ROADWORKS SUMMARY
Trafalgar Avenue, GRIMSBY, DN34 5RE
Introduction
View current and future planned roadworks and road closures for Trafalgar Avenue, DN34 5RE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Trafalgar Avenue, GRIMSBY, DN34 5RE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Trafalgar Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Nov 2026
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Corporation Road, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 February 2023 at 11:00 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 13 Mar 2026 at 16:30.
23 Feb 2027
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Conway Avenue, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 January 2024 at 10:30 and could run through until 23 February 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North East Lincolnshire Council on 3 Jul 2025 at 16:30.
2 Nov 2026
North East Lincolnshire Council are carrying out Highway repair and maintenance works on A180 From Lock Hill Roundabout To Pyewipe Roundabout, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 April 2026 at 08:30 and could run through until 2 November 2026. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by North East Lincolnshire Council on 18 Aug 2026 at 16:04.
24 Aug 2027
North East Lincolnshire Council are carrying out Highway improvement works on Sea Road, Cleethorpes.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 April 2026 at 08:00 and could run through until 24 August 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North East Lincolnshire Council on 2 Jul 2026 at 16:45.
12 Jan 2027
North East Lincolnshire Council are carrying out Highway improvement works on Cross Street, Cleethorpes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 May 2026 at 08:30 and could run through until 12 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 30 Jul 2026 at 15:33.
12 Jan 2027
North East Lincolnshire Council are carrying out Highway improvement works on Cross Street, Cleethorpes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 May 2026 at 08:30 and could run through until 12 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 30 Jul 2026 at 15:33.
31 Oct 2026
North East Lincolnshire Council are carrying out Highway improvement works on Yarborough Road, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 July 2026 at 09:00 and could run through until 31 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 22 Jul 2026 at 14:34.
24 Sep 2026
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Riby Street, Grimsby.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2026 at 10:00 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2026 at 16:31.
25 Sep 2026
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Humber Street, Grimsby.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 August 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2026 at 16:31.
30 Sep 2026
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Thorold Street, Grimsby.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 August 2026 at 14:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2026 at 16:31.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Haile Road, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:25.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Derwent Drive, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 16:18.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Jackson Place, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 4 Aug 2026 at 15:39.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Coniston Crescent, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:46.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Coniston Crescent, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:19.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Ennerdale Close, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:00.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Grasmere Grove, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:42.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Grasmere Grove, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:20.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Ennerdale Close, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:23.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Lidgard Road, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:24.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Derwent Drive, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:19.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Windermere Crescent, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:46.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Windermere Crescent, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:19.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Barry Avenue, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 4 Aug 2026 at 15:22.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Algernon Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:22.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Torrington Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:22.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Dugard Road, Cleethorpes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 16:29.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Healing Road, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:36.
Friday
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Healing Road, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 21 Aug 2026 at 11:21.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Station Road, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 16:24.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Lomond Grove, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:20.
Friday
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Stallingborough Road, Healing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 21 Aug 2026 at 11:20.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Stallingborough Road, Healing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:37.
9 Oct 2026
North East Lincolnshire Council are carrying out Highway repair and maintenance works on A1173 From Kings Road Roundabout To Kiln Lane Roundabout, Immingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 18:00 and could run through until 9 October 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by North East Lincolnshire Council on 25 Aug 2026 at 09:12.
Friday
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Stallingborough Road, Healing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 21 Aug 2026 at 11:20.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Stallingborough Road, Healing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:39.
Friday
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Keelby Road, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 24 Aug 2026 at 16:08.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Keelby Road, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:40.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Midfield Road, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:23.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Sheraton Drive, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:24.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on The Crofts, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:23.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on The Crofts, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:00.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Swales Road, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:21.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Chippendale Close, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:24.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Little Beck Road, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:20.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Buttermere Crescent, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 16:15.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Buttermere Crescent, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:20.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Great Coates Road, Healing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:23.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Little Beck Road, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 16:16.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on St Peters Crescent, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:22.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Lomond Grove, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 16:16.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on St Peters Crescent, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 14 Aug 2026 at 14:19.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Queen Elizabeth Road, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:45.
24 Aug and 24 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Queen Elizabeth Road, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 5 Aug 2026 at 15:31.
Friday
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Station Road, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 21 Aug 2026 at 11:20.
30 Aug and 23 Sep 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Peaks Parkway From Victoria Street South To Peaks Farm Bridge, Grimsby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 11 Aug 2026 at 16:59.
1 and 28 Sep 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Sea Road, Cleethorpes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Aug 2026 at 11:39.
1 and 28 Sep 2026
Northern Powergrid (Yorkshire) were proposing to carry out Utility repair and maintenance works on Sea Road, Cleethorpes.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2026 and run through until 28 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2026 at 12:10.
23 Sep 2026
Cadent Gas are carrying out Utility asset works on Clee Crescent, Grimsby.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 15:01.
25 Sep 2026
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Ashby Cross Roads Roundabout, Ashby Cum Fenby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 07:30 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 15 Sep 2026 at 11:52.
Tomorrow
Anglian Water are proposing to carry out Utility repair and maintenance works on Farebrother Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 2 Sep 2026 at 07:26.
Tomorrow
Anglian Water were proposing to carry out Utility repair and maintenance works on Farebrother Street, Grimsby.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 16 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 2 Sep 2026 at 07:25.
14 and 28 Sep 2026
Cadent Gas are proposing to carry out Utility asset works on Clee Crescent, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 13:46.
16 Sep and 14 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Carr Lane, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 14:24.
21 and 24 Sep 2026
Lincolnshire County Council are proposing to carry out Highway improvement works on Roxton Avenue, Keelby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 15 Jul 2026 at 07:34.
21 and 25 Sep 2026
Lincolnshire County Council are proposing to carry out Highway improvement works on North End, Keelby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 26 Aug 2026 at 08:01.
21 and 23 Sep 2026
Anglian Water are proposing to carry out Utility repair and maintenance works on South Marsh Lane, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 1 Jul 2026 at 12:00.
28 Sep and 20 Nov 2026
North East Lincolnshire Council are proposing to carry out Highway improvement works on Queen Elizabeth Road, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 20 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North East Lincolnshire Council on 21 Aug 2026 at 10:36.
28 Sep and 20 Nov 2026
North East Lincolnshire Council are proposing to carry out Highway improvement works on Midfield Road, Humberston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 20 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North East Lincolnshire Council on 21 Aug 2026 at 11:18.
5 and 26 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Carr Lane, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 14:17.
5 and 7 Oct 2026
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Main Road, Ashby Cum Fenby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the verge only.
This roadwork event was last updated by Quickline Commucations on 20 Jul 2026 at 16:23.
5 Oct and 6 Nov 2026
North East Lincolnshire Council are proposing to carry out Highway improvement works on Magdalene Road, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 7 Sep 2026 at 16:31.
5 and 7 Oct 2026
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Ashby Lane Along Drain Access Track East Off, Ashby Cum Fenby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 16 Jul 2026 at 14:43.
5 and 7 Oct 2026
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Waithe Lane, Brigsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Aug 2026 at 11:39.
5 and 23 Oct 2026
North East Lincolnshire Council are proposing to carry out roadworks on A46 Laceby Roundabout To Cottagers Plot, Laceby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by North East Lincolnshire Council on 24 Jun 2026 at 14:35.
7 and 9 Oct 2026
Anglian Water are proposing to carry out Utility repair and maintenance works on St Heliers Road, Cleethorpes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 23 Jul 2026 at 08:00.
12 Oct and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Weelsby View, New Waltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 16:31.
12 Oct and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Peaks Lane, New Waltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 13:34.
12 and 26 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Station Road, Great Coates.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2026 at 08:55.
12 and 16 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Sep 2026 at 13:31.
12 and 18 Oct 2026
Anglian Water are proposing to carry out Utility repair and maintenance works on Victoria Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 18 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 31 Jul 2026 at 17:30.
12 and 16 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Jul 2026 at 15:06.
19 Oct and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Peaks Avenue, New Waltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 16:26.
26 and 28 Oct 2026
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Main Road, Ashby Cum Fenby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 3 Aug 2026 at 15:47.
26 Oct and 11 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Queens Road, Immingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Jul 2026 at 14:47.
26 Oct and 6 Nov 2026
North East Lincolnshire Council are proposing to carry out Highway improvement works on Weelsby Road, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 21 Aug 2026 at 11:15.
26 Oct and 9 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Trafalgar Park, New Waltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 16:30.
2 and 16 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Haycroft Avenue, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2026 at 09:01.
2 and 16 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Cromwell Road, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jul 2026 at 16:40.
2 and 4 Nov 2026
Quantum Communications Ltd are proposing to carry out Utility repair and maintenance works on Main Road, Ashby Cum Fenby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Quantum Communications Ltd on 12 Aug 2026 at 08:37.
9 and 24 Nov 2026
North East Lincolnshire Council are proposing to carry out Highway improvement works on High Street, Waltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 24 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 2 Sep 2026 at 14:17.
10 and 12 Nov 2026
Anglian Water are proposing to carry out Utility repair and maintenance works on St Heliers Road, Cleethorpes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 14 Sep 2026 at 12:07.
16 and 18 Nov 2026
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Old Farm Road, Hatcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 18 Aug 2026 at 16:52.
18 Nov and 1 Dec 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Ayscough Avenue, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 25 Aug 2026 at 15:45.
18 Nov and 1 Dec 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Ayscough Avenue, Stallingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Aug 2026 at 07:49.
23 and 25 Nov 2026
Anglian Water are proposing to carry out Utility repair and maintenance works on Sixhills Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 28 Aug 2026 at 15:01.
23 and 29 Nov 2026
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Queens Road, Immingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 29 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 21 Aug 2026 at 10:28.
30 Nov and 2 Dec 2026
Anglian Water are proposing to carry out Utility asset works on Hatcliffe Road, Beelsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 2 Sep 2026 at 07:47.
8 and 10 Dec 2026
Anglian Water are proposing to carry out Utility repair and maintenance works on Ainslie Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 4 Sep 2026 at 11:41.
Roadworks Map near to Trafalgar Avenue, GRIMSBY, DN34 5RE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Trafalgar Avenue, GRIMSBY, DN34 5RE (11 Events)
(Scheduled Dates)
(miles)
(Scheduled: 15 Sep 2026 - 21 Sep 2026)
(Scheduled: 15 Sep 2026 - 21 Sep 2026)
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
(Scheduled: 14 Sep 2026 - 16 Sep 2026)
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
(Scheduled: 14 Sep 2026 - 16 Sep 2026)
Contains public sector information licensed under the Open Government Licence v3.0.