ROADWORKS SUMMARY
Willow Close, BROMLEY, BR2 8EG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Willow Close, BR2 8EG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Willow Close, BROMLEY, BR2 8EG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Willow Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 13 Jan 2025
Details
View Map
Share
Follow
Willersley Avenue

Thames Water are proposing to carry out New service connection on Willersley Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 13 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:23.

Thames Water logo
LONG TERM
Between
6 May 2024 and 13 May 2025
Details
View Map
Share
Follow
Longmead Drive

Thames Water are proposing to carry out New service connection on Longmead Drive, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:16.

Thames Water logo
LONG TERM
Until
26 Oct 2024
Details
View Map
Share
Follow
Glenbow Road

Thames Water are carrying out Utility asset works on Glenbow Road, Bromley.

These works are categorised as Major.

The works started on 10 June 2024 at 10:36 and could run through until 26 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2024 at 09:48.

Thames Water logo
LONG TERM
Until
20 Oct 2024
Details
View Map
Share
Follow
Bromley Hill

Thames Water are carrying out Utility asset works on Bromley Hill, Bromley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 June 2024 at 09:55 and could run through until 20 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Jun 2024 at 10:51.

Southern Gas Networks logo
LONG TERM
Until
27 Oct 2024
Details
View Map
Share
Follow
Kidbrooke Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Kidbrooke Park Road, Kidbrooke.

These works are categorised as Major.

The works started on 22 July 2024 at 07:55 and could run through until 27 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Sep 2024 at 12:59.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 15 Sep 2025
Details
View Map
Share
Follow
Hatherley Crescent

Thames Water are proposing to carry out New service connection on Hatherley Crescent, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 15 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:10.

Thames Water logo
LONG TERM
Until
29 Sep 2024
Details
View Map
Share
Follow
The Green

Thames Water are carrying out Disconnection or alteration of supply on The Green, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2024 at 09:30 and could run through until 29 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 11:50.

Thames Water logo
LONG TERM
Until
15 Oct 2024
Details
View Map
Share
Follow
Sandpit Road

Thames Water are carrying out Utility asset works on Sandpit Road, Bromley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 07:00 and could run through until 15 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 07:56.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 1 Dec 2025
Details
View Map
Share
Follow
Faraday Avenue

Thames Water are proposing to carry out New service connection on Faraday Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:06.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 17 Oct 2024
Details
View Map
Share
Follow
Homestead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Homestead Road, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2024 at 15:19.

Southern Gas Networks logo
LONG TERM
Between
30 Aug and 4 Oct 2024
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 14:04.

Southern Gas Networks logo
LONG TERM
Between
30 Aug and 4 Oct 2024
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 08:36.

Southern Gas Networks logo
LONG TERM
Until
4 Oct 2024
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2024 at 10:15 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 11:06.

Southern Gas Networks logo
LONG TERM
Between
30 Aug and 4 Oct 2024
Details
View Map
Share
Follow
Linslade Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Linslade Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 14:04.

Southern Gas Networks logo
LONG TERM
Between
30 Aug and 4 Oct 2024
Details
View Map
Share
Follow
Linslade Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Linslade Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 08:39.

Southern Gas Networks logo
LONG TERM
Until
9 Oct 2024
Details
View Map
Share
Follow
Linslade Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Linslade Road, Orpington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 11:05 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 12:56.

Southern Gas Networks logo
LONG TERM
Between
30 Aug and 4 Oct 2024
Details
View Map
Share
Follow
Durham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham Avenue, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 14:04.

Southern Gas Networks logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Middleton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Middleton Avenue, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2024 at 11:00 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 11:11.

Southern Gas Networks logo
LONG TERM
Until
18 Oct 2024
Details
View Map
Share
Follow
Granton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Granton Road, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 11:10 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 11:19.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Kemsing Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kemsing Close, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 21 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2024 at 10:53.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Bourne Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bourne Way, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 21 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2024 at 10:53.

Southern Gas Networks logo
LONG TERM
Between
2 Sep and 13 Oct 2024
Details
View Map
Share
Follow
Rookery Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rookery Road, Downe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 13 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2024 at 16:15.

Southern Gas Networks logo
LONG TERM
Between
2 Sep and 27 Oct 2024
Details
View Map
Share
Follow
Leaves Green Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leaves Green Road, Keston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 20 Mar 2024 at 14:57.

Southern Gas Networks logo
Between
2 and 30 Sep 2024
Details
View Map
Share
Follow
Baston Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Baston Road, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
2 Sep and 4 Nov 2024
Details
View Map
Share
Follow
Durham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 14:04.

Southern Gas Networks logo
LONG TERM
Between
2 Sep and 4 Nov 2024
Details
View Map
Share
Follow
Durham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 11:06.

London Borough Of Bromley logo
Between
2 and 30 Sep 2024
Details
View Map
Share
Follow
Westgate Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Westgate Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 28 Aug 2024 at 09:29.

London Borough Of Bromley logo
Until
30 Sep 2024
Details
View Map
Share
Follow
Westgate Road

London Borough Of Bromley are carrying out Highway improvement works on Westgate Road, Beckenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:30 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2024 at 09:06.

Southern Gas Networks logo
LONG TERM
Until
4 Nov 2024
Details
View Map
Share
Follow
Princes Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Princes Avenue, Petts Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 10:30 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 11:05.

Southern Gas Networks logo
LONG TERM
Until
4 Nov 2024
Details
View Map
Share
Follow
Chislehurst Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Chislehurst Road, Orpington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 10:00 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 10:48.

Southern Gas Networks logo
LONG TERM
Between
9 Sep and 4 Nov 2024
Details
View Map
Share
Follow
Chislehurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chislehurst Road, Orpington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 09:29.

Southern Gas Networks logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Durham Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Durham Avenue, Shortlands.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 15:00 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 15:08.

Southern Gas Networks logo
LONG TERM
Until
16 Oct 2024
Details
View Map
Share
Follow
Dudsbury Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Dudsbury Road, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 10:25 and could run through until 16 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 10:38.

Southern Gas Networks logo
Between
9 and 30 Sep 2024
Details
View Map
Share
Follow
Welbeck Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jun 2024 at 08:55.

Southern Gas Networks logo
Between
9 and 30 Sep 2024
Details
View Map
Share
Follow
Chatsworth Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jun 2024 at 08:55.

Southern Gas Networks logo
Between
9 and 30 Sep 2024
Details
View Map
Share
Follow
Collindale Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jun 2024 at 08:55.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Sangley Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sangley Road, Catford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2024 at 14:27.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Plassy Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Plassy Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2024 at 14:29.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bromley Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bromley Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2024 at 14:29.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Catford Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Catford Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2024 at 14:28.

BT logo
LONG TERM
Until
28 Oct 2024
Details
View Map
Share
Follow
Foots Cray High Street

BT are carrying out Utility repair and maintenance works on Foots Cray High Street, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 08:30 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Sep 2024 at 15:00.

Southern Gas Networks logo
Between
13 Sep and 11 Oct 2024
Details
View Map
Share
Follow
Baston Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Baston Road, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 09:36.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 25 Nov 2024
Details
View Map
Share
Follow
Worlds End Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 May 2024 at 13:03.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 1 Nov 2024
Details
View Map
Share
Follow
Homestead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Homestead Road, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 10:17.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Petts Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 09:45.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Petts Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 13:29.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 18 Nov 2024
Details
View Map
Share
Follow
Durham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:52.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bromley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bromley Road, Beckenham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 15:45 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 12:21.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Copers Cope Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Copers Cope Road, Beckenham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 13:00 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 12:21.

London Borough Of Bexley logo
Finishing
Tuesday
Details
View Map
Share
Follow
Burnt Oak Lane

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Burnt Oak Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Jul 2024 at 15:36.

London Borough Of Bexley logo
Finishing
Tuesday
Details
View Map
Share
Follow
Burnt Oak Lane

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Burnt Oak Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 5 Sep 2024 at 16:19.

Thames Water logo
Between
18 Sep and 6 Oct 2024
Details
View Map
Share
Follow
Flimwell Close

Thames Water are proposing to carry out Utility asset works on Flimwell Close, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 16:25.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Dunvegan Road

Thames Water are carrying out Utility repair and maintenance works on Dunvegan Road, Eltham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 09:39 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:49.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Brackley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Brackley Road, Beckenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 17:00 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 08:28.

Southern Gas Networks logo
LONG TERM
Between
23 Sep and 25 Oct 2024
Details
View Map
Share
Follow
Fox Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fox Lane, Keston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 12:56.

Southern Gas Networks logo
LONG TERM
Between
23 Sep and 25 Oct 2024
Details
View Map
Share
Follow
West Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Common Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 12:56.

Southern Gas Networks logo
LONG TERM
Between
23 Sep and 25 Oct 2024
Details
View Map
Share
Follow
Baston Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Baston Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
23 Sep and 28 Oct 2024
Details
View Map
Share
Follow
Waring Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waring Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 13:02.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Corbylands Road

Southern Gas Networks were proposing to carry out New service connection on Corbylands Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 27 September 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 11:44.

Southern Gas Networks logo
Between
24 Sep and 7 Oct 2024
Details
View Map
Share
Follow
Montpelier Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Montpelier Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 14:16.

Southern Gas Networks logo
Between
25 Sep and 25 Oct 2024
Details
View Map
Share
Follow
Beckenham Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beckenham Hill Road, Bellingham, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 14:19.

Southern Gas Networks logo
Between
25 Sep and 16 Oct 2024
Details
View Map
Share
Follow
Esher Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Esher Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 16 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 14:37.

UK Power Networks Eastern & London logo
Between
30 Sep and 7 Oct 2024
Details
View Map
Share
Follow
Burnhill Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Burnhill Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 13:32.

UK Power Networks Eastern & London logo
Between
30 Sep and 7 Oct 2024
Details
View Map
Share
Follow
Burnhill Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Burnhill Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2024 at 10:56.

Thames Water logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Court Farm Road

Thames Water are proposing to carry out New service connection on Court Farm Road, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jul 2024 at 17:13.

Thames Water logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Court Farm Road

Thames Water are proposing to carry out New service connection on Court Farm Road, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2024 at 20:14.

Southern Gas Networks logo
Between
30 Sep and 21 Oct 2024
Details
View Map
Share
Follow
Stansted Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stansted Crescent, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 16:53.

Southern Gas Networks logo
Between
30 Sep and 21 Oct 2024
Details
View Map
Share
Follow
Shoreham Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shoreham Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 10:11.

Southern Gas Networks logo
Between
30 Sep and 21 Oct 2024
Details
View Map
Share
Follow
Shoreham Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shoreham Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 16:54.

Southern Gas Networks logo
Between
30 Sep and 21 Oct 2024
Details
View Map
Share
Follow
Burnt Oak Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnt Oak Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2024 at 11:37.

Southern Gas Networks logo
Between
30 Sep and 21 Oct 2024
Details
View Map
Share
Follow
Collindale Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2024 at 13:03.

Southern Gas Networks logo
Between
30 Sep and 21 Oct 2024
Details
View Map
Share
Follow
Hill Crest

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Crest, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2024 at 13:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
30 Sep and 1 Nov 2024
Details
View Map
Share
Follow
Stoneycroft Close

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Stoneycroft Close, London.

These works are categorised as Major.

The works will start on or after 30 September 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2024 at 09:30.

Southern Gas Networks logo
LONG TERM
Between
2 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Vine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vine Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 10:01.

Southern Gas Networks logo
Between
3 and 25 Oct 2024
Details
View Map
Share
Follow
Logs Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Logs Hill, Chislehurst.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 25 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2024 at 15:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Howard Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 14:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Howard Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2024 at 11:12.

Thames Water logo
Between
4 and 6 Oct 2024
Details
View Map
Share
Follow
Cudham Lane North

Thames Water are proposing to carry out Remedial works on Cudham Lane North, Cudham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 6 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:06.

Thames Water logo
Between
4 and 6 Oct 2024
Details
View Map
Share
Follow
Cudham Lane North

Thames Water are proposing to carry out Remedial works on Cudham Lane North, Cudham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 6 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:04.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Rookery Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rookery Road, Downe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Sep 2024 at 08:05.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
New Road Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Road Hill, Downe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 12:18.

UK Power Networks South Eastern logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Worlds End Lane

UK Power Networks South Eastern were proposing to carry out Utility asset works on Worlds End Lane, Orpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 11 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2024 at 10:33.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Sandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandford Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 12:59.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Sandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandford Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 13:34.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Sandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandford Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Sandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandford Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 12:49.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Waring Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waring Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Sep 2024 at 10:21.

Southern Gas Networks logo
Between
7 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Wingate Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wingate Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 13:52.

Southern Gas Networks logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Follow
Durham Road

Southern Gas Networks are proposing to carry out New service connection on Durham Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 10:44.

Thames Water logo
Between
7 and 15 Oct 2024
Details
View Map
Share
Longlands Park Crescent

Thames Water were proposing to carry out New service connection on Longlands Park Crescent, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 15 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 13:29.

UK Power Networks South Eastern logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
Brow Crescent

UK Power Networks South Eastern are proposing to carry out New service connection on Brow Crescent, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Jul 2024 at 10:46.

Southern Gas Networks logo
Between
14 and 22 Oct 2024
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out New service connection on High Street, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 22 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.

Thames Water logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Mottingham Lane

Thames Water were proposing to carry out New service connection on Mottingham Lane, Mottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 17 October 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:37.

Thames Water logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Follow
Mottingham Lane

Thames Water are proposing to carry out New service connection on Mottingham Lane, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 09:38.

Thames Water logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Follow
Mottingham Lane

Thames Water are proposing to carry out New service connection on Mottingham Lane, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 13:32.

UK Power Networks Eastern & London logo
Between
15 and 17 Oct 2024
Details
View Map
Share
Follow
Brookehowse Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Brookehowse Road, Bellingham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 12:06.

Southern Gas Networks logo
Between
15 and 21 Oct 2024
Details
View Map
Share
Follow
Broadfield Road

Southern Gas Networks are proposing to carry out New service connection on Broadfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 08:04.

Thames Water logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
Hazelbank Road

Thames Water are proposing to carry out Utility asset works on Hazelbank Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jul 2024 at 13:08.

Thames Water logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
Hazelbank Road

Thames Water are proposing to carry out Utility asset works on Hazelbank Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:19.

Thames Water logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
Torridon Road

Thames Water are proposing to carry out Utility asset works on Torridon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jul 2024 at 13:02.

Thames Water logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
Torridon Road

Thames Water are proposing to carry out Utility asset works on Torridon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:36.

Thames Water logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
Dowanhill Road

Thames Water are proposing to carry out Utility asset works on Dowanhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jul 2024 at 13:07.

Thames Water logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
Dowanhill Road

Thames Water are proposing to carry out Utility asset works on Dowanhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:16.

Southern Gas Networks logo
Between
21 Oct and 17 Nov 2024
Details
View Map
Share
Leaves Green Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Leaves Green Road, Keston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 17 November 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:40.

Southern Gas Networks logo
Between
21 Oct and 17 Nov 2024
Details
View Map
Share
Downe Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Downe Road, Downe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 17 November 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:41.

Southern Gas Networks logo
Between
21 Oct and 17 Nov 2024
Details
View Map
Share
Westerham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Westerham Road, Keston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 17 November 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:41.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Vine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vine Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 16:10.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Vine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vine Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:45.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Vine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vine Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 19:07.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Vine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vine Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:11.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 16:10.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:45.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 10:33.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Glentrammon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glentrammon Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:13.

UK Power Networks South Eastern logo
Between
21 and 24 Oct 2024
Details
View Map
Share
Follow
High Street

UK Power Networks South Eastern are proposing to carry out New service connection on High Street, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Jul 2024 at 07:46.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 10:58.

Southern Gas Networks logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Mead Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Way, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Cromwell Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Avenue, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 12:59.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Cromwell Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Avenue, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 13:32.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Cromwell Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Avenue, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 12:51.

Southern Gas Networks logo
Between
21 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Wendover Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wendover Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:35.

Southern Gas Networks logo
Between
21 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Wendover Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wendover Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:02.

Thames Water logo
Between
21 and 27 Oct 2024
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 27 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 13:52.

Thames Water logo
Between
21 and 27 Oct 2024
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 27 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 08:53.

Thames Water logo
Between
21 and 27 Oct 2024
Details
View Map
Share
Follow
Avondale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Avondale Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 27 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 10:33.

Thames Water logo
Between
21 and 27 Oct 2024
Details
View Map
Share
Avondale Road

Thames Water were proposing to carry out Utility repair and maintenance works on Avondale Road, Bromley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 27 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2024 at 11:04.

Thames Water logo
Between
21 and 29 Oct 2024
Details
View Map
Share
Follow
Annandale Road

Thames Water are proposing to carry out New service connection on Annandale Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 29 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 14:56.

Thames Water logo
Between
22 and 24 Oct 2024
Details
View Map
Share
Burnhill Road

Thames Water were proposing to carry out New service connection on Burnhill Road, Beckenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 24 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 14:31.

Thames Water logo
Between
22 and 24 Oct 2024
Details
View Map
Share
Follow
Burnhill Road

Thames Water are proposing to carry out New service connection on Burnhill Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 24 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 15:28.

Thames Water logo
Between
26 Oct and 12 Nov 2024
Details
View Map
Share
Follow
Sidcup Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 15:51.

Virgin Media logo
Between
28 Oct and 11 Nov 2024
Details
View Map
Share
Follow
East Street

Virgin Media are proposing to carry out Utility asset works on East Street, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Jul 2024 at 08:44.

Thames Water logo
Between
28 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Avondale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Avondale Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 19:07.

Southern Gas Networks logo
Between
28 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Eynswood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eynswood Drive, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 10:09.

Thames Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Downham Way

Thames Water are proposing to carry out Utility repair and maintenance works on Downham Way, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2024 at 14:02.

T-Mobile (UK) logo
Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Rochester Way

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rochester Way, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 2 Aug 2024 at 18:13.

London Borough Of Lewisham logo
Between
30 Oct and 1 Nov 2024
Details
View Map
Share
Follow
King Alfred Avenue

London Borough Of Lewisham are proposing to carry out Highway improvement works on King Alfred Avenue, Bellingham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 08:55.

Southern Gas Networks logo
LONG TERM
Between
1 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Worlds End Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 15:10.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Cudham Lane North

Thames Water were proposing to carry out Utility repair and maintenance works on Cudham Lane North, Orpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 11:36.

Thames Water logo
Between
4 and 12 Nov 2024
Details
View Map
Share
Follow
Starts Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Starts Hill Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 12 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 12:00.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Goddington Lane

BT are proposing to carry out Utility asset works on Goddington Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Aug 2024 at 15:45.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Goddington Lane

BT are proposing to carry out Utility asset works on Goddington Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Aug 2024 at 13:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 10:49.

Thames Water logo
Between
4 and 10 Nov 2024
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 16:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
Between
7 and 15 Nov 2024
Details
View Map
Share
Follow
Blandford Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blandford Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

London Borough Of Lewisham logo
Between
7 and 9 Nov 2024
Details
View Map
Share
Follow
Perry Rise

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Rise, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 10:03.

Electricity Network Company logo
Between
8 and 22 Nov 2024
Details
View Map
Share
Follow
South Street

Electricity Network Company are proposing to carry out Utility asset works on South Street, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 22 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 28 Aug 2024 at 11:05.

Electricity Network Company logo
Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
South Street

Electricity Network Company are proposing to carry out Utility asset works on South Street, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 19 Sep 2024 at 13:03.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Mottingham Lane

Thames Water were proposing to carry out New service connection on Mottingham Lane, Mottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 14 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:54.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:32.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
St Mildreds Road

Thames Water were proposing to carry out Utility asset works on St Mildreds Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 4 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:47.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:11.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:22.

BT logo
Between
13 and 16 Nov 2024
Details
View Map
Share
Follow
Jewels Hill

BT are proposing to carry out Utility asset works on Jewels Hill, Biggin Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Aug 2024 at 11:23.

BT logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Jewels Hill

BT were proposing to carry out Utility asset works on Jewels Hill, Biggin Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 30 Aug 2024 at 10:10.

BT logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Sheepbarn Lane

BT were proposing to carry out Utility asset works on Sheepbarn Lane, Biggin Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 30 Aug 2024 at 10:06.

BT logo
Between
13 and 16 Nov 2024
Details
View Map
Share
Follow
Sheepbarn Lane

BT are proposing to carry out Utility asset works on Sheepbarn Lane, Biggin Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Aug 2024 at 11:23.

Transport for London (TfL) logo
Between
13 and 16 Nov 2024
Details
View Map
Share
Follow
South Eden Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on South Eden Park Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2024 at 08:31.

UK Power Networks Eastern & London logo
Between
13 and 21 Nov 2024
Details
View Map
Share
Follow
Croydon Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Feb 2024 at 13:59.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Hayes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hayes Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.

Southern Gas Networks logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Corbylands Road

Southern Gas Networks are proposing to carry out New service connection on Corbylands Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 08:32.

London Borough Of Lewisham logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Verdant Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Verdant Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 10:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 17 Mar 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 14:38.

London Borough Of Lewisham logo
Between
21 and 24 Nov 2024
Details
View Map
Share
Follow
Beckenham Hill Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Beckenham Hill Road, Bellingham, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 08:54.

Thames Water logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Stonehouse Lane

Thames Water are proposing to carry out New service connection on Stonehouse Lane, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 06:10.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 13:34.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 08:41.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 12:48.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Wendover Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wendover Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 12 May 2025
Details
View Map
Share
Follow
Hollies Avenue

Thames Water are proposing to carry out New service connection on Hollies Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 11:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

Thames Water logo
Between
4 and 10 Dec 2024
Details
View Map
Share
Follow
Wellmeadow Road

Thames Water are proposing to carry out New service connection on Wellmeadow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:00.

Thames Water logo
Between
4 and 10 Dec 2024
Details
View Map
Share
Follow
Wellmeadow Road

Thames Water are proposing to carry out New service connection on Wellmeadow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 13:47.

National Highways logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Sidcup By Pass

National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2024 at 14:14.

Thames Water logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Framlingham Crescent

Thames Water are proposing to carry out New service connection on Framlingham Crescent, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 13:22.

London Borough Of Bromley logo
Between
12 and 15 Dec 2024
Details
View Map
Share
Follow
Lovibonds Avenue

London Borough Of Bromley are proposing to carry out Highway improvement works on Lovibonds Avenue, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 12 Sep 2024 at 08:03.

Thames Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Sheepcote Lane

Thames Water are proposing to carry out New service connection on Sheepcote Lane, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 08:07.


Roadworks Map near to Willow Close, BROMLEY, BR2 8EG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Sep 2024 03:06
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Willow Close, BROMLEY, BR2 8EG (14 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
URGENT
  
FAIRMEAD CLOSE 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 20 Sep 2024 16:25
(Scheduled: 20 Sep 2024 - 24 Sep 2024)
0.3
Details
Share
Follow
2
Thames Water logo
MAGPIE HALL LANE 
(0.5 miles)
Thames Water
Remedial works - Footway - No carriageway incursion
Complete
20 Sep 2024 07:34 - 14:43
0.5
Details
Share
3
London Borough Of Bromley logo
MAJOR
  
SOUTHLANDS GROVE 
(0.7 miles)
London Borough Of Bromley
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 17 Sep 2024 10:13
(Scheduled: 17 Sep 2024 - 1 Oct 2024)
0.7
Details
Share
Follow
4
London Borough Of Bromley logo
GREAT THRIFT 
(0.9 miles)
London Borough Of Bromley
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 21 Sep 2024 - 24 Sep 2024
0.9
Details
Share
Follow
5
London Borough Of Bromley logo
BICKLEY PARK ROAD 
(0.9 miles)
London Borough Of Bromley
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 21 Sep 2024 - 24 Sep 2024
0.9
Details
Share
Follow
6
London Borough Of Bromley logo
GREAT THRIFT 
(0.9 miles)
London Borough Of Bromley
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 21 Sep 2024 - 24 Sep 2024
0.9
Details
Share
Follow
7
UK Power Networks South Eastern logo
QUEENSWAY 
(0.9 miles)
UK Power Networks South Eastern
New service connection - Footway - Some carriageway incursion
Cancelled
(Scheduled: 19 Sep 2024 - 25 Sep 2024)
0.9
Details
Share
8
London Borough Of Bromley logo
NIGHTINGALE ROAD 
(0.9 miles)
London Borough Of Bromley
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 20 Sep 2024 - 23 Sep 2024
0.9
Details
Share
Follow
9
Southern Gas Networks logo
MAJOR
  
PINES ROAD 
(0.9 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 2 Sep 2024 08:45
(Scheduled: 30 Aug 2024 - 1 Oct 2024)
0.9
Details
Share
Follow
10
Southern Gas Networks logo
MAJOR
  
PINES ROAD 
(0.9 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 2 Sep 2024 - 30 Sep 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data