ROADWORKS SUMMARY
Unity Court, DEWSBURY, WF13 2PY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Unity Court, WF13 2PY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Unity Court, DEWSBURY, WF13 2PY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Unity Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Dalton Bank Road

Kirklees Council are carrying out Highway repair and maintenance works on Dalton Bank Road, Dalton, Huddersfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2024 at 15:00 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 18 Feb 2025 at 09:51.

Network Rail logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Thornhill Road

Network Rail are carrying out roadworks on Thornhill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 08:00 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Mar 2024 at 12:12.

Network Rail logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Calder Road

Network Rail are carrying out Works for Rail Purposes on Calder Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 07:00 and could run through until 30 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Jan 2025 at 14:42.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Royle Fold

Kirklees Council are carrying out Highway repair and maintenance works on Royle Fold, Heckmondwike.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 07:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 18 Jun 2024 at 14:29.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
George Street

Kirklees Council are carrying out Highway repair and maintenance works on George Street, Heckmondwike.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 07:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 18 Jun 2024 at 14:28.

LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Town Hall Way

Kirklees Council are carrying out Highway improvement works on Town Hall Way, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Kirklees Council on 15 Jul 2024 at 07:10.

LONG TERM
Between
30 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Bond Street

Kirklees Council are proposing to carry out Highway improvement works on Bond Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 10:02.

LONG TERM
Between
30 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Bond Street

Kirklees Council are proposing to carry out Highway improvement works on Bond Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:16.

LONG TERM
Until
21 May 2025
Details
View Map
Share
Follow
Bond Street

Kirklees Council are carrying out Highway improvement works on Bond Street, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:30 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 7 Oct 2024 at 12:45.

Network Rail logo
LONG TERM
Between
1 Nov 2024 and 1 Nov 2025
Details
View Map
Share
Whitacre Street

Network Rail were proposing to carry out Works for Rail Purposes on Whitacre Street, Deighton, Huddersfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Aug 2024 at 14:26.

LONG TERM
Between
18 Nov 2024 and 24 Nov 2025
Details
View Map
Share
Follow
Chidswell Lane

Kirklees Council are proposing to carry out Section 50 on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 11:38.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Link Road

Kirklees Council were proposing to carry out Highway improvement works on Link Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Aldams Road

Kirklees Council are proposing to carry out Highway improvement works on Aldams Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:27.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Aldams Road

Kirklees Council were proposing to carry out Highway improvement works on Aldams Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:05.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Wilton Street

Kirklees Council are proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:28.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Wilton Street

Kirklees Council were proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:06.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Longcauseway

Kirklees Council were proposing to carry out Highway improvement works on Longcauseway, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
South Street

Kirklees Council are proposing to carry out Highway improvement works on South Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
South Street

Kirklees Council were proposing to carry out Highway improvement works on South Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Railway Street

Kirklees Council are proposing to carry out Highway improvement works on Railway Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:38.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Railway Street

Kirklees Council were proposing to carry out Highway improvement works on Railway Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Battye Street

Kirklees Council are proposing to carry out Highway improvement works on Battye Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:40.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Battye Street

Kirklees Council were proposing to carry out Highway improvement works on Battye Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Dewsbury Ring Road

Kirklees Council are proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:37.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Dewsbury Ring Road

Kirklees Council were proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Alfred Street

Kirklees Council are proposing to carry out Highway improvement works on Alfred Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:41.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Alfred Street

Kirklees Council were proposing to carry out Highway improvement works on Alfred Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Ings Road

Kirklees Council are proposing to carry out Highway improvement works on Ings Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Ings Road

Kirklees Council were proposing to carry out Highway improvement works on Ings Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Commercial Road

Kirklees Council are proposing to carry out Highway improvement works on Commercial Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Commercial Road

Kirklees Council were proposing to carry out Highway improvement works on Commercial Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Victoria Road

Kirklees Council are proposing to carry out Highway improvement works on Victoria Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Victoria Road

Kirklees Council were proposing to carry out Highway improvement works on Victoria Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Carlton Road

Kirklees Council are proposing to carry out Highway improvement works on Carlton Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Carlton Road

Kirklees Council were proposing to carry out Highway improvement works on Carlton Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Road

Kirklees Council are proposing to carry out Highway improvement works on Mill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:23.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Road

Kirklees Council were proposing to carry out Highway improvement works on Mill Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Town Street

Kirklees Council are proposing to carry out Highway improvement works on Town Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 09:42.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Town Street

Kirklees Council were proposing to carry out Highway improvement works on Town Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Jack Lane

Kirklees Council are proposing to carry out Highway improvement works on Jack Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 16:23.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Jack Lane

Kirklees Council were proposing to carry out Highway improvement works on Jack Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Howard Street

Kirklees Council are proposing to carry out Highway improvement works on Howard Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:14.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Howard Street

Kirklees Council were proposing to carry out Highway improvement works on Howard Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:14.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rink Street

Kirklees Council are proposing to carry out Highway improvement works on Rink Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rink Street

Kirklees Council were proposing to carry out Highway improvement works on Rink Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mount Street

Kirklees Council are proposing to carry out Highway improvement works on Mount Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:18.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mount Street

Kirklees Council were proposing to carry out Highway improvement works on Mount Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 10:00.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Leeds Road

Kirklees Council were proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grafton Street

Kirklees Council are proposing to carry out Highway improvement works on Grafton Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grafton Street

Kirklees Council were proposing to carry out Highway improvement works on Grafton Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Alexandra Road

Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 09:27.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:18.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:09.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Alexandra Road

Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Challenge Way

Kirklees Council are proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 16 Aug 2024 at 10:35.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Challenge Way

Kirklees Council were proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grange Road

Kirklees Council are proposing to carry out Highway improvement works on Grange Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:10.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grange Road

Kirklees Council were proposing to carry out Highway improvement works on Grange Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Forest Way

Kirklees Council are proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Forest Way

Kirklees Council were proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rouse Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:04.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rouse Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 23 Aug 2024 at 13:18.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Bradford Road

Kirklees Council were proposing to carry out Highway improvement works on Bradford Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 6 Apr 2025
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 8 Jul 2024 at 12:40.

Yorkshire Water logo
LONG TERM
Until
27 Apr 2025
Details
View Map
Share
Follow
New Road

Yorkshire Water are carrying out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 10:30 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Feb 2025 at 08:36.

Network Rail logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Station Road

Network Rail are carrying out roadworks on Station Road, Mirfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 09:30 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Jan 2025 at 10:54.

Yorkshire Water logo
LONG TERM
Between
13 Jan and 11 Apr 2025
Details
View Map
Share
Follow
River Street

Yorkshire Water are proposing to carry out Utility asset works on River Street, Brighouse.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 18 Dec 2024 at 10:59.

Yorkshire Water logo
LONG TERM
Until
17 Apr 2025
Details
View Map
Share
Follow
River Street

Yorkshire Water are carrying out Utility asset works on River Street, Brighouse.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 January 2025 at 12:15 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Feb 2025 at 08:36.

Yorkshire Water logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Dewsbury Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 14:29.

Yorkshire Water logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Wide Lane

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wide Lane, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 10:31.

Network Rail logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Wood Lane

Network Rail are carrying out roadworks on Wood Lane, Mirfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:30 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Jan 2025 at 09:30.

Yorkshire Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Spring Avenue

Yorkshire Water were proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 24 Sep 2024 at 13:07.

Yorkshire Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Spring Avenue

Yorkshire Water were proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 14:01.

Yorkshire Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Spring Avenue

Yorkshire Water are proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 13:55.

Finishing
Today
Details
View Map
Share
Follow
Cooper Bridge Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Cooper Bridge Road, Cooper Bridge, Brighouse.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Dec 2024 at 12:38.

Finishing
Today
Details
View Map
Share
Follow
Cooper Bridge Road

Kirklees Council are carrying out Highway repair and maintenance works on Cooper Bridge Road, Cooper Bridge, Brighouse.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2025 at 21:00 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 3 Feb 2025 at 08:33.

Finishing
Today
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Leeds Road, Mirfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 6 Jan 2025 at 09:51.

Finishing
Today
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are carrying out Highway repair and maintenance works on Leeds Road, Mirfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2025 at 21:00 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 3 Feb 2025 at 08:33.

Finishing
Today
Details
View Map
Share
Follow
Wakefield Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Wakefield Road, Brighouse.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Dec 2024 at 12:39.

Finishing
Today
Details
View Map
Share
Follow
Wakefield Road

Kirklees Council are carrying out Highway repair and maintenance works on Wakefield Road, Brighouse.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2025 at 21:00 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 3 Feb 2025 at 08:32.

Finishing
Today
Details
View Map
Share
Follow
Huddersfield Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Huddersfield Road, Mirfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 7 Jan 2025 at 09:07.

Finishing
Today
Details
View Map
Share
Follow
Huddersfield Road

Kirklees Council are carrying out Highway repair and maintenance works on Huddersfield Road, Mirfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 February 2025 at 21:00 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 3 Feb 2025 at 08:34.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
The Combs

Yorkshire Water are proposing to carry out Utility asset works on The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 10:35.

Northern Gas Networks logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Savile Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Savile Road, Savile Town, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:42.

Northern Gas Networks logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Harrop Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Harrop Avenue, Morley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 14:00 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Feb 2025 at 16:56.

Northern Gas Networks logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Old Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Old Lane, Birkenshaw, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 08:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 11:50.

LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Headfield Road

Kirklees Council are carrying out roadworks on Headfield Road, Savile Town, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 08:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 4 Feb 2025 at 08:08.

LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Chapel Street

Kirklees Council are carrying out roadworks on Chapel Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 08:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 4 Feb 2025 at 08:08.

LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Warren Street

Kirklees Council are carrying out Highway repair and maintenance works on Warren Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 08:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 4 Feb 2025 at 08:08.

LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
South Street

Kirklees Council are carrying out roadworks on South Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 08:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 4 Feb 2025 at 08:08.

Yorkshire Water logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Spring Avenue

Yorkshire Water are carrying out Utility asset works on Spring Avenue, Gildersome, Morley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 09:00 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 6 Feb 2025 at 10:56.

Yorkshire Water logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Cross Road

Yorkshire Water are proposing to carry out Utility asset works on Cross Road, Middlestown, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 09:21.

Yorkshire Water logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Cross Road

Yorkshire Water are proposing to carry out Utility asset works on Cross Road, Middlestown, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 15:40.

LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Crossley Lane

Kirklees Council are carrying out Section 50 on Crossley Lane, Dalton, Huddersfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 08:00 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 Feb 2025 at 15:12.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Old Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Lane, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 13:02.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Latham Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Latham Lane, Gomersal, Cleckheaton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 10:23 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 08:40.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Leeds Road, Birstall, Batley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 February 2025 at 10:30 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Feb 2025 at 12:24.

Yorkshire Water logo
Until
10 Mar 2025
Details
View Map
Share
Follow
Springbank Road

Yorkshire Water are carrying out Utility asset works on Springbank Road, Gildersome, Morley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:00 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 17:04.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Green Lane

Yorkshire Water are carrying out roadworks on Green Lane, Overton, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:00 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 16:31.

Yorkshire Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Cross Road

Yorkshire Water are carrying out Utility asset works on Cross Road, Middlestown, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 16:30.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Access To 50-76 The Combs

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To 50-76 The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 08:01.

Northern Gas Networks logo
Until
14 Mar 2025
Details
View Map
Share
Follow
Access To 50-76 The Combs

Northern Gas Networks are carrying out Utility repair and maintenance works on Access To 50-76 The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 10:30 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 12:00.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
The Combs

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 08:03.

Northern Gas Networks logo
Until
14 Mar 2025
Details
View Map
Share
Follow
The Combs

Northern Gas Networks are carrying out Utility repair and maintenance works on The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 10:30 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 12:00.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Warren Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Warren Street, Savile Town, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:45.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Tingley Common

Northern Gas Networks are carrying out Utility repair and maintenance works on Tingley Common, Morley.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 February 2025 at 09:08 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 26 Feb 2025 at 15:56.

Yorkshire Water logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Feb 2025 at 09:42.

Yorkshire Water logo
Until
16 Mar 2025
Details
View Map
Share
Follow
New Road

Yorkshire Water are carrying out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 09:23 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 24 Feb 2025 at 09:23.

Finishing
Friday
Details
View Map
Share
Follow
Hopton Hall Lane

Kirklees Council are carrying out Highway repair and maintenance works on Hopton Hall Lane, Upper Hopton, Mirfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Feb 2025 at 09:44.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Waterton Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Waterton Road, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 26 Feb 2025 at 09:52.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Cross Lane

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Cross Lane, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 26 Feb 2025 at 09:45.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Dewsbury Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Dewsbury Road, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 26 Feb 2025 at 09:51.

Northern Gas Networks logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Crackenedge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Crackenedge Lane, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 14:31.

LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
High Wood Road

Kirklees Council are proposing to carry out Highway improvement works on High Wood Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 22 Nov 2024 at 07:48.

LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
High Wood Road

Kirklees Council are carrying out Highway improvement works on High Wood Road, Birstall, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 09:45 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 09:51.

Network Rail logo
Until
15 Mar 2025
Details
View Map
Share
Follow
Bog Green Lane

Network Rail are carrying out roadworks on Bog Green Lane, Colne Bridge, Huddersfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 09:30 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 25 Feb 2025 at 09:30.

Northern Gas Networks logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Wrenthorpe Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Wrenthorpe Lane, Wrenthorpe, Wakefield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 09:54 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Feb 2025 at 13:39.

Northern Gas Networks logo
LONG TERM
Between
27 Feb and 21 May 2025
Details
View Map
Share
Thornhill Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Thornhill Road, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 February 2025 and run through until 21 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Feb 2025 at 12:07.

Northern Gas Networks logo
Until
28 Mar 2025
Details
View Map
Share
Follow
Tetley Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Tetley Drive, Birkenshaw, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 February 2025 at 08:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 08:13.

Yorkshire Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Low Road

Yorkshire Water are carrying out Utility repair and maintenance works on Low Road, Thornhill Edge, Dewsbury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 February 2025 at 07:09 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 08:35.

Network Rail logo
LONG TERM
Until
7 Apr 2025
Details
View Map
Share
Follow
Whitacre Street

Network Rail are carrying out roadworks on Whitacre Street, Deighton, Huddersfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 February 2025 at 06:00 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Feb 2025 at 08:32.

Northern Powergrid (Yorkshire) logo
Finishing
Thursday
Details
View Map
Share
Follow
Hobart Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Hobart Road, Dewsbury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 February 2025 at 09:30 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Feb 2025 at 11:16.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Whitcliffe Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Whitcliffe Road, Cleckheaton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 March 2025 at 11:30 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Mar 2025 at 13:09.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
The Sidings

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on The Sidings, Savile Town, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:45.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 21 May 2025
Details
View Map
Share
Follow
Fall Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fall Lane, Scout Hill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 13:41.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 21 May 2025
Details
View Map
Share
Follow
Thornhill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornhill Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 13:39.

Northern Gas Networks logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Tetley Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tetley Drive, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 13:03.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Horsfall Street

Leeds City Council are proposing to carry out Highway improvement works on Horsfall Street, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 12 Nov 2024 at 12:14.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Horsfall Street

Leeds City Council are proposing to carry out Highway improvement works on Horsfall Street, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Feb 2025 at 11:45.

Yorkshire Water logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Springbank Road

Yorkshire Water are proposing to carry out Utility asset works on Springbank Road, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Jan 2025 at 15:12.

Yorkshire Water logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Springbank Road

Yorkshire Water are proposing to carry out Utility asset works on Springbank Road, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Feb 2025 at 13:27.

Yorkshire Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Child Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Child Lane, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Jan 2025 at 13:13.

Yorkshire Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Child Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Child Lane, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Jan 2025 at 15:11.

Between
7 and 9 Mar 2025
Details
View Map
Share
Follow
Lascelles Hall Road

Kirklees Council are proposing to carry out Section 50 on Lascelles Hall Road, Lascelles Hall, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jan 2025 at 10:04.

Between
7 and 9 Mar 2025
Details
View Map
Share
Follow
Lascelles Hall Road

Kirklees Council are proposing to carry out Section 50 on Lascelles Hall Road, Lascelles Hall, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 24 Jan 2025 at 10:53.

City Of Wakefield Metropolitan District Council logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Waterton Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Waterton Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 16 Oct 2024 at 15:54.

City Of Wakefield Metropolitan District Council logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Cross Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Cross Lane, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 16 Oct 2024 at 15:53.

City Of Wakefield Metropolitan District Council logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Dewsbury Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Dewsbury Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 16 Oct 2024 at 15:54.

Yorkshire Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Thornhill Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Thornhill Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Jan 2025 at 09:54.

Yorkshire Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Thornhill Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Thornhill Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Jan 2025 at 10:47.

Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Kitson Hill Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Kitson Hill Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 16 Dec 2024 at 12:02.

Yorkshire Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
River Street

Yorkshire Water are proposing to carry out Utility asset works on River Street, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Dec 2024 at 08:52.

Yorkshire Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
River Street

Yorkshire Water are proposing to carry out Utility asset works on River Street, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Jan 2025 at 10:06.

Yorkshire Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
River Street

Yorkshire Water are proposing to carry out Utility asset works on River Street, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Jan 2025 at 15:01.

Yorkshire Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Chidswell Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Jan 2025 at 07:59.

Yorkshire Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Chidswell Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Jan 2025 at 08:53.

Between
12 and 21 Mar 2025
Details
View Map
Share
Hopton Hall Lane

Kirklees Council were proposing to carry out Highway repair and maintenance works on Hopton Hall Lane, Upper Hopton, Mirfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 7 Feb 2025 at 09:24.

City Of Wakefield Metropolitan District Council logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Wood Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wood Lane, Overton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 25 Feb 2025 at 15:12.

City Of Wakefield Metropolitan District Council logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Wood Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wood Lane, Overton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 25 Feb 2025 at 15:13.

Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Foxroyd Lane

Kirklees Council are proposing to carry out Core Sampling on Foxroyd Lane, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 16 Jan 2025 at 07:54.

Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Foxroyd Lane

Kirklees Council are proposing to carry out Core Sampling on Foxroyd Lane, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 16 Jan 2025 at 13:20.

Northern Gas Networks logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Sugar Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sugar Lane, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jan 2025 at 10:40.

Northern Gas Networks logo
Between
17 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Moor Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Park Lane, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jan 2025 at 10:39.

City Of Wakefield Metropolitan District Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Ossett Bypass A638

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ossett Bypass A638, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 12 Feb 2025 at 15:33.

Leeds City Council logo
Between
18 and 23 Mar 2025
Details
View Map
Share
Follow
Asquith Avenue

Leeds City Council are proposing to carry out Highway repair and maintenance works on Asquith Avenue, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 6 Feb 2025 at 12:51.

Leeds City Council logo
Between
19 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Asquith Avenue

Leeds City Council are proposing to carry out Highway repair and maintenance works on Asquith Avenue, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 24 Feb 2025 at 14:50.

Network Rail logo
Between
21 and 24 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Feb 2025 at 09:18.

Network Rail logo
Between
21 and 24 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Feb 2025 at 10:29.

Northern Powergrid (Yorkshire) logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Jackson's Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Jackson's Lane, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Jan 2025 at 11:22.

Northern Powergrid (Yorkshire) logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Jackson's Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Jackson's Lane, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Feb 2025 at 11:18.

Northern Gas Networks logo
Between
24 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Sackville Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sackville Street, Ravensthorpe, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Feb 2025 at 09:08.

Northern Gas Networks logo
Between
24 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Crackenedge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Crackenedge Lane, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jan 2025 at 10:41.

City Of Wakefield Metropolitan District Council logo
Between
27 Mar and 16 Apr 2025
Details
View Map
Share
Upper Lane

City Of Wakefield Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Upper Lane, Netherton, Wakefield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 March 2025 and run through until 16 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 5 Feb 2025 at 12:53.

Network Rail logo
Between
28 and 31 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Feb 2025 at 09:19.

Network Rail logo
Between
28 and 31 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Feb 2025 at 11:00.

Yorkshire Water logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Child Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Child Lane, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Feb 2025 at 09:06.

Yorkshire Water logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Child Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Child Lane, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Feb 2025 at 13:08.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Moorbottom

Kirklees Council are proposing to carry out Highway repair and maintenance works on Moorbottom, Moorbottom, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jan 2025 at 17:56.

Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Moorbottom

Kirklees Council are proposing to carry out Highway repair and maintenance works on Moorbottom, Moorbottom, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 Feb 2025 at 12:27.

Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Moorside

Kirklees Council are proposing to carry out roadworks on Moorside, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 Feb 2025 at 12:28.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Westgate

Kirklees Council are proposing to carry out Highway repair and maintenance works on Westgate, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jan 2025 at 18:20.

Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Westgate

Kirklees Council are proposing to carry out Highway repair and maintenance works on Westgate, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 Feb 2025 at 12:25.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
St Peg Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on St Peg Lane, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 6 Feb 2025 at 14:42.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
St Peg Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on St Peg Lane, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 25 Feb 2025 at 16:25.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
St Peg Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on St Peg Lane, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jan 2025 at 18:11.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Spen Bank

Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Bank, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jan 2025 at 18:09.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Spen Bank

Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Bank, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 6 Feb 2025 at 14:41.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Spen Bank

Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Bank, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 25 Feb 2025 at 16:21.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Spen Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jan 2025 at 18:07.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Spen Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 25 Feb 2025 at 16:18.

Yorkshire Water logo
LONG TERM
Between
31 Mar and 22 Jun 2025
Details
View Map
Share
Follow
Moorside Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moorside Road, Drighlington, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Jan 2025 at 14:55.

Northern Gas Networks logo
Between
5 and 20 Apr 2025
Details
View Map
Share
Bottom Boat Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bottom Boat Road, Stanley, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 20 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 11:05.

Northern Gas Networks logo
Between
5 and 20 Apr 2025
Details
View Map
Share
Follow
Bridge Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridge Road, Horbury, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 12:32.

Northern Gas Networks logo
Between
5 and 20 Apr 2025
Details
View Map
Share
Follow
Bridge Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridge Road, Horbury, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 12:48.

Between
5 and 20 Apr 2025
Details
View Map
Share
Follow
Kitson Hill Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Kitson Hill Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 Jan 2025 at 10:19.

Between
5 and 20 Apr 2025
Details
View Map
Share
Follow
Kitson Hill Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Kitson Hill Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 12 Feb 2025 at 09:34.

Leeds City Council logo
Between
5 and 17 Apr 2025
Details
View Map
Share
Follow
Victoria Road

Leeds City Council are proposing to carry out roadworks on Victoria Road, Churwell, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 12 Feb 2025 at 12:10.

Northern Gas Networks logo
LONG TERM
Between
7 Apr and 23 May 2025
Details
View Map
Share
Follow
Bretton Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bretton Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Feb 2025 at 09:12.

Northern Gas Networks logo
LONG TERM
Between
7 Apr and 7 May 2025
Details
View Map
Share
Follow
Link Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Link Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jan 2025 at 10:37.

Northern Gas Networks logo
LONG TERM
Between
7 Apr and 7 May 2025
Details
View Map
Share
Follow
Longcauseway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longcauseway, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jan 2025 at 10:36.

Yorkshire Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Fairfield Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Fairfield Drive, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 6 Jan 2025 at 09:59.

Northern Gas Networks logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Church Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 14:50.

National Highways logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Dewsbury Road

National Highways are proposing to carry out roadworks on Dewsbury Road, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Jun 2024 at 10:59.

Northern Gas Networks logo
Between
7 and 23 Apr 2025
Details
View Map
Share
Marshall Crescent

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Marshall Crescent, Morley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 12:50.

Northern Powergrid (Yorkshire) logo
Between
8 and 15 Apr 2025
Details
View Map
Share
Follow
Grange Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Grange Road, Staincliffe, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Feb 2025 at 14:09.

Northern Powergrid (Yorkshire) logo
Between
8 and 15 Apr 2025
Details
View Map
Share
Follow
Grange Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Grange Road, Staincliffe, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Feb 2025 at 10:33.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Sunnydale Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sunnydale Road, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Feb 2025 at 10:27.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Sunnydale Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sunnydale Road, Ossett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Feb 2025 at 11:10.

Northern Gas Networks logo
Between
14 and 25 Apr 2025
Details
View Map
Share
Selbourne Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Selbourne Road, Savile Town, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:48.

Virgin Media logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Wellhouse Lane

Virgin Media are proposing to carry out Utility repair and maintenance works on Wellhouse Lane, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 17 Feb 2025 at 14:37.

Network Rail logo
Between
17 and 22 Apr 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 May 2024 at 07:00.

Northern Gas Networks logo
Between
17 Apr and 9 May 2025
Details
View Map
Share
Follow
Brookroyd Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brookroyd Lane, Birstall, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 07:45.

Network Rail logo
Between
18 Apr and 2 May 2025
Details
View Map
Share
Follow
Whitacre Street

Network Rail are proposing to carry out Works for Rail Purposes on Whitacre Street, Deighton, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Jan 2025 at 14:29.

Yorkshire Water logo
Between
18 and 24 Apr 2025
Details
View Map
Share
Follow
Selso Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Selso Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Jan 2025 at 11:23.

Network Rail logo
LONG TERM
Between
21 Apr 2025 and 1 Jun 2026
Details
View Map
Share
Follow
Whitacre Street

Network Rail are proposing to carry out Works for Rail Purposes on Whitacre Street, Deighton, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 1 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Feb 2025 at 11:37.

Yorkshire Water logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Sackville Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Sackville Street, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Feb 2025 at 09:48.

Yorkshire Water logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Sackville Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Sackville Street, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Feb 2025 at 09:43.

Yorkshire Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Nettleton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nettleton Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Feb 2025 at 08:49.

LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Littletown, Liversedge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 09:37.

LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Littletown, Liversedge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 15:18.

LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Gomersal Road

Kirklees Council are proposing to carry out Highway improvement works on Gomersal Road, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 09:39.

LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Gomersal Road

Kirklees Council are proposing to carry out Highway improvement works on Gomersal Road, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 15:26.

LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Leeds Old Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Old Road, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 09:40.

LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Leeds Old Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Old Road, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 15:38.

LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
New North Road

Kirklees Council are proposing to carry out Highway improvement works on New North Road, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 09:40.

LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
New North Road

Kirklees Council are proposing to carry out Highway improvement works on New North Road, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 15:30.

LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 09:38.

LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Feb 2025 at 15:20.

Northern Gas Networks logo
Between
22 Apr and 9 May 2025
Details
View Map
Share
Follow
Quaker Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Quaker Lane, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 Feb 2025 at 13:28.

Yorkshire Water logo
LONG TERM
Between
22 Apr and 5 Sep 2025
Details
View Map
Share
Follow
Dewsbury Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 11:43.

Yorkshire Water logo
LONG TERM
Between
22 Apr and 5 Sep 2025
Details
View Map
Share
Follow
Wide Lane

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wide Lane, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 11:44.

Northern Powergrid (Yorkshire) logo
Between
24 and 30 Apr 2025
Details
View Map
Share
Follow
Queens Promenade

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Queens Promenade, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Feb 2025 at 10:24.

National Highways logo
Between
25 Apr and 14 May 2025
Details
View Map
Share
Follow
Royston Hill

National Highways are proposing to carry out roadworks on Royston Hill, East Ardsley, Wakefield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Jun 2024 at 10:42.

Northern Gas Networks logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Spen Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Spen Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 14:47.

Northern Gas Networks logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Barrington Parade

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrington Parade, Gomersal, Cleckheaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 13:55.

Northern Gas Networks logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Barrington Parade

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrington Parade, Gomersal, Cleckheaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 15:09.

Yorkshire Water logo
Between
29 Apr and 2 May 2025
Details
View Map
Share
Follow
St John's Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on St John's Avenue, Kirkheaton, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 19 Feb 2025 at 14:19.

Yorkshire Water logo
Between
29 Apr and 2 May 2025
Details
View Map
Share
Follow
St John's Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on St John's Avenue, Kirkheaton, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 20 Feb 2025 at 11:21.

Quickline Commucations logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Old Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Old Road, Flockton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 13 Feb 2025 at 15:31.

Quickline Commucations logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Old Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Old Road, Flockton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 19 Feb 2025 at 11:51.

Quickline Commucations logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Old Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Old Road, Flockton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 20 Feb 2025 at 15:18.

LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Stonefield Street

Kirklees Council are proposing to carry out Highway improvement works on Stonefield Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 12 Feb 2025 at 14:26.

LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Stonefield Street

Kirklees Council are proposing to carry out Highway improvement works on Stonefield Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 17 Feb 2025 at 10:26.

LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Halifax Road

Kirklees Council are proposing to carry out Highway improvement works on Halifax Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 18 Feb 2025 at 08:03.

LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Halifax Road

Kirklees Council are proposing to carry out Highway improvement works on Halifax Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 18 Feb 2025 at 14:24.

LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Hope Street

Kirklees Council are proposing to carry out roadworks on Hope Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 12 Feb 2025 at 14:27.

Northern Powergrid (Yorkshire) logo
Between
7 and 15 May 2025
Details
View Map
Share
Follow
Beech Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Beech Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Feb 2025 at 10:23.

Network Rail logo
Between
9 and 12 May 2025
Details
View Map
Share
Follow
Colne Bridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Colne Bridge Road, Colne Bridge, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Aug 2024 at 08:19.

Network Rail logo
LONG TERM
Between
16 May and 21 Jun 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 21 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jan 2025 at 12:19.

Network Rail logo
Between
16 and 19 May 2025
Details
View Map
Share
Follow
Ravensthorpe Road

Network Rail are proposing to carry out Works for Rail Purposes on Ravensthorpe Road, Thornhill Lees, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Jun 2024 at 12:29.

Network Rail logo
Between
16 and 19 May 2025
Details
View Map
Share
Follow
Calder Road

Network Rail are proposing to carry out Works for Rail Purposes on Calder Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Jun 2024 at 12:20.

Network Rail logo
Between
16 and 19 May 2025
Details
View Map
Share
Follow
Colne Bridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Colne Bridge Road, Colne Bridge, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Jan 2025 at 16:12.

Northern Gas Networks logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Lark Hill Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lark Hill Drive, Moorside, Cleckheaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Feb 2025 at 10:37.

Northern Gas Networks logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Lower Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 07:29.

Network Rail logo
Between
24 and 30 May 2025
Details
View Map
Share
Follow
Halifax Road

Network Rail are proposing to carry out Works for Rail Purposes on Halifax Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Feb 2025 at 07:46.

Northern Gas Networks logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Follow
Smithies Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Smithies Lane, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 07:39.

Network Rail logo
Between
30 May and 2 Jun 2025
Details
View Map
Share
Follow
Ravensthorpe Road

Network Rail are proposing to carry out Works for Rail Purposes on Ravensthorpe Road, Thornhill Lees, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Jun 2024 at 12:35.

Network Rail logo
Between
30 May and 2 Jun 2025
Details
View Map
Share
Follow
Calder Road

Network Rail are proposing to carry out Works for Rail Purposes on Calder Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Jun 2024 at 12:21.


Roadworks Map near to Unity Court, DEWSBURY, WF13 2PY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 2 Mar 2025 19:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Unity Court, DEWSBURY, WF13 2PY (63 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
URGENT
  
ST JOHN WALK, WESTTOWN 
(0.0 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 24 Feb 2025 12:50
(Scheduled: 24 Feb 2025 - 7 Mar 2025)
0.0
Details
Share
Follow
2
Northern Gas Networks logo
MAJOR
  
THORNHILL ROAD 
(0.3 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 27 Feb 2025 - 23 May 2025
0.3
Details
Share
Follow
3
Northern Powergrid (Yorkshire) logo
OXFORD ROAD 
(0.4 miles)
Northern Powergrid (Yorkshire)
New service connection - Footway, Carriageway - Give and take
In Progress
Since: 1 Mar 2025 08:00
(Scheduled: 1 Mar 2025 - 2 Mar 2025)
0.4
Details
Share
Follow
4
Yorkshire Water logo
MAJOR
  
THORNHILL ROAD 
(0.4 miles)
Yorkshire Water
Statutory Infrastructure Works - Carriageway - Some carriageway incursion
Planned
Scheduled: 6 Jan 2025 - 25 Apr 2025
0.4
Details
Share
Follow
5
Yorkshire Water logo
MAJOR
  
THORNHILL ROAD 
(0.4 miles)
Yorkshire Water
Statutory Infrastructure Works - Carriageway - Some carriageway incursion
In Progress
Since: 7 Jan 2025 11:00
(Scheduled: 6 Jan 2025 - 25 Apr 2025)
0.4
Details
Share
Follow
6
Network Rail logo
MAJOR
  
FALL LANE, SCOUT HILL 
(0.4 miles)
Network Rail
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Some carriageway incursion
In Progress
Since: 25 Apr 2024 08:00
(Scheduled: 25 Apr 2024 - 30 Dec 2025)
0.4
Details
Share
Follow
7
Network Rail logo
MAJOR
  
THORNHILL ROAD 
(0.4 miles)
Network Rail
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Some carriageway incursion
In Progress
Since: 1 Jun 2024 08:00
(Scheduled: 1 Jun 2024 - 31 Dec 2025)
0.4
Details
Share
Follow
8
Network Rail logo
MAJOR
  
THORNHILL ROAD 
(0.4 miles)
Network Rail
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Multi-way signals
In Progress
Since: 12 Feb 2024 08:00
(Scheduled: 12 Feb 2024 - 30 Nov 2025)
0.4
Details
Share
Follow
9
Network Rail logo
MAJOR
  
FALL LANE, SCOUT HILL 
(0.4 miles)
Network Rail
Works for Rail Purposes - Carriageway - Some carriageway incursion
In Progress
Since: 1 Jun 2024 07:00
(Scheduled: 1 Jun 2024 - 31 Dec 2025)
0.4
Details
Share
Follow
10
Northern Gas Networks logo
MAJOR
  
THORNHILL ROAD 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 27 Feb 2025 - 21 May 2025)
0.4
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.