ROADWORKS SUMMARY
Tweedale, CAMBRIDGE, CB1 9JU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Tweedale, CB1 9JU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Tweedale, CAMBRIDGE, CB1 9JU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tweedale are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Herbert Street

Cambridgeshire County Council are carrying out Highway improvement works on Herbert Street, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 13 Aug 2024 at 11:08.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
George Street

Cambridgeshire County Council are carrying out Highway improvement works on George Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 14:07.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Milton Road (A1134)

Cambridgeshire County Council are carrying out Highway improvement works on Milton Road (A1134), Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 14:13.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Ascham Road

Cambridgeshire County Council are carrying out Highway improvement works on Ascham Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2024 at 15:06.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Hurst Park Avenue

Cambridgeshire County Council are carrying out Highway improvement works on Hurst Park Avenue, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 14:49.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Milton Road

Cambridgeshire County Council are carrying out Highway improvement works on Milton Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 19 Aug 2024 at 15:56.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Highworth Avenue

Cambridgeshire County Council are carrying out Highway improvement works on Highworth Avenue, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 22:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Jan 2024 at 09:13.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Oak Tree Avenue

Cambridgeshire County Council are carrying out Highway improvement works on Oak Tree Avenue, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 16:29.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Union Lane

Cambridgeshire County Council are carrying out Highway improvement works on Union Lane, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 16:27.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Arbury Road

Cambridgeshire County Council are carrying out Highway improvement works on Arbury Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 13:44.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Birch Close

Cambridgeshire County Council are carrying out Highway improvement works on Birch Close, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 15:28.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Downhams Lane

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Downhams Lane, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 15:21.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Fraser Road

Cambridgeshire County Council are carrying out Highway improvement works on Fraser Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 15:13.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Kendal Way

Cambridgeshire County Council are carrying out Highway improvement works on Kendal Way, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Aug 2024 at 15:23.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Ramsden Square

Cambridgeshire County Council are carrying out Highway improvement works on Ramsden Square, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 11:52.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are carrying out Highway improvement works on Green End Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 15:24.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Kings Hedges Road

Cambridgeshire County Council are carrying out Highway improvement works on Kings Hedges Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 19 Aug 2024 at 13:11.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Lovell Road

Cambridgeshire County Council are carrying out Highway improvement works on Lovell Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 15 Aug 2024 at 10:58.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Woodhead Drive

Cambridgeshire County Council are carrying out Highway improvement works on Woodhead Drive, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2022 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 15:07.

Cambridgeshire County Council logo
LONG TERM
Until
17 Dec 2024
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are carrying out Highway repair and maintenance works on High Street, Sawston.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 11:00 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Sep 2024 at 11:29.

Cambridgeshire County Council logo
LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Cowley Road

Cambridgeshire County Council are carrying out Highway improvement works on Cowley Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 09:00 and could run through until 25 November 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 8 Jul 2024 at 10:43.

Cambridgeshire County Council logo
LONG TERM
Until
3 Nov 2024
Details
View Map
Share
Follow
Newmarket Road

Cambridgeshire County Council are carrying out Highway improvement works on Newmarket Road, Great Abington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 09:00 and could run through until 3 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 10 Sep 2024 at 12:10.

Cambridgeshire County Council logo
LONG TERM
Between
15 Jul and 29 Nov 2024
Details
View Map
Share
Barton Road

Cambridgeshire County Council were proposing to carry out Highway improvement works on Barton Road, Grantchester.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 1 Aug 2024 at 09:43.

Cambridgeshire County Council logo
LONG TERM
Between
17 Jul and 28 Oct 2024
Details
View Map
Share
Follow
Newmarket Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Newmarket Road, Little Abington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 28 October 2024. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 24 Jul 2024 at 14:45.

Cambridgeshire County Council logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
A603 Old Alignment

Cambridgeshire County Council are carrying out Highway repair and maintenance works on A603 Old Alignment, Grantchester.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 09:30 and could run through until 11 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 18 Sep 2024 at 14:20.

Cambridgeshire County Council logo
LONG TERM
Between
1 Aug 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Coleridge Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Coleridge Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 8 Aug 2024 at 16:06.

UK Power Networks Eastern & London logo
LONG TERM
Until
16 Oct 2024
Details
View Map
Share
Follow
Haverhill Road

UK Power Networks Eastern & London are carrying out New service connection on Haverhill Road, Stapleford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2024 at 10:00 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 10:05.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Babraham Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Babraham Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 23 September 2024. The works will impact the carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jun 2024 at 13:47.

UK Power Networks Eastern & London logo
LONG TERM
Until
7 Oct 2024
Details
View Map
Share
Follow
Mowbray Road

UK Power Networks Eastern & London are carrying out New service connection on Mowbray Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 7 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2024 at 08:18.

Cambridgeshire County Council logo
LONG TERM
Between
1 Sep and 8 Nov 2024
Details
View Map
Share
Follow
A14 J B1049 Leave W

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on A14 J B1049 Leave W, South Cambridgeshire.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 26 Apr 2024 at 08:20.

Cambridgeshire County Council logo
LONG TERM
Between
1 Sep and 8 Nov 2024
Details
View Map
Share
Follow
Cambridge Road (B1049)

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road (B1049), Impington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 22 May 2024 at 08:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 Sep and 28 Oct 2024
Details
View Map
Share
Follow
Church Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Church Street, Stapleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jun 2024 at 12:25.

Finishing
Friday
Details
View Map
Share
Follow
Tennis Court Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Tennis Court Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Aug 2024 at 12:02.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bridge Street

Cambridgeshire County Council are proposing to carry out Highway improvement works on Bridge Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 22 Aug 2024 at 14:38.

Cambridgeshire County Council logo
Between
9 and 28 Sep 2024
Details
View Map
Share
Follow
Magdalene Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Magdalene Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Aug 2024 at 16:06.

Cambridgeshire County Council logo
LONG TERM
Between
9 Sep and 13 Dec 2024
Details
View Map
Share
Follow
High Ditch Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on High Ditch Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Mar 2024 at 11:29.

Cadent Gas logo
Between
15 Sep and 3 Oct 2024
Details
View Map
Share
Follow
Hills Road

Cadent Gas are proposing to carry out Utility asset works on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2023 at 13:17.

Cadent Gas logo
Between
16 Sep and 4 Oct 2024
Details
View Map
Share
Hills Road

Cadent Gas were proposing to carry out Utility asset works on Hills Road, Cambridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 4 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 15:03.

Finishing
Friday
Details
View Map
Share
Follow
Tennis Court Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Tennis Court Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Sep 2024 at 13:37.

Finishing
Friday
Details
View Map
Share
Follow
Tennis Court Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Tennis Court Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Sep 2024 at 15:56.

Finishing
Friday
Details
View Map
Share
Follow
Tennis Court Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Tennis Court Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 16 Sep 2024 at 09:21.

Cambridgeshire County Council logo
Between
16 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Horningsea Road (C210)

Cambridgeshire County Council are proposing to carry out Highway improvement works on Horningsea Road (C210), Horningsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 4 October 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 22 Aug 2024 at 13:00.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Stonebridge Lane

Anglian Water are carrying out Utility repair and maintenance works on Stonebridge Lane, Fulbourn.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 09:20 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Sep 2024 at 15:35.

UK Power Networks Eastern & London logo
LONG TERM
Until
1 Nov 2024
Details
View Map
Share
Follow
Cherry Hinton Road

UK Power Networks Eastern & London are carrying out New service connection on Cherry Hinton Road, Great Shelford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 09:30 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Sep 2024 at 09:55.

Cambridgeshire County Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Babraham Road

Cambridgeshire County Council are carrying out Works for road purposes on Babraham Road, Cambridge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 07:50 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 19 Aug 2024 at 11:02.

Cambridge Water Company logo
Between
22 and 28 Sep 2024
Details
View Map
Share
Follow
Parker Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Parker Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 22 Aug 2024 at 14:43.

Cambridge Water Company logo
Between
22 and 28 Sep 2024
Details
View Map
Share
Follow
Parker Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Parker Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 19 Sep 2024 at 15:44.

Cambridge Water Company logo
Between
22 and 28 Sep 2024
Details
View Map
Share
Follow
Parker Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Parker Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 19 Sep 2024 at 15:57.

UK Power Networks Eastern & London logo
Between
23 and 29 Sep 2024
Details
View Map
Share
Follow
Bar Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bar Lane, Stapleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2024 at 11:14.

UK Power Networks Eastern & London logo
Between
23 and 29 Sep 2024
Details
View Map
Share
Follow
Bar Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bar Lane, Stapleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 10:35.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Jul 2024 at 11:08.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 09:14.

Cambridgeshire County Council logo
Between
23 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Teversham Road

Cambridgeshire County Council are proposing to carry out Section 50 on Teversham Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 6 Sep 2024 at 08:57.

Cambridgeshire County Council logo
Between
23 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Teversham Road

Cambridgeshire County Council are proposing to carry out Section 50 on Teversham Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 6 Sep 2024 at 09:08.

Cambridgeshire County Council logo
Between
23 Sep and 9 Oct 2024
Details
View Map
Share
Follow
Teversham Road

Cambridgeshire County Council are proposing to carry out Section 50 on Teversham Road, Fulbourn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 18 Sep 2024 at 14:29.

Cambridgeshire County Council logo
Between
23 Sep and 9 Oct 2024
Details
View Map
Share
Follow
Teversham Road

Cambridgeshire County Council are proposing to carry out Section 50 on Teversham Road, Fulbourn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 18 Sep 2024 at 14:32.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Lower Park Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lower Park Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2024 at 12:39.

Cambridge Water Company logo
Finishing
Friday
Details
View Map
Share
Follow
Cambridge Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Cambridge Road, Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cambridge Water Company on 25 Jul 2024 at 13:25.

Cambridge Water Company logo
Finishing
Friday
Details
View Map
Share
Follow
Harvey Goodwin Avenue

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Harvey Goodwin Avenue, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 24 Jul 2024 at 13:10.

Cambridge Water Company logo
Finishing
Friday
Details
View Map
Share
Follow
Harvey Goodwin Avenue

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Harvey Goodwin Avenue, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 8 Aug 2024 at 10:14.

Cambridge Water Company logo
Finishing
Friday
Details
View Map
Share
Follow
Harvey Goodwin Avenue

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Harvey Goodwin Avenue, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 16 Aug 2024 at 11:00.

UK Power Networks Eastern & London logo
Between
28 Sep and 27 Oct 2024
Details
View Map
Share
Follow
Queen Ediths Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Queen Ediths Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2024 and could run through until 27 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 09:32.

Between
30 Sep and 11 Oct 2024
Details
View Map
Share
Follow
Tennis Court Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Tennis Court Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 31 Jul 2024 at 14:37.

Cambridgeshire County Council logo
Between
30 Sep and 5 Oct 2024
Details
View Map
Share
Follow
Tennis Court Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Tennis Court Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 5 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 10 Jul 2024 at 13:19.

Cambridgeshire County Council logo
Between
30 Sep and 5 Oct 2024
Details
View Map
Share
Follow
Tennis Court Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Tennis Court Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 5 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 10 Sep 2024 at 11:31.

Cambridgeshire County Council logo
Between
30 Sep and 11 Oct 2024
Details
View Map
Share
Follow
Horningsea Road (C210)

Cambridgeshire County Council are proposing to carry out Highway improvement works on Horningsea Road (C210), Horningsea.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 11 October 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 9 Sep 2024 at 09:20.

Cambridge Water Company logo
Between
1 and 4 Oct 2024
Details
View Map
Share
Follow
Lichfield Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Lichfield Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 25 Jul 2024 at 14:16.

Cambridge Water Company logo
Between
1 and 4 Oct 2024
Details
View Map
Share
Follow
Lichfield Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Lichfield Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 8 Aug 2024 at 14:45.

Cambridge Water Company logo
Between
1 and 4 Oct 2024
Details
View Map
Share
Follow
Lichfield Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Lichfield Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 4 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 14 Aug 2024 at 16:00.

Cambridge Water Company logo
Between
1 and 4 Oct 2024
Details
View Map
Share
Follow
Searle Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Searle Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 24 Jul 2024 at 13:17.

Cambridge Water Company logo
Between
1 and 3 Oct 2024
Details
View Map
Share
Follow
Searle Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Searle Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 12 Aug 2024 at 11:09.

Cadent Gas logo
Between
2 and 8 Oct 2024
Details
View Map
Share
Follow
Brunswick Terrace

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Brunswick Terrace, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 8 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 16:14.

Cambridgeshire County Council logo
Between
3 and 5 Oct 2024
Details
View Map
Share
Follow
Hauxton Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on Hauxton Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 5 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 19 Jul 2024 at 15:35.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Oct and 17 Nov 2024
Details
View Map
Share
Follow
Church Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Church Street, Stapleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 17 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2024 at 16:58.

Cambridge Water Company logo
Between
7 and 10 Oct 2024
Details
View Map
Share
Follow
Macaulay Avenue

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Macaulay Avenue, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 5 Aug 2024 at 09:35.

Cambridge Water Company logo
Between
7 and 10 Oct 2024
Details
View Map
Share
Follow
Macaulay Avenue

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Macaulay Avenue, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 12 Aug 2024 at 15:53.

Cambridgeshire County Council logo
Between
7 and 23 Oct 2024
Details
View Map
Share
Follow
Mill End Close

Cambridgeshire County Council are proposing to carry out Highway improvement works on Mill End Close, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 23 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 6 Sep 2024 at 15:43.

Cambridgeshire County Council logo
Between
7 and 24 Oct 2024
Details
View Map
Share
Follow
Brookfields (C280)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Brookfields (C280), Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 29 Jul 2024 at 16:19.

UK Power Networks Eastern & London logo
Between
7 and 27 Oct 2024
Details
View Map
Share
Follow
Silver Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Silver Street, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 27 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2024 at 16:04.

Cambridgeshire County Council logo
Between
7 and 18 Oct 2024
Details
View Map
Share
Follow
St Johns Street

Cambridgeshire County Council are proposing to carry out Works for road purposes on St Johns Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Sep 2024 at 11:55.

Cambridgeshire County Council logo
Between
7 and 18 Oct 2024
Details
View Map
Share
Follow
St Johns Street

Cambridgeshire County Council are proposing to carry out Works for road purposes on St Johns Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Sep 2024 at 16:13.

Cambridge Water Company logo
Between
8 and 10 Oct 2024
Details
View Map
Share
Follow
Argyle Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Argyle Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 7 Aug 2024 at 13:02.

Cambridge Water Company logo
Between
8 and 10 Oct 2024
Details
View Map
Share
Follow
Argyle Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Argyle Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 14 Aug 2024 at 09:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
11 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Babraham Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Babraham Road, Sawston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2024 at 13:14.

Cambridgeshire County Council logo
Between
14 and 25 Oct 2024
Details
View Map
Share
Follow
Geoffrey Bishop Avenue

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Geoffrey Bishop Avenue, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Sep 2024 at 15:47.

Cambridgeshire County Council logo
Between
14 Oct and 1 Nov 2024
Details
View Map
Share
Geoffrey Bishop Avenue

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Geoffrey Bishop Avenue, Fulbourn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 13 Sep 2024 at 08:07.

Cambridgeshire County Council logo
LONG TERM
Between
14 Oct and 20 Nov 2024
Details
View Map
Share
Follow
Geoffrey Bishop Avenue

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Geoffrey Bishop Avenue, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 13 Sep 2024 at 08:22.

Cambridgeshire County Council logo
LONG TERM
Between
14 Oct 2024 and 19 May 2025
Details
View Map
Share
Follow
Barton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Barton Road, Grantchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 19 May 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Sep 2024 at 10:02.

Cambridgeshire County Council logo
Between
14 and 25 Oct 2024
Details
View Map
Share
Follow
Horningsea Road (C210)

Cambridgeshire County Council are proposing to carry out Highway improvement works on Horningsea Road (C210), Horningsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 October 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 30 Aug 2024 at 10:28.

Cambridge Water Company logo
Between
15 and 17 Oct 2024
Details
View Map
Share
Follow
Stone Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Stone Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 2 Aug 2024 at 11:05.

Cambridgeshire County Council logo
LONG TERM
Between
16 Oct and 21 Nov 2024
Details
View Map
Share
Follow
Porson Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Porson Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 5 Sep 2024 at 16:25.

UK Power Networks Eastern & London logo
Between
18 and 25 Oct 2024
Details
View Map
Share
Follow
Bar Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bar Lane, Stapleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Sep 2024 at 12:01.

Cambridgeshire County Council logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Granhams Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Granhams Road, Great Shelford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 25 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 12:59.

Cambridgeshire County Council logo
LONG TERM
Between
21 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Barrow Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Barrow Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 4 Jul 2024 at 14:10.

Cambridgeshire County Council logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Teversham Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Teversham Road, Fulbourn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 25 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 11:01.

Cambridgeshire County Council logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Fulbourn Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Fulbourn Road, Teversham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 25 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 11:03.

Cambridgeshire County Council logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Albert Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Albert Road, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 22 Aug 2024 at 09:30.

Cambridge Water Company logo
Between
22 and 24 Oct 2024
Details
View Map
Share
Follow
Trafalgar Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 24 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 1 Aug 2024 at 15:16.

Cambridge Water Company logo
Between
22 and 24 Oct 2024
Details
View Map
Share
Follow
Trafalgar Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 24 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 12 Aug 2024 at 09:20.

Cambridgeshire County Council logo
Between
25 Oct and 8 Nov 2024
Details
View Map
Share
Church Road

Cambridgeshire County Council were proposing to carry out Works for road purposes on Church Road, Hauxton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 16 Sep 2024 at 16:01.

Cityfibre Metro Networks logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Cambridge Road

Cityfibre Metro Networks are proposing to carry out Highway improvement works on Cambridge Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Jul 2024 at 12:28.

Cambridge Water Company logo
Between
28 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Queen Ediths Way

Cambridge Water Company are proposing to carry out Utility asset works on Queen Ediths Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 6 Aug 2024 at 08:47.

Cambridge Water Company logo
Between
28 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Queen Ediths Way

Cambridge Water Company are proposing to carry out Utility asset works on Queen Ediths Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 15 Aug 2024 at 14:07.

Cambridge Water Company logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
High Street (C233)

Cambridge Water Company are proposing to carry out Permanent reinstatement on High Street (C233), Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cambridge Water Company on 17 Apr 2024 at 12:39.

Cityfibre Metro Networks logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Teversham Road

Cityfibre Metro Networks are proposing to carry out Highway improvement works on Teversham Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 5 Aug 2024 at 10:51.

Cityfibre Metro Networks logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Teversham Road

Cityfibre Metro Networks are proposing to carry out Highway improvement works on Teversham Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Aug 2024 at 09:35.

Cambridge Water Company logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
St Johns Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on St Johns Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 18 Apr 2024 at 10:20.

Gigaclear logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Bottisham Cycletrack 1

Gigaclear are proposing to carry out Utility repair and maintenance works on Bottisham Cycletrack 1, Bottisham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Jul 2024 at 10:34.

Gigaclear logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Bottisham Cycletrack 1

Gigaclear are proposing to carry out Utility repair and maintenance works on Bottisham Cycletrack 1, Bottisham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 2 Aug 2024 at 09:19.

Cambridgeshire County Council logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Huntingdon Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Huntingdon Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 23 Aug 2024 at 14:21.

Cambridgeshire County Council logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Huntingdon Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Huntingdon Road, Girton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 5 Sep 2024 at 12:26.

Cambridgeshire County Council logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Huntingdon Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Huntingdon Road, Girton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 17 Sep 2024 at 10:38.

Cadent Gas logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Mere Way

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Mere Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:07.

Cadent Gas logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Mere Way

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Mere Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:51.

Cambridge Water Company logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Cambridge Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Cambridge Road, Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cambridge Water Company on 2 Sep 2024 at 15:02.

Cityfibre Metro Networks logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
High Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on High Street, Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Jul 2024 at 11:40.

Cambridge Water Company logo
Between
29 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Sidgwick Avenue

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Sidgwick Avenue, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 2 Aug 2024 at 09:05.

Cambridgeshire County Council logo
Between
1 and 21 Nov 2024
Details
View Map
Share
Follow
Mowbray Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mowbray Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 28 Mar 2024 at 10:28.

Cambridgeshire County Council logo
Between
1 and 21 Nov 2024
Details
View Map
Share
Follow
Perne Road (A1134)

Cambridgeshire County Council are proposing to carry out Highway improvement works on Perne Road (A1134), Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 28 Mar 2024 at 10:14.

Cambridgeshire County Council logo
Between
1 and 21 Nov 2024
Details
View Map
Share
Follow
Cherry Hinton Road (C235)

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cherry Hinton Road (C235), Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 28 Mar 2024 at 10:23.

Cambridge Water Company logo
Between
2 and 10 Nov 2024
Details
View Map
Share
Follow
High Street

Cambridge Water Company are proposing to carry out New service connection on High Street, East Chesterton, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 6 Sep 2024 at 11:33.

Cambridge Water Company logo
Between
2 and 10 Nov 2024
Details
View Map
Share
Follow
High Street

Cambridge Water Company are proposing to carry out New service connection on High Street, East Chesterton, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 13 Sep 2024 at 12:34.

Cambridgeshire County Council logo
Between
4 and 30 Nov 2024
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Cambridge Road, Little Abington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 23 Aug 2024 at 12:54.

Cityfibre Metro Networks logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Teversham Road

Cityfibre Metro Networks are proposing to carry out Highway improvement works on Teversham Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Aug 2024 at 08:28.

Cityfibre Metro Networks logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Teversham Road

Cityfibre Metro Networks are proposing to carry out Highway improvement works on Teversham Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Aug 2024 at 09:31.

Cityfibre Metro Networks logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Teversham Road

Cityfibre Metro Networks are proposing to carry out Highway improvement works on Teversham Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Aug 2024 at 15:31.

UK Power Networks Eastern & London logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Lower Park Street

UK Power Networks Eastern & London were proposing to carry out New service connection on Lower Park Street, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Sep 2024 at 09:10.

Cambridge Water Company logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
New Park Street

Cambridge Water Company are proposing to carry out New service connection on New Park Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 4 Sep 2024 at 16:20.

Cambridge Water Company logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
New Park Street

Cambridge Water Company are proposing to carry out New service connection on New Park Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 19 Sep 2024 at 12:05.

Cambridge Water Company logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Cambridge Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Cambridge Road, Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cambridge Water Company on 2 Sep 2024 at 15:28.

UK Power Networks Eastern & London logo
Between
8 and 29 Nov 2024
Details
View Map
Share
Follow
Brooks Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Brooks Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Jul 2024 at 09:10.

UK Power Networks Eastern & London logo
Between
8 and 22 Nov 2024
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Aug 2024 at 16:18.

Cambridgeshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Queen Ediths Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Queen Ediths Way, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 15 Sep 2023 at 07:33.

UK Power Networks Eastern & London logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Bridge Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, Cambridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2024 at 08:28.

Cambridgeshire County Council logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
St Catharines Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on St Catharines Road, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Sep 2024 at 12:38.

Cambridgeshire County Council logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
St Catharines Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on St Catharines Road, Impington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Sep 2024 at 16:15.

Cambridge Water Company logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Butt Lane (C206)

Cambridge Water Company are proposing to carry out New service connection on Butt Lane (C206), Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 12 Sep 2024 at 15:42.

Cityfibre Metro Networks logo
Between
12 and 18 Nov 2024
Details
View Map
Share
Follow
Hinton Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hinton Way, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 18 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Aug 2024 at 11:56.

Cityfibre Metro Networks logo
Between
14 and 20 Nov 2024
Details
View Map
Share
Follow
Hinton Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hinton Way, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 20 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Sep 2024 at 09:30.

Cambridge Water Company logo
Between
16 and 30 Nov 2024
Details
View Map
Share
Follow
Hills Road

Cambridge Water Company are proposing to carry out New service connection on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cambridge Water Company on 30 Aug 2024 at 10:44.

Cityfibre Metro Networks logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Hinton Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hinton Way, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Sep 2024 at 10:53.

Cityfibre Metro Networks logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Hinton Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hinton Way, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Sep 2024 at 10:57.

Cambridge Water Company logo
Between
7 and 15 Dec 2024
Details
View Map
Share
High Street

Cambridge Water Company were proposing to carry out New service connection on High Street, East Chesterton, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 13 Aug 2024 at 14:41.

Cityfibre Metro Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Whittlesford Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Whittlesford Road, Little Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Sep 2024 at 10:21.

UK Power Networks Eastern & London logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Lower Park Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lower Park Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Sep 2024 at 09:11.

Cambridgeshire County Council logo
LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Newmarket Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Newmarket Road, Bottisham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 11 Jul 2024 at 15:08.

Cambridge Water Company logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
High Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on High Street, East Chesterton, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 16 Aug 2024 at 10:38.

Cambridge Water Company logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Suez Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Suez Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 9 Sep 2024 at 15:59.

Cambridge Water Company logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Thornton Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Thornton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 10 Sep 2024 at 10:44.

Cambridge Water Company logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Woodlark Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Woodlark Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 19 Sep 2024 at 10:38.

Cambridgeshire County Council logo
Between
19 and 23 Dec 2024
Details
View Map
Share
Follow
Granhams Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Granhams Road, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Sep 2024 at 15:56.


Roadworks Map near to Tweedale, CAMBRIDGE, CB1 9JU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Sep 2024 01:26
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Tweedale, CAMBRIDGE, CB1 9JU (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
LUCERNE CLOSE 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 20 Sep 2024 - 24 Sep 2024
0.4
Details
Share
Follow
2
Virgin Media logo
KELSEY CRESCENT 
(0.6 miles)
Virgin Media
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 21 Sep 2024
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.