ROADWORKS SUMMARY
Horbury View, OSSETT, WF5 0FA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Horbury View, WF5 0FA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Horbury View, OSSETT, WF5 0FA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Horbury View are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Thornhill Road

Network Rail are carrying out roadworks on Thornhill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 08:00 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Mar 2024 at 12:12.

Network Rail logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Calder Road

Network Rail are carrying out roadworks on Calder Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 07:00 and could run through until 30 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Mar 2024 at 08:14.

Network Rail logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Forge Lane

Network Rail are carrying out roadworks on Forge Lane, Thornhill Lees, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Oct 2024 at 07:07.

Network Rail logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Ravensthorpe Road

Network Rail are carrying out roadworks on Ravensthorpe Road, Thornhill Lees, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Jun 2024 at 08:05.

Network Rail logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Calder Road

Network Rail are carrying out roadworks on Calder Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Jun 2024 at 08:06.

LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Town Hall Way

Kirklees Council are carrying out Highway improvement works on Town Hall Way, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Kirklees Council on 15 Jul 2024 at 07:10.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Parkhill Grove

Yorkshire Water are proposing to carry out Utility asset works on Parkhill Grove, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:11.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Parkhill Grove

Yorkshire Water were proposing to carry out Utility asset works on Parkhill Grove, Wakefield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Sep 2024 at 08:36.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Parkhill Crescent

Yorkshire Water are proposing to carry out Utility asset works on Parkhill Crescent, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:11.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Parkhill Crescent

Yorkshire Water were proposing to carry out Utility asset works on Parkhill Crescent, Wakefield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2024 at 16:21.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are proposing to carry out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:12.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are proposing to carry out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2024 at 09:24.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Park Lodge Lane

Yorkshire Water are proposing to carry out Utility asset works on Park Lodge Lane, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:11.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Park Lodge Lane

Yorkshire Water are proposing to carry out Utility asset works on Park Lodge Lane, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2024 at 09:22.

LONG TERM
Between
9 Sep and 9 Nov 2024
Details
View Map
Share
Follow
Pentland Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Pentland Road, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 25 Jul 2024 at 09:15.

LONG TERM
Between
9 Sep and 9 Nov 2024
Details
View Map
Share
Follow
South Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on South Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 25 Jul 2024 at 09:15.

LONG TERM
Between
9 Sep and 9 Nov 2024
Details
View Map
Share
Follow
Purlwell Avenue

Kirklees Council are proposing to carry out Highway repair and maintenance works on Purlwell Avenue, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 18 Jul 2024 at 10:19.

LONG TERM
Between
9 Sep and 9 Nov 2024
Details
View Map
Share
Follow
Park Croft

Kirklees Council are proposing to carry out Highway repair and maintenance works on Park Croft, Staincliffe, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 18 Jul 2024 at 15:11.

LONG TERM
Between
9 Sep and 9 Nov 2024
Details
View Map
Share
Follow
Bridle Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Bridle Street, Soothill, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 18 Jul 2024 at 09:58.

Northern Gas Networks logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Ebury Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Ebury Street, Batley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 10:11.

Northern Gas Networks logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Bretton Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Bretton Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 09:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 11:23.

Northern Gas Networks logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Access To 31 Bretton Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Access To 31 Bretton Street, Savile Town, Dewsbury.

These works are categorised as Major.

The works started on 23 September 2024 at 12:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 12:51.

LONG TERM
Between
23 Sep and 18 Nov 2024
Details
View Map
Share
Follow
Pentland Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Pentland Road, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 7 Aug 2024 at 14:07.

LONG TERM
Between
23 Sep and 18 Nov 2024
Details
View Map
Share
Follow
South Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on South Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 7 Aug 2024 at 14:09.

Yorkshire Water logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are carrying out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:30 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 23 Sep 2024 at 09:37.

Northern Gas Networks logo
LONG TERM
Until
7 Nov 2024
Details
View Map
Share
Follow
Crackenedge Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Crackenedge Lane, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 09:00 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 09:17.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Leeds Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Leeds Road, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:30 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 28 Oct 2024 at 13:02.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Whitley Road

Kirklees Council are carrying out Highway improvement works on Whitley Road, Whitley, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 September 2024 at 08:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 23 Oct 2024 at 07:01.

LONG TERM
Between
30 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Bond Street

Kirklees Council are proposing to carry out Highway improvement works on Bond Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 10:02.

LONG TERM
Between
30 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Bond Street

Kirklees Council are proposing to carry out Highway improvement works on Bond Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:16.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Grosvenor Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jul 2024 at 12:45.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ebury Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ebury Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jul 2024 at 12:51.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Denby Dale Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Denby Dale Road, Durkar, Wakefield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 27 Sep 2024 at 07:51.

City Of Wakefield Metropolitan District Council logo
Finishing
Friday
Details
View Map
Share
Follow
Denby Dale Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Denby Dale Road, Durkar, Wakefield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2024 at 12:45 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 11 Oct 2024 at 09:16.

LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Pentland Road

Kirklees Council are carrying out Highway repair and maintenance works on Pentland Road, Savile Town, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:58.

LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
South Street

Kirklees Council are carrying out Highway repair and maintenance works on South Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:57.

LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Purlwell Avenue

Kirklees Council are carrying out Highway repair and maintenance works on Purlwell Avenue, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:51.

LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Park Croft

Kirklees Council are carrying out Highway repair and maintenance works on Park Croft, Staincliffe, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:57.

LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Bridle Street

Kirklees Council are carrying out Highway repair and maintenance works on Bridle Street, Soothill, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:51.

Yorkshire Water logo
LONG TERM
Between
7 Oct and 22 Dec 2024
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Jul 2024 at 12:36.

LONG TERM
Until
21 May 2025
Details
View Map
Share
Follow
Bond Street

Kirklees Council are carrying out Highway improvement works on Bond Street, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:30 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 7 Oct 2024 at 12:45.

City Of Wakefield Metropolitan District Council logo
Between
14 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Balne Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Balne Lane, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 20 Aug 2024 at 14:18.

City Of Wakefield Metropolitan District Council logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Balne Lane

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Balne Lane, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:30 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 14 Oct 2024 at 11:39.

Northern Gas Networks logo
Between
14 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Woodside

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodside, Wrenthorpe, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Apr 2024 at 10:50.

Northern Gas Networks logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Woodside

Northern Gas Networks are carrying out Utility repair and maintenance works on Woodside, Wrenthorpe, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 08:41.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Trough Well Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Trough Well Lane, Wrenthorpe, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 08:42.

City Of Wakefield Metropolitan District Council logo
Finishing
Today
Details
View Map
Share
Follow
Fishponds Drive

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fishponds Drive, Crigglestone, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 27 Aug 2024 at 09:36.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Between
15 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Ings Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ings Road, Wakefield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 11 Oct 2024 at 11:34.

Northern Powergrid (Yorkshire) logo
Finishing
Sunday
Details
View Map
Share
Follow
Wood Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Wood Street, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Sep 2024 at 15:39.

Northern Powergrid (Yorkshire) logo
Finishing
Sunday
Details
View Map
Share
Follow
Wood Street

Northern Powergrid (Yorkshire) are carrying out New service connection on Wood Street, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 October 2024 at 08:00 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Oct 2024 at 08:19.

Yorkshire Water logo
Between
21 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Parkhill Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Parkhill Grove, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 5 Sep 2024 at 14:09.

Yorkshire Water logo
Between
21 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Parkhill Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Parkhill Grove, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Sep 2024 at 12:40.

City Of Wakefield Metropolitan District Council logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Broadmeadows

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Broadmeadows, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 15 Oct 2024 at 15:28.

City Of Wakefield Metropolitan District Council logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Broadmeadows

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Broadmeadows, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:30 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 21 Oct 2024 at 15:50.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Park View

Yorkshire Water are carrying out Utility repair and maintenance works on Park View, Earlsheaton, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 08:00 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Oct 2024 at 08:29.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Follow
The Combs

Yorkshire Water are proposing to carry out Utility asset works on The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 22 Aug 2024 at 14:11.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
The Combs

Yorkshire Water were proposing to carry out Utility asset works on The Combs, Thornhill, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 3 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 09:13.

Northern Gas Networks logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Wrenthorpe Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Wrenthorpe Lane, Wrenthorpe, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 08:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Oct 2024 at 08:40.

Leeds City Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Britannia Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Britannia Road, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 24 Jul 2024 at 13:38.

Leeds City Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Britannia Road

Leeds City Council are proposing to carry out Highway improvement works on Britannia Road, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Jul 2024 at 10:54.

Leeds City Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Britannia Road

Leeds City Council are carrying out Highway improvement works on Britannia Road, Morley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 October 2024 at 09:00 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 28 Oct 2024 at 09:17.

Yorkshire Water logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
New Road

Yorkshire Water are carrying out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 09:11.

Yorkshire Water logo
Until
22 Nov 2024
Details
View Map
Share
Follow
Parkhill Grove

Yorkshire Water are carrying out Utility repair and maintenance works on Parkhill Grove, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 11:45 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 13:32.

LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Headfield Road

Kirklees Council were proposing to carry out roadworks on Headfield Road, Savile Town, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 9 Sep 2024 at 11:14.

LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Warren Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Warren Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 22 Aug 2024 at 15:45.

Cityfibre Metro Networks logo
Finishing
Today
Details
View Map
Share
Follow
Syke Ing Terrace

Cityfibre Metro Networks are proposing to carry out Utility asset works on Syke Ing Terrace, Earlsheaton, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Aug 2024 at 14:22.

Cityfibre Metro Networks logo
Today
Details
View Map
Share
Syke Ing Terrace

Cityfibre Metro Networks carried out Utility asset works on Syke Ing Terrace, Earlsheaton, Dewsbury.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 28 Oct 2024 and 30 Oct 2024 and were actually completed between 28 Oct 2024 (09:42) and 30 Oct 2024 (13:19). The works impacted the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Oct 2024 at 13:20.

Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Staincliffe Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Staincliffe Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Aug 2024 at 14:24.

Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Staincliffe Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Staincliffe Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 23 Sep 2024 at 10:47.

Northern Gas Networks logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Staincliffe Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Staincliffe Road, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 11:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Oct 2024 at 12:54.

Northern Gas Networks logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Access To 24-32 Heckmondwike Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Access To 24-32 Heckmondwike Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works started on 28 October 2024 at 11:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Oct 2024 at 12:55.

Northern Gas Networks logo
Until
22 Nov 2024
Details
View Map
Share
Follow
Woodland Grove

Northern Gas Networks are carrying out Utility repair and maintenance works on Woodland Grove, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works started on 28 October 2024 at 11:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Oct 2024 at 12:55.

Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Staincliffe Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Staincliffe Road, Westborough, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Aug 2024 at 14:24.

Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Staincliffe Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Staincliffe Road, Westborough, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 23 Sep 2024 at 10:48.

National Highways logo
Finishing
Monday
Details
View Map
Share
Follow
Lingwell Gate Lane

National Highways are proposing to carry out Highway repair and maintenance works on Lingwell Gate Lane, Lofthouse, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Sep 2024 at 11:24.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Woodhouse Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Woodhouse Lane, Emley, Huddersfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 12:23 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 30 Oct 2024 at 07:02.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Between
29 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Wood Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wood Lane, Overton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 29 Oct 2024 at 15:01.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Fenton Street

Yorkshire Water are carrying out roadworks on Fenton Street, Tingley, Wakefield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 06:47 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Oct 2024 at 08:57.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Foundry Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Foundry Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Aug 2024 at 20:49.

Between
3 and 24 Nov 2024
Details
View Map
Share
Follow
Huddersfield Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Huddersfield Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 10:41.

Between
3 and 24 Nov 2024
Details
View Map
Share
Follow
Huddersfield Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Huddersfield Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 29 Oct 2024 at 07:26.

Yorkshire Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Low Lane

Yorkshire Water are proposing to carry out Utility asset works on Low Lane, Middlestown, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Oct 2024 at 10:11.

Yorkshire Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Low Lane

Yorkshire Water are proposing to carry out Utility asset works on Low Lane, Middlestown, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Oct 2024 at 12:58.

Network Rail logo
LONG TERM
Between
4 Nov 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Thornhill Road

Network Rail are proposing to carry out roadworks on Thornhill Road, Dewsbury.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 10:07.

Northern Powergrid (Yorkshire) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Chidswell Lane

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Chidswell Lane, Shaw Cross, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Sep 2024 at 12:35.

City Of Wakefield Metropolitan District Council logo
Between
6 and 20 Nov 2024
Details
View Map
Share
Follow
Kenmore Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Kenmore Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 25 Oct 2024 at 10:04.

Network Rail logo
Between
8 and 11 Nov 2024
Details
View Map
Share
Follow
Portobello Road

Network Rail are proposing to carry out Works for Rail Purposes on Portobello Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 22 Aug 2024 at 11:20.

Network Rail logo
Between
8 and 11 Nov 2024
Details
View Map
Share
Follow
Portobello Road

Network Rail are proposing to carry out Works for Rail Purposes on Portobello Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Aug 2024 at 14:29.

Network Rail logo
Between
8 and 11 Nov 2024
Details
View Map
Share
Follow
Portobello Road

Network Rail are proposing to carry out Works for Rail Purposes on Portobello Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 25 Sep 2024 at 14:59.

Northern Powergrid (Yorkshire) logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Sunnydale Terrace

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sunnydale Terrace, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Sep 2024 at 07:48.

Northern Powergrid (Yorkshire) logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Sunnydale Terrace

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sunnydale Terrace, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Sep 2024 at 13:25.

Northern Powergrid (Yorkshire) logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Sunnydale Terrace

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Sunnydale Terrace, Ossett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Oct 2024 at 11:36.

Northern Powergrid (Yorkshire) logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Sunnydale Terrace

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sunnydale Terrace, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Oct 2024 at 12:20.

Northern Gas Networks logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Providence Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Providence Street, Earlsheaton, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:05.

Northern Gas Networks logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Low Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 11:55.

City Of Wakefield Metropolitan District Council logo
Between
16 and 24 Nov 2024
Details
View Map
Share
Follow
Grandstand Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Grandstand Road, Lofthouse, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 15 Oct 2024 at 09:09.

City Of Wakefield Metropolitan District Council logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Bridge Street

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 23 Oct 2024 at 14:05.

Northern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Selbourne Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selbourne Avenue, Savile Town, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 08:28.

Northern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Providence Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Providence Street, Earlsheaton, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 07:46.

Northern Gas Networks logo
Between
18 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Footpath Between 10/12 Groves Hall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Between 10/12 Groves Hall Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 18 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 10:15.

Northern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Access To Rear Of 1-7 Woodland Grove

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 1-7 Woodland Grove, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 10:17.

Northern Gas Networks logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Selbourne Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selbourne Road, Savile Town, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 08:30.

Northern Gas Networks logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Access To Rear Of 38-52 Groves Hall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 38-52 Groves Hall Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 10:23.

Northern Powergrid (Yorkshire) logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Chidswell Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Sep 2024 at 11:40.

Northern Powergrid (Yorkshire) logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Chidswell Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Sep 2024 at 15:49.

Yorkshire Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Westfield Terrace

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Westfield Terrace, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Oct 2024 at 15:19.

Yorkshire Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Westfield Terrace

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Westfield Terrace, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Oct 2024 at 10:40.

Yorkshire Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Hill Top

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hill Top, Newmillerdam, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Oct 2024 at 11:32.

Northern Gas Networks logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Cliff Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff Road, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 09:52.

Northern Gas Networks logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Cliff Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff Road, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 12:44.

Northern Gas Networks logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Cliff Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff Road, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 15:02.

Northern Gas Networks logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
High Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on High Street, Crigglestone, Wakefield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 12:10.

Northern Gas Networks logo
LONG TERM
Between
29 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Hollin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollin Lane, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 09:51.

Northern Gas Networks logo
LONG TERM
Between
29 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Hollin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollin Lane, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 12:51.

Northern Gas Networks logo
LONG TERM
Between
29 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Hollin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollin Lane, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 15:00.

Yorkshire Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Shepstye Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Shepstye Road, Horbury, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Oct 2024 at 15:00.

Northern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Forge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Forge Lane, Thornhill Lees, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2024 at 12:17.

Northern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Access From Town Street To Town Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access From Town Street To Town Green, Earlsheaton, Dewsbury.

These works are categorised as Major.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:37.

Northern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Town Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Street, Earlsheaton, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 07:23.

Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
West View

Kirklees Council are proposing to carry out Highway repair and maintenance works on West View, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 10 Oct 2024 at 11:58.

City Of Wakefield Metropolitan District Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Common Lane

City Of Wakefield Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Common Lane, Walton, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 3 Sep 2024 at 14:12.

Network Rail logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Common Lane

Network Rail are proposing to carry out Works for Rail Purposes on Common Lane, Walton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 14:11.

Network Rail logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Common Lane

Network Rail are proposing to carry out Works for Rail Purposes on Common Lane, Walton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 10:43.

Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Gardens Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Gardens Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 30 Sep 2024 at 08:52.

Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Gardens Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Gardens Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 1 Oct 2024 at 16:26.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Footpath To Rear Of 53-64 Town Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath To Rear Of 53-64 Town Green, Earlsheaton, Dewsbury.

These works are categorised as Major.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:40.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Town Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Street, Earlsheaton, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Aug 2024 at 08:53.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Footpath To 58-74 Groves Hall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath To 58-74 Groves Hall Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 10:25.

Northern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Footpath To 80-94 Groves Hall Road/22-30 Lowfield Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath To 80-94 Groves Hall Road/22-30 Lowfield Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 16 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 10:26.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Link Road

Kirklees Council were proposing to carry out Highway improvement works on Link Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Aldams Road

Kirklees Council are proposing to carry out Highway improvement works on Aldams Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:27.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Aldams Road

Kirklees Council were proposing to carry out Highway improvement works on Aldams Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:05.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Wilton Street

Kirklees Council are proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:28.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Wilton Street

Kirklees Council were proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:06.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Longcauseway

Kirklees Council were proposing to carry out Highway improvement works on Longcauseway, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
South Street

Kirklees Council are proposing to carry out Highway improvement works on South Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
South Street

Kirklees Council were proposing to carry out Highway improvement works on South Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Railway Street

Kirklees Council are proposing to carry out Highway improvement works on Railway Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:38.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Railway Street

Kirklees Council were proposing to carry out Highway improvement works on Railway Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Battye Street

Kirklees Council are proposing to carry out Highway improvement works on Battye Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:40.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Battye Street

Kirklees Council were proposing to carry out Highway improvement works on Battye Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Dewsbury Ring Road

Kirklees Council are proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:37.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Dewsbury Ring Road

Kirklees Council were proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Alfred Street

Kirklees Council are proposing to carry out Highway improvement works on Alfred Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:41.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Alfred Street

Kirklees Council were proposing to carry out Highway improvement works on Alfred Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Ings Road

Kirklees Council are proposing to carry out Highway improvement works on Ings Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Ings Road

Kirklees Council were proposing to carry out Highway improvement works on Ings Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Commercial Road

Kirklees Council are proposing to carry out Highway improvement works on Commercial Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Commercial Road

Kirklees Council were proposing to carry out Highway improvement works on Commercial Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Victoria Road

Kirklees Council are proposing to carry out Highway improvement works on Victoria Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Victoria Road

Kirklees Council were proposing to carry out Highway improvement works on Victoria Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Carlton Road

Kirklees Council are proposing to carry out Highway improvement works on Carlton Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Carlton Road

Kirklees Council were proposing to carry out Highway improvement works on Carlton Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Road

Kirklees Council are proposing to carry out Highway improvement works on Mill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:23.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Road

Kirklees Council were proposing to carry out Highway improvement works on Mill Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Town Street

Kirklees Council are proposing to carry out Highway improvement works on Town Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 09:42.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Town Street

Kirklees Council were proposing to carry out Highway improvement works on Town Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Jack Lane

Kirklees Council are proposing to carry out Highway improvement works on Jack Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 16:23.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Jack Lane

Kirklees Council were proposing to carry out Highway improvement works on Jack Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Howard Street

Kirklees Council are proposing to carry out Highway improvement works on Howard Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:14.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Howard Street

Kirklees Council were proposing to carry out Highway improvement works on Howard Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:14.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rink Street

Kirklees Council are proposing to carry out Highway improvement works on Rink Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rink Street

Kirklees Council were proposing to carry out Highway improvement works on Rink Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mount Street

Kirklees Council are proposing to carry out Highway improvement works on Mount Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:18.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mount Street

Kirklees Council were proposing to carry out Highway improvement works on Mount Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 10:00.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Leeds Road

Kirklees Council were proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grafton Street

Kirklees Council are proposing to carry out Highway improvement works on Grafton Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grafton Street

Kirklees Council were proposing to carry out Highway improvement works on Grafton Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Alexandra Road

Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 09:27.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:18.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:09.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Alexandra Road

Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Challenge Way

Kirklees Council are proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 16 Aug 2024 at 10:35.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Challenge Way

Kirklees Council were proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grange Road

Kirklees Council are proposing to carry out Highway improvement works on Grange Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:10.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grange Road

Kirklees Council were proposing to carry out Highway improvement works on Grange Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Forest Way

Kirklees Council are proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Forest Way

Kirklees Council were proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rouse Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:04.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rouse Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 23 Aug 2024 at 13:18.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Bradford Road

Kirklees Council were proposing to carry out Highway improvement works on Bradford Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 6 Apr 2025
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Jul 2024 at 12:40.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 6 Apr 2025
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2024 at 11:34.

Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Hostingley Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Hostingley Lane, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 23 Oct 2024 at 14:11.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Headfield Road

Kirklees Council are proposing to carry out roadworks on Headfield Road, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 16 Sep 2024 at 07:52.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Chapel Street

Kirklees Council are proposing to carry out roadworks on Chapel Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 20 Sep 2024 at 07:38.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Warren Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Warren Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 19 Sep 2024 at 11:46.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
South Street

Kirklees Council are proposing to carry out roadworks on South Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 20 Sep 2024 at 07:39.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
South Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:13.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Orchard Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:13.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Savile Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Savile Road, Savile Town, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:11.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Link Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Link Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 07:31.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Link Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Link Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2024 at 13:59.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Longcauseway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longcauseway, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 07:32.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Longcauseway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longcauseway, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2024 at 14:00.

Yorkshire Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Chidswell Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Oct 2024 at 14:23.

Yorkshire Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Chidswell Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Oct 2024 at 16:39.

Network Rail logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Common Lane

Network Rail are proposing to carry out Works for Rail Purposes on Common Lane, Walton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Sep 2024 at 15:37.

Yorkshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Headfield Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Headfield Road, Savile Town, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Yorkshire Water on 24 Oct 2024 at 13:48.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Footpath To Rear Of 2-12 Lowfield Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath To Rear Of 2-12 Lowfield Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 11:54.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Access To Rear Of 98-106 Groves Hall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 98-106 Groves Hall Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 11:55.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Howard Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Howard Crescent, Durkar, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 09:51.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Howard Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Howard Crescent, Durkar, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 12:52.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Howard Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Howard Crescent, Durkar, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 15:00.

Northern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Forge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Forge Lane, Thornhill Lees, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 12:21.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Sugar Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sugar Lane, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 09:44.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Moor Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Park Lane, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 09:43.

Yorkshire Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
The Nook

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Nook, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Oct 2024 at 13:07.

Yorkshire Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
The Nook

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Nook, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Oct 2024 at 13:21.

Northern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Access To Rear Of 34-46 Lowfield Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 34-46 Lowfield Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 11:55.


Roadworks Map near to Horbury View, OSSETT, WF5 0FA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Oct 2024 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Horbury View, OSSETT, WF5 0FA (13 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
URGENT
  
CAVEWELL GARDENS 
(0.3 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 26 Oct 2024 12:00
(Scheduled: 26 Oct 2024 - 1 Nov 2024)
0.3
Details
Share
Follow
2
Netomnia logo
REGENT STREET, HORBURY 
(0.4 miles)
Netomnia
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 31 Oct 2024 - 4 Nov 2024
0.4
Details
Share
Follow
3
Northern Powergrid (Yorkshire) logo
URGENT
  
VALLEY VIEW ROAD 
(0.5 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 30 Oct 2024 14:30
(Scheduled: 30 Oct 2024 - 5 Nov 2024)
0.5
Details
Share
Follow
4
Yorkshire Water logo
HEALEY DRIVE 
(0.5 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
28 Oct 2024 09:14 - 10:56
0.5
Details
Share
5
Northern Powergrid (Yorkshire) logo
STORRS HILL ROAD, HORBURY 
(0.6 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 30 Oct 2024
0.6
Details
Share
Follow
6
Northern Powergrid (Yorkshire) logo
SUNNYDALE PARK 
(0.6 miles)
Northern Powergrid (Yorkshire)
New service connection - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 28 Oct 2024 - 5 Nov 2024)
0.6
Details
Share
7
Northern Powergrid (Yorkshire) logo
SUNNYDALE PARK 
(0.6 miles)
Northern Powergrid (Yorkshire)
New service connection - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 28 Oct 2024 12:00
(Scheduled: 28 Oct 2024 - 5 Nov 2024)
0.6
Details
Share
Follow
8
City Of Wakefield Metropolitan District Council logo
MAJOR
  
HEALEY ROAD 
(0.7 miles)
City Of Wakefield Metropolitan District Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 10 Oct 2024 - 21 Nov 2024
0.7
Details
Share
Follow
9
City Of Wakefield Metropolitan District Council logo
MAJOR
  
HEALEY ROAD 
(0.7 miles)
City Of Wakefield Metropolitan District Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
11 Oct 2024 09:30 - 16 Oct 2024 15:00
0.7
Details
Share
10
BT logo
MAPPLEWELL CRESCENT 
(0.7 miles)
BT
Remedial works - Footway - No carriageway incursion
Planned
Scheduled: 31 Oct 2024
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.