ROADWORKS SUMMARY
Jaffray Road, BROMLEY, BR2 9NR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Jaffray Road, BR2 9NR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Jaffray Road, BROMLEY, BR2 9NR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Jaffray Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 13 Jan 2025
Details
View Map
Share
Follow
Willersley Avenue

Thames Water are proposing to carry out New service connection on Willersley Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 13 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:23.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Mount Rise

Thames Water are carrying out Disconnection or alteration of supply on Mount Rise, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 10:59.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Grassmount

Thames Water are carrying out Disconnection or alteration of supply on Grassmount, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 10:59.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Forestholme Close

Thames Water are carrying out Disconnection or alteration of supply on Forestholme Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:00.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lawrie Park Avenue

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lawrie Park Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 10:00 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 14:23.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Sydenham Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 11:20.

Thames Water logo
LONG TERM
Between
6 May 2024 and 13 May 2025
Details
View Map
Share
Follow
Longmead Drive

Thames Water are proposing to carry out New service connection on Longmead Drive, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:16.

Thames Water logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Glenbow Road

Thames Water are carrying out Utility asset works on Glenbow Road, Bromley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 10:36 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 08:57.

UK Power Networks Eastern & London logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Jews Walk

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Jews Walk, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:35.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Rembrandt Road

Thames Water are carrying out Disconnection or alteration of supply on Rembrandt Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:06.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Murillo Road

Thames Water are carrying out Disconnection or alteration of supply on Murillo Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:07.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Manor Park

Thames Water are carrying out Disconnection or alteration of supply on Manor Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:09.

Thames Water logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Weardale Road

Thames Water are carrying out Disconnection or alteration of supply on Weardale Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Jul 2024 at 10:38.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 15 Sep 2025
Details
View Map
Share
Follow
Hatherley Crescent

Thames Water are proposing to carry out New service connection on Hatherley Crescent, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 15 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:10.

London Borough Of Lewisham logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Lewisham High Street

London Borough Of Lewisham are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 08:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 11 Oct 2024 at 14:33.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 1 Dec 2025
Details
View Map
Share
Follow
Faraday Avenue

Thames Water are proposing to carry out New service connection on Faraday Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:06.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2024 at 16:33.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 14:04.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 12:51.

Southern Gas Networks logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Middleton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Middleton Avenue, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2024 at 11:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 12:24.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Durham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 14:04.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Durham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 11:06.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Springfield Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Springfield Road, Sydenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:00 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 08:04.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Princes Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Princes Avenue, Petts Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 10:30 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 11:05.

Southern Gas Networks logo
LONG TERM
Until
13 Nov 2024
Details
View Map
Share
Follow
Chislehurst Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Chislehurst Road, Orpington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 10:00 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 08:17.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Chislehurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chislehurst Road, Orpington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 09:29.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Anerley Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Anerley Park Road, Penge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 11:00 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 11:01.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Westwood Hill

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Westwood Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 12:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:29.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 25 Nov 2024
Details
View Map
Share
Follow
Worlds End Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 7 May 2024 at 13:03.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 18 Nov 2024
Details
View Map
Share
Follow
Durham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:52.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Kirkdale

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Kirkdale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 14:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:28.

Southern Gas Networks logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Homestead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Homestead Road, Chelsfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 10:50 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 09:56.

Southern Gas Networks logo
LONG TERM
Between
30 Sep and 8 Nov 2024
Details
View Map
Share
Follow
Sefton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sefton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
30 Sep and 8 Nov 2024
Details
View Map
Share
Follow
Sefton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sefton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 14:33.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Stoneycroft Close

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Stoneycroft Close, London.

These works were categorised as Major.

The works were originally planned to start 30 September 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2024 at 10:59.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Vine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vine Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 10:01.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Howard Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 14:38.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Rookery Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Rookery Road, Downe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:23.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
New Road Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on New Road Hill, Downe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:29.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Kemsing Close

Southern Gas Networks are carrying out Utility repair and maintenance works on Kemsing Close, Hayes.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 October 2024 at 09:00 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 08:32.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Sandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandford Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 12:59.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Sandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandford Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 13:34.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Sandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandford Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Waring Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waring Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 11:38.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Dunvegan Road

Thames Water are carrying out Utility repair and maintenance works on Dunvegan Road, Eltham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2024 at 20:30 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 09:48.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lee High Road

Thames Water are carrying out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 October 2024 at 17:00 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 07:16.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Compton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Compton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 14:19.

UK Power Networks Eastern & London logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Howard Road, Penge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:30 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 11:55.

London Borough Of Bexley logo
Finishing
Tomorrow
Details
View Map
Share
Old Farm Avenue Car Park

London Borough Of Bexley were proposing to carry out Section 50 on Old Farm Avenue Car Park, Sidcup.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 22 Oct 2024 at 11:43.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on The Avenue, Bickley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 13:45 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 09:15.

Southern Gas Networks logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Beckenham Hill Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Beckenham Hill Road, Bellingham, Bromley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 11:45 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 10:38.

Southern Gas Networks logo
Between
21 Oct and 17 Nov 2024
Details
View Map
Share
Leaves Green Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Leaves Green Road, Keston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 17 November 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:40.

Southern Gas Networks logo
Between
21 Oct and 17 Nov 2024
Details
View Map
Share
Downe Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Downe Road, Downe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 17 November 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:41.

Southern Gas Networks logo
Between
21 Oct and 17 Nov 2024
Details
View Map
Share
Westerham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Westerham Road, Keston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 17 November 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:41.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Linslade Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Linslade Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 11:31.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Linslade Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Linslade Road, Orpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 4 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 13:39.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Vine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vine Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 16:10.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Vine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vine Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:45.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Vine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vine Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 19:07.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Vine Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Vine Road, Orpington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:25 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 11:39.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 16:10.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:45.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 10:33.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:25 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 11:41.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 09:38.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Mead Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Way, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Cromwell Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Avenue, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 12:59.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Cromwell Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Avenue, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 13:32.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Wendover Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wendover Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:35.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Wendover Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wendover Road, Bromley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:30 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 08:59.

Southern Gas Networks logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Waring Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Waring Road, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 16:55 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 08:41.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Blackfen Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Blackfen Road, Sidcup.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 13:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 14:36.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Hawes Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Hawes Lane, West Wickham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 23:15 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 09:05.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Widmore Road

Thames Water are carrying out Utility repair and maintenance works on Widmore Road, Bromley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 20:00 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 09:29.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Marvels Lane

Thames Water are carrying out Utility repair and maintenance works on Marvels Lane, Grove Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 09:46 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:21.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wellington Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Wellington Avenue, Sidcup.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 17:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 14:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2024 at 08:44.

London Borough Of Bexley logo
Finishing
Today
Details
View Map
Share
Ramillies Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Ramillies Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 October 2024 and run through until 30 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Oct 2024 at 10:05.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Willett Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willett Way, Petts Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 07:49.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Farnborough Common

Southern Gas Networks are carrying out Utility repair and maintenance works on Farnborough Common, Farnborough.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 14:43 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:13.

Southern Gas Networks logo
LONG TERM
Between
25 Oct and 24 Nov 2024
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:20.

Southern Gas Networks logo
Between
25 Oct and 22 Nov 2024
Details
View Map
Share
Croydon Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 09:13.

Thames Water logo
Between
26 Oct and 12 Nov 2024
Details
View Map
Share
Follow
Sidcup Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 15:51.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Sidcup High Street

Southern Gas Networks are carrying out New service connection on Sidcup High Street, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:40 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 09:41.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Sidcup High Street

Thames Water are proposing to carry out New service connection on Sidcup High Street, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 09:45.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Sidcup High Street

Thames Water are carrying out New service connection on Sidcup High Street, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 09:36 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Oct 2024 at 09:45.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Worlds End Lane

BT are carrying out Utility asset works on Worlds End Lane, Orpington.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 16:32 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Oct 2024 at 08:21.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Cromwell Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Avenue, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 09:10.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Sandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandford Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 09:10.

Thames Water logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Holmesdale Road

Thames Water are carrying out Utility repair and maintenance works on Holmesdale Road, South Norwood, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 12:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 12:59.

Virgin Media logo
Between
28 Oct and 11 Nov 2024
Details
View Map
Share
East Street

Virgin Media were proposing to carry out Utility asset works on East Street, Bromley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 11 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Oct 2024 at 08:44.

Southern Gas Networks logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 10:49.

Southern Gas Networks logo
Until
27 Nov 2024
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 08:14.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Avondale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Avondale Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 19:07.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Avondale Road

Thames Water are carrying out Utility repair and maintenance works on Avondale Road, Bromley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:30 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:48.

Southern Gas Networks logo
Between
28 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Eynswood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eynswood Drive, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 10:09.

Thames Water logo
Finishing
Today
Details
View Map
Share
Downham Way

Thames Water were proposing to carry out Utility repair and maintenance works on Downham Way, Bromley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 30 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:47.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Sidcup High Street

Southern Gas Networks are proposing to carry out New service connection on Sidcup High Street, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 10:23.

T-Mobile (UK) logo
Finishing
Tomorrow
Details
View Map
Share
Rochester Way

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Rochester Way, Eltham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 31 October 2024. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 9 Oct 2024 at 14:14.

Southern Gas Networks logo
Between
29 Oct and 26 Nov 2024
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 08:37.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Brackley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Brackley Road, Beckenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 12:50 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 09:11.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Copers Cope Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Copers Cope Road, Beckenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 12:54 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 09:12.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Windsor Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Windsor Drive, Chelsfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 09:00 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 10:16.

Southern Gas Networks logo
Between
30 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Willett Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willett Way, Petts Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 13:24.

Southern Gas Networks logo
Until
6 Nov 2024
Details
View Map
Share
Follow
Leesons Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Leesons Hill, St Pauls Cray.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 10:00 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 14:22.

London Borough Of Bromley logo
Finishing
Friday
Details
View Map
Share
Follow
Hillside Road

London Borough Of Bromley are carrying out Highway improvement works on Hillside Road, Shortlands.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 09:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 30 Oct 2024 at 09:02.

London Borough Of Lewisham logo
Finishing
Friday
Details
View Map
Share
Follow
King Alfred Avenue

London Borough Of Lewisham are proposing to carry out Highway improvement works on King Alfred Avenue, Bellingham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 08:55.

London Borough Of Lewisham logo
Finishing
Friday
Details
View Map
Share
Follow
King Alfred Avenue

London Borough Of Lewisham are carrying out Highway improvement works on King Alfred Avenue, Bellingham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 09:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 30 Oct 2024 at 10:29.

Southern Gas Networks logo
LONG TERM
Between
1 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Worlds End Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:10.

Southern Gas Networks logo
Between
1 and 15 Nov 2024
Details
View Map
Share
Follow
Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Petts Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 12:25.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Rookery Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rookery Road, Downe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:12.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 15 Dec 2024
Details
View Map
Share
Follow
New Road Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Road Hill, Downe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:12.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Cudham Lane North

Thames Water were proposing to carry out Utility repair and maintenance works on Cudham Lane North, Orpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 11:36.

Thames Water logo
Between
4 and 12 Nov 2024
Details
View Map
Share
Follow
Starts Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Starts Hill Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 12 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 12:00.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Goddington Lane

BT are proposing to carry out Utility asset works on Goddington Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Aug 2024 at 15:45.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Goddington Lane

BT are proposing to carry out Utility asset works on Goddington Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 16 Oct 2024 at 08:23.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Goddington Lane

BT are proposing to carry out Utility asset works on Goddington Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Oct 2024 at 10:54.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Goddington Lane

BT are proposing to carry out Utility asset works on Goddington Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Aug 2024 at 13:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 10:49.

Thames Water logo
Between
4 and 10 Nov 2024
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 16:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 08:48.

Thames Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Bredhurst Close

Thames Water were proposing to carry out New service connection on Bredhurst Close, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 7 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 11:55.

London Borough Of Bromley logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Kent House Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Kent House Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 7 Oct 2024 at 15:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
5 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 08:48.

London Borough Of Lewisham logo
Between
5 and 11 Nov 2024
Details
View Map
Share
Follow
High Level Drive

London Borough Of Lewisham are proposing to carry out Highway improvement works on High Level Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 10:14.

London Borough Of Lewisham logo
Between
5 and 7 Nov 2024
Details
View Map
Share
Follow
High Level Drive

London Borough Of Lewisham are proposing to carry out Highway improvement works on High Level Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Oct 2024 at 09:48.

Thames Water logo
Between
5 and 12 Nov 2024
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 12 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 12:43.

Southern Gas Networks logo
Between
6 and 22 Nov 2024
Details
View Map
Share
Follow
Lee High Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lee High Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 14:28.

UK Power Networks Eastern & London logo
Between
7 and 15 Nov 2024
Details
View Map
Share
Follow
Blandford Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blandford Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
Between
7 and 15 Nov 2024
Details
View Map
Share
Follow
Blandford Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blandford Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 08:48.

London Borough Of Lewisham logo
Between
7 and 9 Nov 2024
Details
View Map
Share
Follow
Perry Rise

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Rise, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 10:03.

London Borough Of Lewisham logo
Between
7 and 9 Nov 2024
Details
View Map
Share
Follow
Perry Rise

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Rise, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 16 Oct 2024 at 11:16.

Electricity Network Company logo
Between
8 and 22 Nov 2024
Details
View Map
Share
Follow
South Street

Electricity Network Company are proposing to carry out Utility asset works on South Street, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 22 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 28 Aug 2024 at 11:05.

Electricity Network Company logo
Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
South Street

Electricity Network Company are proposing to carry out Utility asset works on South Street, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 26 Sep 2024 at 15:14.

Electricity Network Company logo
Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
South Street

Electricity Network Company are proposing to carry out Utility asset works on South Street, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 10 Oct 2024 at 13:48.

Southern Gas Networks logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Wingate Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wingate Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 10:22.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Mottingham Lane

Thames Water were proposing to carry out New service connection on Mottingham Lane, Mottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 14 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:54.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:32.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
St Mildreds Road

Thames Water were proposing to carry out Utility asset works on St Mildreds Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 4 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:47.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:11.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:22.

BT logo
Between
13 and 16 Nov 2024
Details
View Map
Share
Follow
Jewels Hill

BT are proposing to carry out Utility asset works on Jewels Hill, Biggin Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Aug 2024 at 11:23.

BT logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Jewels Hill

BT were proposing to carry out Utility asset works on Jewels Hill, Biggin Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 30 Aug 2024 at 10:10.

BT logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Sheepbarn Lane

BT were proposing to carry out Utility asset works on Sheepbarn Lane, Biggin Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 30 Aug 2024 at 10:06.

BT logo
Between
13 and 16 Nov 2024
Details
View Map
Share
Follow
Sheepbarn Lane

BT are proposing to carry out Utility asset works on Sheepbarn Lane, Biggin Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Aug 2024 at 11:23.

Transport for London (TfL) logo
Between
13 and 16 Nov 2024
Details
View Map
Share
Follow
South Eden Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on South Eden Park Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2024 at 08:31.

Transport for London (TfL) logo
Between
13 and 16 Nov 2024
Details
View Map
Share
Follow
South Eden Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on South Eden Park Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:16.

UK Power Networks Eastern & London logo
Between
13 and 21 Nov 2024
Details
View Map
Share
Follow
Croydon Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Feb 2024 at 13:59.

Thames Water logo
Between
16 and 22 Nov 2024
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:45.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Rookery Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rookery Road, Downe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 14:21.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
New Road Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Road Hill, Downe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 14:17.

Southern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Oxenden Wood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:28.

Southern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Oxenden Wood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 08:23.

London Borough Of Bromley logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Hawes Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Hawes Lane, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 7 Oct 2024 at 15:28.

Southern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Sefton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sefton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 09:28.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Hayes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hayes Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.

Southern Gas Networks logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Wiverton Road

Southern Gas Networks are proposing to carry out New service connection on Wiverton Road, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 09:38.

Southern Gas Networks logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Wiverton Road

Southern Gas Networks are proposing to carry out New service connection on Wiverton Road, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 08:52.

Southern Gas Networks logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Corbylands Road

Southern Gas Networks are proposing to carry out New service connection on Corbylands Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 08:32.

London Borough Of Lewisham logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Verdant Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Verdant Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 10:05.

London Borough Of Lewisham logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Verdant Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Verdant Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 8 Oct 2024 at 11:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 17 Mar 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 14:38.

London Borough Of Lewisham logo
Between
21 and 24 Nov 2024
Details
View Map
Share
Follow
Beckenham Hill Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Beckenham Hill Road, Bellingham, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 08:54.

London Borough Of Lewisham logo
Between
21 and 24 Nov 2024
Details
View Map
Share
Follow
Beckenham Hill Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Beckenham Hill Road, Bellingham, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 8 Oct 2024 at 11:38.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 09:35.

Southern Gas Networks logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Cobden Road

Southern Gas Networks are proposing to carry out New service connection on Cobden Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 16:11.

Southern Gas Networks logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Cobden Road

Southern Gas Networks are proposing to carry out New service connection on Cobden Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 14:46.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 13:34.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 08:41.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 09:23.

London Borough Of Croydon logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Portland Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Portland Road, South Norwood, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 5 Sep 2024 at 14:34.

Thames Water logo
Between
30 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:46.

Thames Water logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Clifford Road

Thames Water are proposing to carry out New service connection on Clifford Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 09:34.

Thames Water logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Clifford Road

Thames Water are proposing to carry out New service connection on Clifford Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 13:13.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Wendover Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wendover Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Anerley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Anerley Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 12:00.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 12 May 2025
Details
View Map
Share
Follow
Hollies Avenue

Thames Water are proposing to carry out New service connection on Hollies Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:27.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 12:50.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 11:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 08:48.

Southern Gas Networks logo
Between
4 and 19 Dec 2024
Details
View Map
Share
Croydon Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:51.

Thames Water logo
Between
4 and 19 Dec 2024
Details
View Map
Share
Follow
Bell Green

Thames Water are proposing to carry out New service connection on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:16.

Thames Water logo
Between
4 and 10 Dec 2024
Details
View Map
Share
Follow
Wellmeadow Road

Thames Water are proposing to carry out New service connection on Wellmeadow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:00.

Thames Water logo
Between
4 and 10 Dec 2024
Details
View Map
Share
Follow
Wellmeadow Road

Thames Water are proposing to carry out New service connection on Wellmeadow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 10:39.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Compton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Compton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 09:32.

National Highways logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Sidcup By Pass

National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2024 at 14:14.

National Highways logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Sidcup By Pass

National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 22 Oct 2024 at 13:02.

Thames Water logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Framlingham Crescent

Thames Water are proposing to carry out New service connection on Framlingham Crescent, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 10:16.

Thames Water logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Framlingham Crescent

Thames Water are proposing to carry out New service connection on Framlingham Crescent, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:49.

London Borough Of Bromley logo
Between
12 and 15 Dec 2024
Details
View Map
Share
Follow
Lovibonds Avenue

London Borough Of Bromley are proposing to carry out Highway improvement works on Lovibonds Avenue, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 25 Sep 2024 at 09:05.

London Borough Of Bexley logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Ramillies Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Ramillies Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Oct 2024 at 13:38.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:13.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 11:31.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 13:34.

Thames Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Brownhill Road

Thames Water are proposing to carry out New service connection on Brownhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 17:38.

Thames Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Brownhill Road

Thames Water are proposing to carry out New service connection on Brownhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:39.

Thames Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Sheepcote Lane

Thames Water are proposing to carry out New service connection on Sheepcote Lane, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 08:07.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Oxenden Wood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 09:56.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Worlds End Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 17:18.

Southern Gas Networks logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 13:52.

Southern Gas Networks logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 08:23.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Southborough Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southborough Lane, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Crown Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crown Lane, Bromley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 09:38.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Montrose Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:55.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Montrose Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 15:56.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Cavendish Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:53.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Cavendish Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 14:50.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Rutland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:58.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Rutland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 14:33.

London Borough Of Bromley logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Wood Lodge Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Wood Lodge Lane, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 25 Sep 2024 at 09:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 09:45.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 09:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 09:31.

Thames Water logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Sidcup Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:37.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:31.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Westhorne Avenue

Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:57.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:09.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:26.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Jan and 19 Jun 2025
Details
View Map
Share
Follow
Sandy Lane

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:36.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Jan and 19 Jun 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:36.

London Borough Of Bexley logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Blackfen Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 10:12.

Southern Gas Networks logo
Between
8 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Mead Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Way, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 13:52.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Jan and 2 Jul 2025
Details
View Map
Share
Sevenoaks Way

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 2 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 11:11.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Jan and 29 Jul 2025
Details
View Map
Share
Cray Avenue

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.

These works were categorised as Major.

The works were originally planned to start 13 January 2025 and run through until 29 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Sep 2024 at 11:40.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Thorndon Close

Thames Water are proposing to carry out New service connection on Thorndon Close, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:53.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Thorndon Close

Thames Water were proposing to carry out New service connection on Thorndon Close, St Pauls Cray.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:40.

Transport for London (TfL) logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2024 at 13:55.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:33.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:49.

Southern Gas Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sydney Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydney Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 10:57.

Southern Gas Networks logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Slades Drive

Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 13:24.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Welbeck Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:19.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Welbeck Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 11:00.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Chatsworth Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:00.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Chatsworth Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 10:56.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Collindale Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 08:28.

Thames Water logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:10.

Thames Water logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:27.

Thames Water logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Westhorne Avenue

Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 10:25.

Thames Water logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Westhorne Avenue

Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:11.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Sandy Lane

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 17:33.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Jan and 14 Aug 2025
Details
View Map
Share
Follow
Sevenoaks Way

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:35.

Transport for London (TfL) logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2024 at 12:07.

Transport for London (TfL) logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2024 at 12:15.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Waring Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waring Drive, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 09:28.

London Borough Of Bromley logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Station Square

London Borough Of Bromley are proposing to carry out Highway improvement works on Station Square, Petts Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 28 Oct 2024 at 07:56.

London Borough Of Bexley logo
Between
20 and 29 Jan 2025
Details
View Map
Share
Follow
Cray Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Cray Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 14:40.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Burnt Oak Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnt Oak Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 13:36.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Chatsworth Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 13:40.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2024 at 13:44.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2024 at 13:40.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2024 at 13:37.

London Borough Of Bromley logo
LONG TERM
Between
22 Jan and 4 Mar 2025
Details
View Map
Share
Follow
South Eden Park Road

London Borough Of Bromley are proposing to carry out Highway improvement works on South Eden Park Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 4 March 2025. The works will impact the footpath only.

This roadwork event was last updated by London Borough Of Bromley on 30 Oct 2024 at 12:11.

Thames Water logo
LONG TERM
Between
23 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Harland Road

Thames Water are proposing to carry out Utility asset works on Harland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2024 at 08:51.

Thames Water logo
LONG TERM
Between
23 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Harland Road

Thames Water are proposing to carry out Utility asset works on Harland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 08:21.

Thames Water logo
LONG TERM
Between
23 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Harland Road

Thames Water are proposing to carry out Utility asset works on Harland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:15.

Transport for London (TfL) logo
LONG TERM
Between
26 Jan 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 January 2025 and could run through until 28 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 16:13.

London Borough Of Bromley logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Addington Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Addington Road, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 28 Oct 2024 at 09:10.

London Borough Of Bromley logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Midfield Way

London Borough Of Bromley are proposing to carry out Highway improvement works on Midfield Way, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 28 Oct 2024 at 08:32.

Transport for London (TfL) logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2024 at 13:59.

Transport for London (TfL) logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2024 at 13:57.

Thames Water logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
William Barefoot Drive

Thames Water are proposing to carry out Utility repair and maintenance works on William Barefoot Drive, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 08:32.

Southern Gas Networks logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Collindale Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 13:16.

Southern Gas Networks logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Hill Crest

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Crest, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 13:20.


Roadworks Map near to Jaffray Road, BROMLEY, BR2 9NR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Oct 2024 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Jaffray Road, BROMLEY, BR2 9NR (34 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
EMERGENCY
  
BEACONSFIELD ROAD 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - No carriageway incursion
Complete
21 Oct 2024 12:05 - 29 Oct 2024 21:26
0.3
Details
Share
2
Southern Gas Networks logo
BEACONSFIELD ROAD 
(0.3 miles)
Southern Gas Networks
Disconnection or alteration of supply - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 30 Oct 2024 10:24
(Scheduled: 31 Oct 2024 - 6 Nov 2024)
0.3
Details
Share
Follow
3
Southern Gas Networks logo
EMERGENCY
  
THE AVENUE 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 17 Oct 2024 13:45
(Scheduled: 17 Oct 2024 - 31 Oct 2024)
0.3
Details
Share
Follow
4
Southern Gas Networks logo
MAJOR
  
WENDOVER ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 21 Oct 2024 08:30
(Scheduled: 21 Oct 2024 - 1 Nov 2024)
0.5
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
WENDOVER ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 21 Oct 2024 - 1 Nov 2024
0.5
Details
Share
Follow
6
Thames Water logo
SOUTHBOROUGH ROAD 
(0.5 miles)
Thames Water
Utility asset works - Carriageway - Two-way signals
Complete
14 Sep 2024 10:00 - 16:00
0.5
Details
Share
7
Southern Gas Networks logo
MAJOR
  
LANGDON ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 14 Oct 2024 13:30
(Scheduled: 11 Oct 2024 - 11 Nov 2024)
0.5
Details
Share
Follow
8
London Borough Of Bromley logo
NIGHTINGALE LANE 
(0.5 miles)
London Borough Of Bromley
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 30 Oct 2024 - 31 Oct 2024
0.5
Details
Share
Follow
9
Thames Water logo
COOMBE LEA 
(0.6 miles)
Thames Water
Utility asset works - Footway - No carriageway incursion
Complete
30 Oct 2024 11:25 - 14:23
0.6
Details
Share
10
Southern Gas Networks logo
MAJOR
  
CROMWELL AVENUE 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 21 Oct 2024 - 16 Dec 2024
0.6
Details
Share
Follow
  • ...