ROADWORKS SUMMARY
Charlemont Road, LONDON, E6 6AG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Charlemont Road, E6 6AG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Charlemont Road, LONDON, E6 6AG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Charlemont Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
19 Nov 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2023 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 22 Apr 2025 at 14:45.

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 31 Jan 2026
Details
View Map
Share
Follow
Westwood Lane

Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2023 and 10 Oct 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.

LONG TERM
Until
4 Feb 2026
Details
View Map
Share
Follow
Westfield Avenue

London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 4 February 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 29 Apr 2025 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
31 Mar 2024 and 26 Jun 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 26 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Mar 2025 at 10:03.

LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 09:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 27 May 2025 at 09:23.

LONG TERM
Until
19 Nov 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2024 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:26.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 26 May 2025 at 19:46.

LONG TERM
Between
27 May 2024 and 1 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.

LONG TERM
Between
27 May 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 17 Apr 2025 at 08:06.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 17 Apr 2025 at 08:06.

Thames Water logo
LONG TERM
Until
7 Apr 2026
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 08:10 and could run through until 7 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:27.

LONG TERM
Between
14 Aug 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.

LONG TERM
Between
14 Aug 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.

LONG TERM
Between
15 Aug 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Sheringham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:17.

LONG TERM
Between
15 Aug 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Dersingham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:16.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:20.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.

LONG TERM
Between
14 Sep 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.

LONG TERM
Until
31 Aug 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Apr 2025 at 15:42.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:15 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 13:49.

LONG TERM
Between
28 Nov 2024 and 6 Mar 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.

Thames Water logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works started on 6 January 2025 at 09:00 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 13:36.

LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 16 Jan 2025 at 08:13.

Thames Water logo
LONG TERM
Until
6 Jul 2025
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 11:51 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 13:16.

Thames Water logo
LONG TERM
Between
10 Feb and 27 Jun 2025
Details
View Map
Share
Romford Road

Thames Water were proposing to carry out Utility asset works on Romford Road, Manor Park, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 12:19.

Royal Borough Of Greenwich logo
LONG TERM
Between
15 Feb and 29 Aug 2025
Details
View Map
Share
Follow
Vincent Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on Vincent Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Greenwich on 20 Jan 2025 at 16:29.

Thames Water logo
LONG TERM
Between
20 Feb and 20 Jun 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 12:11.

Thames Water logo
LONG TERM
Between
24 Feb and 12 Jun 2025
Details
View Map
Share
Lyndon Road

Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.

LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are carrying out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:14.

Thames Water logo
LONG TERM
Between
24 Feb and 13 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Feb 2025 at 13:05.

Thames Water logo
LONG TERM
Until
13 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:15 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 08:19.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

The works started on 3 March 2025 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Apr 2025 at 16:03.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Leslie Road

London Borough Of Newham are carrying out Section 50 on Leslie Road, Canning Town, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 February 2025 at 09:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 8 May 2025 at 09:31.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Lyndon Road

Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 16:41.

Transport for London (TfL) logo
LONG TERM
Between
15 Mar and 27 Sep 2025
Details
View Map
Share
High Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 12:11.

LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Leyton Road

London Borough Of Newham are carrying out Highway improvement works on Leyton Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 07:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 2 Jun 2025 at 15:28.

Thames Water logo
LONG TERM
Between
23 Mar and 8 Aug 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jan 2025 at 14:34.

Thames Water logo
LONG TERM
Until
30 Aug 2025
Details
View Map
Share
Follow
Kingsman Street

Thames Water are carrying out Utility asset works on Kingsman Street, Woolwich.

The works started on 24 March 2025 at 13:45 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:40.

Transport for London (TfL) logo
LONG TERM
Between
31 Mar and 26 Jun 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2025 at 11:42.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
International Way

London Borough Of Newham are carrying out Section 50 on International Way, Stratford, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 13:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 6 May 2025 at 09:34.

LONG TERM
Between
1 Apr 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Barbers Road

London Borough Of Newham are proposing to carry out Section 50 on Barbers Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 23:20.

LONG TERM
Between
1 Apr 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Marshgate Lane

London Borough Of Newham are proposing to carry out Section 50 on Marshgate Lane, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 23:07.

LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Dock Road

London Borough Of Newham are carrying out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 11:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:25.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 07:25 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 29 Apr 2025 at 07:25.

LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Wellesley Road

London Borough Of Redbridge are carrying out Highway improvement works on Wellesley Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 07:55 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 7 May 2025 at 13:45.

LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Hermon Hill

London Borough Of Redbridge are carrying out Highway improvement works on Hermon Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 07:55 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 7 May 2025 at 13:45.

LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Bidder Street

London Borough Of Newham are carrying out Section 50 on Bidder Street, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 09:00 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 14:39.

LONG TERM
Between
21 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Ilford Lane

London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Redbridge on 22 Apr 2025 at 14:45.

Thames Water logo
LONG TERM
Between
22 Apr and 11 Jul 2025
Details
View Map
Share
Follow
Poplar Mount

Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:17.

Thames Water logo
LONG TERM
Between
22 Apr and 20 Jun 2025
Details
View Map
Share
Gladeswood Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 17:29.

Thames Water logo
LONG TERM
Between
22 Apr and 23 Jun 2025
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 13:55.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Temple Mill Lane

Thames Water are carrying out Utility repair and maintenance works on Temple Mill Lane, Stratford, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 12:00 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 11:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Apr and 19 Jun 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.

Network Rail logo
LONG TERM
Between
28 Apr and 15 Aug 2025
Details
View Map
Share
Follow
St Germans Place

Network Rail are proposing to carry out Works for Rail Purposes on St Germans Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 28 Feb 2025 at 10:08.

Transport for London (TfL) logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Commercial Road

Transport for London (TfL) are proposing to carry out Permanent reinstatement on Commercial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 8 June 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 24 Apr 2025 at 21:04.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Commercial Road

Transport for London (TfL) are proposing to carry out Permanent reinstatement on Commercial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 13 June 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:32.

Thames Water logo
LONG TERM
Between
1 May and 5 Aug 2025
Details
View Map
Share
Follow
Poplar Mount

Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.

Thames Water logo
LONG TERM
Until
5 Aug 2025
Details
View Map
Share
Follow
Poplar Mount

Thames Water are carrying out Utility asset works on Poplar Mount, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 10:00 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 11:11.

Thames Water logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are carrying out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 09:45 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 11:12.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Aspen Way

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Aspen Way, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 May 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 09:12.

Southern Gas Networks logo
LONG TERM
Between
6 May and 4 Jul 2025
Details
View Map
Share
Follow
Welling Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:41.

Network Rail logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
St Germans Place

Network Rail are carrying out Works for Rail Purposes on St Germans Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 May 2025 at 08:17.

Southern Gas Networks logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Follow
Charlton Park Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 12:53.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Nelson Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Nelson Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:20.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Nelson Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Nelson Road, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Creek Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Creek Road, Deptford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:19.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Creek Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Creek Road, Deptford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Greenwich Church Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:18.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Greenwich Church Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:08.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are carrying out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 09:03.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Woodford Bridge Road

UK Power Networks Eastern & London are carrying out New service connection on Woodford Bridge Road, Ilford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 10:30 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 11:29.

Thames Water logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Norman Road

Thames Water are carrying out Utility asset works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 May 2025 at 12:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 06:43.

Cadent Gas logo
LONG TERM
Between
7 May and 26 Jun 2025
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.

Cadent Gas logo
LONG TERM
Between
7 May and 26 Jun 2025
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Thames Water logo
LONG TERM
Between
8 May and 18 Jul 2025
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 May 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 12:06.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 May and 23 Jul 2025
Details
View Map
Share
Follow
Perth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.

Southern Gas Networks logo
LONG TERM
Between
12 May and 30 Jun 2025
Details
View Map
Share
Follow
Exmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Exmouth Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:06.

Southern Gas Networks logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Exmouth Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Exmouth Road, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 11:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:12.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Mascalls Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Mascalls Road, Charlton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 07:00 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 07:47.

LONG TERM
Between
13 May and 27 Jun 2025
Details
View Map
Share
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 May 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 05:54.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Aldborough Road South

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Aldborough Road South, Seven Kings, Ilford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 07:00 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 15:46.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Olyffe Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Olyffe Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 10:39.

Thames Water logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Olyffe Avenue

Thames Water are carrying out Utility repair and maintenance works on Olyffe Avenue, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 10:30 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 13:35.

Thames Water logo
Finishing
Today
Details
View Map
Share
Olyffe Avenue

Thames Water were proposing to carry out roadworks on Olyffe Avenue, Welling.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 08:04.

Thames Water logo
Finishing
Today
Details
View Map
Share
Lovel Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Lovel Avenue, Welling.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:44.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Stadium Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stadium Road, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:09.

Southern Gas Networks logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Little Heath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Heath, Charlton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 13:54.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:48.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Folkestone Road

Cadent Gas were proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:15.

Thames Water logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Old Ford Road

Thames Water carried out roadworks on Old Ford Road, London.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 19 May 2025 and 13 Jun 2025 and were actually completed between 19 May 2025 (11:25) and 3 Jun 2025 (11:14). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:14.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Wick Lane

Thames Water are carrying out Utility repair and maintenance works on Wick Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 11:11.

London Borough Of Waltham Forest logo
LONG TERM
Between
19 May and 20 Jun 2025
Details
View Map
Share
Follow
Oliver Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Oliver Road, Leyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 May 2025 at 16:06.

Thames Water logo
LONG TERM
Between
20 May and 3 Aug 2025
Details
View Map
Share
Follow
Thomas Road

Thames Water are proposing to carry out Utility asset works on Thomas Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 15:45.

Thames Water logo
LONG TERM
Between
20 May and 3 Aug 2025
Details
View Map
Share
Follow
Pixley Street

Thames Water are proposing to carry out Utility asset works on Pixley Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 14:01.

Thames Water logo
LONG TERM
Between
20 May and 28 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 14:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 May and 24 Jun 2025
Details
View Map
Share
Follow
Perth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 14:00.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Jun 2025
Details
View Map
Share
Follow
Perth Road

UK Power Networks Eastern & London are carrying out New service connection on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 08:00 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 08:56.

Finishing
Today
Details
View Map
Share
Follow
Milton Crescent

London Borough Of Redbridge are carrying out Highway improvement works on Milton Crescent, Gants Hill, Ilford.

The works started on 20 May 2025 at 09:57 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 3 Jun 2025 at 12:15.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:09.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:46.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Ruston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:46.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Warspite Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
23 May and 27 Jun 2025
Details
View Map
Share
Ightham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ightham Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 09:52.

Southern Gas Networks logo
LONG TERM
Between
23 May and 27 Jun 2025
Details
View Map
Share
Hythe Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hythe Avenue, Bexleyheath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 09:53.

Southern Gas Networks logo
LONG TERM
Between
23 May and 27 Jun 2025
Details
View Map
Share
Bedonwell Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bedonwell Road, Bexleyheath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 09:53.

Transport for London (TfL) logo
Between
23 May and 15 Jun 2025
Details
View Map
Share
Newham Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 11:39.

Transport for London (TfL) logo
Between
23 May and 15 Jun 2025
Details
View Map
Share
Newham Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:42.

Until
10 Jun 2025
Details
View Map
Share
Follow
Melbourne Road

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Melbourne Road, Ilford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 10:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 28 May 2025 at 14:45.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
Plumstead High Street

Royal Borough Of Greenwich are proposing to carry out Section 50 on Plumstead High Street, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:37.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
St Nicholas Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on St Nicholas Road, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:17.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
St Nicholas Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on St Nicholas Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:33.

LONG TERM
Between
26 May and 27 Jun 2025
Details
View Map
Share
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 06:11.

LONG TERM
Between
26 May and 27 Jun 2025
Details
View Map
Share
Follow
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 14:47.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 28 Jun 2025
Details
View Map
Share
Follow
South Crescent

UK Power Networks Eastern & London are proposing to carry out Utility asset works on South Crescent, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:17.

UK Power Networks Eastern & London logo
Between
26 May and 15 Jun 2025
Details
View Map
Share
Follow
Wellington Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wellington Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:37.

Thames Water logo
LONG TERM
Between
26 May and 28 Jul 2025
Details
View Map
Share
Follow
St James's Avenue

Thames Water are proposing to carry out Utility asset works on St James's Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 14:55.

Cadent Gas logo
LONG TERM
Between
26 May and 11 Oct 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 12:10.

Cadent Gas logo
LONG TERM
Between
26 May and 11 Oct 2025
Details
View Map
Share
Forest Road

Cadent Gas were proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 11 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 14:13.

Southern Gas Networks logo
Between
27 May and 24 Jun 2025
Details
View Map
Share
Follow
Clinton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clinton Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 15:10.

Southern Gas Networks logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 08:29.

Thames Water logo
LONG TERM
Between
27 May and 2 Jul 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Feb 2025 at 11:29.

London Borough Of Waltham Forest logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Oliver Road

London Borough Of Waltham Forest are carrying out Highway improvement works on Oliver Road, Leyton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 May 2025 at 16:35.

Southern Gas Networks logo
Between
28 May and 20 Jun 2025
Details
View Map
Share
Follow
Shooters Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 12:14.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Bardsley Lane

Thames Water are carrying out Utility repair and maintenance works on Bardsley Lane, Greenwich.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 08:55 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 11:10.

Transport for London (TfL) logo
Until
17 Jun 2025
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are carrying out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 21:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2025 at 08:17.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Ron Leighton Way

Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 09:25.

Southern Gas Networks logo
Between
29 May and 26 Jun 2025
Details
View Map
Share
Follow
Clinton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clinton Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 16:27.

Southern Gas Networks logo
Until
26 Jun 2025
Details
View Map
Share
Follow
Clinton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Clinton Avenue, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:00 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 08:14.

Thames Water logo
Between
29 May and 13 Jun 2025
Details
View Map
Share
Lovel Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Lovel Avenue, Welling.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 May 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 07:23.

LONG TERM
Between
29 May and 1 Jul 2025
Details
View Map
Share
Follow
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 29 May 2025 at 13:29.

Thames Water logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Julia Gardens

Thames Water are carrying out Utility repair and maintenance works on Julia Gardens, Barking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:20 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:44.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Longbridge Road

Cadent Gas are carrying out Utility repair and maintenance works on Longbridge Road, Barking.

The works started on 29 May 2025 at 11:12 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 12:05.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:44.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 22:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 08:43.

Finishing
Monday
Details
View Map
Share
Follow
Belfairs Drive

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Belfairs Drive, Chadwell Heath, Romford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 08:38 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 2 Jun 2025 at 10:30.

T-Mobile (UK) logo
Finishing
Friday
Details
View Map
Share
Follow
Rochester Way

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rochester Way, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 11 Mar 2025 at 08:32.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Grangehill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grangehill Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:05.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Grangehill Road

Thames Water are carrying out Utility repair and maintenance works on Grangehill Road, Eltham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 07:26 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:58.

Southern Gas Networks logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Carlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 16:13.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 28 Aug 2025
Details
View Map
Share
Blackheath Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 15:46.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:34.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:41.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

Thames Water logo
Between
2 and 12 Jun 2025
Details
View Map
Share
Follow
Colomb Street

Thames Water are proposing to carry out Utility asset works on Colomb Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 10:31.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Bunkers Hill

London Borough Of Bexley are proposing to carry out Highway improvement works on Bunkers Hill, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:37.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Bunkers Hill

London Borough Of Bexley are proposing to carry out Highway improvement works on Bunkers Hill, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 28 May 2025 at 12:23.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Halt Robin Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:32.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Halt Robin Road

London Borough Of Bexley are carrying out Highway improvement works on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 2 Jun 2025 at 08:25.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Gideon Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Gideon Close, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:38.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Gideon Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Gideon Close, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 28 May 2025 at 12:22.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Brigstock Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Brigstock Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:38.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Brigstock Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Brigstock Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 28 May 2025 at 12:22.

Thames Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Bullbanks Road

Thames Water were proposing to carry out Utility asset works on Bullbanks Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 09:12.

Electricity Network Company logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Millennium Way

Electricity Network Company are carrying out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 09:11.

Transport for London (TfL) logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Dock Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 21:31.

Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Ruscoe Road

London Borough Of Newham are proposing to carry out Section 50 on Ruscoe Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 May 2025 at 14:27.

Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Rathbone Street

London Borough Of Newham are proposing to carry out Section 50 on Rathbone Street, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 20 May 2025 at 14:08.

Thames Water logo
LONG TERM
Until
17 Aug 2025
Details
View Map
Share
Follow
Thomas Road

Thames Water are carrying out Utility asset works on Thomas Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:40 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:46.

Thames Water logo
LONG TERM
Until
17 Aug 2025
Details
View Map
Share
Follow
Pixley Street

Thames Water are carrying out Utility asset works on Pixley Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:40 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:47.

Thames Water logo
LONG TERM
Until
10 Aug 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:40 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:47.

Thames Water logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Glaucus Street

Thames Water are carrying out Utility repair and maintenance works on Glaucus Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:37.

LONG TERM
Between
2 Jun and 18 Oct 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.

Cadent Gas logo
LONG TERM
Between
2 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:43.

Cadent Gas logo
LONG TERM
Between
2 Jun and 13 Jul 2025
Details
View Map
Share
Eastbourne Road

Cadent Gas were proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:16.

Cadent Gas logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:44.

Cadent Gas logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Folkestone Road

Cadent Gas were proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 22 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:16.

Thames Water logo
Until
30 Jun 2025
Details
View Map
Share
Follow
St James's Avenue

Thames Water are carrying out Utility asset works on St James's Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:48.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road

Cadent Gas are proposing to carry out Utility asset works on Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road, Dagenham.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:11.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road

Cadent Gas were proposing to carry out Utility asset works on Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road, Dagenham.

These works were categorised as Major.

The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:23.

UK Power Networks Eastern & London logo
Until
28 Jun 2025
Details
View Map
Share
Follow
Babbacombe Gardens

UK Power Networks Eastern & London are carrying out New service connection on Babbacombe Gardens, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:15.

Southern Gas Networks logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Picardy Manorway

Southern Gas Networks are carrying out Utility repair and maintenance works on Picardy Manorway, Belvedere.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:45 and could run through until 10 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 11:53.

LONG TERM
Between
3 Jun and 5 Jul 2025
Details
View Map
Share
Richmond Road

London Borough Of Redbridge carried out Highway improvement works on Richmond Road, Ilford.

The works were originally planned between 3 Jun 2025 and 5 Jul 2025 and were actually completed on 3 Jun 2025 between 12:29 and 12:29. The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 3 Jun 2025 at 12:39.

LONG TERM
Between
3 Jun and 5 Jul 2025
Details
View Map
Share
St Marys Road

London Borough Of Redbridge carried out Highway improvement works on St Marys Road, Ilford.

The works were originally planned between 3 Jun 2025 and 5 Jul 2025 and were actually completed on 3 Jun 2025 between 14:00 and 14:01. The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 3 Jun 2025 at 14:04.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Atherton Road

Cadent Gas are carrying out Utility repair and maintenance works on Atherton Road, Clayhall, Ilford.

The works started on 3 June 2025 at 16:45 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 16:47.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Flanders Road

Thames Water are proposing to carry out Utility repair and maintenance works on Flanders Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:37.

Thames Water logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Ellesmere Road

Thames Water were proposing to carry out Utility repair and maintenance works on Ellesmere Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 13:04.

Thames Water logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Ellesmere Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ellesmere Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:17.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Sandhurst Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Sandhurst Drive, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 14:00.

London Borough Of Waltham Forest logo
Finishing
Saturday
Details
View Map
Share
Follow
Leyspring Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Leyspring Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 3 Jun 2025 at 14:40.

London Borough Of Waltham Forest logo
Finishing
Saturday
Details
View Map
Share
Follow
Leyspring Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Leyspring Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 7 May 2025 at 21:10.

London Borough Of Waltham Forest logo
Finishing
Saturday
Details
View Map
Share
Follow
Leyspring Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Leyspring Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 8 May 2025 at 10:07.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Netley Road

Cadent Gas are proposing to carry out roadworks on Netley Road, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 14:30.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:08.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:29.

Thames Water logo
Between
5 and 10 Jun 2025
Details
View Map
Share
Follow
Gardner Road

Thames Water are proposing to carry out New service connection on Gardner Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:54.

Thames Water logo
Between
5 and 10 Jun 2025
Details
View Map
Share
Follow
Esk Road

Thames Water are proposing to carry out New service connection on Esk Road, Plaistow, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:55.

Cadent Gas logo
Between
5 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Cameron Road

Cadent Gas are proposing to carry out Utility asset works on Cameron Road, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Cameron Road

Cadent Gas are proposing to carry out Utility asset works on Cameron Road, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.

Cadent Gas logo
Between
5 and 26 Jun 2025
Details
View Map
Share
Follow
Elgin Road

Cadent Gas are proposing to carry out Utility asset works on Elgin Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 and 26 Jun 2025
Details
View Map
Share
Follow
Elgin Road

Cadent Gas are proposing to carry out Utility asset works on Elgin Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.

Cadent Gas logo
Between
5 and 26 Jun 2025
Details
View Map
Share
Follow
Norfolk Road

Cadent Gas are proposing to carry out Utility asset works on Norfolk Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 and 26 Jun 2025
Details
View Map
Share
Follow
Norfolk Road

Cadent Gas are proposing to carry out Utility asset works on Norfolk Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.

Cadent Gas logo
Between
5 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Aldborough Road South

Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Aldborough Road South

Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.

Transport for London (TfL) logo
Between
6 and 11 Jun 2025
Details
View Map
Share
Follow
Frances Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 07:47.

Transport for London (TfL) logo
Between
6 and 11 Jun 2025
Details
View Map
Share
Follow
Frances Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:17.

Transport for London (TfL) logo
Between
6 and 11 Jun 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:15.

London Borough Of Barking And Dagenham logo
Finishing
Sunday
Details
View Map
Share
Follow
Cecil Avenue

London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Cecil Avenue, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 May 2025 at 10:23.

London Borough Of Barking And Dagenham logo
Finishing
Sunday
Details
View Map
Share
Follow
Cecil Avenue

London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Cecil Avenue, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 19 May 2025 at 08:56.

London Borough Of Barking And Dagenham logo
Finishing
Sunday
Details
View Map
Share
Follow
Wilmington Gardens

London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Wilmington Gardens, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 May 2025 at 07:30.

London Borough Of Barking And Dagenham logo
Finishing
Sunday
Details
View Map
Share
Follow
Wilmington Gardens

London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Wilmington Gardens, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 May 2025 at 10:22.

London Borough Of Barking And Dagenham logo
Finishing
Sunday
Details
View Map
Share
Follow
Hurstbourne Gardens

London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Hurstbourne Gardens, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 May 2025 at 10:25.

London Borough Of Barking And Dagenham logo
Finishing
Sunday
Details
View Map
Share
Follow
Hurstbourne Gardens

London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Hurstbourne Gardens, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 19 May 2025 at 08:56.

Southern Gas Networks logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:26.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Burcharbro Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:20.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Albury Street

BT are proposing to carry out Utility asset works on Albury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Apr 2025 at 11:02.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Albury Street

BT are proposing to carry out Utility asset works on Albury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 06:13.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
West Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 15:58.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Charlton Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 07:17.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Tyler Street

Thames Water are proposing to carry out Utility asset works on Tyler Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jan 2025 at 13:28.

Thames Water logo
LONG TERM
Between
9 Jun and 5 Aug 2025
Details
View Map
Share
Follow
Methuen Road

Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 16:30.

London Borough Of Bexley logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Picardy Road

London Borough Of Bexley are proposing to carry out Section 50 on Picardy Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 18 Mar 2025 at 11:36.

Thames Water logo
LONG TERM
Between
9 Jun and 7 Aug 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:57.

Thames Water logo
Between
9 and 26 Jun 2025
Details
View Map
Share
Follow
Quebec Way

Thames Water are proposing to carry out Utility asset works on Quebec Way, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:30.

Thames Water logo
Between
9 and 26 Jun 2025
Details
View Map
Share
Follow
Quebec Way

Thames Water are proposing to carry out Utility asset works on Quebec Way, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 13:35.

Transport for London (TfL) logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Millharbour

Transport for London (TfL) were proposing to carry out Highway improvement works on Millharbour, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 08:59.

Transport for London (TfL) logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Marsh Wall

Transport for London (TfL) were proposing to carry out Highway improvement works on Marsh Wall, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 09:00.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Tree Road

Thames Water were proposing to carry out Utility repair and maintenance works on Tree Road, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:15.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Thames Water are proposing to carry out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 16:16.

Vodafone logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Lochnagar Street

Vodafone are proposing to carry out Utility repair and maintenance works on Lochnagar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 8 Apr 2025 at 12:11.

Vodafone logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Lochnagar Street

Vodafone are proposing to carry out Utility repair and maintenance works on Lochnagar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 2 May 2025 at 10:31.

Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Hannibal Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hannibal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 6 Mar 2025 at 16:25.

Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Hannibal Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hannibal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Mar 2025 at 15:55.

Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
River Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Mar 2025 at 08:30.

Between
9 and 27 Jun 2025
Details
View Map
Share
River Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on River Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 09:38.

Thames Water logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 14:01.

LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
White Post Lane

London Borough Of Tower Hamlets are proposing to carry out Section 50 on White Post Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 3 Jun 2025 at 17:09.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 11:49.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Dore Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dore Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 11:19.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Dersingham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 11:38.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Goodmayes Lane

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Goodmayes Lane

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:00.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Mayesbrook Road

Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Mayesbrook Road

Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 11:45.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 13:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 11:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 14:30.

Cadent Gas logo
Between
9 and 22 Jun 2025
Details
View Map
Share
Follow
Heron Mews

Cadent Gas are proposing to carry out Utility asset works on Heron Mews, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 10:00.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Oakhurst Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Oakhurst Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 16:09.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Oakhurst Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Oakhurst Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 16:11.

Virgin Media logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Woolwich Road

Virgin Media were proposing to carry out Utility asset works on Woolwich Road, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Mar 2025 at 10:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:38.

Thames Water logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Henderson Road

Thames Water are proposing to carry out Utility repair and maintenance works on Henderson Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:12.

Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Rectory Square

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rectory Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 12 Mar 2025 at 09:54.

Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Rectory Square

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rectory Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Mar 2025 at 15:57.

Thames Water logo
Between
11 Jun and 1 Jul 2025
Details
View Map
Share
Roman Road

Thames Water were proposing to carry out Utility repair and maintenance works on Roman Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 June 2025 and run through until 1 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 07:52.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:42.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Mar 2025 at 20:42.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 14 Mar 2025 at 14:44.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:45.

Transport for London (TfL) logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:09.

Transport for London (TfL) logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:30.

Transport for London (TfL) logo
Between
13 and 15 Jun 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 15:11.

UK Power Networks Eastern & London logo
Between
13 and 17 Jun 2025
Details
View Map
Share
Follow
Coniston Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Coniston Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 10:00.

UK Power Networks Eastern & London logo
Between
13 and 17 Jun 2025
Details
View Map
Share
Follow
Coniston Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Coniston Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 15:45.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Vanbrugh Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanbrugh Park, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 06:25.

London Borough Of Bexley logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Holly Hill Road

London Borough Of Bexley are proposing to carry out Section 50 on Holly Hill Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 22 May 2025 at 16:52.

London Borough Of Bexley logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Holly Hill Road

London Borough Of Bexley are proposing to carry out Section 50 on Holly Hill Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 29 May 2025 at 16:39.

London Borough Of Bexley logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rutland Gate

London Borough Of Bexley are proposing to carry out Section 50 on Rutland Gate, Belvedere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 22 May 2025 at 16:52.

London Borough Of Bexley logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rutland Gate

London Borough Of Bexley are proposing to carry out Section 50 on Rutland Gate, Belvedere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 27 May 2025 at 16:35.

Thames Water logo
LONG TERM
Between
16 Jun and 5 Aug 2025
Details
View Map
Share
Follow
Methuen Road

Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Strait Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 May 2025 at 12:06.

Cadent Gas logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Gooseley Lane

Cadent Gas were proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 6 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:16.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Bacton Street

BT are proposing to carry out Utility repair and maintenance works on Bacton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 14:38.

Thames Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:38.

Cadent Gas logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Highbridge Road

Cadent Gas are proposing to carry out Utility asset works on Highbridge Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:04.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
East Cross Route

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on East Cross Route, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:29.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
East Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Cross Route, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 09:59.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Cowdry Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Cowdry Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:39.

Thames Water logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Station Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 15:35.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Northbrook Road

London Borough Of Redbridge were proposing to carry out Highway repair and maintenance works on Northbrook Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 25 Apr 2025 at 16:05.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Pedley Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Pedley Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 27 Feb 2025 at 09:15.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Blake Hall Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 6 Mar 2025 at 08:30.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Arran Drive

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Arran Drive, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 09:00.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Blake Hall Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 6 Mar 2025 at 08:30.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Felstead Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Felstead Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Cambridge Park

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cambridge Park, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

London Borough Of Waltham Forest logo
Between
16 and 21 Jun 2025
Details
View Map
Share
Follow
Colworth Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Colworth Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 7 May 2025 at 15:45.

London Borough Of Waltham Forest logo
Between
16 and 21 Jun 2025
Details
View Map
Share
Follow
Colworth Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Colworth Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 8 May 2025 at 10:17.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Brook Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Brook Road, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 09:00.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Cambridge Park

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cambridge Park, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Gaysham Avenue

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Gaysham Avenue, Gants Hill, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

Cadent Gas logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 11:09.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Beattyville Gardens

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Beattyville Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Granville Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Granville Road, South Woodford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Cowslip Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cowslip Road, South Woodford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Cleveland Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cleveland Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Atherton Road

London Borough Of Redbridge were proposing to carry out Highway repair and maintenance works on Atherton Road, Clayhall, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 3 Mar 2025 at 16:55.

BT logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Morpeth Street

BT are proposing to carry out Utility repair and maintenance works on Morpeth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 14:31.

Between
17 Jun and 7 Jul 2025
Details
View Map
Share
Follow
High Street North

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on High Street North, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Mar 2025 at 09:23.

London Borough Of Waltham Forest logo
Between
17 and 21 Jun 2025
Details
View Map
Share
Follow
Fletcher Lane

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Fletcher Lane, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 7 May 2025 at 15:10.

London Borough Of Waltham Forest logo
Between
17 and 21 Jun 2025
Details
View Map
Share
Follow
Fletcher Lane

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Fletcher Lane, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 8 May 2025 at 10:18.

Thames Water logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Temple Mill Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Temple Mill Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 16:52.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Apple Road

BT are proposing to carry out Utility repair and maintenance works on Apple Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 May 2025 at 16:30.

Thames Water logo
Between
18 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 11:54.

London Borough Of Waltham Forest logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Melbourne Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Melbourne Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 3 Jun 2025 at 14:27.

London Borough Of Waltham Forest logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Melbourne Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Melbourne Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 7 May 2025 at 11:01.

London Borough Of Waltham Forest logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Melbourne Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Melbourne Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 8 May 2025 at 10:20.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:13.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:12.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Ruston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:47.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Warspite Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:46.

Transport for London (TfL) logo
LONG TERM
Between
19 Jun and 21 Dec 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 15:38.

Thames Water logo
LONG TERM
Between
19 Jun and 11 Sep 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 13:21.

UK Power Networks Eastern & London logo
Between
19 and 21 Jun 2025
Details
View Map
Share
Highbridge Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Highbridge Road, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 21 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 08:36.

UK Power Networks Eastern & London logo
Between
19 and 22 Jun 2025
Details
View Map
Share
Follow
Highbridge Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Highbridge Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 08:38.

Thames Water logo
LONG TERM
Between
19 Jun and 14 Sep 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 14:41.

Thames Water logo
LONG TERM
Between
19 Jun and 1 Aug 2025
Details
View Map
Share
Carpenters Road

Thames Water were proposing to carry out Utility asset works on Carpenters Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:00.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:12.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 15:07.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 16:07.

UK Power Networks Eastern & London logo
Between
20 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.

UK Power Networks Eastern & London logo
Between
21 Jun and 19 Jul 2025
Details
View Map
Share
Follow
Perth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 May 2025 at 16:50.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Budleigh Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:43.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 11:08.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:26.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:10.

London Borough Of Lewisham logo
LONG TERM
Between
23 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Deptford Church Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Deptford Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 1 May 2025 at 15:57.

Thames Water logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Tunnel Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 06:21.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Wilmount Street

Thames Water are proposing to carry out Remedial works on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 08:36.

Thames Water logo
LONG TERM
Between
23 Jun and 22 Aug 2025
Details
View Map
Share
Follow
Methuen Road

Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:18.

Cornerstone Telecommunications Infrastructure logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Strait Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 26 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 May 2025 at 12:06.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Burgess Street

Thames Water are proposing to carry out New service connection on Burgess Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 13:26.

Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Hayfield Passage

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hayfield Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 1 Apr 2025 at 10:47.

Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Hayfield Passage

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hayfield Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 May 2025 at 13:18.

LONG TERM
Between
23 Jun and 7 Nov 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:23.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 13:54.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 14:52.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:05.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Altmore Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Altmore Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:48.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 11:43.

Between
23 and 25 Jun 2025
Details
View Map
Share
Ferns Road

London Borough Of Newham were proposing to carry out roadworks on Ferns Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 31 Mar 2025 at 19:35.

Cadent Gas logo
Between
23 Jun and 9 Jul 2025
Details
View Map
Share
Acacia Road

Cadent Gas were proposing to carry out Utility asset works on Acacia Road, Leytonstone.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 08:34.

Cadent Gas logo
Between
23 Jun and 9 Jul 2025
Details
View Map
Share
Cecil Road

Cadent Gas were proposing to carry out Utility asset works on Cecil Road, Leytonstone.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 08:34.

Cadent Gas logo
Between
23 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Acacia Road

Cadent Gas are proposing to carry out Utility asset works on Acacia Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 14:49.

Cadent Gas logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Benton Road

Cadent Gas are proposing to carry out Utility asset works on Benton Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

UK Power Networks Eastern & London logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Derwent Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Derwent Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 10:00.

UK Power Networks Eastern & London logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Derwent Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Derwent Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 15:45.

Thames Water logo
LONG TERM
Between
24 Jun and 28 Aug 2025
Details
View Map
Share
Follow
Edwards Road

Thames Water are proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:38.

Thames Water logo
LONG TERM
Between
24 Jun and 28 Aug 2025
Details
View Map
Share
Follow
Edwards Road

Thames Water are proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:59.

Thames Water logo
LONG TERM
Between
24 Jun and 1 Sep 2025
Details
View Map
Share
Monarch Road

Thames Water were proposing to carry out Utility asset works on Monarch Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 1 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:12.

Between
24 and 28 Jun 2025
Details
View Map
Share
Follow
Gibbins Road

London Borough Of Newham are proposing to carry out Section 50 on Gibbins Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 6 Mar 2025 at 14:59.

Thames Water logo
Between
24 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Colchester Avenue

Thames Water are proposing to carry out New service connection on Colchester Avenue, Manor Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:37.

Thames Water logo
LONG TERM
Between
26 Jun and 8 Sep 2025
Details
View Map
Share
Follow
Bullbanks Road

Thames Water are proposing to carry out Utility asset works on Bullbanks Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 17:01.

Between
26 Jun and 26 Jul 2025
Details
View Map
Share
Dock Road

London Borough Of Newham were proposing to carry out Highway improvement works on Dock Road, Silvertown, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 26 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 26 Mar 2025 at 09:42.

LONG TERM
Between
26 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Dock Road

London Borough Of Newham are proposing to carry out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 4 Apr 2025 at 17:16.

Cadent Gas logo
LONG TERM
Between
26 Jun and 18 Sep 2025
Details
View Map
Share
Follow
Sunnyside Road

Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:21.

Cadent Gas logo
LONG TERM
Between
26 Jun and 18 Sep 2025
Details
View Map
Share
Follow
Sunnyside Road

Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:47.

Cadent Gas logo
LONG TERM
Between
26 Jun and 18 Sep 2025
Details
View Map
Share
Sunnyside Road

Cadent Gas were proposing to carry out Utility asset works on Sunnyside Road, Ilford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 18 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:50.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Keswick Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Keswick Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 13:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Keswick Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Keswick Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 09:28.

Thames Water logo
LONG TERM
Between
27 Jun and 29 Sep 2025
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:11.

LONG TERM
Between
28 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Mar 2025 at 11:45.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Northdown Road

Thames Water are proposing to carry out Utility repair and maintenance works on Northdown Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 11:02.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Northdown Road

Thames Water are proposing to carry out Utility repair and maintenance works on Northdown Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 08:58.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Prince Charles Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Charles Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:45.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Charlton Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Charlton Way, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:48.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Maze Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Maze Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:47.

London Borough Of Bexley logo
LONG TERM
Between
30 Jun and 31 Dec 2025
Details
View Map
Share
Follow
Bronze Age Way

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 December 2025. The works will impact the verge only.

This roadwork event was last updated by London Borough Of Bexley on 11 Sep 2024 at 11:34.

UK Power Networks Eastern & London logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:31.

UK Power Networks Eastern & London logo
Between
30 Jun and 5 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:31.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Mile End Road

Thames Water are proposing to carry out Utility asset works on Mile End Road, London.

These works are categorised as Major.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:24.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 14:47.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 12:26.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 14:48.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 12:27.

Thames Water logo
Between
30 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Great Eastern Road

Thames Water are proposing to carry out Utility repair and maintenance works on Great Eastern Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 11:26.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
30 Jun and 19 Sep 2025
Details
View Map
Share
Follow
Dagenham Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Apr 2025 at 14:01.

Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Montfichet Road

London Borough Of Newham are proposing to carry out Section 50 on Montfichet Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 14:51.

Cadent Gas logo
Between
30 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Aldborough Road South

Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
30 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Colenso Road

Cadent Gas are proposing to carry out Utility asset works on Colenso Road, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Thames Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Wilmount Street

Thames Water are proposing to carry out Remedial works on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:28.

Thames Water logo
Between
1 and 7 Jul 2025
Details
View Map
Share
Follow
Clements Road

Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 09:30.

UK Power Networks Eastern & London logo
Between
2 and 6 Jul 2025
Details
View Map
Share
Follow
Ambleside Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Ambleside Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 13:15.

UK Power Networks Eastern & London logo
Between
2 and 6 Jul 2025
Details
View Map
Share
Follow
Ambleside Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Ambleside Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 09:30.

Transport for London (TfL) logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:44.

Transport for London (TfL) logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2025 at 09:09.

Transport for London (TfL) logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:19.

Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 21 Apr 2025 at 21:51.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Morden College Footpath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:19.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Oct 2025
Details
View Map
Share
Follow
Morden College Footpath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 7 July 2025 and could run through until 15 October 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Kidbrooke Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kidbrooke Gardens, Kidbrooke.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:18.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Follow
St Germans Place

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Germans Place, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:19.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 1 Sep 2025
Details
View Map
Share
Follow
St Germans Place

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Germans Place, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 06:27.

Cadent Gas logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Highbridge Road

Cadent Gas are proposing to carry out Utility asset works on Highbridge Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 15:48.

Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
White Post Lane

London Borough Of Tower Hamlets are proposing to carry out Section 50 on White Post Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 3 Jun 2025 at 15:54.

Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Little Ilford Lane

London Borough Of Newham are proposing to carry out Highway improvement works on Little Ilford Lane, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 21 May 2025 at 09:27.

Thames Water logo
Between
7 and 22 Jul 2025
Details
View Map
Share
Follow
Royston Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 7 July 2025 and could run through until 22 July 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 13:13.

Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Wellesley Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Wellesley Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Hermon Hill

London Borough Of Redbridge are proposing to carry out Highway improvement works on Hermon Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Prestons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Apr 2025 at 11:21.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Prestons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 May 2025 at 10:56.

Electricity Network Company logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Ordnance Crescent

Electricity Network Company are proposing to carry out Utility asset works on Ordnance Crescent, Greenwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 24 Apr 2025 at 13:27.

Electricity Network Company logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Ordnance Crescent

Electricity Network Company are proposing to carry out Utility asset works on Ordnance Crescent, Greenwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Apr 2025 at 07:19.

Between
9 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Ilford Lane

London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
York Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on York Road, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Atherton Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Atherton Road, Clayhall, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Thames Water logo
Between
10 and 14 Jul 2025
Details
View Map
Share
Ravenhill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Ravenhill Road, Upton Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 10:28.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Breamore Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Breamore Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

London Borough Of Enfield logo
Between
10 and 17 Jul 2025
Details
View Map
Share
Water Lane

London Borough Of Enfield were proposing to carry out Highway improvement works on Water Lane, Seven Kings, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 17 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 10 Apr 2025 at 12:54.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Water Lane

London Borough Of Redbridge are proposing to carry out Highway improvement works on Water Lane, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 28 Apr 2025 at 10:45.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Audley Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Audley Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Oakwood Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Oakwood Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Leamington Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Leamington Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Charlbury Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Charlbury Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Lynford Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Lynford Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Nutfield Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Nutfield Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Talbot Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Talbot Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Woodstock Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Woodstock Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Arundel Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Arundel Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Cardigan Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Cardigan Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 10:34.

Electricity Network Company logo
Between
14 and 24 Jul 2025
Details
View Map
Share
Follow
Victoria Dock Road

Electricity Network Company are proposing to carry out Utility asset works on Victoria Dock Road, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 7 Apr 2025 at 16:36.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Ethel Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 17 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 11:52.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Prince Regent Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Prince Regent Lane, West Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 14:00.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Tree Road

Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:30.

UK Power Networks Eastern & London logo
Between
14 and 24 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 14:18.

UK Power Networks Eastern & London logo
Between
14 and 23 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 14:09.

Murphy Power Distribution logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 23 Apr 2025 at 16:48.

Murphy Power Distribution logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2025 at 08:17.

Virgin Media logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Movers Lane

Virgin Media are proposing to carry out Utility asset works on Movers Lane, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 28 Apr 2025 at 16:00.

Cadent Gas logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Seton Gardens

Cadent Gas are proposing to carry out Utility asset works on Seton Gardens, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 10:28.

Cadent Gas logo
LONG TERM
Between
14 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Arden Crescent

Cadent Gas are proposing to carry out Utility asset works on Arden Crescent, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:58.

Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Belgrave Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Belgrave Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 11 Apr 2025 at 15:15.

Electricity Network Company logo
LONG TERM
Between
15 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Millennium Way

Electricity Network Company are proposing to carry out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 23 Apr 2025 at 07:15.

Transport for London (TfL) logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Forty Acre Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Forty Acre Lane, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 14:00.

UK Power Networks Eastern & London logo
Between
16 and 20 Jul 2025
Details
View Map
Share
Follow
Widecombe Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Widecombe Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 13:15.

UK Power Networks Eastern & London logo
Between
16 and 20 Jul 2025
Details
View Map
Share
Follow
Widecombe Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Widecombe Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 09:31.

UK Power Networks Eastern & London logo
Between
17 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.

Thames Water logo
LONG TERM
Between
19 Jul and 23 Aug 2025
Details
View Map
Share
Follow
Ohio Road

Thames Water are proposing to carry out Utility asset works on Ohio Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:35.

Thames Water logo
LONG TERM
Between
19 Jul and 20 Sep 2025
Details
View Map
Share
Follow
Lucas Avenue

Thames Water are proposing to carry out Utility asset works on Lucas Avenue, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:44.

Thames Water logo
LONG TERM
Between
19 Jul and 20 Sep 2025
Details
View Map
Share
Follow
Raymond Road

Thames Water are proposing to carry out Utility asset works on Raymond Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:46.

Thames Water logo
LONG TERM
Between
19 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Wolseley Road

Thames Water are proposing to carry out Utility asset works on Wolseley Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:26.

Southern Gas Networks logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Springfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 13:36.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Plymstock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plymstock Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 16:19.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Plymstock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plymstock Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:42.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Plymstock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plymstock Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:55.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Charlton Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 08:43.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Charlton Church Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Church Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:24.

Thames Water logo
LONG TERM
Between
21 Jul and 17 Sep 2025
Details
View Map
Share
Follow
Halt Robin Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 10:54.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:25.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:49.

Thames Water logo
LONG TERM
Between
21 Jul and 1 Oct 2025
Details
View Map
Share
Bullbanks Road

Thames Water were proposing to carry out Utility asset works on Bullbanks Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 16:58.

Thames Water logo
LONG TERM
Between
21 Jul and 19 Sep 2025
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 17:04.

Thames Water logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Prince Regent Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Prince Regent Lane, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:28.

Thames Water logo
Between
21 and 27 Jul 2025
Details
View Map
Share
Follow
Tree Road

Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 12:46.

Thames Water logo
Between
21 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Ackroyd Drive

Thames Water are proposing to carry out Statutory Infrastructure Works on Ackroyd Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 11:44.

Thames Water logo
LONG TERM
Between
21 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Braemar Road

Thames Water are proposing to carry out Utility asset works on Braemar Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.

Virgin Media logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Morville Street

Virgin Media were proposing to carry out Utility asset works on Morville Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 26 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 May 2025 at 15:42.

Virgin Media logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
Morville Street

Virgin Media are proposing to carry out Utility asset works on Morville Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 12 May 2025 at 11:38.

Virgin Media logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
Morville Street

Virgin Media are proposing to carry out Utility asset works on Morville Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 May 2025 at 14:02.

BT logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Dunedin Road

BT are proposing to carry out Utility asset works on Dunedin Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Apr 2025 at 15:09.

BT logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Dunedin Road

BT are proposing to carry out Utility asset works on Dunedin Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 May 2025 at 11:02.

Cadent Gas logo
LONG TERM
Between
21 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Meadow Walk

Cadent Gas are proposing to carry out Utility asset works on Meadow Walk, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2024 at 08:37.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Bristow Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:25.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Bristow Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 13:43.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Shakespeare Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shakespeare Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:11.

Southern Gas Networks logo
Between
23 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Shooters Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Mar 2025 at 07:06.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 15:35.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 13:56.

Thames Water logo
Between
23 Jul and 5 Aug 2025
Details
View Map
Share
Follow
St Helens Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Helens Road, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 14:15.

Southern Gas Networks logo
Between
24 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Holmesdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holmesdale Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:42.

Southern Gas Networks logo
Between
24 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Gipsy Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gipsy Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:44.

Transport for London (TfL) logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 11:55.

Transport for London (TfL) logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 10:19.

Transport for London (TfL) logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 10:40.

Transport for London (TfL) logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 10:06.

Southern Gas Networks logo
LONG TERM
Between
25 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Elsa Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elsa Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:44.

Network Rail logo
Between
26 and 28 Jul 2025
Details
View Map
Share
Follow
Kennedy Road

Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:17.

Network Rail logo
Between
26 and 28 Jul 2025
Details
View Map
Share
Follow
Harrow Road

Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 May 2025 at 09:27.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Cumberland Court

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Court, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 15:20.

Southern Gas Networks logo
Between
28 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Budleigh Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 15:50.

Southern Gas Networks logo
Between
28 Jul and 13 Aug 2025
Details
View Map
Share
Budleigh Crescent

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 13 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 09:37.

Southern Gas Networks logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Highcombe

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highcombe, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:44.

Southern Gas Networks logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Highcombe

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highcombe, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 21:07.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 May 2025 at 17:48.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 12:01.

Southern Gas Networks logo
Between
28 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Masons Hill

Southern Gas Networks are proposing to carry out New service connection on Masons Hill, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 09:29.

Thames Water logo
Between
28 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 21:44.

Thames Water logo
LONG TERM
Between
28 Jul and 24 Sep 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:20.

London Borough Of Bexley logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Eastern Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Eastern Way, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 Feb 2025 at 14:39.

London Borough Of Bexley logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Eastern Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Eastern Way, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 2 Jun 2025 at 13:35.

London Borough Of Bexley logo
Between
28 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Bazalgette Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Bazalgette Way, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 13:42.

Cadent Gas logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Oval Road South

Cadent Gas are proposing to carry out Utility asset works on Oval Road South, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:41.

Thames Water logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Canterbury Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Canterbury Avenue, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 14:15.

Thames Water logo
LONG TERM
Between
28 Jul and 29 Oct 2025
Details
View Map
Share
Follow
Whipps Cross Road

Thames Water are proposing to carry out Utility repair and maintenance works on Whipps Cross Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 16:05.

Southern Gas Networks logo
LONG TERM
Between
29 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Northumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 13:16.

Southern Gas Networks logo
LONG TERM
Between
29 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Millbrook Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Millbrook Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:45.

Transport for London (TfL) logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:32.

Transport for London (TfL) logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:31.

London Borough Of Bexley logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Bazalgette Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Bazalgette Way, Thamesmead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 July 2025 and run through until 2 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 12:40.

Network Rail logo
Between
2 and 4 Aug 2025
Details
View Map
Share
Follow
Kennedy Road

Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:16.

Network Rail logo
Between
2 and 4 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 May 2025 at 11:01.

Between
2 and 7 Aug 2025
Details
View Map
Share
Follow
International Way

London Borough Of Newham are proposing to carry out Section 50 on International Way, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 5 Mar 2025 at 09:15.

Transport for London (TfL) logo
Between
4 and 9 Aug 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:09.

Southern Gas Networks logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Bowford Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bowford Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:11.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Shakespeare Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Shakespeare Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:54.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Kingsgate Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Kingsgate Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:59.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Berkeley Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Berkeley Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:50.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Lewisham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Road, Lewisham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:50.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:16.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Preston Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Preston Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:46.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Greenwich South Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Greenwich South Street, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:54.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Brampton Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Brampton Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 May 2025 at 08:07.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Brampton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Brampton Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:21.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 06:18.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Chancelot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chancelot Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 09:17.

LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 12 May 2025 at 09:46.

Vodafone logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
White Horse Road

Vodafone are proposing to carry out Utility repair and maintenance works on White Horse Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 9 May 2025 at 14:17.

Cadent Gas logo
Between
4 and 24 Aug 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:02.

Cadent Gas logo
Between
4 and 24 Aug 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 09:19.

Thames Water logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Wick Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Wick Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:23.

Cadent Gas logo
Between
4 and 29 Aug 2025
Details
View Map
Share
London Road

Cadent Gas were proposing to carry out Utility asset works on London Road, Barking.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 15:17.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Gale Street

Cadent Gas are proposing to carry out Utility asset works on Gale Street, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 14:52.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Gale Street

Cadent Gas are proposing to carry out Utility asset works on Gale Street, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:43.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Gale Street

Cadent Gas were proposing to carry out Utility asset works on Gale Street, Dagenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 11:27.

Cadent Gas logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Washington Road

Cadent Gas are proposing to carry out roadworks on Washington Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 16:00.

Thames Water logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Henderson Road

Thames Water are proposing to carry out Utility repair and maintenance works on Henderson Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:48.

Thames Water logo
LONG TERM
Between
4 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:52.

Thames Water logo
LONG TERM
Between
4 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:44.

Thames Water logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Park Grove Road

Thames Water are proposing to carry out Utility asset works on Park Grove Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:21.

Thames Water logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Granleigh Road

Thames Water are proposing to carry out Utility asset works on Granleigh Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:38.

Thames Water logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Mayville Road

Thames Water are proposing to carry out Utility asset works on Mayville Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:29.

Thames Water logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Woodlands Road

Thames Water are proposing to carry out Utility asset works on Woodlands Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:33.

Thames Water logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Short Road

Thames Water are proposing to carry out Utility asset works on Short Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:24.

Thames Water logo
LONG TERM
Between
4 Aug and 25 Oct 2025
Details
View Map
Share
Follow
Norman Road

Thames Water are proposing to carry out Utility asset works on Norman Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:16.

UK Power Networks Eastern & London logo
Between
5 and 31 Aug 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:40.

Thames Water logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Woodland Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Woodland Terrace, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 07:23.

Southern Gas Networks logo
Between
7 and 22 Aug 2025
Details
View Map
Share
Follow
Darwin Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Darwin Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:35.

Southern Gas Networks logo
Between
7 and 22 Aug 2025
Details
View Map
Share
Follow
Northumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:33.

Southern Gas Networks logo
Between
7 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Westwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westwood Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:38.

Southern Gas Networks logo
Between
8 and 29 Aug 2025
Details
View Map
Share
Follow
Cornwall Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cornwall Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 09:34.

Southern Gas Networks logo
Between
8 and 22 Aug 2025
Details
View Map
Share
Follow
Orchard Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 11:27.

Network Rail logo
Between
9 and 11 Aug 2025
Details
View Map
Share
Follow
Kennedy Road

Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:16.

Network Rail logo
Between
9 and 11 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 May 2025 at 11:09.

Southern Gas Networks logo
Between
10 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Westmoreland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmoreland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:47.

Southern Gas Networks logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Upper Wickham Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Wickham Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 13:37.

Southern Gas Networks logo
Between
11 and 26 Aug 2025
Details
View Map
Share
Follow
Bideford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bideford Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:36.

Southern Gas Networks logo
Between
11 and 26 Aug 2025
Details
View Map
Share
Follow
Totnes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Totnes Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:37.

Southern Gas Networks logo
Between
11 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Lodge Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:36.

Royal Borough Of Greenwich logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Grovebury Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Grovebury Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 9 May 2025 at 05:46.

Thames Water logo
Between
11 and 22 Aug 2025
Details
View Map
Share
Follow
Pintail Close

Thames Water are proposing to carry out Utility repair and maintenance works on Pintail Close, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:01.

Thames Water logo
Between
11 and 28 Aug 2025
Details
View Map
Share
Follow
Glaucus Street

Thames Water are proposing to carry out Utility repair and maintenance works on Glaucus Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 14:56.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Balfour Road

Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Balfour Road

Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
LONG TERM
Between
11 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Perth Road

Cadent Gas are proposing to carry out Utility asset works on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 12:45.

Cadent Gas logo
LONG TERM
Between
11 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Perth Road

Cadent Gas are proposing to carry out Utility asset works on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 14:15.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Coventry Road

Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Coventry Road

Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Colombo Road

Cadent Gas are proposing to carry out Utility asset works on Colombo Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Colombo Road

Cadent Gas are proposing to carry out Utility asset works on Colombo Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 13:00.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Montreal Road

Cadent Gas are proposing to carry out Utility asset works on Montreal Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 13:00.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Montreal Road

Cadent Gas are proposing to carry out Utility asset works on Montreal Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Quebec Road

Cadent Gas are proposing to carry out Utility asset works on Quebec Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Quebec Road

Cadent Gas are proposing to carry out Utility asset works on Quebec Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Cranley Drive

Cadent Gas are proposing to carry out Utility asset works on Cranley Drive, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Cranley Drive

Cadent Gas are proposing to carry out Utility asset works on Cranley Drive, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

BT logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Brooke Road

BT are proposing to carry out Utility repair and maintenance works on Brooke Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 May 2025 at 13:01.

BT logo
Between
11 and 22 Aug 2025
Details
View Map
Share
Follow
Oakhurst Gardens

BT are proposing to carry out Utility repair and maintenance works on Oakhurst Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 May 2025 at 15:42.

BT logo
Between
11 and 22 Aug 2025
Details
View Map
Share
Follow
Oakhurst Close

BT are proposing to carry out Utility repair and maintenance works on Oakhurst Close, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 May 2025 at 13:24.

Thames Water logo
Between
12 and 31 Aug 2025
Details
View Map
Share
Follow
Manchester Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manchester Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 11:12.

Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Senrab Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Senrab Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 25 Apr 2025 at 10:34.

Thames Water logo
Between
12 and 15 Aug 2025
Details
View Map
Share
Follow
Ravenhill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ravenhill Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 09:35.

Thames Water logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Wilmount Street

Thames Water are proposing to carry out New service connection on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:54.

Southern Gas Networks logo
Between
14 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Cumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 09:37.

Network Rail logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Kennedy Road

Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:16.

Network Rail logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 May 2025 at 11:13.

Transport for London (TfL) logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:32.

UK Power Networks Eastern & London logo
Between
18 and 31 Aug 2025
Details
View Map
Share
Follow
Ealdham Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Ealdham Square, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 08:20.

UK Power Networks Eastern & London logo
Between
18 and 31 Aug 2025
Details
View Map
Share
Follow
Ealdham Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Ealdham Square, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 07:24.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Buckingham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 10:10.

Royal Borough Of Greenwich logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Timbercroft Lane

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Timbercroft Lane, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 20 May 2025 at 08:52.

Southern Gas Networks logo
Between
18 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Ha Ha Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ha Ha Road, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Dec 2024 at 07:18.

Thames Water logo
LONG TERM
Between
18 Aug and 20 Oct 2025
Details
View Map
Share
Follow
Tuskar Street

Thames Water are proposing to carry out Utility asset works on Tuskar Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 06:58.

Thames Water logo
LONG TERM
Between
18 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Azof Street

Thames Water are proposing to carry out Utility asset works on Azof Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 21 May 2025 at 06:54.

Thames Water logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Mauritius Road

Thames Water are proposing to carry out New service connection on Mauritius Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 07:17.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Bazely Street

Cadent Gas are proposing to carry out Utility asset works on Bazely Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 14:12.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Bazely Street

Cadent Gas are proposing to carry out Utility asset works on Bazely Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 10:53.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:01.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:34.

Vodafone logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
White Horse Road

Vodafone are proposing to carry out Utility repair and maintenance works on White Horse Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 May 2025 at 22:10.

Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
High Street South

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on High Street South, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 19 May 2025 at 15:20.

Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
Pilgrims Way

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Pilgrims Way, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Newham on 19 May 2025 at 15:16.

Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
Alma Street

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Alma Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 27 May 2025 at 10:10.

Thames Water logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Station Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 08:19.

Southern Gas Networks logo
Between
19 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Cumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 10:35.

Thames Water logo
Between
19 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 10:19.

Thames Water logo
LONG TERM
Between
20 Aug and 12 Dec 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 11:18.

Thames Water logo
LONG TERM
Between
20 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 11:17.

Thames Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Dunkeld Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dunkeld Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 15:12.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Elsa Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Elsa Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:51.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Avondale Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Avondale Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:53.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Ivedon Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Ivedon Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:53.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Hazeldene Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Hazeldene Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:52.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Kenmere Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Kenmere Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:51.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Teignmouth Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Teignmouth Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:52.

Southern Gas Networks logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Okehampton Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Okehampton Crescent, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:28.

Southern Gas Networks logo
Between
25 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:35.

Southern Gas Networks logo
Between
25 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Orchard Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Avenue, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:30.

Royal Borough Of Greenwich logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
Bentham Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Bentham Road, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 20 May 2025 at 08:52.

Thames Water logo
LONG TERM
Between
25 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Garfield Road

Thames Water are proposing to carry out Utility asset works on Garfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.

Between
26 Aug and 6 Sep 2025
Details
View Map
Share
Follow
Ruscoe Road

London Borough Of Newham are proposing to carry out Section 50 on Ruscoe Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 13 May 2025 at 11:34.

Between
27 Aug and 6 Sep 2025
Details
View Map
Share
Follow
Rathbone Street

London Borough Of Newham are proposing to carry out Section 50 on Rathbone Street, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 6 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 13 May 2025 at 11:36.

Between
27 and 31 Aug 2025
Details
View Map
Share
Follow
Welfare Road

London Borough Of Newham are proposing to carry out Section 50 on Welfare Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 21 May 2025 at 16:35.

Thames Water logo
LONG TERM
Between
30 Aug and 11 Oct 2025
Details
View Map
Share
Follow
Belton Road

Thames Water are proposing to carry out Utility asset works on Belton Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:26.


Roadworks Map near to Charlemont Road, LONDON, E6 6AG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 20:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Charlemont Road, LONDON, E6 6AG (64 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
EASTBOURNE ROAD, EAST HAM 
(0.1 miles)
Cadent Gas
Utility asset works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 2 Jun 2025 - 13 Jul 2025)
0.1
Details
Share
2
Cadent Gas logo
MAJOR
  
EASTBOURNE ROAD, EAST HAM 
(0.1 miles)
Cadent Gas
Utility asset works - Carriageway - Multi-way signals
Planned
Scheduled: 2 Jun 2025 - 13 Jul 2025
0.1
Details
Share
Follow
3
Thames Water logo
ALEXANDRA ROAD, EAST HAM 
(0.1 miles)
Thames Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 3 Jun 2025 13:06
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
0.1
Details
Share
Follow
4
BREDE CLOSE, EAST HAM 
(0.1 miles)
London Borough Of Newham
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 30 May 2025 - 3 Jun 2025)
0.1
Details
Share
5
Cadent Gas logo
MAJOR
  
FOLKESTONE ROAD, EAST HAM 
(0.2 miles)
Cadent Gas
Utility asset works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 2 Jun 2025 - 22 Jun 2025)
0.2
Details
Share
6
Cadent Gas logo
MAJOR
  
FOLKESTONE ROAD, EAST HAM 
(0.2 miles)
Cadent Gas
Utility asset works - Carriageway - Multi-way signals
Planned
Scheduled: 2 Jun 2025 - 22 Jun 2025
0.2
Details
Share
Follow
7
Thames Water logo
GOOSELEY LANE, EAST HAM 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 09:49
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.2
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
FOLKESTONE ROAD, EAST HAM 
(0.2 miles)
Cadent Gas
Utility asset works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 19 May 2025 - 8 Jun 2025)
0.2
Details
Share
9
Cadent Gas logo
MAJOR
  
FOLKESTONE ROAD, EAST HAM 
(0.2 miles)
Cadent Gas
Utility asset works - Carriageway - Multi-way signals
Planned
Scheduled: 19 May 2025 - 8 Jun 2025
0.2
Details
Share
Follow
10
Thames Water logo
BLANEY CRESCENT, EAST HAM 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.2
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data