ROADWORKS SUMMARY
Cross In Hand Lane, LICHFIELD, WS13 8DY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cross In Hand Lane, WS13 8DY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cross In Hand Lane, LICHFIELD, WS13 8DY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cross In Hand Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Staffordshire County Council logo
LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Meg Lane

Staffordshire County Council are carrying out Highway improvement works on Meg Lane, Burntwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 May 2024 at 00:00 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Jun 2024 at 15:04.

Staffordshire County Council logo
LONG TERM
Between
2 Sep 2024 and 2 Jul 2025
Details
View Map
Share
Follow
Lea Hall Way

Staffordshire County Council are proposing to carry out Highway improvement works on Lea Hall Way, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 16 Jul 2024 at 12:50.

Staffordshire County Council logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Priory Avenue

Staffordshire County Council are carrying out Highway improvement works on Priory Avenue, Hawksyard, Rugeley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 06:00 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 08:21.

Staffordshire County Council logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Lea Hall Way

Staffordshire County Council are carrying out Highway improvement works on Lea Hall Way, Rugeley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 06:00 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 12:53.

Staffordshire County Council logo
LONG TERM
Between
30 Oct 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Netherstowe Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Netherstowe Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 28 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 10:20.

Staffordshire County Council logo
LONG TERM
Between
30 Oct 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Netherstowe Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Netherstowe Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 28 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 8 Aug 2024 at 14:04.

Staffordshire County Council logo
LONG TERM
Between
30 Oct 2024 and 28 Jan 2025
Details
View Map
Share
Netherstowe Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Netherstowe Lane, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Aug 2024 at 08:50.

Cadent Gas logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Chorley Road

Cadent Gas are carrying out Utility asset works on Chorley Road, Burntwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 13:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:38.

Cadent Gas logo
LONG TERM
Between
14 Nov and 18 Dec 2024
Details
View Map
Share
John Street

Cadent Gas were proposing to carry out Utility asset works on John Street, Wimblebury, Cannock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 09:22.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Wimblebury Road

Cadent Gas were proposing to carry out Utility asset works on Wimblebury Road, Hednesford, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 11:51.

Cadent Gas logo
LONG TERM
Between
19 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Littleworth Road

Cadent Gas were proposing to carry out Utility asset works on Littleworth Road, Cannock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 20 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:59.

Cadent Gas logo
Until
17 Dec 2024
Details
View Map
Share
Follow
Lymington Road

Cadent Gas are carrying out Utility asset works on Lymington Road, Burntwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:45 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 09:48.

Cadent Gas logo
Between
22 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Hednesford Road

Cadent Gas are proposing to carry out Utility asset works on Hednesford Road, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 11:00.

Cadent Gas logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Hednesford Road

Cadent Gas are carrying out Utility asset works on Hednesford Road, Brownhills.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 09:15.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lawnoaks Close

Cadent Gas are proposing to carry out Utility asset works on Lawnoaks Close, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 11:33.

Cadent Gas logo
Until
12 Dec 2024
Details
View Map
Share
Follow
Lawnoaks Close

Cadent Gas are carrying out Utility asset works on Lawnoaks Close, Brownhills.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 09:00 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 09:13.

Staffordshire County Council logo
LONG TERM
Between
25 Nov 2024 and 29 Sep 2025
Details
View Map
Share
Follow
Priory Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Priory Avenue, Hawksyard, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:52.

Staffordshire County Council logo
LONG TERM
Between
30 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Netherstowe Lane

Staffordshire County Council were proposing to carry out Utility asset works on Netherstowe Lane, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2024 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Aug 2024 at 08:50.

Staffordshire County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Wall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wall Lane, Wall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Sep 2024 at 11:52.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Fisherwick Road

Staffordshire County Council are carrying out Highway improvement works on Fisherwick Road, Whittington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 08:29 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:24.

Cadent Gas logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Follow
Ogley Hay Road

Cadent Gas are proposing to carry out Utility asset works on Ogley Hay Road, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 09:06.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hobstone Hill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hobstone Hill Lane, Chorley, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Sep 2024 at 14:38.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hobstone Hill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hobstone Hill Lane, Chorley, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Gilbert Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gilbert Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 10:35.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Fine Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Fine Lane, Bell Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 10:11.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Daisy Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Daisy Lane, Alrewas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 10:11.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Main Road

Staffordshire County Council were proposing to carry out Highway improvement works on Main Road, Rugeley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 09:53.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Lea Hall Way

Staffordshire County Council were proposing to carry out Highway improvement works on Lea Hall Way, Rugeley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 09:53.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Meadow Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Meadow Lane, Woodhouses, Yoxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Aug 2024 at 10:35.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Pipe Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Pipe Lane, Pipe Ridware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 14:17.

Cadent Gas logo
Between
3 and 17 Dec 2024
Details
View Map
Share
Follow
Lunns Croft

Cadent Gas are proposing to carry out Utility asset works on Lunns Croft, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 14:13.

Cadent Gas logo
Between
3 and 24 Dec 2024
Details
View Map
Share
Follow
Partridge Croft

Cadent Gas are proposing to carry out Utility asset works on Partridge Croft, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 14:13.

Cadent Gas logo
Between
5 and 27 Dec 2024
Details
View Map
Share
Follow
St Michael Road

Cadent Gas are proposing to carry out Utility asset works on St Michael Road, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 14:26.

Cadent Gas logo
Between
5 and 27 Dec 2024
Details
View Map
Share
Follow
Scotch Orchard

Cadent Gas are proposing to carry out Utility asset works on Scotch Orchard, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 14:26.

Cadent Gas logo
Between
5 and 27 Dec 2024
Details
View Map
Share
Follow
Valley Lane

Cadent Gas are proposing to carry out Utility asset works on Valley Lane, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 14:26.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Fighting Cock Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Fighting Cock Lane, Stonnall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 11:03.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Ashcroft Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Ashcroft Lane, Shenstone, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 11:44.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Ashcroft Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Ashcroft Lane, Wall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 11:44.

Cadent Gas logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Poole Crescent

Cadent Gas are proposing to carry out Utility asset works on Poole Crescent, Brownhills.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 11:36.

Cadent Gas logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Poole Crescent

Cadent Gas are proposing to carry out Utility asset works on Poole Crescent, Brownhills.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 10:06.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Park Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Park Avenue, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 09:20.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
St James Road

Staffordshire County Council are proposing to carry out Highway improvement works on St James Road, Norton Canes, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 09:32.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Tamworth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 09:35.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Quarry Hills Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Quarry Hills Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 10:41.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Abbotsford Road

Staffordshire County Council are proposing to carry out Highway improvement works on Abbotsford Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 11:54.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Huddlesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:41.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Europa Way

Staffordshire County Council are proposing to carry out Highway improvement works on Europa Way, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 11:54.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Whittington Hurst, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:41.

Cadent Gas logo
Between
9 and 24 Dec 2024
Details
View Map
Share
Squirrels Hollow

Cadent Gas were proposing to carry out Utility asset works on Squirrels Hollow, Burntwood.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 24 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:37.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Fecknam Way

Staffordshire County Council are proposing to carry out Highway improvement works on Fecknam Way, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 10:01.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Weston Road

Staffordshire County Council are proposing to carry out Highway improvement works on Weston Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 10:40.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Stockford Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Stockford Lane, Hilliards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 13:38.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Stafford Road

Staffordshire County Council are proposing to carry out Highway improvement works on Stafford Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 10:40.

Electricity Network Company logo
Between
9 and 20 Dec 2024
Details
View Map
Share
A38 From J A513 To J B5016 Ne

Electricity Network Company were proposing to carry out New service connection on A38 From J A513 To J B5016 Ne, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Electricity Network Company on 9 Oct 2024 at 10:21.

Network Rail logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Brookhay Lane

Network Rail are proposing to carry out Works for Rail Purposes on Brookhay Lane, Hilliards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Aug 2024 at 09:28.

Network Rail logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Brookhay Lane

Network Rail are proposing to carry out Works for Rail Purposes on Brookhay Lane, Hilliards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Oct 2024 at 09:10.

Network Rail logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Brookhay Lane

Network Rail were proposing to carry out Works for Rail Purposes on Brookhay Lane, Hilliards Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Oct 2024 at 10:42.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Brookhay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Brookhay Lane, Hilliards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:41.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Moor

Staffordshire County Council are proposing to carry out Highway improvement works on The Moor, Fradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:08.

Staffordshire County Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Fradley Junction

Staffordshire County Council are proposing to carry out Highway improvement works on Fradley Junction, Orgreave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:08.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Sale Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Sale Lane, Fradley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 10:53.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Sale Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Sale Lane, Fradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:08.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Stockings Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Stockings Lane, Upper Longdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Crawley Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Crawley Lane, Kings Bromley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Sep 2024 at 10:24.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Main Road

Staffordshire County Council were proposing to carry out Highway improvement works on Main Road, Rugeley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 16:16.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Springfield Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Springfield Avenue, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 09:45.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Holly Hill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Holly Hill Road, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:28.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Church Road

Staffordshire County Council are proposing to carry out Highway improvement works on Church Road, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:28.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Barracks Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Barracks Lane, Walsall Wood, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:49.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Brooklyn Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brooklyn Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 15:18.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Newgate Street

Staffordshire County Council are proposing to carry out Highway improvement works on Newgate Street, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 15:32.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Brantwood Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Brantwood Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 15:18.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Baker Street

Staffordshire County Council are proposing to carry out Highway improvement works on Baker Street, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 13:33.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Meadway Street

Staffordshire County Council are proposing to carry out Highway improvement works on Meadway Street, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 15:32.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Myatt Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Myatt Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 13:21.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Morley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Morley Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 13:21.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Rochester Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Rochester Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 13:33.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Rake Hill

Staffordshire County Council were proposing to carry out Highway improvement works on Rake Hill, Burntwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 1 Oct 2024 at 15:31.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Ironstone Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ironstone Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 13:08.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Holly Grove Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Holly Grove Lane, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:36.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Dark Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dark Lane, Chorley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:06.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Chorley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Chorley Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:21.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Ford Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Ford Lane, Creswell Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:21.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Holly Hill Road

Staffordshire County Council were proposing to carry out Highway improvement works on Holly Hill Road, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:38.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Holly Hill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Holly Hill Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:49.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Sittles Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Sittles Lane, Bell Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 13:38.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Roddige Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Roddige Lane, Bell Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 13:50.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Crawley Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Crawley Lane, Kings Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Red Lion Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Red Lion Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 09:00.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Red Lion Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Red Lion Lane, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 14:33.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Little Pipe Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Pipe Lane, Creswell Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 15:54.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Cross In Hand Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cross In Hand Lane, Farewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 15:54.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Fine Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Fine Lane, Bell Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 08:34.

Cadent Gas logo
LONG TERM
Between
3 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lindon Road

Cadent Gas are proposing to carry out Utility asset works on Lindon Road, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:41.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Fighting Cock Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Fighting Cock Lane, Stonnall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 10:09.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hillside Close

Cadent Gas are proposing to carry out Utility asset works on Hillside Close, Brownhills.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:47.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Commonside

Cadent Gas are proposing to carry out Utility asset works on Commonside, Brownhills.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:55.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Lindon Road

Cadent Gas are proposing to carry out Utility asset works on Lindon Road, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 14:40.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Wall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wall Lane, Wall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:56.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Fisherwick Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fisherwick Road, Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 10:22.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brantwood Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Brantwood Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 10:58.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Meadway Street

Staffordshire County Council are proposing to carry out Highway improvement works on Meadway Street, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 10:58.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Huddlesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 09:16.

Staffordshire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Fecknam Way

Staffordshire County Council are proposing to carry out Highway improvement works on Fecknam Way, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 10:07.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Broad Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Broad Lane, Whittington Hurst, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:01.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Ponesfield Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ponesfield Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 09:54.

Electricity Network Company logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
A38 From J A513 To J B5016 Ne

Electricity Network Company were proposing to carry out New service connection on A38 From J A513 To J B5016 Ne, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 13:17.

Staffordshire County Council logo
LONG TERM
Between
6 Jan and 2 Apr 2025
Details
View Map
Share
Follow
Watery Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Watery Lane, Curborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 16:30.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Brookhay Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Brookhay Lane, Hilliards Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 10:48.

Staffordshire County Council logo
LONG TERM
Between
6 Jan and 8 Oct 2025
Details
View Map
Share
Watery Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Watery Lane, Curborough.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 13:33.

Staffordshire County Council logo
LONG TERM
Between
6 Jan and 1 Oct 2025
Details
View Map
Share
Follow
Watery Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Watery Lane, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 16:30.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Cannock Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Wood Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 14:15.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Cannock Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Wood Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:13.

Network Rail logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Old Road

Network Rail are proposing to carry out Works for Rail Purposes on Old Road, Armitage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Oct 2024 at 11:49.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Marsh Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Marsh Lane, Darnford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 16:15.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Marsh Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Marsh Lane, Darnford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 09:13.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Chase Road

Staffordshire County Council are proposing to carry out Highway improvement works on Chase Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 10:27.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Ivanhoe Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 16:12.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sycamore Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sycamore Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 16:44.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Milestone Way

Staffordshire County Council are proposing to carry out Highway improvement works on Milestone Way, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 10:43.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Cannock Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Road, Chase Terrace.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 09:42.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
St John Street

Staffordshire County Council are proposing to carry out Highway improvement works on St John Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:54.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Water Street

Staffordshire County Council are proposing to carry out Highway improvement works on Water Street, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 16:44.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Stowe Street

Staffordshire County Council are proposing to carry out Highway improvement works on Stowe Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 11:35.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Abnalls Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Abnalls Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 13:45.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Dorset Road

Staffordshire County Council are proposing to carry out Highway improvement works on Dorset Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:01.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Stafford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Stafford Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:14.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Brownsfield Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brownsfield Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 11:49.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Spring Road

Staffordshire County Council are proposing to carry out Highway improvement works on Spring Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 13:32.

Staffordshire County Council logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wood End Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wood End Lane, Hilliards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 09:09.

Staffordshire County Council logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Wood End Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Wood End Lane, Wood End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 15:23.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Common Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Common Lane, Pipe Ridware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 13:45.

South Staffordshire Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Ashcroft Lane

South Staffordshire Water are proposing to carry out Remedial works on Ashcroft Lane, Shenstone, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 8 Oct 2024 at 11:40.

Cadent Gas logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wrekin View

Cadent Gas are proposing to carry out Utility asset works on Wrekin View, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 16:03.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Brownhills Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brownhills Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 09:13.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Red Lion Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Red Lion Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 09:13.

South Staffordshire Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Market Street

South Staffordshire Water were proposing to carry out New service connection on Market Street, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 28 Oct 2024 at 11:54.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Dorset Road

Staffordshire County Council are proposing to carry out Highway improvement works on Dorset Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 14:51.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Stafford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Stafford Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 15:04.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Daisy Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Daisy Lane, Alrewas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Stile Cop Road

Staffordshire County Council are proposing to carry out Highway improvement works on Stile Cop Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:26.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Redbrook Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Redbrook Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:51.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lea Hall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lea Hall Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:51.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Hislop Road

Staffordshire County Council are proposing to carry out Highway improvement works on Hislop Road, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:39.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
St Marks Road

Cadent Gas are proposing to carry out Utility asset works on St Marks Road, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:39.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Marklew Close

Cadent Gas are proposing to carry out Utility asset works on Marklew Close, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:41.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Marklew Close

Cadent Gas are proposing to carry out Utility asset works on Marklew Close, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 13:40.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Wrekin View

Cadent Gas were proposing to carry out Utility asset works on Wrekin View, Brownhills.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 09:57.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
St Marks Road

Cadent Gas are proposing to carry out Utility asset works on St Marks Road, Brownhills.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 13:40.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Silver Birch Road

Staffordshire County Council are proposing to carry out Highway improvement works on Silver Birch Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:03.

South Staffordshire Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Quarry Hills Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Quarry Hills Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 10 Oct 2024 at 10:07.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Sturgeons Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sturgeons Hill, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 16:30.

South Staffordshire Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Wade Street

South Staffordshire Water were proposing to carry out New service connection on Wade Street, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 24 Oct 2024 at 10:12.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Whitgreave Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Whitgreave Lane, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Dec 2024 at 15:53.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
30 Jan and 26 Mar 2025
Details
View Map
Share
Follow
Lichfield Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Lichfield Road, Kings Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Dec 2024 at 09:59.

Cadent Gas logo
Between
31 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Lymington Road

Cadent Gas are proposing to carry out Utility asset works on Lymington Road, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:33.

Cadent Gas logo
LONG TERM
Between
31 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Chorley Road

Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:18.

Cadent Gas logo
Between
31 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Ogley Hay Road

Cadent Gas are proposing to carry out Utility asset works on Ogley Hay Road, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:33.

Cadent Gas logo
Between
31 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Squirrels Hollow

Cadent Gas are proposing to carry out Utility asset works on Squirrels Hollow, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:01.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Robson Close

Cadent Gas were proposing to carry out Utility asset works on Robson Close, Brownhills.

These works were categorised as Major.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 09:06.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Brownhills Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brownhills Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:24.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Red Lion Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Red Lion Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Nov 2024 at 15:58.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Silver Birch Road

Staffordshire County Council are proposing to carry out Highway improvement works on Silver Birch Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:09.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Friary Road

Staffordshire County Council were proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 15:11.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Cappers Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 15:11.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Batesway

Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Upper Longdon, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Batesway

Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Brereton, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 15:13.

Walsall Metropolitan Borough Council logo
Between
6 and 26 Feb 2025
Details
View Map
Share
Follow
Lichfield Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lichfield Road, Sandhills.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 14 Nov 2024 at 09:40.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Pinfold Hill

Cadent Gas are proposing to carry out New service connection on Pinfold Hill, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:59.

South Staffordshire Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Back Lane

South Staffordshire Water are proposing to carry out New service connection on Back Lane, Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 25 Nov 2024 at 13:18.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 23 May 2025
Details
View Map
Share
Follow
Friary Road

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 12:04.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 23 May 2025
Details
View Map
Share
Follow
Friary Island

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Island, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:54.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Birch Terrace

Cadent Gas are proposing to carry out New service connection on Birch Terrace, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:44.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Birch Terrace

Cadent Gas are proposing to carry out New service connection on Birch Terrace, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:10.

Staffordshire County Council logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Burntwood Way

Staffordshire County Council are proposing to carry out Highway improvement works on Burntwood Way, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 09:07.

Staffordshire County Council logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Burntwood Way

Staffordshire County Council are proposing to carry out Highway improvement works on Burntwood Way, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Dec 2024 at 10:32.

South Staffordshire Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Long Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Long Lane, Fradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 20 Nov 2024 at 12:13.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chase Road

Staffordshire County Council are proposing to carry out Highway improvement works on Chase Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 13:33.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ivanhoe Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:24.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Sycamore Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sycamore Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 13:33.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Cappers Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 10:28.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Cannock Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Road, Chase Terrace.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 1 Oct 2024 at 09:05.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Rochester Avenue

Cadent Gas are proposing to carry out Utility asset works on Rochester Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:32.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Rochester Avenue

Cadent Gas are proposing to carry out Utility asset works on Rochester Avenue, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 08:08.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Slade Avenue

Cadent Gas are proposing to carry out Utility asset works on Slade Avenue, Chase Terrace.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:18.

South Staffordshire Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Wissage Lane

South Staffordshire Water are proposing to carry out New service connection on Wissage Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 09:44.

South Staffordshire Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Scotch Orchard

South Staffordshire Water are proposing to carry out New service connection on Scotch Orchard, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 09:44.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Gilbert Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gilbert Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Nov 2024 at 11:58.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Daisy Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Daisy Lane, Alrewas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 10:28.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Batesway

Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Upper Longdon, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:10.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Batesway

Staffordshire County Council are proposing to carry out Highway improvement works on Batesway, Brereton, Rugeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:10.

Vodafone logo
Between
20 and 27 Feb 2025
Details
View Map
Share
Follow
A38 From J A5127 To J A513 Ne

Vodafone are proposing to carry out Statutory Infrastructure Works on A38 From J A5127 To J A513 Ne, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 28 Nov 2024 at 09:45.

Network Rail logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Ivanhoe Road

Network Rail are proposing to carry out Works for Rail Purposes on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Nov 2024 at 08:50.

Cadent Gas logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out New service connection on Cedar Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 14:00.

Cadent Gas logo
Between
28 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Squirrels Hollow

Cadent Gas are proposing to carry out Utility asset works on Squirrels Hollow, Burntwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 13:30.

Severn Trent Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Coulter Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coulter Lane, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 11:57.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Gilbert Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gilbert Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 09:44.

BT logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Chorley Road

BT are proposing to carry out Utility repair and maintenance works on Chorley Road, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Dec 2024 at 16:13.

Staffordshire County Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Lichfield Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Lichfield Road, Rileyhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 22 Nov 2024 at 15:03.


Roadworks Map near to Cross In Hand Lane, LICHFIELD, WS13 8DY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 5 Dec 2024 01:36
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cross In Hand Lane, LICHFIELD, WS13 8DY (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
STAFFORD ROAD 
(0.3 miles)
BT
Utility repair and maintenance works - Verge - Some carriageway incursion
Planned
Scheduled: 6 Dec 2024
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.