1
Metrolink fencing and equipment near Mauldeth Road West
The new tram route to Chorlton / St Werburgh's Road opened in 2011, with tracks being laid a short distance beyond the St Werburgh's Road stop. Work was well underway on the next two extensions to the network - a continuation of the South Manchester Line along the disused railway to East Didsbury (along the trackbed seen here), and a line to Manchester Airport which will leave the existing line just behind the photographer's position.
Image: © Phil Champion
Taken: 18 Dec 2011
0.05 miles
2
End of the line - for now
The new Metrolink route to Chorlton / St Werburgh's Road opened in 2011. Track had been laid for a short distance beyond the St Werburgh's Road stop, and was in use as a headshunt. Work was well underway on the next two extensions to the network - a continuation of the South Manchester Line along the disused railway to Didsbury, and a line to Manchester Airport. The latter will leave the existing line near this point, cutting across former school playing fields and Chorlton Brook to join Mauldeth Road West.
Image: © Phil Champion
Taken: 18 Dec 2011
0.05 miles
3
Warning notice on Metrolink line fencing
This is just beyond the temporary end of the line after the St Werburgh's Road tram stop. The line will be extended across this view, along the disused railway line to East Didsbury.
Image: © Phil Champion
Taken: 18 Dec 2011
0.05 miles
4
End of the line - for now
The new Metrolink route to Chorlton / St Werburgh's Road opened in 2011. Track had been laid for a short distance beyond the St Werburgh's Road stop, and was in use as a headshunt. Work was well underway on the next two extensions to the network - a continuation of the South Manchester Line along the disused railway to Didsbury, and a line to Manchester Airport. The latter will leave the existing line just north of this point.
The photographers position is at the foot of Twenty-seven Steps - a flight of steps (not actually 27 of them) leading up to Mauldeth Road West adjacent to the railway bridge.
Image: © Phil Champion
Taken: 18 Dec 2011
0.05 miles
5
Chorlton Brook and the route of the Metrolink extension towards Manchester Airport
Work was already well underway preparing the route of the new extension to the tram network This will leave the South Manchester Line after the St Werburgh's Road stop, running right to left across this view to join Mauldeth Road West, where it will run along the central reservation to Hardy Lane. The buildings form part of Chorlton High School.
Image: © Phil Champion
Taken: 18 Dec 2011
0.05 miles
6
Current end of the Metrolink line near Mauldeth Road West
The disused railway line to Chorlton was re-opened as far as the new St Werburgh's Road stop in July 2011. The tracks were extended a short distance beyond the station. Work was well underway extending the route SE along the former heavy rail line to Didsbury. The line to Manchester Airport will leave the South Manchester Line just north of this point, to run across the triangular area of grass (already fenced off from the adjoining playing field), crossing Chorlton Brook, and joining Mauldeth Road West near Chorlton High School.
Image: © Phil Champion
Taken: 18 Dec 2011
0.06 miles
7
Japanese Knotweed at the Clough, Chorlton-cum-Hardy
To the left are the buildings of Chorlton High School.
Image: © Phil Champion
Taken: 18 Dec 2011
0.06 miles
8
Mauldeth Road West railway bridge, Chorlton cum Hardy
Mauldeth Road West was constructed in the 1920s, crossing the existing railway line by means of this substantial bridge. Older maps indicate that prior to the new dual carriageway being constructed there was already a railway bridge here carrying a lane from Hough End Hall. Although only a double track line, space was left for future doubling to four tracks. The railway was closed in the 1960s and for many years the public had unrestricted access along the trackbed under this bridge. However the line had recently been opened as far as St Werburgh's Road as part of the Metrolink tram network, and work was underway to extend the line to East Didsbury, and this section was already well fenced off.
The small building probably houses electrical equipment related to the overhead lines.
Expect the graffiti to be removed before the new line opens.
Image: © Phil Champion
Taken: 18 Dec 2011
0.06 miles
9
The top of Twenty-Seven Steps, Mauldeth Road West, Chorlton
Mauldeth Road West was constructed in the 1920s, crossing the existing railway line by means of a substantial bridge. The road rises up to cross the line on substantial embankment. Steps on the north side of the road next to the bridge lead down to track level, a footpath then following Chorlton Brook to Nell Lane. Old maps suggest there was a bridge here before the dual carriageway was constructed, carrying a lane which led past Hough End Hall, though the current roadway is substantially wider.
The name twenty-seven steps is a name that was certainly current during the late twentieth century, although I don't know if the location is still known by that name. There certainly aren't twenty seven of them (around thirty?).
Image: © Phil Champion
Taken: 18 Dec 2011
0.06 miles
10
Line of the Metrolink extension near Chorlton High School
The new tram route to Chorlton / St Werburgh's Road opened in 2011. Work was well underway on the next two extensions to the network - a continuation of the South Manchester Line along the disused railway to Didsbury, and a line to Manchester Airport. The latter will leave the existing line just after St Werburgh's Road, cutting across former school playing fields and Chorlton Brook to join Mauldeth Road West at the end of the line of trees. Work was already well underway on the new route.
Image: © Phil Champion
Taken: 18 Dec 2011
0.06 miles