ROADWORKS SUMMARY
Station Drive, RUGELEY, WS15 4DA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Station Drive, WS15 4DA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Station Drive, RUGELEY, WS15 4DA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Station Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Staffordshire County Council logo
LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Meg Lane

Staffordshire County Council are carrying out Highway improvement works on Meg Lane, Burntwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 May 2024 at 00:00 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Jun 2024 at 15:04.

Staffordshire County Council logo
LONG TERM
Between
2 Sep 2024 and 2 Jul 2025
Details
View Map
Share
Follow
Lea Hall Way

Staffordshire County Council are proposing to carry out Highway improvement works on Lea Hall Way, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 16 Jul 2024 at 12:50.

Staffordshire County Council logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Priory Avenue

Staffordshire County Council are carrying out Highway improvement works on Priory Avenue, Hawksyard, Rugeley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 06:00 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 08:21.

Staffordshire County Council logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Lea Hall Way

Staffordshire County Council are carrying out Highway improvement works on Lea Hall Way, Rugeley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 06:00 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 12:53.

Staffordshire County Council logo
LONG TERM
Between
30 Oct 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Netherstowe Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Netherstowe Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 28 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 10:20.

Staffordshire County Council logo
LONG TERM
Between
30 Oct 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Netherstowe Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Netherstowe Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 28 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 8 Aug 2024 at 14:04.

Staffordshire County Council logo
LONG TERM
Between
30 Oct 2024 and 28 Jan 2025
Details
View Map
Share
Netherstowe Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Netherstowe Lane, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Aug 2024 at 08:50.

Cadent Gas logo
LONG TERM
Between
19 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Littleworth Road

Cadent Gas were proposing to carry out Utility asset works on Littleworth Road, Cannock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 20 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:59.

Staffordshire County Council logo
LONG TERM
Between
25 Nov 2024 and 29 Sep 2025
Details
View Map
Share
Follow
Priory Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Priory Avenue, Hawksyard, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:52.

Staffordshire County Council logo
LONG TERM
Between
30 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Netherstowe Lane

Staffordshire County Council were proposing to carry out Utility asset works on Netherstowe Lane, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2024 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Aug 2024 at 08:50.

Staffordshire County Council logo
Until
14 Jan 2025
Details
View Map
Share
Follow
Sandford Street

Staffordshire County Council are carrying out Highway improvement works on Sandford Street, Lichfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Jan 2025 at 08:21.

Staffordshire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Fecknam Way

Staffordshire County Council are proposing to carry out Highway improvement works on Fecknam Way, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 10:07.

Staffordshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ponesfield Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ponesfield Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 09:54.

Electricity Network Company logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
A38 From J A513 To J B5016 Ne

Electricity Network Company were proposing to carry out New service connection on A38 From J A513 To J B5016 Ne, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 13:17.

Staffordshire County Council logo
LONG TERM
Between
6 Jan and 2 Apr 2025
Details
View Map
Share
Follow
Watery Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Watery Lane, Curborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 16:30.

Staffordshire County Council logo
LONG TERM
Between
6 Jan and 8 Oct 2025
Details
View Map
Share
Watery Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Watery Lane, Curborough.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 13:33.

Staffordshire County Council logo
LONG TERM
Between
6 Jan and 1 Oct 2025
Details
View Map
Share
Follow
Watery Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Watery Lane, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 16:30.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cannock Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Wood Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 14:15.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cannock Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Wood Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:13.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Old Road

Network Rail are proposing to carry out Works for Rail Purposes on Old Road, Armitage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Oct 2024 at 11:49.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Morrey Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Morrey Lane, Morrey, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 09:53.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Hollow Lane

Staffordshire County Council are carrying out Highway improvement works on Hollow Lane, Colton.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 6 January 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Jan 2025 at 11:37.

Staffordshire County Council logo
Until
13 Jan 2025
Details
View Map
Share
Follow
Uttoxeter Road

Staffordshire County Council are carrying out Highway improvement works on Uttoxeter Road, Colton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 12:06 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Jan 2025 at 12:36.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Chase Road

Staffordshire County Council are proposing to carry out Highway improvement works on Chase Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 10:27.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Ivanhoe Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 16:12.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sycamore Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sycamore Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 16:44.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Milestone Way

Staffordshire County Council are proposing to carry out Highway improvement works on Milestone Way, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 10:43.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Cannock Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Road, Chase Terrace.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 09:42.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
St John Street

Staffordshire County Council are proposing to carry out Highway improvement works on St John Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:54.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Water Street

Staffordshire County Council are proposing to carry out Highway improvement works on Water Street, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 16:44.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Stowe Street

Staffordshire County Council are proposing to carry out Highway improvement works on Stowe Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 11:35.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Abnalls Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Abnalls Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 13:45.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Brownsfield Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brownsfield Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 11:49.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Spring Road

Staffordshire County Council are proposing to carry out Highway improvement works on Spring Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 13:32.

Staffordshire County Council logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wood End Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wood End Lane, Hilliards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 09:09.

Staffordshire County Council logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Wood End Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Wood End Lane, Wood End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 15:23.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Common Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Common Lane, Pipe Ridware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 13:45.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Bondfield Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Bondfield Lane, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 09:21.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Savey Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Savey Lane, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 09:21.

Staffordshire County Council logo
Between
15 and 24 Jan 2025
Details
View Map
Share
Follow
Bird Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bird Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 11:52.

South Staffordshire Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Market Street

South Staffordshire Water were proposing to carry out New service connection on Market Street, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 28 Oct 2024 at 11:54.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Hobstone Hill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hobstone Hill Lane, Chorley, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Dec 2024 at 15:30.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Daisy Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Daisy Lane, Alrewas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Stile Cop Road

Staffordshire County Council are proposing to carry out Highway improvement works on Stile Cop Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:26.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Redbrook Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Redbrook Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:51.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lea Hall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lea Hall Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:51.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Hislop Road

Staffordshire County Council are proposing to carry out Highway improvement works on Hislop Road, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:39.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Landor Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Landor Crescent, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:39.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Upper Cross Road

Staffordshire County Council are proposing to carry out Highway improvement works on Upper Cross Road, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 14:41.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Heron Street

Staffordshire County Council are proposing to carry out Highway improvement works on Heron Street, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:26.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Fernwood Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Fernwood Drive, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:26.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Leyland Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Leyland Drive, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 14:29.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Yoxall Road

Staffordshire County Council are proposing to carry out Highway improvement works on Yoxall Road, Hamstall Ridware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 19 Dec 2024 at 14:08.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Sturgeons Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sturgeons Hill, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 16:30.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Sturgeons Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sturgeons Hill, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Dec 2024 at 09:03.

South Staffordshire Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Wade Street

South Staffordshire Water were proposing to carry out New service connection on Wade Street, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 24 Oct 2024 at 10:12.

Staffordshire County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Tamworth Street

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 11:52.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Rugeley Road

Staffordshire County Council were proposing to carry out Highway improvement works on Rugeley Road, Hednesford, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 16:04.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Whitgreave Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Whitgreave Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 08:34.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Meadow Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Meadow Lane, Woodhouses, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Post Office Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Post Office Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:55.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Burnthill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Burnthill Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 08:34.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Woodcock Road

Staffordshire County Council are proposing to carry out Highway improvement works on Woodcock Road, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:08.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:54.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
30 Jan and 26 Mar 2025
Details
View Map
Share
Follow
Lichfield Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Lichfield Road, Kings Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Dec 2024 at 09:59.

Cadent Gas logo
Between
31 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Lymington Road

Cadent Gas are proposing to carry out Utility asset works on Lymington Road, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:33.

Cadent Gas logo
LONG TERM
Between
31 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Chorley Road

Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:18.

Cadent Gas logo
Between
31 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Ogley Hay Road

Cadent Gas are proposing to carry out Utility asset works on Ogley Hay Road, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:33.

Cadent Gas logo
Between
31 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Squirrels Hollow

Cadent Gas are proposing to carry out Utility asset works on Squirrels Hollow, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:01.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 16 May 2025
Details
View Map
Share
Follow
Friary Road

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 11:52.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Friary Road

Staffordshire County Council were proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 15:11.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 16 May 2025
Details
View Map
Share
Follow
Friary Island

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Island, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 11:52.

Cadent Gas logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out New service connection on Cedar Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 11:31.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Cappers Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 15:11.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Batesway

Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Upper Longdon, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Batesway

Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Brereton, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 15:13.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Yoxall Road

Staffordshire County Council are proposing to carry out Highway improvement works on Yoxall Road, Woodhouses, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Narrow Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Narrow Lane, Colton, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:11.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 23 May 2025
Details
View Map
Share
Follow
Friary Road

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 15:58.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 23 May 2025
Details
View Map
Share
Follow
Friary Island

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Island, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 15:45.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Birch Terrace

Cadent Gas are proposing to carry out New service connection on Birch Terrace, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:44.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Birch Terrace

Cadent Gas are proposing to carry out New service connection on Birch Terrace, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 07:53.

Staffordshire County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Dunstall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dunstall Lane, Woodlane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Dec 2024 at 09:25.

Staffordshire County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Dunstall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dunstall Lane, Woodlane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Jan 2025 at 14:43.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Hurst Farm Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hurst Farm Lane, Bromley Hurst, Abbots Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 14:57.

South Staffordshire Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Long Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Long Lane, Fradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 18 Dec 2024 at 08:09.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Willow Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Willow Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:51.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Borrowcop Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Borrowcop Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:36.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chase Road

Staffordshire County Council are proposing to carry out Highway improvement works on Chase Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 13:33.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chapel Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Chapel Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 10:37.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ivanhoe Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:24.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Tudor Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tudor Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:36.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Sycamore Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sycamore Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 13:33.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 10:37.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Cherry Orchard

Staffordshire County Council are proposing to carry out Highway improvement works on Cherry Orchard, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:36.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Victory Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Victory Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:51.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Rochester Avenue

Cadent Gas are proposing to carry out Utility asset works on Rochester Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:32.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Rochester Avenue

Cadent Gas are proposing to carry out Utility asset works on Rochester Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 08:08.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Slade Avenue

Cadent Gas are proposing to carry out Utility asset works on Slade Avenue, Chase Terrace.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:18.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Slade Avenue

Cadent Gas are proposing to carry out Utility asset works on Slade Avenue, Chase Terrace.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:17.

South Staffordshire Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Wissage Lane

South Staffordshire Water are proposing to carry out New service connection on Wissage Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 09:44.

South Staffordshire Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Scotch Orchard

South Staffordshire Water are proposing to carry out New service connection on Scotch Orchard, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 09:44.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Holly Grove Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Holly Grove Lane, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:36.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Squirrels Hollow

Cadent Gas are proposing to carry out Utility asset works on Squirrels Hollow, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 12:43.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Gilbert Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gilbert Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Nov 2024 at 11:58.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Sevens Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sevens Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 11:20.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Daisy Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Daisy Lane, Alrewas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 10:28.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Batesway

Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Upper Longdon, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:10.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Batesway

Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Brereton, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:10.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Meadow Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Meadow Lane, Woodhouses, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 09:07.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Yoxall Road

Staffordshire County Council are proposing to carry out Highway improvement works on Yoxall Road, Woodhouses, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 10:56.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Hurst Farm Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hurst Farm Lane, Bromley Hurst, Abbots Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 09:07.

Vodafone logo
Between
20 and 27 Feb 2025
Details
View Map
Share
Follow
A38 From J A5127 To J A513 Ne

Vodafone are proposing to carry out Statutory Infrastructure Works on A38 From J A5127 To J A513 Ne, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 26 Dec 2024 at 16:30.

Network Rail logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Ivanhoe Road

Network Rail are proposing to carry out Works for Rail Purposes on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Nov 2024 at 08:50.

Cadent Gas logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out New service connection on Cedar Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 08:23.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Bondfield Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Bondfield Lane, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Dec 2024 at 13:16.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Savey Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Savey Lane, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Dec 2024 at 13:02.

South Staffordshire Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Sandpits Lane

South Staffordshire Water are proposing to carry out New service connection on Sandpits Lane, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 23 Dec 2024 at 12:43.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Narrow Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Narrow Lane, Colton, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:10.

Cadent Gas logo
Between
28 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Squirrels Hollow

Cadent Gas are proposing to carry out Utility asset works on Squirrels Hollow, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 13:16.

Severn Trent Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Coulter Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coulter Lane, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 11:05.

Severn Trent Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Coulter Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coulter Lane, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 17:42.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Gilbert Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gilbert Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 09:44.

BT logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Chorley Road

BT are proposing to carry out Utility repair and maintenance works on Chorley Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 23 Dec 2024 at 12:28.

Staffordshire County Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Lichfield Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Lichfield Road, Rileyhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 15:13.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Blithbury Road

Staffordshire County Council are proposing to carry out Highway improvement works on Blithbury Road, Colton, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Dec 2024 at 13:17.

South Staffordshire Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Back Lane

South Staffordshire Water are proposing to carry out New service connection on Back Lane, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 23 Dec 2024 at 12:57.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Blithbury Road

Staffordshire County Council are proposing to carry out Highway improvement works on Blithbury Road, Blithbury, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Dec 2024 at 13:17.

Network Rail logo
Between
8 and 10 Mar 2025
Details
View Map
Share
Follow
Slitting Mill Road

Network Rail are proposing to carry out Works for Rail Purposes on Slitting Mill Road, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Oct 2024 at 09:58.

Network Rail logo
Between
8 and 10 Mar 2025
Details
View Map
Share
Follow
Slitting Mill Road

Network Rail are proposing to carry out Works for Rail Purposes on Slitting Mill Road, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Dec 2024 at 13:36.

Western Power Distribution (West Midlands) logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Love Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Love Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Jan 2025 at 13:57.

Staffordshire County Council logo
Between
12 and 21 Mar 2025
Details
View Map
Share
Follow
Bird Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bird Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 09:13.

Staffordshire County Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Mill Green Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Green Lane, Abbots Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 09:41.

Staffordshire County Council logo
Between
17 and 25 Mar 2025
Details
View Map
Share
Follow
Sandford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Sandford Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Dec 2024 at 13:59.

Cadent Gas logo
Between
17 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Valley Lane

Cadent Gas are proposing to carry out Utility asset works on Valley Lane, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:33.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Cannock Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Wood Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 11:18.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Whitgreave Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Whitgreave Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Dec 2024 at 12:12.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Burnthill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Burnthill Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Dec 2024 at 12:26.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Blithbury Road

Staffordshire County Council are proposing to carry out Highway improvement works on Blithbury Road, Colton, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Dec 2024 at 15:30.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Blithbury Road

Staffordshire County Council are proposing to carry out Highway improvement works on Blithbury Road, Blithbury, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Dec 2024 at 15:30.

Staffordshire County Council logo
Between
21 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Cappers Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 11:55.

Staffordshire County Council logo
Between
21 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Cappers Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 23 Dec 2024 at 11:46.

Staffordshire County Council logo
Between
21 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Europa Way

Staffordshire County Council are proposing to carry out Highway improvement works on Europa Way, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 12:04.

Staffordshire County Council logo
Between
21 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Europa Way

Staffordshire County Council are proposing to carry out Highway improvement works on Europa Way, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 23 Dec 2024 at 11:46.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Willow Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Willow Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 08:12.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Borrowcop Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Borrowcop Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:40.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Chapel Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 08:25.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Tudor Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tudor Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 08:12.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 08:25.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Cherry Orchard

Staffordshire County Council are proposing to carry out Highway improvement works on Cherry Orchard, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:40.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Victory Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Victory Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 08:12.

Staffordshire County Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Tamworth Street

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 09:56.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Holly Grove Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Holly Grove Lane, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:40.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Sevens Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sevens Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:25.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Yoxall Road

Staffordshire County Council are proposing to carry out Highway improvement works on Yoxall Road, Hamstall Ridware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 17 Dec 2024 at 15:28.

Virgin Media logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Hood Lane

Virgin Media are proposing to carry out New service connection on Hood Lane, Longdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Virgin Media on 3 Jan 2025 at 11:21.


Roadworks Map near to Station Drive, RUGELEY, WS15 4DA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 6 Jan 2025 12:52
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Station Drive, RUGELEY, WS15 4DA (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Network Rail logo
MAJOR
  
OLD ROAD 
(0.4 miles)
Network Rail
Works for Rail Purposes - Carriageway - Road closure
Planned
Scheduled: 6 Jan 2025 - 8 Jan 2025
0.4
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.