ROADWORKS SUMMARY
Lychgate, WARRINGTON, WA4 6TF
Introduction
View current and future planned roadworks and road closures for Lychgate, WA4 6TF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Lychgate, WARRINGTON, WA4 6TF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lychgate are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
24 Apr 2025
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Murdishaw Avenue, Runcorn.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 February 2024 at 12:00 and could run through until 24 April 2025. The works will impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Apr 2024 at 11:49.
12 Aug 2024 and 15 Aug 2025
Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 11:59.
15 Aug 2025
Halton Borough Council are carrying out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.
12 Aug 2024 and 31 Oct 2025
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The works will start on or after 12 August 2024 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Halton Borough Council on 16 Feb 2024 at 13:40.
12 Aug 2024 and 15 Aug 2025
Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.
These works are categorised as Major.
The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 12:28.
15 Aug 2025
Halton Borough Council are carrying out Highway improvement works on Chester Road, Daresbury, Runcorn.
These works are categorised as Major.
The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.
12 Aug 2024 and 15 Aug 2025
Halton Borough Council are proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.
These works are categorised as Major.
The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 12:24.
15 Aug 2025
Halton Borough Council are carrying out Highway improvement works on Eastern Expressway, Runcorn.
These works are categorised as Major.
The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.
12 Aug 2024 and 13 Oct 2025
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Chester Road, Daresbury, Runcorn.
These works are categorised as Major.
The works will start on or after 12 August 2024 and could run through until 13 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Halton Borough Council on 13 May 2024 at 08:31.
2 Oct 2024 and 12 Mar 2025
Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works were categorised as Major.
The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:37.
2 Oct 2024 and 12 Mar 2025
Halton Borough Council were proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.
2 Oct 2024 and 12 Mar 2025
Halton Borough Council were proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.
Today
Warrington Borough Council are proposing to carry out Utility asset works on Weaste Lane, Grappenhall And Thelwall, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warrington Borough Council on 16 Sep 2024 at 14:24.
Today
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Footpath Astmoor Road Between Goddard Road And Access Road, Runcorn.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footpath only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Halton Borough Council on 16 Sep 2024 at 09:05.
2 Dec 2024 and 8 Jan 2025
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Footpath Astmoor Road Between Goddard Road And Access Road, Runcorn.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 8 January 2025. The works will impact the footpath only.
This roadwork event was last updated by Halton Borough Council on 9 Sep 2024 at 14:56.
2 Dec 2024 and 15 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Academy Street, Bewsey And Whitecross, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 08:49.
2 Dec 2024 and 7 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 6 Nov 2024 at 11:03.
2 Dec 2024 and 7 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:54.
2 Dec 2024 and 7 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 9 Dec 2024 at 09:11.
2 Dec 2024 and 7 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:55.
2 Dec 2024 and 7 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 6 Nov 2024 at 11:06.
28 Jan 2025
Cadent Gas are carrying out Utility asset works on Berkshire Drive, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 08:30 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 08:30.
2 Dec 2024 and 7 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:53.
2 Dec 2024 and 7 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 4 Oct 2024 at 16:08.
2 Dec 2024 and 7 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 11 Oct 2024 at 09:31.
3 Dec 2024 and 8 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:57.
3 Dec 2024 and 8 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 8 Oct 2024 at 15:09.
3 Dec 2024 and 8 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 8 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 11 Oct 2024 at 09:35.
9 Dec 2024 and 29 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Halton Brow, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 10:20.
9 Dec 2024 and 29 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Halton Brow, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 11:57.
Today
Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Latchford, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 11:36.
9 Dec 2024 and 6 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Withycombe Road, Penketh, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 11 Oct 2024 at 11:01.
31 Dec 2024 and 3 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 9 Oct 2024 at 09:52.
2 Jan and 7 Mar 2025
Halton Borough Council were proposing to carry out Highway repair and maintenance works on Busway Palace Fields Dc, Runcorn.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 10 Oct 2024 at 13:47.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bd, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 12:43.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bd, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:14.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Palace Fields Avenue, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 23 Oct 2024 at 08:21.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 09:10.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:54.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea G, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 15 Nov 2024 at 15:27.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 09:12.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:54.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Halton Lea E, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 20 Nov 2024 at 08:48.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bc, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:23.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bc, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:15.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 11:04.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 5 Nov 2024 at 09:52.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Castlefields Ea, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 20 Nov 2024 at 08:54.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:20.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:22.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Priory B, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:14.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Priory B, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 10:43.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Tyrrell Way, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 11:42.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Tyrrell Way, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 10:46.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Ba, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:18.
2 Jan and 7 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Ba, Runcorn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 30 Oct 2024 at 09:24.
2 and 6 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 15 Oct 2024 at 10:03.
2 and 29 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Winwick Road, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 11:23.
2 and 29 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Orford, Warrington.
These works are categorised as Major.
The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:56.
2 Jan and 1 Dec 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 19 Sep 2024 at 14:17.
6 and 8 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Aston Lane South, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Oct 2024 at 12:31.
6 and 8 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Aston Lane South, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Nov 2024 at 09:10.
6 and 10 Jan 2025
Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 09:50.
6 and 10 Jan 2025
Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 10:05.
6 and 10 Jan 2025
Halton Borough Council are proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 19 Jun 2024 at 10:59.
6 and 8 Jan 2025
BT are proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Oct 2024 at 12:26.
6 and 8 Jan 2025
BT are proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 30 Oct 2024 at 14:53.
6 and 8 Jan 2025
BT were proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Dec 2024 at 10:23.
6 Jan and 31 Mar 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 16 Dec 2024 at 10:52.
6 Jan and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Pasture Lane Segregated Footpath, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:20.
6 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Fearnhead Lane, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 16:13.
6 and 28 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Myddleton Lane, Winwick, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 12 Dec 2024 at 10:29.
14 and 16 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 29 Oct 2024 at 15:08.
16 and 22 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Green Lane, Appleton, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 24 Oct 2024 at 15:48.
16 and 22 Jan 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Appleton Bridleway 26, Appleton, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 28 Oct 2024 at 10:35.
19 Jan and 2 Feb 2025
Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Cromwell Avenue, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warrington Borough Council on 11 Dec 2024 at 10:58.
20 Jan and 28 Feb 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Mill Lane, Widnes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by ManWeb on 5 Dec 2024 at 10:07.
20 and 31 Jan 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Marina Avenue, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:45.
20 and 31 Jan 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Marina Avenue, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 17 Dec 2024 at 10:17.
20 and 24 Jan 2025
Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Cromwell Avenue, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Warrington Borough Council on 11 Dec 2024 at 11:00.
21 and 23 Jan 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Arley Road, Appleton, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ManWeb on 18 Dec 2024 at 14:52.
23 Jan and 7 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Reaper Close, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 11:09.
23 Jan and 7 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Reaper Close, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 23 Dec 2024 at 15:17.
23 Jan and 7 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Keith Avenue, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 09:02.
27 Jan and 7 Feb 2025
Halton Borough Council were proposing to carry out Highway improvement works on Priory Road, Runcorn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 29 Oct 2024 at 14:10.
27 Jan and 4 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waring Avenue, Latchford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Oct 2024 at 15:30.
27 Jan and 4 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waring Avenue, Latchford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 11:50.
27 Jan and 19 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Berkshire Drive, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:17.
27 Jan and 7 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Hughes Avenue, Orford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 19 Nov 2024 at 10:28.
27 Jan and 7 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Hughes Avenue, Orford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 23 Dec 2024 at 14:14.
27 Jan and 28 Feb 2025
Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Woolston Grange Avenue, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 16 Oct 2024 at 09:05.
27 Jan and 28 Feb 2025
Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Woolston Grange Avenue, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 17 Oct 2024 at 14:18.
29 Jan and 17 Feb 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:44.
29 Jan and 12 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 09:48.
29 Jan and 12 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:41.
29 Jan and 12 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 09:47.
29 Jan and 12 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:40.
31 Jan and 14 Feb 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Lower Wash Lane, Latchford, Warrington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:29.
31 Jan and 14 Feb 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Grange Avenue, Latchford, Warrington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 14 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:24.
3 and 28 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 20 Dec 2024 at 08:56.
3 Feb and 28 Mar 2025
Halton Borough Council are proposing to carry out Highway improvement works on Albert Road, Widnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 13:26.
3 and 5 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Avenue, Grappenhall And Thelwall, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 11:30.
3 and 5 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Avenue, Grappenhall And Thelwall, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 14:05.
3 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Knutsford Road, Latchford, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:37.
3 and 14 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Lowe Avenue, Latchford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 19 Dec 2024 at 14:57.
3 and 11 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Haig Avenue, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 12:15.
3 and 11 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Haig Avenue, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Nov 2024 at 10:02.
3 and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 13:17.
3 Feb and 2 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Gig Lane, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:11.
3 and 14 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Honister Avenue, Poplars And Hulme, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:29.
3 and 14 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Honister Avenue, Poplars And Hulme, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:43.
3 and 14 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Buttermere Crescent, Poplars And Hulme, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:24.
3 and 14 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Buttermere Crescent, Poplars And Hulme, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:42.
10 and 12 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on The Uplands, Runcorn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 20 Nov 2024 at 13:18.
10 Feb and 18 Apr 2025
Halton Borough Council were proposing to carry out Highway improvement works on East Lane, Runcorn.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 18 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 10:44.
10 and 21 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Elizabeth Drive, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 13 Nov 2024 at 13:46.
10 and 21 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Elizabeth Drive, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:45.
10 and 21 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:38.
10 and 21 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:44.
10 and 21 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:40.
10 and 21 Feb 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:44.
17 and 19 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on Wenlock Road, Runcorn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 20 Nov 2024 at 13:25.
17 and 21 Feb 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Crow Wood Lane, Widnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 17 Dec 2024 at 16:24.
17 and 21 Feb 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Crow Wood Lane, Widnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 18 Dec 2024 at 09:37.
17 Feb and 12 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Knutsford Road, Latchford, Warrington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 12 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:22.
17 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:33.
17 Feb and 16 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Gig Lane, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:37.
17 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Mawdsley Avenue, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 09:56.
17 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:20.
17 Feb and 5 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 5 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 13:28.
17 Feb and 12 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Holes Lane, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:02.
21 and 27 Feb 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Crow Wood Lane, Widnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 29 Nov 2024 at 14:29.
24 Feb and 18 Apr 2025
Halton Borough Council are proposing to carry out Highway improvement works on Albert Road, Widnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 14:14.
24 and 27 Feb 2025
Halton Borough Council are proposing to carry out Highway repair and maintenance works on Derby Road, Widnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 20 Dec 2024 at 08:38.
24 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Fearnhead Lane, Poulton-with-fearnhead, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 14:06.
25 Feb and 19 Mar 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Myddleton Lane, Winwick, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 12 Dec 2024 at 10:02.
25 Feb and 19 Mar 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Myddleton Lane, Winwick, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 3 Dec 2024 at 14:07.
25 Feb and 19 Mar 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Waterworks Lane, Winwick, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 12 Dec 2024 at 10:02.
26 Feb and 4 Mar 2025
ManWeb were proposing to carry out Utility repair and maintenance works on Crow Wood Lane, Widnes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ManWeb on 17 Dec 2024 at 14:16.
28 Feb and 27 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Orford, Warrington.
These works are categorised as Major.
The works will start on or after 28 February 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:42.
3 and 14 Mar 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Fothergill Street, Fairfield And Howley, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 5 Nov 2024 at 15:17.
3 and 14 Mar 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Fothergill Street, Fairfield And Howley, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:47.
3 and 14 Mar 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Elaine Street, Fairfield And Howley, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 5 Nov 2024 at 15:04.
3 and 14 Mar 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Elaine Street, Fairfield And Howley, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:47.
3 and 14 Mar 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Beresford Street, Fairfield And Howley, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:18.
3 and 14 Mar 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Beresford Street, Fairfield And Howley, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 24 Dec 2024 at 08:46.
3 and 19 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Mawdsley Avenue, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:25.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:48.
3 and 24 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Golborne Road, Winwick, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 24 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:18.
5 Mar and 1 Apr 2025
ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by ManWeb on 12 Dec 2024 at 10:24.
7 and 28 Mar 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 18 Dec 2024 at 15:06.
7 and 21 Mar 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Keith Avenue, Great Sankey, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 13 Dec 2024 at 10:01.
10 and 21 Mar 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Lowe Avenue, Latchford, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 18 Dec 2024 at 12:19.
10 and 26 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ivy Road, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 11:40.
10 and 13 Mar 2025
BT were proposing to carry out Utility repair and maintenance works on Vulcan Close, Poulton-with-fearnhead, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 19 Dec 2024 at 15:12.
11 Mar 2025
BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 11 March 2025 and are due to last for only one day. The works will impact the verge only.
This roadwork event was last updated by BT on 23 Dec 2024 at 11:39.
11 Mar 2025
BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 11 March 2025 and are due to last for only one day. The works will impact the verge only.
This roadwork event was last updated by BT on 24 Dec 2024 at 10:51.
11 Mar 2025
BT were proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were scheduled for 11 March 2025 The works were due to impact the verge only.
This roadwork event was last updated by BT on 16 Dec 2024 at 12:57.
13 Mar and 23 May 2025
Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works are categorised as Major.
The works will start on or after 13 March 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 11:02.
13 Mar and 15 Aug 2025
Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.
These works were categorised as Major.
The works were originally planned to start 13 March 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.
13 Mar and 23 May 2025
Halton Borough Council were proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.
These works were categorised as Major.
The works were originally planned to start 13 March 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:39.
13 Mar and 15 Aug 2025
Halton Borough Council were proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 March 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:39.
13 Mar and 10 Apr 2025
Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warrington Borough Council on 19 Dec 2024 at 10:54.
17 Mar and 2 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Maple Road, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:47.
17 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Poplars Avenue, Warrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 16:00.
17 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Green Lane, Winwick, Warrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:48.
17 Mar and 7 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Green Lane, Winwick, Warrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:18.
24 Mar and 9 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Ivy Road, Woolston, Warrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:21.
Roadworks Map near to Lychgate, WARRINGTON, WA4 6TF
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Lychgate, WARRINGTON, WA4 6TF (0 Events)