ROADWORKS SUMMARY
Bow Common Lane, LONDON, E3 4FU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bow Common Lane, E3 4FU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bow Common Lane, LONDON, E3 4FU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bow Common Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.

Thames Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Vulcan Road

Thames Water are carrying out roadworks on Vulcan Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2021 at 10:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 15:26.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Albert Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Albert Embankment, Prince's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2022 at 08:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 14 Jan 2025 at 13:24.

LONG TERM
Until
19 Nov 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2023 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 22 Apr 2025 at 14:45.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.

London Borough Of Southwark logo
LONG TERM
Between
13 Jul 2023 and 30 Sep 2025
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2023 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 28 Aug 2025 at 15:05.

Transport for London (TfL) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Walworth Road

Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 13:54.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2023 and 10 Oct 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 21:46.

LONG TERM
Until
4 Feb 2026
Details
View Map
Share
Follow
Westfield Avenue

London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 4 February 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 29 Apr 2025 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
17 Jan 2024 and 14 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.

London Borough Of Hackney logo
LONG TERM
Between
15 Feb 2024 and 12 Jul 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.

LONG TERM
Until
19 Nov 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2024 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:26.

Transport for London (TfL) logo
LONG TERM
Between
24 May 2024 and 7 Dec 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out roadworks on New Bridge Street, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 May 2024 and could run through until 7 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 15:51.

Transport for London (TfL) logo
LONG TERM
Between
10 Jun 2024 and 13 Apr 2026
Details
View Map
Share
Follow
Kennington Lane

Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2024 at 10:34.

LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 3 Sep 2025 at 08:45.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2026
Details
View Map
Share
Follow
King William Street

City Of London Corporation are carrying out Highway repair and maintenance works on King William Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 30 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 8 Jul 2024 at 07:30.

London Borough Of Southwark logo
LONG TERM
Between
2 Jul 2024 and 27 Jan 2026
Details
View Map
Share
Follow
Sceaux Gardens

London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.

These works are categorised as Major.

The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.

Thames Water logo
LONG TERM
Until
7 Apr 2026
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 08:10 and could run through until 7 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:27.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Valette Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Valette Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:50.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Morning Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Morning Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:29.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:30.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:26.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:48.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:43.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:44.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:42.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Spurstowe Terrace

London Borough Of Hackney are proposing to carry out Highway improvement works on Spurstowe Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:33.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:19.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Sigdon Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Sigdon Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:32.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:40.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:22.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 20 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 20 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:15.

LONG TERM
Between
15 Aug 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Sheringham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:17.

LONG TERM
Between
15 Aug 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Dersingham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:16.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:20.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
New Cross Road

Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.

London Borough Of Lambeth logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2025 at 09:44.

London Borough Of Southwark logo
LONG TERM
Between
12 Oct 2024 and 12 Oct 2025
Details
View Map
Share
Colombo Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 1 Oct 2024 at 10:57.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 4 Oct 2024 at 12:17.

LONG TERM
Between
28 Nov 2024 and 6 Mar 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.

Thames Water logo
LONG TERM
Until
14 Dec 2025
Details
View Map
Share
Follow
Myddelton Square

Thames Water are carrying out Utility asset works on Myddelton Square, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:08 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:36.

Cadent Gas logo
LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are carrying out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:57 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 14:53.

LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 16 Jan 2025 at 08:13.

Thames Water logo
LONG TERM
Between
26 Jan and 28 Oct 2025
Details
View Map
Share
Renfrew Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 January 2025 and run through until 28 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 07:58.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:06.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:17.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:51.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Horseferry Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 11:15.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 15:06.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:04.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 15:47.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:07.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2025 at 11:43.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are carrying out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:10.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2025 at 11:45.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:06.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Horseferry Road

Transport for London (TfL) are carrying out Highway improvement works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:06.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are carrying out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

London Borough Of Camden logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are carrying out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:00 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 1 Jul 2025 at 16:18.

Thames Water logo
LONG TERM
Between
17 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Feb 2025 at 11:47.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are carrying out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are carrying out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:11 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:11.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are carrying out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:15 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 27 Feb 2025 at 11:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are carrying out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:14 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:14.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are carrying out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:13 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are carrying out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:13 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are carrying out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are carrying out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Between
17 Feb 2025 and 28 Aug 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 25 Feb 2025 at 15:42.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

The works started on 3 March 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 21 Aug 2025 at 15:48.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Linden Grove

Thames Water are carrying out Utility repair and maintenance works on Linden Grove, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 06:51.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 13:17.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 14:59.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Jan 2025 at 17:10.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Feb 2025 at 14:19.

LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Garnet Street

London Borough Of Tower Hamlets are proposing to carry out roadworks on Garnet Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 16 May 2025 at 13:12.

LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Monza Street

London Borough Of Tower Hamlets are proposing to carry out roadworks on Monza Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 16 May 2025 at 12:10.

LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Wapping Wall

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Wapping Wall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 May 2025 at 15:54.

Transport for London (TfL) logo
LONG TERM
Between
15 Mar and 27 Sep 2025
Details
View Map
Share
High Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 12:11.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Leyton Road

London Borough Of Newham are carrying out Highway improvement works on Leyton Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 07:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 11:24.

London Borough Of Southwark logo
LONG TERM
Between
17 Mar and 10 Sep 2025
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:25.

London Borough Of Southwark logo
LONG TERM
Between
17 Mar and 10 Sep 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jan 2025 at 14:52.

Transport for London (TfL) logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 10:20.

Thames Water logo
LONG TERM
Until
14 Dec 2025
Details
View Map
Share
Follow
Chadwell Street

Thames Water are carrying out Utility asset works on Chadwell Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 08:45 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:37.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Mcgrath Road

London Borough Of Newham are carrying out Highway repair and maintenance works on Mcgrath Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 06:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 21 Aug 2025 at 14:55.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2025 at 09:00 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:46.

LONG TERM
Between
30 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Marshgate Lane

London Borough Of Newham are proposing to carry out Section 50 on Marshgate Lane, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 24 Jun 2025 at 16:04.

LONG TERM
Between
1 Apr 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Barbers Road

London Borough Of Newham are proposing to carry out Section 50 on Barbers Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 23:20.

LONG TERM
Between
1 Apr 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Marshgate Lane

London Borough Of Newham are proposing to carry out Section 50 on Marshgate Lane, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 23:07.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 14:52.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 14:08.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 13:40.

LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Dock Road

London Borough Of Newham are carrying out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 11:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:25.

LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 07:25 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 2 Jul 2025 at 15:33.

Thames Water logo
LONG TERM
Between
21 Apr and 3 Nov 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:06.

London Borough Of Southwark logo
LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are carrying out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 10:57 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Jul 2025 at 11:36.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:43.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:53.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Cheapside, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are carrying out Highway repair and maintenance works on Cheapside, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:11.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are carrying out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:11.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are carrying out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:09.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
King Edward Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on King Edward Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
King Edward Street

City Of London Corporation are carrying out Highway repair and maintenance works on King Edward Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:08.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Medway Street

Cadent Gas are proposing to carry out Utility asset works on Medway Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:48.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Monck Street

Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 06:23.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:14.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:42.

City Of London Corporation logo
LONG TERM
Until
10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are carrying out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 6 May 2025 at 09:10.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
St Mary Axe

City Of London Corporation were proposing to carry out Highway repair and maintenance works on St Mary Axe, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 10 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 16 Apr 2025 at 15:01.

London Borough Of Waltham Forest logo
LONG TERM
Between
6 May 2025 and 31 Jan 2026
Details
View Map
Share
High Street

London Borough Of Waltham Forest were proposing to carry out Highway improvement works on High Street, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 31 January 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Waltham Forest on 9 Apr 2025 at 11:14.

London Borough Of Waltham Forest logo
LONG TERM
Between
6 May 2025 and 31 Jan 2026
Details
View Map
Share
Follow
High Street

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on High Street, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 31 January 2026. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Waltham Forest on 16 Jun 2025 at 15:59.

London Borough Of Waltham Forest logo
LONG TERM
Between
6 May 2025 and 31 Jan 2026
Details
View Map
Share
Follow
High Street

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on High Street, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 31 January 2026. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Apr 2025 at 15:15.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Manor Grove

London Borough Of Southwark are carrying out Highway improvement works on Manor Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2025 at 00:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Aug 2025 at 10:33.

City Of London Corporation logo
LONG TERM
Between
15 May and 20 Sep 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are proposing to carry out Highway repair and maintenance works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are carrying out Highway repair and maintenance works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 15 May 2025 at 08:43.

Network Rail logo
LONG TERM
Between
19 May and 3 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 31 Mar 2025 at 15:58.

Network Rail logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are carrying out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 08:00 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 May 2025 at 08:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 6 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Mar 2025 at 08:42.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:34.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:41.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

Cadent Gas logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are carrying out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:30 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 11:46.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 12 Dec 2025
Details
View Map
Share
Parkhurst Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:39.

Cadent Gas logo
LONG TERM
Until
2 Dec 2025
Details
View Map
Share
Follow
Medway Street

Cadent Gas are carrying out Utility asset works on Medway Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 June 2025 at 10:33 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 11:20.

Cadent Gas logo
LONG TERM
Until
1 Dec 2025
Details
View Map
Share
Follow
Monck Street

Cadent Gas are carrying out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 June 2025 at 10:54 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 11:13.

London Borough Of Southwark logo
LONG TERM
Between
4 Jun and 3 Oct 2025
Details
View Map
Share
Follow
King James Street

London Borough Of Southwark are proposing to carry out Highway improvement works on King James Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 October 2025. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 20 May 2025 at 13:19.

London Borough Of Southwark logo
LONG TERM
Between
4 Jun and 3 Oct 2025
Details
View Map
Share
Follow
King James Street

London Borough Of Southwark are proposing to carry out Highway improvement works on King James Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 October 2025. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 20 May 2025 at 13:27.

London Borough Of Southwark logo
LONG TERM
Until
13 Sep 2025
Details
View Map
Share
Follow
Clements Road

London Borough Of Southwark are carrying out Highway improvement works on Clements Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 June 2025 at 00:00 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 11 Aug 2025 at 12:31.

LONG TERM
Between
9 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 1 May 2025 at 18:13.

LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are carrying out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 June 2025 at 08:00 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 18 Aug 2025 at 12:43.

Transport for London (TfL) logo
LONG TERM
Between
19 Jun and 21 Dec 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 15:38.

Thames Water logo
LONG TERM
Between
19 Jun and 11 Sep 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 13:21.

Thames Water logo
LONG TERM
Between
19 Jun and 14 Sep 2025
Details
View Map
Share
High Street

Thames Water were proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 14 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jun 2025 at 14:33.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Strand

Cadent Gas are carrying out Utility repair and maintenance works on Strand, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 June 2025 at 22:48 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 12:40.

London Borough Of Lewisham logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Reginald Road

London Borough Of Lewisham are carrying out Highway improvement works on Reginald Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 28 Aug 2025 at 15:58.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun 2025 and 23 Jun 2027
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 23 June 2027. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Jun 2025 at 17:32.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are carrying out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 07:19 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 12:09.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 07:20 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 12:09.

Thames Water logo
LONG TERM
Between
23 Jun and 29 Sep 2025
Details
View Map
Share
Follow
Bishops Way

Thames Water are proposing to carry out Utility asset works on Bishops Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 9 Jun 2025 at 15:34.

Thames Water logo
LONG TERM
Between
23 Jun and 29 Sep 2025
Details
View Map
Share
Follow
Bonner Road

Thames Water are proposing to carry out Utility asset works on Bonner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 13:28.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Mile End Road

Thames Water are proposing to carry out Utility asset works on Mile End Road, London.

These works are categorised as Major.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:24.

Thames Water logo
LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

The works started on 30 June 2025 at 11:00 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 11:52.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 May 2025 at 14:47.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Aberavon Road

Thames Water were proposing to carry out Utility asset works on Aberavon Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 5 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 13:49.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 May 2025 at 14:48.

Thames Water logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are carrying out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 11:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 11:05.

LONG TERM
Between
30 Jun 2025 and 30 Mar 2026
Details
View Map
Share
Follow
Barbers Road

London Borough Of Newham are proposing to carry out Section 50 on Barbers Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 30 March 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 24 Jun 2025 at 15:41.

Transport for London (TfL) logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are carrying out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 07:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 14:03.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 15:03.

Transport for London (TfL) logo
LONG TERM
Until
15 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 07:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2025 at 10:22.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment Slip Road (N)

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment Slip Road (N), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Temple Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Temple Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the footway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 13:56.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Temple Place

Transport for London (TfL) were proposing to carry out Highway improvement works on Temple Place, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 14:03.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Blackfriars Passage

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 13:58.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Carmelite Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Carmelite Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 14:01.

London Borough Of Southwark logo
LONG TERM
Between
1 Jul 2025 and 22 Feb 2026
Details
View Map
Share
Follow
Stoney Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 22 February 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 24 Jul 2025 at 15:58.

London Borough Of Camden logo
LONG TERM
Between
2 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 2 Apr 2025 at 12:11.

London Borough Of Camden logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are carrying out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 July 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Jul 2025 at 09:49.

LONG TERM
Until
11 Sep 2025
Details
View Map
Share
Follow
Wharfside Road

London Borough Of Newham are carrying out Section 50 on Wharfside Road, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 July 2025 at 09:00 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 15 Jul 2025 at 15:53.

Network Rail logo
LONG TERM
Until
29 Aug 2026
Details
View Map
Share
Follow
Springbank Road

Network Rail are carrying out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 July 2025 at 14:00 and could run through until 29 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Sep 2025 at 08:08.

London Borough Of Southwark logo
LONG TERM
Between
4 Jul 2025 and 3 Jul 2026
Details
View Map
Share
Follow
Great Dover Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Great Dover Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 3 July 2026. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 13 Jun 2025 at 11:21.

London Borough Of Southwark logo
LONG TERM
Between
4 Jul 2025 and 3 Jul 2026
Details
View Map
Share
Great Dover Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Great Dover Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 3 July 2026. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Jun 2025 at 07:13.

Transport for London (TfL) logo
LONG TERM
Between
6 Jul and 24 Nov 2025
Details
View Map
Share
Follow
Gray's Inn Road

Transport for London (TfL) are proposing to carry out roadworks on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Aug 2025 at 08:54.

Thames Water logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 22:10 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 11:38.

Thames Water logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Bishops Way

Thames Water are carrying out Utility asset works on Bishops Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 14:13 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 07:56.

Cadent Gas logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Highbridge Road

Cadent Gas are carrying out Utility asset works on Highbridge Road, Barking.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 06:32 and could run through until 31 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 07:53.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul and 10 Sep 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2025 at 11:32.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul and 10 Sep 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2025 at 11:28.

City Of Westminster logo
LONG TERM
Between
7 Jul 2025 and 7 Jul 2026
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 July 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 3 Apr 2025 at 12:08.

London Borough Of Waltham Forest logo
LONG TERM
Until
1 Dec 2026
Details
View Map
Share
Follow
Oliver Road

London Borough Of Waltham Forest are carrying out roadworks on Oliver Road, Leyton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 July 2025 at 08:00 and could run through until 1 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Jul 2025 at 09:54.

London Borough Of Waltham Forest logo
LONG TERM
Until
1 Dec 2026
Details
View Map
Share
Follow
Oliver Road

London Borough Of Waltham Forest are carrying out roadworks on Oliver Road, Leyton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 July 2025 at 08:00 and could run through until 1 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Jul 2025 at 09:53.

Thames Water logo
LONG TERM
Between
14 Jul and 14 Nov 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 14 July 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 14:20.

Thames Water logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works started on 14 July 2025 at 08:56 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 08:56.

Thames Water logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Bonner Road

Thames Water are carrying out Utility asset works on Bonner Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 12:03 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 13:26.

Thames Water logo
LONG TERM
Between
14 Jul and 10 Oct 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 10:42.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 10:34.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul 2025 and 12 Jul 2027
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 12:41.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul 2025 and 12 Jul 2027
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 July 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 14:21.

London Borough Of Haringey logo
LONG TERM
Between
17 Jul and 17 Oct 2025
Details
View Map
Share
Follow
Elm Park Avenue

London Borough Of Haringey are proposing to carry out Highway improvement works on Elm Park Avenue, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 18 Jul 2025 at 13:41.

National Grid Electricity Transmission logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Camley Street

National Grid Electricity Transmission are carrying out roadworks on Camley Street, St Pancras And Somers Town, London.

The works started on 18 July 2025 at 11:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by National Grid Electricity Transmission on 12 Aug 2025 at 18:15.

Thames Water logo
LONG TERM
Between
19 Jul and 20 Sep 2025
Details
View Map
Share
Follow
Lucas Avenue

Thames Water are proposing to carry out Utility asset works on Lucas Avenue, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:44.

Thames Water logo
LONG TERM
Between
19 Jul and 20 Sep 2025
Details
View Map
Share
Follow
Raymond Road

Thames Water are proposing to carry out Utility asset works on Raymond Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:46.

Thames Water logo
LONG TERM
Between
19 Jul and 2 Nov 2025
Details
View Map
Share
Highbury Grove

Thames Water were proposing to carry out Utility asset works on Highbury Grove, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Jul 2025 at 16:03.

Thames Water logo
LONG TERM
Between
21 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Braemar Road

Thames Water are proposing to carry out Utility asset works on Braemar Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 6 Jan 2026
Details
View Map
Share
Follow
King's Cross Road

Transport for London (TfL) are proposing to carry out roadworks on King's Cross Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 11:20.

Southern Gas Networks logo
LONG TERM
Until
10 Sep 2025
Details
View Map
Share
Follow
St Germans Place

Southern Gas Networks are carrying out Utility repair and maintenance works on St Germans Place, Blackheath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 July 2025 at 14:00 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 10:56.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Charlton Church Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Church Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
21 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 16:16.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:25.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:49.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Charlton Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Lane, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:25.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Westmoor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Westmoor Street, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:26.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Prospect Vale

Transport for London (TfL) are proposing to carry out Highway improvement works on Prospect Vale, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:24.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Warspite Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:24.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Ruston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:26.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Church Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Church Hill, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:24.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
John Wilson Street

Transport for London (TfL) were proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 30 January 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 13:30.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 13:38.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Ferry Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Ferry Approach, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Jul 2025 at 16:30.

Royal Borough Of Greenwich logo
LONG TERM
Between
21 Jul and 30 Nov 2025
Details
View Map
Share
Follow
West Parkside

Royal Borough Of Greenwich are proposing to carry out Section 50 on West Parkside, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Greenwich on 11 Aug 2025 at 16:30.

Thames Tideway Tunnel logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Croft Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2025 at 00:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 20 Aug 2025 at 17:33.

London Borough Of Southwark logo
LONG TERM
Until
20 Feb 2026
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 08:07.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lassell Street

Thames Water are carrying out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 09:00 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 05:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 17 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:38.

City Of London Corporation logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are carrying out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 28 Jul 2025 at 09:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 18 Sep 2025
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jul 2025 at 10:14.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Whitechapel Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Whitechapel Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 1 Aug 2025 at 14:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 14 Sep 2025
Details
View Map
Share
Follow
Southampton Row

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southampton Row, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 14 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 08:42.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 20 Oct 2025
Details
View Map
Share
Follow
Curtain Road

Transport for London (TfL) are proposing to carry out roadworks on Curtain Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Aug 2025 at 09:57.

UK Power Networks Eastern & London logo
LONG TERM
Until
15 Sep 2025
Details
View Map
Share
Follow
Nelson Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Nelson Street, East Ham, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 13:00 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jul 2025 at 14:28.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 19 Dec 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 19 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 09:38.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 14 Nov 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 10:07.

Thames Water logo
LONG TERM
Until
15 Oct 2025
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:30 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jul 2025 at 10:17.

Thames Water logo
LONG TERM
Between
28 Jul and 29 Oct 2025
Details
View Map
Share
Follow
Whipps Cross Road

Thames Water are proposing to carry out Utility repair and maintenance works on Whipps Cross Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 16:05.

Thames Water logo
LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Follow
Whipps Cross Road

Thames Water are proposing to carry out Utility repair and maintenance works on Whipps Cross Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 26 Jun 2025 at 16:11.

Thames Water logo
LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Whipps Cross Road

Thames Water were proposing to carry out Utility repair and maintenance works on Whipps Cross Road, Leytonstone.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 15:55.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 1 Jun 2026
Details
View Map
Share
St John Street

Thames Water were proposing to carry out Utility asset works on St John Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 1 June 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jun 2025 at 13:35.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:56.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Chadwick Road

Thames Water are proposing to carry out Utility asset works on Chadwick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.

Thames Water logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Chadwick Road

Thames Water are carrying out Utility asset works on Chadwick Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 08:30 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:58.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Grove Park

Thames Water are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.

Thames Water logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Grove Park

Thames Water are carrying out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 08:30 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:57.

Thames Water logo
LONG TERM
Between
29 Jul and 16 Oct 2025
Details
View Map
Share
Follow
Linwood Close

Thames Water are proposing to carry out Utility asset works on Linwood Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 16:51.

Thames Water logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Linwood Close

Thames Water are carrying out Utility asset works on Linwood Close, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 08:30 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:57.

UK Power Networks Eastern & London logo
LONG TERM
Between
30 Jul and 20 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2025 at 11:35.

Transport for London (TfL) logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Westminster Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westminster Bridge Road, St James's, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2025 at 12:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2025 at 15:03.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 09:13.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 August 2025 at 13:30 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Aug 2025 at 13:48.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:20.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:19.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:20.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:19.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment Slip Road (N)

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment Slip Road (N), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:19.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Temple Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Temple Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the footway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 09:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Temple Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Temple Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 14:18.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Blackfriars Passage

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 09:48.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Carmelite Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Carmelite Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 09:49.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:20.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:20.

LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are carrying out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 August 2025 at 09:30 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 4 Aug 2025 at 07:56.

Transport for London (TfL) logo
LONG TERM
Between
2 Aug and 21 Dec 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 August 2025 and run through until 21 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 10:03.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 August 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 10:13.

Transport for London (TfL) logo
LONG TERM
Between
2 Aug and 23 Dec 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 August 2025 and run through until 23 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 09:58.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 August 2025 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 10:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Aug and 25 Sep 2025
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jul 2025 at 11:24.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Nelson Street

Thames Water were proposing to carry out Utility asset works on Nelson Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 13:25.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Nelson Street

Thames Water are proposing to carry out Utility asset works on Nelson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:56.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Ashfield Street

Thames Water were proposing to carry out Utility asset works on Ashfield Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 09:22.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Ashfield Street

Thames Water are proposing to carry out Utility asset works on Ashfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:50.

LONG TERM
Between
4 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
St John Street

London Borough Of Islington are proposing to carry out Highway improvement works on St John Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 3 Apr 2025 at 11:45.

LONG TERM
Between
4 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Cowcross Street

London Borough Of Islington are proposing to carry out Highway improvement works on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 27 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 8 Apr 2025 at 13:19.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 26 Dec 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 26 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jul 2025 at 16:58.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 26 Dec 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 15:43.

Transport for London (TfL) logo
LONG TERM
Until
26 Dec 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are carrying out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 26 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 11:40.

Thames Water logo
LONG TERM
Until
15 Sep 2025
Details
View Map
Share
Follow
Lucas Avenue

Thames Water are carrying out Utility asset works on Lucas Avenue, Upton Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 14:44 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 12:33.

Thames Water logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Wolseley Road

Thames Water are proposing to carry out Utility asset works on Wolseley Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 11:07.

London Borough Of Hackney logo
LONG TERM
Between
4 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Colvestone Crescent

London Borough Of Hackney are proposing to carry out Highway improvement works on Colvestone Crescent, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 30 Dec 2024 at 13:50.

Thames Water logo
LONG TERM
Between
4 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:52.

Thames Water logo
LONG TERM
Between
4 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:44.

Thames Water logo
LONG TERM
Between
4 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jun 2025 at 08:39.

Thames Water logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Park Grove Road

Thames Water are proposing to carry out Utility asset works on Park Grove Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:59.

Thames Water logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Park Grove Road

Thames Water are carrying out Utility asset works on Park Grove Road, Leytonstone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 14:12 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 14:12.

Thames Water logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Granleigh Road

Thames Water are proposing to carry out Utility asset works on Granleigh Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:46.

Thames Water logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Mayville Road

Thames Water are proposing to carry out Utility asset works on Mayville Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 15:12.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Woodlands Road

Thames Water are proposing to carry out Utility asset works on Woodlands Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:49.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Short Road

Thames Water are proposing to carry out Utility asset works on Short Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:52.

Thames Water logo
LONG TERM
Between
4 Aug and 25 Oct 2025
Details
View Map
Share
Follow
Norman Road

Thames Water are proposing to carry out Utility asset works on Norman Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:58.

Thames Water logo
LONG TERM
Until
18 Sep 2025
Details
View Map
Share
Follow
Hillsboro Road

Thames Water are carrying out roadworks on Hillsboro Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:51.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are carrying out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:50.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Glengarry Road

Thames Water are carrying out Remedial works on Glengarry Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:50.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Lewisham Road

Transport for London (TfL) are carrying out Highway improvement works on Lewisham Road, Lewisham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are carrying out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are carrying out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Greenwich South Street

Transport for London (TfL) are carrying out Highway improvement works on Greenwich South Street, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:11.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 29 Oct 2025
Details
View Map
Share
Walworth Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Walworth Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 13:24.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 29 Oct 2025
Details
View Map
Share
Elephant And Castle

Transport for London (TfL) were proposing to carry out Highway improvement works on Elephant And Castle, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 13:25.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 12 May 2025 at 09:46.

Thames Water logo
LONG TERM
Until
6 Feb 2026
Details
View Map
Share
Follow
Selborne Road

Thames Water are carrying out Utility asset works on Selborne Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 11:02 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 10:55.

Thames Water logo
LONG TERM
Between
4 Aug 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Selborne Road

Thames Water are proposing to carry out Utility asset works on Selborne Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 15:05.

Thames Water logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Ohio Road

Thames Water are carrying out Utility asset works on Ohio Road, Plaistow, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 09:55 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:29.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mayfield Road

Thames Water are proposing to carry out Utility asset works on Mayfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 14:06.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mayfield Road

Thames Water are carrying out Utility asset works on Mayfield Road, Plaistow, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 09:59 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:32.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Mayfield Road

Thames Water were proposing to carry out Utility asset works on Mayfield Road, Plaistow, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jul 2025 at 11:25.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Garfield Road

Thames Water are proposing to carry out Utility asset works on Garfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 14:00.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Garfield Road

Thames Water are carrying out Utility asset works on Garfield Road, Plaistow, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 10:23 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:32.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 15:44.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are carrying out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 10:00 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 10:03.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 15:44.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are carrying out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 10:00 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 10:02.

London Borough Of Southwark logo
LONG TERM
Between
8 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Jun 2025 at 13:29.

City Of Westminster logo
LONG TERM
Between
8 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Jun 2025 at 08:03.

City Of Westminster logo
LONG TERM
Between
8 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Waterloo Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 6 Jun 2025 at 08:01.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 August 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jul 2025 at 17:18.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 August 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jul 2025 at 16:55.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 August 2025 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Jul 2025 at 17:11.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 August 2025 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jul 2025 at 16:51.

LONG TERM
Between
11 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Newham are proposing to carry out Highway improvement works on Osborne Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 17 Jun 2025 at 09:07.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Little College Street

Thames Water are proposing to carry out Utility asset works on Little College Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 09:44.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Little College Street

Thames Water are carrying out Utility asset works on Little College Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 08:00 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 09:09.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:42.

Transport for London (TfL) logo
LONG TERM
Between
13 Aug and 15 Sep 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 12:03.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 13:13.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:46.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 13:17.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Liverpool Street

Cadent Gas are carrying out Utility repair and maintenance works on Liverpool Street, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 August 2025 at 18:00 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 18:12.

Thames Water logo
LONG TERM
Between
15 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Braemar Road

Thames Water are proposing to carry out Utility asset works on Braemar Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 12:42.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Charlotte Terrace

Cadent Gas are carrying out Utility repair and maintenance works on Charlotte Terrace, Islington, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2025 at 22:47 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 13:02.

UK Power Networks Eastern & London logo
Between
18 Aug and 13 Sep 2025
Details
View Map
Share
Follow
High Holborn

UK Power Networks Eastern & London are proposing to carry out Utility asset works on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 18:00.

UK Power Networks Eastern & London logo
Between
18 Aug and 13 Sep 2025
Details
View Map
Share
Follow
Museum Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Museum Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 18:03.

LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 2 Jun 2025 at 15:32.

Finishing
Friday
Details
View Map
Share
Follow
Cooks Road

London Borough Of Newham are carrying out Section 50 on Cooks Road, Stratford, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 09:37 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 2 Sep 2025 at 17:12.

London Borough Of Hackney logo
LONG TERM
Between
18 Aug and 28 Nov 2025
Details
View Map
Share
Whiston Road

London Borough Of Hackney were proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 25 Jul 2025 at 11:27.

London Borough Of Hackney logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Whiston Road

London Borough Of Hackney are carrying out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Aug 2025 at 08:22.

Thames Water logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Raymond Road

Thames Water are carrying out Utility asset works on Raymond Road, Upton Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 15:06 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 09:28.

Thames Water logo
Between
18 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Woodlands Road

Thames Water are proposing to carry out Utility asset works on Woodlands Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 10:18.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 1 Oct 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 06:04.

Southern Gas Networks logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 10:30 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 10:51.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Bird In Bush Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Bird In Bush Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 3 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Aug 2025 at 11:44.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Ha Ha Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ha Ha Road, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Dec 2024 at 07:18.

Thames Water logo
LONG TERM
Between
18 Aug and 20 Oct 2025
Details
View Map
Share
Tuskar Street

Thames Water were proposing to carry out Utility asset works on Tuskar Street, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 16:26.

Thames Water logo
LONG TERM
Between
18 Aug and 6 Oct 2025
Details
View Map
Share
Azof Street

Thames Water were proposing to carry out Utility asset works on Azof Street, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 6 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 16:26.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
New Kent Road

Transport for London (TfL) were proposing to carry out Highway improvement works on New Kent Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 4 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 17:14.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Elephant And Castle

Transport for London (TfL) were proposing to carry out Highway improvement works on Elephant And Castle, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 4 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 17:18.

Thames Water logo
LONG TERM
Between
18 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Millbank

Thames Water are proposing to carry out Utility asset works on Millbank, Vincent Square, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 08:35.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
William Iv Street

Thames Water are carrying out Utility repair and maintenance works on William Iv Street, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 10:00 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 16:36.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Bazely Street

Cadent Gas are proposing to carry out Utility asset works on Bazely Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 14:12.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Bazely Street

Cadent Gas are carrying out Utility asset works on Bazely Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 15:39 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 16:10.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:01.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are carrying out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 15:42 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 16:24.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Bird In Bush Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Bird In Bush Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 11:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 11:41.

Southern Gas Networks logo
Until
14 Sep 2025
Details
View Map
Share
Follow
Elephant And Castle

Southern Gas Networks are carrying out Utility repair and maintenance works on Elephant And Castle, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 09:30 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 09:46.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 10:19.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Aug 2025 at 13:33.

Thames Water logo
LONG TERM
Between
20 Aug and 12 Dec 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 11:18.

Thames Water logo
LONG TERM
Between
20 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 11:17.

Between
20 Aug and 12 Sep 2025
Details
View Map
Share
Boleyn Road

London Borough Of Islington were proposing to carry out Highway repair and maintenance works on Boleyn Road, Hackney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Jul 2025 at 08:18.

London Borough Of Southwark logo
LONG TERM
Between
20 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Fenham Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Fenham Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 05:53.

London Borough Of Southwark logo
LONG TERM
Between
20 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Fenham Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Fenham Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 05:53.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 19 May 2025 at 11:45.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 20 May 2025 at 10:51.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 13:23.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 23 May 2025 at 09:01.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Bird In Bush Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Bird In Bush Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 12:39.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Bird In Bush Road

UK Power Networks Eastern & London are carrying out New service connection on Bird In Bush Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 August 2025 at 08:30 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 09:55.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Leadenhall Street

Cadent Gas are carrying out Utility repair and maintenance works on Leadenhall Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 August 2025 at 19:26 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 14:59.

London Borough Of Hackney logo
LONG TERM
Between
21 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Downham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Downham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 18 Jun 2025 at 11:39.

Finishing
Tuesday
Details
View Map
Share
Follow
Albert Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Albert Road, North Woolwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 26 Jun 2025 at 12:12.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Morden College Footpath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 25 August 2025 and could run through until 6 October 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 14:56.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Kidbrooke Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kidbrooke Gardens, Kidbrooke.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 14:58.

London Borough Of Southwark logo
LONG TERM
Between
25 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Aug 2025 at 14:13.

London Borough Of Southwark logo
LONG TERM
Between
25 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 12 Aug 2025 at 12:36.

Thames Water logo
LONG TERM
Between
25 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Chadwick Street

Thames Water are proposing to carry out Utility repair and maintenance works on Chadwick Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 07:36.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Chadwick Street

Thames Water are carrying out Utility repair and maintenance works on Chadwick Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 13:43.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 13:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 15:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Surrey Quays Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 11:47.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Prospect Hill

Cadent Gas are proposing to carry out Utility asset works on Prospect Hill, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 16:19.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 10:37.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 15:49.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 15:32.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Prospect Hill

Cadent Gas are proposing to carry out Utility asset works on Prospect Hill, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 10:31.

UK Power Networks Eastern & London logo
Between
25 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Bury Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:58.

Electricity Network Company logo
Between
25 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 15 May 2025 at 15:28.

Thames Water logo
LONG TERM
Between
25 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Garfield Road

Thames Water are proposing to carry out Utility asset works on Garfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Vyner Street

Thames Water are proposing to carry out Utility asset works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 12:03.

Thames Water logo
Until
11 Sep 2025
Details
View Map
Share
Follow
Vyner Street

Thames Water are carrying out Utility asset works on Vyner Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 12:36 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 12:36.

Finishing
Saturday
Details
View Map
Share
Follow
Ruscoe Road

London Borough Of Newham are proposing to carry out Section 50 on Ruscoe Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 13 May 2025 at 11:34.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 Aug and 28 Oct 2025
Details
View Map
Share
Follow
Kemble Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Kemble Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jun 2025 at 08:03.

UK Power Networks Eastern & London logo
LONG TERM
Until
28 Oct 2025
Details
View Map
Share
Follow
Kemble Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Kemble Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 11:55 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Aug 2025 at 12:38.

Cadent Gas logo
Between
26 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 14:22.

Cadent Gas logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are carrying out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:58 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:31.

Electricity Network Company logo
Finishing
Sunday
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 14:57.

Electricity Network Company logo
Finishing
Sunday
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are carrying out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 06:00 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 26 Aug 2025 at 07:07.

UK Power Networks Eastern & London logo
LONG TERM
Until
22 Oct 2025
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:00 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 11:01.

Thames Water logo
LONG TERM
Between
26 Aug and 24 Nov 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility repair and maintenance works on Burdett Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 14:51.

Until
21 Sep 2025
Details
View Map
Share
Follow
Fairfield Road

Aurora Utilities Limited are carrying out Utility asset works on Fairfield Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:02 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 26 Aug 2025 at 08:11.

Finishing
Tomorrow
Details
View Map
Share
Follow
Chant Street

London Borough Of Newham are proposing to carry out Section 50 on Chant Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 22 Aug 2025 at 12:17.

Finishing
Tomorrow
Details
View Map
Share
Follow
Chant Street

London Borough Of Newham are carrying out Section 50 on Chant Street, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 13:41 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Sep 2025 at 16:44.

Cadent Gas logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Sheringham Road

Cadent Gas are carrying out Utility repair and maintenance works on Sheringham Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:42 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 12:14.

Thames Water logo
Until
25 Sep 2025
Details
View Map
Share
Follow
Woodlands Road

Thames Water are carrying out Utility asset works on Woodlands Road, Leytonstone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 08:30.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Oscar Street

Thames Water are proposing to carry out Utility asset works on Oscar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 11:07.

Thames Water logo
LONG TERM
Between
26 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Romney Street

Thames Water are proposing to carry out Utility repair and maintenance works on Romney Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 06:21.

Transport for London (TfL) logo
Between
26 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Limehouse Link

Transport for London (TfL) are proposing to carry out Utility asset works on Limehouse Link, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jul 2025 at 14:29.

BT logo
LONG TERM
Between
27 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

BT are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 May 2025 at 08:11.

BT logo
LONG TERM
Between
27 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Redriff Road

BT are proposing to carry out Utility repair and maintenance works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 May 2025 at 08:11.

Finishing
Saturday
Details
View Map
Share
Follow
Rathbone Street

London Borough Of Newham are proposing to carry out Section 50 on Rathbone Street, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 6 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 13 May 2025 at 11:36.

Thames Water logo
Until
16 Sep 2025
Details
View Map
Share
Follow
Pretoria Road

Thames Water are carrying out Utility repair and maintenance works on Pretoria Road, Ilford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 10:30 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 11:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Aug and 28 Oct 2025
Details
View Map
Share
Follow
Wild Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wild Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jun 2025 at 18:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Aug and 28 Oct 2025
Details
View Map
Share
Follow
Wild Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wild Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2025 at 09:23.

London Borough Of Camden logo
LONG TERM
Between
28 Aug and 20 Dec 2025
Details
View Map
Share
Follow
Keeley Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Keeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 14 Jul 2025 at 16:04.

London Borough Of Camden logo
LONG TERM
Between
28 Aug and 20 Dec 2025
Details
View Map
Share
Follow
Keeley Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Keeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 14 Aug 2025 at 07:26.

London Borough Of Camden logo
LONG TERM
Until
20 Dec 2025
Details
View Map
Share
Follow
Keeley Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Keeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 08:00 and could run through until 20 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 28 Aug 2025 at 08:57.

Cadent Gas logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Essex Road

Cadent Gas are carrying out Utility repair and maintenance works on Essex Road, Islington, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 12:00 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 12:11.

Cadent Gas logo
Between
28 Aug and 17 Sep 2025
Details
View Map
Share
Highbury Grove

Cadent Gas were proposing to carry out Utility asset works on Highbury Grove, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2025 and run through until 17 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 10:44.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2025 at 10:38.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2025 at 09:10.

Royal Borough Of Greenwich logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Lewisham Road

Royal Borough Of Greenwich are carrying out Highway improvement works on Lewisham Road, Lewisham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 23:00 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 31 Aug 2025 at 15:17.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Eglinton Hill

Thames Water are carrying out Utility repair and maintenance works on Eglinton Hill, Plumstead.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 09:56 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:47.

London Borough Of Southwark logo
Between
29 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 13 Jun 2025 at 13:00.

London Borough Of Southwark logo
Between
29 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 15:16.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Great Peter Street

Thames Water are carrying out Utility repair and maintenance works on Great Peter Street, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2025 at 21:30 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:08.

Thames Water logo
LONG TERM
Between
30 Aug and 11 Oct 2025
Details
View Map
Share
Follow
Belton Road

Thames Water are proposing to carry out Utility asset works on Belton Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:26.

Cadent Gas logo
Between
31 Aug and 28 Sep 2025
Details
View Map
Share
Follow
Ashby Street

Cadent Gas are proposing to carry out Utility asset works on Ashby Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 14:00.

Cadent Gas logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Ashby Street

Cadent Gas are carrying out Utility asset works on Ashby Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:20 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 08:36.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Puddle Dock

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Puddle Dock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Jul 2025 at 11:00.

Cadent Gas logo
Until
12 Sep 2025
Details
View Map
Share
Follow
New Bridge Street

Cadent Gas are carrying out Utility repair and maintenance works on New Bridge Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 16:30 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 10:24.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Bouverie Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bouverie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 11:47.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Bouverie Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bouverie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 13:57.

UK Power Networks Eastern & London logo
Until
15 Sep 2025
Details
View Map
Share
Follow
Outwich Street

UK Power Networks Eastern & London are carrying out Utility asset works on Outwich Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 07:45 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 07:45.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Burgess Street

Thames Water are proposing to carry out New service connection on Burgess Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 14:43.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Burgess Street

Thames Water are carrying out New service connection on Burgess Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:40 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 12:11.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Circus Place

Cadent Gas are carrying out Utility repair and maintenance works on Circus Place, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 17:38 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 11:51.

LONG TERM
Until
3 Mar 2026
Details
View Map
Share
Follow
St John Street

London Borough Of Islington are carrying out Highway improvement works on St John Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 3 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 1 Sep 2025 at 08:40.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Jul 2025 at 09:42.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 12:09.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
Newham Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Newham Way, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 15:38.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Newham Way, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 16:30.

Thames Water logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Croydon Road

Thames Water are proposing to carry out Utility asset works on Croydon Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 16:27.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Stokes Road

Thames Water were proposing to carry out New service connection on Stokes Road, East Ham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2025 at 14:46.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Stokes Road

Thames Water are carrying out New service connection on Stokes Road, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 08:48 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 10:15.

Thames Water logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility repair and maintenance works on Burdett Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:57 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 09:57.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
Royal Docks Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Royal Docks Road, Beckton, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 16:10.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
North Circular Road

Transport for London (TfL) were proposing to carry out Highway improvement works on North Circular Road, Newham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 16:05.

BT logo
Finishing
Today
Details
View Map
Share
Morpeth Street

BT were proposing to carry out Utility repair and maintenance works on Morpeth Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Jul 2025 at 11:24.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Morpeth Street

BT are proposing to carry out Utility repair and maintenance works on Morpeth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Jul 2025 at 11:10.

Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Barbers Road

London Borough Of Newham are proposing to carry out Section 50 on Barbers Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 21 Jul 2025 at 14:44.

Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Barbers Road

London Borough Of Newham are proposing to carry out Section 50 on Barbers Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 2 Sep 2025 at 16:56.

Thames Water logo
LONG TERM
Between
1 Sep 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Bishops Way

Thames Water are proposing to carry out Utility asset works on Bishops Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 14:13.

Cadent Gas logo
Between
1 and 21 Sep 2025
Details
View Map
Share
Follow
Leywick Street

Cadent Gas are proposing to carry out Utility asset works on Leywick Street, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 13:17.

Cadent Gas logo
Between
1 and 21 Sep 2025
Details
View Map
Share
Follow
Leywick Street

Cadent Gas are proposing to carry out Utility asset works on Leywick Street, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 14:17.

Cadent Gas logo
Between
1 and 21 Sep 2025
Details
View Map
Share
Follow
Abbey Road

Cadent Gas are proposing to carry out Utility asset works on Abbey Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 13:16.

Cadent Gas logo
Between
1 and 21 Sep 2025
Details
View Map
Share
Follow
Abbey Road

Cadent Gas are proposing to carry out Utility asset works on Abbey Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 12:08.

UK Power Networks Eastern & London logo
Between
1 and 21 Sep 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:40.

UK Power Networks Eastern & London logo
Between
1 and 21 Sep 2025
Details
View Map
Share
London Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on London Road, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 21 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 17:08.

LONG TERM
Until
1 Jun 2026
Details
View Map
Share
Follow
Montfichet Road

London Borough Of Newham are carrying out Highway repair and maintenance works on Montfichet Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 06:00 and could run through until 1 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Sep 2025 at 06:30.

Virgin Media logo
Finishing
Today
Details
View Map
Share
Follow
High Street

Virgin Media are proposing to carry out Utility asset works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 May 2025 at 10:02.

Virgin Media logo
Finishing
Today
Details
View Map
Share
High Street

Virgin Media were proposing to carry out Utility asset works on High Street, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Aug 2025 at 08:20.

Finishing
Friday
Details
View Map
Share
Follow
Gibbins Road

London Borough Of Newham are carrying out Section 50 on Gibbins Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 15:42 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Sep 2025 at 16:43.

Thames Water logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Belton Road

Thames Water are carrying out Utility asset works on Belton Road, Forest Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 08:13 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 08:14.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Browning Road

Thames Water are proposing to carry out Utility repair and maintenance works on Browning Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 10:31.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Nursery Lane

Cadent Gas are proposing to carry out New service connection on Nursery Lane, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 08:40.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Nursery Lane

Cadent Gas were proposing to carry out New service connection on Nursery Lane, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 08:46.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
North Road

Thames Water are carrying out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:54 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 11:10.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 13:54.

Finishing
Friday
Details
View Map
Share
Follow
Blake Hall Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 24 Jun 2025 at 10:30.

Finishing
Friday
Details
View Map
Share
Follow
Blake Hall Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 1 Jul 2025 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Ravensbourne Park Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park Crescent, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jun 2025 at 13:55.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 29 Jul 2025 at 09:31.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2025 at 08:24.

London Borough Of Southwark logo
LONG TERM
Until
14 Oct 2025
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are carrying out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2025 at 08:05.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 6 Oct 2025
Details
View Map
Share
Peckham Rye

London Borough Of Southwark were proposing to carry out Highway improvement works on Peckham Rye, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Jul 2025 at 10:24.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 6 Oct 2025
Details
View Map
Share
Peckham Rye

London Borough Of Southwark were proposing to carry out Highway improvement works on Peckham Rye, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Jul 2025 at 08:11.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Champion Grove

London Borough Of Southwark were proposing to carry out Highway improvement works on Champion Grove, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 12 Jun 2025 at 08:07.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Grove Lane

London Borough Of Southwark were proposing to carry out Highway improvement works on Grove Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 12 Jun 2025 at 08:05.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Stories Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Stories Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 12 Jun 2025 at 08:06.

Thames Water logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Denman Road

Thames Water were proposing to carry out Utility repair and maintenance works on Denman Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 29 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 09:17.

Thames Water logo
Until
29 Sep 2025
Details
View Map
Share
Follow
Denman Road

Thames Water are carrying out Utility repair and maintenance works on Denman Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:30 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 10:58.

Thames Water logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Lewisham Road

Thames Water are proposing to carry out Utility asset works on Lewisham Road, Lewisham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 12:08.

Transport for London (TfL) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Prince Charles Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Charles Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:41.

Transport for London (TfL) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Charlton Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Charlton Way, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:43.

Transport for London (TfL) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Maze Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Maze Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:40.

Southern Gas Networks logo
Between
1 and 15 Sep 2025
Details
View Map
Share
Follow
Vanbrugh Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanbrugh Hill, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 12:51.

Transport for London (TfL) logo
Between
1 and 20 Sep 2025
Details
View Map
Share
Elephant And Castle

Transport for London (TfL) were proposing to carry out Highway improvement works on Elephant And Castle, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 20 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 16:39.

Transport for London (TfL) logo
Between
1 and 20 Sep 2025
Details
View Map
Share
Elephant And Castle

Transport for London (TfL) were proposing to carry out Highway improvement works on Elephant And Castle, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 20 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 13:24.

Thames Water logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 12:19.

Thames Water logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 08:32.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 12:28.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 12:19.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Borough High Street

Network Rail are proposing to carry out Works for Rail Purposes on Borough High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 May 2025 at 06:39.

Thames Water logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Pall Mall

Thames Water were proposing to carry out Utility asset works on Pall Mall, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 14 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 09:18.

Thames Water logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Follow
Pall Mall

Thames Water are proposing to carry out Utility asset works on Pall Mall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 06:58.

Thames Water logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Follow
Pall Mall

Thames Water are proposing to carry out Utility asset works on Pall Mall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 10:11.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Spring Gardens

Thames Water are proposing to carry out New service connection on Spring Gardens, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 10:08.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Spring Gardens

Thames Water are carrying out New service connection on Spring Gardens, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:24 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 09:56.

City Of Westminster logo
Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 09:43.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Trafalgar Square

Cadent Gas are carrying out Utility repair and maintenance works on Trafalgar Square, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:10 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 12:27.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Charles Ii Street

Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jun 2025 at 07:32.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Lower Thames Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Lower Thames Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Jun 2025 at 14:00.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lower Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Thames Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Jun 2025 at 15:57.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Lower Thames Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Lower Thames Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2025 at 12:45.

Cornerstone Telecommunications Infrastructure logo
Finishing
Friday
Details
View Map
Share
Follow
Strait Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 11 Jul 2025 at 10:03.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Upper Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Jun 2025 at 15:56.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Upper Thames Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2025 at 12:46.

Transport for London (TfL) logo
Between
1 and 25 Sep 2025
Details
View Map
Share
Limehouse Link

Transport for London (TfL) were proposing to carry out Utility asset works on Limehouse Link, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 25 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:17.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 18 Dec 2025
Details
View Map
Share
Follow
Limehouse Link

Transport for London (TfL) are proposing to carry out Utility asset works on Limehouse Link, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 16:30.

Cadent Gas logo
Between
1 and 10 Sep 2025
Details
View Map
Share
Follow
Denman Street

Cadent Gas are proposing to carry out Utility asset works on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 13:33.

Cadent Gas logo
Between
1 and 10 Sep 2025
Details
View Map
Share
Denman Street

Cadent Gas were proposing to carry out Utility asset works on Denman Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 14:45.

Cadent Gas logo
Between
1 and 10 Sep 2025
Details
View Map
Share
Shaftesbury Avenue

Cadent Gas were proposing to carry out Utility asset works on Shaftesbury Avenue, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 14:47.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Coldharbour Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Coldharbour Lane, Brixton Windrush, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 12:00 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:30.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Coldharbour Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Coldharbour Lane, London.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 9 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:29.

Royal Borough Of Greenwich logo
Finishing
Monday
Details
View Map
Share
Follow
Nithdale Road

Royal Borough Of Greenwich are carrying out Highway repair and maintenance works on Nithdale Road, Plumstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 08:00 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 2 Sep 2025 at 08:47.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Gracechurch Street

Thames Water are carrying out Utility repair and maintenance works on Gracechurch Street, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 21:22 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 11:09.

Thames Water logo
Between
2 and 22 Sep 2025
Details
View Map
Share
Croydon Road

Thames Water were proposing to carry out Utility asset works on Croydon Road, Plaistow, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 11:17.

Cadent Gas logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Tavistock Place

Cadent Gas are carrying out Utility repair and maintenance works on Tavistock Place, King's Cross, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:22 and could run through until 10 September 2025. The works will impact the footway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 10:24.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Ashby Street

Cadent Gas were proposing to carry out Utility repair and maintenance works on Ashby Street, Islington, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 09:57.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are carrying out Utility repair and maintenance works on Goswell Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 07:53 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 10:01.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Pentonville Road

Thames Water are carrying out Utility repair and maintenance works on Pentonville Road, Islington, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:42 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 13:28.

Cadent Gas logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Burgh Street

Cadent Gas are carrying out Utility repair and maintenance works on Burgh Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:15 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 13:01.

Cadent Gas logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Cross Street

Cadent Gas are carrying out Utility repair and maintenance works on Cross Street, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:11 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 12:09.

Finishing
Friday
Details
View Map
Share
Follow
Highbury Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Highbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 23 May 2025 at 16:39.

Cadent Gas logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Highbury New Park

Cadent Gas are carrying out Utility repair and maintenance works on Highbury New Park, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:17 and could run through until 10 September 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 09:32.

Cadent Gas logo
Until
10 Sep 2025
Details
View Map
Share
Follow
Nevill Road

Cadent Gas are carrying out Utility repair and maintenance works on Nevill Road, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 11:42 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 19:49.

Finishing
Friday
Details
View Map
Share
Follow
Radland Road

London Borough Of Newham are carrying out Highway repair and maintenance works on Radland Road, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:21 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 3 Sep 2025 at 09:25.

Friday
Details
View Map
Share
Radland Road

London Borough Of Newham carried out Highway repair and maintenance works on Radland Road, Canning Town, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 3 Sep 2025 and 5 Sep 2025 and were actually completed on 3 Sep 2025 between 10:52 and 12:25. The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 3 Sep 2025 at 12:27.

Friday
Details
View Map
Share
Radland Road

London Borough Of Newham carried out Highway repair and maintenance works on Radland Road, Canning Town, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 3 Sep 2025 and 5 Sep 2025 and were actually completed on 3 Sep 2025 between 10:22 and 10:52. The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 3 Sep 2025 at 11:01.

G2 Energy IDNO logo
Finishing
Friday
Details
View Map
Share
Follow
Stephen Mews

G2 Energy IDNO are proposing to carry out New service connection on Stephen Mews, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 18 Aug 2025 at 10:19.

G2 Energy IDNO logo
Finishing
Friday
Details
View Map
Share
Follow
Stephen Mews

G2 Energy IDNO are carrying out New service connection on Stephen Mews, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 3 Sep 2025 at 08:26.

Cadent Gas logo
Until
11 Sep 2025
Details
View Map
Share
Follow
Old Montague Street

Cadent Gas are carrying out Utility repair and maintenance works on Old Montague Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 08:34 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 08:36.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Batemans Row

Thames Water are carrying out Utility repair and maintenance works on Batemans Row, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 11:00 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 11:40.

Between
3 and 19 Sep 2025
Details
View Map
Share
Follow
Sheridan Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Sheridan Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 26 Jun 2025 at 12:16.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Varcoe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Varcoe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 13:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Varcoe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 12:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 14:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 12:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 08:59.

Thames Water logo
LONG TERM
Between
3 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Sylvan Road

Thames Water are proposing to carry out Utility asset works on Sylvan Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 09:11.

Between
5 and 19 Sep 2025
Details
View Map
Share
Silvertown Way

London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Silvertown Way, Canning Town, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Jul 2025 at 07:07.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Jun 2025 at 10:19.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Aug 2025 at 12:39.

London Borough Of Southwark logo
Finishing
Sunday
Details
View Map
Share
Follow
Lower Road

London Borough Of Southwark are carrying out Highway improvement works on Lower Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 7 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Jul 2025 at 11:06.

Southern Gas Networks logo
Between
8 and 15 Sep 2025
Details
View Map
Share
Follow
Marischal Road

Southern Gas Networks are proposing to carry out New service connection on Marischal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jun 2025 at 14:35.

Southern Gas Networks logo
Between
8 and 15 Sep 2025
Details
View Map
Share
Follow
Marischal Road

Southern Gas Networks are proposing to carry out New service connection on Marischal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 12:51.

Transport for London (TfL) logo
Between
8 and 28 Sep 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 10:27.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 27 Oct 2025
Details
View Map
Share
Langton Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Langton Way, Blackheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 15:03.

Thames Tideway Tunnel logo
LONG TERM
Between
8 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Hapenny Hatch Footpath

Thames Tideway Tunnel are proposing to carry out Highway improvement works on Hapenny Hatch Footpath, Greenwich.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 8 September 2025 and could run through until 8 October 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Thames Tideway Tunnel on 3 Sep 2025 at 13:15.

Thames Tideway Tunnel logo
LONG TERM
Between
8 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Hapenny Hatch Footpath

Thames Tideway Tunnel are proposing to carry out Highway improvement works on Hapenny Hatch Footpath, Greenwich.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 8 September 2025 and could run through until 8 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Tideway Tunnel on 3 Sep 2025 at 13:20.

London Borough Of Southwark logo
LONG TERM
Between
8 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Aug 2025 at 15:37.

Royal Borough Of Greenwich logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
Grand Depot Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on Grand Depot Road, Woolwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 29 Aug 2025 at 09:18.

Transport for London (TfL) logo
Between
8 and 29 Sep 2025
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 17:17.

Transport for London (TfL) logo
Between
8 and 29 Sep 2025
Details
View Map
Share
Follow
Elephant And Castle

Transport for London (TfL) are proposing to carry out Highway improvement works on Elephant And Castle, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 17:21.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Lancaster Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lancaster Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 17:20.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Lancaster Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lancaster Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 14:38.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Lancaster Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lancaster Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Webber Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Webber Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 17:20.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Webber Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Webber Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 14:46.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Webber Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Webber Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 10:46.

Southern Gas Networks logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
Blackfriars Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackfriars Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 17:06.

Southern Gas Networks logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
Blackfriars Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackfriars Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 14:49.

LONG TERM
Between
8 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Connaught Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Connaught Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 16 Jun 2025 at 10:51.

Thames Water logo
Between
8 and 21 Sep 2025
Details
View Map
Share
Follow
Pall Mall

Thames Water are proposing to carry out Utility asset works on Pall Mall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 13:49.

UK Power Networks Eastern & London logo
Between
8 and 23 Sep 2025
Details
View Map
Share
Follow
Sackville Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 09:17.

Vodafone logo
Between
8 and 14 Sep 2025
Details
View Map
Share
Cannon Street

Vodafone were proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 14 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 11 Jun 2025 at 08:20.

Vodafone logo
Between
8 and 14 Sep 2025
Details
View Map
Share
Follow
Cannon Street

Vodafone are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 6 Jul 2025 at 17:37.

Cadent Gas logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
Seven Sisters Road

Cadent Gas are proposing to carry out Utility asset works on Seven Sisters Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Jun 2025 at 11:30.

Cadent Gas logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Exeter Street

Cadent Gas are proposing to carry out Utility asset works on Exeter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:26.

Cadent Gas logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Exeter Street

Cadent Gas are proposing to carry out Utility asset works on Exeter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 08:54.

Thames Water logo
Between
8 and 15 Sep 2025
Details
View Map
Share
Follow
Cannon Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 12:40.

Cadent Gas logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Catherine Street

Cadent Gas are proposing to carry out Utility asset works on Catherine Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:26.

Cadent Gas logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Catherine Street

Cadent Gas are proposing to carry out Utility asset works on Catherine Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 08:54.

Thames Water logo
Between
8 and 15 Sep 2025
Details
View Map
Share
Follow
Cannon Street

Thames Water are proposing to carry out New service connection on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 11:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Bury Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2025 at 21:36.

Eunetworks logo
Between
8 and 18 Sep 2025
Details
View Map
Share
Follow
Wardour Street

Eunetworks are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 9 Jun 2025 at 15:26.

Eunetworks logo
Between
8 and 18 Sep 2025
Details
View Map
Share
Follow
Wardour Street

Eunetworks are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 23 Jul 2025 at 11:58.

Thames Water logo
LONG TERM
Between
8 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Nelson Street

Thames Water are proposing to carry out Utility asset works on Nelson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 10:27.

UK Power Networks Eastern & London logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Goring Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Goring Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2025 at 21:38.

City Of London Corporation logo
Between
8 and 21 Sep 2025
Details
View Map
Share
Follow
Staining Lane

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Staining Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 4 Aug 2025 at 14:39.

City Of London Corporation logo
Between
8 and 21 Sep 2025
Details
View Map
Share
Follow
Staining Lane

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Staining Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 5 Aug 2025 at 14:00.

Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Old Montague Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Old Montague Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 15 Apr 2025 at 08:58.

Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Old Montague Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Old Montague Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Aug 2025 at 14:07.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Howland Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Howland Street, Bloomsbury, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:48.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Howland Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Howland Street, Bloomsbury, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Aug 2025 at 16:49.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Whitfield Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Whitfield Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:41.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Whitfield Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Whitfield Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 28 Aug 2025 at 16:51.

London Borough Of Camden logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:12.

London Borough Of Camden logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Kenton Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kenton Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:19.

City Of London Telecomms logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Great Eastern Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Eastern Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 28 Aug 2025 at 09:29.

City Of London Telecomms logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Great Eastern Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Eastern Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 1 Sep 2025 at 09:14.

City Of London Telecomms logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Great Eastern Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Eastern Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 1 Sep 2025 at 09:24.

City Of London Telecomms logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Rivington Street

City Of London Telecomms are proposing to carry out Utility asset works on Rivington Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 29 Jul 2025 at 21:02.

City Of London Telecomms logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Rivington Street

City Of London Telecomms are proposing to carry out Utility asset works on Rivington Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 2 Sep 2025 at 16:58.

Network Rail logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Bethnal Green Road

Network Rail are proposing to carry out Works for Rail Purposes on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Jul 2025 at 08:50.

BT logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Bacton Street

BT were proposing to carry out Utility repair and maintenance works on Bacton Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Jul 2025 at 11:29.

BT logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Bacton Street

BT are proposing to carry out Utility repair and maintenance works on Bacton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Jul 2025 at 11:11.

London Borough Of Hackney logo
LONG TERM
Between
8 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Hackney Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Hackney Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Jun 2025 at 09:27.

London Borough Of Hackney logo
LONG TERM
Between
8 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Hackney Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Hackney Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Jul 2025 at 11:24.

London Borough Of Hackney logo
LONG TERM
Between
8 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Hackney Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Hackney Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 22 Jul 2025 at 15:13.

Thames Water logo
LONG TERM
Between
8 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Thames Water are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works will start on or after 8 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 14:51.

Thames Water logo
LONG TERM
Between
8 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Thames Water are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works will start on or after 8 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 09:38.

Cadent Gas logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Whiston Road

Cadent Gas are proposing to carry out Utility asset works on Whiston Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 19:58.

Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Stour Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Stour Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Aug 2025 at 12:06.

London Borough Of Hackney logo
LONG TERM
Between
8 Sep and 7 Dec 2025
Details
View Map
Share
Follow
Wilton Way

London Borough Of Hackney are proposing to carry out Highway improvement works on Wilton Way, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 30 Jul 2025 at 16:14.

Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Keogh Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Keogh Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 25 Jul 2025 at 10:39.

Between
8 and 12 Sep 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 4 Jun 2025 at 09:41.

Between
8 and 15 Sep 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 5 Jun 2025 at 12:34.

London Borough Of Waltham Forest logo
Between
8 and 27 Sep 2025
Details
View Map
Share
Follow
Stewart Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Stewart Road, Stratford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 Aug 2025 at 10:44.

LONG TERM
Between
8 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Ilford Lane

London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 28 May 2025 at 08:30.

LONG TERM
Between
8 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Ilford Lane

London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 29 May 2025 at 05:51.

London Borough Of Waltham Forest logo
Between
8 and 13 Sep 2025
Details
View Map
Share
Follow
Granville Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Granville Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 22 May 2025 at 09:34.

London Borough Of Waltham Forest logo
Between
8 and 13 Sep 2025
Details
View Map
Share
Follow
Granville Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Granville Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 May 2025 at 10:56.

Virgin Media logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Wells Street

Virgin Media were proposing to carry out Utility asset works on Wells Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 11 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 2 Jun 2025 at 10:31.

Virgin Media logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Wells Street

Virgin Media are proposing to carry out Utility asset works on Wells Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Jun 2025 at 11:32.

Thames Water logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Paul Street

Thames Water are proposing to carry out Remedial works on Paul Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 19:09.

Thames Water logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Paul Street

Thames Water are proposing to carry out Remedial works on Paul Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 14:20.

Thames Water logo
Between
9 and 12 Sep 2025
Details
View Map
Share
Follow
Oscar Street

Thames Water are proposing to carry out Utility asset works on Oscar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 12:12.

Its Technology Group logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Great College Street

Its Technology Group are proposing to carry out Utility repair and maintenance works on Great College Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 10 Jun 2025 at 06:59.

Its Technology Group logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Great College Street

Its Technology Group are proposing to carry out Utility repair and maintenance works on Great College Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 11 Aug 2025 at 10:30.

Thames Water logo
Between
10 and 16 Sep 2025
Details
View Map
Share
Follow
White Hart Yard

Thames Water are proposing to carry out Utility repair and maintenance works on White Hart Yard, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 13:24.

Thames Water logo
Between
10 and 16 Sep 2025
Details
View Map
Share
Follow
White Hart Yard

Thames Water are proposing to carry out Utility repair and maintenance works on White Hart Yard, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 10:25.

Between
10 and 12 Sep 2025
Details
View Map
Share
Devons Road

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Devons Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Apr 2025 at 08:16.

London Borough Of Camden logo
Between
10 and 30 Sep 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Sep 2025 at 15:16.

London Borough Of Camden logo
Between
10 and 30 Sep 2025
Details
View Map
Share
Follow
Kenton Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kenton Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Sep 2025 at 15:14.

Transport for London (TfL) logo
LONG TERM
Between
10 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 14:08.

Thames Water logo
Between
11 and 15 Sep 2025
Details
View Map
Share
Follow
Osborne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Osborne Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Jul 2025 at 14:31.

Between
11 and 24 Sep 2025
Details
View Map
Share
New Cross Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on New Cross Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 10 Jun 2025 at 15:55.

Between
11 and 24 Sep 2025
Details
View Map
Share
New Cross Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on New Cross Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 6 Aug 2025 at 10:33.

Thames Water logo
Between
11 and 14 Sep 2025
Details
View Map
Share
The Highway

Thames Water were proposing to carry out Utility repair and maintenance works on The Highway, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 14 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 15:52.

Thames Water logo
Between
11 and 14 Sep 2025
Details
View Map
Share
Cannon Street Road

Thames Water were proposing to carry out Utility repair and maintenance works on Cannon Street Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 14 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 14:17.

Thames Water logo
Between
11 and 14 Sep 2025
Details
View Map
Share
Cannon Street Road

Thames Water were proposing to carry out Utility repair and maintenance works on Cannon Street Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 14 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 15:53.

Thames Water logo
Between
11 and 14 Sep 2025
Details
View Map
Share
The Highway

Thames Water were proposing to carry out Utility repair and maintenance works on The Highway, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 14 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 14:16.

Thames Water logo
LONG TERM
Between
12 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Old Ford Road

Thames Water are proposing to carry out Utility asset works on Old Ford Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 13:13.

Thames Water logo
LONG TERM
Between
12 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Old Ford Road

Thames Water are proposing to carry out Utility asset works on Old Ford Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep 2025 and 20 Jan 2026
Details
View Map
Share
Gresham Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Gresham Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 20 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2025 at 23:31.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Plumtree Court

Cadent Gas are proposing to carry out Utility asset works on Plumtree Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 13:54.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Plumtree Court

Cadent Gas are proposing to carry out Utility asset works on Plumtree Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 15:02.

Cadent Gas logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Farringdon Street

Cadent Gas are proposing to carry out Utility asset works on Farringdon Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2025 at 13:58.

Cadent Gas logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Farringdon Street

Cadent Gas are proposing to carry out Utility asset works on Farringdon Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 00:10.

City Of London Corporation logo
LONG TERM
Between
15 Sep 2025 and 15 Sep 2026
Details
View Map
Share
Follow
South Place

City Of London Corporation are proposing to carry out Highway improvement works on South Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 15 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 23 Jun 2025 at 15:06.

City Of London Corporation logo
LONG TERM
Between
15 Sep 2025 and 15 Sep 2026
Details
View Map
Share
Follow
South Place

City Of London Corporation are proposing to carry out Highway improvement works on South Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 15 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 21 Jul 2025 at 11:24.

Its Technology Group logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Gower Mews

Its Technology Group are proposing to carry out Utility repair and maintenance works on Gower Mews, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 17 Jul 2025 at 21:33.

Its Technology Group logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Gower Mews

Its Technology Group are proposing to carry out Utility repair and maintenance works on Gower Mews, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 29 Aug 2025 at 22:31.

Thames Water logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Garfield Road

Thames Water are proposing to carry out Utility asset works on Garfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 16:29.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Jun 2025 at 09:58.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 1 Jul 2025 at 11:57.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 17 Jul 2025 at 10:52.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Jul 2025 at 15:06.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Aug 2025 at 08:41.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Maddams Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Maddams Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Aug 2025 at 08:55.

Cadent Gas logo
Between
15 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Lambs Passage

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Lambs Passage, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 07:30.

Cadent Gas logo
Between
15 and 28 Sep 2025
Details
View Map
Share
Follow
Lambs Passage

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Lambs Passage, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 11:09.

Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Virginia Road

London Borough Of Tower Hamlets are proposing to carry out Section 50 on Virginia Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 25 Jul 2025 at 16:40.

Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Virginia Road

London Borough Of Tower Hamlets are proposing to carry out Section 50 on Virginia Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Jul 2025 at 11:47.

Network Rail logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Bethnal Green Road

Network Rail are proposing to carry out Works for Rail Purposes on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 25 Jun 2025 at 12:17.

Network Rail logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Bethnal Green Road

Network Rail are proposing to carry out Works for Rail Purposes on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Jul 2025 at 12:32.

Network Rail logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Bethnal Green Road

Network Rail were proposing to carry out Works for Rail Purposes on Bethnal Green Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 17 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Sep 2025 at 16:03.

Thames Water logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Norfolk Road

Thames Water were proposing to carry out Utility repair and maintenance works on Norfolk Road, East Ham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 17 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 09:31.

Thames Water logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Thorngrove Road

Thames Water are proposing to carry out Utility asset works on Thorngrove Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 11:50.

Thames Water logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Granary Street

Thames Water are proposing to carry out New service connection on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 11:46.

London Borough Of Hackney logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Downs Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Downs Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 6 Aug 2025 at 13:03.

London Borough Of Hackney logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Maury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Maury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2025 at 10:52.

BT logo
Between
15 and 20 Sep 2025
Details
View Map
Share
Follow
Burwell Road

BT are proposing to carry out Utility repair and maintenance works on Burwell Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Aug 2025 at 15:58.

BT logo
Between
15 and 20 Sep 2025
Details
View Map
Share
Follow
Burwell Road

BT are proposing to carry out Utility repair and maintenance works on Burwell Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Aug 2025 at 16:17.

Cadent Gas logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Woodberry Grove

Cadent Gas are proposing to carry out Utility asset works on Woodberry Grove, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:23.

Thames Water logo
Between
15 Sep and 7 Oct 2025
Details
View Map
Share
Rye Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:54.

Thames Water logo
Between
15 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Lewisham Road

Thames Water are proposing to carry out Utility asset works on Lewisham Road, Lewisham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 08:30.

BT logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
Zangwill Road

BT are proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Aug 2025 at 10:23.

BT logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
Zangwill Road

BT are proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Aug 2025 at 09:56.

Thames Water logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Grosvenor Terrace

Thames Water were proposing to carry out Utility repair and maintenance works on Grosvenor Terrace, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:00.

Southern Gas Networks logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Vanbrugh Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanbrugh Hill, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 07:58.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep 2025 and 9 Jan 2026
Details
View Map
Share
Raymouth Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 9 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 15:09.

London Borough Of Southwark logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 14 Aug 2025 at 12:55.

Thames Water logo
LONG TERM
Between
15 Sep 2025 and 31 Oct 2026
Details
View Map
Share
Follow
Millennium Way

Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 07:05.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Cowley Street

Thames Water are proposing to carry out Utility asset works on Cowley Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:26.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Cowley Street

Thames Water are proposing to carry out Utility asset works on Cowley Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 16:48.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Lord North Street

Thames Water are proposing to carry out Utility asset works on Lord North Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:26.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Lord North Street

Thames Water are proposing to carry out Utility asset works on Lord North Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 16:48.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Barton Street

Thames Water are proposing to carry out Utility asset works on Barton Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:27.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Barton Street

Thames Water are proposing to carry out Utility asset works on Barton Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 16:48.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Jun 2025 at 09:56.

London Borough Of Southwark logo
LONG TERM
Between
15 Sep and 26 Nov 2025
Details
View Map
Share
Follow
Wilson Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Wilson Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Jul 2025 at 10:55.

London Borough Of Southwark logo
LONG TERM
Between
15 Sep and 26 Nov 2025
Details
View Map
Share
Follow
Wilson Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Wilson Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 10:10.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 15:49.

Southern Gas Networks logo
Between
15 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 15:49.

Southern Gas Networks logo
Between
15 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 09:38.

Transport for London (TfL) logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Great Dover Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Great Dover Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 18:42.

Transport for London (TfL) logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Great Dover Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Great Dover Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 11:23.

Transport for London (TfL) logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Borough High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 18:39.

Transport for London (TfL) logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Borough High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 11:19.

Transport for London (TfL) logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Marshalsea Road

Transport for London (TfL) are proposing to carry out roadworks on Marshalsea Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Jul 2025 at 06:39.

Transport for London (TfL) logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Borough High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 18:40.

Transport for London (TfL) logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Borough High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 11:20.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Park Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jul 2025 at 13:47.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Park Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2025 at 07:23.

Thames Water logo
Between
16 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Foxes Dale

Thames Water are proposing to carry out Disconnection or alteration of supply on Foxes Dale, Blackheath.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 16 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 08:35.

UK Power Networks Eastern & London logo
Between
16 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Lindsell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 09:16.

UK Power Networks Eastern & London logo
Between
16 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Lindsell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 06:55.

Thames Water logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Follow
Bolton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bolton Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 11:02.

Thames Water logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Field Street

Thames Water are proposing to carry out Remedial works on Field Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 11:00.

Thames Water logo
Between
17 and 23 Sep 2025
Details
View Map
Share
Follow
Ashwin Street

Thames Water are proposing to carry out New service connection on Ashwin Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 16:28.

Network Rail logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Amhurst Road

Network Rail are proposing to carry out Works for Rail Purposes on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Jun 2025 at 15:16.

Network Rail logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Amhurst Road

Network Rail are proposing to carry out Works for Rail Purposes on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Aug 2025 at 13:20.

Thames Water logo
Between
17 and 30 Sep 2025
Details
View Map
Share
Follow
Gloucester Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gloucester Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 16:17.

Thames Water logo
Between
18 and 24 Sep 2025
Details
View Map
Share
Follow
Wellesley Road

Thames Water are proposing to carry out New service connection on Wellesley Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jun 2025 at 09:30.

Thames Water logo
LONG TERM
Between
19 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Tarbert Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Tarbert Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:55.

City Of London Corporation logo
LONG TERM
Between
19 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 23 Jun 2025 at 15:03.

City Of London Corporation logo
LONG TERM
Between
19 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Jul 2025 at 16:30.

City Of London Corporation logo
LONG TERM
Between
19 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 21 Jul 2025 at 11:23.

Thames Water logo
Between
19 and 25 Sep 2025
Details
View Map
Share
Field Street

Thames Water were proposing to carry out New service connection on Field Street, King's Cross, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 09:37.

Thames Water logo
LONG TERM
Between
20 Sep and 22 Nov 2025
Details
View Map
Share
Follow
Thorngrove Road

Thames Water are proposing to carry out Utility asset works on Thorngrove Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:46.

Thames Water logo
LONG TERM
Between
20 Sep and 22 Nov 2025
Details
View Map
Share
Follow
Penge Road

Thames Water are proposing to carry out Utility asset works on Penge Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:47.

UK Power Networks Eastern & London logo
Between
21 Sep and 7 Oct 2025
Details
View Map
Share
Follow
London Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on London Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2025 at 13:02.

UK Power Networks Eastern & London logo
Between
21 Sep and 8 Oct 2025
Details
View Map
Share
Highbridge Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Highbridge Road, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 14:51.

Between
21 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Keogh Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Keogh Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 19 Jun 2025 at 12:26.

Thames Water logo
LONG TERM
Between
22 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 22 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 13:34.

Thames Water logo
LONG TERM
Between
22 Sep 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 22 September 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 13:55.

UK Power Networks Eastern & London logo
Between
22 and 29 Sep 2025
Details
View Map
Share
Follow
Salisbury Court

UK Power Networks Eastern & London are proposing to carry out New service connection on Salisbury Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 11:10.

UK Power Networks Eastern & London logo
Between
22 and 29 Sep 2025
Details
View Map
Share
Follow
Salisbury Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Salisbury Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 16:55.

Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Tollgate Road

London Borough Of Newham are proposing to carry out Highway improvement works on Tollgate Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 9 Jun 2025 at 10:04.

Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Tollgate Road

London Borough Of Newham are proposing to carry out Highway improvement works on Tollgate Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 29 Jul 2025 at 10:02.

City Of Westminster logo
Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Berners Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 May 2025 at 12:26.

City Of Westminster logo
Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 May 2025 at 13:40.

LONG TERM
Between
22 Sep 2025 and 12 Jun 2026
Details
View Map
Share
Follow
Fulbourne Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Fulbourne Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 18 Aug 2025 at 15:40.

Thames Water logo
Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
Malcolm Place

Thames Water are proposing to carry out Utility repair and maintenance works on Malcolm Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jul 2025 at 11:48.

Between
22 Sep and 18 Oct 2025
Details
View Map
Share
Follow
Bethnal Green Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Bethnal Green Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 27 Aug 2025 at 10:10.

UK Power Networks Eastern & London logo
Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Tavistock Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Tavistock Place, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jul 2025 at 15:10.

UK Power Networks Eastern & London logo
Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Tavistock Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Tavistock Place, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2025 at 09:15.

Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Rainhill Way

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Rainhill Way, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 12 May 2025 at 13:18.

Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Rainhill Way

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rainhill Way, London.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 15 May 2025 at 13:51.

Between
22 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Rainhill Way

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rainhill Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 23 May 2025 at 11:40.

Between
22 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Rainhill Way

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rainhill Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Jun 2025 at 09:57.

Between
22 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Rainhill Way

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rainhill Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 20 Jun 2025 at 14:38.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Euston Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 12:03.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:32.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
King's Cross Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:52.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
King's Cross Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 12:07.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:57.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:47.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:35.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:29.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Caledonian Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:45.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Caledonian Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 10:51.

Thames Water logo
Between
22 and 28 Sep 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jun 2025 at 14:22.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Glebe Road

BT are proposing to carry out Utility asset works on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 28 Aug 2025 at 12:44.

Network Rail logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Amhurst Road

Network Rail are proposing to carry out Works for Rail Purposes on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Jun 2025 at 15:17.

Network Rail logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Amhurst Road

Network Rail are proposing to carry out Works for Rail Purposes on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 10:56.

Transport for London (TfL) logo
Between
22 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 11:41.

Thames Water logo
Between
22 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Carysfort Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Carysfort Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 15:44.

Thames Water logo
Between
22 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Carysfort Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Carysfort Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 11:54.

London Borough Of Waltham Forest logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Grove Green Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Grove Green Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 15 Jul 2025 at 10:49.

London Borough Of Waltham Forest logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Grove Green Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Grove Green Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Jul 2025 at 15:08.

London Borough Of Waltham Forest logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Grove Green Road

London Borough Of Waltham Forest were proposing to carry out Highway repair and maintenance works on Grove Green Road, Leytonstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 15 Jul 2025 at 10:46.

London Borough Of Waltham Forest logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Grove Green Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Grove Green Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Jul 2025 at 14:37.

London Borough Of Waltham Forest logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Grove Green Road

London Borough Of Waltham Forest were proposing to carry out Highway repair and maintenance works on Grove Green Road, Leytonstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Jul 2025 at 15:07.

Thames Water logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bromley Road

Thames Water are proposing to carry out Utility asset works on Bromley Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 15:08.

Thames Water logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bromley Road

Thames Water are proposing to carry out Utility asset works on Bromley Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 16:09.

Thames Water logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bromley Road

Thames Water are proposing to carry out Utility asset works on Bromley Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 16:15.

London Borough Of Waltham Forest logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Sylvan Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Sylvan Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Jun 2025 at 15:21.

London Borough Of Waltham Forest logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Leopold Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Leopold Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Jun 2025 at 15:39.

Cadent Gas logo
Between
22 Sep and 16 Oct 2025
Details
View Map
Share
Hove Avenue

Cadent Gas were proposing to carry out Utility asset works on Hove Avenue, Walthamstow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 16 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 16:21.

Cadent Gas logo
Between
22 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Hove Avenue

Cadent Gas are proposing to carry out Utility asset works on Hove Avenue, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 09:45.

Cadent Gas logo
Between
22 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Hove Avenue

Cadent Gas are proposing to carry out Utility asset works on Hove Avenue, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2024 at 14:41.

Southern Gas Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Morden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 13:19.

Southern Gas Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Morden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 16:30.

Royal Borough Of Greenwich logo
Between
22 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Blackwall Lane

Royal Borough Of Greenwich are proposing to carry out Section 50 on Blackwall Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 29 Aug 2025 at 16:30.

LONG TERM
Between
22 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Glenaffric Avenue

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Glenaffric Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Jul 2025 at 11:49.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Druid Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 13:17.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Druid Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:53.

ESP Electricity logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Manilla Street

ESP Electricity are proposing to carry out Utility asset works on Manilla Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 3 Sep 2025 at 11:02.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Bermondsey Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 15:38.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Bermondsey Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 23:08.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Crucifix Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Crucifix Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 15:39.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Crucifix Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Crucifix Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 23:08.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Snowsfields

Transport for London (TfL) are proposing to carry out Highway improvement works on Snowsfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 13:24.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Snowsfields

Transport for London (TfL) are proposing to carry out Highway improvement works on Snowsfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:53.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
St Thomas Street

Transport for London (TfL) are proposing to carry out Highway improvement works on St Thomas Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Jul 2025 at 11:29.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
St Thomas Street

Transport for London (TfL) are proposing to carry out Highway improvement works on St Thomas Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 20:47.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Shand Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Shand Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 13:17.

Transport for London (TfL) logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Shand Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Shand Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 10:14.

London Borough Of Southwark logo
LONG TERM
Between
22 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Lavington Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Lavington Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 17:35.

City Of Westminster logo
LONG TERM
Between
22 Sep and 23 Oct 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 09:40.

Thames Water logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Charles Ii Street

Thames Water were proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 30 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 08:45.

Thames Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Charles Ii Street

Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 09:48.

Thames Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Charles Ii Street

Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 08:26.

UK Power Networks Eastern & London logo
Between
22 Sep and 15 Oct 2025
Details
View Map
Share
Follow
West India Dock Road

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on West India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 10:34.

Cornerstone Telecommunications Infrastructure logo
Between
22 and 27 Sep 2025
Details
View Map
Share
Strait Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 27 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Jul 2025 at 10:35.

Transport for London (TfL) logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Limehouse Link

Transport for London (TfL) are proposing to carry out Utility asset works on Limehouse Link, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jul 2025 at 14:45.

Thames Water logo
Between
23 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Kidbrooke Park Road

Thames Water are proposing to carry out New service connection on Kidbrooke Park Road, Kidbrooke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 08:50.

Thames Water logo
Between
23 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Kidbrooke Park Road

Thames Water are proposing to carry out New service connection on Kidbrooke Park Road, Kidbrooke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 09:34.

City Of Westminster logo
LONG TERM
Between
23 Sep 2025 and 17 Feb 2027
Details
View Map
Share
Winnett Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Winnett Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 17 February 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 16:35.

Network Rail logo
Between
23 and 27 Sep 2025
Details
View Map
Share
Fairfield Road

Network Rail were proposing to carry out Works for Rail Purposes on Fairfield Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 27 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Sep 2025 at 11:48.

Virgin Media logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Monier Road

Virgin Media were proposing to carry out Utility asset works on Monier Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 17 Jun 2025 at 16:20.

Virgin Media logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Monier Road

Virgin Media were proposing to carry out Utility asset works on Monier Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 26 Jun 2025 at 11:01.

Virgin Media logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Monier Road

Virgin Media were proposing to carry out Utility asset works on Monier Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 7 Jul 2025 at 11:47.

Virgin Media logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Monier Road

Virgin Media were proposing to carry out Utility asset works on Monier Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 16 Jul 2025 at 11:10.

Virgin Media logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Monier Road

Virgin Media are proposing to carry out Utility asset works on Monier Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 24 Jul 2025 at 13:12.

Southern Gas Networks logo
Between
24 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Morden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 15:27.

City Of Westminster logo
LONG TERM
Between
24 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 5 November 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 3 Jun 2025 at 07:07.

City Of Westminster logo
LONG TERM
Between
24 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 5 November 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 6 Jun 2025 at 07:46.

Verizon Business logo
Between
26 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Pall Mall

Verizon Business are proposing to carry out Utility repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Verizon Business on 25 Jun 2025 at 10:03.

City Of London Corporation logo
Between
26 and 28 Sep 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:41.

Between
26 Sep and 23 Oct 2025
Details
View Map
Share
Fairfield Road

Aurora Utilities Limited were proposing to carry out Utility asset works on Fairfield Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 23 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 23 Jul 2025 at 11:06.

Between
26 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Jul 2025 at 08:57.

Thames Water logo
Between
26 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Hatherley Mews

Thames Water are proposing to carry out New service connection on Hatherley Mews, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jul 2025 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Ravensbourne Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2025 at 12:39.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Ravensbourne Park Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park Crescent, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 16:02.

Royal Borough Of Greenwich logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Greenwich High Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 30 Jun 2025 at 13:31.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Charlton Church Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Church Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:44.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Gallions Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gallions Road, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:34.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
Gallon Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Gallon Close, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 13:07.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Gallon Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Gallon Close, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Gallon Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Gallon Close, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:46.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Charlton Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Lane, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:03.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
Penhall Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Penhall Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 13:08.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Penhall Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Penhall Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Penhall Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Penhall Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:35.

UK Power Networks Eastern & London logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Rotherhithe New Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 11:14.

UK Power Networks Eastern & London logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2025 at 11:28.

UK Power Networks Eastern & London logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 07:03.

UK Power Networks Eastern & London logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jul 2025 at 11:41.

UK Power Networks Eastern & London logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 12:33.

UK Power Networks Eastern & London logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 09:04.

UK Power Networks Eastern & London logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jul 2025 at 11:41.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Westmoor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Westmoor Street, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:35.

UK Power Networks Eastern & London logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Raymouth Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Eastmoor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastmoor Street, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:03.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Eastmoor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastmoor Street, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:14.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Cleveley Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Cleveley Close, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:17.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Cleveley Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Cleveley Close, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:39.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Prospect Vale

Transport for London (TfL) are proposing to carry out Highway improvement works on Prospect Vale, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:58.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Pett Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Pett Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Pett Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Pett Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:44.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Tamar Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Tamar Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:23.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Tamar Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Tamar Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:42.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Frances Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:37.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:43.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Kingsman Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Kingsman Street, Woolwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 29 March 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Kingsman Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kingsman Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:04.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Kingsman Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kingsman Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:15.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Warspite Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:39.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Ruston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:41.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Boneta Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Boneta Road, Woolwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 31 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:02.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Boneta Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Boneta Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:04.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Boneta Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Boneta Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:15.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Powis Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Powis Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:01.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Powis Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Powis Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 16:29.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Leda Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Leda Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:05.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Leda Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Leda Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Church Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Church Hill, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:41.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 15:04.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:11.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 13:18.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep and 19 Dec 2025
Details
View Map
Share
Southwark Park Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2025 at 14:22.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2025 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:35.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Woolwich Ferry Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Ferry Roundabout, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:58.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Glass Yard

Transport for London (TfL) are proposing to carry out Highway improvement works on Glass Yard, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 13:19.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
Ferry Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Ferry Approach, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 15:49.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Ferry Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Ferry Approach, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:19.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 16:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 09:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 08:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 16:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 26 Jan 2026
Details
View Map
Share
Poolmans Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 26 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 11:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 11:06.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2025 at 15:15.

Network Rail logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Embankment Place

Network Rail are proposing to carry out Works for Rail Purposes on Embankment Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Mar 2025 at 08:21.

Network Rail logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Embankment Place

Network Rail are proposing to carry out Works for Rail Purposes on Embankment Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Aug 2025 at 09:14.

Vodafone logo
Between
29 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Waterloo Place

Vodafone are proposing to carry out Utility repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 2 Jul 2025 at 10:24.

Thames Water logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Craven Street

Thames Water are proposing to carry out Utility repair and maintenance works on Craven Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 13:48.

Thames Water logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Craven Street

Thames Water are proposing to carry out Utility repair and maintenance works on Craven Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 15:59.

Transport for London (TfL) logo
Between
29 Sep and 22 Oct 2025
Details
View Map
Share
Limehouse Link

Transport for London (TfL) were proposing to carry out Utility asset works on Limehouse Link, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:12.

BT logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Glasshouse Fields

BT were proposing to carry out Utility asset works on Glasshouse Fields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Aug 2025 at 15:07.

BT logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Glasshouse Fields

BT are proposing to carry out Utility asset works on Glasshouse Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Aug 2025 at 16:00.

BT logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Glasshouse Fields

BT are proposing to carry out Utility asset works on Glasshouse Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Jul 2025 at 11:26.

UK Power Networks Eastern & London logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Beak Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Beak Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 09:12.

UK Power Networks Eastern & London logo
Between
29 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Dorset Rise

UK Power Networks Eastern & London are proposing to carry out New service connection on Dorset Rise, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 16:52.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Rathbone Street

Thames Water are proposing to carry out New service connection on Rathbone Street, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 16:11.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Tant Avenue

Thames Water are proposing to carry out New service connection on Tant Avenue, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 16:06.

Cadent Gas logo
Between
29 Sep and 23 Oct 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 12:45.

Cadent Gas logo
Between
29 Sep and 23 Oct 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 12:46.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Newman Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Newman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jun 2025 at 09:30.

Thames Water logo
LONG TERM
Between
29 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Mayfield Road

Thames Water are proposing to carry out Utility asset works on Mayfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:34.

Thames Water logo
LONG TERM
Between
29 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Mayfield Road

Thames Water are proposing to carry out Utility asset works on Mayfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 11:45.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Brooks Avenue

London Borough Of Newham are proposing to carry out Highway improvement works on Brooks Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 16 Jul 2025 at 11:37.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Great Sutton Street

Thames Water are proposing to carry out New service connection on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 08:15.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Great Sutton Street

Thames Water were proposing to carry out New service connection on Great Sutton Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:46.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Great Sutton Street

Thames Water are proposing to carry out New service connection on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 12:03.

Transport for London (TfL) logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Alfreds Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Alfreds Way, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 12:32.

Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Fairfield Road

Aurora Utilities Limited were proposing to carry out New service connection on Fairfield Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 4 Jul 2025 at 09:56.

Thames Water logo
LONG TERM
Between
29 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Old Ford Road

Thames Water are proposing to carry out Utility asset works on Old Ford Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 14:17.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Abbey Road

Cadent Gas are proposing to carry out Utility asset works on Abbey Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 13:20.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Abbey Road

Cadent Gas are proposing to carry out Utility asset works on Abbey Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 16:10.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Abbey Road

Cadent Gas are proposing to carry out Utility asset works on Abbey Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 08:54.

Electricity Network Company logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Purcell Street

Electricity Network Company are proposing to carry out Utility asset works on Purcell Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 20 Jun 2025 at 15:16.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Brooks Road

London Borough Of Newham were proposing to carry out Highway improvement works on Brooks Road, Plaistow, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 2 Jul 2025 at 11:29.

Thames Water logo
LONG TERM
Between
29 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Penge Road

Thames Water are proposing to carry out Utility asset works on Penge Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 11:50.

Thames Water logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Ismailia Road

Thames Water are proposing to carry out Utility asset works on Ismailia Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 12:03.

Thames Water logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Homerton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Homerton Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 20:59.

Thames Water logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Homerton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Homerton Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 12:17.

Thames Water logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Homerton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Homerton Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 12:26.

T-Mobile (UK) logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Shakspeare Walk

T-Mobile (UK) were proposing to carry out Utility asset works on Shakspeare Walk, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 25 Jul 2025 at 12:29.

Thames Water logo
LONG TERM
Between
29 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Norman Road

Thames Water are proposing to carry out Utility asset works on Norman Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jul 2025 at 16:00.

London Borough Of Waltham Forest logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Onra Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Onra Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Jun 2025 at 15:50.

Cornerstone Telecommunications Infrastructure logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Markhouse Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Markhouse Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Aug 2025 at 14:56.

London Borough Of Camden logo
Between
30 Sep and 4 Oct 2025
Details
View Map
Share
Follow
New Oxford Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Apr 2025 at 22:12.

London Borough Of Camden logo
Between
30 Sep and 4 Oct 2025
Details
View Map
Share
Follow
New Oxford Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 6 May 2025 at 13:55.

Thames Water logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Canonbury Square

Thames Water are proposing to carry out Disconnection or alteration of supply on Canonbury Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 12:23.

Thames Water logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Canonbury Square

Thames Water are proposing to carry out Disconnection or alteration of supply on Canonbury Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 17:07.

Transport for London (TfL) logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Upper Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Aug 2025 at 15:19.

Transport for London (TfL) logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Upper Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 15:00.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct and 11 Dec 2025
Details
View Map
Share
Follow
Rushey Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Rushey Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2025 at 15:54.

Thames Water logo
Between
1 and 21 Oct 2025
Details
View Map
Share
Follow
Brookway

Thames Water are proposing to carry out Disconnection or alteration of supply on Brookway, Blackheath.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 1 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 06:52.

Royal Borough Of Greenwich logo
LONG TERM
Between
1 Oct 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Tunnel Avenue

Royal Borough Of Greenwich are proposing to carry out Section 50 on Tunnel Avenue, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Royal Borough Of Greenwich on 12 Aug 2025 at 16:30.

Thames Water logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 10:16.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Oct 2025 and 15 Jan 2026
Details
View Map
Share
Follow
Snaresbrook Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Snaresbrook Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 24 Jun 2025 at 16:00.

Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Tarling Road

London Borough Of Newham are proposing to carry out Highway improvement works on Tarling Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 10 Jul 2025 at 09:34.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Oct 2025 and 15 Jan 2026
Details
View Map
Share
Follow
York Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on York Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 Jun 2025 at 16:10.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Oct 2025 and 15 Jan 2026
Details
View Map
Share
Follow
Dunedin Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Dunedin Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 Jun 2025 at 15:56.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Oct 2025 and 15 Jan 2026
Details
View Map
Share
Follow
Lyttelton Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Lyttelton Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 Jun 2025 at 16:11.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Oct 2025 and 15 Jan 2026
Details
View Map
Share
Follow
Cathall Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Cathall Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 24 Jun 2025 at 15:57.

Cadent Gas logo
Between
3 and 24 Oct 2025
Details
View Map
Share
Follow
Fleet Street

Cadent Gas are proposing to carry out Utility asset works on Fleet Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 13:49.

Cadent Gas logo
Between
3 and 24 Oct 2025
Details
View Map
Share
Follow
Stonecutter Street

Cadent Gas are proposing to carry out Utility asset works on Stonecutter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jul 2025 at 09:59.

Cadent Gas logo
Between
3 and 24 Oct 2025
Details
View Map
Share
Follow
Stonecutter Street

Cadent Gas are proposing to carry out Utility asset works on Stonecutter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 15:04.

London Borough Of Hackney logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
De Beauvoir Road

London Borough Of Hackney are proposing to carry out Highway improvement works on De Beauvoir Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 8 Jul 2025 at 15:15.

London Borough Of Hackney logo
Between
3 and 8 Oct 2025
Details
View Map
Share
Follow
Cecilia Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Cecilia Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 8 Jul 2025 at 10:39.

London Borough Of Hackney logo
Between
3 and 7 Oct 2025
Details
View Map
Share
Follow
Lee Conservancy Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Lee Conservancy Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Jul 2025 at 14:15.

London Borough Of Hackney logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Oswald Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Oswald Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 8 Jul 2025 at 14:53.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Aug 2025 at 10:13.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Springbank Road

Network Rail were proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 October 2025 and run through until 1 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 08:44.

Network Rail logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Jun 2025 at 10:18.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 10:24.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 13:31.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 14:43.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 14:54.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:14.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Sep 2025 at 15:18.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Kenton Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kenton Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:09.

Fulcrum Pipelines logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Dukes Place

Fulcrum Pipelines are proposing to carry out Utility asset works on Dukes Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Fulcrum Pipelines on 18 Jul 2025 at 11:48.

Cadent Gas logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Newham Way

Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 16:34.

Cadent Gas logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Newham Way

Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 19:53.

Cadent Gas logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Newham Way

Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jul 2025 at 16:12.

Cadent Gas logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Newham Way

Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 12:05.

Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Wharfside Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Wharfside Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Jul 2025 at 09:39.

City Of London Corporation logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Coleman Street

City Of London Corporation are proposing to carry out Highway improvement works on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 10 Aug 2025 at 21:59.

City Of London Corporation logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Coleman Street

City Of London Corporation are proposing to carry out Highway improvement works on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 17 Aug 2025 at 16:14.

BT logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Olympic Park Avenue

BT are proposing to carry out Utility asset works on Olympic Park Avenue, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Jul 2025 at 13:14.

London Borough Of Hackney logo
LONG TERM
Between
6 Oct 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Reading Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Reading Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 14 Aug 2025 at 12:36.

Thames Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Katherine Road

Thames Water are proposing to carry out Utility repair and maintenance works on Katherine Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 10:40.

Cadent Gas logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Winchester Place

Cadent Gas are proposing to carry out New service connection on Winchester Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 18:51.

LONG TERM
Between
6 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Newham are proposing to carry out Highway improvement works on Osborne Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 13 Aug 2025 at 10:13.

Thames Water logo
Between
6 and 13 Oct 2025
Details
View Map
Share
Follow
Forest View Road

Thames Water are proposing to carry out Utility repair and maintenance works on Forest View Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Jul 2025 at 14:33.

Thames Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Windsor Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Windsor Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2025 at 16:13.

Cadent Gas logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Lawrence Buildings

Cadent Gas are proposing to carry out New service connection on Lawrence Buildings, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 18:50.

Network Rail logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Lancaster Road

Network Rail were proposing to carry out Works for Rail Purposes on Lancaster Road, Leytonstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 11:13.

Network Rail logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Lancaster Road

Network Rail are proposing to carry out Works for Rail Purposes on Lancaster Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Jul 2025 at 15:35.

Thames Water logo
Between
6 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Denman Road

Thames Water are proposing to carry out Utility repair and maintenance works on Denman Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 12:28.

Southern Gas Networks logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Donaldson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Donaldson Road, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Jun 2025 at 15:18.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Ankerdine Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ankerdine Crescent, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Jun 2025 at 09:15.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 15 Dec 2025
Details
View Map
Share
Follow
Moordown

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Moordown, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Jun 2025 at 15:20.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 15 Dec 2025
Details
View Map
Share
Follow
Ankerdine Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ankerdine Crescent, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Jun 2025 at 16:50.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Mascalls Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mascalls Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 07:21.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 07:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2025 at 14:00.

Southern Gas Networks logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Newington Butts

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newington Butts, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 07:46.

UK Power Networks Eastern & London logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 12:10.

Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Prestons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Jun 2025 at 09:50.

Thames Water logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Queen Elizabeth Street

Thames Water are proposing to carry out Remedial works on Queen Elizabeth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 14:51.

London Borough Of Lambeth logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Upper Ground

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Upper Ground, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 20 Jun 2025 at 10:05.

Vodafone logo
Between
6 and 12 Oct 2025
Details
View Map
Share
Follow
Waterloo Place

Vodafone are proposing to carry out Utility repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 2 Jul 2025 at 10:59.

City Of Westminster logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Charles Ii Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Jun 2025 at 07:34.

City Of Westminster logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Charles Ii Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Jun 2025 at 08:03.

UK Power Networks Eastern & London logo
Between
6 and 17 Oct 2025
Details
View Map
Share
New Row

UK Power Networks Eastern & London were proposing to carry out New service connection on New Row, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 11:35.

UK Power Networks Eastern & London logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
New Row

UK Power Networks Eastern & London are proposing to carry out New service connection on New Row, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 14:08.

London Borough Of Lewisham logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Jerningham Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Jerningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 09:40.

London Borough Of Lewisham logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Jerningham Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Jerningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 20 Aug 2025 at 12:24.

London Borough Of Wandsworth logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Jerningham Road

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Jerningham Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2025 and run through until 11 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 11 Jun 2025 at 15:01.

Network Rail logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
South Lambeth Place

Network Rail are proposing to carry out Works for Rail Purposes on South Lambeth Place, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 Aug 2025 at 17:00.

Network Rail logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
South Lambeth Place

Network Rail are proposing to carry out Works for Rail Purposes on South Lambeth Place, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 2 Sep 2025 at 13:26.

Network Rail logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Kennington Lane

Network Rail are proposing to carry out Works for Rail Purposes on Kennington Lane, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Aug 2025 at 15:15.

Network Rail logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Kennington Lane

Network Rail are proposing to carry out Works for Rail Purposes on Kennington Lane, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Sep 2025 at 13:21.

City Of London Corporation logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 26 Sep 2024 at 10:18.

City Of London Corporation logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 15 Oct 2024 at 10:47.

City Of London Corporation logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Tower Bridge

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 29 Aug 2024 at 13:52.

City Of London Corporation logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Tower Bridge

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 30 Aug 2024 at 09:31.

City Of London Corporation logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Tower Bridge Approach

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 29 Aug 2024 at 13:54.

City Of London Corporation logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Tower Bridge Approach

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 30 Aug 2024 at 09:33.

Transport for London (TfL) logo
Between
8 and 12 Oct 2025
Details
View Map
Share
Lambeth Palace Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 12 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2025 at 13:13.

Transport for London (TfL) logo
Between
8 and 12 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2025 at 13:16.

City Of Westminster logo
Between
8 and 21 Oct 2025
Details
View Map
Share
Follow
Bridge Street

City Of Westminster are proposing to carry out Highway improvement works on Bridge Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 26 Jun 2025 at 12:08.

City Of Westminster logo
Between
8 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 09:41.

UK Power Networks Eastern & London logo
Between
8 and 21 Oct 2025
Details
View Map
Share
Follow
Sackville Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2025 at 12:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Oct 2025 and 12 Feb 2026
Details
View Map
Share
Follow
Gresham Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gresham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 16:42.

UK Power Networks Eastern & London logo
Between
8 and 21 Oct 2025
Details
View Map
Share
Follow
Tavistock Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Tavistock Place, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2025 at 16:09.

Between
9 and 24 Oct 2025
Details
View Map
Share
Follow
Halley Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Halley Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 31 Jul 2025 at 10:06.

Between
9 and 24 Oct 2025
Details
View Map
Share
Follow
Gainsborough Avenue

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Gainsborough Avenue, Manor Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 29 Jul 2025 at 09:46.

BT logo
Between
9 and 20 Oct 2025
Details
View Map
Share
Follow
Trafalgar Road

BT are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by BT on 29 Jul 2025 at 07:31.

BT logo
Between
9 and 20 Oct 2025
Details
View Map
Share
Follow
Trafalgar Road

BT are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by BT on 4 Aug 2025 at 12:36.

Network Rail logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 09:14.

Network Rail logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 11:45.

Network Rail logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 12:11.

Network Rail logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 13:30.

Thames Water logo
LONG TERM
Between
11 Oct and 22 Nov 2025
Details
View Map
Share
Follow
Ismailia Road

Thames Water are proposing to carry out Utility asset works on Ismailia Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:27.

Thames Water logo
Between
12 and 16 Oct 2025
Details
View Map
Share
Follow
Cleveland Park Crescent

Thames Water are proposing to carry out Utility asset works on Cleveland Park Crescent, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2023 at 16:30.

Thames Water logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Lausanne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lausanne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 09:57.

Thames Water logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Lausanne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lausanne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 11:15.

BT logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Zangwill Road

BT were proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 13 Aug 2025 at 10:17.

Thames Water logo
Between
13 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Macleod Street

Thames Water are proposing to carry out Utility repair and maintenance works on Macleod Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:48.

Thames Water logo
Between
13 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Macleod Street

Thames Water are proposing to carry out Utility repair and maintenance works on Macleod Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 08:53.

Between
13 Oct and 4 Nov 2025
Details
View Map
Share
Glenaffric Avenue

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Glenaffric Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 17 Jul 2025 at 12:29.

LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Glenaffric Avenue

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Glenaffric Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 23 Jul 2025 at 07:56.

London Borough Of Southwark logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Aug 2025 at 13:04.

City Of London Corporation logo
Between
13 and 18 Oct 2025
Details
View Map
Share
Tower Bridge Road

City Of London Corporation were proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 23 May 2025 at 15:51.

UK Power Networks Eastern & London logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
Savoy Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Savoy Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Mar 2025 at 08:06.

UK Power Networks Eastern & London logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
Savoy Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Savoy Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 09:53.

UK Power Networks Eastern & London logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2025 at 21:41.

Thames Water logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Follow
Drury Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Drury Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:28.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Hanway Street

Virgin Media are proposing to carry out Utility asset works on Hanway Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 2 Jul 2025 at 11:25.

Cadent Gas logo
Between
13 and 21 Oct 2025
Details
View Map
Share
Follow
Brick Lane

Cadent Gas are proposing to carry out Utility asset works on Brick Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 15:22.

Thames Water logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Russell Square

Thames Water were proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 09:41.

Cadent Gas logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Whidborne Street

Cadent Gas were proposing to carry out Utility asset works on Whidborne Street, King's Cross, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 12:33.

Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Stour Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Stour Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 27 Aug 2025 at 11:04.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Cadogan Terrace

Virgin Media are proposing to carry out Utility asset works on Cadogan Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Jul 2025 at 12:29.

Network Rail logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
London Lane

Network Rail are proposing to carry out Works for Rail Purposes on London Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Jul 2025 at 19:05.

Thames Water logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2025 at 11:16.

UK Power Networks Eastern & London logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Green Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Green Street, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jul 2025 at 09:13.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Clissold Crescent

Thames Water were proposing to carry out Disconnection or alteration of supply on Clissold Crescent, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 08:40.

Thames Water logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Foubert's Place

Thames Water are proposing to carry out Remedial works on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 14:52.

Transport for London (TfL) logo
Between
14 Oct and 6 Nov 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 6 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:50.

Transport for London (TfL) logo
Between
14 Oct and 6 Nov 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 6 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:53.

London Borough Of Hackney logo
LONG TERM
Between
14 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Brooke Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brooke Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 31 Jul 2025 at 10:49.

London Borough Of Hackney logo
LONG TERM
Between
14 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Brooke Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brooke Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Aug 2025 at 15:31.

London Borough Of Hackney logo
Between
14 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Reighton Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Reighton Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 31 Jul 2025 at 10:51.

London Borough Of Hackney logo
Between
14 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Reighton Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Reighton Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Aug 2025 at 11:23.

London Borough Of Hackney logo
Between
14 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Reighton Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Reighton Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2025 at 11:43.

London Borough Of Southwark logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Lordship Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Jun 2025 at 14:33.

Between
14 and 27 Oct 2025
Details
View Map
Share
Billington Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Billington Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 6 Aug 2025 at 10:32.

UK Power Networks Eastern & London logo
Between
14 and 27 Oct 2025
Details
View Map
Share
Follow
Abbey Orchard Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 13:49.

Lumen Technologies logo
Between
14 and 18 Oct 2025
Details
View Map
Share
Follow
Victoria Street

Lumen Technologies are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 18 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 16 Jul 2025 at 07:03.

Thames Water logo
Between
14 and 17 Oct 2025
Details
View Map
Share
Store Road

Thames Water were proposing to carry out roadworks on Store Road, North Woolwich, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 07:39.

Lumen Technologies logo
Between
14 and 19 Oct 2025
Details
View Map
Share
Follow
Storey's Gate

Lumen Technologies are proposing to carry out Utility asset works on Storey's Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 19 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 16 Jul 2025 at 07:00.

City Of Westminster logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2025 at 14:51.

Thames Water logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Thorngrove Road

Thames Water were proposing to carry out Utility repair and maintenance works on Thorngrove Road, Upton Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 16:39.

Between
15 and 31 Oct 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Jul 2025 at 09:10.

Between
15 and 31 Oct 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Jul 2025 at 10:11.

Between
15 and 31 Oct 2025
Details
View Map
Share
Follow
Matthias Road

London Borough Of Islington are proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 20 Aug 2025 at 15:14.

London Borough Of Hackney logo
Between
15 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Wordsworth Road

London Borough Of Hackney are proposing to carry out roadworks on Wordsworth Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Aug 2025 at 12:13.

Cadent Gas logo
LONG TERM
Between
16 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Arkley Crescent

Cadent Gas are proposing to carry out Utility asset works on Arkley Crescent, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2024 at 14:52.

Cadent Gas logo
LONG TERM
Between
16 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Arkley Crescent

Cadent Gas are proposing to carry out Utility asset works on Arkley Crescent, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 09:19.

London Borough Of Southwark logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
East Dulwich Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on East Dulwich Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Jun 2025 at 19:55.

Thames Water logo
Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Southwark Street

Thames Water are proposing to carry out Utility repair and maintenance works on Southwark Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 09:03.

Thames Water logo
Between
17 and 21 Oct 2025
Details
View Map
Share
Tree Road

Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jul 2025 at 08:28.

Between
17 Oct and 14 Nov 2025
Details
View Map
Share
Fourth Avenue

London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Fourth Avenue, Manor Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Sep 2025 at 10:29.

UK Power Networks Eastern & London logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Follow
Bedford Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bedford Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2025 at 10:44.

Southern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Ravensbourne Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 15:12.

Southern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Ravensbourne Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 15:12.

London Borough Of Lewisham logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Fernbrook Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 3 Sep 2025 at 12:12.

London Borough Of Southwark logo
Between
20 Oct and 8 Nov 2025
Details
View Map
Share
Bellenden Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Bellenden Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 8 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 24 Jun 2025 at 08:30.

London Borough Of Southwark logo
Between
20 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Maxted Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Maxted Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2025 at 09:44.

London Borough Of Southwark logo
Between
20 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Danby Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Danby Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2025 at 10:00.

London Borough Of Lambeth logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Lilford Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 19 Jun 2025 at 16:13.

Royal Borough Of Greenwich logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Greenwich High Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 5 Jun 2025 at 13:47.

Royal Borough Of Greenwich logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Greenwich High Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 6 Jun 2025 at 10:11.

Thames Tideway Tunnel logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are proposing to carry out Utility repair and maintenance works on Norman Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 3 Sep 2025 at 13:15.

Southern Gas Networks logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Canberra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:10.

Southern Gas Networks logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Marlborough Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:09.

Southern Gas Networks logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Mascalls Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mascalls Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:56.

Southern Gas Networks logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:57.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Caradoc Street

Thames Water are proposing to carry out Utility repair and maintenance works on Caradoc Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 14:10.

Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Ferry Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Ferry Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:49.

Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Westferry Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Westferry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 31 Jul 2025 at 12:18.

Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Manchester Road

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Manchester Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 23 Jul 2025 at 08:05.

Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
East Ferry Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on East Ferry Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:51.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 08:05.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 13:25.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Jul 2025 at 11:12.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 13:25.

UK Power Networks Eastern & London logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Old Pye Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Old Pye Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 08:25.

UK Power Networks Eastern & London logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Strutton Ground

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Strutton Ground, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 08:26.

UK Power Networks Eastern & London logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Victoria Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 08:28.

Thames Water logo
Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Irving Street

Thames Water were proposing to carry out New service connection on Irving Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 4 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 11:36.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Limehouse Link

Transport for London (TfL) are proposing to carry out Utility asset works on Limehouse Link, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jul 2025 at 15:11.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
King Street

UK Power Networks Eastern & London were proposing to carry out New service connection on King Street, St James's East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 09:36.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
King Street

UK Power Networks Eastern & London are proposing to carry out New service connection on King Street, St James's East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jul 2025 at 07:02.

UK Power Networks Eastern & London logo
Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
King Street

UK Power Networks Eastern & London are proposing to carry out New service connection on King Street, St James's East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jul 2025 at 08:34.

UK Power Networks Eastern & London logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
King Street

UK Power Networks Eastern & London are proposing to carry out New service connection on King Street, St James's East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 07:58.

City Of London Corporation logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Garlick Hill

City Of London Corporation are proposing to carry out Highway improvement works on Garlick Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 11 Aug 2025 at 11:07.

City Of London Corporation logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Garlick Hill

City Of London Corporation are proposing to carry out Highway improvement works on Garlick Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 17 Aug 2025 at 16:10.

Thames Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Tree Road

Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 09:47.

City Of London Corporation logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are proposing to carry out Highway improvement works on St Martin's-le-grand, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 10 Aug 2025 at 22:10.

City Of London Corporation logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are proposing to carry out Highway improvement works on St Martin's-le-grand, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 13 Aug 2025 at 14:37.

Thames Water logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
West Central Street

Thames Water are proposing to carry out Utility asset works on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 08:03.

UK Power Networks Eastern & London logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
New Fetter Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on New Fetter Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 14:43.

Cadent Gas logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Tottenham Court Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Tottenham Court Road, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 16:49.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Lever Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Lever Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 15:34.

BT logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Morpeth Street

BT were proposing to carry out Utility repair and maintenance works on Morpeth Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Jul 2025 at 09:09.

BT logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Morpeth Street

BT are proposing to carry out Utility repair and maintenance works on Morpeth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Aug 2025 at 18:21.

BT logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Morpeth Street

BT are proposing to carry out Utility repair and maintenance works on Morpeth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Aug 2025 at 18:36.

Thames Water logo
LONG TERM
Between
20 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Old Ford Road

Thames Water are proposing to carry out Utility asset works on Old Ford Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 15:33.

Network Rail logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Exmouth Place

Network Rail are proposing to carry out Works for Rail Purposes on Exmouth Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Jul 2025 at 19:04.

London Borough Of Hackney logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Downs Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Downs Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Jul 2025 at 14:31.

London Borough Of Hackney logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Maury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Maury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Jul 2025 at 14:50.

London Borough Of Hackney logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Maury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Maury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Aug 2025 at 11:19.

Cadent Gas logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Woodberry Down

Cadent Gas are proposing to carry out Utility asset works on Woodberry Down, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 16:26.

Telefonica UK logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
Forest Road

Telefonica UK are proposing to carry out Utility asset works on Forest Road, Walthamstow.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 28 Aug 2025 at 15:51.

Telefonica UK logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
Forest Road

Telefonica UK are proposing to carry out Utility asset works on Forest Road, Walthamstow.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 29 Aug 2025 at 08:23.

Thames Water logo
Between
21 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Trossachs Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Trossachs Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:55.

London Borough Of Lewisham logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Bestwood Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Bestwood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:52.

London Borough Of Lewisham logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Bestwood Street

London Borough Of Lewisham were proposing to carry out Highway improvement works on Bestwood Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2025 and run through until 23 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:32.

Thames Water logo
Between
22 and 28 Oct 2025
Details
View Map
Share
Follow
Whitworth Street

Thames Water are proposing to carry out Utility repair and maintenance works on Whitworth Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 14:09.

T-Mobile (UK) logo
Between
22 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Vyner Street

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 25 Jul 2025 at 19:44.

T-Mobile (UK) logo
Between
22 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Vyner Street

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 4 Aug 2025 at 14:19.

Cadent Gas logo
LONG TERM
Between
22 Oct and 26 Nov 2025
Details
View Map
Share
Homerton High Street

Cadent Gas were proposing to carry out Utility asset works on Homerton High Street, Hackney, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2025 and run through until 26 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 18:10.

Cadent Gas logo
LONG TERM
Between
22 Oct and 2 Dec 2025
Details
View Map
Share
Follow
Woodberry Down

Cadent Gas are proposing to carry out Utility asset works on Woodberry Down, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 13:40.

Cadent Gas logo
LONG TERM
Between
22 Oct and 25 Nov 2025
Details
View Map
Share
Follow
Woodberry Grove

Cadent Gas are proposing to carry out Utility asset works on Woodberry Grove, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 12:29.

London Borough Of Southwark logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Borough Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Borough Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Jul 2025 at 11:46.

Thames Water logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Southwark Street

Thames Water are proposing to carry out Utility repair and maintenance works on Southwark Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 16:53.

Thames Water logo
LONG TERM
Between
24 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Exeter Road

Thames Water are proposing to carry out Utility asset works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 11:00.

Network Rail logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Jun 2025 at 10:23.

Thames Water logo
Between
25 and 28 Oct 2025
Details
View Map
Share
Follow
The Highway

Thames Water are proposing to carry out Utility repair and maintenance works on The Highway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 15:50.

Thames Water logo
Between
25 and 28 Oct 2025
Details
View Map
Share
Follow
Cannon Street Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 14:10.

Thames Water logo
Between
25 and 28 Oct 2025
Details
View Map
Share
Follow
Cannon Street Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:21.

Between
27 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Pepys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 4 Aug 2025 at 11:38.

Southern Gas Networks logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Old Dover Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Dover Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 07:49.

Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Manchester Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manchester Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:47.

Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Manchester Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manchester Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Jul 2025 at 10:51.

Thames Water logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Masons Hill

Thames Water are proposing to carry out New service connection on Masons Hill, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 17:59.

Virgin Media logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Woodland Terrace

Virgin Media are proposing to carry out Utility asset works on Woodland Terrace, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 4 Aug 2025 at 05:48.

Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Glenaffric Avenue

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Glenaffric Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:45.

London Borough Of Southwark logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Cope Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Cope Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 16:42.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Factory Road

Thames Water are proposing to carry out Utility repair and maintenance works on Factory Road, North Woolwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2025 at 09:19.

Transport for London (TfL) logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Albert Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Albert Road, North Woolwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:20.

Transport for London (TfL) logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Woolwich Manor Way, North Woolwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2025 at 15:07.

Vodafone logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Waterloo Place

Vodafone are proposing to carry out Utility repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 2 Jul 2025 at 11:32.

Cadent Gas logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:47.

Cadent Gas logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
St Leonards Road

Cadent Gas are proposing to carry out Utility asset works on St Leonards Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:57.

UK Power Networks Eastern & London logo
Between
27 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Rupert Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Rupert Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 09:17.

Cadent Gas logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Brunswick Road

Cadent Gas are proposing to carry out Utility asset works on Brunswick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:57.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Pretoria Avenue

Thames Water were proposing to carry out Utility asset works on Pretoria Avenue, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 11:33.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Melville Road

Thames Water are proposing to carry out Utility asset works on Melville Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2023 at 16:30.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Tree Road

Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 15:32.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Tree Road

Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 18:12.

Cadent Gas logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Farringdon Street

Cadent Gas are proposing to carry out Utility asset works on Farringdon Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2025 at 14:27.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Dean Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Dean Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 15:16.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Vallance Road

Thames Water are proposing to carry out Utility repair and maintenance works on Vallance Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 12:10.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Stokes Road

Thames Water are proposing to carry out New service connection on Stokes Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 18:22.

Thames Water logo
Between
27 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Hoxton Street

Thames Water are proposing to carry out Statutory Infrastructure Works on Hoxton Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:55.

Thames Water logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Howards Road

Thames Water are proposing to carry out New service connection on Howards Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 13:45.

Thames Water logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Bromley High Street

Thames Water were proposing to carry out Utility repair and maintenance works on Bromley High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 1 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2025 at 15:20.

Thames Water logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Bromley High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Bromley High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 16:16.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Bacton Street

BT are proposing to carry out Utility repair and maintenance works on Bacton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Aug 2025 at 18:20.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Bacton Street

BT are proposing to carry out Utility repair and maintenance works on Bacton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Aug 2025 at 18:37.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:50.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 15:50.

Network Rail logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Old Bethnal Green Road

Network Rail are proposing to carry out Works for Rail Purposes on Old Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jul 2025 at 11:19.

Network Rail logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Old Bethnal Green Road

Network Rail are proposing to carry out Works for Rail Purposes on Old Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Aug 2025 at 18:33.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
King's Cross Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 12:10.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
King's Cross Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 16:14.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 12:03.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 16:15.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 10:46.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 16:02.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Caledonian Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 07:22.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Caledonian Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 16:33.

London Borough Of Hackney logo
LONG TERM
Between
27 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 12 Aug 2025 at 13:06.

Thames Water logo
LONG TERM
Between
27 Oct and 15 Dec 2025
Details
View Map
Share
Follow
Churston Avenue

Thames Water are proposing to carry out Utility asset works on Churston Avenue, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 12:07.

BT logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Glebe Road

BT are proposing to carry out Utility asset works on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Aug 2025 at 13:35.

Thames Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Beauchamp Road

Thames Water are proposing to carry out Utility asset works on Beauchamp Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 12:04.

LONG TERM
Between
27 Oct 2025 and 28 Feb 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Romford Road, Forest Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 11 Aug 2025 at 10:18.

Thames Water logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Hornsey Road

Thames Water are proposing to carry out New service connection on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 06:10.

UK Power Networks Eastern & London logo
Between
28 Oct and 11 Nov 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2025 at 21:42.

Between
28 Oct and 12 Nov 2025
Details
View Map
Share
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Pepys Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:42.

Between
28 Oct and 12 Nov 2025
Details
View Map
Share
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Pepys Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:45.

Between
28 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Pepys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:52.

BT logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Bournville Road

BT are proposing to carry out Utility asset works on Bournville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Jul 2025 at 14:51.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Fentiman Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Fentiman Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 12:51.

London Borough Of Southwark logo
LONG TERM
Between
29 Oct 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Jun 2025 at 19:24.

London Borough Of Southwark logo
LONG TERM
Between
29 Oct 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 26 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Jun 2025 at 08:24.

City Of London Corporation logo
Between
29 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Southwark Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Southwark Bridge Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 15 Aug 2025 at 08:08.

UK Power Networks Eastern & London logo
Between
29 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Leadenhall Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2025 at 12:18.

City Of Westminster logo
LONG TERM
Between
29 Oct and 17 Dec 2025
Details
View Map
Share
Follow
Long Acre

City Of Westminster are proposing to carry out Highway repair and maintenance works on Long Acre, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 28 Aug 2025 at 15:25.

Vodafone logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Great Queen Street

Vodafone are proposing to carry out Remedial works on Great Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 25 Jul 2025 at 12:19.

Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Tredegar Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 1 Aug 2025 at 10:49.

Cadent Gas logo
Between
30 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Ponsford Street

Cadent Gas are proposing to carry out Utility asset works on Ponsford Street, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 19:30.

UK Power Networks Eastern & London logo
Between
31 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Bartlett Court

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bartlett Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 14:44.

Thames Water logo
LONG TERM
Between
1 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Columbia Road

Thames Water are proposing to carry out Utility asset works on Columbia Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:35.

Thames Water logo
LONG TERM
Between
1 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Columbia Road

Thames Water are proposing to carry out Utility asset works on Columbia Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 11:45.

Between
1 and 5 Nov 2025
Details
View Map
Share
Follow
Gibbins Road

London Borough Of Newham are proposing to carry out Section 50 on Gibbins Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 29 Aug 2025 at 12:26.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Drury Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Drury Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 09:32.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
West Central Street

Thames Water are proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 08:58.

Cadent Gas logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Middlesex Street

Cadent Gas are proposing to carry out Utility asset works on Middlesex Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 16:30.

Cadent Gas logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Middlesex Street

Cadent Gas are proposing to carry out Utility asset works on Middlesex Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 11:05.

Cadent Gas logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Middlesex Street

Cadent Gas are proposing to carry out Utility asset works on Middlesex Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 17:51.

Cadent Gas logo
Between
3 and 12 Nov 2025
Details
View Map
Share
Follow
Sandy's Row

Cadent Gas are proposing to carry out Utility asset works on Sandy's Row, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 16:30.

Cadent Gas logo
Between
3 and 12 Nov 2025
Details
View Map
Share
Follow
Widegate Street

Cadent Gas are proposing to carry out Utility asset works on Widegate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 16:30.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Moor Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Moor Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 11:43.

LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Finsbury Square

London Borough Of Islington are proposing to carry out Highway improvement works on Finsbury Square, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 18 Jul 2025 at 08:07.

LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
City Road

London Borough Of Islington are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 26 Jun 2025 at 10:35.

Thames Water logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Russell Square

Thames Water are proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 16:00.

Thames Water logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Russell Square

Thames Water are proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 11:14.

Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Glen Road

London Borough Of Newham are proposing to carry out Highway improvement works on Glen Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 16 Jun 2025 at 10:52.

Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Glen Road

London Borough Of Newham are proposing to carry out Highway improvement works on Glen Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Jul 2025 at 13:29.

Thames Water logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Old Street

Thames Water are proposing to carry out Statutory Infrastructure Works on Old Street, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 14:57.

Network Rail logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
Richmond Road

Network Rail are proposing to carry out Works for Rail Purposes on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Jul 2025 at 17:17.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
North Road

Thames Water are proposing to carry out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2025 at 07:43.

Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Jul 2025 at 09:21.

Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Jul 2025 at 10:10.

London Borough Of Hackney logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Northwold Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Northwold Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 28 Aug 2025 at 12:12.

London Borough Of Waltham Forest logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
Grove Green Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Grove Green Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Aug 2025 at 11:34.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Chesterfield Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chesterfield Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 08:27.

UK Power Networks Eastern & London logo
Between
3 and 26 Nov 2025
Details
View Map
Share
Follow
Lindsell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 13:08.

UK Power Networks Eastern & London logo
Between
3 and 26 Nov 2025
Details
View Map
Share
Follow
Lindsell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 14:24.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Ha Ha Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ha Ha Road, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 14:57.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Charlton Church Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Church Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jun 2025 at 07:49.

Virgin Media logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Maryon Road

Virgin Media were proposing to carry out Utility asset works on Maryon Road, Charlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 5 Aug 2025 at 10:49.

London Borough Of Southwark logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Rotherhithe Old Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe Old Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 16:27.

London Borough Of Southwark logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Rotherhithe Old Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe Old Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2025 at 07:00.

London Borough Of Southwark logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Cope Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Cope Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Aug 2025 at 15:59.

London Borough Of Southwark logo
Between
3 and 26 Nov 2025
Details
View Map
Share
Cope Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Cope Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 26 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2025 at 09:34.

London Borough Of Lewisham logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Grove Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Grove Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 14:40.

London Borough Of Lewisham logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Grove Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Grove Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 18 Aug 2025 at 11:10.

Cornerstone Telecommunications Infrastructure logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Strait Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Jul 2025 at 12:09.

Thames Water logo
Between
3 and 9 Nov 2025
Details
View Map
Share
Follow
King William Street

Thames Water are proposing to carry out New service connection on King William Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 11:11.

Thames Water logo
Between
3 and 9 Nov 2025
Details
View Map
Share
Follow
Abchurch Lane

Thames Water are proposing to carry out New service connection on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Aug 2025 at 21:48.

Thames Water logo
Between
4 and 9 Nov 2025
Details
View Map
Share
Follow
Durward Street

Thames Water are proposing to carry out Utility repair and maintenance works on Durward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 18:33.

Vodafone logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Northburgh Street

Vodafone are proposing to carry out New service connection on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 8 Aug 2025 at 14:01.

Thames Water logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 6 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 07:47.

Between
5 and 28 Nov 2025
Details
View Map
Share
Follow
Tylney Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Tylney Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 7 Aug 2025 at 12:14.

Vodafone logo
Between
5 and 11 Nov 2025
Details
View Map
Share
Follow
Waterloo Place

Vodafone are proposing to carry out Utility repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 28 Aug 2025 at 16:00.

London Borough Of Hackney logo
Between
6 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2025 at 10:27.

Thames Water logo
Between
6 and 12 Nov 2025
Details
View Map
Share
Follow
Ashwin Street

Thames Water are proposing to carry out New service connection on Ashwin Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 12:34.

Between
6 and 28 Nov 2025
Details
View Map
Share
Morris Avenue

London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Morris Avenue, Manor Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Sep 2025 at 08:37.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Radland Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Radland Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:50.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Radland Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Radland Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:50.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Radland Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Radland Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:51.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Forty Acre Lane

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Forty Acre Lane, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 22 Aug 2025 at 11:41.

UK Power Networks Eastern & London logo
Between
7 and 19 Nov 2025
Details
View Map
Share
Follow
Thavies Inn

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thavies Inn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 16:20.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Brooks Avenue

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Brooks Avenue, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:28.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Lonsdale Avenue

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Lonsdale Avenue, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:27.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Kimberley Avenue

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Kimberley Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:19.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Barking Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Barking Road, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:29.

Thames Water logo
Between
7 and 11 Nov 2025
Details
View Map
Share
Follow
Mare Street

Thames Water are proposing to carry out Utility repair and maintenance works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jul 2025 at 16:05.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
The Green

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on The Green, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Aug 2025 at 15:19.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Wingfield Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Wingfield Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Aug 2025 at 15:38.

Southern Gas Networks logo
LONG TERM
Between
7 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Chesterfield Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chesterfield Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:46.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Boxley Street

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Boxley Street, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:51.

City Of Westminster logo
LONG TERM
Between
7 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 09:42.

City Of Westminster logo
LONG TERM
Between
7 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Waterloo Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 Jun 2025 at 14:15.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Victoria Dock Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Victoria Dock Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:59.

UK Power Networks Eastern & London logo
Between
8 and 19 Nov 2025
Details
View Map
Share
Follow
Old Pye Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Old Pye Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 15:34.

UK Power Networks Eastern & London logo
Between
8 and 19 Nov 2025
Details
View Map
Share
Follow
Strutton Ground

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Strutton Ground, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 15:34.

UK Power Networks Eastern & London logo
Between
8 and 19 Nov 2025
Details
View Map
Share
Follow
Victoria Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 17:12.

BT logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Chudleigh Road

BT are proposing to carry out Utility asset works on Chudleigh Road, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2025 at 10:20.

BT logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Gordonbrock Road

BT are proposing to carry out Utility asset works on Gordonbrock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Aug 2025 at 15:13.

Southern Gas Networks logo
Between
10 and 18 Nov 2025
Details
View Map
Share
Follow
Colwell Road

Southern Gas Networks are proposing to carry out New service connection on Colwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:41.

Southern Gas Networks logo
Between
10 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Shooters Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 09:41.

Royal Borough Of Greenwich logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Greenwich High Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 20 Aug 2025 at 10:41.

Southern Gas Networks logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Grenada Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grenada Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:32.

Southern Gas Networks logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Shooters Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 09:04.

Southern Gas Networks logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Indus Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Indus Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:31.

Southern Gas Networks logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Marlborough Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 06:38.

Thames Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Trundleys Road

Thames Water are proposing to carry out Utility repair and maintenance works on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 08:41.

London Borough Of Southwark logo
LONG TERM
Between
10 Nov 2025 and 17 Jan 2026
Details
View Map
Share
Aylesbury Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Aylesbury Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 17 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 Jun 2025 at 12:27.

London Borough Of Southwark logo
LONG TERM
Between
10 Nov 2025 and 17 Jan 2026
Details
View Map
Share
Follow
Aylesbury Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Aylesbury Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 17 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 18 Jul 2025 at 12:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 6 Mar 2026
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 6 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 14:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 13:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jun 2025 at 09:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Needleman Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 18 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Needleman Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 18 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 13:36.

Royal Borough Of Greenwich logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Ordnance Crescent

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Ordnance Crescent, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 4 Aug 2025 at 12:22.

UK Power Networks Eastern & London logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Jun 2025 at 13:03.

UK Power Networks Eastern & London logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 13:45.

UK Power Networks Eastern & London logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 07:38.

UK Power Networks Eastern & London logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 15:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jun 2025 at 16:50.

Between
10 and 25 Nov 2025
Details
View Map
Share
Treveris Street

Leep Utilities Electric were proposing to carry out Utility asset works on Treveris Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 25 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leep Utilities Electric on 14 Aug 2025 at 09:13.

ESP Electricity logo
Between
10 and 25 Nov 2025
Details
View Map
Share
Follow
Treveris Street

ESP Electricity are proposing to carry out Utility asset works on Treveris Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 14 Aug 2025 at 09:28.

ESP Electricity logo
Between
10 and 25 Nov 2025
Details
View Map
Share
Follow
Bear Lane

ESP Electricity are proposing to carry out Utility asset works on Bear Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 14 Aug 2025 at 09:45.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Brewer Street

Thames Water are proposing to carry out Utility repair and maintenance works on Brewer Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:00.

Thames Water logo
Between
10 and 16 Nov 2025
Details
View Map
Share
Follow
West Smithfield

Thames Water are proposing to carry out New service connection on West Smithfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2025 at 16:44.

UK Power Networks Eastern & London logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Brick Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Brick Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 15:28.

London Borough Of Hackney logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Leswin Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Leswin Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 28 Aug 2025 at 13:04.

Transport for London (TfL) logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 11:55.

Transport for London (TfL) logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 12:00.

Transport for London (TfL) logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 11:39.

Transport for London (TfL) logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 14:18.

London Borough Of Waltham Forest logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Leopold Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Leopold Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Aug 2025 at 11:48.

London Borough Of Waltham Forest logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Sylvan Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Sylvan Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 15 Aug 2025 at 09:17.

UK Power Networks Eastern & London logo
Between
11 and 27 Nov 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2025 at 21:42.

London Borough Of Hackney logo
Between
11 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Benthal Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Benthal Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 31 Jul 2025 at 10:54.

London Borough Of Hackney logo
Between
11 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Narford Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Narford Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 31 Jul 2025 at 10:52.

London Borough Of Hackney logo
Between
11 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Narford Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Narford Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Aug 2025 at 11:27.

London Borough Of Hackney logo
Between
11 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Narford Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Narford Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2025 at 13:17.

Electricity Network Company logo
Between
12 and 28 Nov 2025
Details
View Map
Share
Follow
Purcell Street

Electricity Network Company are proposing to carry out Utility asset works on Purcell Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 19 Aug 2025 at 10:55.

London Borough Of Waltham Forest logo
Between
12 and 15 Nov 2025
Details
View Map
Share
Follow
Onra Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Onra Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 14 Aug 2025 at 11:32.

Transport for London (TfL) logo
LONG TERM
Between
13 Nov 2025 and 23 Feb 2026
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jun 2025 at 16:03.

Thames Water logo
Between
14 and 28 Nov 2025
Details
View Map
Share
Follow
Turner Street

Thames Water are proposing to carry out Utility asset works on Turner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 23:10.

Thames Water logo
LONG TERM
Between
14 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
St James's Avenue

Thames Water are proposing to carry out Utility asset works on St James's Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jan 2025 at 15:56.

Thames Water logo
LONG TERM
Between
14 Nov 2025 and 30 Jan 2026
Details
View Map
Share
St James's Avenue

Thames Water were proposing to carry out Utility asset works on St James's Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2025 and run through until 30 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Feb 2025 at 09:38.

Between
14 and 17 Nov 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Aug 2025 at 08:21.

London Borough Of Hackney logo
On
14 Nov 2025
Details
View Map
Share
Follow
Painsthorpe Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Painsthorpe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 14 November 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 28 Aug 2025 at 13:24.

Transport for London (TfL) logo
LONG TERM
Between
14 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Blackwall Tunnel Southern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 16:24.

Transport for London (TfL) logo
LONG TERM
Between
14 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 16:24.

Transport for London (TfL) logo
LONG TERM
Between
14 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 10:05.

Transport for London (TfL) logo
Between
14 and 17 Nov 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:52.

City Of London Corporation logo
Between
15 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Coleman Street

City Of London Corporation are proposing to carry out Highway improvement works on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 11 Aug 2025 at 11:00.

City Of London Corporation logo
Between
15 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Coleman Street

City Of London Corporation are proposing to carry out Highway improvement works on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 17 Aug 2025 at 16:30.

City Of Westminster logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Sep 2025 at 13:11.

UK Power Networks Eastern & London logo
Between
17 and 27 Nov 2025
Details
View Map
Share
Follow
Rathbone Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Rathbone Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 15:19.

Cadent Gas logo
Between
17 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Tollgate Road

Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 14:24.

Cadent Gas logo
Between
17 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Tollgate Road

Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:44.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Berners Mews

Thames Water are proposing to carry out New service connection on Berners Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 08:02.

City Of Westminster logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 May 2025 at 08:26.

City Of Westminster logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 31 Jul 2025 at 13:17.

Thames Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Gray's Inn Road

Thames Water were proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 09:12.

Thames Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 09:14.

UK Power Networks Eastern & London logo
Between
17 and 25 Nov 2025
Details
View Map
Share
Follow
Mount Pleasant

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2025 at 18:34.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Beaumont Road

Thames Water are proposing to carry out New service connection on Beaumont Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 13:44.

Transport for London (TfL) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Euston Underpass

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Euston Underpass, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 13:04.

Transport for London (TfL) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Euston Underpass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Euston Underpass, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 13:09.

Transport for London (TfL) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Euston Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 14:23.

Cadent Gas logo
Between
17 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:41.

Cadent Gas logo
Between
17 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:08.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Camden Street

Transport for London (TfL) were proposing to carry out Section 58 on Camden Street, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:10.

Transport for London (TfL) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Cowdry Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cowdry Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 14:25.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Nevill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Nevill Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 21:04.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 08:53.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 10:43.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 14:55.

London Borough Of Southwark logo
LONG TERM
Between
17 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Everthorpe Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Everthorpe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Jul 2025 at 11:20.

Thames Water logo
Between
17 and 24 Nov 2025
Details
View Map
Share
Springwater Close

Thames Water were proposing to carry out Utility repair and maintenance works on Springwater Close, Plumstead.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 16:54.

London Borough Of Southwark logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Hanover Park

London Borough Of Southwark are proposing to carry out Highway improvement works on Hanover Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Aug 2025 at 12:26.

London Borough Of Southwark logo
LONG TERM
Between
17 Nov 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Cooks Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Cooks Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 18 Jul 2025 at 12:30.

Virgin Media logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Maryon Road

Virgin Media are proposing to carry out Utility asset works on Maryon Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 15 Aug 2025 at 07:43.

BT logo
Between
17 and 27 Nov 2025
Details
View Map
Share
Follow
Upper Thames Street

BT are proposing to carry out Utility repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Aug 2025 at 10:15.

Thames Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Rosebank Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Rosebank Grove, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 15:27.

BT logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Cresswell Park

BT are proposing to carry out Utility asset works on Cresswell Park, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Aug 2025 at 06:27.

BT logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Bennett Park

BT are proposing to carry out Utility asset works on Bennett Park, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2025 at 06:24.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 11 Jun 2025 at 09:20.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2025 and run through until 20 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Jun 2025 at 10:06.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Jun 2025 at 12:30.

Virgin Media logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Follow
Gedling Place

Virgin Media are proposing to carry out Utility asset works on Gedling Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 29 Aug 2025 at 15:05.

UK Power Networks Eastern & London logo
Between
19 and 28 Nov 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 12:54.

Transport for London (TfL) logo
Between
19 Nov and 4 Dec 2025
Details
View Map
Share
Follow
East Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on East Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:10.

Transport for London (TfL) logo
Between
19 Nov and 4 Dec 2025
Details
View Map
Share
Follow
East Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on East Cross Route, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:06.

Transport for London (TfL) logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 13:50.

Thames Water logo
Between
21 and 27 Nov 2025
Details
View Map
Share
Follow
New Oxford Street

Thames Water are proposing to carry out Disconnection or alteration of supply on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 20:13.

Cadent Gas logo
Between
21 Nov and 1 Dec 2025
Details
View Map
Share
Middlesex Street

Cadent Gas were proposing to carry out Remedial works on Middlesex Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 10:14.

Between
21 Nov and 12 Dec 2025
Details
View Map
Share
Follow
International Way

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on International Way, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Aug 2025 at 15:27.

Thames Water logo
Between
21 and 23 Nov 2025
Details
View Map
Share
Follow
Isledon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Isledon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 14:56.

Transport for London (TfL) logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:58.

Thames Water logo
LONG TERM
Between
22 Nov 2025 and 21 Feb 2026
Details
View Map
Share
Follow
Churston Avenue

Thames Water are proposing to carry out Utility asset works on Churston Avenue, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2025 and could run through until 21 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:48.

Thames Water logo
LONG TERM
Between
22 Nov 2025 and 17 Jan 2026
Details
View Map
Share
Follow
Beauchamp Road

Thames Water are proposing to carry out Utility asset works on Beauchamp Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2025 and could run through until 17 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:27.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
High Holborn

Thames Water are proposing to carry out Disconnection or alteration of supply on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 13:44.

UK Power Networks Eastern & London logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Rathbone Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Rathbone Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 12:45.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Great Russell Street

Thames Water are proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 18:01.

Cadent Gas logo
Between
24 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Devons Road

Cadent Gas are proposing to carry out Utility asset works on Devons Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 15:27.

Thames Water logo
Between
24 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Wilson Street

Thames Water are proposing to carry out New service connection on Wilson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 13:29.

Network Rail logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Ash Grove (North)

Network Rail are proposing to carry out Works for Rail Purposes on Ash Grove (North), Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Aug 2025 at 17:16.

Between
24 Nov and 2 Dec 2025
Details
View Map
Share
Follow
West Ham Lane

London Borough Of Newham are proposing to carry out Highway improvement works on West Ham Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 9 Jun 2025 at 10:08.

Between
24 Nov and 2 Dec 2025
Details
View Map
Share
Follow
West Ham Lane

London Borough Of Newham are proposing to carry out Highway improvement works on West Ham Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 29 Jul 2025 at 10:04.

Between
24 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 21 Aug 2025 at 17:59.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Lindley Road

BT are proposing to carry out Utility repair and maintenance works on Lindley Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Aug 2025 at 12:02.

Thames Water logo
Between
24 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Royston Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 November 2025 and could run through until 10 December 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 15:54.

Thames Water logo
Between
24 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Royston Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 10 December 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:56.

Southern Gas Networks logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Lytcott Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lytcott Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 11:38.

Thames Water logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Costa Street

Thames Water are proposing to carry out New service connection on Costa Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 09:08.

London Borough Of Lewisham logo
Between
24 and 29 Nov 2025
Details
View Map
Share
Follow
Deptford Church Street

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Deptford Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 27 Aug 2025 at 08:10.

London Borough Of Lewisham logo
Between
24 and 29 Nov 2025
Details
View Map
Share
Follow
Deptford Church Street

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Deptford Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 27 Aug 2025 at 14:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Nov 2025 and 13 Mar 2026
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 13 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 14:28.

London Borough Of Southwark logo
LONG TERM
Between
24 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Elephant Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Elephant Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 20 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 21 Aug 2025 at 14:38.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Shad Thames

BT are proposing to carry out Utility repair and maintenance works on Shad Thames, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Aug 2025 at 12:47.

City Of Westminster logo
Between
25 and 28 Nov 2025
Details
View Map
Share
John Islip Street

City Of Westminster were proposing to carry out Highway improvement works on John Islip Street, Vincent Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Jul 2025 at 11:24.

City Of Westminster logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
John Islip Street

City Of Westminster are proposing to carry out Highway improvement works on John Islip Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:52.

City Of Westminster logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
John Islip Street

City Of Westminster are proposing to carry out Highway improvement works on John Islip Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Jul 2025 at 14:53.

City Of Westminster logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
Dean Ryle Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Dean Ryle Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:51.

City Of Westminster logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
Dean Ryle Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Dean Ryle Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Jul 2025 at 14:54.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
Strait Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Jul 2025 at 12:08.

BT logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Glasshouse Fields

BT are proposing to carry out Utility asset works on Glasshouse Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2025 at 09:12.

Thames Water logo
Between
25 Nov and 1 Dec 2025
Details
View Map
Share
Follow
West Central Street

Thames Water are proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 15:57.

Thames Water logo
Between
25 Nov and 1 Dec 2025
Details
View Map
Share
West Central Street

Thames Water were proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 11:41.

Transport for London (TfL) logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 13:34.

Transport for London (TfL) logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
Norton Folgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Norton Folgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 13:35.

Between
26 and 28 Nov 2025
Details
View Map
Share
Rainhill Way

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Rainhill Way, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 26 Aug 2025 at 14:11.

On
26 Nov 2025
Details
View Map
Share
Follow
Rainhill Way

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rainhill Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 26 November 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 27 Aug 2025 at 11:16.

Thames Water logo
Between
26 Nov and 16 Dec 2025
Details
View Map
Share
Follow
Compton Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Compton Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 16 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 13:32.

London Borough Of Southwark logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Rotherhithe Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 16:27.

London Borough Of Southwark logo
LONG TERM
Between
27 Nov 2025 and 19 Dec 2026
Details
View Map
Share
Follow
Lorrimore Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Lorrimore Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 19 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2025 at 09:20.

London Borough Of Southwark logo
LONG TERM
Between
27 Nov 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Lorrimore Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Lorrimore Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 26 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 16:42.

City Of Westminster logo
Between
27 and 29 Nov 2025
Details
View Map
Share
Follow
Exeter Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Exeter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Jun 2025 at 07:31.

Thames Water logo
LONG TERM
Between
28 Nov 2025 and 6 Mar 2026
Details
View Map
Share
Follow
Ashfield Street

Thames Water are proposing to carry out Utility asset works on Ashfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 6 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jul 2025 at 14:46.

On
28 Nov 2025
Details
View Map
Share
Follow
Rainhill Way

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rainhill Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 28 November 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Aug 2025 at 09:00.

Thames Water logo
Between
28 and 30 Nov 2025
Details
View Map
Share
Follow
Isledon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Isledon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 08:13.

London Borough Of Hackney logo
On
28 Nov 2025
Details
View Map
Share
Follow
Woodberry Grove

London Borough Of Hackney are proposing to carry out Highway improvement works on Woodberry Grove, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 28 November 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 14 Aug 2025 at 17:15.

Network Rail logo
Between
30 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Mantle Road

Network Rail are proposing to carry out Works for Rail Purposes on Mantle Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Aug 2025 at 14:43.

London Borough Of Southwark logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Peckham Park Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Aug 2025 at 09:46.

Royal Borough Of Greenwich logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Welland Street

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Welland Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 26 Aug 2025 at 10:41.

London Borough Of Southwark logo
Between
1 and 4 Dec 2025
Details
View Map
Share
Follow
Ambergate Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Ambergate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 07:34.

Cadent Gas logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 08:31.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 08:47.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
St Leonards Road

Cadent Gas are proposing to carry out Utility asset works on St Leonards Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 15:39.

Cadent Gas logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
St Leonards Road

Cadent Gas are proposing to carry out Utility asset works on St Leonards Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 14:59.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Brunswick Road

Cadent Gas are proposing to carry out Utility asset works on Brunswick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 15:40.

Cadent Gas logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Brunswick Road

Cadent Gas are proposing to carry out Utility asset works on Brunswick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 14:57.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Museum Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Museum Street, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 15:55.

Transport for London (TfL) logo
LONG TERM
Between
1 Dec 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Woolwich Manor Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 09:44.

Transport for London (TfL) logo
LONG TERM
Between
1 Dec 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Newham Way, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 13:30.

Transport for London (TfL) logo
LONG TERM
Between
1 Dec 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Royal Docks Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 13:47.

Transport for London (TfL) logo
LONG TERM
Between
1 Dec 2025 and 6 Feb 2026
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 13:48.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:41.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:09.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:42.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:08.

Network Rail logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Fairfield Road

Network Rail are proposing to carry out Works for Rail Purposes on Fairfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Sep 2025 at 11:44.

Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Stour Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Stour Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 1 Sep 2025 at 08:41.

Network Rail logo
Between
1 and 4 Dec 2025
Details
View Map
Share
Follow
Cann Hall Road

Network Rail are proposing to carry out Works for Rail Purposes on Cann Hall Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Aug 2025 at 11:34.


Roadworks Map near to Bow Common Lane, LONDON, E3 4FU (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bow Common Lane, LONDON, E3 4FU (74 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
MAJOR
  
BURGESS STREET 
(0.1 miles)
Thames Water
New service connection - Footway, Carriageway - Road closure
Planned
Scheduled: 1 Sep 2025 - 5 Sep 2025
0.1
Details
Share
Follow
2
Thames Water logo
MAJOR
  
BURGESS STREET 
(0.1 miles)
Thames Water
New service connection - Footway, Carriageway - Road closure
In Progress
Since: 1 Sep 2025 09:40
(Scheduled: 1 Sep 2025 - 7 Sep 2025)
0.1
Details
Share
Follow
3
Eunetworks logo
ST PAULS WAY 
(0.2 miles)
Eunetworks
Utility asset works - Carriageway - Two-way signals
Planned
Scheduled: 3 Sep 2025 - 5 Sep 2025
0.2
Details
Share
Follow
4
GLAUCUS STREET 
(0.2 miles)
Leep Utilities Electric
Utility asset works - Footway - Two-way signals
Planned
Scheduled: 1 Sep 2025 - 12 Sep 2025
0.2
Details
Share
Follow
5
Thames Water logo
FAWE STREET 
(0.3 miles)
Thames Water
Remedial works - Footway - Some carriageway incursion
Complete
2 Sep 2025 08:58 - 3 Sep 2025 08:28
0.3
Details
Share
6
Network Rail logo
URGENT
  
BURDETT ROAD 
(0.3 miles)
Network Rail
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Cancelled
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
0.3
Details
Share
7
BT logo
ROUNTON ROAD 
(0.5 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 2 Sep 2025 - 4 Sep 2025
0.5
Details
Share
Follow
8
Thames Water logo
MAJOR
  
BURDETT ROAD 
(0.5 miles)
Thames Water
Utility asset works - Footway, Carriageway - Contra-flow
Planned
Scheduled: 14 Jul 2025 - 14 Nov 2025
0.5
Details
Share
Follow
9
Thames Water logo
MAJOR
  
BURDETT ROAD 
(0.5 miles)
Thames Water
Utility asset works - Footway, Carriageway - Contra-flow
In Progress
Since: 14 Jul 2025 08:56
(Scheduled: 14 Jul 2025 - 14 Nov 2025)
0.5
Details
Share
Follow
10
MAJOR
  
SALTWELL STREET 
(0.5 miles)
London Borough Of Tower Hamlets
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 1 Sep 2025 - 13 Oct 2025
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data