ROADWORKS SUMMARY
Hainault Road, LONDON, E11 1HA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hainault Road, E11 1HA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hainault Road, LONDON, E11 1HA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hainault Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Until
12 Jan 2025
Details
View Map
Share
Follow
Stoke Newington High Street

Transport for London (TfL) are carrying out roadworks on Stoke Newington High Street, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2023 at 08:00 and could run through until 12 January 2025. The works will impact the footway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 19:08.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2023 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 16 Aug 2024 at 12:35.

Essex County Council logo
LONG TERM
Until
4 May 2026
Details
View Map
Share
Follow
Station Way

Essex County Council are carrying out Highway improvement works on Station Way, Buckhurst Hill.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 April 2023 at 08:33 and could run through until 4 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Jul 2024 at 07:13.

LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Broadmead Road

London Borough Of Redbridge are carrying out Highway repair and maintenance works on Broadmead Road, Woodford Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2023 at 07:34 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 17 Jun 2024 at 12:01.

Thames Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Finsbury Park Road

Thames Water are carrying out Utility repair and maintenance works on Finsbury Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 08:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:03.

Thames Water logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Myddleton Avenue

Thames Water are carrying out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 09:30 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 12:50.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Queens Market

London Borough Of Newham are carrying out Highway improvement works on Queens Market, Upton Park, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 12 September 2023 at 22:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 17 Dec 2024 at 12:11.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2023 and 10 Oct 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.

LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 15 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 16 Dec 2024 at 14:08.

LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Westfield Avenue

London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 30 April 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 25 Oct 2024 at 11:37.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
South Access Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on South Access Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 15:29.

London Borough Of Hackney logo
LONG TERM
Between
15 Feb 2024 and 12 Jul 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.

Network Rail logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Bodney Road

Network Rail are carrying out Works for Rail Purposes on Bodney Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Dec 2024 at 12:09.

Network Rail logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Downs Park Road

Network Rail are carrying out Works for Rail Purposes on Downs Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 10:30 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 10:47.

LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2024 at 08:00 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 27 Sep 2024 at 16:00.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Dec 2024 at 10:44.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Dec 2024 at 10:44.

Thames Water logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Eade Road

Thames Water are carrying out Utility asset works on Eade Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2024 at 09:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2024 at 09:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Jul 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Curtain Road

Transport for London (TfL) are proposing to carry out roadworks on Curtain Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 13:20.

Thames Water logo
LONG TERM
Until
11 Feb 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 08:10 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 06:36.

London Borough Of Enfield logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Leeside Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Leeside Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 28 Jun 2024 at 14:16.

London Borough Of Enfield logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Meridian Way

London Borough Of Enfield are carrying out Highway improvement works on Meridian Way, Edmonton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 9 Oct 2024 at 09:36.

London Borough Of Enfield logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Glover Drive

London Borough Of Enfield are proposing to carry out Highway improvement works on Glover Drive, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 4 Jul 2024 at 15:51.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Valette Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Valette Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:50.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Morning Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Morning Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:29.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:30.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:26.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:48.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:43.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:44.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:42.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Spurstowe Terrace

London Borough Of Hackney are proposing to carry out Highway improvement works on Spurstowe Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:33.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:19.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Sigdon Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Sigdon Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:32.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:40.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:22.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 20 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 20 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Bow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 11:13.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:05.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 10:24.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:12.

LONG TERM
Between
15 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Sheringham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 10 Dec 2024 at 10:42.

LONG TERM
Between
15 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Dersingham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 10 Dec 2024 at 10:42.

Thames Water logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Thames Water are carrying out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 4 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Dec 2024 at 19:27.

LONG TERM
Between
1 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Auriga Mews

London Borough Of Islington are proposing to carry out Highway improvement works on Auriga Mews, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 25 Apr 2024 at 14:44.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
King Henry's Walk

London Borough Of Islington were proposing to carry out Highway improvement works on King Henry's Walk, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:51.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Grove North

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Grove North, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:53.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
St Jude Street

London Borough Of Islington were proposing to carry out Highway improvement works on St Jude Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:54.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Queen Margaret's Grove

London Borough Of Islington were proposing to carry out Highway improvement works on Queen Margaret's Grove, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:52.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:55.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:50.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Crossway

London Borough Of Islington were proposing to carry out Highway improvement works on Crossway, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:49.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Wolsey Road

London Borough Of Islington were proposing to carry out Highway improvement works on Wolsey Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:57.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:39.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:56.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Park

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Park, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:40.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Shellgrove Road

London Borough Of Islington were proposing to carry out Highway improvement works on Shellgrove Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:48.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green Road

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:38.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:35.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Ferntower Road

London Borough Of Islington were proposing to carry out Highway improvement works on Ferntower Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:37.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:41.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Pellerin Road

London Borough Of Islington were proposing to carry out Highway improvement works on Pellerin Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:47.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Boleyn Road

London Borough Of Islington were proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:46.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:45.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Barretts Grove

London Borough Of Islington were proposing to carry out Highway improvement works on Barretts Grove, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:44.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:42.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:43.

LONG TERM
Between
2 Sep 2024 and 25 Mar 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 25 March 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 20 Dec 2024 at 11:57.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:46.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:42.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:44.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 4 Sep 2024 at 15:10.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 16 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:10.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 16 September 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 10:58.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 16 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 13:02.

Transport for London (TfL) logo
LONG TERM
Between
19 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Aug 2024 at 14:15.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep 2024 and 2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 10:27.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 08:11.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway repair and maintenance works on Lower Lea Crossing, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:07.

Transport for London (TfL) logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Bow Road

Transport for London (TfL) are carrying out Highway improvement works on Bow Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 20:25.

Transport for London (TfL) logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 20:30.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 10:02.

Transport for London (TfL) logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Dec 2024 at 10:54.

Transport for London (TfL) logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Dec 2024 at 08:23.

LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Sep 2024 at 09:04.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep 2024 and 20 Mar 2025
Details
View Map
Share
Harbet Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 20 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 15 Aug 2024 at 15:29.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep 2024 and 20 Jul 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 21 Aug 2024 at 13:15.

Thames Water logo
LONG TERM
Until
9 Feb 2025
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:15 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 13:11.

Thames Water logo
LONG TERM
Until
14 Apr 2025
Details
View Map
Share
Follow
Cephas Street

Thames Water are carrying out Utility repair and maintenance works on Cephas Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:30 and could run through until 14 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:53.

Thames Water logo
LONG TERM
Between
21 Oct 2024 and 24 Feb 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 21 October 2024 and could run through until 24 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 14:03.

Thames Water logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works started on 21 October 2024 at 08:22 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 08:22.

London Borough Of Hackney logo
LONG TERM
Until
18 Jan 2025
Details
View Map
Share
Follow
Ainsworth Road

London Borough Of Hackney are carrying out Highway improvement works on Ainsworth Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:22 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:22.

London Borough Of Hackney logo
LONG TERM
Until
18 Jan 2025
Details
View Map
Share
Follow
Well Street

London Borough Of Hackney are carrying out Highway improvement works on Well Street, Hackney, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:21 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:21.

London Borough Of Hackney logo
LONG TERM
Until
18 Jan 2025
Details
View Map
Share
Follow
Frampton Park Road

London Borough Of Hackney are carrying out Highway improvement works on Frampton Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:22 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:22.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 21 Mar 2025
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 21 October 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:40.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 21 Mar 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 21 October 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:25.

Thames Water logo
LONG TERM
Between
22 Oct 2024 and 5 Apr 2025
Details
View Map
Share
Station Road

Thames Water were proposing to carry out Utility asset works on Station Road, Chingford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 5 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 08:31.

Thames Water logo
LONG TERM
Between
28 Oct 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Carpenters Road

Thames Water are proposing to carry out Utility asset works on Carpenters Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:58.

Thames Water logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Shrubland Road

Thames Water are proposing to carry out Utility asset works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Nov 2023 at 15:37.

London Borough Of Hackney logo
LONG TERM
Between
30 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Ainsworth Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Ainsworth Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 16:17.

London Borough Of Hackney logo
LONG TERM
Between
30 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Well Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Well Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 15:47.

London Borough Of Hackney logo
LONG TERM
Between
30 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Frampton Park Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Frampton Park Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 16:31.

Thames Water logo
LONG TERM
Between
31 Oct 2024 and 16 Mar 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 31 October 2024 and could run through until 16 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 14:09.

Thames Water logo
LONG TERM
Until
16 Mar 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works started on 31 October 2024 at 07:45 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 13:20.

Transport for London (TfL) logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Prestons Road Roundabout

Transport for London (TfL) are carrying out Highway improvement works on Prestons Road Roundabout, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 12:15.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 11:16.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The works started on 4 November 2024 at 00:00 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:32.

London Borough Of Hackney logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
London Fields West Side

London Borough Of Hackney are carrying out Highway improvement works on London Fields West Side, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:07 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Nov 2024 at 08:07.

London Borough Of Hackney logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are carrying out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:07 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Nov 2024 at 08:07.

London Borough Of Hackney logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Greenwood Road

London Borough Of Hackney are carrying out Highway improvement works on Greenwood Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:07 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Nov 2024 at 08:07.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
King Henry's Walk

London Borough Of Islington were proposing to carry out Highway improvement works on King Henry's Walk, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:14.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Grove North

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Grove North, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:17.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
St Jude Street

London Borough Of Islington were proposing to carry out Highway improvement works on St Jude Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:17.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Queen Margaret's Grove

London Borough Of Islington were proposing to carry out Highway improvement works on Queen Margaret's Grove, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:15.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:18.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:13.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Crossway

London Borough Of Islington were proposing to carry out Highway improvement works on Crossway, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:12.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Wolsey Road

London Borough Of Islington were proposing to carry out Highway improvement works on Wolsey Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:20.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:28.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:19.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Park

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Park, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:50.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Shellgrove Road

London Borough Of Islington were proposing to carry out Highway improvement works on Shellgrove Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:11.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green Road

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:49.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:47.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Ferntower Road

London Borough Of Islington were proposing to carry out Highway improvement works on Ferntower Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:48.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:53.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Pellerin Road

London Borough Of Islington were proposing to carry out Highway improvement works on Pellerin Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:00.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Boleyn Road

London Borough Of Islington were proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:58.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:57.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Barretts Grove

London Borough Of Islington were proposing to carry out Highway improvement works on Barretts Grove, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:56.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:54.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:55.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Grove Park

Cadent Gas were proposing to carry out Utility asset works on Grove Park, Wanstead, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 23 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:01.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 07:49.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 11:08.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Montalt Road

Cadent Gas are proposing to carry out Utility asset works on Montalt Road, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:54.

Thames Water logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Heigham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Heigham Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:33.

Thames Water logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Burges Road

Thames Water are proposing to carry out Utility repair and maintenance works on Burges Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:32.

LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are carrying out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 10 Dec 2024 at 08:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Edison Close

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2024 at 14:20.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Edison Close

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Sep 2024 at 16:19.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 9 Mar 2025
Details
View Map
Share
Follow
Hurst Road

Cadent Gas are proposing to carry out Utility asset works on Hurst Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 15:52.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 9 Mar 2025
Details
View Map
Share
Hurst Road

Cadent Gas were proposing to carry out Utility asset works on Hurst Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 9 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 13:59.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 16:12.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Forest Road

Cadent Gas were proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 13:57.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 6 Apr 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:11.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 16:20.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:27.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 28 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 12:36.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 28 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:22.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.

These works are categorised as Major.

The works will start on or after 19 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 13:24.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, London.

These works are categorised as Major.

The works started on 19 November 2024 at 00:00 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 06:58.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:03.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:03.

Thames Water logo
LONG TERM
Between
25 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 09:44.

London Borough Of Hackney logo
LONG TERM
Between
26 Nov 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Brownlow Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brownlow Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:29.

London Borough Of Hackney logo
LONG TERM
Between
26 Nov 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Scriven Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Scriven Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:31.

London Borough Of Hackney logo
LONG TERM
Between
26 Nov 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Shrubland Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Shrubland Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:28.

LONG TERM
Between
28 Nov 2024 and 6 Mar 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Brunswick Street

Cadent Gas are proposing to carry out Utility asset works on Brunswick Street, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Jun 2024 at 10:52.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 15:36.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Feb 2025
Details
View Map
Share
Follow
St Mary Road

Cadent Gas are proposing to carry out Utility asset works on St Mary Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Jun 2024 at 10:48.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Feb 2025
Details
View Map
Share
Follow
St Mary Road

Cadent Gas are proposing to carry out Utility asset works on St Mary Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 14:28.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Feb 2025
Details
View Map
Share
Follow
St Mary Road

Cadent Gas are proposing to carry out Utility asset works on St Mary Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:56.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:33.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:37.

London Borough Of Hackney logo
LONG TERM
Between
6 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 7 Oct 2024 at 09:57.

London Borough Of Hackney logo
LONG TERM
Between
6 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:58.

Cadent Gas logo
LONG TERM
Between
6 Dec 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Hatch Lane

Cadent Gas are proposing to carry out Utility asset works on Hatch Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 15:15.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Connaught Avenue

Thames Water are proposing to carry out roadworks on Connaught Avenue, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:26.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Springfield Road

Thames Water are proposing to carry out roadworks on Springfield Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Nelson Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Nelson Street, East Ham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 09:48.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 3 Mar 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 15:18.

LONG TERM
Until
22 Feb 2025
Details
View Map
Share
Follow
Rectory Road

London Borough Of Newham are carrying out Highway improvement works on Rectory Road, Manor Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:00 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 9 Dec 2024 at 08:03.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Hillcroft Road

Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 15:35.

London Borough Of Hackney logo
LONG TERM
Between
11 Dec 2024 and 28 Feb 2025
Details
View Map
Share
Follow
London Fields West Side

London Borough Of Hackney are proposing to carry out Highway improvement works on London Fields West Side, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 7 Oct 2024 at 09:53.

London Borough Of Hackney logo
Between
11 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Eleanor Road (North)

London Borough Of Hackney are proposing to carry out Highway improvement works on Eleanor Road (North), Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:36.

London Borough Of Hackney logo
LONG TERM
Between
11 Dec 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Greenwood Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Greenwood Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Oct 2024 at 09:02.

Cadent Gas logo
Between
13 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:12.

Cadent Gas logo
Between
13 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:00.

London Borough Of Hackney logo
LONG TERM
Between
13 Dec 2024 and 14 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:24.

Transport for London (TfL) logo
LONG TERM
Between
16 Dec 2024 and 26 Jan 2025
Details
View Map
Share
Follow
Leamouth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Leamouth Road Roundabout, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 26 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 11:52.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Oakfield Road

Cadent Gas are carrying out Utility repair and maintenance works on Oakfield Road, Hornsey, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 December 2024 at 12:19 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 15:08.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Church Road

Thames Water are carrying out Utility repair and maintenance works on Church Road, Tottenham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 December 2024 at 13:44 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 15:08.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Ethel Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:45.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Dunlace Road

Thames Water are proposing to carry out New service connection on Dunlace Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:33.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Langham Road

Thames Water are proposing to carry out New service connection on Langham Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 16:20.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Carlingford Road

Thames Water are proposing to carry out New service connection on Carlingford Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 07:59.

Transport for London (TfL) logo
LONG TERM
Between
25 Dec 2024 and 26 Jan 2025
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 December 2024 and could run through until 26 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 07:30.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Ley Street

Cadent Gas are carrying out Utility repair and maintenance works on Ley Street, Ilford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 December 2024 at 11:22 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 14:05.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Cadent Gas are carrying out Utility repair and maintenance works on Blackwall Tunnel Northern Approach, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 December 2024 at 22:36 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Dec 2024 at 05:54.

BT logo
Finishing
Tuesday
Details
View Map
Share
Follow
Grosvenor Avenue

BT are proposing to carry out Utility asset works on Grosvenor Avenue, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 26 Sep 2024 at 07:52.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Horns Road

Cadent Gas are carrying out Utility repair and maintenance works on Horns Road, Barkingside, Ilford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 December 2024 at 12:57 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 13:03.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Perrymans Farm Road

Cadent Gas are carrying out Utility repair and maintenance works on Perrymans Farm Road, Barkingside, Ilford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 December 2024 at 13:04 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 13:06.

BT logo
Finishing
Tuesday
Details
View Map
Share
Green Lanes

BT were proposing to carry out Utility asset works on Green Lanes, Hornsey, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Oct 2024 at 08:35.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Greenleaf Road

Thames Water are carrying out Utility repair and maintenance works on Greenleaf Road, Walthamstow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 December 2024 at 15:09 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Dec 2024 at 15:09.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Grosvenor Avenue

BT are proposing to carry out Utility repair and maintenance works on Grosvenor Avenue, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Oct 2024 at 10:12.

Cadent Gas logo
Between
30 Dec 2024 and 26 Jan 2025
Details
View Map
Share
Lambourne Road

Cadent Gas were proposing to carry out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 26 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:25.

Thames Water logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Vernon Road

Thames Water are proposing to carry out Utility asset works on Vernon Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 10:01.

Thames Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 10:01.

Thames Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 10:48.

Thames Water logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Erskine Road

Thames Water are proposing to carry out Utility asset works on Erskine Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:52.

Thames Water logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Erskine Road

Thames Water are proposing to carry out Utility asset works on Erskine Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:45.

Thames Water logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Somers Road

Thames Water are proposing to carry out Utility asset works on Somers Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:44.

Thames Water logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Somers Road

Thames Water are proposing to carry out Utility asset works on Somers Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:56.

Thames Water logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Avon Road

Thames Water are proposing to carry out Utility asset works on Avon Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 09:47.

Thames Water logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Avon Road

Thames Water are proposing to carry out Utility asset works on Avon Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 13:40.

Thames Water logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Fyfield Road

Thames Water are proposing to carry out Utility asset works on Fyfield Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 10:08.

Thames Water logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Fyfield Road

Thames Water are proposing to carry out Utility asset works on Fyfield Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 12:45.

Thames Water logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Forest Road

Thames Water are proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 15:50.

Thames Water logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Rosebank Grove

Thames Water are proposing to carry out Utility asset works on Rosebank Grove, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 15:55.

Thames Water logo
LONG TERM
Between
2 Jan and 13 Mar 2025
Details
View Map
Share
Follow
Winsbeach

Thames Water are proposing to carry out Utility asset works on Winsbeach, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:49.

Thames Water logo
LONG TERM
Between
2 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Ulverston Road

Thames Water are proposing to carry out Utility asset works on Ulverston Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 15:53.

Thames Water logo
LONG TERM
Between
2 Jan and 13 Mar 2025
Details
View Map
Share
Follow
Castleton Road

Thames Water are proposing to carry out Utility asset works on Castleton Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:55.

Thames Water logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Grantock Road

Thames Water are proposing to carry out Utility asset works on Grantock Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 12:49.

Thames Water logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Grantock Road

Thames Water are proposing to carry out Utility asset works on Grantock Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 08:48.

Thames Water logo
LONG TERM
Between
2 Jan and 13 Mar 2025
Details
View Map
Share
Follow
Grantock Road

Thames Water are proposing to carry out Utility asset works on Grantock Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:53.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Foyle Road

Thames Water are proposing to carry out Utility repair and maintenance works on Foyle Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 07:48.

Cadent Gas logo
Between
3 and 24 Jan 2025
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:11.

Cadent Gas logo
Between
3 and 24 Jan 2025
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:01.

Thames Water logo
Between
3 and 6 Jan 2025
Details
View Map
Share
Follow
The Forest

Thames Water are proposing to carry out Remedial works on The Forest, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:16.

Thames Water logo
LONG TERM
Between
3 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Westbury Road

Thames Water are proposing to carry out Utility asset works on Westbury Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Nov 2023 at 14:13.

Cadent Gas logo
Between
4 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Movers Lane

Cadent Gas are proposing to carry out Utility asset works on Movers Lane, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:36.

Cadent Gas logo
Between
4 Jan and 3 Feb 2025
Details
View Map
Share
Movers Lane

Cadent Gas were proposing to carry out Utility asset works on Movers Lane, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:23.

Transport for London (TfL) logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 16:46.

Transport for London (TfL) logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 16:49.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Freemasons Road

Cadent Gas are proposing to carry out Utility asset works on Freemasons Road, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 15:44.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Freemasons Road

Cadent Gas are proposing to carry out Utility asset works on Freemasons Road, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 14:13.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Barking Road

Cadent Gas were proposing to carry out Utility asset works on Barking Road, Canning Town, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:40.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:21.

Cadent Gas logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:11.

LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Manor Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Oct 2024 at 11:50.

Thames Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Vallance Road

Thames Water are proposing to carry out Utility repair and maintenance works on Vallance Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 12:57.

Thames Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Vallance Road

Thames Water are proposing to carry out Utility repair and maintenance works on Vallance Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 10:15.

LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Wodeham Gardens

London Borough Of Tower Hamlets were proposing to carry out roadworks on Wodeham Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 11:14.

LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Old Montague Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Old Montague Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 09:21.

LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 09:22.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Woodside Road

BT are proposing to carry out Utility repair and maintenance works on Woodside Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Oct 2024 at 11:01.

Thames Water logo
LONG TERM
Between
6 Jan and 25 May 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:30.

Thames Water logo
LONG TERM
Between
6 Jan and 24 May 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 24 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 14:05.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Charlemont Road

Thames Water are proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:43.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Charlemont Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out roadworks on Charlemont Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 19 Dec 2024 at 09:40.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
High Street South

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on High Street South, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 3 Dec 2024 at 14:53.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
High Street South

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on High Street South, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Dec 2024 at 10:53.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Dongola Road

BT were proposing to carry out Utility repair and maintenance works on Dongola Road, Plaistow, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Oct 2024 at 13:43.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
High Street South

Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:53.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Hockley Avenue

Thames Water are proposing to carry out Utility asset works on Hockley Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:01.

Thames Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ernald Avenue

Thames Water are proposing to carry out Utility asset works on Ernald Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:37.

Thames Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Bartle Avenue

Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:38.

Thames Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Katherine Road

Thames Water are proposing to carry out Utility asset works on Katherine Road, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 12:47.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:56.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 10:00.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
London Road

Cadent Gas were proposing to carry out Utility asset works on London Road, Barking.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 16:27.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Dorset Road

Thames Water were proposing to carry out Utility repair and maintenance works on Dorset Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:55.

Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Dove Road

London Borough Of Islington are proposing to carry out Highway improvement works on Dove Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 25 Sep 2024 at 09:36.

LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Mildmay Park

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Park, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Dec 2024 at 07:47.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Mildmay Park

G. Network Communications are proposing to carry out Remedial works on Mildmay Park, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 23 Dec 2024 at 08:21.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Dames Road

Thames Water were proposing to carry out Utility repair and maintenance works on Dames Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 13:37.

Cadent Gas logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.

Cadent Gas logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Richmond Road

Cadent Gas were proposing to carry out Utility asset works on Richmond Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:31.

BT logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Lea Bridge Road

BT are proposing to carry out Utility repair and maintenance works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Nov 2024 at 10:15.

BT logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Lea Bridge Road

BT are proposing to carry out Utility repair and maintenance works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Dec 2024 at 13:58.

Thames Water logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Montague Road

Thames Water are proposing to carry out Utility asset works on Montague Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:57.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Myddleton Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:47.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Blake Hall Crescent

Thames Water are proposing to carry out Utility asset works on Blake Hall Crescent, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 11:30.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Blake Hall Crescent

Thames Water are proposing to carry out Utility asset works on Blake Hall Crescent, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 13:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Clarendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Clarendon Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:37.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Clarendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Clarendon Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 12:47.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Clarendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Clarendon Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:00.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Cleveland Park Avenue

Thames Water are proposing to carry out Utility asset works on Cleveland Park Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:22.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 25 Jun 2025
Details
View Map
Share
Follow
Monument Way

Transport for London (TfL) are proposing to carry out Section 50 on Monument Way, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 14:33.

Transport for London (TfL) logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
Monument Way

Transport for London (TfL) are proposing to carry out Section 50 on Monument Way, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 10:56.

London Borough Of Haringey logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Park View Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Park View Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 21 Nov 2024 at 12:10.

London Borough Of Haringey logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Park View Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Park View Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 21 Nov 2024 at 14:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Gloucester Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 08:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Gloucester Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 12:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 5 Mar 2025
Details
View Map
Share
Follow
Priory Court

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Priory Court, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 16:45.

Thames Water logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Turpins Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Turpins Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 12:46.

Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Katherine Road

London Borough Of Newham are proposing to carry out Highway improvement works on Katherine Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 18 Dec 2024 at 09:03.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Elsenham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Elsenham Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 13:41.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Lansdowne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 13:25.

Thames Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 10:37.

Thames Water logo
Between
9 and 24 Jan 2025
Details
View Map
Share
Follow
Barking Road

Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:16.

Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Lathom Road

London Borough Of Newham are proposing to carry out Highway improvement works on Lathom Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 14 Nov 2024 at 12:02.

Thames Water logo
Between
10 and 17 Jan 2025
Details
View Map
Share
High Street North

Thames Water were proposing to carry out Utility asset works on High Street North, Manor Park, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 08:50.

Transport for London (TfL) logo
LONG TERM
Between
11 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 15:07.

Transport for London (TfL) logo
LONG TERM
Between
11 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:02.

Transport for London (TfL) logo
LONG TERM
Between
11 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.

Transport for London (TfL) logo
LONG TERM
Between
11 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:03.

Thames Water logo
Between
12 and 14 Jan 2025
Details
View Map
Share
Rushcroft Road

Thames Water were proposing to carry out roadworks on Rushcroft Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 08:47.

Thames Water logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
Upper North Street

Thames Water are proposing to carry out Utility asset works on Upper North Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:41.

Thames Water logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
Upper North Street

Thames Water are proposing to carry out Utility asset works on Upper North Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:38.

Cadent Gas logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Tollgate Road

Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, Beckton, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 13:02.

Cadent Gas logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Tollgate Road

Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, Beckton, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:04.

Thames Water logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:29.

Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Priory Road

London Borough Of Newham are proposing to carry out Highway improvement works on Priory Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 18 Dec 2024 at 09:03.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Gascoigne Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Gascoigne Road, Barking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 17 Dec 2024 at 10:01.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Pritchards Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Pritchards Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 10:09.

London Borough Of Hackney logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Ada Street

London Borough Of Hackney are proposing to carry out New service connection on Ada Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 5 Dec 2024 at 09:16.

London Borough Of Hackney logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Ada Street

London Borough Of Hackney are proposing to carry out New service connection on Ada Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 5 Dec 2024 at 11:50.

London Borough Of Hackney logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Stean Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Stean Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 19 Dec 2024 at 10:55.

London Borough Of Hackney logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Dunston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Dunston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 19 Dec 2024 at 10:59.

Thames Water logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:46.

London Borough Of Hackney logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Barnabas Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Barnabas Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Dec 2024 at 19:06.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Utility repair and maintenance works on Claremont Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 11:03.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Apr 2025
Details
View Map
Share
Follow
Myddleton Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 13:49.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Capworth Street

BT are proposing to carry out Utility repair and maintenance works on Capworth Street, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Nov 2024 at 14:52.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Heysham Road

BT are proposing to carry out Utility asset works on Heysham Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:56.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Manchester Road

BT are proposing to carry out Utility asset works on Manchester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:56.

BT logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Leyton Green Road

BT were proposing to carry out Utility repair and maintenance works on Leyton Green Road, Leyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by BT on 21 Oct 2024 at 11:31.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Leyton Green Road

BT were proposing to carry out Utility repair and maintenance works on Leyton Green Road, Leyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by BT on 22 Oct 2024 at 16:24.

Thames Water logo
Between
13 and 14 Jan 2025
Details
View Map
Share
Follow
Ermine Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Ermine Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 16:30.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Selborne Road

Thames Water are proposing to carry out roadworks on Selborne Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:45.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Rowley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rowley Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 09:20.

BT logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Forest Rise

BT were proposing to carry out Utility repair and maintenance works on Forest Rise, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 21 Oct 2024 at 11:35.

BT logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Forest Rise

BT are proposing to carry out Utility repair and maintenance works on Forest Rise, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 14:33.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Fairbourne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fairbourne Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 11:26.

London Borough Of Haringey logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Park View Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Park View Road, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 21 Nov 2024 at 14:25.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 08:25.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 11:02.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Dec 2024 at 09:19.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 14:15.

Thames Water logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Connaught Road

Thames Water are proposing to carry out roadworks on Connaught Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:15.

Thames Water logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Connaught Road

Thames Water were proposing to carry out roadworks on Connaught Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:20.

BT logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Durham Road

BT are proposing to carry out Utility repair and maintenance works on Durham Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Nov 2024 at 15:44.

Network Rail logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Strode Road

Network Rail are proposing to carry out Works for Rail Purposes on Strode Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2024 at 11:33.

Network Rail logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Strode Road

Network Rail are proposing to carry out Works for Rail Purposes on Strode Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Nov 2024 at 09:18.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Ronald Avenue

BT are proposing to carry out Utility asset works on Ronald Avenue, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Oct 2024 at 10:29.

Thames Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Talwin Street

Thames Water are proposing to carry out Remedial works on Talwin Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 12:38.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Overbury Road

BT are proposing to carry out Utility asset works on Overbury Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 09:26.

Thames Water logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:17.

Cadent Gas logo
Between
17 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:20.

Cadent Gas logo
Between
17 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 11:59.

Thames Water logo
Between
17 and 19 Jan 2025
Details
View Map
Share
Follow
Low Hall Lane

Thames Water are proposing to carry out Utility asset works on Low Hall Lane, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:32.

Thames Water logo
LONG TERM
Between
18 Jan and 24 May 2025
Details
View Map
Share
Follow
Forest Road

Thames Water are proposing to carry out Utility repair and maintenance works on Forest Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 24 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 09:54.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:43.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Blackwall Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 09:52.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 14:27.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 13:47.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:10.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 14:27.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 13:51.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Leamouth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Leamouth Road Roundabout, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 09:55.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Leamouth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Leamouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 09:45.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Leamouth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Leamouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 09:48.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Silvocea Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Silvocea Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:40.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 14:26.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 13:56.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 14:26.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 13:53.

LONG TERM
Between
20 Jan and 15 Mar 2025
Details
View Map
Share
Gainsborough Road

London Borough Of Newham were proposing to carry out Highway improvement works on Gainsborough Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 15 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 19 Dec 2024 at 12:59.

Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Keppel Road

London Borough Of Newham are proposing to carry out Highway improvement works on Keppel Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 14 Nov 2024 at 12:03.

Cadent Gas logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Highbridge Road

Cadent Gas were proposing to carry out Utility asset works on Highbridge Road, Barking.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 16:27.

Cadent Gas logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Station Parade

Cadent Gas are proposing to carry out Remedial works on Station Parade, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:27.

LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Rotherfield Street

London Borough Of Islington were proposing to carry out Highway improvement works on Rotherfield Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 20 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Dec 2024 at 08:53.

LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 09:25.

LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 11:06.

LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Essex Road

London Borough Of Islington were proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 20 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Dec 2024 at 08:49.

LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Canonbury Street

London Borough Of Islington were proposing to carry out Highway improvement works on Canonbury Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 20 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Dec 2024 at 08:52.

Transport for London (TfL) logo
Between
20 and 21 Jan 2025
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 09:26.

Thames Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Hitcham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hitcham Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:13.

Thames Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Hitcham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hitcham Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 16:08.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 12:00.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Mafeking Avenue

Cadent Gas were proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:47.

Cadent Gas logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 13:50.

Cadent Gas logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:47.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 14:00.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Wards Road

Cadent Gas were proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 10 Apr 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Beehive Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:15.

UK Power Networks Eastern & London logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Keswick Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Keswick Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 13:00.

UK Power Networks Eastern & London logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Keswick Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Keswick Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 12:45.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Gainsford Road

Thames Water are proposing to carry out Utility asset works on Gainsford Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2023 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Woodford Bridge Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Woodford Bridge Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.

Thames Water logo
LONG TERM
Between
20 Jan and 24 Mar 2025
Details
View Map
Share
Follow
Winsbeach

Thames Water are proposing to carry out Utility asset works on Winsbeach, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 10:18.

Thames Water logo
Between
20 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Woodford New Road

Thames Water are proposing to carry out Utility asset works on Woodford New Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 15:22.

Thames Water logo
LONG TERM
Between
20 Jan and 24 Mar 2025
Details
View Map
Share
Follow
Belle Vue Road

Thames Water are proposing to carry out Utility asset works on Belle Vue Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 14:35.

London Borough Of Enfield logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Victoria Road

London Borough Of Enfield are proposing to carry out Remedial works on Victoria Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 7 Oct 2024 at 11:41.

London Borough Of Enfield logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Victoria Road

London Borough Of Enfield are proposing to carry out Remedial works on Victoria Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 20 Sep 2024 at 10:41.

Thames Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Shrubbery Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shrubbery Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 12:05.

LONG TERM
Between
21 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Cavell Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cavell Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 12 Nov 2024 at 11:53.

LONG TERM
Between
21 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Maples Place

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Maples Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 12 Nov 2024 at 11:55.

Transport for London (TfL) logo
Between
21 Jan and 12 Feb 2025
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 10:07.

Transport for London (TfL) logo
Between
21 Jan and 12 Feb 2025
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:46.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 11:53.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 17:12.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 12:09.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 14:13.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:50.

Thames Water logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Fords Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:57.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Dyson Road

London Borough Of Newham are proposing to carry out Highway improvement works on Dyson Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 12:58.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Carnarvon Road

London Borough Of Newham are proposing to carry out Highway improvement works on Carnarvon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 12:41.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Warwick Road

London Borough Of Newham were proposing to carry out Highway improvement works on Warwick Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 18 Dec 2024 at 09:18.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Atherton Road

London Borough Of Newham were proposing to carry out Highway improvement works on Atherton Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 18 Dec 2024 at 09:19.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Palmerston Road

London Borough Of Newham were proposing to carry out Highway improvement works on Palmerston Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 18 Dec 2024 at 09:20.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Westbury Road

London Borough Of Newham were proposing to carry out Highway improvement works on Westbury Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 18 Dec 2024 at 09:19.

UK Power Networks Eastern & London logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Widecombe Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Widecombe Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 10:00.

UK Power Networks Eastern & London logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Widecombe Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Widecombe Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Dec 2024 at 15:00.

Essex County Council logo
Between
24 and 26 Jan 2025
Details
View Map
Share
Follow
Palace Gardens

Essex County Council are proposing to carry out Highway improvement works on Palace Gardens, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 13:02.

Thames Water logo
Between
26 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Coopers Close

Thames Water are proposing to carry out roadworks on Coopers Close, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 12:23.

Transport for London (TfL) logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Tidal Basin Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tidal Basin Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 14:57.

Thames Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Ethel Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:44.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Stonewall

Thames Water were proposing to carry out roadworks on Stonewall, Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:20.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:21.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:03.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Waghorn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Waghorn Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:49.

BT logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Grangewood Street

BT were proposing to carry out Utility asset works on Grangewood Street, East Ham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Nov 2024 at 08:57.

Hyperoptic logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Dunn Street

Hyperoptic are proposing to carry out Utility asset works on Dunn Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 24 Dec 2024 at 13:31.

Thames Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Queens Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queens Drive, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 14:43.

Thames Water logo
Between
27 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 10:06.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Beehive Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 14:00.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Chesterfield Gardens

Thames Water are proposing to carry out New service connection on Chesterfield Gardens, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:09.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Shrubland Road

Thames Water are proposing to carry out Utility asset works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2023 at 15:27.

London Borough Of Enfield logo
LONG TERM
Between
27 Jan and 26 Oct 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 28 Oct 2024 at 14:28.

Thames Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Bethell Avenue

Thames Water were proposing to carry out roadworks on Bethell Avenue, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:31.

Thames Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Kimberley Road

Thames Water were proposing to carry out roadworks on Kimberley Road, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:32.

Thames Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Higham Road

Thames Water are proposing to carry out Remedial works on Higham Road, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:45.

Thames Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Uphall Road

Thames Water were proposing to carry out Utility repair and maintenance works on Uphall Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 15:48.

Transport for London (TfL) logo
Between
29 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Median Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Median Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2024 at 11:45.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:24.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 11:59.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Gooseley Lane

Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:25.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Gooseley Lane

Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:21.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:24.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:18.

Cadent Gas logo
LONG TERM
Between
3 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:40.

Cadent Gas logo
LONG TERM
Between
3 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:19.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:27.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:23.

Thames Water logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
High Street South

Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:59.

Thames Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Southchurch Road

Thames Water were proposing to carry out roadworks on Southchurch Road, East Ham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:54.

Thames Water logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Barking Road

Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 09:18.

Thames Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Hockley Avenue

Thames Water are proposing to carry out Utility asset works on Hockley Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 15:18.

Thames Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Barking Road

Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 09:32.

Thames Water logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Barking Road

Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:15.

Thames Water logo
LONG TERM
Between
3 Feb and 21 Apr 2025
Details
View Map
Share
Follow
Waterloo Gardens

Thames Water are proposing to carry out Utility asset works on Waterloo Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:06.

Thames Water logo
LONG TERM
Between
3 Feb and 21 Apr 2025
Details
View Map
Share
Follow
Waterloo Gardens

Thames Water are proposing to carry out Utility asset works on Waterloo Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 17:28.

Thames Water logo
LONG TERM
Between
3 Feb and 21 Apr 2025
Details
View Map
Share
Russia Lane

Thames Water were proposing to carry out Utility asset works on Russia Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:41.

Thames Water logo
LONG TERM
Between
3 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Russia Lane

Thames Water are proposing to carry out Utility asset works on Russia Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:41.

Thames Water logo
LONG TERM
Between
3 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Russia Lane

Thames Water are proposing to carry out Utility asset works on Russia Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 17:25.

Thames Water logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:30.

Thames Water logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Winter Avenue

Thames Water are proposing to carry out Utility asset works on Winter Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 22:58.

Thames Water logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Ron Leighton Way

Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:16.

Thames Water logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out Utility asset works on St Johns Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:21.

Thames Water logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Grangewood Street

Thames Water are proposing to carry out Utility asset works on Grangewood Street, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:23.

Thames Water logo
LONG TERM
Between
3 Feb and 21 Apr 2025
Details
View Map
Share
Follow
Vyner Street

Thames Water are proposing to carry out Remedial works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:40.

Thames Water logo
LONG TERM
Between
3 Feb and 21 Apr 2025
Details
View Map
Share
Follow
Vyner Street

Thames Water are proposing to carry out Remedial works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 17:09.

Thames Water logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Ward Road

Thames Water are proposing to carry out Utility asset works on Ward Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:47.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
King Henry's Walk

London Borough Of Islington are proposing to carry out Highway improvement works on King Henry's Walk, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:18.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Grove North

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Grove North, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:29.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
St Jude Street

London Borough Of Islington are proposing to carry out Highway improvement works on St Jude Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:15.

LONG TERM
Between
3 Feb and 19 Jul 2025
Details
View Map
Share
Follow
Leyton Road

London Borough Of Newham are proposing to carry out Highway improvement works on Leyton Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 19 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 23 Dec 2024 at 10:56.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Queen Margaret's Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Queen Margaret's Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:13.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:55.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:53.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Crossway

London Borough Of Islington are proposing to carry out Highway improvement works on Crossway, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 26 Nov 2024 at 21:13.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Wolsey Road

London Borough Of Islington are proposing to carry out Highway improvement works on Wolsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:15.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:07.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Park

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Park, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:19.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Shellgrove Road

London Borough Of Islington are proposing to carry out Highway improvement works on Shellgrove Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 26 Nov 2024 at 21:17.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green Road

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:27.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:08.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Ferntower Road

London Borough Of Islington are proposing to carry out Highway improvement works on Ferntower Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:49.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:09.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Pellerin Road

London Borough Of Islington are proposing to carry out Highway improvement works on Pellerin Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 26 Nov 2024 at 20:48.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:25.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Matthias Road

London Borough Of Islington are proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:52.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Barretts Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Barretts Grove, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 26 Nov 2024 at 21:03.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:12.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Matthias Road

London Borough Of Islington are proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:50.

Cadent Gas logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 13:30.

Cadent Gas logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:15.

Cadent Gas logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 09:30.

UK Power Networks Eastern & London logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Castleview Gardens

UK Power Networks Eastern & London are proposing to carry out roadworks on Castleview Gardens, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 11:33.

UK Power Networks Eastern & London logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Ambleside Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Ambleside Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 10:00.

UK Power Networks Eastern & London logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Ambleside Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Ambleside Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Dec 2024 at 15:00.

BT logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Oakhurst Gardens

BT are proposing to carry out Utility repair and maintenance works on Oakhurst Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Nov 2024 at 15:39.

BT logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Oakhurst Close

BT are proposing to carry out Utility repair and maintenance works on Oakhurst Close, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Nov 2024 at 15:43.

BT logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Oakhurst Close

BT are proposing to carry out Utility repair and maintenance works on Oakhurst Close, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Nov 2024 at 11:11.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Oakleafe Gardens

Cadent Gas were proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 2 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:05.

Thames Water logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Rolls Park Road

Thames Water were proposing to carry out Utility repair and maintenance works on Rolls Park Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:21.

Thames Water logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Rolls Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rolls Park Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:29.

Essex County Council logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Field Close

Essex County Council are proposing to carry out Highway improvement works on Field Close, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 08:27.

Essex County Council logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Broadfield Way

Essex County Council are proposing to carry out Highway improvement works on Broadfield Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 08:26.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Cart Lane

Thames Water are proposing to carry out roadworks on Cart Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:27.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Buxton Road

Thames Water are proposing to carry out roadworks on Buxton Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 14:59.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Garfield Road

Thames Water are proposing to carry out roadworks on Garfield Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:13.

London Borough Of Enfield logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
South Eastern Avenue

London Borough Of Enfield are proposing to carry out Remedial works on South Eastern Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 20 Sep 2024 at 10:44.

London Borough Of Enfield logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
South Eastern Avenue

London Borough Of Enfield are proposing to carry out Remedial works on South Eastern Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 7 Oct 2024 at 11:42.

UK Power Networks Eastern & London logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Victoria Road

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Victoria Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 12:22.

Transport for London (TfL) logo
Between
4 and 8 Feb 2025
Details
View Map
Share
Follow
Mile End Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mile End Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 11:17.

Transport for London (TfL) logo
Between
4 and 8 Feb 2025
Details
View Map
Share
Follow
Mile End Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mile End Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 15:28.

Transport for London (TfL) logo
Between
4 and 8 Feb 2025
Details
View Map
Share
Follow
Mile End Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mile End Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 16:34.

Thames Water logo
LONG TERM
Between
4 Feb and 6 Mar 2025
Details
View Map
Share
Follow
John Street

Thames Water are proposing to carry out Utility repair and maintenance works on John Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 12:26.

Thames Water logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Hertford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hertford Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:53.

Thames Water logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Hertford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hertford Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:32.

UK Power Networks Eastern & London logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Broad Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Broad Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 14:54.

UK Power Networks Eastern & London logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Broad Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Broad Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 20:16.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Babbacombe Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Babbacombe Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 13:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Babbacombe Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Babbacombe Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 15:00.

Thames Water logo
Between
6 and 28 Feb 2025
Details
View Map
Share
Follow
Radbourne Crescent

Thames Water are proposing to carry out Utility asset works on Radbourne Crescent, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 10:45.

Transport for London (TfL) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Newham Way, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 10:38.

Thames Water logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Edwin Street

Thames Water are proposing to carry out Utility repair and maintenance works on Edwin Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 10:49.

Thames Water logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Edwin Street

Thames Water are proposing to carry out Utility repair and maintenance works on Edwin Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 18:31.

London Borough Of Hackney logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Denne Terrace

London Borough Of Hackney are proposing to carry out Highway improvement works on Denne Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 20 Dec 2024 at 13:50.

LONG TERM
Between
10 Feb and 10 May 2025
Details
View Map
Share
Follow
Rotherfield Street

London Borough Of Islington are proposing to carry out Highway improvement works on Rotherfield Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Dec 2024 at 08:41.

LONG TERM
Between
10 Feb and 10 May 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Dec 2024 at 08:43.

LONG TERM
Between
10 Feb and 10 May 2025
Details
View Map
Share
Follow
Canonbury Street

London Borough Of Islington are proposing to carry out Highway improvement works on Canonbury Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Dec 2024 at 08:40.

Between
10 and 22 Feb 2025
Details
View Map
Share
Elm Road

London Borough Of Newham were proposing to carry out Highway improvement works on Elm Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 22 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 18 Dec 2024 at 09:20.

Cadent Gas logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.

BT logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Canterbury Road

BT were proposing to carry out Utility repair and maintenance works on Canterbury Road, Leyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Nov 2024 at 14:40.

BT logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Canterbury Road

BT are proposing to carry out Utility repair and maintenance works on Canterbury Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Dec 2024 at 14:39.

BT logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Chesterfield Road

BT are proposing to carry out Utility repair and maintenance works on Chesterfield Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Nov 2024 at 15:48.

BT logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Chesterfield Road

BT were proposing to carry out Utility repair and maintenance works on Chesterfield Road, Leyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Nov 2024 at 14:38.

BT logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Chesterfield Road

BT are proposing to carry out Utility repair and maintenance works on Chesterfield Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Dec 2024 at 14:38.

BT logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Canterbury Road

BT were proposing to carry out Utility repair and maintenance works on Canterbury Road, Leyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Nov 2024 at 15:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
South Access Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on South Access Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 15:59.

BT logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
West End Avenue

BT are proposing to carry out Utility repair and maintenance works on West End Avenue, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by BT on 4 Dec 2024 at 14:39.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Edison Close

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2023 at 13:47.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 14:45.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 15:15.

Thames Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Stag Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Stag Lane, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:06.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Sweet Briar Grove

Thames Water are proposing to carry out New service connection on Sweet Briar Grove, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 14:21.

Thames Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Waltheof Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Waltheof Avenue, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 11:22.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Shirley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shirley Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 16:31.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Vicarage Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Vicarage Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 11:00.

London Borough Of Hackney logo
LONG TERM
Between
12 Feb and 12 May 2025
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Dec 2024 at 12:07.

London Borough Of Hackney logo
LONG TERM
Between
12 Feb and 12 May 2025
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Dec 2024 at 15:12.

Thames Water logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Philip Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Philip Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 11:15.

Thames Water logo
LONG TERM
Between
14 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Robinson Road

Thames Water are proposing to carry out Utility repair and maintenance works on Robinson Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 14:26.

UK Power Networks Eastern & London logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Woodford Bridge Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Woodford Bridge Road, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 13:15.

Thames Water logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Marlborough Road

Thames Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 12:15.

Thames Water logo
Between
16 and 20 Feb 2025
Details
View Map
Share
Follow
Stonewall

Thames Water are proposing to carry out Utility repair and maintenance works on Stonewall, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 09:46.

Transport for London (TfL) logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
St Leonards Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St Leonards Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 11:38.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
High Street South

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on High Street South, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Dec 2024 at 10:52.

UK Power Networks Eastern & London logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Perth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 10:29.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:02.

Thames Water logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Glebe Road

Thames Water are proposing to carry out New service connection on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 10:56.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Osborne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Osborne Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 10:58.

Virgin Media logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Barretts Grove

Virgin Media are proposing to carry out Utility asset works on Barretts Grove, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 12 Nov 2024 at 18:39.

Thames Water logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Stoke Newington Road

Thames Water are proposing to carry out Utility repair and maintenance works on Stoke Newington Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 13:37.

Thames Water logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Stoke Newington Road

Thames Water are proposing to carry out Utility repair and maintenance works on Stoke Newington Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 15:45.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Gillespie Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gillespie Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 13:49.

Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Thorold Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Thorold Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 3 Dec 2024 at 13:00.

Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Thorold Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Thorold Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 10 Dec 2024 at 15:00.

Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Thorold Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Thorold Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 17 Dec 2024 at 10:45.

Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Thorold Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Thorold Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 18 Dec 2024 at 16:42.

Eunetworks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Blake Hall Crescent

Eunetworks are proposing to carry out Utility asset works on Blake Hall Crescent, Wanstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 10 Dec 2024 at 15:00.

Eunetworks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Blake Hall Road

Eunetworks are proposing to carry out Utility asset works on Blake Hall Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Dec 2024 at 15:00.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Coventry Road

Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Coventry Road

Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.

Cadent Gas logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Boundary Avenue

Cadent Gas were proposing to carry out Utility asset works on Boundary Avenue, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 14:21.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Hollybush Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Hollybush Hill, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:15.

Hyperoptic logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Frobisher Road

Hyperoptic are proposing to carry out Utility asset works on Frobisher Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 9 Dec 2024 at 13:18.

Cadent Gas logo
LONG TERM
Between
17 Feb and 6 Apr 2025
Details
View Map
Share
Longwood Gardens

Cadent Gas were proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:04.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:15.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.

UK Power Networks Eastern & London logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Eastleigh Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eastleigh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 10:37.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Poynton Road

Thames Water are proposing to carry out New service connection on Poynton Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:52.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Poynton Road

Thames Water are proposing to carry out New service connection on Poynton Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 13:09.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Lansdowne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:57.

Cadent Gas logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Turpins Lane

Cadent Gas are proposing to carry out Utility asset works on Turpins Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:06.

Essex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Avondale Drive

Essex County Council are proposing to carry out Highway improvement works on Avondale Drive, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Dec 2024 at 08:48.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Station Way

Essex County Council are proposing to carry out Highway improvement works on Station Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 15:22.

Transport for London (TfL) logo
Between
18 and 22 Feb 2025
Details
View Map
Share
Follow
Gillender Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gillender Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 14:04.

Transport for London (TfL) logo
Between
18 and 22 Feb 2025
Details
View Map
Share
Follow
Twelvetrees Crescent

Transport for London (TfL) are proposing to carry out Highway improvement works on Twelvetrees Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Dec 2024 at 10:04.

Transport for London (TfL) logo
Between
18 and 22 Feb 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 11:36.

Thames Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Glenavon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenavon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 16:44.

Thames Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Elsenham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Elsenham Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 13:24.

Thames Water logo
Between
18 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Vine Gardens

Thames Water are proposing to carry out Permanent reinstatement on Vine Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:45.

Transport for London (TfL) logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 11:38.

Transport for London (TfL) logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 10:39.

Transport for London (TfL) logo
Between
20 and 26 Feb 2025
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 10:38.

Transport for London (TfL) logo
Between
20 and 26 Feb 2025
Details
View Map
Share
Follow
Limehouse Link

Transport for London (TfL) are proposing to carry out Highway improvement works on Limehouse Link, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 10:39.

Thames Water logo
LONG TERM
Between
21 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Somerfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Somerfield Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 11:40.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Fords Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 08:56.

Thames Water logo
Between
24 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Ackroyd Drive

Thames Water are proposing to carry out Statutory Infrastructure Works on Ackroyd Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 11:35.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Southchurch Road

Thames Water are proposing to carry out Utility repair and maintenance works on Southchurch Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 09:24.

Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Priory Road

London Borough Of Newham are proposing to carry out Highway improvement works on Priory Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 27 Nov 2024 at 09:24.

LONG TERM
Between
24 Feb and 12 Apr 2025
Details
View Map
Share
Follow
Valetta Grove

London Borough Of Newham are proposing to carry out Highway improvement works on Valetta Grove, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 19 Nov 2024 at 12:11.

London Borough Of Barking And Dagenham logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Sherwood Gardens

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Sherwood Gardens, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Dec 2024 at 09:47.

Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Maitland Road

London Borough Of Newham were proposing to carry out Highway improvement works on Maitland Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 8 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 18 Dec 2024 at 09:21.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Dec 2024 at 13:38.

Thames Water logo
Between
24 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Olympic Park Avenue

Thames Water are proposing to carry out New service connection on Olympic Park Avenue, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 11:12.

BT logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Church Walk

BT are proposing to carry out Utility asset works on Church Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Nov 2024 at 11:24.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Dunkeld Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dunkeld Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 13:30.

Thames Water logo
Between
24 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:18.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Wellesley Road

Cadent Gas are proposing to carry out Utility asset works on Wellesley Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Wellesley Road

Cadent Gas are proposing to carry out Utility asset works on Wellesley Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.

BT logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Capworth Street

BT were proposing to carry out Utility repair and maintenance works on Capworth Street, Leyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Nov 2024 at 09:22.

BT logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Capworth Street

BT are proposing to carry out Utility repair and maintenance works on Capworth Street, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Dec 2024 at 14:56.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Onra Road

Cadent Gas are proposing to carry out Utility asset works on Onra Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:50.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Onra Road

Cadent Gas are proposing to carry out Utility asset works on Onra Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:35.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Onra Road

Cadent Gas were proposing to carry out Utility asset works on Onra Road, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 15:02.

BT logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Forest Rise

BT are proposing to carry out Utility repair and maintenance works on Forest Rise, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Dec 2024 at 15:59.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Aubrey Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Aubrey Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Dec 2024 at 15:35.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 14:13.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.

Thames Water logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Stanley Road

Thames Water are proposing to carry out roadworks on Stanley Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:13.

Thames Water logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Willow Street

Thames Water are proposing to carry out Utility asset works on Willow Street, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:03.

Essex County Council logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 20 Dec 2024 at 14:40.

Essex County Council logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Manor Road

Essex County Council are proposing to carry out Highway improvement works on Manor Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 20 Dec 2024 at 14:39.

Electricity Network Company logo
Between
25 Feb and 10 Mar 2025
Details
View Map
Share
Victoria Dock Road

Electricity Network Company were proposing to carry out Utility asset works on Victoria Dock Road, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 18 Dec 2024 at 10:20.

Electricity Network Company logo
Between
25 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Freemasons Road

Electricity Network Company are proposing to carry out Utility asset works on Freemasons Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 20 Dec 2024 at 11:17.

Thames Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Carpenters Road

Thames Water are proposing to carry out Utility repair and maintenance works on Carpenters Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 13:18.

Transport for London (TfL) logo
Between
25 and 26 Feb 2025
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:54.

Transport for London (TfL) logo
LONG TERM
Between
26 Feb and 10 Apr 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 07:42.

Transport for London (TfL) logo
LONG TERM
Between
26 Feb and 10 Apr 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 09:38.

Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
High Street North

London Borough Of Newham are proposing to carry out Highway improvement works on High Street North, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 26 Nov 2024 at 09:30.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Seven Kings Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seven Kings Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:30.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Haslemere Road

Thames Water are proposing to carry out Utility repair and maintenance works on Haslemere Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:30.

UK Power Networks Eastern & London logo
Between
26 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Roding Lane South

UK Power Networks Eastern & London are proposing to carry out New service connection on Roding Lane South, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 11:00.

BT logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Wellington Road

BT are proposing to carry out Utility asset works on Wellington Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Dec 2024 at 15:06.

Thames Water logo
Between
27 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Thornham Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Thornham Grove, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:19.

Thames Water logo
LONG TERM
Between
27 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Leyton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Leyton Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:18.

Transport for London (TfL) logo
Between
27 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Glenarm Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Glenarm Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2024 at 11:46.

UK Power Networks Eastern & London logo
Between
27 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Derwent Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Derwent Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 10:00.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:08.

Thames Water logo
LONG TERM
Between
28 Feb and 5 May 2025
Details
View Map
Share
Follow
Elmsdale Road

Thames Water are proposing to carry out Utility asset works on Elmsdale Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2023 at 14:12.

Thames Water logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Nicholas Road

Thames Water are proposing to carry out Utility asset works on Nicholas Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 10:47.

Thames Water logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Nicholas Road

Thames Water are proposing to carry out Utility asset works on Nicholas Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 18:30.

Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Katherine Road

London Borough Of Newham are proposing to carry out Highway improvement works on Katherine Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 27 Nov 2024 at 09:25.

Thames Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:17.

Thames Water logo
Between
3 and 10 Mar 2025
Details
View Map
Share
Follow
Great Eastern Road

Thames Water are proposing to carry out Utility repair and maintenance works on Great Eastern Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 14:18.

Thames Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Monega Road

Thames Water are proposing to carry out Utility repair and maintenance works on Monega Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 14:20.

Cadent Gas logo
LONG TERM
Between
3 Mar and 7 May 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.

Cadent Gas logo
LONG TERM
Between
3 Mar and 7 May 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
3 and 23 Mar 2025
Details
View Map
Share
Follow
Balfour Road

Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
Between
3 and 23 Mar 2025
Details
View Map
Share
Follow
Balfour Road

Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Rochdale Road

Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:22.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Rochdale Road

Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:36.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Rochdale Road

Cadent Gas were proposing to carry out Utility asset works on Rochdale Road, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 14:56.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Northumberland Road

Cadent Gas are proposing to carry out Utility asset works on Northumberland Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:49.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Northumberland Road

Cadent Gas are proposing to carry out Utility asset works on Northumberland Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:37.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Northumberland Road

Cadent Gas were proposing to carry out Utility asset works on Northumberland Road, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 14:55.

Cadent Gas logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Daventry Avenue

Cadent Gas are proposing to carry out New service connection on Daventry Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 16:05.

Thames Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Hatherley Mews

Thames Water are proposing to carry out New service connection on Hatherley Mews, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:31.

Thames Water logo
LONG TERM
Between
3 Mar and 25 May 2025
Details
View Map
Share
Follow
Cleveland Park Avenue

Thames Water are proposing to carry out Utility asset works on Cleveland Park Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Nov 2023 at 15:38.

London Borough Of Waltham Forest logo
LONG TERM
Between
3 Mar and 27 Sep 2025
Details
View Map
Share
Follow
Forest Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Forest Road, Walthamstow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 27 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Waltham Forest on 11 Dec 2024 at 12:31.

Thames Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Brunel Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brunel Road, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 11:13.

Thames Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Frankland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Frankland Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:06.

London Borough Of Hackney logo
LONG TERM
Between
4 Mar and 30 Apr 2025
Details
View Map
Share
Follow
Barnabas Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Barnabas Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Dec 2024 at 19:33.

BT logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Brooke Road

BT are proposing to carry out Utility repair and maintenance works on Brooke Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Dec 2024 at 11:01.

Thames Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Greenside

Thames Water are proposing to carry out Utility repair and maintenance works on Greenside, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Dec 2024 at 10:31.

BT logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Brooke Road

BT were proposing to carry out Utility repair and maintenance works on Brooke Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Dec 2024 at 11:00.

UK Power Networks Eastern & London logo
Between
6 and 10 Mar 2025
Details
View Map
Share
Follow
Coniston Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Coniston Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 11:00.

Thames Water logo
LONG TERM
Between
6 Mar and 1 May 2025
Details
View Map
Share
Follow
Hillside Gardens

Thames Water are proposing to carry out Utility asset works on Hillside Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 16:22.

Thames Water logo
LONG TERM
Between
6 Mar and 14 May 2025
Details
View Map
Share
Follow
Belle Vue Road

Thames Water are proposing to carry out Utility asset works on Belle Vue Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:52.

Cadent Gas logo
LONG TERM
Between
10 Mar and 15 Apr 2025
Details
View Map
Share
Gascoigne Road

Cadent Gas were proposing to carry out Utility asset works on Gascoigne Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 15 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 15:50.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
10 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Gascoigne Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Gascoigne Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 Dec 2024 at 15:04.

Thames Water logo
Between
10 and 18 Mar 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:25.

London Borough Of Hackney logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Denne Terrace

London Borough Of Hackney are proposing to carry out Highway improvement works on Denne Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Dec 2024 at 11:50.

London Borough Of Hackney logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Stean Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Stean Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Dec 2024 at 11:32.

London Borough Of Hackney logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Dunston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Dunston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Dec 2024 at 11:38.

Transport for London (TfL) logo
Between
10 Mar and 5 Apr 2025
Details
View Map
Share
East Cross Route

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on East Cross Route, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 5 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 10:10.

Transport for London (TfL) logo
Between
10 Mar and 5 Apr 2025
Details
View Map
Share
Follow
East Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on East Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 07:29.

Between
10 and 22 Mar 2025
Details
View Map
Share
Tavistock Road

London Borough Of Newham were proposing to carry out Highway improvement works on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 22 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 18 Dec 2024 at 09:21.

Thames Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Wallis Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Wallis Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 10:19.

Thames Water logo
Between
10 and 17 Mar 2025
Details
View Map
Share
High Street North

Thames Water were proposing to carry out Utility asset works on High Street North, Manor Park, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 17 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 12:55.

Cadent Gas logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Pevensey Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Pevensey Road, Forest Gate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 14:23.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Boundary Avenue

Cadent Gas are proposing to carry out Utility asset works on Boundary Avenue, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:45.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Boundary Avenue

Cadent Gas are proposing to carry out Utility asset works on Boundary Avenue, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:36.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Boundary Avenue

Cadent Gas were proposing to carry out Utility asset works on Boundary Avenue, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 24 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 14:58.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Avondale Road

Cadent Gas are proposing to carry out Utility asset works on Avondale Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:50.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Avondale Road

Cadent Gas are proposing to carry out Utility asset works on Avondale Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:37.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Avondale Road

Cadent Gas were proposing to carry out Utility asset works on Avondale Road, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 24 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 14:57.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Hatfield Close

Cadent Gas were proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 30 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:04.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Hatfield Close

Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Hatfield Close

Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 14:45.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Hatfield Close

Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 15:15.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Devonshire Hill Lane

BT are proposing to carry out Utility asset works on Devonshire Hill Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Dec 2024 at 13:57.

Thames Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Osborne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Osborne Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 14:05.

London Borough Of Hackney logo
LONG TERM
Between
12 Mar and 15 Apr 2025
Details
View Map
Share
Follow
Kenton Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Kenton Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Dec 2024 at 10:57.

London Borough Of Hackney logo
LONG TERM
Between
12 Mar and 15 Apr 2025
Details
View Map
Share
Follow
Bentham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Bentham Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Dec 2024 at 11:01.

Thames Water logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Clapton Square

Thames Water were proposing to carry out Utility repair and maintenance works on Clapton Square, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 March 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 15:30.

Between
12 and 21 Mar 2025
Details
View Map
Share
Follow
Highbury Crescent

London Borough Of Islington are proposing to carry out Highway improvement works on Highbury Crescent, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 18 Dec 2024 at 14:39.

London Borough Of Hackney logo
LONG TERM
Between
12 Mar and 9 May 2025
Details
View Map
Share
Follow
Northwold Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Northwold Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Dec 2024 at 11:54.

Thames Water logo
Between
13 and 20 Mar 2025
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out Utility asset works on High Street North, Manor Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 09:07.

Thames Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Thames Water are proposing to carry out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 11:18.

Thames Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Rosedale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rosedale Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 14:21.

LONG TERM
Between
17 Mar and 30 May 2025
Details
View Map
Share
Follow
Leyton Road

London Borough Of Newham are proposing to carry out Highway improvement works on Leyton Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 13 Dec 2024 at 15:22.

Thames Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Sebert Road

Thames Water are proposing to carry out Utility repair and maintenance works on Sebert Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 09:09.

Thames Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Pretoria Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pretoria Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:21.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Theobald Road

Cadent Gas are proposing to carry out Utility asset works on Theobald Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:15.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Theobald Road

Cadent Gas are proposing to carry out Utility asset works on Theobald Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:36.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Theobald Road

Cadent Gas were proposing to carry out Utility asset works on Theobald Road, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 15:52.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Salcombe Road

Cadent Gas are proposing to carry out Utility asset works on Salcombe Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 16:02.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Salcombe Road

Cadent Gas are proposing to carry out Utility asset works on Salcombe Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:35.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Salcombe Road

Cadent Gas were proposing to carry out Utility asset works on Salcombe Road, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 15:01.

Thames Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Oakhurst Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Oakhurst Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 09:05.

UK Power Networks Eastern & London logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Babbacombe Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Babbacombe Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.

Thames Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Waltheof Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Waltheof Avenue, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:53.

Thames Water logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Hermit Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hermit Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 09:17.

Thames Water logo
Between
19 and 24 Mar 2025
Details
View Map
Share
Follow
Esk Road

Thames Water are proposing to carry out New service connection on Esk Road, Plaistow, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 09:20.

Between
19 and 26 Mar 2025
Details
View Map
Share
Follow
Rectory Road

London Borough Of Newham are proposing to carry out Highway improvement works on Rectory Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Dec 2024 at 10:39.

Essex County Council logo
Between
21 and 23 Mar 2025
Details
View Map
Share
Follow
Station Way

Essex County Council are proposing to carry out Highway improvement works on Station Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 11:00.

Thames Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Tilney Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Tilney Drive, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 12:19.

UK Power Networks Eastern & London logo
Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Coolfin Road

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Coolfin Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 11:19.

Thames Water logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Gardner Road

Thames Water are proposing to carry out New service connection on Gardner Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 16:02.

Thames Water logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Park Road

Thames Water were proposing to carry out Utility repair and maintenance works on Park Road, East Ham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:10.

Cadent Gas logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out New service connection on Church Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 12:55.

Cadent Gas logo
Between
24 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Ley Street

Cadent Gas are proposing to carry out Utility asset works on Ley Street, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
Between
24 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Ley Street

Cadent Gas are proposing to carry out Utility asset works on Ley Street, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 15:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 13:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 15:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 12:58.

Thames Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Aubrey Road

Thames Water are proposing to carry out Utility asset works on Aubrey Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:52.

Thames Water logo
LONG TERM
Between
24 Mar and 19 May 2025
Details
View Map
Share
Follow
Hillside Gardens

Thames Water are proposing to carry out Utility asset works on Hillside Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 10:23.

Thames Water logo
LONG TERM
Between
24 Mar and 5 May 2025
Details
View Map
Share
Follow
Hillcrest Road

Thames Water are proposing to carry out Utility asset works on Hillcrest Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 15:14.

BT logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility asset works on Church Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Dec 2024 at 15:04.

Cadent Gas logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
West Grove

Cadent Gas are proposing to carry out New service connection on West Grove, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 12:00.

Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Pudding Mill Lane

London Borough Of Newham are proposing to carry out Highway improvement works on Pudding Mill Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Dec 2024 at 11:17.

Between
27 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Gainsborough Road

London Borough Of Newham are proposing to carry out Highway improvement works on Gainsborough Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Dec 2024 at 11:21.


Roadworks Map near to Hainault Road, LONDON, E11 1HA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hainault Road, LONDON, E11 1HA (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Waltham Forest logo
MAJOR
  
WADLEY ROAD 
(0.1 miles)
London Borough Of Waltham Forest
Highway improvement works - Footway - No carriageway incursion
Planned
Scheduled: 7 Oct 2024 - 2 Feb 2025
0.1
Details
Share
Follow
2
London Borough Of Waltham Forest logo
MAJOR
  
WADLEY ROAD 
(0.1 miles)
London Borough Of Waltham Forest
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 21 Oct 2024 08:00
(Scheduled: 21 Oct 2024 - 14 Feb 2025)
0.1
Details
Share
Follow
3
Cadent Gas logo
EMERGENCY
  
CANTERBURY ROAD 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway, Footpath - Some carriageway incursion
Complete
18 Dec 2024 09:40 - 20 Dec 2024 14:47
0.3
Details
Share
4
Thames Water logo
URGENT
  
LEYTON GREEN ROAD 
(0.6 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
20 Dec 2024 09:49 - 23 Dec 2024 09:21
0.6
Details
Share
5
BT logo
LEA BRIDGE ROAD 
(0.8 miles)
BT
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 27 Dec 2024 - 30 Dec 2024
0.8
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
BRUNSWICK STREET 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 2 Dec 2024 - 6 Jan 2025
0.9
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
BRUNSWICK STREET 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 2 Dec 2024 - 6 Jan 2025
0.9
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
GROVE PARK, WANSTEAD 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 11 Nov 2024 - 23 Jan 2025)
0.9
Details
Share
9
Cadent Gas logo
MAJOR
  
THE AVENUE, WANSTEAD 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 11 Nov 2024 - 23 Jan 2025
0.9
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
THE AVENUE, WANSTEAD 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 11 Nov 2024 - 23 Jan 2025
0.9
Details
Share
Follow