ROADWORKS SUMMARY
WA2 8JR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for WA2 8JR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to WA2 8JR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
17 May 2024
Details
View Map
Share
Follow
Southworth Road

St. Helens Council are carrying out Highway repair and maintenance works on Southworth Road, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 09:00 and could run through until 17 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 23 Feb 2024 at 14:32.

LONG TERM
Until
17 May 2024
Details
View Map
Share
Follow
Newton Road

St. Helens Council are carrying out Highway repair and maintenance works on Newton Road, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 09:00 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 23 Feb 2024 at 14:30.

LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Parkside Road

St. Helens Council are carrying out Highway repair and maintenance works on Parkside Road, Newton Le Willows, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 09:00 and could run through until 16 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 17 Apr 2024 at 07:49.

LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Golborne Dale Road

St. Helens Council are carrying out Highway repair and maintenance works on Golborne Dale Road, Newton Le Willows, St Helens.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 09:00 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by St. Helens Council on 17 Apr 2024 at 07:49.

LONG TERM
Between
15 Jan and 30 Nov 2024
Details
View Map
Share
Follow
Winwick Link Road

St. Helens Council are proposing to carry out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by St. Helens Council on 6 Mar 2024 at 09:19.

LONG TERM
Until
10 May 2024
Details
View Map
Share
Follow
Clock Face Road

St. Helens Council are carrying out Highway repair and maintenance works on Clock Face Road, Clock Face, St Helens.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 08:00 and could run through until 10 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 21 Feb 2024 at 10:03.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Thelwall New Road

Cadent Gas are carrying out Utility asset works on Thelwall New Road, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:30 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 08:40.

LONG TERM
Between
13 Apr and 3 Jun 2024
Details
View Map
Share
Follow
Highfield Lane

St. Helens Council are proposing to carry out Highway improvement works on Highfield Lane, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2024 and could run through until 3 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 10 Apr 2024 at 13:27.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Bagot Avenue Segregated Footpath

Cadent Gas are proposing to carry out Utility asset works on Bagot Avenue Segregated Footpath, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 15 April 2024 and could run through until 1 May 2024. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 1 Feb 2024 at 14:40.

ManWeb logo
LONG TERM
Between
19 Apr and 23 May 2024
Details
View Map
Share
Follow
Lingley Road

ManWeb are proposing to carry out Utility repair and maintenance works on Lingley Road, Great Sankey, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 17 Apr 2024 at 10:41.

Warrington Borough Council logo
LONG TERM
Until
30 May 2024
Details
View Map
Share
Follow
London Road

Warrington Borough Council are carrying out Highway improvement works on London Road, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 18:10 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 23 Apr 2024 at 09:13.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Cliff Lane Access Road To Thelwall Heyes

Cadent Gas were proposing to carry out Utility repair and maintenance works on Cliff Lane Access Road To Thelwall Heyes, Grappenhall And Thelwall, Warrington.

The works were originally planned to start 21 April 2024 and run through until 1 May 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 10:33.

Between
22 Apr and 12 May 2024
Details
View Map
Share
Follow
Waterworks Lane

St. Helens Council are proposing to carry out Highway improvement works on Waterworks Lane, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 12 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 10 Apr 2024 at 13:29.

Warrington Borough Council logo
Until
19 May 2024
Details
View Map
Share
Follow
Massey Brook Lane

Warrington Borough Council are carrying out Utility asset works on Massey Brook Lane, Lymm, Warrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 08:30 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Apr 2024 at 11:55.

Cadent Gas logo
LONG TERM
Until
3 Jun 2024
Details
View Map
Share
Follow
Acacia Avenue

Cadent Gas are carrying out Utility asset works on Acacia Avenue, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 April 2024 at 09:44 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 09:44.

ManWeb logo
Between
25 Apr and 16 May 2024
Details
View Map
Share
Follow
Stocks Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Stocks Lane, Penketh, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 16 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ManWeb on 5 Feb 2024 at 10:11.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Follow
Suez Street

Virgin Media are proposing to carry out Utility repair and maintenance works on Suez Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 29 Jan 2024 at 12:35.

United Utilities Water (formerly North West Water) logo
Between
29 Apr and 7 May 2024
Details
View Map
Share
Follow
Hayfield Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Hayfield Road, Woolston, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Feb 2024 at 11:37.

ManWeb logo
LONG TERM
Between
6 May and 26 Jun 2024
Details
View Map
Share
Follow
Liverpool Road

ManWeb are proposing to carry out Utility repair and maintenance works on Liverpool Road, Great Sankey, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 1 Mar 2024 at 15:34.

United Utilities Water (formerly North West Water) logo
Between
6 and 14 May 2024
Details
View Map
Share
Follow
Back Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Back Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Feb 2024 at 12:41.

Cadent Gas logo
Between
6 and 23 May 2024
Details
View Map
Share
Follow
Padgate Lane

Cadent Gas are proposing to carry out Utility asset works on Padgate Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Feb 2024 at 09:55.

Electricity North West (NorWeb) logo
Between
7 and 13 May 2024
Details
View Map
Share
Follow
East Lancashire Road Service Road 101-111

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on East Lancashire Road Service Road 101-111, Lowton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 27 Feb 2024 at 13:01.

Wigan Metropolitan Borough Council logo
Between
7 and 10 May 2024
Details
View Map
Share
Follow
Garton Drive

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Garton Drive, Lowton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 10 Apr 2024 at 14:15.

Cadent Gas logo
Between
12 May and 5 Jun 2024
Details
View Map
Share
Follow
Star Lane

Cadent Gas are proposing to carry out Utility asset works on Star Lane, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2024 at 11:52.

United Utilities Water (formerly North West Water) logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Massey Brook Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Massey Brook Lane, Lymm, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Mar 2024 at 09:03.

BT logo
Between
21 and 23 May 2024
Details
View Map
Share
Follow
Hobb Lane

BT are proposing to carry out Utility repair and maintenance works on Hobb Lane, Walton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 Feb 2024 at 14:21.

United Utilities Water (formerly North West Water) logo
Between
22 and 24 May 2024
Details
View Map
Share
Follow
Cartridge Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Cartridge Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 5 Mar 2024 at 15:09.

United Utilities Water (formerly North West Water) logo
Between
28 May and 5 Jun 2024
Details
View Map
Share
Follow
Inman Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Inman Avenue, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 5 Mar 2024 at 14:31.

Electricity North West (NorWeb) logo
Between
28 May and 2 Jun 2024
Details
View Map
Share
Follow
Church Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Church Lane, Lowton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Mar 2024 at 12:01.

Electricity North West (NorWeb) logo
Between
29 May and 4 Jun 2024
Details
View Map
Share
Follow
Clifton Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Clifton Avenue, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Mar 2024 at 09:43.

Cadent Gas logo
Between
2 and 25 Jun 2024
Details
View Map
Share
Follow
Park Road South

Cadent Gas are proposing to carry out Utility asset works on Park Road South, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 08:02.

Wigan Metropolitan Borough Council logo
Between
2 and 9 Jun 2024
Details
View Map
Share
Follow
St Helens Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on St Helens Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 26 Apr 2024 at 10:48.

Cadent Gas logo
LONG TERM
Between
3 Jun and 10 Jul 2024
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 12:02.

Cadent Gas logo
Between
3 and 28 Jun 2024
Details
View Map
Share
Follow
Fearnhead Lane

Cadent Gas are proposing to carry out Utility asset works on Fearnhead Lane, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Mar 2024 at 10:43.

Wigan Metropolitan Borough Council logo
Between
9 and 16 Jun 2024
Details
View Map
Share
Follow
Newton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Newton Road, Lowton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Apr 2024 at 10:13.

Cadent Gas logo
Between
9 Jun and 2 Jul 2024
Details
View Map
Share
Follow
Whitbarrow Road

Cadent Gas are proposing to carry out Utility asset works on Whitbarrow Road, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 2 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 08:47.

Cadent Gas logo
Between
10 and 26 Jun 2024
Details
View Map
Share
Follow
Burkhardt Drive

Cadent Gas are proposing to carry out Utility asset works on Burkhardt Drive, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 09:34.

Between
12 and 14 Jun 2024
Details
View Map
Share
Follow
Winwick Lane

St. Helens Council are proposing to carry out Highway improvement works on Winwick Lane, Croft, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 13 Mar 2024 at 10:38.

Between
12 and 14 Jun 2024
Details
View Map
Share
Follow
M6 J22 Leave N

St. Helens Council are proposing to carry out Highway improvement works on M6 J22 Leave N, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 5 Mar 2024 at 12:59.

Halton Borough Council logo
Between
16 and 18 Jun 2024
Details
View Map
Share
Follow
Hobb Lane

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Hobb Lane, Walton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 25 Apr 2024 at 08:07.

Halton Borough Council logo
Between
16 and 27 Jun 2024
Details
View Map
Share
Follow
Hobb Lane

Halton Borough Council are proposing to carry out Highway repair and maintenance works on Hobb Lane, Moore, Runcorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Halton Borough Council on 11 Apr 2024 at 13:26.

Warrington Borough Council logo
LONG TERM
Between
16 Jun and 22 Aug 2024
Details
View Map
Share
Follow
Weaste Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Weaste Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 22 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Apr 2024 at 07:47.

United Utilities Water (formerly North West Water) logo
Between
17 and 25 Jun 2024
Details
View Map
Share
Follow
Silverdale Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Silverdale Road, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Mar 2024 at 10:53.

United Utilities Water (formerly North West Water) logo
Between
24 and 28 Jun 2024
Details
View Map
Share
Follow
Elm Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Elm Avenue, Golborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Mar 2024 at 16:29.

Cadent Gas logo
Between
30 Jun and 30 Jul 2024
Details
View Map
Share
Follow
Statham Avenue

Cadent Gas are proposing to carry out Utility asset works on Statham Avenue, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 30 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 12:58.

Cadent Gas logo
Between
1 and 24 Jul 2024
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, Appleton, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 24 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2024 at 13:00.

Cadent Gas logo
Between
1 and 17 Jul 2024
Details
View Map
Share
Follow
Enfield Park Road

Cadent Gas are proposing to carry out Utility asset works on Enfield Park Road, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 14:59.

ManWeb logo
Between
9 and 28 Jul 2024
Details
View Map
Share
Follow
Green Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Green Lane, Appleton, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Apr 2024 at 14:25.

Between
12 and 14 Jul 2024
Details
View Map
Share
Follow
Winwick Link Road

St. Helens Council are proposing to carry out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 14 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 13 Mar 2024 at 10:46.

Warrington Borough Council logo
Between
16 Jul and 5 Aug 2024
Details
View Map
Share
Follow
Folly Lane

Warrington Borough Council are proposing to carry out Highway improvement works on Folly Lane, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 5 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Apr 2024 at 14:27.

Network Rail logo
Between
16 Jul and 9 Aug 2024
Details
View Map
Share
Follow
Lythgoes Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lythgoes Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 26 Apr 2024 at 14:32.

Warrington Borough Council logo
LONG TERM
Between
17 Jul and 29 Aug 2024
Details
View Map
Share
Follow
Kerfoot Street

Warrington Borough Council are proposing to carry out Highway improvement works on Kerfoot Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 29 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 24 Apr 2024 at 18:17.

BT logo
Between
21 and 23 Jul 2024
Details
View Map
Share
Follow
Redpoll Lane

BT are proposing to carry out New service connection on Redpoll Lane, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 23 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Apr 2024 at 14:23.

ManWeb logo
Between
21 and 29 Jul 2024
Details
View Map
Share
Follow
Station Road

ManWeb are proposing to carry out Utility repair and maintenance works on Station Road, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 26 Apr 2024 at 10:33.

Cadent Gas logo
Between
21 Jul and 20 Aug 2024
Details
View Map
Share
Follow
Gig Lane

Cadent Gas are proposing to carry out Utility asset works on Gig Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 20 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 14:10.

Cadent Gas logo
Between
21 Jul and 20 Aug 2024
Details
View Map
Share
Follow
Dam Lane

Cadent Gas are proposing to carry out Utility asset works on Dam Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 20 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 14:11.

United Utilities Water (formerly North West Water) logo
Between
21 and 29 Jul 2024
Details
View Map
Share
Follow
Newlands Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Newlands Road, Stockton Heath, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Apr 2024 at 11:52.

Cadent Gas logo
Between
22 Jul and 7 Aug 2024
Details
View Map
Share
Follow
Bradlegh Road

Cadent Gas are proposing to carry out Utility asset works on Bradlegh Road, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 7 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 14:12.

Cadent Gas logo
Between
22 Jul and 16 Aug 2024
Details
View Map
Share
Follow
Caunce Avenue

Cadent Gas are proposing to carry out Utility asset works on Caunce Avenue, Newton Le Willows, St Helens.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 22 July 2024 and could run through until 16 August 2024. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 14:13.

Cadent Gas logo
Between
23 Jul and 10 Aug 2024
Details
View Map
Share
Follow
Glover Road

Cadent Gas are proposing to carry out Utility asset works on Glover Road, Birchwood, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 10 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 13:59.


Roadworks Map near to WA2 8JR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Apr 2024 10:07
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to WA2 8JR (11 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
BOULTING AVENUE, BEWSEY AND WHITECROSS 
(0.4 miles)
BT
New service connection - Footway - Give and take
In Progress
Since: 26 Apr 2024 07:50
(Scheduled: 25 Apr 2024 - 29 Apr 2024)
0.4
Details
Share
Follow
2
ManWeb logo
URGENT
  
MILL LANE 
(0.4 miles)
ManWeb
Utility repair and maintenance works - Footway - Two-way signals
In Progress
Since: 24 Apr 2024 08:00
(Scheduled: 24 Apr 2024 - 1 May 2024)
0.4
Details
Share
Follow
3
ManWeb logo
POPLARS AVENUE 
(0.6 miles)
ManWeb
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 26 Apr 2024 15:35
(Scheduled: 25 Apr 2024 - 2 May 2024)
0.6
Details
Share
Follow
4
ManWeb logo
POPLARS AVENUE 
(0.7 miles)
ManWeb
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 26 Apr 2024 15:35
(Scheduled: 25 Apr 2024 - 2 May 2024)
0.7
Details
Share
Follow
5
Cadent Gas logo
MAJOR
  
SANDY LANE PART 2 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 14 Apr 2024 - 30 Apr 2024
0.7
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
BAGOT AVENUE, BEWSEY AND WHITECROSS 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 15 Apr 2024 - 1 May 2024
0.8
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
BAGOT AVENUE SEGREGATED FOOTPATH, BEWSEY AND WHITECROSS 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Verge, Footpath - No carriageway incursion
Planned
Scheduled: 15 Apr 2024 - 1 May 2024
0.8
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
HARYNGTON AVENUE, BEWSEY AND WHITECROSS 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 15 Apr 2024 - 9 May 2024
0.8
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
BOTELER AVENUE, BEWSEY AND WHITECROSS 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 15 Apr 2024 - 1 May 2024
0.9
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
DELVES AVENUE, BEWSEY AND WHITECROSS 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 15 Apr 2024 - 1 May 2024
0.9
Details
Share
Follow