ROADWORKS SUMMARY
Ash Hill Crescent, DONCASTER, DN7 6QX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Ash Hill Crescent, DN7 6QX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ash Hill Crescent, DONCASTER, DN7 6QX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ash Hill Crescent are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
West Moor Link

Doncaster Metropolitan Borough Council are carrying out Highway repair and maintenance works on West Moor Link, Edenthorpe, Doncaster.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 08:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 16 Oct 2024 at 14:19.

Yorkshire Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Fieldside

Yorkshire Water are carrying out Utility asset works on Fieldside, Thorne, Doncaster.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 May 2024 at 09:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 10:38.

Yorkshire Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Field Road

Yorkshire Water are carrying out Utility asset works on Field Road, Thorne, Doncaster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 July 2024 at 08:05 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 10:37.

Yorkshire Water logo
LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Follow
King Street

Yorkshire Water are carrying out Utility asset works on King Street, Thorne, Doncaster.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 08:30 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Sep 2024 at 12:04.

Yorkshire Water logo
LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Follow
Silver Street

Yorkshire Water are carrying out Utility repair and maintenance works on Silver Street, Thorne, Doncaster.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Oct 2024 at 16:04.

Yorkshire Water logo
LONG TERM
Between
23 Sep and 17 Nov 2024
Details
View Map
Share
Follow
Silver Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Silver Street, Thorne, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 20 Sep 2024 at 11:55.

Yorkshire Water logo
LONG TERM
Between
24 Sep and 15 Nov 2024
Details
View Map
Share
Follow
Wike Gate Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Wike Gate Road, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 23 Sep 2024 at 09:43.

Yorkshire Water logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Wike Gate Road

Yorkshire Water are carrying out Utility repair and maintenance works on Wike Gate Road, Thorne, Doncaster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 September 2024 at 17:01 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Sep 2024 at 17:06.

LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Hatfield Lane

Doncaster Metropolitan Borough Council are carrying out Highway repair and maintenance works on Hatfield Lane, Edenthorpe, Doncaster.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 21 Oct 2024 at 11:39.

Yorkshire Water logo
LONG TERM
Between
21 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Ellison Street

Yorkshire Water are proposing to carry out Utility asset works on Ellison Street, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 09:26.

Yorkshire Water logo
LONG TERM
Between
21 Oct and 28 Nov 2024
Details
View Map
Share
Follow
South Parade

Yorkshire Water are proposing to carry out Utility asset works on South Parade, Thorne, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 14:33.

Yorkshire Water logo
LONG TERM
Between
21 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Bridge Street

Yorkshire Water are proposing to carry out Utility asset works on Bridge Street, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 09:29.

LONG TERM
Between
21 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Hatfield Lane

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hatfield Lane, Edenthorpe, Doncaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 15 Oct 2024 at 15:15.

LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
West Moor Link

Doncaster Metropolitan Borough Council are carrying out Highway repair and maintenance works on West Moor Link, Edenthorpe, Doncaster.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 21 Oct 2024 at 11:39.

LONG TERM
Between
21 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Hatfield Lane

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hatfield Lane, Armthorpe, Doncaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 15 Oct 2024 at 15:17.

LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Hatfield Lane

Doncaster Metropolitan Borough Council are carrying out Highway repair and maintenance works on Hatfield Lane, Armthorpe, Doncaster.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 21 Oct 2024 at 11:40.

LONG TERM
Between
21 Oct and 25 Nov 2024
Details
View Map
Share
Follow
West Moor Link

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on West Moor Link, Edenthorpe, Doncaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 15 Oct 2024 at 15:52.

Yorkshire Water logo
LONG TERM
Between
25 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Bridge Street

Yorkshire Water are proposing to carry out Utility asset works on Bridge Street, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Oct 2024 at 12:07.

Network Rail logo
Finishing
Sunday
Details
View Map
Share
Joan Croft Lane

Network Rail were proposing to carry out Works for Rail Purposes on Joan Croft Lane, Holme, Doncaster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 3 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Oct 2024 at 15:53.

Network Rail logo
Finishing
Sunday
Details
View Map
Share
Follow
Joan Croft Lane

Network Rail are proposing to carry out Works for Rail Purposes on Joan Croft Lane, Holme, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jul 2024 at 12:21.

Yorkshire Water logo
LONG TERM
Between
28 Oct and 28 Nov 2024
Details
View Map
Share
Follow
South Parade

Yorkshire Water are proposing to carry out Utility asset works on South Parade, Thorne, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Oct 2024 at 12:13.

Yorkshire Water logo
LONG TERM
Between
28 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Ellison Street

Yorkshire Water are proposing to carry out Utility asset works on Ellison Street, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Oct 2024 at 16:09.

Yorkshire Water logo
LONG TERM
Between
28 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Ellison Street

Yorkshire Water are proposing to carry out Utility asset works on Ellison Street, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Oct 2024 at 12:08.

Yorkshire Water logo
LONG TERM
Between
28 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Bridge Street

Yorkshire Water are proposing to carry out Utility asset works on Bridge Street, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Oct 2024 at 16:08.

Finishing
Friday
Details
View Map
Share
Follow
Armthorpe Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Armthorpe Road, Intake, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 27 Sep 2024 at 11:04.

Finishing
Friday
Details
View Map
Share
Armthorpe Road

Doncaster Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Armthorpe Road, Intake, Doncaster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 27 Sep 2024 at 09:16.

Yorkshire Water logo
LONG TERM
Between
28 Oct and 15 Dec 2024
Details
View Map
Share
Church Street

Yorkshire Water were proposing to carry out Utility asset works on Church Street, Thorne, Doncaster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 15:18.

Finishing
Friday
Details
View Map
Share
Follow
Sandringham Road

Doncaster Metropolitan Borough Council are carrying out Highway repair and maintenance works on Sandringham Road, Intake, Doncaster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 28 Oct 2024 at 09:00.

Finishing
Friday
Details
View Map
Share
Follow
Sandringham Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sandringham Road, Intake, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 25 Sep 2024 at 12:49.

Yorkshire Water logo
LONG TERM
Between
28 Oct and 15 Dec 2024
Details
View Map
Share
Horse Fair Green

Yorkshire Water were proposing to carry out roadworks on Horse Fair Green, Thorne, Doncaster.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 15:17.

Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Moss Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Moss Road, Moss, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 16 Oct 2024 at 09:53.

Northern Powergrid (Yorkshire) logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Bridleway No 9 Barnby Dun With Kirk Sandall

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Bridleway No 9 Barnby Dun With Kirk Sandall, Barnby Dun, Doncaster.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Oct 2024 at 11:08.

Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Moss Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Moss Road, Moss, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 3 Oct 2024 at 15:00.

Northern Powergrid (Yorkshire) logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Cedric Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Cedric Road, Edenthorpe, Doncaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Oct 2024 at 11:40.

Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Low Levels Bank

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Low Levels Bank, Hatfield, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 8 Oct 2024 at 09:46.

Yorkshire Water logo
Between
11 and 13 Nov 2024
Details
View Map
Share
Follow
Brick Kiln Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Brick Kiln Lane, Moss, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Sep 2024 at 09:18.

Yorkshire Water logo
Between
11 and 13 Nov 2024
Details
View Map
Share
Follow
Brick Kiln Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Brick Kiln Lane, Moss, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Sep 2024 at 09:11.

Yorkshire Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
South End

Yorkshire Water are proposing to carry out Utility repair and maintenance works on South End, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 24 Sep 2024 at 08:54.

Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Ferry Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 17 Sep 2024 at 16:08.

Cadent Gas logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Remedial works on Union Road, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:36.

Yorkshire Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Wheatley Hall Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Wheatley Hall Road, Wheatley, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 Oct 2024 at 15:59.

Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Low Levels Bank

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Low Levels Bank, Hatfield, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 28 Oct 2024 at 14:05.

Yorkshire Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
South End

Yorkshire Water were proposing to carry out Utility repair and maintenance works on South End, Thorne, Doncaster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Oct 2024 at 07:50.

Northern Powergrid (Yorkshire) logo
Between
19 and 22 Nov 2024
Details
View Map
Share
Follow
West Moor Link

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on West Moor Link, Edenthorpe, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Oct 2024 at 11:25.

Yorkshire Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Ellison Street

Yorkshire Water are proposing to carry out Utility asset works on Ellison Street, Thorne, Doncaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 30 Aug 2024 at 15:47.

Yorkshire Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Common Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Common Lane, Almholme, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Yorkshire Water on 4 Oct 2024 at 10:09.

Yorkshire Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Common Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Common Lane, Almholme, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Yorkshire Water on 4 Oct 2024 at 09:26.

Between
1 and 8 Dec 2024
Details
View Map
Share
Follow
Catling Lane

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Catling Lane, Barnby Dun, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 16 Oct 2024 at 09:59.

Between
1 and 8 Dec 2024
Details
View Map
Share
Follow
Stainforth Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stainforth Road, Barnby Dun, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 16 Oct 2024 at 10:59.

Between
1 and 8 Dec 2024
Details
View Map
Share
Follow
Sandall Stones Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sandall Stones Road, Kirk Sandall, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 15 Oct 2024 at 10:41.

Between
1 and 8 Dec 2024
Details
View Map
Share
Follow
Church Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Barnby Dun, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 16 Oct 2024 at 10:58.

Between
1 and 8 Dec 2024
Details
View Map
Share
Follow
Crompton Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Crompton Road, Wheatley, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 15 Oct 2024 at 10:50.

Between
1 and 8 Dec 2024
Details
View Map
Share
Follow
Top Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Top Road, Barnby Dun, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 16 Oct 2024 at 10:16.

BT logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

BT are proposing to carry out Utility asset works on Woodhouse Lane, Hatfield, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Sep 2024 at 14:34.

Yorkshire Water logo
Between
5 and 9 Dec 2024
Details
View Map
Share
Follow
Oldfield Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Oldfield Crescent, Stainforth, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 30 Sep 2024 at 14:30.

Quickline Commucations logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Gatewood Lane

Quickline Commucations are proposing to carry out Utility asset works on Gatewood Lane, Old Cantley, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 16 Oct 2024 at 10:58.

Quickline Commucations logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
The Paddock

Quickline Commucations are proposing to carry out Utility asset works on The Paddock, Barnby Dun, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 16 Oct 2024 at 10:11.

Quickline Commucations logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
The Paddock

Quickline Commucations are proposing to carry out Utility asset works on The Paddock, Barnby Dun, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 13:24.

Quickline Commucations logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
The Grove

Quickline Commucations are proposing to carry out Utility asset works on The Grove, Barnby Dun, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 16 Oct 2024 at 10:11.

Quickline Commucations logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
The Grove

Quickline Commucations are proposing to carry out Utility asset works on The Grove, Barnby Dun, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 13:24.

Quickline Commucations logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Gatewood Lane

Quickline Commucations are proposing to carry out Utility asset works on Gatewood Lane, Old Cantley, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 11:17.

Yorkshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
South End

Yorkshire Water are proposing to carry out Utility repair and maintenance works on South End, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Oct 2024 at 12:50.

Yorkshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
South End

Yorkshire Water are proposing to carry out Utility repair and maintenance works on South End, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Oct 2024 at 08:39.

Cadent Gas logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Remedial works on Union Road, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:03.

BT logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Park Road

BT are proposing to carry out Utility asset works on Park Road, Moorends, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Oct 2024 at 08:53.

Quickline Commucations logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Bell Croft Lane

Quickline Commucations are proposing to carry out Utility asset works on Bell Croft Lane, Thorpe In Balne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 29 Oct 2024 at 10:55.

Quickline Commucations logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Bell Croft Lane

Quickline Commucations are proposing to carry out Utility asset works on Bell Croft Lane, Thorpe In Balne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 29 Oct 2024 at 08:42.

Cadent Gas logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Millfield Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Millfield Road, Thorne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 13:22.


Roadworks Map near to Ash Hill Crescent, DONCASTER, DN7 6QX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Oct 2024 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ash Hill Crescent, DONCASTER, DN7 6QX (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
CUCKOO LANE, HATFIELD 
(0.4 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 30 Oct 2024 13:07
(Scheduled: 30 Oct 2024 - 1 Nov 2024)
0.4
Details
Share
Follow
2
Quickline Commucations logo
STATION ROAD, DUNSCROFT 
(0.6 miles)
Quickline Commucations
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 29 Oct 2024 13:39
(Scheduled: 29 Oct 2024 - 31 Oct 2024)
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.