ROADWORKS SUMMARY
Queastybirch Lane, WARRINGTON, WA4 4DQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Queastybirch Lane, WA4 4DQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Queastybirch Lane, WARRINGTON, WA4 4DQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Queastybirch Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
25 Aug 2025
Details
View Map
Share
Follow
Murdishaw Avenue

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Murdishaw Avenue, Runcorn.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2024 at 12:00 and could run through until 25 August 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Mar 2025 at 11:27.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 12:24.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Eastern Expressway

Halton Borough Council are carrying out Highway improvement works on Eastern Expressway, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 11:59.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are carrying out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are carrying out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works started on 12 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:25.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 15 Aug 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 12:28.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 13 Oct 2025
Details
View Map
Share
Follow
Chester Road

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Chester Road, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 13 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 13 May 2024 at 08:31.

Halton Borough Council logo
LONG TERM
Between
12 Aug 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 12 August 2024 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Halton Borough Council on 16 Feb 2024 at 13:40.

Halton Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Eastern Expressway

Halton Borough Council were proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

Halton Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Daresbury Bypass

Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:37.

Halton Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Chester Road

Halton Borough Council were proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

Halton Borough Council logo
LONG TERM
Between
10 Feb and 18 Apr 2025
Details
View Map
Share
East Lane

Halton Borough Council were proposing to carry out Highway improvement works on East Lane, Runcorn.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 18 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Halton Borough Council on 6 Nov 2024 at 10:44.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Knutsford Road

Cadent Gas were proposing to carry out Utility asset works on Knutsford Road, Latchford, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 12 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:22.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Beresford Street

Warrington Borough Council are proposing to carry out Highway improvement works on Beresford Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:18.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Elaine Street

Warrington Borough Council are proposing to carry out Highway improvement works on Elaine Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 5 Nov 2024 at 15:04.

Warrington Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Fothergill Street

Warrington Borough Council are proposing to carry out Highway improvement works on Fothergill Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 5 Nov 2024 at 15:17.

Warrington Borough Council logo
Between
4 and 31 Mar 2025
Details
View Map
Share
Follow
London Road

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on London Road, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Mar 2025 at 13:21.

Warrington Borough Council logo
Between
7 and 28 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Dec 2024 at 15:06.

Warrington Borough Council logo
Between
7 and 21 Mar 2025
Details
View Map
Share
Follow
Keith Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Keith Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 7 Jan 2025 at 14:09.

Warrington Borough Council logo
Between
9 and 31 Mar 2025
Details
View Map
Share
Follow
London Road

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on London Road, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 5 Mar 2025 at 14:13.

Warrington Borough Council logo
Between
9 and 31 Mar 2025
Details
View Map
Share
Follow
London Road

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on London Road, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Mar 2025 at 15:41.

Warrington Borough Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Beresford Street

Warrington Borough Council are proposing to carry out Highway improvement works on Beresford Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 7 Mar 2025 at 15:02.

Warrington Borough Council logo
Until
21 Mar 2025
Details
View Map
Share
Follow
Elaine Street

Warrington Borough Council are carrying out Highway improvement works on Elaine Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 10:55 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 10 Mar 2025 at 12:40.

Warrington Borough Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Fothergill Street

Warrington Borough Council are proposing to carry out Highway improvement works on Fothergill Street, Fairfield And Howley, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 7 Mar 2025 at 15:03.

Warrington Borough Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Lowe Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Lowe Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Dec 2024 at 12:19.

BT logo
Finishing
Today
Details
View Map
Share
Newton Bank

BT were proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 11 March 2025 The works were due to impact the verge only.

This roadwork event was last updated by BT on 16 Dec 2024 at 12:57.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Newton Bank

BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are in progress during today only. The works will impact the verge only.

This roadwork event was last updated by BT on 23 Dec 2024 at 11:39.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Newton Bank

BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are in progress during today only. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Dec 2024 at 10:51.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Newton Bank

BT are proposing to carry out Utility asset works on Newton Bank, Daresbury, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are in progress during today only. The works will impact the verge only.

This roadwork event was last updated by BT on 5 Mar 2025 at 07:33.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 23 May 2025
Details
View Map
Share
Chester Road

Halton Borough Council were proposing to carry out Highway improvement works on Chester Road, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 13 March 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:39.

Warrington Borough Council logo
Between
13 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Broad Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Broad Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Dec 2024 at 10:54.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 23 May 2025
Details
View Map
Share
Follow
Daresbury Bypass

Halton Borough Council are proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works are categorised as Major.

The works will start on or after 13 March 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 23 May 2024 at 11:02.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 15 Aug 2025
Details
View Map
Share
Daresbury Bypass

Halton Borough Council were proposing to carry out Highway improvement works on Daresbury Bypass, Daresbury, Runcorn.

These works were categorised as Major.

The works were originally planned to start 13 March 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:38.

Halton Borough Council logo
LONG TERM
Between
13 Mar and 15 Aug 2025
Details
View Map
Share
Eastern Expressway

Halton Borough Council were proposing to carry out Highway improvement works on Eastern Expressway, Runcorn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 March 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 14 Aug 2024 at 13:39.

Cheshire West And Chester Council logo
Between
20 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Runcorn Road

Cheshire West And Chester Council are proposing to carry out Highway repair and maintenance works on Runcorn Road, Barnton, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 6 Mar 2025 at 13:18.

BT logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Halton Lodge Avenue

BT were proposing to carry out Utility asset works on Halton Lodge Avenue, Runcorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jan 2025 at 16:17.

ManWeb logo
Between
2 and 8 Apr 2025
Details
View Map
Share
Follow
Withers Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Withers Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 14 Jan 2025 at 14:36.

ManWeb logo
Between
7 and 21 Apr 2025
Details
View Map
Share
Follow
Lyons Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Lyons Lane, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 5 Mar 2025 at 13:34.

ManWeb logo
Between
7 and 21 Apr 2025
Details
View Map
Share
Follow
Broomfields Road

ManWeb are proposing to carry out Utility repair and maintenance works on Broomfields Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 4 Mar 2025 at 08:42.

ManWeb logo
Between
7 and 21 Apr 2025
Details
View Map
Share
Follow
Broomfields Road

ManWeb are proposing to carry out Utility repair and maintenance works on Broomfields Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 7 Mar 2025 at 09:57.

ManWeb logo
Between
9 and 15 Apr 2025
Details
View Map
Share
Withers Avenue

ManWeb were proposing to carry out Utility repair and maintenance works on Withers Avenue, Orford, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 April 2025 and run through until 15 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 17 Feb 2025 at 14:59.

ManWeb logo
Between
10 and 24 Apr 2025
Details
View Map
Share
Follow
Broomfields Road

ManWeb are proposing to carry out Utility repair and maintenance works on Broomfields Road, Appleton, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 13 Feb 2025 at 12:26.

ManWeb logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Park Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Park Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 31 Jan 2025 at 13:36.

ManWeb logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Park Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Park Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 17 Jan 2025 at 15:32.

ManWeb logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Park Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Park Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 14 Jan 2025 at 14:26.

ManWeb logo
Between
14 and 21 Apr 2025
Details
View Map
Share
Follow
Delphfields Road

ManWeb are proposing to carry out Utility repair and maintenance works on Delphfields Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Mar 2025 at 15:21.

ManWeb logo
Between
15 Apr and 2 May 2025
Details
View Map
Share
Follow
Park Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Park Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 29 Jan 2025 at 13:09.

United Utilities Water (formerly North West Water) logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Stockham Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Stockham Lane, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 20:47.

United Utilities Water (formerly North West Water) logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Stockton Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Stockton Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Jan 2025 at 13:14.

Cadent Gas logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Padgate Lane

Cadent Gas are proposing to carry out Utility asset works on Padgate Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:58.

United Utilities Water (formerly North West Water) logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Gibb Hill

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Gibb Hill, Antrobus, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Mar 2025 at 09:43.

BT logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Footpath C7-132nt

BT were proposing to carry out Utility repair and maintenance works on Footpath C7-132nt, Runcorn.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by BT on 2 Feb 2025 at 09:54.

Electricity Network Company logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Warrington Road

Electricity Network Company are proposing to carry out Utility asset works on Warrington Road, Penketh, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 5 Mar 2025 at 11:50.

ManWeb logo
Between
8 and 20 May 2025
Details
View Map
Share
Follow
Lyons Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Lyons Lane, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 4 Mar 2025 at 15:25.

ManWeb logo
Between
8 and 13 May 2025
Details
View Map
Share
Follow
Delphfields Road

ManWeb are proposing to carry out Utility repair and maintenance works on Delphfields Road, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Mar 2025 at 08:39.

Cadent Gas logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Liverpool Road

Cadent Gas were proposing to carry out Utility asset works on Liverpool Road, Great Sankey, Warrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 2 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 15:01.

ManWeb logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Withers Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Withers Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 17 Feb 2025 at 14:59.

Cadent Gas logo
Between
19 May and 2 Jun 2025
Details
View Map
Share
Follow
Padgate Lane

Cadent Gas are proposing to carry out Utility asset works on Padgate Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Feb 2025 at 13:30.

ManWeb logo
Between
20 May and 12 Jun 2025
Details
View Map
Share
Follow
London Road

ManWeb are proposing to carry out Utility repair and maintenance works on London Road, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Mar 2025 at 15:32.

ManWeb logo
Between
20 May and 17 Jun 2025
Details
View Map
Share
Follow
Lyons Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Lyons Lane, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 5 Mar 2025 at 10:29.

ManWeb logo
Between
20 May and 17 Jun 2025
Details
View Map
Share
Follow
Lyons Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Lyons Lane, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Mar 2025 at 15:26.

Cheshire West And Chester Council logo
LONG TERM
Between
22 May and 21 Jun 2025
Details
View Map
Share
Follow
Tarporley Road

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Tarporley Road, Whitley, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 28 Feb 2025 at 10:15.

Cheshire West And Chester Council logo
LONG TERM
Between
22 May and 21 Jun 2025
Details
View Map
Share
Follow
Tarporley Road

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Tarporley Road, Whitley, Northwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 25 Feb 2025 at 13:46.

Cadent Gas logo
LONG TERM
Between
26 May and 2 Jul 2025
Details
View Map
Share
Follow
Bridge Lane

Cadent Gas are proposing to carry out Utility asset works on Bridge Lane, Appleton, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 10:46.

Warrington Borough Council logo
LONG TERM
Between
27 May and 3 Jul 2025
Details
View Map
Share
Follow
Winwick Road

Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 4 Mar 2025 at 15:51.

ManWeb logo
Between
28 May and 12 Jun 2025
Details
View Map
Share
Follow
Pinners Brow

ManWeb are proposing to carry out Utility repair and maintenance works on Pinners Brow, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 5 Mar 2025 at 12:33.

Warrington Borough Council logo
LONG TERM
Between
29 May and 19 Dec 2025
Details
View Map
Share
Follow
Winwick Road

Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Mar 2025 at 11:53.

Warrington Borough Council logo
LONG TERM
Between
29 May and 19 Dec 2025
Details
View Map
Share
Follow
Alder Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Alder Lane, Orford, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Mar 2025 at 11:55.

Warrington Borough Council logo
LONG TERM
Between
29 May and 19 Dec 2025
Details
View Map
Share
Follow
Jubilee Way

Warrington Borough Council are proposing to carry out Highway improvement works on Jubilee Way, Orford, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Mar 2025 at 11:51.

ManWeb logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Blandford Road

ManWeb were proposing to carry out Utility repair and maintenance works on Blandford Road, Great Sankey, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 7 Mar 2025 at 10:20.

Warrington Borough Council logo
LONG TERM
Between
3 Jun and 10 Jul 2025
Details
View Map
Share
Follow
Pinners Brow

Warrington Borough Council are proposing to carry out Highway improvement works on Pinners Brow, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 28 Feb 2025 at 16:57.


Roadworks Map near to Queastybirch Lane, WARRINGTON, WA4 4DQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Mar 2025 06:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Queastybirch Lane, WARRINGTON, WA4 4DQ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.