ROADWORKS SUMMARY
Isambard Mews, LONDON, E14 3XB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Isambard Mews, E14 3XB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Isambard Mews, LONDON, E14 3XB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Isambard Mews are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Tideway Tunnel logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Croft Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2020 at 08:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 3 Jan 2025 at 12:00.

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.

Thames Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Vulcan Road

Thames Water are carrying out roadworks on Vulcan Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2021 at 10:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 15:26.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Albert Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Albert Embankment, Prince's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2022 at 08:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 14 Jan 2025 at 13:24.

LONG TERM
Until
19 Nov 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2023 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 22 Apr 2025 at 14:45.

Transport for London (TfL) logo
LONG TERM
Between
27 Mar 2023 and 8 Sep 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.

London Borough Of Southwark logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 July 2023 at 00:00 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Jan 2025 at 11:47.

Transport for London (TfL) logo
LONG TERM
Between
6 Sep 2023 and 3 Sep 2025
Details
View Map
Share
Follow
Walworth Road

Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 13:54.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2023 and 10 Oct 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 21:46.

LONG TERM
Until
4 Feb 2026
Details
View Map
Share
Follow
Westfield Avenue

London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 4 February 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 29 Apr 2025 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
17 Jan 2024 and 14 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.

London Borough Of Hackney logo
LONG TERM
Between
15 Feb 2024 and 12 Jul 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.

Transport for London (TfL) logo
LONG TERM
Between
31 Mar 2024 and 26 Jun 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 26 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Mar 2025 at 10:03.

LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 09:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 27 May 2025 at 09:23.

LONG TERM
Until
19 Nov 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2024 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:26.

Transport for London (TfL) logo
LONG TERM
Between
24 May 2024 and 21 Jun 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out roadworks on New Bridge Street, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 May 2024 and could run through until 21 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 12:06.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 26 May 2025 at 19:46.

LONG TERM
Between
27 May 2024 and 1 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.

LONG TERM
Between
27 May 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.

Transport for London (TfL) logo
LONG TERM
Between
10 Jun 2024 and 13 Apr 2026
Details
View Map
Share
Follow
Kennington Lane

Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2024 at 10:34.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2026
Details
View Map
Share
Follow
King William Street

City Of London Corporation are carrying out Highway repair and maintenance works on King William Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 30 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 8 Jul 2024 at 07:30.

Transport for London (TfL) logo
LONG TERM
Between
1 Jul 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Curtain Road

Transport for London (TfL) are proposing to carry out roadworks on Curtain Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 13:20.

London Borough Of Southwark logo
LONG TERM
Between
2 Jul 2024 and 27 Jan 2026
Details
View Map
Share
Follow
Sceaux Gardens

London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.

These works are categorised as Major.

The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
15 Jul 2024 and 13 Jul 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 13 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:48.

Thames Water logo
LONG TERM
Until
7 Apr 2026
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 08:10 and could run through until 7 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:27.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Valette Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Valette Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:50.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Morning Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Morning Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:29.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:30.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:26.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:48.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:43.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:44.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:42.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Spurstowe Terrace

London Borough Of Hackney are proposing to carry out Highway improvement works on Spurstowe Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:33.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:19.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Sigdon Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Sigdon Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:32.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:40.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:22.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 20 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 20 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:15.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 22 Jul 2025
Details
View Map
Share
Renfrew Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 22 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 08:56.

LONG TERM
Between
14 Aug 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.

LONG TERM
Between
14 Aug 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 30 Jun 2025
Details
View Map
Share
Concert Hall Approach

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Concert Hall Approach, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2024 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 07:44.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 8 Aug 2024 at 14:49.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:20.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
New Cross Road

Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.

London Borough Of Lambeth logo
LONG TERM
Between
9 Sep 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2024 at 12:45.

London Borough Of Lambeth logo
LONG TERM
Between
9 Sep 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 12:00.

London Borough Of Lambeth logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 19 May 2025 at 08:36.

LONG TERM
Between
14 Sep 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.

LONG TERM
Until
31 Aug 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Apr 2025 at 15:42.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:15 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 13:49.

London Borough Of Southwark logo
LONG TERM
Between
12 Oct 2024 and 12 Oct 2025
Details
View Map
Share
Colombo Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 1 Oct 2024 at 10:57.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 4 Oct 2024 at 12:17.

Thames Water logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are carrying out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 11:30 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 10:45.

Thames Water logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are carrying out Utility asset works on Westhorne Avenue, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 12:24 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 10:49.

London Borough Of Lambeth logo
LONG TERM
Between
11 Nov 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 11:05.

LONG TERM
Between
28 Nov 2024 and 6 Mar 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.

Thames Water logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Myddelton Square

Thames Water are carrying out Utility asset works on Myddelton Square, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:08 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:08.

London Borough Of Lambeth logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are carrying out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 19 May 2025 at 08:36.

London Borough Of Southwark logo
LONG TERM
Between
6 Jan and 16 Jun 2025
Details
View Map
Share
Follow
Fenning Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Fenning Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 15 May 2025 at 08:24.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 12:15.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 15:28.

Thames Water logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works started on 6 January 2025 at 09:00 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 13:36.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Jul 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are proposing to carry out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:35.

Cadent Gas logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are carrying out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:57 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 08:10.

LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 16 Jan 2025 at 08:13.

Thames Water logo
LONG TERM
Between
26 Jan and 28 Oct 2025
Details
View Map
Share
Renfrew Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 January 2025 and run through until 28 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 07:58.

London Borough Of Southwark logo
LONG TERM
Until
12 Aug 2025
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are carrying out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2025 at 00:00 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 15:31.

London Borough Of Southwark logo
LONG TERM
Until
12 Aug 2025
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are carrying out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2025 at 00:00 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 May 2025 at 15:43.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:06.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:17.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:51.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 11:18.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 17 Jan 2025 at 11:49.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 08:02.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 6 Dec 2024 at 10:07.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 13 Dec 2024 at 05:36.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 18 Dec 2024 at 08:57.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 19 Dec 2024 at 15:52.

London Borough Of Southwark logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are carrying out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 00:00 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 1 May 2025 at 17:20.

London Borough Of Southwark logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are carrying out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 00:00 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 1 May 2025 at 13:34.

Thames Water logo
LONG TERM
Between
10 Feb and 22 Jun 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 22 Jan 2025 at 15:01.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:13.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:04.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 15:47.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:07.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2025 at 11:45.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:06.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Thames Water logo
LONG TERM
Until
6 Jul 2025
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 11:51 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 13:16.

Royal Borough Of Greenwich logo
LONG TERM
Between
15 Feb and 29 Aug 2025
Details
View Map
Share
Follow
Vincent Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on Vincent Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Greenwich on 20 Jan 2025 at 16:29.

Network Rail logo
LONG TERM
Between
17 Feb and 4 Jul 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 8 Jan 2025 at 09:58.

Network Rail logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are carrying out Works for road purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 07:00 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Feb 2025 at 08:11.

Thames Water logo
LONG TERM
Between
17 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Feb 2025 at 11:47.

Thames Water logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are carrying out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:42 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 15:59.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are carrying out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are carrying out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:11 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:11.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are carrying out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:15 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 27 Feb 2025 at 11:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are carrying out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:14 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:14.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are carrying out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:13 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are carrying out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:13 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are carrying out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are carrying out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Between
17 Feb 2025 and 28 Aug 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 25 Feb 2025 at 15:42.

London Borough Of Southwark logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Ann Moss Way

London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.

These works are categorised as Major.

The works started on 21 February 2025 at 00:00 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 09:11.

Thames Water logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are carrying out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:55.

Thames Water logo
LONG TERM
Between
24 Feb and 13 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Feb 2025 at 13:05.

Thames Water logo
LONG TERM
Until
13 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:15 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 08:19.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Leslie Road

London Borough Of Newham are carrying out Section 50 on Leslie Road, Canning Town, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 February 2025 at 09:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 8 May 2025 at 09:31.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 13:17.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 14:59.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Jan 2025 at 17:10.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Feb 2025 at 14:19.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dulwich Common

Transport for London (TfL) are proposing to carry out Highway improvement works on Dulwich Common, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Jan 2025 at 20:24.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dulwich Common

Transport for London (TfL) are carrying out Highway improvement works on Dulwich Common, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:31.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Feb 2025 at 15:12.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are carrying out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:31.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 23 Jan 2025 at 09:22.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Feb 2025 at 08:44.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are carrying out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:30.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

The works will start on or after 7 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 13 Feb 2025 at 12:19.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are carrying out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

The works started on 7 March 2025 at 06:43 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2025 at 06:49.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:57.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:57.

LONG TERM
Between
10 Mar and 6 Sep 2025
Details
View Map
Share
Follow
Garnet Street

London Borough Of Tower Hamlets are proposing to carry out roadworks on Garnet Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 16 May 2025 at 13:12.

LONG TERM
Between
10 Mar and 6 Sep 2025
Details
View Map
Share
Follow
Monza Street

London Borough Of Tower Hamlets are proposing to carry out roadworks on Monza Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 16 May 2025 at 12:10.

LONG TERM
Between
10 Mar and 6 Sep 2025
Details
View Map
Share
Follow
Wapping Wall

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Wapping Wall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 May 2025 at 15:54.

Southern Gas Networks logo
LONG TERM
Between
11 Mar and 20 Jul 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:57.

Southern Gas Networks logo
LONG TERM
Between
12 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:28.

Southern Gas Networks logo
LONG TERM
Between
13 Mar and 20 Jul 2025
Details
View Map
Share
Zenoria Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Zenoria Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 March 2025 and run through until 20 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 10:26.

Transport for London (TfL) logo
LONG TERM
Between
15 Mar and 27 Sep 2025
Details
View Map
Share
High Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 12:11.

LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Leyton Road

London Borough Of Newham are carrying out Highway improvement works on Leyton Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 07:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 2 Jun 2025 at 15:28.

London Borough Of Southwark logo
LONG TERM
Between
17 Mar and 10 Sep 2025
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:25.

London Borough Of Southwark logo
LONG TERM
Between
17 Mar and 10 Sep 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jan 2025 at 14:52.

Thames Water logo
LONG TERM
Between
19 Mar and 29 Jun 2025
Details
View Map
Share
Follow
Chadwell Street

Thames Water are proposing to carry out Utility asset works on Chadwell Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 14:02.

LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are carrying out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2025 at 08:00 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Mar 2025 at 08:26.

Thames Water logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Chadwell Street

Thames Water are carrying out Utility asset works on Chadwell Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 08:45 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:52.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lewisham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2025 at 13:45.

Transport for London (TfL) logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Lewisham High Street

Transport for London (TfL) are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 08:59.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lewisham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:13.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Lewisham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:32.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar and 14 Jul 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Feb 2025 at 09:16.

Thames Water logo
LONG TERM
Until
30 Aug 2025
Details
View Map
Share
Follow
Kingsman Street

Thames Water are carrying out Utility asset works on Kingsman Street, Woolwich.

The works started on 24 March 2025 at 13:45 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:40.

UK Power Networks Eastern & London logo
LONG TERM
Until
11 Jun 2025
Details
View Map
Share
Follow
Sydenham Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2025 at 10:30 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 10:23.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 15 Jun 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
31 Mar and 26 Jun 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2025 at 11:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
31 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 15:37.

Thames Water logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Parmiter Street

Thames Water are carrying out Utility asset works on Parmiter Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 12:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:52.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
International Way

London Borough Of Newham are carrying out Section 50 on International Way, Stratford, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 13:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 6 May 2025 at 09:34.

LONG TERM
Between
1 Apr 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Barbers Road

London Borough Of Newham are proposing to carry out Section 50 on Barbers Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 23:20.

LONG TERM
Between
1 Apr 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Marshgate Lane

London Borough Of Newham are proposing to carry out Section 50 on Marshgate Lane, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 23:07.

LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Canonbury Street

London Borough Of Islington are carrying out Highway improvement works on Canonbury Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2025 at 08:00 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 2 Apr 2025 at 08:18.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 14:52.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 14:08.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 13:40.

LONG TERM
Between
7 Apr and 3 Jul 2025
Details
View Map
Share
Follow
Rotherfield Street

London Borough Of Islington are proposing to carry out Highway improvement works on Rotherfield Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 16 Jan 2025 at 07:55.

LONG TERM
Between
7 Apr and 5 Jul 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 15 Jan 2025 at 10:11.

LONG TERM
Between
7 Apr and 3 Jul 2025
Details
View Map
Share
Follow
Canonbury Street

London Borough Of Islington are proposing to carry out Highway improvement works on Canonbury Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 16 Jan 2025 at 07:56.

LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Dock Road

London Borough Of Newham are carrying out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 11:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:25.

Transport for London (TfL) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Tower Bridge Road

Transport for London (TfL) are proposing to carry out roadworks on Tower Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 3 June 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 13:21.

Transport for London (TfL) logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Transport for London (TfL) are carrying out Highway improvement works on Mount Pleasant Road, Hither Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 21:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 11:02.

Thames Water logo
LONG TERM
Between
11 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Parmiter Street

Thames Water are proposing to carry out Utility asset works on Parmiter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 13:11.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Percival Street

Cadent Gas are carrying out Utility asset works on Percival Street, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:35 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 17:30.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Ashby Street

Cadent Gas are carrying out Utility asset works on Ashby Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:30 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 17:16.

Thames Water logo
LONG TERM
Between
14 Apr and 7 Jul 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 6 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Bidder Street

London Borough Of Newham are carrying out Section 50 on Bidder Street, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 09:00 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 14:39.

Thames Water logo
LONG TERM
Between
21 Apr and 3 Nov 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:06.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Victoria Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:53.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Underpass

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:52.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Queen Victoria Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Carmelite Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Carmelite Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Passage

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
New Bridge Street

Transport for London (TfL) were proposing to carry out Highway improvement works on New Bridge Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:54.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Drummond Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Drummond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2025 at 11:04.

London Borough Of Southwark logo
LONG TERM
Between
22 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 1 Apr 2025 at 14:04.

London Borough Of Southwark logo
LONG TERM
Until
22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are carrying out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 10:57 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Apr 2025 at 11:06.

London Borough Of Southwark logo
LONG TERM
Between
22 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 July 2025. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2025 at 16:25.

London Borough Of Southwark logo
LONG TERM
Until
22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are carrying out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 06:25 and could run through until 22 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 22 Apr 2025 at 06:27.

Transport for London (TfL) logo
LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 12:00.

Transport for London (TfL) logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are carrying out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 08:00 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 10:51.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Temple Mill Lane

Thames Water are carrying out Utility repair and maintenance works on Temple Mill Lane, Stratford, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 12:00 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 11:53.

London Borough Of Southwark logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Horselydown Lane

London Borough Of Southwark are carrying out Highway improvement works on Horselydown Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 April 2025 at 00:00 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 May 2025 at 15:21.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:43.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Apr and 19 Jun 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Cheapside, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are carrying out Highway repair and maintenance works on Cheapside, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:11.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are carrying out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:11.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are carrying out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:09.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
King Edward Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on King Edward Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
King Edward Street

City Of London Corporation are carrying out Highway repair and maintenance works on King Edward Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:08.

Network Rail logo
LONG TERM
Between
28 Apr and 15 Aug 2025
Details
View Map
Share
Follow
St Germans Place

Network Rail are proposing to carry out Works for Rail Purposes on St Germans Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 28 Feb 2025 at 10:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Apr and 21 Jul 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 11:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Apr and 2 Jul 2025
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 11:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Apr and 2 Jul 2025
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 14:35.

UK Power Networks Eastern & London logo
LONG TERM
Until
2 Jul 2025
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 14:30 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 15:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Apr and 2 Jul 2025
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 14:06.

Transport for London (TfL) logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Commercial Road

Transport for London (TfL) are proposing to carry out Permanent reinstatement on Commercial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 8 June 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 24 Apr 2025 at 21:04.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Commercial Road

Transport for London (TfL) are proposing to carry out Permanent reinstatement on Commercial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 13 June 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:32.

Thames Water logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Harland Road

Thames Water are carrying out Utility asset works on Harland Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 11:30 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 12:35.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Aspen Way

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Aspen Way, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 May 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 09:12.

LONG TERM
Between
5 May and 23 Jul 2025
Details
View Map
Share
Wapping Wall

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Wapping Wall, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 23 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Jan 2025 at 09:54.

LONG TERM
Between
5 May and 12 Jul 2025
Details
View Map
Share
Wapping Wall

London Borough Of Tower Hamlets were proposing to carry out Highway repair and maintenance works on Wapping Wall, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 12 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 27 Feb 2025 at 10:53.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:38.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:46.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 20 Jun 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 07:45.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:40.

LONG TERM
Between
5 May and 8 Aug 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:40.

Thames Water logo
LONG TERM
Between
5 May and 14 Jul 2025
Details
View Map
Share
Follow
Wadeson Street

Thames Water are proposing to carry out Utility asset works on Wadeson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 14:25.

Transport for London (TfL) logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 20:14.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 12:03.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Bishopsgate

Transport for London (TfL) were proposing to carry out Highway improvement works on Bishopsgate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2025 at 10:27.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 16:51.

Transport for London (TfL) logo
LONG TERM
Until
25 Jun 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are carrying out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 21:00 and could run through until 25 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 15:57.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are carrying out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 09:03.

Southern Gas Networks logo
LONG TERM
Between
6 May and 4 Jul 2025
Details
View Map
Share
Follow
Welling Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Nigel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nigel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 17:07.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Nigel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nigel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 16:44.

Southern Gas Networks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Nigel Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Nigel Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 08:18.

Southern Gas Networks logo
LONG TERM
Between
6 May and 27 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 14:00.

Southern Gas Networks logo
LONG TERM
Between
6 May and 27 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 12:25.

Southern Gas Networks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:54.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 12:34.

Network Rail logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
St Germans Place

Network Rail are carrying out Works for Rail Purposes on St Germans Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 May 2025 at 08:17.

Southern Gas Networks logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Follow
Charlton Park Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 12:53.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Nelson Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Nelson Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:20.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Nelson Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Nelson Road, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Creek Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Creek Road, Deptford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:19.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Creek Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Creek Road, Deptford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Greenwich Church Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:18.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Greenwich Church Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:08.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Albany Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Albany Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 09:58.

London Borough Of Southwark logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Follow
Iliffe Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Iliffe Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Feb 2025 at 17:17.

London Borough Of Southwark logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Iliffe Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Iliffe Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 13:23.

Southern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Kennington Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Kennington Park Road, Kennington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 16:00.

London Borough Of Southwark logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Drummond Road

London Borough Of Southwark are carrying out Highway improvement works on Drummond Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 00:00 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 14:37.

Thames Water logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out Utility asset works on Drummond Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 18:48.

Thames Water logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are carrying out Utility asset works on Drummond Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 12:12 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 09:44.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:42.

City Of London Corporation logo
LONG TERM
Until
10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are carrying out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 6 May 2025 at 09:10.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
St Mary Axe

City Of London Corporation were proposing to carry out Highway repair and maintenance works on St Mary Axe, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 10 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 16 Apr 2025 at 15:01.

Thames Water logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Norman Road

Thames Water are carrying out Utility asset works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 May 2025 at 12:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 06:43.

London Borough Of Southwark logo
LONG TERM
Between
7 May and 4 Jul 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:47.

London Borough Of Southwark logo
LONG TERM
Between
9 May and 8 Aug 2025
Details
View Map
Share
Follow
Manor Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 May 2025 at 09:14.

London Borough Of Southwark logo
LONG TERM
Between
9 May and 8 Aug 2025
Details
View Map
Share
Follow
Manor Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 May 2025 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
11 May and 22 Jun 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 14:48.

Southern Gas Networks logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are carrying out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 13:40 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:54.

London Borough Of Southwark logo
LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Albany Road

London Borough Of Southwark are carrying out Highway improvement works on Albany Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 May 2025 at 08:24.

City Of London Corporation logo
LONG TERM
Between
12 May and 8 Jul 2025
Details
View Map
Share
Follow
London Wall

City Of London Corporation are proposing to carry out Highway repair and maintenance works on London Wall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 July 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 10:39.

City Of London Corporation logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
London Wall

City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 07:00 and could run through until 8 July 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 12 May 2025 at 09:21.

Thames Water logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Mowlem Street

Thames Water are carrying out Utility asset works on Mowlem Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:16.

London Borough Of Hackney logo
LONG TERM
Between
12 May and 12 Aug 2025
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Dec 2024 at 12:04.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Rye Lane

Thames Water are carrying out New service connection on Rye Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 May 2025 at 13:31 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:05.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Mascalls Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Mascalls Road, Charlton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 07:00 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 07:47.

LONG TERM
Between
13 May and 27 Jun 2025
Details
View Map
Share
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 May 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 05:54.

City Of London Corporation logo
LONG TERM
Between
15 May and 20 Sep 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are proposing to carry out Highway repair and maintenance works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are carrying out Highway repair and maintenance works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 15 May 2025 at 08:43.

London Borough Of Hackney logo
LONG TERM
Between
16 May and 20 Jun 2025
Details
View Map
Share
Follow
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Feb 2025 at 12:41.

London Borough Of Hackney logo
Finishing
Friday
Details
View Map
Share
Follow
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Feb 2025 at 12:31.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:35.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Eagle Street

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Eagle Street, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 10:25.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:48.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Folkestone Road

Cadent Gas were proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:15.

Thames Water logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Old Ford Road

Thames Water carried out roadworks on Old Ford Road, London.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 19 May 2025 and 13 Jun 2025 and were actually completed between 19 May 2025 (11:25) and 3 Jun 2025 (11:14). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:14.

Thames Water logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Russia Lane

Thames Water are carrying out Utility asset works on Russia Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 12:20 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 12:28.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Wick Lane

Thames Water are carrying out Utility repair and maintenance works on Wick Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 11:11.

London Borough Of Waltham Forest logo
LONG TERM
Between
19 May and 20 Jun 2025
Details
View Map
Share
Follow
Oliver Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Oliver Road, Leyton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 May 2025 at 16:06.

London Borough Of Bromley logo
Between
19 May and 17 Jun 2025
Details
View Map
Share
Follow
Hillcrest Road

London Borough Of Bromley are proposing to carry out Utility asset works on Hillcrest Road, Bromley.

These works are categorised as Major.

The works will start on or after 19 May 2025 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Bromley on 12 Mar 2025 at 10:11.

Thames Water logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Mount Adon Park

Thames Water are carrying out roadworks on Mount Adon Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 11:00 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 12:49.

Network Rail logo
LONG TERM
Between
19 May and 3 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 Mar 2025 at 15:58.

Network Rail logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are carrying out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 08:00 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 May 2025 at 08:08.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Stadium Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stadium Road, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:09.

Southern Gas Networks logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Little Heath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Heath, Charlton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 13:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 6 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Mar 2025 at 08:42.

UK Power Networks Eastern & London logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Lower Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 14:51.

Between
19 May and 14 Jun 2025
Details
View Map
Share
Monza Street

London Borough Of Tower Hamlets were proposing to carry out roadworks on Monza Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 14 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 27 Feb 2025 at 10:52.

UK Power Networks Eastern & London logo
LONG TERM
Until
24 Aug 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 13:00 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 13:49.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Strand

BT are carrying out Utility repair and maintenance works on Strand, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 09:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 May 2025 at 12:18.

Thames Water logo
LONG TERM
Between
20 May and 3 Aug 2025
Details
View Map
Share
Follow
Thomas Road

Thames Water are proposing to carry out Utility asset works on Thomas Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 15:45.

Thames Water logo
LONG TERM
Between
20 May and 3 Aug 2025
Details
View Map
Share
Follow
Pixley Street

Thames Water are proposing to carry out Utility asset works on Pixley Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 14:01.

Thames Water logo
LONG TERM
Between
20 May and 28 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 14:09.

London Borough Of Hackney logo
Finishing
Today
Details
View Map
Share
Follow
Hay Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Hay Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 25 Feb 2025 at 14:01.

London Borough Of Hackney logo
Between
21 May and 11 Jun 2025
Details
View Map
Share
Follow
Goldsmiths Row

London Borough Of Hackney are proposing to carry out Highway improvement works on Goldsmiths Row, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 26 Feb 2025 at 09:35.

London Borough Of Hackney logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Pritchards Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pritchards Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 26 Feb 2025 at 09:41.

City Of London Corporation logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Abchurch Lane

City Of London Corporation are proposing to carry out Highway improvement works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 4 June 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 19 May 2025 at 09:08.

City Of London Corporation logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Abchurch Lane

City Of London Corporation are proposing to carry out Highway improvement works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 4 June 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 27 May 2025 at 12:40.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:09.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:46.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Ruston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:46.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Warspite Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:52.

London Borough Of Southwark logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Elsie Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Elsie Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 08:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 08:02.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Lilford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 11:46.

London Borough Of Southwark logo
LONG TERM
Between
23 May and 30 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 12:08.

London Borough Of Southwark logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 00:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 13:15.

London Borough Of Southwark logo
LONG TERM
Between
23 May and 30 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 12:08.

London Borough Of Southwark logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 00:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 13:15.

London Borough Of Southwark logo
Between
23 May and 10 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 14:35.

Thames Water logo
Between
23 May and 18 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:23.

Thames Water logo
Between
23 May and 18 Jun 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 15:26.

Transport for London (TfL) logo
Between
23 May and 15 Jun 2025
Details
View Map
Share
Newham Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 11:39.

Transport for London (TfL) logo
Between
23 May and 15 Jun 2025
Details
View Map
Share
Newham Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:42.

Thames Water logo
Until
14 Jun 2025
Details
View Map
Share
Follow
Kingsland High Street

Thames Water are carrying out Utility repair and maintenance works on Kingsland High Street, Hackney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 May 2025 at 09:00 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 May 2025 at 09:08.

Electricity Network Company logo
Finishing
Saturday
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 09:15.

Electricity Network Company logo
Finishing
Saturday
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are carrying out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 May 2025 at 09:55 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 24 May 2025 at 09:58.

Southern Gas Networks logo
LONG TERM
Between
25 May and 6 Jul 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

London Borough Of Lambeth logo
Finishing
Monday
Details
View Map
Share
Follow
Loughborough Park

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Loughborough Park, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 27 Jan 2025 at 09:09.

Southern Gas Networks logo
Between
26 May and 15 Jun 2025
Details
View Map
Share
Peckham Rye

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 08:43.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
Plumstead High Street

Royal Borough Of Greenwich are proposing to carry out Section 50 on Plumstead High Street, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:37.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
St Nicholas Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on St Nicholas Road, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:17.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
St Nicholas Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on St Nicholas Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:33.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Redriff Road

Thames Water were proposing to carry out Utility asset works on Redriff Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 5 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 11:05.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 5 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 11:02.

Southern Gas Networks logo
LONG TERM
Between
26 May and 29 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 09:17.

Southern Gas Networks logo
LONG TERM
Between
26 May and 29 Jun 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 08:42.

LONG TERM
Between
26 May and 27 Jun 2025
Details
View Map
Share
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 06:11.

LONG TERM
Between
26 May and 27 Jun 2025
Details
View Map
Share
Follow
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 14:47.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Savoy Street

UK Power Networks Eastern & London are carrying out Utility asset works on Savoy Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 08:00 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 May 2025 at 10:10.

UK Power Networks Eastern & London logo
Between
26 May and 21 Jun 2025
Details
View Map
Share
Follow
Cock Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Cock Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 21 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 19:55.

UK Power Networks Eastern & London logo
Between
26 May and 21 Jun 2025
Details
View Map
Share
Follow
Cock Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Cock Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 21 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 11:32.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 28 Jun 2025
Details
View Map
Share
Follow
South Crescent

UK Power Networks Eastern & London are proposing to carry out Utility asset works on South Crescent, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:17.

Thames Water logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Dawson Street

Thames Water were proposing to carry out Utility repair and maintenance works on Dawson Street, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Feb 2025 at 11:41.

UK Power Networks Eastern & London logo
Between
26 May and 15 Jun 2025
Details
View Map
Share
Follow
Wellington Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wellington Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:37.

Thames Water logo
LONG TERM
Between
26 May and 28 Jul 2025
Details
View Map
Share
Follow
St James's Avenue

Thames Water are proposing to carry out Utility asset works on St James's Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 14:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 30 Jun 2025
Details
View Map
Share
Follow
Pritchards Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Pritchards Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 11:42.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Portsmouth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsmouth Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Mar 2025 at 08:34.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Portsmouth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsmouth Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Mar 2025 at 06:28.

London Borough Of Waltham Forest logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Oliver Road

London Borough Of Waltham Forest are carrying out Highway improvement works on Oliver Road, Leyton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 May 2025 at 16:35.

Thames Water logo
Between
27 May and 15 Jun 2025
Details
View Map
Share
Gresham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Gresham Road, Brixton Windrush, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 15 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:18.

Thames Water logo
Until
15 Jun 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are carrying out Disconnection or alteration of supply on Gresham Road, Brixton Windrush, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:45 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 08:53.

Thames Water logo
Between
27 May and 15 Jun 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are proposing to carry out Remedial works on Gresham Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 14:53.

Thames Water logo
Between
27 May and 15 Jun 2025
Details
View Map
Share
Gresham Road

Thames Water were proposing to carry out Remedial works on Gresham Road, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 15 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:05.

Thames Water logo
LONG TERM
Between
27 May and 2 Jul 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Feb 2025 at 11:29.

Southern Gas Networks logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Newington Butts

Southern Gas Networks are carrying out Utility repair and maintenance works on Newington Butts, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:45 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:06.

Southern Gas Networks logo
LONG TERM
Between
27 May and 7 Jul 2025
Details
View Map
Share
Follow
Newington Butts

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newington Butts, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 14:02.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Denmark Hill

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Denmark Hill, Herne Hill & Loughborough Junction, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 12:00.

Southern Gas Networks logo
Between
28 May and 20 Jun 2025
Details
View Map
Share
Follow
Shooters Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 12:14.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Bardsley Lane

Thames Water are carrying out Utility repair and maintenance works on Bardsley Lane, Greenwich.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 08:55 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 11:10.

Transport for London (TfL) logo
Until
17 Jun 2025
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are carrying out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 21:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2025 at 08:17.

London Borough Of Southwark logo
Finishing
Friday
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 May 2025 at 12:41.

London Borough Of Southwark logo
LONG TERM
Between
28 May and 27 Jul 2025
Details
View Map
Share
Follow
Queen Elizabeth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Queen Elizabeth Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 9 May 2025 at 12:04.

London Borough Of Southwark logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Queen Elizabeth Street

London Borough Of Southwark are carrying out Highway improvement works on Queen Elizabeth Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 05:32 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 28 May 2025 at 05:34.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Buckland Street

Thames Water are proposing to carry out New service connection on Buckland Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 11:02.

Thames Water logo
Finishing
Today
Details
View Map
Share
Buckland Street

Thames Water were proposing to carry out New service connection on Buckland Street, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 3 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 14:03.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Ron Leighton Way

Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 09:25.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Clermont Road

Cadent Gas are carrying out Utility repair and maintenance works on Clermont Road, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:36 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 10:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 May and 28 Jun 2025
Details
View Map
Share
Follow
Alscot Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Alscot Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 07:56.

LONG TERM
Between
29 May and 1 Jul 2025
Details
View Map
Share
Follow
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 29 May 2025 at 13:29.

London Borough Of Southwark logo
Between
30 May and 25 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Jan 2025 at 13:56.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:44.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 22:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 08:43.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Jacob Street

Thames Water are carrying out Utility repair and maintenance works on Jacob Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 10:45 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:05.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Jacob Street

Thames Water were proposing to carry out Utility repair and maintenance works on Jacob Street, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:34.

Eunetworks logo
Between
31 May and 13 Jun 2025
Details
View Map
Share
Follow
Jerome Street

Eunetworks are proposing to carry out Utility asset works on Jerome Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Apr 2025 at 13:22.

Eunetworks logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Jerome Street

Eunetworks are carrying out Utility asset works on Jerome Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 08:20 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 31 May 2025 at 08:32.

Eunetworks logo
LONG TERM
Between
31 May and 13 Jul 2025
Details
View Map
Share
Follow
Corbet Place

Eunetworks are proposing to carry out Utility asset works on Corbet Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Apr 2025 at 13:21.

Eunetworks logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Corbet Place

Eunetworks are carrying out Utility asset works on Corbet Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 08:22 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 31 May 2025 at 08:33.

Eunetworks logo
Between
31 May and 13 Jun 2025
Details
View Map
Share
Follow
Grey Eagle Street

Eunetworks are proposing to carry out Utility asset works on Grey Eagle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Apr 2025 at 13:22.

Eunetworks logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Grey Eagle Street

Eunetworks are carrying out Utility asset works on Grey Eagle Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 08:28 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 31 May 2025 at 08:34.

Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Rathbone Street

London Borough Of Newham are proposing to carry out Section 50 on Rathbone Street, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 20 May 2025 at 14:08.

Finishing
Tomorrow
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 5 Mar 2025 at 13:14.

Finishing
Tomorrow
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 20 May 2025 at 14:22.

Thames Water logo
LONG TERM
Until
17 Aug 2025
Details
View Map
Share
Follow
Thomas Road

Thames Water are carrying out Utility asset works on Thomas Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:40 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:46.

Thames Water logo
LONG TERM
Until
17 Aug 2025
Details
View Map
Share
Follow
Pixley Street

Thames Water are carrying out Utility asset works on Pixley Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:40 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:47.

Thames Water logo
LONG TERM
Until
10 Aug 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:40 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:47.

Thames Water logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Glaucus Street

Thames Water are carrying out Utility repair and maintenance works on Glaucus Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:37.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Charterhouse Street

Virgin Media are proposing to carry out Utility asset works on Charterhouse Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Mar 2025 at 11:48.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Charterhouse Street

Virgin Media were proposing to carry out Utility asset works on Charterhouse Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 6 Mar 2025 at 11:54.

City Of London Telecomms logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Britton Street

City Of London Telecomms are proposing to carry out roadworks on Britton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 14 Feb 2025 at 08:08.

Cadent Gas logo
LONG TERM
Between
2 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:43.

Cadent Gas logo
LONG TERM
Between
2 Jun and 13 Jul 2025
Details
View Map
Share
Eastbourne Road

Cadent Gas were proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:16.

Cadent Gas logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:44.

Cadent Gas logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Folkestone Road

Cadent Gas were proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 22 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:16.

Thames Water logo
Until
30 Jun 2025
Details
View Map
Share
Follow
St James's Avenue

Thames Water are carrying out Utility asset works on St James's Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:48.

Southern Gas Networks logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Grove Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Park Road, Mottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:47.

T-Mobile (UK) logo
Finishing
Friday
Details
View Map
Share
Follow
Rochester Way

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rochester Way, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 11 Mar 2025 at 08:32.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Limesford Road

Thames Water were proposing to carry out Utility repair and maintenance works on Limesford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:23.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Grangehill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grangehill Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:05.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Grangehill Road

Thames Water are carrying out Utility repair and maintenance works on Grangehill Road, Eltham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 07:26 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:58.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 28 Aug 2025
Details
View Map
Share
Blackheath Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 15:46.

Southern Gas Networks logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Peckham Grove

Southern Gas Networks are carrying out Utility repair and maintenance works on Peckham Grove, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 17:00 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 12:03.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:34.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:41.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

Thames Water logo
Between
2 and 12 Jun 2025
Details
View Map
Share
Follow
Colomb Street

Thames Water are proposing to carry out Utility asset works on Colomb Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 10:31.

London Borough Of Southwark logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 13:52.

London Borough Of Southwark logo
LONG TERM
Between
2 Jun and 23 Jul 2025
Details
View Map
Share
Follow
Rollins Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Rollins Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:54.

London Borough Of Southwark logo
LONG TERM
Between
2 Jun and 23 Jul 2025
Details
View Map
Share
Follow
Rollins Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Rollins Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 12:59.

Electricity Network Company logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 27 Feb 2025 at 13:43.

Electricity Network Company logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Feb 2025 at 08:17.

Electricity Network Company logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Feb 2025 at 10:58.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 07:38.

Electricity Network Company logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Millennium Way

Electricity Network Company are carrying out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 09:11.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Bermondsey Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Bermondsey Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:51.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Bermondsey Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Bermondsey Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:41.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Crucifix Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Crucifix Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:59.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Crucifix Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Crucifix Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:59.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Snowsfields

Transport for London (TfL) were proposing to carry out Highway improvement works on Snowsfields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:58.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
St Thomas Street

Transport for London (TfL) were proposing to carry out Highway improvement works on St Thomas Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:56.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
St Thomas Street

Transport for London (TfL) were proposing to carry out Highway improvement works on St Thomas Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:55.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Shand Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Shand Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:59.

Network Rail logo
Between
2 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Blackfriars Road

Network Rail are proposing to carry out Works for Rail Purposes on Blackfriars Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 2 Jun 2025 at 11:50.

Network Rail logo
Until
1 Jul 2025
Details
View Map
Share
Follow
Blackfriars Road

Network Rail are carrying out Works for Rail Purposes on Blackfriars Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 22:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Jun 2025 at 08:01.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bermondsey Street

Network Rail are proposing to carry out Works for Rail Purposes on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 May 2025 at 21:28.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bermondsey Street

Network Rail are proposing to carry out Works for Rail Purposes on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 May 2025 at 17:21.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Bermondsey Street

Network Rail were proposing to carry out Works for Rail Purposes on Bermondsey Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Jun 2025 at 12:00.

London Borough Of Lambeth logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Upper Ground

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Upper Ground, Waterloo & Southbank, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 17 Feb 2025 at 10:17.

Transport for London (TfL) logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Dock Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 21:31.

UK Power Networks Eastern & London logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Fenchurch Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fenchurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:33.

UK Power Networks Eastern & London logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Fenchurch Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fenchurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:09.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Tavistock Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Tavistock Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 07:55.

Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Ruscoe Road

London Borough Of Newham are proposing to carry out Section 50 on Ruscoe Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 May 2025 at 14:27.

City Of London Corporation logo
LONG TERM
Between
3 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Crutched Friars

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Crutched Friars, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 3 Jun 2025 at 10:25.

City Of London Corporation logo
LONG TERM
Between
3 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Crutched Friars

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Crutched Friars, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 3 Jun 2025 at 13:46.

UK Power Networks Eastern & London logo
Between
3 and 14 Jun 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:36.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Farringdon Road

Thames Water are carrying out Utility repair and maintenance works on Farringdon Road, Islington, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:15 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 12:05.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Flanders Road

Thames Water are proposing to carry out Utility repair and maintenance works on Flanders Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:37.

Thames Water logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Ellesmere Road

Thames Water were proposing to carry out Utility repair and maintenance works on Ellesmere Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 13:04.

Thames Water logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Ellesmere Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ellesmere Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:17.

Thames Water logo
Between
4 and 10 Jun 2025
Details
View Map
Share
Manor Grove

Thames Water were proposing to carry out New service connection on Manor Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 10:14.

Thames Water logo
Between
4 and 10 Jun 2025
Details
View Map
Share
Follow
Manor Grove

Thames Water are proposing to carry out New service connection on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 06:45.

London Borough Of Southwark logo
LONG TERM
Between
4 Jun and 3 Oct 2025
Details
View Map
Share
Follow
King James Street

London Borough Of Southwark are proposing to carry out Highway improvement works on King James Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 October 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 20 May 2025 at 13:19.

London Borough Of Southwark logo
LONG TERM
Between
4 Jun and 3 Oct 2025
Details
View Map
Share
Follow
King James Street

London Borough Of Southwark are proposing to carry out Highway improvement works on King James Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 October 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 20 May 2025 at 13:27.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:08.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:29.

Thames Water logo
Between
5 and 10 Jun 2025
Details
View Map
Share
Follow
Gardner Road

Thames Water are proposing to carry out New service connection on Gardner Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:54.

Thames Water logo
Between
5 and 10 Jun 2025
Details
View Map
Share
Follow
Esk Road

Thames Water are proposing to carry out New service connection on Esk Road, Plaistow, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:55.

City Of London Corporation logo
Finishing
Sunday
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Jan 2025 at 13:23.

Thames Water logo
Between
6 and 17 Jun 2025
Details
View Map
Share
Follow
Lilford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2025 at 09:46.

London Borough Of Southwark logo
Between
6 and 14 Jun 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 May 2025 at 13:29.

Transport for London (TfL) logo
Between
6 and 11 Jun 2025
Details
View Map
Share
Follow
Frances Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 07:47.

Transport for London (TfL) logo
Between
6 and 11 Jun 2025
Details
View Map
Share
Follow
Frances Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:17.

Transport for London (TfL) logo
Between
6 and 11 Jun 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:15.

London Borough Of Southwark logo
Between
7 and 30 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 May 2025 at 12:41.

Southern Gas Networks logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
The Crossway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Crossway, Mottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 08:43.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Court Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Farm Road, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:07.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Grove Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Park Road, Mottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 08:43.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Grove Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Park Road, Mottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 13:04.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Utility asset works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:16.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Utility asset works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 11:02.

Network Rail logo
LONG TERM
Between
9 Jun and 28 Aug 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 May 2025 at 10:52.

Network Rail logo
LONG TERM
Between
9 Jun and 28 Aug 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:29.

Thames Water logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out New service connection on Barry Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 14:03.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Surrey Road

Thames Water are proposing to carry out New service connection on Surrey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 15:21.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Surrey Road

Thames Water were proposing to carry out New service connection on Surrey Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:58.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Surrey Road

Thames Water are proposing to carry out New service connection on Surrey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 08:09.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Limesford Road

Thames Water were proposing to carry out Utility repair and maintenance works on Limesford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 7 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 11:46.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Rye Lane

Thames Water were proposing to carry out New service connection on Rye Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 12:51.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Albury Street

BT are proposing to carry out Utility asset works on Albury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Apr 2025 at 11:02.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Albury Street

BT are proposing to carry out Utility asset works on Albury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 06:13.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Charlton Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 07:17.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Tyler Street

Thames Water are proposing to carry out Utility asset works on Tyler Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jan 2025 at 13:28.

BT logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Vauxhall Street

BT are proposing to carry out Utility repair and maintenance works on Vauxhall Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Mar 2025 at 13:35.

BT logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Vauxhall Street

BT are proposing to carry out Utility repair and maintenance works on Vauxhall Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Apr 2025 at 11:22.

London Borough Of Southwark logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 May 2025 at 18:11.

London Borough Of Southwark logo
LONG TERM
Between
9 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Clements Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Clements Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 11:31.

London Borough Of Southwark logo
LONG TERM
Between
9 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Clements Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Clements Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 14:47.

Thames Water logo
Between
9 and 26 Jun 2025
Details
View Map
Share
Follow
Quebec Way

Thames Water are proposing to carry out Utility asset works on Quebec Way, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:30.

Thames Water logo
Between
9 and 26 Jun 2025
Details
View Map
Share
Follow
Quebec Way

Thames Water are proposing to carry out Utility asset works on Quebec Way, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 13:35.

Thames Water logo
Between
9 and 29 Jun 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out New service connection on Drummond Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 13:25.

Thames Water logo
Between
9 and 29 Jun 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out New service connection on Drummond Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:06.

Transport for London (TfL) logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Millharbour

Transport for London (TfL) were proposing to carry out Highway improvement works on Millharbour, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 08:59.

Transport for London (TfL) logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Marsh Wall

Transport for London (TfL) were proposing to carry out Highway improvement works on Marsh Wall, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 09:00.

London Borough Of Southwark logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Queen Elizabeth Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Queen Elizabeth Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Apr 2025 at 08:05.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Tree Road

Thames Water were proposing to carry out Utility repair and maintenance works on Tree Road, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:15.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Thames Water are proposing to carry out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 16:16.

Vodafone logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Lochnagar Street

Vodafone are proposing to carry out Utility repair and maintenance works on Lochnagar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 8 Apr 2025 at 12:11.

Vodafone logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Lochnagar Street

Vodafone are proposing to carry out Utility repair and maintenance works on Lochnagar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 2 May 2025 at 10:31.

Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Hannibal Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hannibal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 6 Mar 2025 at 16:25.

Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Hannibal Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hannibal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Mar 2025 at 15:55.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Sans Walk

Thames Water are proposing to carry out New service connection on Sans Walk, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Feb 2025 at 08:13.

LONG TERM
Between
9 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 1 May 2025 at 18:13.

LONG TERM
Between
9 Jun and 11 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 May 2025 at 06:52.

Thames Water logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 14:01.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Whiston Road

Cadent Gas are proposing to carry out Utility asset works on Whiston Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Feb 2025 at 11:51.

LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
White Post Lane

London Borough Of Tower Hamlets are proposing to carry out Section 50 on White Post Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 3 Jun 2025 at 17:09.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 11:49.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Dore Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dore Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 11:19.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Dersingham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 11:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:38.

Thames Water logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Henderson Road

Thames Water are proposing to carry out Utility repair and maintenance works on Henderson Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:12.

Virgin Media logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Woolwich Road

Virgin Media were proposing to carry out Utility asset works on Woolwich Road, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Mar 2025 at 10:41.

London Borough Of Southwark logo
Between
11 and 20 Jun 2025
Details
View Map
Share
Follow
Tintagel Crescent

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tintagel Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2025 at 16:15.

Thames Water logo
Between
11 and 15 Jun 2025
Details
View Map
Share
Elephant And Castle

Thames Water were proposing to carry out Utility repair and maintenance works on Elephant And Castle, London.

These works were categorised as Major.

The works were originally planned to start 11 June 2025 and run through until 15 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 09:49.

Thames Water logo
Between
11 and 15 Jun 2025
Details
View Map
Share
Follow
Elephant And Castle

Thames Water are proposing to carry out Utility repair and maintenance works on Elephant And Castle, London.

These works are categorised as Major.

The works will start on or after 11 June 2025 and could run through until 15 June 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 14:47.

Thames Water logo
Between
11 and 15 Jun 2025
Details
View Map
Share
Follow
Elephant And Castle

Thames Water are proposing to carry out Utility repair and maintenance works on Elephant And Castle, London.

These works are categorised as Major.

The works will start on or after 11 June 2025 and could run through until 15 June 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 11:29.

Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Rectory Square

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rectory Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 12 Mar 2025 at 09:54.

Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Rectory Square

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rectory Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Mar 2025 at 15:57.

Thames Water logo
Between
11 and 27 Jun 2025
Details
View Map
Share
Follow
Robinson Road

Thames Water are proposing to carry out Utility asset works on Robinson Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:53.

Thames Water logo
Between
11 Jun and 1 Jul 2025
Details
View Map
Share
Roman Road

Thames Water were proposing to carry out Utility repair and maintenance works on Roman Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 June 2025 and run through until 1 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 07:52.

Thames Water logo
Between
12 and 18 Jun 2025
Details
View Map
Share
Follow
St John's Lane

Thames Water are proposing to carry out New service connection on St John's Lane, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 09:35.

Thames Water logo
Between
12 and 17 Jun 2025
Details
View Map
Share
Follow
Boveney Road

Thames Water are proposing to carry out New service connection on Boveney Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 09:05.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:42.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Mar 2025 at 20:42.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 14 Mar 2025 at 14:44.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:45.

Thames Water logo
Between
13 and 26 Jun 2025
Details
View Map
Share
Redriff Road

Thames Water were proposing to carry out Utility asset works on Redriff Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 June 2025 and run through until 26 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 07:40.

Thames Water logo
Between
13 and 26 Jun 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 June 2025 and run through until 26 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 07:39.

Transport for London (TfL) logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:09.

Transport for London (TfL) logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:30.

Transport for London (TfL) logo
Between
13 and 15 Jun 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 15:11.

Southern Gas Networks logo
Between
15 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Spurling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spurling Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

Southern Gas Networks logo
Between
15 Jun and 13 Jul 2025
Details
View Map
Share
East Dulwich Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 15:10.

Southern Gas Networks logo
Between
15 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Worlingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

Southern Gas Networks logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Court Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Farm Road, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 17:23.

Thames Water logo
LONG TERM
Between
16 Jun and 18 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility asset works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:06.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 24 Aug 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 11:59.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 24 Aug 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 10:05.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
St Asaph Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Asaph Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 09:48.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
St Asaph Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Asaph Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 09:10.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Holly Grove

BT are proposing to carry out Utility repair and maintenance works on Holly Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 May 2025 at 13:18.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Holly Grove

BT are proposing to carry out Utility repair and maintenance works on Holly Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 May 2025 at 14:26.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Lorn Road

BT are proposing to carry out Utility asset works on Lorn Road, Stockwell East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 May 2025 at 08:29.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Vanbrugh Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanbrugh Park, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 06:25.

London Borough Of Southwark logo
Between
16 and 21 Jun 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 May 2025 at 13:04.

London Borough Of Southwark logo
Between
16 and 21 Jun 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 May 2025 at 18:11.

BT logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Kennington Road

BT are proposing to carry out Utility repair and maintenance works on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Mar 2025 at 08:56.

Electricity Network Company logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 14 Mar 2025 at 14:48.

Electricity Network Company logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 20 May 2025 at 08:46.

London Borough Of Lambeth logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Gilbert Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Gilbert Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 7 Mar 2025 at 13:41.

UK Power Networks Eastern & London logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Lower Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:25.

UK Power Networks Eastern & London logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Lower Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2025 at 14:38.

UK Power Networks Eastern & London logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:25.

Between
16 Jun and 12 Jul 2025
Details
View Map
Share
Garnet Street

London Borough Of Tower Hamlets were proposing to carry out roadworks on Garnet Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 12 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 27 Feb 2025 at 10:54.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Strait Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 May 2025 at 12:06.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hessel Street

Thames Water are proposing to carry out New service connection on Hessel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 11:51.

Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Old Broad Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Old Broad Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 31 Mar 2025 at 16:30.

UK Power Networks Eastern & London logo
Between
16 and 28 Jun 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:36.

Virgin Media logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Old Castle Street

Virgin Media were proposing to carry out Utility asset works on Old Castle Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 14 Mar 2025 at 13:31.

Virgin Media logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Old Castle Street

Virgin Media are proposing to carry out Utility asset works on Old Castle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 4 Apr 2025 at 17:34.

Virgin Media logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Old Castle Street

Virgin Media are proposing to carry out Utility asset works on Old Castle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 3 Jun 2025 at 07:42.

Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Bath Street

London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Bath Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 17 Mar 2025 at 07:09.

Cadent Gas logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Gooseley Lane

Cadent Gas were proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 6 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:16.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Bacton Street

BT are proposing to carry out Utility repair and maintenance works on Bacton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 14:38.

Thames Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:38.

Cadent Gas logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Highbridge Road

Cadent Gas are proposing to carry out Utility asset works on Highbridge Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:04.

London Borough Of Hackney logo
Between
16 Jun and 3 Jul 2025
Details
View Map
Share
Follow
New North Road

London Borough Of Hackney are proposing to carry out New service connection on New North Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 29 Apr 2025 at 15:52.

London Borough Of Hackney logo
Between
16 Jun and 3 Jul 2025
Details
View Map
Share
Follow
New North Road

London Borough Of Hackney are proposing to carry out New service connection on New North Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 29 Apr 2025 at 16:51.

BT logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Mill Row

BT are proposing to carry out Utility asset works on Mill Row, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 May 2025 at 17:49.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
East Cross Route

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on East Cross Route, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:29.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
East Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Cross Route, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 09:59.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Cowdry Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Cowdry Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:39.

Thames Water logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Station Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 15:35.

BT logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Morpeth Street

BT are proposing to carry out Utility repair and maintenance works on Morpeth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 14:31.

Between
17 Jun and 7 Jul 2025
Details
View Map
Share
Follow
High Street North

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on High Street North, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Mar 2025 at 09:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Cock Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Cock Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 11:28.

Thames Water logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Temple Mill Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Temple Mill Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 16:52.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Apple Road

BT are proposing to carry out Utility repair and maintenance works on Apple Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 May 2025 at 16:30.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Kennington Road

BT are proposing to carry out Utility repair and maintenance works on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Apr 2025 at 10:55.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Kennington Road

BT are proposing to carry out Utility repair and maintenance works on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 May 2025 at 08:49.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Kennington Road

BT are proposing to carry out Utility repair and maintenance works on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 09:03.

Thames Water logo
Between
18 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Surrey Quays Road

Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:23.

Thames Water logo
Between
18 Jun and 1 Jul 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 June 2025 and run through until 1 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 15:27.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:13.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:12.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Ruston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:47.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Warspite Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:46.

Transport for London (TfL) logo
LONG TERM
Between
19 Jun and 21 Dec 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 15:38.

Thames Water logo
LONG TERM
Between
19 Jun and 11 Sep 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 13:21.

UK Power Networks Eastern & London logo
Between
19 and 21 Jun 2025
Details
View Map
Share
Highbridge Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Highbridge Road, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 21 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 08:36.

UK Power Networks Eastern & London logo
Between
19 and 22 Jun 2025
Details
View Map
Share
Follow
Highbridge Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Highbridge Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 08:38.

Thames Water logo
LONG TERM
Between
19 Jun and 14 Sep 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 14:41.

Thames Water logo
LONG TERM
Between
19 Jun and 1 Aug 2025
Details
View Map
Share
Carpenters Road

Thames Water were proposing to carry out Utility asset works on Carpenters Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:00.

Transport for London (TfL) logo
LONG TERM
Between
20 Jun and 8 Aug 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 10:12.

UK Power Networks Eastern & London logo
Between
20 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.

London Borough Of Southwark logo
Between
20 and 22 Jun 2025
Details
View Map
Share
Lordship Lane

London Borough Of Southwark were proposing to carry out Highway improvement works on Lordship Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 June 2025 and run through until 22 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 May 2025 at 14:21.

London Borough Of Southwark logo
Between
20 and 22 Jun 2025
Details
View Map
Share
Follow
Bellenden Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Bellenden Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Apr 2025 at 13:45.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:12.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 15:07.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 16:07.

Transport for London (TfL) logo
Between
22 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out roadworks on Borough High Street, London.

These works are categorised as Major.

The works will start on or after 22 June 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 19:56.

London Borough Of Lewisham logo
Between
23 and 28 Jun 2025
Details
View Map
Share
Follow
Dartmouth Place

London Borough Of Lewisham are proposing to carry out Highway improvement works on Dartmouth Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 3 Jun 2025 at 11:04.

Southern Gas Networks logo
Between
23 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Bromley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bromley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 10:39.

Southern Gas Networks logo
Between
23 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Bromley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bromley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 14:38.

Thames Water logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Honor Oak Road

Thames Water are proposing to carry out Utility repair and maintenance works on Honor Oak Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2025 at 07:52.

London Borough Of Lewisham logo
LONG TERM
Between
23 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Deptford Church Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Deptford Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 1 May 2025 at 15:57.

Thames Water logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Tunnel Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 06:21.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Wilmount Street

Thames Water are proposing to carry out Remedial works on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 08:36.

Thames Water logo
Between
23 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Tanner Street

Thames Water are proposing to carry out Utility repair and maintenance works on Tanner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 13:11.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 12:35.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 07:08.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 07:03.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 10:48.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 07:39.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 07:03.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 13:42.

Cornerstone Telecommunications Infrastructure logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Strait Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 26 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 May 2025 at 12:06.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Burgess Street

Thames Water are proposing to carry out New service connection on Burgess Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 13:26.

Thames Water logo
Between
23 and 30 Jun 2025
Details
View Map
Share
Follow
Moor Place

Thames Water are proposing to carry out New service connection on Moor Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2025 at 13:14.

Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Hayfield Passage

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hayfield Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 1 Apr 2025 at 10:47.

Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Hayfield Passage

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hayfield Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 May 2025 at 13:18.

Thames Water logo
LONG TERM
Between
23 Jun and 29 Sep 2025
Details
View Map
Share
Follow
Bishops Way

Thames Water are proposing to carry out Utility asset works on Bishops Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 08:37.

Thames Water logo
LONG TERM
Between
23 Jun and 29 Sep 2025
Details
View Map
Share
Follow
Bonner Road

Thames Water are proposing to carry out Utility asset works on Bonner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 13:28.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 13:54.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 14:52.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:05.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Altmore Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Altmore Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:48.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 11:43.

Between
23 and 25 Jun 2025
Details
View Map
Share
Ferns Road

London Borough Of Newham were proposing to carry out roadworks on Ferns Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 31 Mar 2025 at 19:35.

Cadent Gas logo
Between
23 Jun and 9 Jul 2025
Details
View Map
Share
Acacia Road

Cadent Gas were proposing to carry out Utility asset works on Acacia Road, Leytonstone.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 08:34.

Cadent Gas logo
Between
23 Jun and 9 Jul 2025
Details
View Map
Share
Cecil Road

Cadent Gas were proposing to carry out Utility asset works on Cecil Road, Leytonstone.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 08:34.

Cadent Gas logo
Between
23 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Acacia Road

Cadent Gas are proposing to carry out Utility asset works on Acacia Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 14:49.

Between
24 and 28 Jun 2025
Details
View Map
Share
Follow
Gibbins Road

London Borough Of Newham are proposing to carry out Section 50 on Gibbins Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 6 Mar 2025 at 14:59.

UK Power Networks Eastern & London logo
Between
24 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Grange Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grange Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 07:56.

Thames Water logo
Between
25 and 29 Jun 2025
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 16:22.

UK Power Networks Eastern & London logo
Between
25 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Elm Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Elm Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 20:54.

Virgin Media logo
Between
26 and 30 Jun 2025
Details
View Map
Share
Follow
Hawkstone Road

Virgin Media are proposing to carry out Utility asset works on Hawkstone Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Apr 2025 at 15:31.

Between
26 Jun and 26 Jul 2025
Details
View Map
Share
Dock Road

London Borough Of Newham were proposing to carry out Highway improvement works on Dock Road, Silvertown, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 26 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 26 Mar 2025 at 09:42.

LONG TERM
Between
26 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Dock Road

London Borough Of Newham are proposing to carry out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 4 Apr 2025 at 17:16.

Thames Water logo
Between
27 and 30 Jun 2025
Details
View Map
Share
Follow
Baring Road

Thames Water are proposing to carry out Utility asset works on Baring Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 12:24.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Forest Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Forest Hill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 15:31.

London Borough Of Southwark logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Sunray Avenue

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Sunray Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Apr 2025 at 09:40.

London Borough Of Southwark logo
LONG TERM
Between
30 Jun and 23 Aug 2025
Details
View Map
Share
Champion Grove

London Borough Of Southwark were proposing to carry out Highway improvement works on Champion Grove, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 23 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2025 at 12:06.

London Borough Of Southwark logo
LONG TERM
Between
30 Jun and 23 Aug 2025
Details
View Map
Share
Grove Lane

London Borough Of Southwark were proposing to carry out Highway improvement works on Grove Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 23 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2025 at 11:53.

London Borough Of Southwark logo
LONG TERM
Between
30 Jun and 23 Aug 2025
Details
View Map
Share
Stories Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Stories Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 23 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2025 at 12:04.

Thames Water logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Rye Lane

Thames Water are proposing to carry out New service connection on Rye Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 15:28.

BT logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lorn Road

BT are proposing to carry out Utility asset works on Lorn Road, Stockwell East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Apr 2025 at 08:32.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Prince Charles Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Charles Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:45.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Charlton Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Charlton Way, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:48.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Maze Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Maze Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:47.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 16:10.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 15:03.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 09:44.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 13:40.

London Borough Of Southwark logo
LONG TERM
Between
30 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Shad Thames

London Borough Of Southwark are proposing to carry out Highway improvement works on Shad Thames, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 13 May 2025 at 09:56.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:52.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:34.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:46.

Cadent Gas logo
Between
30 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Cable Street

Cadent Gas are proposing to carry out New service connection on Cable Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 12:03.

Cadent Gas logo
Between
30 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Cable Street

Cadent Gas are proposing to carry out New service connection on Cable Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 14:35.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment Slip Road (N)

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment Slip Road (N), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:08.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Temple Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Temple Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 31 May 2025 at 10:56.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Temple Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Temple Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 12:08.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Passage

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Carmelite Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Carmelite Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 11:11.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:38.

Cadent Gas logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 10:31.

UK Power Networks Eastern & London logo
Between
30 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Billiter Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Billiter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:57.

UK Power Networks Eastern & London logo
Between
30 Jun and 12 Jul 2025
Details
View Map
Share
Follow
Billiter Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Billiter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 07:36.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:55.

UK Power Networks Eastern & London logo
Between
30 Jun and 19 Jul 2025
Details
View Map
Share
Follow
Camomile Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Camomile Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:32.

UK Power Networks Eastern & London logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:31.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Coleman Street

Thames Water are proposing to carry out New service connection on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:13.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Coleman Street

Thames Water are proposing to carry out New service connection on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 10:37.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Fore Street

Cadent Gas are proposing to carry out Utility asset works on Fore Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 May 2025 at 10:57.

Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Hatton Garden

G. Network Communications were proposing to carry out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 31 Mar 2025 at 14:32.

UK Power Networks Eastern & London logo
Between
30 Jun and 5 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:31.

Electricity Network Company logo
LONG TERM
Between
30 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 10 Apr 2025 at 08:28.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Mile End Road

Thames Water are proposing to carry out Utility asset works on Mile End Road, London.

These works are categorised as Major.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:24.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 14:47.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 12:26.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 14:48.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 12:27.

Thames Water logo
Between
30 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Great Eastern Road

Thames Water are proposing to carry out Utility repair and maintenance works on Great Eastern Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 11:26.

Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Montfichet Road

London Borough Of Newham are proposing to carry out Section 50 on Montfichet Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 14:51.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Glebe Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 12:23.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Glebe Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:57.

Thames Water logo
Between
1 and 7 Jul 2025
Details
View Map
Share
Follow
Horatio Street

Thames Water are proposing to carry out roadworks on Horatio Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 10:55.

Thames Water logo
Between
1 and 7 Jul 2025
Details
View Map
Share
Queensbridge Road

Thames Water were proposing to carry out Utility repair and maintenance works on Queensbridge Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 7 July 2025. The works were due to impact the footway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:19.

Thames Water logo
Between
1 and 7 Jul 2025
Details
View Map
Share
Follow
Clements Road

Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 09:30.

Thames Water logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Bexhill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bexhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 15:24.

Thames Water logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Bexhill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bexhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 11:12.

Thames Water logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Bexhill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Bexhill Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 15:16.

Thames Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Wilmount Street

Thames Water are proposing to carry out Remedial works on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:28.

Thames Water logo
Between
1 and 22 Jul 2025
Details
View Map
Share
Follow
Redriff Road

Thames Water are proposing to carry out Utility asset works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 22 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:23.

Thames Water logo
Between
1 and 22 Jul 2025
Details
View Map
Share
Redriff Road

Thames Water were proposing to carry out Utility asset works on Redriff Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 22 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 15:28.

Thames Water logo
Between
1 and 22 Jul 2025
Details
View Map
Share
Follow
Surrey Quays Road

Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 22 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:23.

Thames Water logo
Between
1 and 22 Jul 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 22 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 15:27.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:04.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 10:38.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:11.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 15:42.

Transport for London (TfL) logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:44.

Transport for London (TfL) logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2025 at 09:09.

Transport for London (TfL) logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:19.

London Borough Of Southwark logo
Between
4 and 26 Jul 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 May 2025 at 14:21.

City Of London Corporation logo
Between
4 and 6 Jul 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:35.

Southern Gas Networks logo
Between
6 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Old Bromley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Old Bromley Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 14:28.

Transport for London (TfL) logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 19:10.

Transport for London (TfL) logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 12:11.

Transport for London (TfL) logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:09.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Morden College Footpath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:19.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Oct 2025
Details
View Map
Share
Follow
Morden College Footpath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 7 July 2025 and could run through until 15 October 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Kidbrooke Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kidbrooke Gardens, Kidbrooke.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:18.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Follow
St Germans Place

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Germans Place, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:19.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 1 Sep 2025
Details
View Map
Share
Follow
St Germans Place

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Germans Place, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 06:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 07:49.

Transport for London (TfL) logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Albert Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 27 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 12:46.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Mar 2025 at 10:49.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2025 at 14:26.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Mar 2025 at 10:49.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2025 at 14:26.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Basinghall Street

Thames Water are proposing to carry out New service connection on Basinghall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 10:34.

Vodafone logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Northburgh Street

Vodafone are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 15 Apr 2025 at 13:11.

Cadent Gas logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Highbridge Road

Cadent Gas are proposing to carry out Utility asset works on Highbridge Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 15:48.

Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
White Post Lane

London Borough Of Tower Hamlets are proposing to carry out Section 50 on White Post Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 3 Jun 2025 at 15:54.

Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Little Ilford Lane

London Borough Of Newham are proposing to carry out Highway improvement works on Little Ilford Lane, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 21 May 2025 at 09:27.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Middlesex Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Middlesex Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 15 May 2025 at 15:25.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:07.

London Borough Of Southwark logo
LONG TERM
Between
8 Jul and 20 Aug 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2025 at 13:09.

London Borough Of Southwark logo
Between
8 and 29 Jul 2025
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 24 Jan 2025 at 13:56.

London Borough Of Southwark logo
Between
8 and 29 Jul 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 24 Jan 2025 at 13:56.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 25 Sep 2024 at 16:53.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 15 Oct 2024 at 13:31.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 29 Aug 2024 at 13:50.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 30 Aug 2024 at 09:33.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge Approach

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 29 Aug 2024 at 13:50.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge Approach

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 30 Aug 2024 at 09:31.

Southern Gas Networks logo
Between
9 and 16 Jul 2025
Details
View Map
Share
Follow
Sydenham Hill

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydenham Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 10:29.

London Borough Of Southwark logo
LONG TERM
Between
9 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 13:48.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Loughborough Street

Electricity Network Company were proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 24 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 Apr 2025 at 12:52.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 May 2025 at 19:34.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Follow
Kennington Lane

Electricity Network Company are proposing to carry out Utility asset works on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 14 May 2025 at 11:04.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Follow
Kennington Lane

Electricity Network Company are proposing to carry out Utility asset works on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 19 May 2025 at 18:40.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Follow
Kennington Lane

Electricity Network Company are proposing to carry out Utility asset works on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 20 May 2025 at 15:17.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Prestons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Apr 2025 at 11:21.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Prestons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 May 2025 at 10:56.

Electricity Network Company logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Ordnance Crescent

Electricity Network Company are proposing to carry out Utility asset works on Ordnance Crescent, Greenwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 24 Apr 2025 at 13:27.

Electricity Network Company logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Ordnance Crescent

Electricity Network Company are proposing to carry out Utility asset works on Ordnance Crescent, Greenwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Apr 2025 at 07:19.

Thames Water logo
Between
10 and 14 Jul 2025
Details
View Map
Share
Ravenhill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Ravenhill Road, Upton Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 10:28.

City Of London Corporation logo
Between
11 and 13 Jul 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:36.

Network Rail logo
Between
12 and 14 Jul 2025
Details
View Map
Share
Mcneil Road

Network Rail were proposing to carry out Works for Rail Purposes on Mcneil Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 July 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Apr 2025 at 09:52.

UK Power Networks Eastern & London logo
Between
12 and 20 Jul 2025
Details
View Map
Share
Follow
Creechurch Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Creechurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 10:33.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:23.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Remedial works on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:42.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 10:32.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:16.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:11.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 10:07.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:06.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 10:34.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Troutbeck Road

Thames Water are proposing to carry out Utility asset works on Troutbeck Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 15:36.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Troutbeck Road

Thames Water are proposing to carry out Utility asset works on Troutbeck Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 10:57.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Troutbeck Road

Thames Water are proposing to carry out Utility asset works on Troutbeck Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 11:40.

London Borough Of Southwark logo
Between
14 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Picton Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Picton Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Apr 2025 at 17:09.

Virgin Media logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Clapham Road

Virgin Media were proposing to carry out Utility asset works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 28 Apr 2025 at 13:42.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Kennington Road

Thames Water are proposing to carry out New service connection on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 08:34.

Electricity Network Company logo
Between
14 and 24 Jul 2025
Details
View Map
Share
Follow
Victoria Dock Road

Electricity Network Company are proposing to carry out Utility asset works on Victoria Dock Road, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 7 Apr 2025 at 16:36.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Ethel Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 17 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 11:52.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Prince Regent Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Prince Regent Lane, West Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 14:00.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Tree Road

Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:30.

UK Power Networks Eastern & London logo
Between
14 and 24 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 14:18.

UK Power Networks Eastern & London logo
Between
14 and 23 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 14:09.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Bath Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Bath Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:35.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Buckland Street

Thames Water are proposing to carry out New service connection on Buckland Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 12:44.

Thames Water logo
LONG TERM
Between
14 Jul and 20 Oct 2025
Details
View Map
Share
Follow
Bonner Road

Thames Water are proposing to carry out Utility asset works on Bonner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 10:36.

Thames Water logo
LONG TERM
Between
14 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Mowlem Street

Thames Water are proposing to carry out Utility asset works on Mowlem Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 14:27.

Electricity Network Company logo
LONG TERM
Between
15 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Millennium Way

Electricity Network Company are proposing to carry out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 23 Apr 2025 at 07:15.

Transport for London (TfL) logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Forty Acre Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Forty Acre Lane, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 14:00.

UK Power Networks Eastern & London logo
Between
17 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.

City Of London Corporation logo
Between
18 and 20 Jul 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:37.

Thames Water logo
LONG TERM
Between
19 Jul and 23 Aug 2025
Details
View Map
Share
Follow
Ohio Road

Thames Water are proposing to carry out Utility asset works on Ohio Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:35.

Thames Water logo
LONG TERM
Between
19 Jul and 20 Sep 2025
Details
View Map
Share
Follow
Lucas Avenue

Thames Water are proposing to carry out Utility asset works on Lucas Avenue, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:44.

Thames Water logo
LONG TERM
Between
19 Jul and 20 Sep 2025
Details
View Map
Share
Follow
Raymond Road

Thames Water are proposing to carry out Utility asset works on Raymond Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:46.

Thames Water logo
LONG TERM
Between
19 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Wolseley Road

Thames Water are proposing to carry out Utility asset works on Wolseley Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:26.

Transport for London (TfL) logo
Between
19 and 21 Jul 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 14:58.

Transport for London (TfL) logo
Between
19 and 21 Jul 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2025 at 14:16.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Farmstead Road

Thames Water are proposing to carry out New service connection on Farmstead Road, Bellingham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 06:52.

Southern Gas Networks logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Chinbrook Road

Southern Gas Networks are proposing to carry out New service connection on Chinbrook Road, Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 14:06.

Southern Gas Networks logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Chinbrook Road

Southern Gas Networks are proposing to carry out New service connection on Chinbrook Road, Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 May 2025 at 15:20.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Derby Hill

Thames Water were proposing to carry out New service connection on Derby Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 13:42.

Thames Water logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out Utility repair and maintenance works on Barry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 14:45.

Cornerstone Telecommunications Infrastructure logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Avery Hill Road

Cornerstone Telecommunications Infrastructure were proposing to carry out roadworks on Avery Hill Road, Avery Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 26 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 9 May 2025 at 09:12.

Cornerstone Telecommunications Infrastructure logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
Avery Hill Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Avery Hill Road, Avery Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 9 May 2025 at 12:53.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Leyland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Leyland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 May 2025 at 11:36.

London Borough Of Southwark logo
Between
21 and 28 Jul 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Apr 2025 at 12:51.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Overton Road

BT are proposing to carry out Utility asset works on Overton Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Apr 2025 at 14:50.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Charlton Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 08:43.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Charlton Church Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Church Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
21 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 16:16.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:25.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:49.

London Borough Of Southwark logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Deans Buildings

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Deans Buildings, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 May 2025 at 16:23.

UK Power Networks Eastern & London logo
Between
21 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Grange Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grange Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 2 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 15:06.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 07:25.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 13:39.

Cadent Gas logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 16:00.

Thames Water logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Prince Regent Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Prince Regent Lane, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:28.

Thames Water logo
Between
21 and 27 Jul 2025
Details
View Map
Share
Follow
Tree Road

Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 12:46.

UK Power Networks Eastern & London logo
Between
21 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Outwich Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Outwich Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:35.

Thames Water logo
Between
21 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Ackroyd Drive

Thames Water are proposing to carry out Statutory Infrastructure Works on Ackroyd Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 11:44.

Cadent Gas logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Fore Street

Cadent Gas are proposing to carry out Utility asset works on Fore Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 10:33.

Thames Water logo
LONG TERM
Between
21 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Braemar Road

Thames Water are proposing to carry out Utility asset works on Braemar Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.

Electricity Network Company logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 08:14.

Virgin Media logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Morville Street

Virgin Media were proposing to carry out Utility asset works on Morville Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 26 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 May 2025 at 15:42.

Virgin Media logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
Morville Street

Virgin Media are proposing to carry out Utility asset works on Morville Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 12 May 2025 at 11:38.

Virgin Media logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
Morville Street

Virgin Media are proposing to carry out Utility asset works on Morville Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 May 2025 at 14:02.

T-Mobile (UK) logo
Between
21 and 30 Jul 2025
Details
View Map
Share
Vyner Street

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Vyner Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 30 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 28 May 2025 at 08:49.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Glebe Road

BT are proposing to carry out Utility asset works on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 May 2025 at 11:46.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Glebe Road

BT are proposing to carry out Utility asset works on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 May 2025 at 12:13.

BT logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Dunedin Road

BT are proposing to carry out Utility asset works on Dunedin Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Apr 2025 at 15:09.

BT logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Dunedin Road

BT are proposing to carry out Utility asset works on Dunedin Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 May 2025 at 11:02.

London Borough Of Lewisham logo
Between
22 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Baring Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Baring Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 7 Mar 2025 at 12:23.

London Borough Of Lewisham logo
Between
22 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Baring Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Baring Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 11 Mar 2025 at 09:44.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 1 Sep 2025
Details
View Map
Share
Newstead Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Newstead Road, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 15:27.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Newstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newstead Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 13:33.

Southern Gas Networks logo
Between
23 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Shooters Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Mar 2025 at 07:06.

Between
23 and 26 Jul 2025
Details
View Map
Share
Follow
Bethnal Green Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 10 Apr 2025 at 15:48.

Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Bath Street

London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Bath Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 2 May 2025 at 11:20.

Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Bethnal Green Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 20 May 2025 at 09:56.

Southern Gas Networks logo
LONG TERM
Between
25 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:49.

London Borough Of Southwark logo
Between
26 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 1 May 2025 at 19:53.

London Borough Of Southwark logo
Between
28 Jul and 20 Aug 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Apr 2025 at 12:51.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 11:47.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 10:05.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Spurling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spurling Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 11:39.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Spurling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spurling Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 14:32.

London Borough Of Southwark logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Grove Vale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2025 at 16:16.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Worlingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 12:08.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Worlingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 13:48.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Cumberland Court

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Court, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 15:20.

Thames Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Rye Lane

Thames Water are proposing to carry out New service connection on Rye Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 16:19.

Southern Gas Networks logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Highcombe

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highcombe, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:44.

Southern Gas Networks logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Highcombe

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highcombe, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 21:07.

Southern Gas Networks logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Kennington Oval

Southern Gas Networks were proposing to carry out Remedial works on Kennington Oval, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 08:10.

Southern Gas Networks logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Kennington Oval

Southern Gas Networks are proposing to carry out Remedial works on Kennington Oval, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2025 at 08:43.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 May 2025 at 17:48.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 12:01.

Southern Gas Networks logo
Between
28 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Masons Hill

Southern Gas Networks are proposing to carry out New service connection on Masons Hill, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 09:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 17 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:38.

Network Rail logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Mepham Street

Network Rail were proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Mar 2025 at 15:30.

Network Rail logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 10:49.

Cadent Gas logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Cannon Street Road

Cadent Gas are proposing to carry out roadworks on Cannon Street Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 12:30.

Cadent Gas logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Cable Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Cable Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 13:56.

UK Power Networks Eastern & London logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
Follow
Leadenhall Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 15:06.

City Of London Corporation logo
LONG TERM
Between
28 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 6 May 2025 at 13:41.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Hessel Street

Thames Water are proposing to carry out New service connection on Hessel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 22:16.

Cadent Gas logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Commercial Road

Cadent Gas were proposing to carry out Utility asset works on Commercial Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 11 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 11:19.

Electricity Network Company logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 08:36.

Electricity Network Company logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 3 Jun 2025 at 15:40.

BT logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Culford Mews

BT were proposing to carry out Utility asset works on Culford Mews, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 16 May 2025 at 14:32.

Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 28 May 2025 at 15:21.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 1 Jun 2026
Details
View Map
Share
Follow
St John Street

Thames Water are proposing to carry out Utility asset works on St John Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 14:35.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:55.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:11.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:56.

Thames Water logo
Between
29 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Brightfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brightfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 15:26.

Southern Gas Networks logo
LONG TERM
Between
29 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Northumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 13:16.

Southern Gas Networks logo
LONG TERM
Between
29 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Millbrook Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Millbrook Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:45.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Chadwick Road

Thames Water are proposing to carry out Utility asset works on Chadwick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Grove Park

Thames Water are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 15:06.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 16:02.

Transport for London (TfL) logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:32.

Transport for London (TfL) logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
30 Jul and 20 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2025 at 11:35.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 09:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 11:04.

Between
2 and 7 Aug 2025
Details
View Map
Share
Follow
International Way

London Borough Of Newham are proposing to carry out Section 50 on International Way, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 5 Mar 2025 at 09:15.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Nelson Street

Thames Water were proposing to carry out Utility asset works on Nelson Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 13:25.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Nelson Street

Thames Water are proposing to carry out Utility asset works on Nelson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:56.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Nelson Street

Thames Water are proposing to carry out Utility asset works on Nelson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:59.

Thames Water logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Turner Street

Thames Water were proposing to carry out Utility asset works on Turner Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 13:11.

Thames Water logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Turner Street

Thames Water are proposing to carry out Utility asset works on Turner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 16:46.

Thames Water logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Turner Street

Thames Water are proposing to carry out Utility asset works on Turner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:00.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Ashfield Street

Thames Water were proposing to carry out Utility asset works on Ashfield Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 09:22.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Ashfield Street

Thames Water are proposing to carry out Utility asset works on Ashfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:50.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Ashfield Street

Thames Water are proposing to carry out Utility asset works on Ashfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:59.

LONG TERM
Between
4 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
St John Street

London Borough Of Islington are proposing to carry out Highway improvement works on St John Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 3 Apr 2025 at 11:45.

LONG TERM
Between
4 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Cowcross Street

London Borough Of Islington are proposing to carry out Highway improvement works on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 27 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 8 Apr 2025 at 13:19.

Transport for London (TfL) logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 14:17.

Transport for London (TfL) logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 15:43.

Thames Water logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Wick Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Wick Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:23.

Cadent Gas logo
Between
4 and 29 Aug 2025
Details
View Map
Share
London Road

Cadent Gas were proposing to carry out Utility asset works on London Road, Barking.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 15:17.

Cadent Gas logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Washington Road

Cadent Gas are proposing to carry out roadworks on Washington Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 16:00.

Thames Water logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Henderson Road

Thames Water are proposing to carry out Utility repair and maintenance works on Henderson Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:48.

London Borough Of Hackney logo
LONG TERM
Between
4 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Colvestone Crescent

London Borough Of Hackney are proposing to carry out Highway improvement works on Colvestone Crescent, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 30 Dec 2024 at 13:50.

Thames Water logo
LONG TERM
Between
4 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:52.

Thames Water logo
LONG TERM
Between
4 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:44.

Thames Water logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Park Grove Road

Thames Water are proposing to carry out Utility asset works on Park Grove Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:21.

Thames Water logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Granleigh Road

Thames Water are proposing to carry out Utility asset works on Granleigh Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:38.

Thames Water logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Mayville Road

Thames Water are proposing to carry out Utility asset works on Mayville Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:29.

Thames Water logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Woodlands Road

Thames Water are proposing to carry out Utility asset works on Woodlands Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:33.

Thames Water logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Short Road

Thames Water are proposing to carry out Utility asset works on Short Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:24.

Thames Water logo
LONG TERM
Between
4 Aug and 25 Oct 2025
Details
View Map
Share
Follow
Norman Road

Thames Water are proposing to carry out Utility asset works on Norman Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:16.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Derby Hill

Thames Water are proposing to carry out New service connection on Derby Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 14:22.

London Borough Of Lewisham logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Perry Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 9 Mar 2025 at 18:57.

London Borough Of Lewisham logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Perry Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 12 Mar 2025 at 05:47.

London Borough Of Lewisham logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Perry Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 12 Mar 2025 at 07:56.

Thames Water logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Plough Lane

Thames Water are proposing to carry out Utility asset works on Plough Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:16.

Thames Water logo
LONG TERM
Between
4 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Hillsboro Road

Thames Water are proposing to carry out roadworks on Hillsboro Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:46.

Thames Water logo
LONG TERM
Between
4 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:46.

Transport for London (TfL) logo
Between
4 and 9 Aug 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:09.

Thames Water logo
LONG TERM
Between
4 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Glengarry Road

Thames Water are proposing to carry out Remedial works on Glengarry Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:46.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Lewisham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Road, Lewisham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:50.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Greenwich South Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Greenwich South Street, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 06:18.

UK Power Networks Eastern & London logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Gomm Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 15:43.

UK Power Networks Eastern & London logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Lower Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 15:43.

UK Power Networks Eastern & London logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 15:43.

LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 12 May 2025 at 09:46.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Redcross Way

Thames Water are proposing to carry out Utility asset works on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 13:47.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Redcross Way

Thames Water are proposing to carry out Utility asset works on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 13:19.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Little Trinity Lane

Thames Water are proposing to carry out New service connection on Little Trinity Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 13:01.

Cadent Gas logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Wellington Street

Cadent Gas are proposing to carry out Utility asset works on Wellington Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 06:26.

Cadent Gas logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:21.

BT logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Fenchurch Street

BT were proposing to carry out Utility asset works on Fenchurch Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Apr 2025 at 11:05.

Vodafone logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
White Horse Road

Vodafone are proposing to carry out Utility repair and maintenance works on White Horse Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 9 May 2025 at 14:17.

Cadent Gas logo
Between
4 and 24 Aug 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:02.

Cadent Gas logo
Between
4 and 24 Aug 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 09:19.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Cornhill

Thames Water are proposing to carry out Utility repair and maintenance works on Cornhill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 11:39.

Thames Water logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Follow
Court Road

Thames Water are proposing to carry out Utility repair and maintenance works on Court Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 12:30.

Thames Water logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Follow
Court Road

Thames Water are proposing to carry out Utility repair and maintenance works on Court Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:24.

UK Power Networks Eastern & London logo
Between
5 and 31 Aug 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:40.

T-Mobile (UK) logo
Between
6 and 16 Aug 2025
Details
View Map
Share
Follow
Vyner Street

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 29 May 2025 at 15:31.

Thames Water logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Woodland Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Woodland Terrace, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 07:23.

Southern Gas Networks logo
Between
7 and 22 Aug 2025
Details
View Map
Share
Follow
Northumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:33.

UK Power Networks Eastern & London logo
Between
7 and 13 Aug 2025
Details
View Map
Share
Follow
Friary Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Friary Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 May 2025 at 15:39.

Thames Water logo
Between
8 and 18 Aug 2025
Details
View Map
Share
Follow
Broadfield Road

Thames Water are proposing to carry out New service connection on Broadfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 14:16.

Southern Gas Networks logo
Between
8 and 29 Aug 2025
Details
View Map
Share
Follow
Cornwall Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cornwall Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 09:34.

London Borough Of Southwark logo
LONG TERM
Between
8 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 13:24.

London Borough Of Southwark logo
Between
8 and 26 Aug 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 9 May 2025 at 12:41.

Thames Water logo
Between
8 and 11 Aug 2025
Details
View Map
Share
Follow
Southwark Street

Thames Water are proposing to carry out Utility repair and maintenance works on Southwark Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 16:12.

Southern Gas Networks logo
Between
10 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Westmoreland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmoreland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:47.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Shad Thames

Thames Water are proposing to carry out Utility repair and maintenance works on Shad Thames, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 09:33.

Thames Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Jacob Street

Thames Water were proposing to carry out Utility repair and maintenance works on Jacob Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 09:15.

City Of London Corporation logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Vine Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Vine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 19 May 2025 at 09:09.

City Of London Corporation logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Vine Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Vine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 21 May 2025 at 10:47.

Thames Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Tavistock Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Tavistock Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 07:44.

UK Power Networks Eastern & London logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Follow
Creechurch Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Creechurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:59.

Thames Water logo
Between
11 and 22 Aug 2025
Details
View Map
Share
Follow
Pintail Close

Thames Water are proposing to carry out Utility repair and maintenance works on Pintail Close, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:01.

Thames Water logo
Between
11 and 28 Aug 2025
Details
View Map
Share
Follow
Glaucus Street

Thames Water are proposing to carry out Utility repair and maintenance works on Glaucus Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 14:56.

BT logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Mill Row

BT are proposing to carry out Utility asset works on Mill Row, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 May 2025 at 13:38.

Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Senrab Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Senrab Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 25 Apr 2025 at 10:34.

Thames Water logo
Between
12 and 15 Aug 2025
Details
View Map
Share
Follow
Ravenhill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ravenhill Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 09:35.

Thames Water logo
Between
12 and 31 Aug 2025
Details
View Map
Share
Follow
Manchester Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manchester Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 11:12.

Thames Water logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Wilmount Street

Thames Water are proposing to carry out New service connection on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:54.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:42.

Transport for London (TfL) logo
LONG TERM
Between
13 Aug and 15 Sep 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 12:03.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 13:13.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:46.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 13:17.

Southern Gas Networks logo
Between
14 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Cumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 09:37.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
New Cross Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on New Cross Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 08:46.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 08:53.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 09:54.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 10:19.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 11:21.

Transport for London (TfL) logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:32.

UK Power Networks Eastern & London logo
Between
18 and 31 Aug 2025
Details
View Map
Share
Follow
Ealdham Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Ealdham Square, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 08:20.

UK Power Networks Eastern & London logo
Between
18 and 31 Aug 2025
Details
View Map
Share
Follow
Ealdham Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Ealdham Square, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 07:24.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Buckingham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 10:10.

Network Rail logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Deptford High Street

Network Rail are proposing to carry out Works for Rail Purposes on Deptford High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Apr 2025 at 13:10.

Royal Borough Of Greenwich logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Timbercroft Lane

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Timbercroft Lane, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 20 May 2025 at 08:52.

Southern Gas Networks logo
Between
18 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Ha Ha Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ha Ha Road, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Dec 2024 at 07:18.

Thames Water logo
LONG TERM
Between
18 Aug and 20 Oct 2025
Details
View Map
Share
Follow
Tuskar Street

Thames Water are proposing to carry out Utility asset works on Tuskar Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 06:58.

Thames Water logo
LONG TERM
Between
18 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Azof Street

Thames Water are proposing to carry out Utility asset works on Azof Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 21 May 2025 at 06:54.

Thames Water logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Mauritius Road

Thames Water are proposing to carry out New service connection on Mauritius Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 07:17.

Southern Gas Networks logo
Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
East Street

Southern Gas Networks are proposing to carry out New service connection on East Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 11:45.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Gainsford Street

Thames Water are proposing to carry out Utility repair and maintenance works on Gainsford Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 09:41.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Bazely Street

Cadent Gas are proposing to carry out Utility asset works on Bazely Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 14:12.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Bazely Street

Cadent Gas are proposing to carry out Utility asset works on Bazely Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 10:53.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:01.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:34.

Thames Water logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
Tudor Street

Thames Water are proposing to carry out Utility repair and maintenance works on Tudor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 11:26.

Vodafone logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
White Horse Road

Vodafone are proposing to carry out Utility repair and maintenance works on White Horse Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 May 2025 at 22:10.

City Of London Telecomms logo
Between
18 and 26 Aug 2025
Details
View Map
Share
Follow
Great Sutton Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 30 May 2025 at 10:54.

LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 2 Jun 2025 at 15:32.

LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 3 Jun 2025 at 08:31.

Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
High Street South

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on High Street South, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 19 May 2025 at 15:20.

Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
Pilgrims Way

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Pilgrims Way, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Newham on 19 May 2025 at 15:16.

Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
Alma Street

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Alma Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 27 May 2025 at 10:10.

Thames Water logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Station Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 08:19.

Thames Water logo
Between
19 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 10:19.

Between
19 and 23 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Apr 2025 at 11:46.

Between
19 and 23 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 3 Jun 2025 at 11:11.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 11:41.

London Borough Of Southwark logo
Between
20 and 27 Aug 2025
Details
View Map
Share
Townley Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Townley Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 27 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 27 Mar 2025 at 11:29.

London Borough Of Southwark logo
Between
20 and 29 Aug 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Apr 2025 at 14:26.

Thames Water logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Camberwell New Road

Thames Water were proposing to carry out Utility repair and maintenance works on Camberwell New Road, Myatt's Fields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 10:50.

Thames Water logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
Camberwell New Road

Thames Water are proposing to carry out Utility repair and maintenance works on Camberwell New Road, Myatt's Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 May 2025 at 21:18.

Thames Water logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
Camberwell New Road

Thames Water are proposing to carry out Utility repair and maintenance works on Camberwell New Road, Myatt's Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:02.

Electricity Network Company logo
Between
20 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 19 May 2025 at 11:45.

Electricity Network Company logo
Between
20 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 20 May 2025 at 10:51.

Electricity Network Company logo
Between
20 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 13:23.

Electricity Network Company logo
Between
20 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 23 May 2025 at 09:01.

Thames Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Aberdour Street

Thames Water are proposing to carry out Utility repair and maintenance works on Aberdour Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 18:15.

Thames Water logo
LONG TERM
Between
20 Aug and 12 Dec 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 11:18.

Thames Water logo
LONG TERM
Between
20 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 11:17.

London Borough Of Hackney logo
LONG TERM
Between
21 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Downham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Downham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 21 May 2025 at 13:34.

Thames Water logo
Between
23 and 30 Aug 2025
Details
View Map
Share
Follow
Cannon Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 16:30.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 16:32.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 14:36.

Thames Water logo
Between
24 Aug and 17 Sep 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gresham Road, Brixton Windrush, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 11:31.

Southern Gas Networks logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Glenwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 13:06.

Southern Gas Networks logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Glenwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 08:26.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 13:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 15:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 14:38.

Thames Water logo
Between
25 and 28 Aug 2025
Details
View Map
Share
Lavington Street

Thames Water were proposing to carry out New service connection on Lavington Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 May 2025 at 13:27.

UK Power Networks Eastern & London logo
Between
25 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Bury Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:58.

Thames Water logo
LONG TERM
Between
25 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Garfield Road

Thames Water are proposing to carry out Utility asset works on Garfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.

Thames Water logo
Between
25 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Vyner Street

Thames Water are proposing to carry out Utility asset works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 13:45.

Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Newington Green Road

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 23 May 2025 at 16:19.

Network Rail logo
Between
26 and 30 Aug 2025
Details
View Map
Share
Follow
Glasshouse Walk

Network Rail are proposing to carry out Works for Rail Purposes on Glasshouse Walk, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 May 2025 at 11:45.

Between
26 Aug and 6 Sep 2025
Details
View Map
Share
Follow
Ruscoe Road

London Borough Of Newham are proposing to carry out Section 50 on Ruscoe Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 13 May 2025 at 11:34.

London Borough Of Southwark logo
Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Grove Vale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 May 2025 at 12:56.

BT logo
LONG TERM
Between
27 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

BT are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 May 2025 at 08:11.

BT logo
LONG TERM
Between
27 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Redriff Road

BT are proposing to carry out Utility repair and maintenance works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 May 2025 at 08:11.

Between
27 Aug and 6 Sep 2025
Details
View Map
Share
Follow
Rathbone Street

London Borough Of Newham are proposing to carry out Section 50 on Rathbone Street, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 6 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 13 May 2025 at 11:36.

Between
27 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Lever Street

London Borough Of Islington are proposing to carry out Highway improvement works on Lever Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 23 May 2025 at 16:43.

Between
27 and 31 Aug 2025
Details
View Map
Share
Follow
Welfare Road

London Borough Of Newham are proposing to carry out Section 50 on Welfare Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 21 May 2025 at 16:35.

Network Rail logo
Between
28 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2025 at 10:38.

Network Rail logo
Between
28 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2025 at 09:10.

Thames Water logo
LONG TERM
Between
30 Aug and 11 Oct 2025
Details
View Map
Share
Follow
Belton Road

Thames Water are proposing to carry out Utility asset works on Belton Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:26.


Roadworks Map near to Isambard Mews, LONDON, E14 3XB (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 19:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Isambard Mews, LONDON, E14 3XB (45 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
MAJOR
  
SEYSSEL STREET 
(0.1 miles)
London Borough Of Tower Hamlets
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 14 Apr 2025 - 9 Jun 2025
0.1
Details
Share
Follow
2
Thames Water logo
KINGFIELD STREET 
(0.2 miles)
Thames Water
Permanent reinstatement - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.2
Details
Share
Follow
3
Lumen Technologies logo
GLENGALL GROVE 
(0.3 miles)
Lumen Technologies
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 4 Jun 2025
0.3
Details
Share
Follow
4
Virgin Media logo
CHIPKA STREET 
(0.4 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.4
Details
Share
Follow
5
BT logo
MARSH WALL 
(0.4 miles)
BT
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.4
Details
Share
Follow
6
Vodafone logo
TUNNEL AVENUE 
(0.5 miles)
Vodafone
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.5
Details
Share
Follow
7
UK Power Networks Eastern & London logo
URGENT
  
WESTFERRY ROAD 
(0.6 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
29 May 2025 10:11 - 31 May 2025 20:36
0.6
Details
Share
8
Transport for London (TfL) logo
MAJOR
  
BLACKWALL TUNNEL SOUTHERN APPROACH 
(0.6 miles)
Transport for London (TfL)
Highway repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 3 Jun 2025 - 4 Jun 2025
0.6
Details
Share
Follow
9
Transport for London (TfL) logo
MAJOR
  
BLACKWALL TUNNEL SOUTHERN APPROACH 
(0.6 miles)
Transport for London (TfL)
Highway repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 3 Jun 2025 - 4 Jun 2025
0.6
Details
Share
Follow
10
Thames Water logo
CASSILIS ROAD 
(0.6 miles)
Thames Water
Remedial works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 08:20
(Scheduled: 2 Jun 2025 - 3 Jun 2025)
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data