ROADWORK EVENT SUMMARY
Eynswood Drive, Sidcup between 16 Mar and 13 Apr 2025
Works Description for Eynswood Drive, Sidcup
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Eynswood Drive, Sidcup.
These works were categorised as Major.
There were no traffic signals or road closures necessary for these works and traffic would have operated on a give-and-take basis. However, the required permit was refused.
The works were originally planned to start 16 March 2025 and run through until 13 April 2025. The works were due to impact the footway and carriageway.
The information for these works was last updated by Southern Gas Networks on 12 November 2024 at 15:58.
Works Map for Eynswood Drive, Sidcup
Works Details
Southern Gas Networks
London Borough Of Bexley
Works Reference | XW016W119934470-00526 |
Permit Number | 06 |
Place Name |
Eynswood Drive Sidcup |
Proposed Start | 16 Mar 2025 |
Proposed End | 13 Apr 2025 |
Actual Start | |
Actual End |
Traffic Management | Give and take |
Impact | Footway, Carriageway |
Coordinates Lat, Lon |
51.420506 0.113509 |
Last Updated | 12 Nov 2024 15:58 |
Works Permits for Eynswood Drive, Sidcup
For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date or, in the case of 'immediate works', the start date contained in the application for immediate works and must end by the estimated end date provided on this permit. The proposed start date, actual start date and estimated end date will be as defined.
Applies to all permits.
For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date and must commence within the valid starting window period or in the case of immediate works by the actual start date contained in the application for immediate works. Once the activities have commenced, the activities must take no more than [x number of] days in total to be completed. The proposed start date, actual start date and estimated end date are as defined.
Applies to all permits.
For the activities hereby permitted, it is a condition of this permit that no materials and/or plant that will not be utilised within the working day are to be stored within or outside of the defined working space from (insert date) until (insert date) due to (stipulate reason for application of condition).
For the activities hereby permitted, it is a condition of this permit that the works comprised in [specified part A/B] of the activities hereby permitted shall be subject to and shall occur only when the following traffic management measures are in place [or as attached in schedule.].
For the activities hereby permitted, it is a condition of this permit that activities shall not be carried out unless a site information board(s) displaying the permit reference number is on the site at all times for the duration of the works. This must be displayed in a prominent place at all times so that it may be read easily by the public, clearly displaying the correct permit reference number. For immediate works, the display of the permit reference number is required by 10.00am on the next working day after the works have started on site.
Applies to all permits.
For the activities hereby permitted, it is a condition of this permit that activities shall not commence unless the promoter has publicised and/or advised all individual properties and businesses [on x roads] setting out where the works will take place; the nature of the works; the duration of the works; the intended start date [etc.] and contact details of a representative of the promoter.
Proposed Work Dates
Roadworks are planned in advance and sometimes are proposed to run over a number of days. It may well be that the roadworks start after the proposed start date due to bad weather or other operational delays. Equally, works may complete before the proposed end date as the works may have included a few extra days just in case.
Problems with roadworks?
On rare occasions, issues may occur during or after the completion of roadworks, such as:
- Poor reinstatement of the footpath or the carriageway.
- Rubbish and mess remaining after the works have completed.
- Traffic management issues during the works.
- Equipment left behind after the works have completed.
- Any other issues or disruption that the works may be causing.
In such instances, you should try and contact the organisation carrying out the works in the first instance. If we have contact details available they are shown on the detailed roadworks page.
In the event that the organistion cannot help, then the local authority that authorised the works may be able to help and again, if their contact details are published then we have provided their contact information on our detailed roadworks page.
Unfortunately, here at StreetGuide, we are only publishers of the data provided by the organisations and cannot provide information or assistance on individual works.
Contains public sector information licensed under the Open Government Licence v3.0.