ROADWORKS SUMMARY
Chester Road, FRODSHAM, WA6 0NX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Chester Road, WA6 0NX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Chester Road, FRODSHAM, WA6 0NX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Chester Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Until
19 Jan 2025
Details
View Map
Share
Follow
St Peters Way

Cadent Gas are carrying out Utility asset works on St Peters Way, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:19 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:42.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
St Peters Way

Cadent Gas are proposing to carry out Utility asset works on St Peters Way, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 16:00.

Cheshire West And Chester Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Milton Road

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Milton Road, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 28 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 26 Nov 2024 at 11:43.

Cheshire West And Chester Council logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
Pepper Street

Cheshire West And Chester Council are carrying out Highway improvement works on Pepper Street, Christleton, Chester.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 09:52 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 19 Dec 2024 at 10:22.

Cadent Gas logo
Between
16 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Plemstall Close

Cadent Gas are proposing to carry out Utility asset works on Plemstall Close, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:25.

United Utilities Water (formerly North West Water) logo
Thursday
Details
View Map
Share
Manley Road

United Utilities Water (formerly North West Water) carried out Utility repair and maintenance works on Manley Road, Frodsham.

The road was closed for some or all of the period.

The works were originally planned between 24 Dec 2024 and 2 Jan 2025 and were actually completed between 24 Dec 2024 (09:00) and 27 Dec 2024 (06:50). The works impacted the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Dec 2024 at 07:05.

ManWeb logo
Until
6 Jan 2025
Details
View Map
Share
Follow
Fox Covert Lane

ManWeb are carrying out Utility repair and maintenance works on Fox Covert Lane, Picton, Chester.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 December 2024 at 17:33 and could run through until 6 January 2025. The works will impact the verge only.

This roadwork event was last updated by ManWeb on 27 Dec 2024 at 08:53.

Severn Trent Water logo
Between
27 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Pickering Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Pickering Street, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 26 Sep 2024 at 15:13.

Cadent Gas logo
LONG TERM
Between
2 Jan and 5 Feb 2025
Details
View Map
Share
Follow
St Peters Way

Cadent Gas are proposing to carry out Utility asset works on St Peters Way, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 10:52.

Cadent Gas logo
Between
2 and 27 Jan 2025
Details
View Map
Share
Follow
Station Lane

Cadent Gas are proposing to carry out Utility asset works on Station Lane, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:18.

Cadent Gas logo
Between
2 and 27 Jan 2025
Details
View Map
Share
Follow
Station Lane

Cadent Gas are proposing to carry out Utility asset works on Station Lane, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 10:51.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Station View

BT were proposing to carry out Utility asset works on Station View, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Dec 2024 at 07:18.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Station View

BT are proposing to carry out Utility asset works on Station View, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Sep 2024 at 12:44.

Cheshire West And Chester Council logo
LONG TERM
Between
6 Jan and 18 Apr 2025
Details
View Map
Share
Follow
St Anne Street

Cheshire West And Chester Council are proposing to carry out Highway improvement works on St Anne Street, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 1 Nov 2024 at 15:25.

Cheshire West And Chester Council logo
LONG TERM
Between
6 Jan and 18 Apr 2025
Details
View Map
Share
Follow
St Anne Street

Cheshire West And Chester Council are proposing to carry out Highway improvement works on St Anne Street, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 31 Oct 2024 at 13:52.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Station View

BT are proposing to carry out Utility asset works on Station View, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Dec 2024 at 09:41.

Nexfibre Networks Limited logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Leadworks Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Leadworks Lane, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 16 Oct 2024 at 15:35.

BT logo
Between
9 and 15 Jan 2025
Details
View Map
Share
Follow
Pepper Street

BT are proposing to carry out Utility asset works on Pepper Street, Cheshire West And Chester, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Oct 2024 at 15:31.

Cadent Gas logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Follow
Plemstall Close

Cadent Gas are proposing to carry out Utility asset works on Plemstall Close, Mickle Trafford, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 10:52.

BT logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Upton Lane

BT are proposing to carry out Utility repair and maintenance works on Upton Lane, Upton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Dec 2024 at 11:48.

BT logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Upton Lane

BT were proposing to carry out Utility repair and maintenance works on Upton Lane, Upton, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 24 Dec 2024 at 11:23.

BT logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Upton Lane

BT were proposing to carry out Utility repair and maintenance works on Upton Lane, Upton, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 24 Dec 2024 at 10:45.

BT logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Upton Lane

BT were proposing to carry out Utility repair and maintenance works on Upton Lane, Upton, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 24 Dec 2024 at 08:46.

BT logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Upton Lane

BT are proposing to carry out Utility repair and maintenance works on Upton Lane, Upton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 1 Nov 2024 at 15:30.

BT logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Upton Lane

BT were proposing to carry out Utility repair and maintenance works on Upton Lane, Upton, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 23 Dec 2024 at 15:07.

Nexfibre Networks Limited logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pearl Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Pearl Lane, Littleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Oct 2024 at 11:28.

Nexfibre Networks Limited logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pearl Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Pearl Lane, Littleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 15:57.

Nexfibre Networks Limited logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pearl Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Pearl Lane, Littleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 12 Dec 2024 at 15:31.

Nexfibre Networks Limited logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pearl Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Pearl Lane, Littleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Dec 2024 at 16:09.

Nexfibre Networks Limited logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Russell Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Russell Street, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 18 Dec 2024 at 13:20.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pickering Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Pickering Street, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 11:26.

Electricity Network Company logo
LONG TERM
Between
22 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Station View

Electricity Network Company are proposing to carry out Utility asset works on Station View, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 12:14.

Cadent Gas logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Howey Lane

Cadent Gas are proposing to carry out Utility asset works on Howey Lane, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:13.

Electricity Network Company logo
Between
3 and 25 Feb 2025
Details
View Map
Share
Follow
Hoole Lane

Electricity Network Company are proposing to carry out Utility asset works on Hoole Lane, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 12:14.

Electricity Network Company logo
Between
7 and 25 Feb 2025
Details
View Map
Share
Follow
Station View

Electricity Network Company are proposing to carry out Utility asset works on Station View, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 10:24.

Electricity Network Company logo
Between
7 and 25 Feb 2025
Details
View Map
Share
Follow
Station View

Electricity Network Company are proposing to carry out Utility asset works on Station View, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 10:59.

Cadent Gas logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Howey Lane

Cadent Gas are proposing to carry out Utility asset works on Howey Lane, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:32.

Cadent Gas logo
Between
10 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:31.

Cadent Gas logo
LONG TERM
Between
10 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:32.

Cadent Gas logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Orchard Close

Cadent Gas are proposing to carry out Utility asset works on Orchard Close, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:21.

Nexfibre Networks Limited logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Birch Heath Lane

Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Birch Heath Lane, Christleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 15 Oct 2024 at 10:50.

Nexfibre Networks Limited logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Birch Heath Lane

Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Birch Heath Lane, Christleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Oct 2024 at 15:46.

Cadent Gas logo
Between
20 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Callender Way

Cadent Gas are proposing to carry out Utility asset works on Callender Way, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:27.

Cadent Gas logo
Between
20 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Helsby, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:26.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Cable Drive

Cadent Gas are proposing to carry out Utility asset works on Cable Drive, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:54.

Cheshire West And Chester Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Church Street

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Church Street, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 28 Oct 2024 at 15:31.

Cheshire West And Chester Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Church Street

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Church Street, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 30 Oct 2024 at 08:46.

Network Rail logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Follow
Bridges Road

Network Rail are proposing to carry out Works for Rail Purposes on Bridges Road, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Dec 2024 at 09:13.

Cadent Gas logo
Between
10 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:18.


Roadworks Map near to Chester Road, FRODSHAM, WA6 0NX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Dec 2024 17:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Chester Road, FRODSHAM, WA6 0NX (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.