ROADWORKS SUMMARY
Lodge Road, RUGELEY, WS15 1HT
Introduction
View current and future planned roadworks and road closures for Lodge Road, WS15 1HT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Lodge Road, RUGELEY, WS15 1HT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lodge Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Oct 2025
Staffordshire County Council are carrying out Highway improvement works on Meg Lane, Burntwood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 May 2024 at 00:00 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Jun 2024 at 15:04.
2 Sep 2024 and 2 Jul 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lea Hall Way, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Staffordshire County Council on 16 Jul 2024 at 12:50.
28 Jul 2025
Staffordshire County Council are carrying out Highway improvement works on Priory Avenue, Hawksyard, Rugeley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 06:00 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 08:21.
28 Jul 2025
Staffordshire County Council are carrying out Highway improvement works on Lea Hall Way, Rugeley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 06:00 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 12:53.
24 Dec 2024
Cadent Gas are carrying out Utility asset works on Chorley Road, Burntwood.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 13:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:38.
14 Nov and 18 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on John Street, Wimblebury, Cannock.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 November 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 09:22.
Tomorrow
Cadent Gas were proposing to carry out Utility asset works on Wimblebury Road, Hednesford, Cannock.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 11:51.
19 Nov 2024 and 20 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Littleworth Road, Cannock.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2024 and run through until 20 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:59.
17 Dec 2024
Cadent Gas are carrying out Utility asset works on Lymington Road, Burntwood.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:45 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 09:48.
25 Nov 2024 and 29 Sep 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Priory Avenue, Hawksyard, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:52.
2 and 22 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ogley Hay Road, Burntwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 09:06.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Hobstone Hill Lane, Chorley, Lichfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Sep 2024 at 14:38.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Hobstone Hill Lane, Chorley, Lichfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Rugeley Road, Hednesford, Cannock.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 13:57 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:13.
Tomorrow
Staffordshire County Council were proposing to carry out Highway improvement works on Main Road, Rugeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 09:53.
Tomorrow
Staffordshire County Council were proposing to carry out Highway improvement works on Lea Hall Way, Rugeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 09:53.
Tomorrow
Staffordshire County Council were proposing to carry out Highway improvement works on Brereton Road, Rugeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 09:39.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Pipe Lane, Pipe Ridware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 14:17.
Tomorrow
Staffordshire County Council were proposing to carry out Highway improvement works on Western Springs Road, Rugeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:21.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Woodcock Road, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:32.
Tomorrow
Staffordshire County Council were proposing to carry out Highway improvement works on Rugeley Eastern Bypass, Rugeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 09:39.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Uttoxeter Road, Blithbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 10:25.
Tomorrow
Staffordshire County Council were proposing to carry out Highway improvement works on Uttoxeter Road, Blithbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 16:01.
Tomorrow
Staffordshire County Council were proposing to carry out Highway improvement works on Bishton Lane, Bishton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 08:47.
6 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Moreton Street, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 09:49.
9 and 24 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Squirrels Hollow, Burntwood.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 24 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:37.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Langholm Drive, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Sep 2024 at 12:10.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Langholm Drive, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 09:57.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Stafford Road, Lichfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 10:40.
9 Dec 2024 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Cannock Road, Chadsmoor, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 09:49.
9 Dec 2024 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Moreton Street, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:46.
9 Dec 2024 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Moreton Street, Cannock.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 10:30.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Stockings Lane, Upper Longdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.
9 and 13 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Crawley Lane, Kings Bromley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Sep 2024 at 10:24.
9 and 13 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Main Road, Rugeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 16:16.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Camp Road, Broadhurst Green, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:44.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Cardigan Avenue, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 09:45.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Springfield Avenue, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 09:45.
9 and 13 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Brereton Road, Rugeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 11:34.
9 and 13 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Taylors Lane, Rugeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 14:32.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Church Lane, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 10:35.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Bondfield Lane, Yoxall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 08:23.
9 and 13 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Rugeley Eastern Bypass, Rugeley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:21.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Blithbury Road, Blithbury, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:33.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Blithbury Road, Colton, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:33.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Moor Lane, Hamley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 15:34.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Sherracop Lane, Stockwell Heath, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 15:47.
9 and 12 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Little Tixall Lane, Great Haywood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:11.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Myatt Avenue, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 13:21.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Morley Road, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 13:21.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Rochester Avenue, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 13:33.
16 and 20 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Rake Hill, Burntwood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 1 Oct 2024 at 15:31.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Ironstone Road, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 13:08.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Chapel Street, Heath Hayes, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 14:23.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Holly Grove Lane, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:36.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Dark Lane, Chorley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:06.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Chorley Road, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:21.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Ford Lane, Creswell Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:21.
16 and 20 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Holly Hill Road, Cannock.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:38.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Holly Hill Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:49.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Crawley Lane, Kings Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Blithbury Road, Blithbury, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:36.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Hurst Farm Lane, Bromley Hurst, Abbots Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:27.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Cross Of Hands, Bromley Hurst, Abbots Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:27.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Port Lane, Abbots Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:54.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Port Lane, Abbots Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 08:23.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Seedcroft Lane, Mill Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:27.
17 and 20 Dec 2024
Staffordshire County Council were proposing to carry out Remedial works on Coley Lane, Little Haywood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:11.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Little Pipe Lane, Creswell Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 15:54.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Cross In Hand Lane, Farewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 15:54.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blithbury Road, Colton, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 08:34.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Uttoxeter Road, Blithbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 08:46.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Bellamour Lane, Bishton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 13:28.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Main Road, Colwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 15:14.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Main Road, Little Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 15:01.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Coley Lane, Little Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 10:57.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Newlands Lane, Newlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 13:06.
6 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Cannock Road, Chadsmoor, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 16:30.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Burgoyne Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 09:22.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Wood Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 14:15.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Wood Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:13.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Pye Green Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:20.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blewitt Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:20.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blewitt Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 13:03.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Whitfield Road, Hednesford, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:33.
6 Jan and 15 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Aug 2024 at 16:19.
6 Jan and 15 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 14:56.
6 Jan and 28 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Nov 2024 at 13:09.
6 Jan and 15 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Aug 2024 at 16:19.
6 Jan and 15 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 15:23.
6 Jan and 28 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Nov 2024 at 13:23.
6 and 8 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Old Road, Armitage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Oct 2024 at 11:49.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Morrey Lane, Morrey, Yoxall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 09:53.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Chase Road, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 10:27.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Sycamore Road, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 16:44.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Milestone Way, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 10:43.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Road, Chase Terrace.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 09:42.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Water Street, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 16:44.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Abnalls Lane, Lichfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 13:45.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Coverdale Way, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:14.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Dorset Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:01.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stafford Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:14.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Langholm Drive, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 14:15.
13 Jan and 10 Feb 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Wood End Lane, Wood End.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 15:23.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Common Lane, Pipe Ridware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 13:45.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Bondfield Lane, Yoxall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 09:21.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Port Lane, Abbots Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 09:49.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Goose Lane, Abbots Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 08:50.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Yeatsall Lane, Abbots Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 08:50.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Coverdale Way, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 14:51.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Dorset Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 14:51.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stafford Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 15:04.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Bank Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 14:51.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stile Cop Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:26.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Redbrook Lane, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:51.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lea Hall Lane, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:51.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hislop Road, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:39.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Landor Crescent, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:39.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Upper Cross Road, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 14:41.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Heron Street, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:26.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Fernwood Drive, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:26.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Leyland Drive, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 14:29.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Chapel Street, Heath Hayes, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:45.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Belt Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 11:48.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Heath Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:41.
27 and 31 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Rugeley Road, Hednesford, Cannock.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 16:04.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Camp Road, Broadhurst Green, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:08.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Whitgreave Lane, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Dec 2024 at 15:53.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Post Office Lane, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:55.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Burnthill Lane, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Dec 2024 at 15:53.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Woodcock Road, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:08.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:54.
30 Jan and 26 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Lichfield Road, Kings Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Dec 2024 at 09:59.
31 Jan and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lymington Road, Burntwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:33.
31 Jan and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Burntwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:18.
31 Jan and 20 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Ogley Hay Road, Burntwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:33.
31 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Squirrels Hollow, Burntwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:01.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blewitt Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 11:11.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Upper Longdon, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Brereton, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 15:13.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Narrow Lane, Colton, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:11.
10 and 14 Feb 2025
Cadent Gas are proposing to carry out New service connection on Birch Terrace, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:44.
10 and 14 Feb 2025
Cadent Gas are proposing to carry out New service connection on Birch Terrace, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:10.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Bellamour Lane, Bishton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 12:13.
10 and 14 Feb 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Main Road, Little Haywood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 17:35.
10 and 13 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Coley Lane, Little Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 12:27.
10 and 19 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Anson Row, Little Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:30.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hurst Farm Lane, Bromley Hurst, Abbots Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 14:57.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Chase Road, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 13:33.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Sycamore Road, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 13:33.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Road, Chase Terrace.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 1 Oct 2024 at 09:05.
17 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Rochester Avenue, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:32.
17 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Rochester Avenue, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 08:08.
17 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Slade Avenue, Chase Terrace.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:18.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Upper Longdon, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:10.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Brereton, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:10.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hurst Farm Lane, Bromley Hurst, Abbots Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 09:07.
24 and 28 Feb 2025
Cadent Gas are proposing to carry out New service connection on Cedar Road, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 14:00.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Narrow Lane, Colton, Rugeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:10.
28 Feb and 20 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Squirrels Hollow, Burntwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 13:30.
3 and 7 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coulter Lane, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 11:57.
3 and 5 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Chorley Road, Burntwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 4 Dec 2024 at 16:13.
3 and 11 Mar 2025
Severn Trent Water are proposing to carry out Remedial works on Burgoyne Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 14:08.
3 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Lichfield Road, Rileyhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 22 Nov 2024 at 15:03.
Roadworks Map near to Lodge Road, RUGELEY, WS15 1HT
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Lodge Road, RUGELEY, WS15 1HT (13 Events)
(Scheduled Dates)
(miles)
(Scheduled: 23 Sep 2024 - 28 Jul 2025)
Contains public sector information licensed under the Open Government Licence v3.0.