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 11:22.
25 and 29 Nov 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Copley Close, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 24 Oct 2024 at 09:49.
25 and 27 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Quex Road, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Nov 2024 at 15:00.
25 and 27 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Eliot Drive, South Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 23 Oct 2024 at 09:15.
25 Nov 2024 and 5 Jan 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:20.
25 Nov 2024 and 16 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.
25 and 27 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on East Towers, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.
25 and 27 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on East Towers, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:01.
25 and 27 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.
25 and 28 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 4 Sep 2024 at 14:34.
25 and 27 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Manor Park Drive, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 31 Oct 2024 at 08:34.
25 Nov 2024 and 17 Jan 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 17 January 2025. The works were due to impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 13:41.
25 and 27 Nov 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Parkfield Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Sep 2024 at 10:19.
25 and 27 Nov 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Parkfield Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Nov 2024 at 09:08.
25 Nov 2024 and 17 Jan 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 16:05.
25 Nov and 20 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Great Field, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 13:52.
26 Nov and 2 Dec 2024
Thames Water were proposing to carry out New service connection on Kingsdown Avenue, West Ealing.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 09:55.
26 Nov and 2 Dec 2024
Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 09:07.
26 Nov and 2 Dec 2024
Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:39.
26 Nov and 2 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wood End Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2024 at 09:39.
26 Nov and 2 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wood End Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 13:08.
26 and 28 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Rayners Lane, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:49.
26 and 28 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Elmcroft Crescent, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 29 Oct 2024 at 08:54.
26 and 28 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Oct 2024 at 15:19.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Sandringham Crescent, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:50.
27 and 29 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Alexandra Avenue, Rayners Lane.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:27.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Exeter Road, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:44.
27 and 29 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Eastcote Avenue, South Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 24 Oct 2024 at 08:54.
27 and 29 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Coles Crescent, South Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 21 Oct 2024 at 10:10.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Capthorne Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:46.
27 and 29 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Alfriston Avenue, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 25 Oct 2024 at 08:20.
27 and 29 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Rosecroft Walk, Pinner.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:42.
27 and 29 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on West End Avenue, Pinner.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:49.
27 and 29 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Broadcroft Avenue, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 28 Aug 2024 at 09:41.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Wolverton Road, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.
28 and 30 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:25.
28 Nov and 1 Dec 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 13:13.
28 Nov and 2 Dec 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Ridgeway, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.
2 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
2 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bulwer Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
2 and 9 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Boston Road, Hanwell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:14.
2 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
2 and 4 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 11:12.
2 and 4 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 10:51.
2 and 4 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 11:12.
2 and 4 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 11:03.
2 and 4 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 10:21.
2 and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 18:14.
2 and 16 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 08:10.
2 and 16 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:09.
2 and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Oct 2024 at 11:31.
2 and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 15:09.
2 and 18 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kingshill Avenue, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:50.
2 and 25 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Fernhead Road, Harrow Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 27 Sep 2024 at 16:01.
2 and 4 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 16 Sep 2024 at 06:16.
2 and 4 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 09:59.
2 and 6 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:32.
2 and 22 Dec 2024
Thames Water are proposing to carry out Utility asset works on Buxton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.
2 and 22 Dec 2024
Thames Water are proposing to carry out Utility asset works on Buxton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 08:16.
2 Dec 2024 and 25 May 2025
Thames Water are proposing to carry out Utility asset works on Chapter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.
2 Dec 2024 and 25 May 2025
Thames Water are proposing to carry out Utility asset works on Chapter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 08:16.
3 and 7 Dec 2024
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Southam Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:36.
3 and 7 Dec 2024
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Adair Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:39.
3 and 7 Dec 2024
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Golborne Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:33.
3 and 7 Dec 2024
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensal Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:32.
3 and 11 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Sep 2024 at 15:25.
4 and 6 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.
4 and 6 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:42.
4 and 6 Dec 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 12 Sep 2024 at 11:49.
5 and 12 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Rosebank Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 15:51.
5 and 12 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Boston Road, Hanwell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:39.
5 and 8 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 December 2024 and run through until 8 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 25 Oct 2024 at 11:13.
6 and 9 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Sep 2024 at 15:58.
6 and 15 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Oct 2024 at 15:31.
6 and 15 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 11:18.
6 and 8 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Nov 2024 at 10:05.
6 and 15 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ingram Way, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Oct 2024 at 10:15.
6 and 8 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ingram Way, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Nov 2024 at 10:05.
6 Dec 2024 and 25 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Stag Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 09:20.
9 and 11 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Netheravon Road, Chiswick, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:45.
9 Dec 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
9 and 13 Dec 2024
Thames Water are proposing to carry out New service connection on Coronation Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:08.
9 and 23 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 09:17.
9 and 23 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 8 Oct 2024 at 13:52.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 09:14.
9 and 13 Dec 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Oct 2024 at 14:54.
9 and 13 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Varley Parade Service Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:38.
9 and 12 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Parkfield Gardens, Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Oct 2024 at 11:29.
9 Dec 2024 and 15 Jan 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 24 Sep 2024 at 14:32.
9 and 11 Dec 2024
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Weston Drive, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 12:09.
9 and 12 Dec 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Weston Drive, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 18 Oct 2024 at 09:24.
10 and 12 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Greenland Crescent, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Sep 2024 at 15:54.
10 and 12 Dec 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Fortune Green Road, Fortune Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:08.
11 and 18 Dec 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.
11 and 22 Dec 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:48.
11 and 16 Dec 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.
11 and 18 Dec 2024
London Borough Of Harrow were proposing to carry out roadworks on Havelock Place, Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:44.
11 and 13 Dec 2024
BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Oct 2024 at 09:19.
11 and 13 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 13:24.
12 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
12 and 16 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 28 Aug 2024 at 11:48.
12 and 14 Dec 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Lower Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 12:38.
13 and 15 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Oct 2024 at 12:01.
13 and 15 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 11:18.
16 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Hanbury Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:16.
16 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Hanbury Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:39.
16 and 18 Dec 2024
Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:28.
17 and 22 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 14:47.
18 and 21 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 December 2024 and run through until 21 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 22 Oct 2024 at 15:34.
19 and 22 Dec 2024
Thames Water were proposing to carry out New service connection on Wood Lane, Isleworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:55.
20 Dec 2024 and 20 Jan 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 December 2024 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 1 Oct 2024 at 07:22.
23 and 31 Dec 2024
Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:48.
28 Dec 2024 and 6 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Rosebank Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:14.
28 Dec 2024 and 29 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 10 Oct 2024 at 17:58.
28 Dec 2024 and 29 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Oct 2024 at 13:42.
1 and 17 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Bromyard Avenue, Acton.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:14.
6 and 31 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Hunt Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Oct 2024 at 12:48.
6 Jan and 9 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Bomore Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:31.
6 and 10 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Tolhurst Drive, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:09.
6 Jan and 2 Mar 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:30.
6 Jan and 2 Mar 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:39.
6 and 17 Jan 2025
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on The Avenue, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 18 Oct 2024 at 13:15.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:12.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:13.
6 Jan and 17 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 09:07.
6 Jan and 17 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 09:27.
6 Jan and 17 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 16:42.
6 Jan and 17 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Nov 2024 at 09:26.
6 and 10 Jan 2025
Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Sep 2024 at 13:05.
6 and 13 Jan 2025
London Borough Of Harrow are proposing to carry out Highway improvement works on Junction Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:50.
6 and 13 Jan 2025
London Borough Of Harrow are proposing to carry out Highway improvement works on Havelock Place, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:43.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.
6 Jan and 7 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on The Hyde, Colindale, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:30.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:52.
6 Jan and 14 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:13.
6 Jan and 14 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 4 Nov 2024 at 07:20.
7 and 9 Jan 2025
Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:26.
7 Jan and 31 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 29 Oct 2024 at 08:45.
11 and 18 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 22 Oct 2024 at 14:25.
11 and 18 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 23 Oct 2024 at 15:48.
13 and 17 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Nov 2024 at 09:41.
13 and 15 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 10:51.
13 Jan and 9 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Grenfell Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:29.
13 Jan and 9 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Walmer Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:29.
13 and 21 Jan 2025
Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:36.
13 Jan and 4 Apr 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 4 Oct 2024 at 10:43.
13 Jan and 4 Apr 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 4 Oct 2024 at 10:54.
13 and 24 Jan 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 18 Sep 2024 at 08:43.
13 and 24 Jan 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:44.
13 and 24 Jan 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 6 Nov 2024 at 07:48.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 08:38.
14 Jan and 10 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Swift Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Oct 2024 at 11:43.
14 and 17 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 16:02.
14 Jan and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Stag Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.
16 and 22 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Rootes Drive, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:37.
17 and 20 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.
20 Jan and 9 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:07.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Cherington Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:29.
20 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Creffield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 10:23.
20 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Longfield Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 16:25.
20 and 23 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Eastcote Lane, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 10:15.
20 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 07:51.
20 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 07:51.
20 Jan and 5 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.
20 and 28 Jan 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 25 Oct 2024 at 11:16.
24 and 28 Jan 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Wharncliffe Drive, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Nov 2024 at 13:57.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Coles Green Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:46.
27 and 30 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 09:48.
28 Jan and 30 Apr 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Ruislip Road, Northolt.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Ealing on 31 Oct 2024 at 16:15.
28 and 31 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 28 Oct 2024 at 10:18.
29 Jan and 16 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 13:49.
3 and 7 Feb 2025
Thames Water are proposing to carry out New service connection on Kilmarsh Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:28.
3 Feb and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:07.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Southam Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 24 Oct 2024 at 11:26.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Southam Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Adair Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Adair Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 1 Nov 2024 at 15:04.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Golborne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 1 Nov 2024 at 15:04.
3 and 5 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Nov 2024 at 15:13.
3 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bowrons Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:02.
3 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Castleton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 3 Nov 2024 at 19:10.
4 and 7 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 11:23.
4 and 7 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 23:04.
5 and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Shepherd's Bush Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 15:50.
7 Feb and 28 Apr 2025
Transport for London (TfL) are proposing to carry out roadworks on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Jul 2024 at 16:26.
7 and 10 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Eastcote Lane, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 1 Nov 2024 at 16:55.
7 and 21 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 14 Oct 2024 at 15:18.
Roadworks Map near to Clifford Road, WEMBLEY, HA0 1AF
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Clifford Road, WEMBLEY, HA0 1AF (44 Events)
(Scheduled Dates)
(miles)
(Scheduled: 8 Nov 2024 - 14 Nov 2024)
(Scheduled: 8 Nov 2024 - 14 Nov 2024)
(Scheduled: 6 Nov 2024 - 6 Dec 2024)
(Scheduled: 20 Oct 2024 - 1 Dec 2024)
(Scheduled: 26 Oct 2024 - 14 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data