ROADWORKS SUMMARY
Longfellow Road, LONDON, E17 8DP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Longfellow Road, E17 8DP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Longfellow Road, LONDON, E17 8DP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Longfellow Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.

Transport for London (TfL) logo
LONG TERM
Until
16 Nov 2024
Details
View Map
Share
Follow
Stoke Newington High Street

Transport for London (TfL) are carrying out roadworks on Stoke Newington High Street, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2023 at 08:00 and could run through until 16 November 2024. The works will impact the footway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jun 2024 at 10:09.

Transport for London (TfL) logo
LONG TERM
Between
27 Mar 2023 and 8 Sep 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.

Essex County Council logo
LONG TERM
Until
4 May 2026
Details
View Map
Share
Follow
Station Way

Essex County Council are carrying out Highway improvement works on Station Way, Buckhurst Hill.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 April 2023 at 08:33 and could run through until 4 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Jul 2024 at 07:13.

LONG TERM
Until
31 Oct 2024
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 June 2023 at 08:00 and could run through until 31 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 8 May 2024 at 09:17.

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Broadmead Road

London Borough Of Redbridge are carrying out Highway repair and maintenance works on Broadmead Road, Woodford Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2023 at 07:34 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 17 Jun 2024 at 12:01.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Finsbury Park Road

Thames Water are carrying out Utility repair and maintenance works on Finsbury Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 08:30 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 15:58.

Thames Water logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Myddleton Avenue

Thames Water are carrying out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 09:30 and could run through until 30 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 15:50.

London Borough Of Enfield logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are carrying out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

The works started on 1 August 2023 at 07:00 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 24 May 2024 at 15:27.

LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Queens Market

London Borough Of Newham are carrying out Highway improvement works on Queens Market, Upton Park, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 12 September 2023 at 22:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 14 Aug 2024 at 11:59.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2023 and 10 Oct 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.

LONG TERM
Until
31 Oct 2024
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 31 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 15 Jul 2024 at 10:36.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Oct 2024
Details
View Map
Share
Follow
Low Hall Lane

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Low Hall Lane, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 09:00 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 15:38.

City Of London Corporation logo
LONG TERM
Until
10 Oct 2024
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are carrying out Highway improvement works on Leadenhall Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2024 at 08:00 and could run through until 10 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 10 Sep 2024 at 13:49.

London Borough Of Enfield logo
LONG TERM
Until
12 Oct 2024
Details
View Map
Share
Follow
Angel Walk

London Borough Of Enfield are carrying out Section 50 on Angel Walk, London.

These works are categorised as Major.

The works started on 13 January 2024 at 09:00 and could run through until 12 October 2024. The works will impact the verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Enfield on 14 Aug 2024 at 11:07.

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Westfield Avenue

London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 16 Feb 2024 at 10:14.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are carrying out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 January 2024 at 08:00 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 14:47.

London Borough Of Waltham Forest logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Waltham Forest are carrying out Highway repair and maintenance works on Sutherland Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2024 at 08:00 and could run through until 23 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Waltham Forest on 2 Feb 2024 at 14:09.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
South Access Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on South Access Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 15:29.

London Borough Of Hackney logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Queensbridge Road

London Borough Of Hackney are carrying out Highway improvement works on Queensbridge Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 12 Sep 2024 at 10:41.

London Borough Of Hackney logo
LONG TERM
Between
15 Feb 2024 and 12 Jul 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.

Network Rail logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Bodney Road

Network Rail are carrying out Works for Rail Purposes on Bodney Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 09:23.

Network Rail logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Downs Park Road

Network Rail are carrying out Works for Rail Purposes on Downs Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 10:30 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 10:47.

UK Power Networks Eastern & London logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2024 at 13:00 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 13:22.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2024 at 14:40 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Apr 2024 at 13:45.

Transport for London (TfL) logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2024 at 20:00 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Aug 2024 at 15:27.

London Borough Of Hackney logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 24 September 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 16 Jan 2024 at 09:35.

London Borough Of Hackney logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 11:55.

London Borough Of Hackney logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Laburnum Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Laburnum Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 14:09.

London Borough Of Hackney logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Albion Drive

London Borough Of Hackney are proposing to carry out Highway improvement works on Albion Drive, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 10:55.

London Borough Of Waltham Forest logo
LONG TERM
Between
2 May and 1 Nov 2024
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Sutherland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Waltham Forest on 2 Feb 2024 at 12:57.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 16 Sep 2024 at 10:03.

Thames Water logo
LONG TERM
Until
28 Oct 2024
Details
View Map
Share
Follow
Barking Road

Thames Water are carrying out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 08:05 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 09:25.

LONG TERM
Until
31 Oct 2024
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 19 Sep 2024 at 19:04.

Thames Water logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Erskine Road

Thames Water are carrying out Utility asset works on Erskine Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2024 at 08:25 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2024 at 07:25.

Thames Water logo
LONG TERM
Between
2 Jun and 13 Oct 2024
Details
View Map
Share
Follow
Beacontree Avenue

Thames Water are proposing to carry out Utility asset works on Beacontree Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 13 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:51.

London Borough Of Hackney logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lea Bridge Road

London Borough Of Hackney are carrying out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2024 at 08:00 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 24 Jul 2024 at 13:45.

LONG TERM
Until
31 Oct 2024
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 19 Sep 2024 at 19:03.

Thames Water logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Eade Road

Thames Water are carrying out Utility asset works on Eade Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2024 at 09:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2024 at 09:50.

London Borough Of Camden logo
LONG TERM
Between
24 Jun and 6 Dec 2024
Details
View Map
Share
Follow
Randell's Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Randell's Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 26 Jun 2024 at 07:05.

City Of London Corporation logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
London Wall

City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 1 Jul 2024 at 07:02.

Transport for London (TfL) logo
LONG TERM
Between
1 Jul 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Curtain Road

Transport for London (TfL) are proposing to carry out roadworks on Curtain Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 13:20.

London Borough Of Camden logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway repair and maintenance works on York Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 14:00 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Jul 2024 at 14:28.

London Borough Of Haringey logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Chesnut Road

London Borough Of Haringey are carrying out Highway improvement works on Chesnut Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 09:29 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 1 Jul 2024 at 08:34.

London Borough Of Enfield logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Brownlow Road

London Borough Of Enfield are carrying out Highway improvement works on Brownlow Road, Southgate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 9 Jul 2024 at 07:06.

Thames Water logo
LONG TERM
Until
27 Oct 2024
Details
View Map
Share
Follow
Penton Street

Thames Water are carrying out Utility asset works on Penton Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 12:31 and could run through until 27 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 07:31.

Thames Water logo
LONG TERM
Until
29 Oct 2024
Details
View Map
Share
Follow
Bisterne Avenue

Thames Water are carrying out Utility asset works on Bisterne Avenue, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 July 2024 at 08:16 and could run through until 29 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:47.

Thames Water logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Melville Road

Thames Water are carrying out Utility asset works on Melville Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 July 2024 at 08:20 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 15:55.

London Borough Of Waltham Forest logo
LONG TERM
Between
19 Jul and 30 Sep 2024
Details
View Map
Share
Follow
St James Street

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on St James Street, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2024 and could run through until 30 September 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Waltham Forest on 25 Jul 2024 at 15:01.

Thames Water logo
LONG TERM
Until
11 Feb 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 08:10 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Jul 2024 at 08:20.

Thames Water logo
LONG TERM
Until
18 Oct 2024
Details
View Map
Share
Follow
Fyfield Road

Thames Water are carrying out Utility asset works on Fyfield Road, Walthamstow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 09:30 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:45.

London Borough Of Enfield logo
LONG TERM
Between
22 Jul and 26 Oct 2024
Details
View Map
Share
Follow
Sandal Road

London Borough Of Enfield are proposing to carry out Section 50 on Sandal Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 20 Jun 2024 at 13:35.

London Borough Of Enfield logo
LONG TERM
Between
22 Jul and 26 Oct 2024
Details
View Map
Share
Follow
Woolmer Road

London Borough Of Enfield are proposing to carry out Section 50 on Woolmer Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 20 Jun 2024 at 13:30.

Thames Water logo
LONG TERM
Until
12 Oct 2024
Details
View Map
Share
Follow
Highbury Grove

Thames Water are carrying out Utility asset works on Highbury Grove, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 July 2024 at 08:00 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jul 2024 at 08:02.

Thames Water logo
LONG TERM
Between
24 Jul and 31 Oct 2024
Details
View Map
Share
Follow
Eagle Lane

Thames Water are proposing to carry out Utility asset works on Eagle Lane, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 15 Jul 2024 at 09:50.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Trafalgar Way

UK Power Networks Eastern & London are carrying out Utility asset works on Trafalgar Way, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2024 at 08:00 and could run through until 26 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2024 at 08:59.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Baffin Way

UK Power Networks Eastern & London are carrying out Utility asset works on Baffin Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 08:45 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2024 at 08:53.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Blackwall Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Blackwall Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2024 and could run through until 26 September 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Jul 2024 at 13:54.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Prestons Road

UK Power Networks Eastern & London are carrying out Utility asset works on Prestons Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 26 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2024 at 08:54.

LONG TERM
Between
29 Jul and 4 Oct 2024
Details
View Map
Share
Angel Lane

London Borough Of Newham were proposing to carry out Highway improvement works on Angel Lane, Stratford, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 4 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 6 Aug 2024 at 10:09.

LONG TERM
Between
29 Jul and 4 Oct 2024
Details
View Map
Share
Follow
Penny Brookes Street

London Borough Of Newham are proposing to carry out Highway improvement works on Penny Brookes Street, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 9 May 2024 at 12:08.

LONG TERM
Between
29 Jul and 4 Oct 2024
Details
View Map
Share
Follow
Leyton Road

London Borough Of Newham are proposing to carry out Highway improvement works on Leyton Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 9 May 2024 at 12:17.

London Borough Of Enfield logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Leeside Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Leeside Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 28 Jun 2024 at 14:16.

London Borough Of Enfield logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Meridian Way

London Borough Of Enfield are proposing to carry out Highway improvement works on Meridian Way, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 4 Jul 2024 at 15:51.

London Borough Of Enfield logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Glover Drive

London Borough Of Enfield are proposing to carry out Highway improvement works on Glover Drive, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 4 Jul 2024 at 15:51.

Cadent Gas logo
LONG TERM
Between
29 Jul and 30 Sep 2024
Details
View Map
Share
Russell Road

Cadent Gas were proposing to carry out Utility asset works on Russell Road, Buckhurst Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 30 September 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 16:57.

London Borough Of Haringey logo
LONG TERM
Between
30 Jul and 18 Nov 2024
Details
View Map
Share
Follow
Stanhope Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Stanhope Road, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 4 Jun 2024 at 11:56.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Valette Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Valette Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:50.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Morning Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Morning Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:29.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:30.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:26.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:48.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:43.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:44.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:42.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Spurstowe Terrace

London Borough Of Hackney are proposing to carry out Highway improvement works on Spurstowe Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:33.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:19.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Sigdon Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Sigdon Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:32.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:40.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:22.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 20 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 20 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:15.

Thames Water logo
LONG TERM
Between
4 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are proposing to carry out Utility asset works on Offord Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 May 2024 at 10:30.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Woodberry Grove

Cadent Gas are carrying out Utility repair and maintenance works on Woodberry Grove, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2024 at 11:33 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 14:30.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2024
Details
View Map
Share
Follow
Ulverston Road

Thames Water are proposing to carry out Utility asset works on Ulverston Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2024 and could run through until 13 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:49.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Seven Sisters Road

Cadent Gas are carrying out Utility repair and maintenance works on Seven Sisters Road, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 16:19 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:56.

Thames Water logo
LONG TERM
Until
16 Mar 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are carrying out Utility asset works on Offord Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 08:00 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 08:32.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Avon Road

Thames Water are proposing to carry out Utility asset works on Avon Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 9 Aug 2024 at 14:50.

Thames Water logo
LONG TERM
Until
20 Oct 2024
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works started on 12 August 2024 at 11:40 and could run through until 20 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 11:40.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Hamlets Way

Thames Water are carrying out Utility asset works on Hamlets Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 11:26 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 11:27.

Thames Water logo
LONG TERM
Until
9 Nov 2024
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility repair and maintenance works on Burdett Road, London.

These works are categorised as Major.

The works started on 12 August 2024 at 11:26 and could run through until 9 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 11:26.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Bow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 11:13.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:05.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 10:24.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:12.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Forest Road

Thames Water are carrying out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 11:40 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 10:08.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Russell Road

Thames Water are carrying out Utility asset works on Russell Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:50 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:38.

Cadent Gas logo
LONG TERM
Between
12 Aug and 1 Oct 2024
Details
View Map
Share
Follow
Westward Road

Cadent Gas are proposing to carry out Utility asset works on Westward Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 1 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 15:16.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wilbury Way

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Wilbury Way, Edmonton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 August 2024 at 11:46 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2024 at 10:47.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Keppel Road

Thames Water are carrying out Utility asset works on Keppel Road, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 10:00 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:36.

Thames Water logo
LONG TERM
Until
18 Oct 2024
Details
View Map
Share
Follow
Avon Road

Thames Water are carrying out roadworks on Avon Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 August 2024 at 09:30 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 09:39.

LONG TERM
Between
15 Aug and 31 Oct 2024
Details
View Map
Share
Follow
Sheringham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 3 Jul 2024 at 08:28.

LONG TERM
Between
15 Aug and 31 Oct 2024
Details
View Map
Share
Follow
Dersingham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 3 Jul 2024 at 08:27.

Thames Water logo
LONG TERM
Until
30 Oct 2024
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works started on 16 August 2024 at 09:13 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 09:13.

Murphy Power Distribution logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Brunswick Place

Murphy Power Distribution are proposing to carry out Utility asset works on Brunswick Place, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2024 and could run through until 23 September 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Murphy Power Distribution on 17 May 2024 at 11:41.

Cadent Gas logo
LONG TERM
Between
19 Aug and 17 Nov 2024
Details
View Map
Share
Lever Street

Cadent Gas were proposing to carry out Utility asset works on Lever Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2024 and run through until 17 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:51.

Thames Water logo
LONG TERM
Until
1 Nov 2024
Details
View Map
Share
Follow
Heigham Road

Thames Water are carrying out Utility repair and maintenance works on Heigham Road, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 11:00 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:00.

London Borough Of Hackney logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Marvin Street

London Borough Of Hackney are carrying out Highway improvement works on Marvin Street, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:03 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 19 Aug 2024 at 08:03.

Thames Water logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Mansfield Road

Thames Water are carrying out Utility asset works on Mansfield Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 12:30 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 15:25.

Thames Water logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Hatherley Road

Thames Water are carrying out Utility asset works on Hatherley Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 12:29 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 16:21.

Thames Water logo
LONG TERM
Between
26 Aug and 29 Nov 2024
Details
View Map
Share
Ramsay Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ramsay Road, Forest Gate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:06.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Mile End Road

Thames Water were proposing to carry out Utility asset works on Mile End Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 August 2024 and run through until 25 September 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 08:44.

Finishing
Tuesday
Details
View Map
Share
Follow
High Street

London Borough Of Redbridge are carrying out Highway improvement works on High Street, Barkingside, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 20:00 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 11 Sep 2024 at 14:00.

LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Gibbins Road

London Borough Of Newham are carrying out Highway improvement works on Gibbins Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2024 at 08:00 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 17 Sep 2024 at 11:07.

LONG TERM
Between
28 Aug and 4 Oct 2024
Details
View Map
Share
Follow
Angel Lane

London Borough Of Newham are proposing to carry out Highway improvement works on Angel Lane, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 12 Aug 2024 at 17:50.

Thames Water logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Beacontree Avenue

Thames Water are carrying out Utility asset works on Beacontree Avenue, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:41.

UK Power Networks Eastern & London logo
Finishing
Wednesday
Details
View Map
Share
Follow
Pritchards Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Pritchards Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jun 2024 at 14:35.

Cadent Gas logo
LONG TERM
Until
10 Oct 2024
Details
View Map
Share
Follow
Beechwood Park

Cadent Gas are carrying out Utility asset works on Beechwood Park, South Woodford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 September 2024 at 09:52 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 09:45.

LONG TERM
Between
1 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Auriga Mews

London Borough Of Islington are proposing to carry out Highway improvement works on Auriga Mews, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 25 Apr 2024 at 14:44.

London Borough Of Waltham Forest logo
LONG TERM
Between
1 Sep and 31 Oct 2024
Details
View Map
Share
Follow
Spruce Hills Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Spruce Hills Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 31 Jul 2024 at 13:03.

Finishing
Monday
Details
View Map
Share
Follow
Maddams Street

London Borough Of Tower Hamlets are carrying out roadworks on Maddams Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 2 Sep 2024 at 16:08.

Finishing
Monday
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 21 Jun 2024 at 13:36.

Finishing
Monday
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are carrying out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 2 Sep 2024 at 16:08.

Finishing
Monday
Details
View Map
Share
Follow
Blackthorn Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Blackthorn Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 21 Jun 2024 at 13:41.

Finishing
Monday
Details
View Map
Share
Follow
Blackthorn Street

London Borough Of Tower Hamlets are carrying out Highway improvement works on Blackthorn Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 2 Sep 2024 at 16:08.

Thames Water logo
Between
2 Sep and 1 Oct 2024
Details
View Map
Share
Follow
Mile End Road

Thames Water are proposing to carry out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 1 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 11:07.

Thames Water logo
Until
1 Oct 2024
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 16:50 and could run through until 1 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 07:54.

Thames Water logo
Between
2 Sep and 1 Oct 2024
Details
View Map
Share
Follow
Mile End Road

Thames Water are proposing to carry out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 1 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2024 at 14:51.

Thames Water logo
Between
2 Sep and 1 Oct 2024
Details
View Map
Share
Mile End Road

Thames Water were proposing to carry out Utility asset works on Mile End Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 1 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 10:02.

Thames Water logo
Between
2 Sep and 1 Oct 2024
Details
View Map
Share
Mile End Road

Thames Water were proposing to carry out Utility asset works on Mile End Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 1 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 10:04.

Thames Water logo
Between
2 Sep and 1 Oct 2024
Details
View Map
Share
Mile End Road

Thames Water were proposing to carry out Utility asset works on Mile End Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 1 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 10:08.

Thames Water logo
Between
2 Sep and 1 Oct 2024
Details
View Map
Share
Mile End Road

Thames Water were proposing to carry out Utility asset works on Mile End Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 1 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 10:42.

Thames Water logo
LONG TERM
Between
2 Sep and 28 Oct 2024
Details
View Map
Share
Follow
Cephas Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Cephas Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 10:45.

Thames Water logo
LONG TERM
Until
28 Oct 2024
Details
View Map
Share
Follow
Cephas Avenue

Thames Water are carrying out Utility repair and maintenance works on Cephas Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:14.

Thames Water logo
LONG TERM
Until
26 Oct 2024
Details
View Map
Share
Follow
Pentonville Road

Thames Water are carrying out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:17 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 15:18.

Thames Water logo
LONG TERM
Until
6 Oct 2024
Details
View Map
Share
Follow
Cumming Street

Thames Water are carrying out Utility asset works on Cumming Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:16 and could run through until 6 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 09:17.

Thames Water logo
Between
2 and 30 Sep 2024
Details
View Map
Share
Follow
Aldworth Road

Thames Water are proposing to carry out Utility asset works on Aldworth Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Aug 2024 at 12:11.

Thames Water logo
Until
30 Sep 2024
Details
View Map
Share
Follow
Aldworth Road

Thames Water are carrying out Utility asset works on Aldworth Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 11:00 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 10:42.

London Borough Of Camden logo
LONG TERM
Between
2 Sep and 20 Dec 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are proposing to carry out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Jul 2024 at 08:02.

London Borough Of Camden logo
LONG TERM
Between
2 Sep and 3 Nov 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are proposing to carry out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Sep 2024 at 08:06.

London Borough Of Camden logo
LONG TERM
Until
3 Nov 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 14:45 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Sep 2024 at 16:33.

London Borough Of Camden logo
LONG TERM
Between
2 Sep and 3 Nov 2024
Details
View Map
Share
Hungerford Road

London Borough Of Camden were proposing to carry out Highway improvement works on Hungerford Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 3 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 30 Aug 2024 at 16:54.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
King Henry's Walk

London Borough Of Islington were proposing to carry out Highway improvement works on King Henry's Walk, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:51.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Grove North

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Grove North, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:53.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
St Jude Street

London Borough Of Islington were proposing to carry out Highway improvement works on St Jude Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:54.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Queen Margaret's Grove

London Borough Of Islington were proposing to carry out Highway improvement works on Queen Margaret's Grove, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:52.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:55.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:50.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Crossway

London Borough Of Islington were proposing to carry out Highway improvement works on Crossway, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:49.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Wolsey Road

London Borough Of Islington were proposing to carry out Highway improvement works on Wolsey Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:57.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:39.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:56.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Park

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Park, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:40.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Shellgrove Road

London Borough Of Islington were proposing to carry out Highway improvement works on Shellgrove Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:48.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green Road

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:38.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:35.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Ferntower Road

London Borough Of Islington were proposing to carry out Highway improvement works on Ferntower Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:37.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:41.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Pellerin Road

London Borough Of Islington were proposing to carry out Highway improvement works on Pellerin Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:47.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Boleyn Road

London Borough Of Islington were proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:46.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:45.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Barretts Grove

London Borough Of Islington were proposing to carry out Highway improvement works on Barretts Grove, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:44.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:42.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:43.

LONG TERM
Between
2 Sep and 25 Nov 2024
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 3 Jul 2024 at 08:28.

Cadent Gas logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Inglehurst Gardens

Cadent Gas are carrying out Utility asset works on Inglehurst Gardens, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 September 2024 at 13:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 13:11.

London Borough Of Enfield logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
Rays Road

London Borough Of Enfield are proposing to carry out Section 50 on Rays Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 14 Aug 2024 at 10:31.

London Borough Of Enfield logo
LONG TERM
Until
12 Oct 2024
Details
View Map
Share
Follow
Rays Road

London Borough Of Enfield are carrying out Section 50 on Rays Road, Edmonton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:00 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 9 Sep 2024 at 17:44.

Thames Water logo
Between
2 and 30 Sep 2024
Details
View Map
Share
Carbis Close

Thames Water were proposing to carry out Utility asset works on Carbis Close, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 September 2024. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 08:54.

London Borough Of Hackney logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Brownlow Road

London Borough Of Hackney are carrying out Highway improvement works on Brownlow Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 07:08 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Sep 2024 at 09:33.

London Borough Of Hackney logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Shrubland Road

London Borough Of Hackney are carrying out Highway improvement works on Shrubland Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2024 at 12:36 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Sep 2024 at 09:29.

Thames Water logo
LONG TERM
Between
5 Sep and 6 Oct 2024
Details
View Map
Share
Lloyd Square

Thames Water were proposing to carry out Utility asset works on Lloyd Square, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2024 and run through until 6 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 08:55.

Thames Water logo
LONG TERM
Until
18 Oct 2024
Details
View Map
Share
Follow
Latimer Avenue

Thames Water are carrying out Utility repair and maintenance works on Latimer Avenue, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 September 2024 at 09:00 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 09:24.

Thames Water logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Waltham Way

Thames Water are carrying out Utility repair and maintenance works on Waltham Way, Chingford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 10:00 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 16:10.

Thames Water logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Streatfeild Avenue

Thames Water are carrying out Utility asset works on Streatfeild Avenue, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 September 2024 at 09:00 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 09:28.

City Of London Corporation logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Billiter Street

City Of London Corporation are proposing to carry out Highway improvement works on Billiter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 22 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 16 Jul 2024 at 12:51.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Ackroyd Drive

Thames Water are proposing to carry out Statutory Infrastructure Works on Ackroyd Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 26 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jun 2024 at 11:24.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Ackroyd Drive

Thames Water are proposing to carry out Statutory Infrastructure Works on Ackroyd Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 26 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 10:32.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Vallance Road

Thames Water were proposing to carry out Utility repair and maintenance works on Vallance Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 27 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 15:15.

City Of London Corporation logo
Between
9 and 29 Sep 2024
Details
View Map
Share
Follow
Primrose Street

City Of London Corporation are proposing to carry out Disconnection or alteration of supply on Primrose Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 7 Aug 2024 at 16:44.

City Of London Corporation logo
Until
29 Sep 2024
Details
View Map
Share
Follow
Primrose Street

City Of London Corporation are carrying out Disconnection or alteration of supply on Primrose Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 9 Sep 2024 at 08:08.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:46.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:42.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:44.

Thames Water logo
LONG TERM
Between
9 Sep and 11 Nov 2024
Details
View Map
Share
Follow
Jupp Road West

Thames Water are proposing to carry out Utility repair and maintenance works on Jupp Road West, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 November 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:50.

Thames Water logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Jupp Road West

Thames Water are carrying out Utility repair and maintenance works on Jupp Road West, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 11:15 and could run through until 11 November 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:24.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 10:10.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Sep 2024 at 15:10.

London Borough Of Enfield logo
LONG TERM
Between
9 Sep and 14 Oct 2024
Details
View Map
Share
Follow
Conduit Lane

London Borough Of Enfield are proposing to carry out Works for road purposes on Conduit Lane, Edmonton.

These works are categorised as Major.

The works will start on or after 9 September 2024 and could run through until 14 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by London Borough Of Enfield on 29 Aug 2024 at 10:25.

London Borough Of Enfield logo
LONG TERM
Until
14 Oct 2024
Details
View Map
Share
Follow
Conduit Lane

London Borough Of Enfield are carrying out Works for road purposes on Conduit Lane, Edmonton.

These works are categorised as Major.

The works started on 12 September 2024 at 08:00 and could run through until 14 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by London Borough Of Enfield on 12 Sep 2024 at 08:13.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Seven Sisters Road

Thames Water are carrying out Utility repair and maintenance works on Seven Sisters Road, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 08:00 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 09:04.

London Borough Of Haringey logo
Between
12 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2024 at 09:27.

London Borough Of Haringey logo
Until
2 Oct 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are carrying out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 08:00 and could run through until 2 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 12 Sep 2024 at 08:14.

London Borough Of Haringey logo
Between
12 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 4 Sep 2024 at 13:48.

London Borough Of Haringey logo
Between
12 Sep and 2 Oct 2024
Details
View Map
Share
Western Road

London Borough Of Haringey were proposing to carry out Remedial works on Western Road, Wood Green, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 September 2024 and run through until 2 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 Sep 2024 at 10:58.

Murphy Power Distribution logo
Finishing
Friday
Details
View Map
Share
Follow
Holloway Road

Murphy Power Distribution are proposing to carry out Utility asset works on Holloway Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 2 Sep 2024 at 12:18.

Murphy Power Distribution logo
Finishing
Friday
Details
View Map
Share
Follow
Holloway Road

Murphy Power Distribution are carrying out Utility asset works on Holloway Road, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 08:45 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 13 Sep 2024 at 09:05.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Stroud Green Road

Thames Water are carrying out Utility repair and maintenance works on Stroud Green Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 13:19 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 08:58.

London Borough Of Waltham Forest logo
Between
13 Sep and 5 Oct 2024
Details
View Map
Share
Follow
Leucha Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Leucha Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 5 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Waltham Forest on 6 Sep 2024 at 14:45.

London Borough Of Waltham Forest logo
Between
13 Sep and 5 Oct 2024
Details
View Map
Share
Follow
Leucha Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Leucha Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 5 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Waltham Forest on 6 Sep 2024 at 14:53.

City Of London Corporation logo
Finishing
Tomorrow
Details
View Map
Share
Billiter Street

City Of London Corporation were proposing to carry out Highway improvement works on Billiter Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 22 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 13 Sep 2024 at 08:16.

Cadent Gas logo
Until
3 Oct 2024
Details
View Map
Share
Follow
Vincent Street

Cadent Gas are carrying out Utility asset works on Vincent Street, Canning Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:00 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:21.

Cadent Gas logo
Until
3 Oct 2024
Details
View Map
Share
Follow
Fords Park Road

Cadent Gas are carrying out Utility asset works on Fords Park Road, Canning Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:09 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:18.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Holywell Row

Thames Water are carrying out Utility repair and maintenance works on Holywell Row, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 07:41 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 13:57.

Thames Water logo
LONG TERM
Between
16 Sep and 20 Oct 2024
Details
View Map
Share
Pentonville Road

Thames Water were proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 20 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 10:41.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Pentonville Road

Thames Water were proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 27 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 10:40.

Thames Water logo
LONG TERM
Between
16 Sep and 28 Oct 2024
Details
View Map
Share
Follow
Nelson Street

Thames Water are proposing to carry out Utility asset works on Nelson Street, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jul 2024 at 19:24.

Thames Water logo
LONG TERM
Between
16 Sep and 28 Oct 2024
Details
View Map
Share
Follow
Wellington Road

Thames Water are proposing to carry out Utility asset works on Wellington Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jul 2024 at 19:24.

ESP Electricity logo
Between
16 Sep and 7 Oct 2024
Details
View Map
Share
Follow
Emma Street

ESP Electricity are proposing to carry out Utility asset works on Emma Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 12 Aug 2024 at 17:23.

ESP Electricity logo
Until
7 Oct 2024
Details
View Map
Share
Follow
Emma Street

ESP Electricity are carrying out Utility asset works on Emma Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:30 and could run through until 7 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 16 Sep 2024 at 08:46.

London Borough Of Hackney logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Scriven Street

London Borough Of Hackney are carrying out Highway improvement works on Scriven Street, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:30 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 12:11.

Thames Water logo
LONG TERM
Until
1 Nov 2024
Details
View Map
Share
Follow
High Street North

Thames Water are carrying out Utility asset works on High Street North, East Ham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 10:00 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 10:22.

Cadent Gas logo
LONG TERM
Between
16 Sep and 21 Oct 2024
Details
View Map
Share
Follow
Ravenswood Road

Cadent Gas are proposing to carry out Utility asset works on Ravenswood Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2024 at 14:34.

Cadent Gas logo
LONG TERM
Until
22 Oct 2024
Details
View Map
Share
Follow
Ravenswood Road

Cadent Gas are carrying out Utility asset works on Ravenswood Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:10 and could run through until 22 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:43.

London Borough Of Haringey logo
Until
11 Oct 2024
Details
View Map
Share
Follow
Hale Road

London Borough Of Haringey are carrying out Highway improvement works on Hale Road, Tottenham, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 16 Sep 2024 at 08:31.

UK Power Networks Eastern & London logo
Between
16 Sep and 11 Oct 2024
Details
View Map
Share
Dowsett Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Dowsett Road, Tottenham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 11 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 10:21.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 16 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:10.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 16 September 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 10:58.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 16 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 13:02.

Cadent Gas logo
Between
16 and 29 Sep 2024
Details
View Map
Share
Follow
Derwent Avenue

Cadent Gas are proposing to carry out Utility asset works on Derwent Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 29 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 12:49.

Cadent Gas logo
Between
16 Sep and 13 Oct 2024
Details
View Map
Share
Follow
Meridian Way

Cadent Gas are proposing to carry out New service connection on Meridian Way, Edmonton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 13 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Jul 2024 at 14:45.

Cadent Gas logo
LONG TERM
Until
20 Oct 2024
Details
View Map
Share
Follow
Meridian Way

Cadent Gas are carrying out New service connection on Meridian Way, Edmonton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 00:01 and could run through until 20 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 13:06.

Thames Water logo
LONG TERM
Between
17 Sep and 28 Oct 2024
Details
View Map
Share
Follow
Faringford Road

Thames Water are proposing to carry out Utility asset works on Faringford Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jun 2024 at 08:22.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Lytton Road

Thames Water are carrying out Utility repair and maintenance works on Lytton Road, Leytonstone.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 07:37 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 15:29.

Cadent Gas logo
Between
17 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Beechwood Park

Cadent Gas are proposing to carry out Utility asset works on Beechwood Park, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 09:30.

Cadent Gas logo
Until
8 Oct 2024
Details
View Map
Share
Follow
Beechwood Park

Cadent Gas are carrying out Utility asset works on Beechwood Park, South Woodford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 12:15 and could run through until 8 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 13:16.

Cadent Gas logo
Between
17 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Woodford Road

Cadent Gas are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 09:30.

Cadent Gas logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Woodford Road

Cadent Gas are carrying out Utility asset works on Woodford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 12:15 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 13:15.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
St Loys Road

Thames Water are carrying out Utility repair and maintenance works on St Loys Road, Tottenham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:30 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 10:22.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Alverstone Road

Thames Water are carrying out Utility repair and maintenance works on Alverstone Road, Manor Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 14:51 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:45.

Until
1 Oct 2024
Details
View Map
Share
Follow
Lowbrook Road

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Lowbrook Road, Ilford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 09:53 and could run through until 1 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 18 Sep 2024 at 13:00.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Malford Grove

Thames Water are carrying out Utility repair and maintenance works on Malford Grove, South Woodford, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 07:15 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 09:45.

Transport for London (TfL) logo
LONG TERM
Between
19 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Aug 2024 at 14:15.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Croston Street

Thames Water are carrying out Utility repair and maintenance works on Croston Street, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 12:09 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 14:37.

Finishing
Thursday
Details
View Map
Share
Follow
Field Road

London Borough Of Newham are carrying out Highway repair and maintenance works on Field Road, Forest Gate, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 14:00 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 19 Sep 2024 at 14:40.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Florence Road

Thames Water are carrying out Utility repair and maintenance works on Florence Road, Hornsey, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 12:38 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 12:36.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Vallance Road

Thames Water are carrying out Utility repair and maintenance works on Vallance Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 11:00 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 13:57.

Hyperoptic logo
Finishing
Today
Details
View Map
Share
Follow
Richmond Avenue

Hyperoptic are carrying out Utility repair and maintenance works on Richmond Avenue, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 08:30 and could run through until 21 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 20 Sep 2024 at 09:06.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Tavistock Terrace

Thames Water were proposing to carry out Utility repair and maintenance works on Tavistock Terrace, Islington, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 September 2024 and run through until 26 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:48.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Wedmore Street

Thames Water are carrying out Utility repair and maintenance works on Wedmore Street, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 10:44 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 14:11.

Murphy Power Distribution logo
Between
20 and 29 Sep 2024
Details
View Map
Share
Follow
Marlborough Road

Murphy Power Distribution are proposing to carry out Utility asset works on Marlborough Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 29 Aug 2024 at 12:40.

Murphy Power Distribution logo
Until
29 Sep 2024
Details
View Map
Share
Follow
Marlborough Road

Murphy Power Distribution are carrying out Utility asset works on Marlborough Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 08:00 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 20 Sep 2024 at 08:54.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Vaughan Gardens

Thames Water are carrying out Utility repair and maintenance works on Vaughan Gardens, Cranbrook, Ilford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 12:20 and could run through until 26 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 15:00.

Cadent Gas logo
Until
30 Sep 2024
Details
View Map
Share
Follow
Lawrence Road

Cadent Gas are carrying out Utility repair and maintenance works on Lawrence Road, Tottenham, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 12:37 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 12:39.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2024 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 10:19.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2024 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Sep 2024 at 07:30.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2024 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 10:20.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2024 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Sep 2024 at 07:31.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2024 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 14:51.

Thames Water logo
Between
21 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Altmore Avenue

Thames Water are proposing to carry out Utility asset works on Altmore Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 13:06.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep 2024 and 2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 10:27.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep 2024 and 2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep 2024 and 2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 10:46.

Thames Water logo
Between
23 and 28 Sep 2024
Details
View Map
Share
Follow
Cheshire Street

Thames Water are proposing to carry out New service connection on Cheshire Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 11:09.

Thames Water logo
Between
23 and 28 Sep 2024
Details
View Map
Share
Follow
Cheshire Street

Thames Water are proposing to carry out New service connection on Cheshire Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 15:26.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Augurs Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Augurs Lane, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2024 at 14:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Augurs Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Augurs Lane, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 10:29.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gibson Square

BT are proposing to carry out Utility asset works on Gibson Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Aug 2024 at 12:58.

Thames Water logo
LONG TERM
Between
23 Sep and 4 Nov 2024
Details
View Map
Share
Follow
Faringford Road

Thames Water are proposing to carry out Utility asset works on Faringford Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 16:10.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Clarence Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarence Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 12:08.

Between
23 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Ilford Lane

London Borough Of Redbridge are proposing to carry out Core Sampling on Ilford Lane, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 19 Sep 2024 at 14:27.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Adelaide Road

Thames Water are proposing to carry out Utility repair and maintenance works on Adelaide Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jul 2024 at 14:57.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Ruckholt Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ruckholt Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jul 2024 at 15:01.

London Borough Of Hackney logo
Between
23 Sep and 3 Oct 2024
Details
View Map
Share
Follow
Lea Bridge Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 24 Jul 2024 at 13:28.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Francis Road

Thames Water are proposing to carry out Utility repair and maintenance works on Francis Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jul 2024 at 14:59.

Cadent Gas logo
Between
23 Sep and 14 Oct 2024
Details
View Map
Share
Thorold Road

Cadent Gas were proposing to carry out Utility asset works on Thorold Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 14 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 16:02.

Cadent Gas logo
LONG TERM
Between
23 Sep and 8 Nov 2024
Details
View Map
Share
Perth Road

Cadent Gas were proposing to carry out Utility asset works on Perth Road, Gants Hill, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 16:01.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Clarendon Road

Thames Water were proposing to carry out New service connection on Clarendon Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 27 September 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 08:27.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out New service connection on Clarendon Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 13:46.

Thames Water logo
Between
23 and 29 Sep 2024
Details
View Map
Share
Frederic Street

Thames Water were proposing to carry out New service connection on Frederic Street, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 29 September 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 16:11.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Mount Pleasant Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 14:09.

UK Power Networks Eastern & London logo
Between
23 Sep and 3 Oct 2024
Details
View Map
Share
Follow
Devonshire Hill Lane

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Devonshire Hill Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jul 2024 at 13:40.

UK Power Networks Eastern & London logo
Between
23 Sep and 3 Oct 2024
Details
View Map
Share
Follow
Devonshire Hill Lane

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Devonshire Hill Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 12:29.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Elm Park Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Park Avenue, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 14:59.

UK Power Networks Eastern & London logo
Between
24 and 30 Sep 2024
Details
View Map
Share
Follow
Honeysett Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Honeysett Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2024 at 10:02.

UK Power Networks Eastern & London logo
Between
24 and 30 Sep 2024
Details
View Map
Share
Follow
Honeysett Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Honeysett Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 07:58.

Thames Water logo
LONG TERM
Between
24 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Carnanton Road

Thames Water are proposing to carry out Utility asset works on Carnanton Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 10:09.

Thames Water logo
LONG TERM
Between
24 Sep and 25 Oct 2024
Details
View Map
Share
Follow
Pentire Road

Thames Water are proposing to carry out Utility asset works on Pentire Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 10:10.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Waterloo Terrace

BT are proposing to carry out Utility asset works on Waterloo Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Aug 2024 at 07:21.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
New Clocktower Place

BT are proposing to carry out Utility asset works on New Clocktower Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Aug 2024 at 07:23.

Thames Water logo
Between
26 and 28 Sep 2024
Details
View Map
Share
Follow
Essex Road

Thames Water are proposing to carry out Utility repair and maintenance works on Essex Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 28 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 09:36.

Between
27 and 29 Sep 2024
Details
View Map
Share
Follow
Settles Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Settles Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 20 Sep 2024 at 15:58.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Prestons Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Prestons Road Roundabout, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Aug 2024 at 12:45.

Thames Water logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Manor Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2024 at 10:41.

Thames Water logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Manor Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 13:09.

Cadent Gas logo
Between
30 Sep and 7 Oct 2024
Details
View Map
Share
Follow
Middlesex Street

Cadent Gas are proposing to carry out Remedial works on Middlesex Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 7 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jun 2024 at 13:57.

Thames Water logo
LONG TERM
Between
30 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Lloyd Square

Thames Water are proposing to carry out Utility asset works on Lloyd Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:34.

Thames Water logo
LONG TERM
Between
30 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Lloyd Baker Street

Thames Water are proposing to carry out Utility asset works on Lloyd Baker Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 07:48.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 13:54.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 11:07.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 10:02.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Sep 2024 at 14:57.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 13:54.

ESP Electricity logo
Between
30 Sep and 16 Oct 2024
Details
View Map
Share
Pritchards Road

ESP Electricity were proposing to carry out Utility asset works on Pritchards Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 16 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 19 Aug 2024 at 09:21.

Thames Water logo
Between
30 Sep and 7 Oct 2024
Details
View Map
Share
Follow
Wharf Place

Thames Water are proposing to carry out New service connection on Wharf Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 7 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 14:50.

Thames Water logo
Between
30 Sep and 7 Oct 2024
Details
View Map
Share
Follow
Great Eastern Road

Thames Water are proposing to carry out Utility repair and maintenance works on Great Eastern Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 7 October 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:31.

T-Mobile (UK) logo
Between
30 Sep and 8 Oct 2024
Details
View Map
Share
Buckingham Road

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Buckingham Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 8 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 3 Sep 2024 at 14:46.

Network Rail logo
Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Turnpike Lane

Network Rail are proposing to carry out Works for Rail Purposes on Turnpike Lane, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Jun 2024 at 13:11.

Network Rail logo
Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Turnpike Lane

Network Rail are proposing to carry out Works for Rail Purposes on Turnpike Lane, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Sep 2024 at 07:58.

Network Rail logo
Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Turnpike Lane

Network Rail are proposing to carry out Works for Rail Purposes on Turnpike Lane, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Sep 2024 at 12:59.

Thames Water logo
LONG TERM
Between
30 Sep and 1 Nov 2024
Details
View Map
Share
Follow
Forest Road

Thames Water are proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 15:14.

Thames Water logo
LONG TERM
Between
30 Sep and 1 Nov 2024
Details
View Map
Share
Follow
Borwick Avenue

Thames Water are proposing to carry out Utility asset works on Borwick Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:27.

Cadent Gas logo
Between
30 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Cleveland Road

Cadent Gas are proposing to carry out Utility asset works on Cleveland Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 12:15.

Cadent Gas logo
Between
30 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Bedford Road

Cadent Gas are proposing to carry out Utility asset works on Bedford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 12:15.

London Borough Of Haringey logo
Between
30 Sep and 16 Oct 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 Sep 2024 at 11:40.

London Borough Of Haringey logo
Between
30 Sep and 16 Oct 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 16 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 18 Sep 2024 at 14:56.

Thames Water logo
LONG TERM
Between
30 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Pentire Road

Thames Water are proposing to carry out Utility asset works on Pentire Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:43.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep 2024 and 20 Mar 2025
Details
View Map
Share
Harbet Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 20 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 15 Aug 2024 at 15:29.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep 2024 and 20 Jul 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 21 Aug 2024 at 13:15.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep 2024 and 20 Jul 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 29 Aug 2024 at 10:50.

Cadent Gas logo
Between
30 Sep and 13 Oct 2024
Details
View Map
Share
Follow
Pentyre Avenue

Cadent Gas are proposing to carry out Utility asset works on Pentyre Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 13 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 12:51.

Cadent Gas logo
Between
30 Sep and 13 Oct 2024
Details
View Map
Share
Follow
Pentyre Avenue

Cadent Gas are proposing to carry out Utility asset works on Pentyre Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 13 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:41.

London Borough Of Enfield logo
Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Church Street

London Borough Of Enfield are proposing to carry out Highway improvement works on Church Street, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Sep 2024 at 12:00.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep and 1 Nov 2024
Details
View Map
Share
Follow
Halstead Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Halstead Road, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 29 May 2024 at 08:36.

Thames Water logo
Between
30 Sep and 28 Oct 2024
Details
View Map
Share
Follow
Carbis Close

Thames Water are proposing to carry out Utility asset works on Carbis Close, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 28 October 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:21.

Thames Water logo
Between
30 Sep and 28 Oct 2024
Details
View Map
Share
Follow
Carbis Close

Thames Water are proposing to carry out Utility asset works on Carbis Close, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 28 October 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:39.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep and 1 Nov 2024
Details
View Map
Share
Follow
Firs Park Avenue

London Borough Of Enfield are proposing to carry out Highway improvement works on Firs Park Avenue, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 29 May 2024 at 08:35.

LONG TERM
Between
1 and 31 Oct 2024
Details
View Map
Share
Follow
Burges Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Burges Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Jul 2024 at 08:51.

Thames Water logo
Between
1 and 4 Oct 2024
Details
View Map
Share
Follow
Priory Avenue

Thames Water are proposing to carry out New service connection on Priory Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 07:54.

UK Power Networks Eastern & London logo
Between
1 and 9 Oct 2024
Details
View Map
Share
Follow
Reform Row

UK Power Networks Eastern & London are proposing to carry out New service connection on Reform Row, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 9 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2024 at 09:34.

Thames Water logo
Between
2 and 31 Oct 2024
Details
View Map
Share
Follow
Mile End Road

Thames Water are proposing to carry out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 09:24.

Thames Water logo
Between
2 and 31 Oct 2024
Details
View Map
Share
Follow
Mile End Road

Thames Water are proposing to carry out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 09:41.

London Borough Of Haringey logo
Between
2 and 30 Oct 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 16 Sep 2024 at 15:25.

Essex County Council logo
Between
2 and 9 Oct 2024
Details
View Map
Share
Follow
Palace Gardens

Essex County Council are proposing to carry out Highway improvement works on Palace Gardens, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 9 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Jul 2024 at 16:38.

Cadent Gas logo
Between
3 and 8 Oct 2024
Details
View Map
Share
Follow
Artillery Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Artillery Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 8 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 09:29.

Cadent Gas logo
Between
3 and 8 Oct 2024
Details
View Map
Share
Follow
Artillery Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Artillery Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 8 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 00:10.

Thames Water logo
Between
3 and 8 Oct 2024
Details
View Map
Share
Follow
Artillery Lane

Thames Water are proposing to carry out New service connection on Artillery Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 8 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:00.

Thames Water logo
Between
5 and 9 Oct 2024
Details
View Map
Share
Follow
Aldgate High Street

Thames Water are proposing to carry out New service connection on Aldgate High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 16:44.

Thames Water logo
Between
5 and 9 Oct 2024
Details
View Map
Share
Follow
Aldgate High Street

Thames Water are proposing to carry out New service connection on Aldgate High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:33.

Thames Water logo
LONG TERM
Between
6 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Hillcrest Road

Thames Water are proposing to carry out Utility asset works on Hillcrest Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:54.

Thames Water logo
LONG TERM
Between
6 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Carnanton Road

Thames Water are proposing to carry out Utility asset works on Carnanton Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:54.

LONG TERM
Between
7 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Manor Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Sep 2024 at 09:21.

Thames Water logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Follow
Brick Lane

Thames Water are proposing to carry out New service connection on Brick Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Aug 2024 at 09:50.

Thames Water logo
LONG TERM
Between
7 Oct 2024 and 14 Apr 2025
Details
View Map
Share
Follow
Cephas Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cephas Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 14 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 10:46.

Thames Water logo
Between
7 and 24 Oct 2024
Details
View Map
Share
John Street

Thames Water were proposing to carry out New service connection on John Street, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 24 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Aug 2024 at 11:17.

Thames Water logo
Between
7 and 12 Oct 2024
Details
View Map
Share
Follow
Ron Leighton Way

Thames Water are proposing to carry out New service connection on Ron Leighton Way, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2024 at 09:14.

Thames Water logo
Between
7 and 12 Oct 2024
Details
View Map
Share
Follow
Clements Road

Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jun 2024 at 09:18.

Thames Water logo
LONG TERM
Between
7 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Fonthill Road

Thames Water are proposing to carry out Utility asset works on Fonthill Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:38.

Cadent Gas logo
LONG TERM
Between
7 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Braydon Road

Cadent Gas are proposing to carry out Utility asset works on Braydon Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:30.

Cadent Gas logo
LONG TERM
Between
7 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Clapton Terrace

Cadent Gas are proposing to carry out Utility asset works on Clapton Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 13:00.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 09:56.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 11:38.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 11:15.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 09:49.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 11:23.

Thames Water logo
LONG TERM
Between
7 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Sylvan Road

Thames Water are proposing to carry out Utility asset works on Sylvan Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 15:24.

Thames Water logo
LONG TERM
Between
7 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Sylvan Road

Thames Water are proposing to carry out Utility asset works on Sylvan Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 15:03.

Thames Water logo
Between
7 and 12 Oct 2024
Details
View Map
Share
Follow
Rodney Road

Thames Water are proposing to carry out New service connection on Rodney Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jul 2024 at 13:25.

Thames Water logo
Between
7 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Northcote Road

Thames Water are proposing to carry out Utility asset works on Northcote Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 15:09.

Cadent Gas logo
Between
7 and 12 Oct 2024
Details
View Map
Share
Follow
West Green Road

Cadent Gas are proposing to carry out Utility asset works on West Green Road, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:21.

Cadent Gas logo
Between
7 and 12 Oct 2024
Details
View Map
Share
Follow
West Green Road

Cadent Gas are proposing to carry out Utility asset works on West Green Road, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 00:10.

Cadent Gas logo
Between
7 and 12 Oct 2024
Details
View Map
Share
Follow
Carlingford Road

Cadent Gas are proposing to carry out New service connection on Carlingford Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 16:05.

Cadent Gas logo
Between
7 and 12 Oct 2024
Details
View Map
Share
Follow
Carlingford Road

Cadent Gas are proposing to carry out New service connection on Carlingford Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 00:10.

London Borough Of Waltham Forest logo
Between
7 and 12 Oct 2024
Details
View Map
Share
Follow
Spruce Hills Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Spruce Hills Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 16 Sep 2024 at 12:15.

Thames Water logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Old Church Road

Thames Water were proposing to carry out Utility repair and maintenance works on Old Church Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 11 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 16:07.

Thames Water logo
Between
8 and 14 Oct 2024
Details
View Map
Share
Follow
Cheshire Street

Thames Water are proposing to carry out New service connection on Cheshire Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 14 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Jul 2024 at 09:11.

Cadent Gas logo
Between
8 and 27 Oct 2024
Details
View Map
Share
Follow
Addison Road

Cadent Gas are proposing to carry out Utility asset works on Addison Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 27 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 16:13.

Cadent Gas logo
Between
8 and 27 Oct 2024
Details
View Map
Share
Follow
Addison Road

Cadent Gas are proposing to carry out Utility asset works on Addison Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 27 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 14:52.

BT logo
Between
8 and 10 Oct 2024
Details
View Map
Share
Wellington Road

BT were proposing to carry out Utility asset works on Wellington Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2024 and run through until 10 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2024 at 21:39.

UK Power Networks Eastern & London logo
Between
8 and 11 Oct 2024
Details
View Map
Share
Follow
Horsley Road

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Horsley Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 11 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Aug 2024 at 16:07.

UK Power Networks Eastern & London logo
Between
8 and 11 Oct 2024
Details
View Map
Share
Follow
Horsley Road

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Horsley Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 11 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 09:19.

London Borough Of Haringey logo
Between
9 and 11 Oct 2024
Details
View Map
Share
Follow
Durnsford Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Durnsford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 20 Sep 2024 at 11:22.

London Borough Of Haringey logo
Between
9 and 11 Oct 2024
Details
View Map
Share
Follow
Durnsford Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Durnsford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 20 Sep 2024 at 11:06.

UK Power Networks Eastern & London logo
Between
11 and 24 Oct 2024
Details
View Map
Share
Follow
Silvermere Drive

UK Power Networks Eastern & London are proposing to carry out New service connection on Silvermere Drive, Edmonton.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 24 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2024 at 16:11.

BT logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Follow
Chapman Street

BT are proposing to carry out Utility asset works on Chapman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Jul 2024 at 15:28.

BT logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Follow
Chapman Street

BT are proposing to carry out Utility asset works on Chapman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Aug 2024 at 16:37.

UK Power Networks Eastern & London logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Cutler Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Cutler Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2024 at 09:03.

Thames Water logo
LONG TERM
Between
14 Oct and 5 Dec 2024
Details
View Map
Share
Follow
St John Street

Thames Water are proposing to carry out Utility asset works on St John Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:35.

Hyperoptic logo
Between
14 and 16 Oct 2024
Details
View Map
Share
Follow
Stock Orchard Crescent

Hyperoptic are proposing to carry out Utility repair and maintenance works on Stock Orchard Crescent, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 14 Aug 2024 at 14:45.

BT logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
Filey Avenue

BT are proposing to carry out Utility repair and maintenance works on Filey Avenue, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Jul 2024 at 16:38.

Thames Water logo
Between
14 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Weston Park

Thames Water are proposing to carry out Utility repair and maintenance works on Weston Park, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2024 at 06:24.

Thames Water logo
Between
14 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Weston Park

Thames Water are proposing to carry out Utility repair and maintenance works on Weston Park, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 07:44.

Cadent Gas logo
Between
14 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Nutter Lane

Cadent Gas are proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 07:49.

Cadent Gas logo
Between
14 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Nutter Lane

Cadent Gas are proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 11:08.

Cadent Gas logo
Between
14 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Nutter Lane

Cadent Gas are proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

BT logo
Between
14 and 16 Oct 2024
Details
View Map
Share
Follow
Westminster Gardens

BT are proposing to carry out Utility asset works on Westminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 16 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Jul 2024 at 08:01.

BT logo
Between
14 and 16 Oct 2024
Details
View Map
Share
Westminster Gardens

BT were proposing to carry out Utility asset works on Westminster Gardens, Barkingside, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 16 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Sep 2024 at 13:43.

London Borough Of Haringey logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 8 Aug 2024 at 09:54.

Between
14 and 25 Oct 2024
Details
View Map
Share
Follow
Lynwood Close

London Borough Of Redbridge are proposing to carry out Highway improvement works on Lynwood Close, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 19 Sep 2024 at 11:45.

Essex County Council logo
Between
14 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Broadfield Way

Essex County Council are proposing to carry out Highway improvement works on Broadfield Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Jul 2024 at 10:41.

Essex County Council logo
Between
14 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Field Close

Essex County Council are proposing to carry out Highway improvement works on Field Close, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Jul 2024 at 10:43.

Thames Water logo
Between
15 and 17 Oct 2024
Details
View Map
Share
Follow
Spruce Hills Road

Thames Water are proposing to carry out Utility repair and maintenance works on Spruce Hills Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 09:37.

London Borough Of Haringey logo
Between
15 and 30 Oct 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 29 Jul 2024 at 15:42.

London Borough Of Haringey logo
Between
15 and 30 Oct 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 5 Aug 2024 at 15:12.

Transport for London (TfL) logo
Between
16 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 8 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 5 Jul 2024 at 13:48.

Transport for London (TfL) logo
Between
16 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 8 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 08:41.

Thames Water logo
Between
16 and 22 Oct 2024
Details
View Map
Share
Follow
Windmill Lane

Thames Water are proposing to carry out New service connection on Windmill Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 22 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:15.

London Borough Of Hackney logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 23 Aug 2024 at 14:30.

London Borough Of Hackney logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 12:09.

London Borough Of Hackney logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
Woodberry Grove

London Borough Of Hackney are proposing to carry out Highway improvement works on Woodberry Grove, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Aug 2024 at 14:35.

London Borough Of Enfield logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
High Road

London Borough Of Enfield are proposing to carry out Highway improvement works on High Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 23 Jul 2024 at 11:42.

UK Power Networks Eastern & London logo
Between
19 and 25 Oct 2024
Details
View Map
Share
Follow
Simmons Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Simmons Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 25 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 15:40.

Essex County Council logo
Between
20 and 28 Oct 2024
Details
View Map
Share
Follow
Station Way

Essex County Council are proposing to carry out Highway improvement works on Station Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 17:00.

Essex County Council logo
Between
20 and 28 Oct 2024
Details
View Map
Share
Follow
Station Way

Essex County Council are proposing to carry out Highway improvement works on Station Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 17:11.

Essex County Council logo
Between
20 and 28 Oct 2024
Details
View Map
Share
Follow
Station Way

Essex County Council are proposing to carry out Highway improvement works on Station Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 17:11.

Cadent Gas logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Silk Street

Cadent Gas are proposing to carry out Utility asset works on Silk Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 15:00.

Thames Water logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Bancroft Road

Thames Water were proposing to carry out New service connection on Bancroft Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 25 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Aug 2024 at 13:38.

Thames Water logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Bancroft Road

Thames Water were proposing to carry out New service connection on Bancroft Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 25 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 09:42.

Thames Water logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Bancroft Road

Thames Water were proposing to carry out New service connection on Bancroft Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 25 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Aug 2024 at 11:35.

Transport for London (TfL) logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 07:58.

Transport for London (TfL) logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
White Lion Street

Transport for London (TfL) are proposing to carry out Highway improvement works on White Lion Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 07:57.

Transport for London (TfL) logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Upper Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 07:44.

Transport for London (TfL) logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 07:55.

Thames Water logo
Between
21 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Jackman Street

Thames Water are proposing to carry out Utility repair and maintenance works on Jackman Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 11:59.

London Borough Of Hackney logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Aug 2024 at 14:37.

London Borough Of Hackney logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 23 Aug 2024 at 14:28.

London Borough Of Hackney logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 12:08.

London Borough Of Hackney logo
LONG TERM
Between
21 Oct 2024 and 18 Jan 2025
Details
View Map
Share
Follow
Ainsworth Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Ainsworth Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 6 Sep 2024 at 14:10.

London Borough Of Hackney logo
LONG TERM
Between
21 Oct 2024 and 18 Jan 2025
Details
View Map
Share
Follow
Well Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Well Street, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 6 Sep 2024 at 14:07.

London Borough Of Hackney logo
LONG TERM
Between
21 Oct 2024 and 18 Jan 2025
Details
View Map
Share
Follow
Frampton Park Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Frampton Park Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 30 Aug 2024 at 08:48.

BT logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Barnsbury Street

BT are proposing to carry out Utility asset works on Barnsbury Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Sep 2024 at 08:22.

Transport for London (TfL) logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Canonbury Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Canonbury Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 07:55.

Thames Water logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Follow
Windmill Lane

Thames Water are proposing to carry out New service connection on Windmill Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jul 2024 at 10:36.

Thames Water logo
Between
21 and 26 Oct 2024
Details
View Map
Share
Follow
Hampton Road

Thames Water are proposing to carry out New service connection on Hampton Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 26 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Jul 2024 at 11:39.

Hyperoptic logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Freegrove Road

Hyperoptic are proposing to carry out Utility repair and maintenance works on Freegrove Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 10 Jul 2024 at 09:24.

Thames Water logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Follow
Alexandra Road

Thames Water are proposing to carry out Utility repair and maintenance works on Alexandra Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 15:27.

Thames Water logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manor Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 15:49.

Cadent Gas logo
Between
21 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Woodford Road

Cadent Gas are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 14:04.

Cadent Gas logo
Between
21 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Woodford Road

Cadent Gas are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 10:41.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 21 Mar 2025
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 21 October 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 12:30.

Cadent Gas logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Derwent Avenue

Cadent Gas are proposing to carry out Utility asset works on Derwent Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 22:24.

Thames Water logo
Between
21 and 27 Oct 2024
Details
View Map
Share
Follow
Simmons Lane

Thames Water are proposing to carry out Statutory Infrastructure Works on Simmons Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 27 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Aug 2024 at 12:07.

Essex County Council logo
Between
21 and 26 Oct 2024
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Jul 2024 at 10:58.

Essex County Council logo
Between
21 and 26 Oct 2024
Details
View Map
Share
Follow
Manor Road

Essex County Council are proposing to carry out Highway improvement works on Manor Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Jul 2024 at 10:58.

Thames Water logo
LONG TERM
Between
22 Oct 2024 and 5 Apr 2025
Details
View Map
Share
Station Road

Thames Water were proposing to carry out Utility asset works on Station Road, Chingford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 5 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 08:31.

Thames Water logo
Between
23 and 25 Oct 2024
Details
View Map
Share
Follow
Chisenhale Road

Thames Water are proposing to carry out Remedial works on Chisenhale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Aug 2024 at 14:44.

London Borough Of Hackney logo
Between
23 and 26 Oct 2024
Details
View Map
Share
Follow
Well Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Well Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Aug 2024 at 12:28.

London Borough Of Hackney logo
Between
23 and 26 Oct 2024
Details
View Map
Share
Follow
Well Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Well Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 23 Aug 2024 at 14:26.

London Borough Of Hackney logo
Between
23 and 26 Oct 2024
Details
View Map
Share
Follow
Well Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Well Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 12:04.

BT logo
Between
23 and 25 Oct 2024
Details
View Map
Share
Wellington Road

BT were proposing to carry out Utility asset works on Wellington Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 October 2024 and run through until 25 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2024 at 15:27.

Essex County Council logo
Between
23 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Westbury Road

Essex County Council are proposing to carry out Highway improvement works on Westbury Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Aug 2024 at 12:57.

BT logo
Between
24 and 28 Oct 2024
Details
View Map
Share
Barnsbury Street

BT were proposing to carry out Utility asset works on Barnsbury Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2024 and run through until 28 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Aug 2024 at 11:24.

BT logo
Between
24 and 28 Oct 2024
Details
View Map
Share
Follow
New Clocktower Place

BT are proposing to carry out Utility asset works on New Clocktower Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Jul 2024 at 12:50.

Thames Water logo
LONG TERM
Between
24 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Cecil Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Cecil Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 14:08.

BT logo
Between
25 and 29 Oct 2024
Details
View Map
Share
Follow
Gibson Square

BT are proposing to carry out Utility asset works on Gibson Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 29 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 31 Jul 2024 at 10:46.

Transport for London (TfL) logo
Between
25 Oct and 19 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 19 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jun 2024 at 14:54.

Transport for London (TfL) logo
Between
25 Oct and 19 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 19 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:46.

London Borough Of Enfield logo
Between
26 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are proposing to carry out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 3 Sep 2024 at 12:46.

London Borough Of Enfield logo
Between
26 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are proposing to carry out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 3 Sep 2024 at 12:53.

Thames Water logo
Between
28 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Greenfield Road

Thames Water are proposing to carry out New service connection on Greenfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2024 at 08:47.

Cadent Gas logo
Between
28 Oct and 24 Nov 2024
Details
View Map
Share
Follow
Mona Street

Cadent Gas are proposing to carry out Utility asset works on Mona Street, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:03.

Cadent Gas logo
Between
28 Oct and 24 Nov 2024
Details
View Map
Share
Follow
Beckton Road

Cadent Gas are proposing to carry out Utility asset works on Beckton Road, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 10:57.

City Of London Telecomms logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Central Street

City Of London Telecomms are proposing to carry out Utility asset works on Central Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 20 Sep 2024 at 12:40.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 15:07.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Hartley Avenue

Thames Water are proposing to carry out New service connection on Hartley Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jul 2024 at 09:06.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
White Lion Street

Transport for London (TfL) are proposing to carry out Highway improvement works on White Lion Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 15:12.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Liverpool Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Liverpool Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:39.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Duncan Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Duncan Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Upper Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 15:04.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 15:16.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Camden Passage

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Passage, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Charlton Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Berners Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Berners Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Islington Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
St Alban's Place

Transport for London (TfL) are proposing to carry out Highway improvement works on St Alban's Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:39.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Collins Yard

Transport for London (TfL) are proposing to carry out Highway improvement works on Collins Yard, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:39.

Thames Water logo
LONG TERM
Between
28 Oct 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Carpenters Road

Thames Water are proposing to carry out Utility asset works on Carpenters Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:58.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Theberton Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Theberton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:39.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Cross Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Almeida Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Almeida Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Waterloo Terrace

Transport for London (TfL) are proposing to carry out Highway improvement works on Waterloo Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:39.

Hyperoptic logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Liverpool Road

Hyperoptic are proposing to carry out Utility repair and maintenance works on Liverpool Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 16 Jul 2024 at 12:53.

Hyperoptic logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Barnsbury Street

Hyperoptic are proposing to carry out Utility repair and maintenance works on Barnsbury Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 16 Jul 2024 at 12:48.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Florence Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Florence Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Barnsbury Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnsbury Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Richmond Grove

Transport for London (TfL) are proposing to carry out Highway improvement works on Richmond Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:39.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Tyndale Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Tyndale Lane, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:39.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Islington Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington Park Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Canonbury Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Canonbury Lane, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Laycock Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Laycock Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 09:38.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Canonbury Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Canonbury Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 15:05.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Alexandra Road

Thames Water are proposing to carry out Utility repair and maintenance works on Alexandra Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Aug 2024 at 15:59.

Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Mill Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 29 Jul 2024 at 14:04.

Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Mill Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 5 Aug 2024 at 10:39.

Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Mill Road

Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 28 Aug 2024 at 15:23.

Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Mill Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 4 Sep 2024 at 16:30.

Network Rail logo
LONG TERM
Between
28 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Aug 2024 at 10:21.

Network Rail logo
LONG TERM
Between
28 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 14:45.

Network Rail logo
LONG TERM
Between
28 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Sep 2024 at 12:34.

Thames Water logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Seven Sisters Road

Thames Water were proposing to carry out Utility repair and maintenance works on Seven Sisters Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 08:08.

London Borough Of Hackney logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Woodberry Grove

London Borough Of Hackney are proposing to carry out Highway improvement works on Woodberry Grove, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 23 Aug 2024 at 14:23.

Thames Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manor Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 10:47.

UK Power Networks Eastern & London logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Vale Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Vale Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2024 at 13:41.

Transport for London (TfL) logo
Between
28 Oct and 19 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 19 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 11:44.

Thames Water logo
Between
28 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Frederic Street

Thames Water are proposing to carry out New service connection on Frederic Street, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 15:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Exeter Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2024 at 16:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Exeter Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 15:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Exeter Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2024 at 09:52.

National Highways logo
Between
28 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Charlie Brown's Roundabout

National Highways are proposing to carry out Works for road purposes on Charlie Brown's Roundabout, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Aug 2024 at 09:50.

London Borough Of Haringey logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 30 Jul 2024 at 10:37.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Poynton Road

Thames Water are proposing to carry out New service connection on Poynton Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 14:05.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Halefield Road

Thames Water were proposing to carry out New service connection on Halefield Road, Tottenham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 15:23.

Thames Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Jul 2024 at 13:38.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Lightcliffe Road

Thames Water are proposing to carry out New service connection on Lightcliffe Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Jul 2024 at 14:49.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Lightcliffe Road

Thames Water are proposing to carry out New service connection on Lightcliffe Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 10:24.

Thames Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Old Church Road

Thames Water were proposing to carry out Utility repair and maintenance works on Old Church Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 10:51.

Thames Water logo
Between
28 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Chester Road

Thames Water are proposing to carry out New service connection on Chester Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Aug 2024 at 15:41.

Thames Water logo
Between
28 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Chester Road

Thames Water are proposing to carry out New service connection on Chester Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 11:14.

City Of London Corporation logo
LONG TERM
Between
29 Oct 2024 and 12 May 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway improvement works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 19 Aug 2024 at 13:56.

City Of London Corporation logo
LONG TERM
Between
29 Oct 2024 and 12 May 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway improvement works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 20 Aug 2024 at 09:25.

Thames Water logo
Between
29 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Jedburgh Road

Thames Water are proposing to carry out Utility repair and maintenance works on Jedburgh Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:08.

Thames Water logo
Between
29 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Central Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Central Park Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jun 2024 at 08:29.

Thames Water logo
Between
29 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Boundary Road

Thames Water are proposing to carry out Utility repair and maintenance works on Boundary Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2024 at 10:47.

Thames Water logo
Between
29 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Terrace Road

Thames Water are proposing to carry out Utility repair and maintenance works on Terrace Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 09:56.

Thames Water logo
LONG TERM
Between
29 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Shrubland Road

Thames Water are proposing to carry out Utility asset works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Nov 2023 at 15:37.

Thames Water logo
Between
30 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Hilda Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hilda Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 09:14.

London Borough Of Hackney logo
LONG TERM
Between
30 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Ainsworth Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Ainsworth Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 16:17.

London Borough Of Hackney logo
LONG TERM
Between
30 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Well Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Well Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 15:47.

London Borough Of Hackney logo
LONG TERM
Between
30 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Frampton Park Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Frampton Park Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 16:31.

BT logo
Between
30 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Barnsbury Street

BT are proposing to carry out Utility asset works on Barnsbury Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Aug 2024 at 08:32.

London Borough Of Hackney logo
Between
30 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Victoria Park Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Victoria Park Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Aug 2024 at 14:39.

London Borough Of Hackney logo
Between
30 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Victoria Park Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Victoria Park Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 23 Aug 2024 at 14:31.

London Borough Of Hackney logo
Between
30 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Victoria Park Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Victoria Park Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 12:06.

London Borough Of Haringey logo
Between
30 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 8 Aug 2024 at 09:43.

London Borough Of Haringey logo
Between
30 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 Sep 2024 at 11:19.

Essex County Council logo
Between
30 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Palace Gardens

Essex County Council are proposing to carry out Highway improvement works on Palace Gardens, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Aug 2024 at 13:10.

Thames Water logo
Between
31 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Whites Row

Thames Water are proposing to carry out Utility repair and maintenance works on Whites Row, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 10:47.

Thames Water logo
Between
31 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Canonbury Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Canonbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:34.

Transport for London (TfL) logo
Between
1 and 3 Nov 2024
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Sep 2024 at 08:17.

Cadent Gas logo
Between
1 and 14 Nov 2024
Details
View Map
Share
Follow
Mona Street

Cadent Gas are proposing to carry out Utility asset works on Mona Street, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 17:15.

Cadent Gas logo
Between
1 and 14 Nov 2024
Details
View Map
Share
Beckton Road

Cadent Gas were proposing to carry out Utility asset works on Beckton Road, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 14 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:48.

Thames Water logo
Between
1 and 3 Nov 2024
Details
View Map
Share
Follow
Glenavon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenavon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:38.

BT logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Burslem Street

BT are proposing to carry out Utility asset works on Burslem Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Aug 2024 at 16:36.

Thames Water logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
High Street South

Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 16:19.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Bartle Avenue

Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:04.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Barking Road

Thames Water were proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 10:16.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Barking Road

Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:04.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Navarre Road

Thames Water are proposing to carry out Utility asset works on Navarre Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:05.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Streatfeild Avenue

Thames Water are proposing to carry out Utility asset works on Streatfeild Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:38.

Thames Water logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Pilgrims Way

Thames Water are proposing to carry out Utility asset works on Pilgrims Way, East Ham, London.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 17:32.

Thames Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Charlton Place

Thames Water are proposing to carry out New service connection on Charlton Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Aug 2024 at 08:28.

Thames Water logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Ron Leighton Way

Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:46.

Thames Water logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:54.

Thames Water logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Clements Road

Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:54.

Hyperoptic logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Hertford Road

Hyperoptic are proposing to carry out Utility asset works on Hertford Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 18 Sep 2024 at 14:40.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Wallis Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Wallis Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 11:12.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Wallis Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Wallis Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 12:32.

London Borough Of Hackney logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Aug 2024 at 14:40.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Trevelyan Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Trevelyan Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:00.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Romford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Romford Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:42.

T-Mobile (UK) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Goodall Road

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Goodall Road, Leytonstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 20 Aug 2024 at 13:58.

T-Mobile (UK) logo
Between
4 and 9 Nov 2024
Details
View Map
Share
Goodall Road

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Goodall Road, Leytonstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 9 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 19 Sep 2024 at 08:49.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Warren Road

Thames Water are proposing to carry out Utility repair and maintenance works on Warren Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 14:51.

BT logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Stanhope Gardens

BT were proposing to carry out Utility asset works on Stanhope Gardens, Tottenham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Aug 2024 at 10:40.

Transport for London (TfL) logo
Between
4 and 27 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jun 2024 at 14:56.

Transport for London (TfL) logo
Between
4 and 27 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:41.

London Borough Of Enfield logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Hazelwood Lane

London Borough Of Enfield are proposing to carry out Highway improvement works on Hazelwood Lane, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 21 May 2024 at 09:45.

London Borough Of Enfield logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Hazelwood Lane

London Borough Of Enfield are proposing to carry out Highway improvement works on Hazelwood Lane, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 29 May 2024 at 08:50.

London Borough Of Enfield logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Hazelwood Lane

London Borough Of Enfield are proposing to carry out Highway improvement works on Hazelwood Lane, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 29 May 2024 at 08:50.

Transport for London (TfL) logo
Between
5 and 30 Nov 2024
Details
View Map
Share
Follow
Orchard Place

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchard Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:18.

Transport for London (TfL) logo
Between
5 and 30 Nov 2024
Details
View Map
Share
Follow
Orchard Place

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchard Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2024 at 10:40.

London Borough Of Enfield logo
Between
5 and 7 Nov 2024
Details
View Map
Share
Follow
Church Street

London Borough Of Enfield are proposing to carry out Highway improvement works on Church Street, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 22 Aug 2024 at 10:58.

Thames Water logo
Between
6 and 8 Nov 2024
Details
View Map
Share
Follow
Dersingham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2024 at 08:58.

City Of London Telecomms logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Moorgate

City Of London Telecomms are proposing to carry out Utility asset works on Moorgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 14 Aug 2024 at 14:51.

Virgin Media logo
Between
11 and 13 Nov 2024
Details
View Map
Share
Follow
Sycamore Street

Virgin Media are proposing to carry out Utility asset works on Sycamore Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 7 Aug 2024 at 08:21.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Bryant Street

Thames Water are proposing to carry out Utility asset works on Bryant Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:32.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are proposing to carry out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 11:16.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
King Henry's Walk

London Borough Of Islington are proposing to carry out Highway improvement works on King Henry's Walk, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:30.

Thames Water logo
Between
11 and 18 Nov 2024
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 12:07.

Thames Water logo
Between
11 and 18 Nov 2024
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 12:47.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Grove North

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Grove North, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:30.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
St Jude Street

London Borough Of Islington are proposing to carry out Highway improvement works on St Jude Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:29.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Queen Margaret's Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Queen Margaret's Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:29.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:28.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:28.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Crossway

London Borough Of Islington are proposing to carry out Highway improvement works on Crossway, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Sep 2024 at 21:52.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Wolsey Road

London Borough Of Islington are proposing to carry out Highway improvement works on Wolsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:29.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:28.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:28.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Park

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Park, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:30.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Shellgrove Road

London Borough Of Islington are proposing to carry out Highway improvement works on Shellgrove Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Sep 2024 at 21:53.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green Road

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:30.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:29.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Ferntower Road

London Borough Of Islington are proposing to carry out Highway improvement works on Ferntower Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:27.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:29.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Pellerin Road

London Borough Of Islington are proposing to carry out Highway improvement works on Pellerin Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Sep 2024 at 21:50.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:30.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Matthias Road

London Borough Of Islington are proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:27.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Barretts Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Barretts Grove, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Sep 2024 at 21:51.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:29.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Matthias Road

London Borough Of Islington are proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:27.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Warren Road

Thames Water are proposing to carry out Utility repair and maintenance works on Warren Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 09:41.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Grove Park

Cadent Gas were proposing to carry out Utility asset works on Grove Park, Wanstead, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 23 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:01.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 07:49.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 11:08.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Nutter Lane

Cadent Gas were proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:02.

Cadent Gas logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Comely Bank Road

Cadent Gas are proposing to carry out Utility asset works on Comely Bank Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2024 at 14:42.

Cadent Gas logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Comely Bank Road

Cadent Gas are proposing to carry out Utility asset works on Comely Bank Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 11:22.

Cadent Gas logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Comely Bank Road

Cadent Gas are proposing to carry out Utility asset works on Comely Bank Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 13:36.

Thames Water logo
Between
11 and 24 Nov 2024
Details
View Map
Share
Follow
Priory Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Priory Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 07:31.

Thames Water logo
Between
11 and 24 Nov 2024
Details
View Map
Share
Follow
Priory Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Priory Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 07:42.

Thames Water logo
Between
11 and 13 Nov 2024
Details
View Map
Share
Follow
Mount Pleasant Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 15:07.

Thames Water logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Radbourne Crescent

Thames Water are proposing to carry out Utility asset works on Radbourne Crescent, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:51.

Thames Water logo
Between
11 and 13 Nov 2024
Details
View Map
Share
Follow
Spruce Hills Road

Thames Water are proposing to carry out Utility repair and maintenance works on Spruce Hills Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 16:17.

Thames Water logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Malvern Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Malvern Avenue, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 15:38.

Cadent Gas logo
LONG TERM
Between
11 Nov and 30 Dec 2024
Details
View Map
Share
Follow
Montalt Road

Cadent Gas are proposing to carry out Utility asset works on Montalt Road, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 11:00.

Essex County Council logo
Between
11 and 16 Nov 2024
Details
View Map
Share
Follow
Epping New Road

Essex County Council are proposing to carry out Highway improvement works on Epping New Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 2 Jul 2024 at 12:09.

Thames Water logo
Between
12 and 23 Nov 2024
Details
View Map
Share
Follow
Nelson Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Nelson Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:38.

Thames Water logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Follow
Priory Avenue

Thames Water are proposing to carry out New service connection on Priory Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:02.

Thames Water logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Priory Avenue

Thames Water were proposing to carry out New service connection on Priory Avenue, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 15:48.

Thames Water logo
Between
13 and 16 Nov 2024
Details
View Map
Share
Follow
The Forest

Thames Water are proposing to carry out Remedial works on The Forest, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:05.

London Borough Of Haringey logo
Between
13 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Hale Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Hale Road, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 14 Aug 2024 at 14:39.

Essex County Council logo
Between
13 and 20 Nov 2024
Details
View Map
Share
Follow
The Stables

Essex County Council are proposing to carry out Highway improvement works on The Stables, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Aug 2024 at 08:32.

Thames Water logo
LONG TERM
Between
14 Nov and 31 Dec 2024
Details
View Map
Share
Follow
Heigham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Heigham Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:33.

Thames Water logo
LONG TERM
Between
14 Nov and 31 Dec 2024
Details
View Map
Share
Follow
Burges Road

Thames Water are proposing to carry out Utility repair and maintenance works on Burges Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:32.

Essex County Council logo
Between
14 and 22 Nov 2024
Details
View Map
Share
Follow
North End

Essex County Council are proposing to carry out Highway improvement works on North End, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Aug 2024 at 08:33.

UK Power Networks Eastern & London logo
Between
15 and 19 Nov 2024
Details
View Map
Share
Follow
Rufus Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Rufus Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 22:57.

BT logo
Between
15 and 19 Nov 2024
Details
View Map
Share
Follow
Waterloo Terrace

BT are proposing to carry out Utility asset works on Waterloo Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Aug 2024 at 10:20.

Thames Water logo
Between
16 and 18 Nov 2024
Details
View Map
Share
Follow
Elder Street

Thames Water are proposing to carry out Utility repair and maintenance works on Elder Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 16:36.

Thames Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Stepney Green

Thames Water are proposing to carry out Utility repair and maintenance works on Stepney Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Aug 2024 at 16:27.

Thames Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Old Ford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Old Ford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 12:44.

Hyperoptic logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Rona Walk

Hyperoptic were proposing to carry out Utility asset works on Rona Walk, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 16 Aug 2024 at 09:10.

Thames Water logo
Between
18 and 24 Nov 2024
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 10:47.

Thames Water logo
Between
18 and 24 Nov 2024
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 07:36.

Thames Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Elm Park Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Park Avenue, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 15:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Edison Close

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2024 at 14:20.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Edison Close

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2024 at 09:54.

Thames Water logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Marlborough Road

Thames Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 10:21.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 9 Mar 2025
Details
View Map
Share
Follow
Hurst Road

Cadent Gas are proposing to carry out Utility asset works on Hurst Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 15:52.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 16:12.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 15:26.

Essex County Council logo
Between
18 and 24 Nov 2024
Details
View Map
Share
Follow
Forest Side

Essex County Council are proposing to carry out Highway improvement works on Forest Side, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Aug 2024 at 08:39.

Essex County Council logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Greenhill

Essex County Council are proposing to carry out Highway improvement works on Greenhill, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Aug 2024 at 08:35.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:27.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 16:20.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 28 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 12:36.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 28 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:22.

Thames Water logo
Between
19 and 26 Nov 2024
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out New service connection on High Street North, Manor Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 15:36.

Hyperoptic logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Japan Crescent

Hyperoptic are proposing to carry out Utility asset works on Japan Crescent, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 16 Aug 2024 at 10:21.

London Borough Of Haringey logo
LONG TERM
Between
19 Nov and 31 Dec 2024
Details
View Map
Share
Follow
Stanhope Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Stanhope Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 4 Jun 2024 at 11:56.

Thames Water logo
Between
20 and 23 Nov 2024
Details
View Map
Share
Follow
Poynton Road

Thames Water are proposing to carry out New service connection on Poynton Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 15:25.

London Borough Of Hackney logo
Between
21 and 27 Nov 2024
Details
View Map
Share
Follow
Martello Terrace

London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Martello Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 29 Aug 2024 at 13:42.

Thames Water logo
Between
21 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Kingswood Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingswood Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 14:07.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Cumberland Gardens

Thames Water are proposing to carry out New service connection on Cumberland Gardens, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 07:50.

Thames Water logo
LONG TERM
Between
25 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 09:44.

Cadent Gas logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Winchester Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Winchester Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:48.

Thames Water logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Clarence Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarence Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 09:05.

Thames Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Goodwin Street

Thames Water are proposing to carry out Utility asset works on Goodwin Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:44.

Cadent Gas logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Redcliffe Gardens

Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:37.

Cadent Gas logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Redcliffe Gardens

Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 12:47.

Cadent Gas logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Redcliffe Gardens

Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:00.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Woodford Road

Cadent Gas are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 14:04.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Woodford Road

Cadent Gas are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 10:41.

BT logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Wellington Road

BT are proposing to carry out Utility asset works on Wellington Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Sep 2024 at 16:23.

BT logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Wellington Road

BT were proposing to carry out Utility asset works on Wellington Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Sep 2024 at 15:04.

Cadent Gas logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Bedford Road

Cadent Gas are proposing to carry out Utility asset works on Bedford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Bedford Road

Cadent Gas are proposing to carry out Utility asset works on Bedford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 15:30.

Thames Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Vivian Road

Thames Water are proposing to carry out Permanent reinstatement on Vivian Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 15:53.

London Borough Of Hackney logo
LONG TERM
Between
26 Nov 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Brownlow Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brownlow Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:29.

London Borough Of Hackney logo
LONG TERM
Between
26 Nov 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Scriven Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Scriven Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:31.

London Borough Of Hackney logo
LONG TERM
Between
26 Nov 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Shrubland Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Shrubland Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:28.

Cadent Gas logo
Between
26 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Cleveland Road

Cadent Gas are proposing to carry out Utility asset works on Cleveland Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
26 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Cleveland Road

Cadent Gas are proposing to carry out Utility asset works on Cleveland Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 15:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Thorold Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Thorold Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 3 Sep 2024 at 13:57.

Thames Water logo
Between
28 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Essex Road

Thames Water are proposing to carry out Utility repair and maintenance works on Essex Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 10:59.

LONG TERM
Between
28 Nov 2024 and 6 Mar 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.

Cadent Gas logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 13:01.

Cadent Gas logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Plymouth Road

Cadent Gas are proposing to carry out New service connection on Plymouth Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 15:00.

Thames Water logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Altmore Avenue

Thames Water are proposing to carry out Utility asset works on Altmore Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 14:04.

Thames Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Brewery Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brewery Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 14:28.

Thames Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Hollybush Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Hollybush Hill, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 14:00.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Brunswick Street

Cadent Gas are proposing to carry out Utility asset works on Brunswick Street, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Jun 2024 at 10:52.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:30.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Feb 2025
Details
View Map
Share
Follow
St Mary Road

Cadent Gas are proposing to carry out Utility asset works on St Mary Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Jun 2024 at 10:48.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Feb 2025
Details
View Map
Share
Follow
St Mary Road

Cadent Gas are proposing to carry out Utility asset works on St Mary Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 14:28.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Feb 2025
Details
View Map
Share
Follow
St Mary Road

Cadent Gas are proposing to carry out Utility asset works on St Mary Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:56.

Thames Water logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Avon Road

Thames Water are proposing to carry out Utility asset works on Avon Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:51.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Gladstone Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Gladstone Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 12:33.

Virgin Media logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Lyndhurst Road

Virgin Media are proposing to carry out Utility asset works on Lyndhurst Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Sep 2024 at 12:08.

London Borough Of Enfield logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Green Lanes

London Borough Of Enfield are proposing to carry out Highway improvement works on Green Lanes, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 5 Sep 2024 at 14:50.

BT logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Wellington Road

BT were proposing to carry out Utility asset works on Wellington Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2024 at 16:11.

BT logo
Between
5 and 9 Dec 2024
Details
View Map
Share
Follow
Park Avenue

BT are proposing to carry out Utility asset works on Park Avenue, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Sep 2024 at 10:14.

BT logo
Between
5 and 9 Dec 2024
Details
View Map
Share
Follow
Ranelagh Road

BT are proposing to carry out Utility asset works on Ranelagh Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Sep 2024 at 10:20.

London Borough Of Hackney logo
LONG TERM
Between
6 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 13 Sep 2024 at 08:32.

London Borough Of Hackney logo
LONG TERM
Between
6 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:58.

Thames Water logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Osborne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Osborne Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 12:01.

Cadent Gas logo
Between
7 and 21 Dec 2024
Details
View Map
Share
Follow
Brushfield Street

Cadent Gas are proposing to carry out Utility asset works on Brushfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 17:23.

Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Carr Street

London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Carr Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 19 Sep 2024 at 11:13.

Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Settles Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Settles Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 16 Sep 2024 at 11:32.

Thames Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Great Winchester Street

Thames Water are proposing to carry out New service connection on Great Winchester Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 13:38.

Cadent Gas logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Bale Road

Cadent Gas are proposing to carry out New service connection on Bale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:12.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Coopers Close

Thames Water are proposing to carry out roadworks on Coopers Close, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 18:32.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Golden Lane

London Borough Of Islington are proposing to carry out Highway improvement works on Golden Lane, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:25.

Network Rail logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Devons Road

Network Rail are proposing to carry out Works for Rail Purposes on Devons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Sep 2024 at 15:36.

Between
9 and 13 Dec 2024
Details
View Map
Share
Central Street

London Borough Of Islington were proposing to carry out Highway improvement works on Central Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 13 Sep 2024 at 14:03.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Bancroft Road

Thames Water are proposing to carry out New service connection on Bancroft Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Aug 2024 at 14:16.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Bancroft Road

Thames Water are proposing to carry out New service connection on Bancroft Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Nelson Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Nelson Street, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 17:56.

Thames Water logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:49.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Cloudesley Place

London Borough Of Islington are proposing to carry out Highway improvement works on Cloudesley Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:18.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 3 Mar 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 15:18.

Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Gibbins Road

London Borough Of Newham are proposing to carry out Highway improvement works on Gibbins Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 9 Aug 2024 at 16:14.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Grange Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Grange Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:23.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Stroud Green Road

London Borough Of Islington are proposing to carry out Highway improvement works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 9 Sep 2024 at 07:55.

Between
9 and 13 Dec 2024
Details
View Map
Share
Stroud Green Road

London Borough Of Islington were proposing to carry out Highway improvement works on Stroud Green Road, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 13:58.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hornsey Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:07.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Low Hall Lane

Thames Water were proposing to carry out Utility asset works on Low Hall Lane, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 12:44.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Haringey Park

Thames Water are proposing to carry out Utility repair and maintenance works on Haringey Park, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 07:44.

UK Power Networks Eastern & London logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Talbot Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Talbot Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Sep 2024 at 10:12.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Warner Road

Thames Water are proposing to carry out Utility asset works on Warner Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2023 at 15:24.

BT logo
Between
10 and 19 Dec 2024
Details
View Map
Share
Follow
Chamber Street

BT are proposing to carry out Utility repair and maintenance works on Chamber Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Sep 2024 at 13:36.

Thames Water logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Stroud Green Road

Thames Water are carrying out Utility repair and maintenance works on Stroud Green Road, Hornsey, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 13:10 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Feb 2024 at 14:17.

Vorboss logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Goodmans Stile

Vorboss are proposing to carry out Utility repair and maintenance works on Goodmans Stile, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vorboss on 17 Sep 2024 at 16:57.

London Borough Of Hackney logo
LONG TERM
Between
11 Dec 2024 and 28 Feb 2025
Details
View Map
Share
Follow
London Fields West Side

London Borough Of Hackney are proposing to carry out Highway improvement works on London Fields West Side, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 11:18.

London Borough Of Hackney logo
Between
11 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Eleanor Road (North)

London Borough Of Hackney are proposing to carry out Highway improvement works on Eleanor Road (North), Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:36.

London Borough Of Hackney logo
LONG TERM
Between
11 Dec 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Greenwood Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Greenwood Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 11:12.

London Borough Of Hackney logo
LONG TERM
Between
13 Dec 2024 and 14 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:24.

Thames Water logo
Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Low Hall Lane

Thames Water are proposing to carry out Utility asset works on Low Hall Lane, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 12:48.

Thames Water logo
Between
14 and 22 Dec 2024
Details
View Map
Share
Follow
Turpins Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Turpins Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 10:51.

Thames Water logo
Between
16 and 22 Dec 2024
Details
View Map
Share
Follow
Fulbourne Street

Thames Water are proposing to carry out New service connection on Fulbourne Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 16:00.

Between
16 and 20 Dec 2024
Details
View Map
Share
Central Street

London Borough Of Islington were proposing to carry out Highway improvement works on Central Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 13 Sep 2024 at 14:12.

Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Central Street

London Borough Of Islington are proposing to carry out Highway improvement works on Central Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 16 Sep 2024 at 07:46.

Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
New North Road

London Borough Of Islington are proposing to carry out Highway improvement works on New North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 16 Sep 2024 at 10:46.

Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Baring Street

London Borough Of Islington are proposing to carry out Highway improvement works on Baring Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 16 Sep 2024 at 10:44.

Cadent Gas logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Heigham Road

Cadent Gas are proposing to carry out roadworks on Heigham Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:13.

Cadent Gas logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Burges Road

Cadent Gas are proposing to carry out roadworks on Burges Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:12.

Thames Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Utility repair and maintenance works on Claremont Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 10:54.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
West Bank

BT are proposing to carry out Utility asset works on West Bank, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Sep 2024 at 10:18.

Virgin Media logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
High Street

Virgin Media are proposing to carry out Remedial works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 17 Sep 2024 at 09:42.

Thames Water logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Wallwood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wallwood Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 10:28.

BT logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Gloucester Road

BT are proposing to carry out Utility asset works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Sep 2024 at 10:12.


Roadworks Map near to Longfellow Road, LONDON, E17 8DP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Sep 2024 01:26
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Longfellow Road, LONDON, E17 8DP (61 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
BOSTON ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 9 Sep 2024 - 23 Sep 2024
0.2
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
BOUNDARY ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 9 Sep 2024 - 23 Sep 2024
0.2
Details
Share
Follow
3
London Borough Of Waltham Forest logo
MAJOR
  
CAMPUS ROAD 
(0.2 miles)
London Borough Of Waltham Forest
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Road closure
Planned
Scheduled: 21 Sep 2024
0.2
Details
Share
Follow
4
UK Power Networks Eastern & London logo
MAJOR
  
EDINBURGH ROAD 
(0.2 miles)
UK Power Networks Eastern & London
Statutory Infrastructure Works - Carriageway - Road closure
In Progress
Since: 5 Mar 2024 13:00
(Scheduled: 4 Mar 2024 - 30 Sep 2024)
0.2
Details
Share
Follow
5
BT logo
EMERGENCY
  
BELGRAVE ROAD 
(0.3 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Complete
19 Sep 2024 11:04 - 20 Sep 2024 16:06
0.3
Details
Share
6
London Borough Of Waltham Forest logo
MAJOR
  
CHURCH ROAD 
(0.3 miles)
London Borough Of Waltham Forest
Highway improvement works - Carriageway, Verge, Cycleway - Some carriageway incursion
Planned
Scheduled: 16 Sep 2024 - 20 Dec 2024
0.3
Details
Share
Follow
7
London Borough Of Waltham Forest logo
MAJOR
  
CHURCH ROAD 
(0.3 miles)
London Borough Of Waltham Forest
Highway improvement works - Carriageway, Verge, Cycleway - Some carriageway incursion
Planned
Scheduled: 16 Sep 2024 - 20 Dec 2024
0.3
Details
Share
Follow
8
Hyperoptic logo
ARKLEY CRESCENT 
(0.4 miles)
Hyperoptic
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 20 Sep 2024 - 23 Sep 2024
0.4
Details
Share
Follow
9
UK Power Networks Eastern & London logo
MAJOR
  
SHRUBLAND ROAD 
(0.4 miles)
UK Power Networks Eastern & London
Statutory Infrastructure Works - Carriageway - Road closure
In Progress
Since: 3 Apr 2024 14:40
(Scheduled: 2 Apr 2024 - 23 Sep 2024)
0.4
Details
Share
Follow
10
London Borough Of Waltham Forest logo
MAJOR
  
LEA BRIDGE ROAD 
(0.4 miles)
London Borough Of Waltham Forest
Highway improvement works - Footway, Verge, Cycleway - Some carriageway incursion
Planned
Scheduled: 16 Sep 2024 - 20 Dec 2024
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data