ROADWORKS SUMMARY
Shepcroft Lane, WARRINGTON, WA4 5PJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Shepcroft Lane, WA4 5PJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Shepcroft Lane, WARRINGTON, WA4 5PJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Shepcroft Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
24 Apr 2025
Details
View Map
Share
Follow
Murdishaw Avenue

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Murdishaw Avenue, Runcorn.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2024 at 12:00 and could run through until 24 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Apr 2024 at 11:49.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 11:59.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are carrying out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 16 Feb 2024 at 13:40.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 12:28.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are carrying out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 12:24.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are carrying out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 13 Oct 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 13 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 13 May 2024 at 08:31.

Halton Borough Council logo
LONG TERM
Between
2 Oct 2024 and 12 Mar 2025
Details
View Map
Share
Daresbury Bypass

Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:37.

Halton Borough Council logo
LONG TERM
Between
2 Oct 2024 and 12 Mar 2025
Details
View Map
Share
Chester Road

Halton Borough Council were proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

Halton Borough Council logo
LONG TERM
Between
2 Oct 2024 and 12 Mar 2025
Details
View Map
Share
Eastern Expressway

Halton Borough Council were proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Busway Palace Fields Dc

Halton Borough Council were proposing to carry out Highway repair and maintenance works on Busway Palace Fields Dc, Runcorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 10 Oct 2024 at 13:47.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bd

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bd, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 12:43.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Palace Fields Avenue

Halton Borough Council are proposing to carry out Highway improvement works on Palace Fields Avenue, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 23 Oct 2024 at 08:21.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bc

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bc, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:23.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Bb

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:20.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Priory B

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Priory B, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:14.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Tyrrell Way

Halton Borough Council are proposing to carry out Highway improvement works on Tyrrell Way, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 11:42.

Halton Borough Council logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Ba

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Ba, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 22 Oct 2024 at 14:18.

ManWeb logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are carrying out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 January 2025 at 09:00 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Jan 2025 at 09:44.

Warrington Borough Council logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Pepper Street

Warrington Borough Council are carrying out Highway improvement works on Pepper Street, Lymm, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 09:50 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 20 Jan 2025 at 10:06.

Cadent Gas logo
LONG TERM
Between
27 Jan and 19 Mar 2025
Details
View Map
Share
Follow
Berkshire Drive

Cadent Gas are proposing to carry out Utility asset works on Berkshire Drive, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:17.

Cadent Gas logo
LONG TERM
Until
7 Apr 2025
Details
View Map
Share
Follow
Pasture Lane Segregated Footpath

Cadent Gas are carrying out Utility asset works on Pasture Lane Segregated Footpath, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 30 January 2025 at 08:44 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 08:55.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
27 Jan and 24 Mar 2025
Details
View Map
Share
Follow
Long Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Long Lane, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Jan 2025 at 13:11.

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
24 Mar 2025
Details
View Map
Share
Follow
Long Lane

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Long Lane, Orford, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 10:00 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Feb 2025 at 14:04.

ManWeb logo
Finishing
Today
Details
View Map
Share
Follow
Watkin Street

ManWeb are proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:44.

Warrington Borough Council logo
Until
28 Feb 2025
Details
View Map
Share
Follow
Broad Lane

Warrington Borough Council are carrying out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 19:35 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 10 Feb 2025 at 09:22.

Cadent Gas logo
Between
3 and 26 Feb 2025
Details
View Map
Share
Follow
Knutsford Road

Cadent Gas are proposing to carry out Utility asset works on Knutsford Road, Latchford, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:37.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Manchester Road

Cadent Gas were proposing to carry out Utility asset works on Manchester Road, Woolston, Warrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 08:40.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Winwick Road

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Feb 2025 at 10:41.

Cadent Gas logo
LONG TERM
Until
7 Apr 2025
Details
View Map
Share
Follow
Gig Lane

Cadent Gas are carrying out Utility asset works on Gig Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 11:30 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 11:58.

Halton Borough Council logo
LONG TERM
Between
10 Feb and 18 Apr 2025
Details
View Map
Share
East Lane

Halton Borough Council were proposing to carry out Highway improvement works on East Lane, Runcorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 10:44.

Cadent Gas logo
Until
28 Feb 2025
Details
View Map
Share
Follow
Mawdsley Avenue

Cadent Gas are carrying out Utility asset works on Mawdsley Avenue, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 12:10 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 12:12.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Elizabeth Drive

Warrington Borough Council are proposing to carry out Highway improvement works on Elizabeth Drive, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 13 Nov 2024 at 13:46.

Warrington Borough Council logo
Until
26 Feb 2025
Details
View Map
Share
Follow
Elizabeth Drive

Warrington Borough Council are carrying out Highway improvement works on Elizabeth Drive, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 February 2025 at 09:45 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 13 Feb 2025 at 10:41.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Anderson Close

Warrington Borough Council are proposing to carry out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:38.

Warrington Borough Council logo
Until
26 Feb 2025
Details
View Map
Share
Follow
Anderson Close

Warrington Borough Council are carrying out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 February 2025 at 10:00 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 13 Feb 2025 at 10:41.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Anderson Close

Warrington Borough Council are proposing to carry out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:40.

Warrington Borough Council logo
Until
26 Feb 2025
Details
View Map
Share
Follow
Anderson Close

Warrington Borough Council are carrying out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 February 2025 at 10:00 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 13 Feb 2025 at 10:42.

Halton Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Daresbury Lane

Halton Borough Council are carrying out Highway repair and maintenance works on Daresbury Lane, Daresbury, Runcorn.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 10:00 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Feb 2025 at 10:42.

Cadent Gas logo
Until
6 Mar 2025
Details
View Map
Share
Follow
Harpers Road

Cadent Gas are carrying out Utility asset works on Harpers Road, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:10 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Feb 2025 at 09:13.

BT logo
Finishing
Wednesday
Details
View Map
Share
Wenlock Road

BT were proposing to carry out Utility repair and maintenance works on Wenlock Road, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 20 Nov 2024 at 13:25.

Cadent Gas logo
Between
17 Feb and 12 Mar 2025
Details
View Map
Share
Knutsford Road

Cadent Gas were proposing to carry out Utility asset works on Knutsford Road, Latchford, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 12 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:22.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:33.

Cadent Gas logo
LONG TERM
Between
17 Feb and 16 Apr 2025
Details
View Map
Share
Follow
Gig Lane

Cadent Gas are proposing to carry out Utility asset works on Gig Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:37.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Hillock Lane

Cadent Gas are proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:20.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Hillock Lane

Cadent Gas were proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 5 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 13:28.

Cadent Gas logo
Between
17 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Holes Lane

Cadent Gas are proposing to carry out Utility asset works on Holes Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:02.

United Utilities Water (formerly North West Water) logo
Finishing
Friday
Details
View Map
Share
Follow
Long Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Long Lane, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Jan 2025 at 13:13.

United Utilities Water (formerly North West Water) logo
Finishing
Friday
Details
View Map
Share
Follow
Long Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Long Lane, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 5 Feb 2025 at 16:18.

United Utilities Water (formerly North West Water) logo
Finishing
Friday
Details
View Map
Share
Follow
Senna Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Senna Lane, Comberbach, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Dec 2024 at 09:52.

United Utilities Water (formerly North West Water) logo
Finishing
Friday
Details
View Map
Share
Follow
Senna Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Senna Lane, Comberbach, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Dec 2024 at 16:08.

Halton Borough Council logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bd

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bd, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 28 Jan 2025 at 21:08.

Halton Borough Council logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Palace Fields Avenue

Halton Borough Council are proposing to carry out Highway improvement works on Palace Fields Avenue, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 30 Jan 2025 at 10:12.

Halton Borough Council logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Bc

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Bc, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 28 Jan 2025 at 14:12.

Halton Borough Council logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Bb

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Bb, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 6 Feb 2025 at 09:31.

Halton Borough Council logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Busway Norton Priory B

Halton Borough Council are proposing to carry out Highway improvement works on Busway Norton Priory B, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 28 Jan 2025 at 09:51.

Halton Borough Council logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Tyrrell Way

Halton Borough Council are proposing to carry out Highway improvement works on Tyrrell Way, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 28 Jan 2025 at 09:40.

Halton Borough Council logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Busway Windmill Hill Ba

Halton Borough Council are proposing to carry out Highway improvement works on Busway Windmill Hill Ba, Runcorn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 28 Jan 2025 at 09:51.

Cadent Gas logo
Between
28 Feb and 27 Mar 2025
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Orford, Warrington.

These works are categorised as Major.

The works will start on or after 28 February 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:42.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Fothergill Street

Warrington Borough Council are proposing to carry out Highway improvement works on Fothergill Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 5 Nov 2024 at 15:17.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Fothergill Street

Warrington Borough Council are proposing to carry out Highway improvement works on Fothergill Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 2 Jan 2025 at 09:27.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Elaine Street

Warrington Borough Council are proposing to carry out Highway improvement works on Elaine Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 5 Nov 2024 at 15:04.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Elaine Street

Warrington Borough Council are proposing to carry out Highway improvement works on Elaine Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 2 Jan 2025 at 09:58.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Beresford Street

Warrington Borough Council are proposing to carry out Highway improvement works on Beresford Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:18.

Warrington Borough Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Beresford Street

Warrington Borough Council are proposing to carry out Highway improvement works on Beresford Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 2 Jan 2025 at 10:43.

Cadent Gas logo
Between
3 and 19 Mar 2025
Details
View Map
Share
Follow
Mawdsley Avenue

Cadent Gas are proposing to carry out Utility asset works on Mawdsley Avenue, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:25.

ManWeb logo
Between
5 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 12 Dec 2024 at 10:24.

Warrington Borough Council logo
Between
7 and 28 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Dec 2024 at 15:06.

Warrington Borough Council logo
Between
7 and 21 Mar 2025
Details
View Map
Share
Follow
Keith Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Keith Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 7 Jan 2025 at 14:09.

Warrington Borough Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Lowe Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Lowe Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Dec 2024 at 12:19.

Cadent Gas logo
Between
10 and 26 Mar 2025
Details
View Map
Share
Follow
Ivy Road

Cadent Gas are proposing to carry out Utility asset works on Ivy Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 11:40.

BT logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Vulcan Close

BT were proposing to carry out Utility repair and maintenance works on Vulcan Close, Poulton-with-fearnhead, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 19 Dec 2024 at 15:12.

BT logo
On
11 Mar 2025
Details
View Map
Share
Follow
Newton Bank

BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 11 March 2025 and are due to last for only one day. The works will impact the verge only.

This roadwork event was last updated by BT on 23 Dec 2024 at 11:39.

BT logo
On
11 Mar 2025
Details
View Map
Share
Follow
Newton Bank

BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 11 March 2025 and are due to last for only one day. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Dec 2024 at 10:51.

BT logo
On
11 Mar 2025
Details
View Map
Share
Newton Bank

BT were proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 11 March 2025 The works were due to impact the verge only.

This roadwork event was last updated by BT on 16 Dec 2024 at 12:57.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 23 May 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 13 March 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 11:02.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 15 Aug 2025
Details
View Map
Share
Daresbury Bypass

Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 13 March 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 23 May 2025
Details
View Map
Share
Chester Road

Halton Borough Council were proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 13 March 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:39.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 15 Aug 2025
Details
View Map
Share
Eastern Expressway

Halton Borough Council were proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 March 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:39.

Warrington Borough Council logo
Between
13 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Broad Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Dec 2024 at 10:54.

Cadent Gas logo
Between
17 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:47.

Cadent Gas logo
Between
24 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Ivy Road

Cadent Gas are proposing to carry out Utility asset works on Ivy Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:21.

Cadent Gas logo
Between
31 Mar and 16 Apr 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:30.

ManWeb logo
Between
2 and 8 Apr 2025
Details
View Map
Share
Follow
Withers Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Withers Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 14 Jan 2025 at 14:36.

Cadent Gas logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Hillock Lane

Cadent Gas are proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 14:49.

Cadent Gas logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Holes Lane

Cadent Gas are proposing to carry out Utility asset works on Holes Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 14:51.

Cadent Gas logo
Between
7 Apr and 7 May 2025
Details
View Map
Share
Follow
Harpers Road

Cadent Gas are proposing to carry out Utility asset works on Harpers Road, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 15:15.

ManWeb logo
Between
9 and 15 Apr 2025
Details
View Map
Share
Follow
Withers Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Withers Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 11 Feb 2025 at 13:58.

ManWeb logo
Between
10 and 24 Apr 2025
Details
View Map
Share
Follow
Broomfields Road

ManWeb are proposing to carry out Utility repair and maintenance works on Broomfields Road, Appleton, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 13 Feb 2025 at 12:26.

ManWeb logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Park Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Park Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 14 Jan 2025 at 14:26.

ManWeb logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Park Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Park Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 17 Jan 2025 at 15:32.

ManWeb logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Park Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Park Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 31 Jan 2025 at 13:36.

Cadent Gas logo
Between
14 Apr and 9 May 2025
Details
View Map
Share
Follow
Holes Lane

Cadent Gas are proposing to carry out Utility asset works on Holes Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 11:13.

Cadent Gas logo
Between
14 Apr and 7 May 2025
Details
View Map
Share
Follow
Harpers Road

Cadent Gas are proposing to carry out Utility asset works on Harpers Road, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:29.

ManWeb logo
Between
15 Apr and 2 May 2025
Details
View Map
Share
Follow
Park Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Park Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Jan 2025 at 13:09.

United Utilities Water (formerly North West Water) logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Stockham Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Stockham Lane, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 20:47.

United Utilities Water (formerly North West Water) logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Stockton Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Stockton Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Jan 2025 at 13:14.

BT logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Footpath C7-132nt

BT were proposing to carry out Utility repair and maintenance works on Footpath C7-132nt, Runcorn.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by BT on 2 Feb 2025 at 09:54.

Cadent Gas logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Padgate Lane

Cadent Gas are proposing to carry out Utility asset works on Padgate Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:58.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Booths Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Booths Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 14:06.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Booths Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Booths Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Feb 2025 at 11:24.

ManWeb logo
Between
8 and 20 May 2025
Details
View Map
Share
Follow
Lyons Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Lyons Lane, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 13 Feb 2025 at 15:42.

ManWeb logo
Between
8 and 13 May 2025
Details
View Map
Share
Follow
Delphfields Road

ManWeb are proposing to carry out Utility repair and maintenance works on Delphfields Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 13 Feb 2025 at 16:00.

Cadent Gas logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
Liverpool Road

Cadent Gas are proposing to carry out Utility asset works on Liverpool Road, Great Sankey, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 14:30.


Roadworks Map near to Shepcroft Lane, WARRINGTON, WA4 5PJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Feb 2025 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Shepcroft Lane, WARRINGTON, WA4 5PJ (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Warrington Borough Council logo
HIGHFIELD AVENUE, APPLETON 
(0.6 miles)
Warrington Borough Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 17 Feb 2025 - 19 Feb 2025
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.