ROADWORKS SUMMARY
Gloucester Walk, LONDON, W8 4HY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Gloucester Walk, W8 4HY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Gloucester Walk, LONDON, W8 4HY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Gloucester Walk are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Carrington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Carrington Road, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:54.

Thames Tideway Tunnel logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Trinity Road

Thames Tideway Tunnel are carrying out Utility asset works on Trinity Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2021 at 14:50 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 19 Mar 2025 at 13:55.

London Borough Of Ealing logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 08:28.

London Borough Of Wandsworth logo
LONG TERM
Until
24 Feb 2026
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Albert Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Albert Embankment, Prince's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2022 at 08:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 14 Jan 2025 at 13:24.

London Borough Of Wandsworth logo
LONG TERM
Between
17 Feb 2023 and 30 Apr 2025
Details
View Map
Share
Follow
Havelock Terrace

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Havelock Terrace, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.

London Borough Of Wandsworth logo
LONG TERM
Between
17 Feb 2023 and 30 Apr 2025
Details
View Map
Share
Follow
Bradmead

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Bradmead, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.

Thames Tideway Tunnel logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
York Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 May 2023 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 4 Dec 2024 at 09:17.

London Borough Of Southwark logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 July 2023 at 00:00 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Jan 2025 at 11:47.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Hammersmith Bridge Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 August 2023 at 00:01 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Feb 2025 at 16:39.

Transport for London (TfL) logo
LONG TERM
Between
6 Sep 2023 and 3 Sep 2025
Details
View Map
Share
Follow
Walworth Road

Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 13:54.

Thames Water logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Eaton Square

Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 09:11.

Transport for London (TfL) logo
LONG TERM
Between
17 Jan 2024 and 14 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Hammersmith Bridge, Barnes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 00:00 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Feb 2025 at 15:01.

Transport for London (TfL) logo
LONG TERM
Until
27 Aug 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Feb 2025 at 17:35.

Transport for London (TfL) logo
LONG TERM
Between
24 May 2024 and 21 Jun 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out roadworks on New Bridge Street, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 May 2024 and could run through until 21 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 12:06.

Transport for London (TfL) logo
LONG TERM
Between
10 Jun 2024 and 13 Apr 2026
Details
View Map
Share
Follow
Kennington Lane

Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2024 at 10:34.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Nine Elms Lane

Thames Tideway Tunnel are carrying out Works for road purposes on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2024 at 08:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 24 Jul 2024 at 12:05.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2026
Details
View Map
Share
Follow
King William Street

City Of London Corporation are carrying out Highway repair and maintenance works on King William Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 30 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 8 Jul 2024 at 07:30.

London Borough Of Camden logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 23 Oct 2024 at 18:06.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 22 Jul 2025
Details
View Map
Share
Renfrew Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 22 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 08:56.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 30 Jun 2025
Details
View Map
Share
Concert Hall Approach

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Concert Hall Approach, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2024 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 07:44.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 8 Aug 2024 at 14:49.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 25 Apr 2025
Details
View Map
Share
Concert Hall Approach

London Borough Of Lambeth were proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2024 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 1 Aug 2024 at 10:36.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 13:35.

London Borough Of Southwark logo
LONG TERM
Between
31 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
Stoney Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 13:59.

London Borough Of Southwark logo
LONG TERM
Between
31 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
Stoney Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:06.

London Borough Of Lambeth logo
LONG TERM
Between
9 Sep 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2024 at 12:45.

London Borough Of Lambeth logo
LONG TERM
Between
9 Sep 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 12:00.

London Borough Of Lambeth logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 08:13.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Monument Street

City Of London Corporation are carrying out Highway improvement works on Monument Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 5 Feb 2025 at 16:16.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:42.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 30 May 2025
Details
View Map
Share
Follow
Battersea Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:41.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:41.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:42.

London Borough Of Wandsworth logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 23 Oct 2024 at 09:06.

City Of Westminster logo
LONG TERM
Between
6 Oct 2024 and 31 Mar 2026
Details
View Map
Share
Oxford Street

City Of Westminster were proposing to carry out Section 50 on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2024 and run through until 31 March 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 13:24.

London Borough Of Southwark logo
LONG TERM
Between
12 Oct 2024 and 12 Oct 2025
Details
View Map
Share
Colombo Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.

City Of Westminster logo
LONG TERM
Between
14 Oct 2024 and 31 May 2025
Details
View Map
Share
Knightsbridge

City Of Westminster were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Aug 2024 at 16:45.

City Of Westminster logo
LONG TERM
Between
14 Oct 2024 and 31 May 2025
Details
View Map
Share
Piccadilly

City Of Westminster were proposing to carry out Highway improvement works on Piccadilly, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Aug 2024 at 16:50.

City Of Westminster logo
LONG TERM
Between
14 Oct 2024 and 31 May 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Aug 2024 at 13:52.

London Borough Of Lambeth logo
LONG TERM
Between
19 Oct 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 25 April 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 11:58.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Kensington Park Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensington Park Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 09:06.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 1 Oct 2024 at 10:57.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 4 Oct 2024 at 12:17.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
28 Oct 2024 and 23 May 2025
Details
View Map
Share
Follow
Hogarth Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Hogarth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 23 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 18 Sep 2024 at 16:21.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Hogarth Road

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Hogarth Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 28 Oct 2024 at 08:31.

HS2 logo
LONG TERM
Between
28 Oct 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.

HS2 logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 01:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 28 Oct 2024 at 11:18.

London Borough Of Camden logo
LONG TERM
Between
28 Oct 2024 and 12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.

City Of London Corporation logo
LONG TERM
Between
29 Oct 2024 and 12 May 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway improvement works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 19 Aug 2024 at 13:56.

City Of London Corporation logo
LONG TERM
Between
29 Oct 2024 and 12 May 2025
Details
View Map
Share
Whittington Avenue

City Of London Corporation were proposing to carry out Highway improvement works on Whittington Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 12 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 18 Dec 2024 at 07:07.

Transport for London (TfL) logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Jan 2025 at 15:04.

London Borough Of Lambeth logo
LONG TERM
Between
11 Nov 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 11:05.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are proposing to carry out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 28 Aug 2024 at 19:03.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are carrying out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Feb 2025 at 16:30.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are proposing to carry out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 17 Sep 2024 at 09:54.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are carrying out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:23.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are proposing to carry out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 11:16.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are carrying out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:26.

Thames Water logo
LONG TERM
Until
25 May 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:00 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 13:02.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Little Trinity Lane

City Of London Corporation are carrying out Highway repair and maintenance works on Little Trinity Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 2 Apr 2025 at 21:16.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are proposing to carry out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
LONG TERM
Until
25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are carrying out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:30 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:55.

Transport for London (TfL) logo
LONG TERM
Between
9 Dec 2024 and 2 May 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2025 at 10:11.

Thames Water logo
LONG TERM
Between
2 Jan and 4 May 2025
Details
View Map
Share
Myddelton Square

Thames Water were proposing to carry out Utility asset works on Myddelton Square, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 4 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 16:19.

Thames Water logo
LONG TERM
Between
2 Jan and 4 May 2025
Details
View Map
Share
Follow
Myddelton Square

Thames Water are proposing to carry out Utility asset works on Myddelton Square, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 4 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:01.

Thames Water logo
LONG TERM
Until
4 May 2025
Details
View Map
Share
Follow
Myddelton Square

Thames Water are carrying out Utility asset works on Myddelton Square, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:08 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Feb 2025 at 08:45.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Apr 2025
Details
View Map
Share
Heathfield Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 27 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:17.

London Borough Of Lambeth logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are carrying out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Feb 2025 at 11:18.

Cadent Gas logo
LONG TERM
Between
6 Jan and 31 May 2025
Details
View Map
Share
Follow
Fenelon Place

Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 17:29.

Cadent Gas logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Storey's Gate

Cadent Gas are carrying out Utility asset works on Storey's Gate, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:54 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 13:48.

London Borough Of Southwark logo
LONG TERM
Until
8 May 2025
Details
View Map
Share
Follow
Fenning Street

London Borough Of Southwark are carrying out Highway improvement works on Fenning Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Apr 2025 at 10:15.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 12:15.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 15:28.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are carrying out Utility repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 10:00 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 10:20.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 May 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:50.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 May 2025
Details
View Map
Share
Follow
Roger Street

London Borough Of Camden are proposing to carry out Highway improvement works on Roger Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.

London Borough Of Camden logo
LONG TERM
Until
1 May 2025
Details
View Map
Share
Follow
Roger Street

London Borough Of Camden are carrying out Highway improvement works on Roger Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 16:00 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 6 Jan 2025 at 16:47.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Jul 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are proposing to carry out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:35.

Cadent Gas logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are carrying out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:57 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 21:46.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 May 2025
Details
View Map
Share
Follow
Compton Street

Cadent Gas are proposing to carry out Utility asset works on Compton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:34.

Cadent Gas logo
LONG TERM
Until
19 May 2025
Details
View Map
Share
Follow
Compton Street

Cadent Gas are carrying out Utility asset works on Compton Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:55 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 09:12.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 May 2025
Details
View Map
Share
Follow
Ashby Street

Cadent Gas are proposing to carry out Utility asset works on Ashby Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:30.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 Jul 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:49.

London Borough Of Camden logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are carrying out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 16:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 6 Jan 2025 at 16:48.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 2 May 2025
Details
View Map
Share
Follow
King's Cross Road

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 21:52.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 2 May 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Dec 2024 at 13:39.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 2 May 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Dec 2024 at 13:37.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Crowndale Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Crowndale Road, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 18 Dec 2024 at 14:09.

Thames Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Willesden Lane

Thames Water are carrying out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 11:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 18:05.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Tempelhof Avenue

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Tilling Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Claremont Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:53.

City Of Westminster logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Howick Place

City Of Westminster are carrying out Highway repair and maintenance works on Howick Place, Vincent Square, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2025 at 08:00 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Mar 2025 at 12:18.

Thames Water logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Lowndes Court

Thames Water are carrying out Utility repair and maintenance works on Lowndes Court, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 January 2025 at 11:38 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2025 at 09:08.

City Of Westminster logo
LONG TERM
Between
13 Jan and 3 Jun 2025
Details
View Map
Share
Follow
St Anselm's Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 9 Sep 2024 at 15:44.

City Of Westminster logo
LONG TERM
Between
13 Jan and 3 Jun 2025
Details
View Map
Share
Follow
St Anselm's Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 6 Dec 2024 at 12:37.

City Of Westminster logo
LONG TERM
Until
3 Jun 2025
Details
View Map
Share
Follow
St Anselm's Place

City Of Westminster are carrying out Highway repair and maintenance works on St Anselm's Place, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 11:00 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 20 Jan 2025 at 11:15.

London Borough Of Camden logo
LONG TERM
Between
13 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Kingsway

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kingsway, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 16 Dec 2024 at 12:10.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
King's Cross Road

Transport for London (TfL) are carrying out Highway improvement works on King's Cross Road, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 08:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Jan 2025 at 08:18.

Transport for London (TfL) logo
LONG TERM
Between
13 Jan and 2 May 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 7 Jan 2025 at 11:31.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are carrying out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 08:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Jan 2025 at 08:19.

Transport for London (TfL) logo
LONG TERM
Between
13 Jan and 2 May 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 7 Jan 2025 at 11:28.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are carrying out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 08:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Jan 2025 at 08:18.

London Borough Of Ealing logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Freeland Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Freeland Road, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 16 Jan 2025 at 15:21.

London Borough Of Ealing logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Freeland Road

London Borough Of Ealing are carrying out Highway improvement works on Freeland Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 00:00 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 3 Feb 2025 at 10:26.

LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 09:25.

LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 11:06.

LONG TERM
Finishing
Sunday
Details
View Map
Share
Essex Road

London Borough Of Islington were proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 20 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Dec 2024 at 08:49.

Thames Water logo
LONG TERM
Between
26 Jan and 28 Oct 2025
Details
View Map
Share
Renfrew Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 January 2025 and run through until 28 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 07:58.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Borough High Street

Transport for London (TfL) were proposing to carry out roadworks on Borough High Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Jan 2025 at 11:36.

Thames Water logo
LONG TERM
Until
27 Apr 2025
Details
View Map
Share
Follow
Lloyd Baker Street

Thames Water are carrying out Utility asset works on Lloyd Baker Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:45 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jan 2025 at 09:45.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Willesden Lane

Thames Water are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:53.

London Borough Of Camden logo
LONG TERM
Between
28 Jan and 31 Dec 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 11 Nov 2024 at 14:09.

Transport for London (TfL) logo
LONG TERM
Between
28 Jan and 30 May 2025
Details
View Map
Share
Follow
Beaufort Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beaufort Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 13:50.

London Borough Of Southwark logo
LONG TERM
Until
4 May 2025
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are carrying out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2025 at 00:00 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Feb 2025 at 14:21.

London Borough Of Southwark logo
LONG TERM
Until
12 Aug 2025
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are carrying out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2025 at 00:00 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 15:31.

London Borough Of Southwark logo
LONG TERM
Until
4 May 2025
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are carrying out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2025 at 00:00 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Feb 2025 at 12:13.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:06.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:17.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:51.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Horseferry Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 11:15.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 15:06.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Garratt Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 27 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 09:16.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Magdalen Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 27 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 09:16.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
3 Feb and 18 Jun 2025
Details
View Map
Share
Follow
Imperial Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Imperial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 22 Jan 2025 at 08:36.

LONG TERM
Between
3 Feb and 3 Aug 2025
Details
View Map
Share
Follow
Kew Green

London Borough Of Richmond Upon Thames are proposing to carry out Section 50 on Kew Green, Kew.

These works are categorised as Major.

The works will start on or after 3 February 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 29 Jan 2025 at 15:52.

LONG TERM
Until
3 Aug 2025
Details
View Map
Share
Follow
Kew Green

London Borough Of Richmond Upon Thames are carrying out Section 50 on Kew Green, Kew.

These works are categorised as Major.

The works started on 3 February 2025 at 08:00 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 26 Feb 2025 at 10:22.

City Of Westminster logo
LONG TERM
Between
3 Feb and 23 May 2025
Details
View Map
Share
Pall Mall

City Of Westminster were proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 9 Dec 2024 at 15:15.

UK Power Networks Eastern & London logo
LONG TERM
Until
16 Jun 2025
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 15:00 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 12:14.

Thames Water logo
LONG TERM
Between
3 Feb and 8 May 2025
Details
View Map
Share
Follow
Acacia Road

Thames Water are proposing to carry out Utility asset works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.

Thames Water logo
LONG TERM
Between
3 Feb and 18 May 2025
Details
View Map
Share
Finchley Road

Thames Water were proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 13:01.

Thames Water logo
LONG TERM
Between
3 Feb and 18 May 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:25.

Cadent Gas logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are carrying out Utility repair and maintenance works on Great Peter Street, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 20:16 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 08:07.

Transport for London (TfL) logo
LONG TERM
Between
7 Feb and 28 Apr 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out roadworks on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Jul 2024 at 16:26.

Transport for London (TfL) logo
LONG TERM
Between
7 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:40.

Transport for London (TfL) logo
LONG TERM
Between
7 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:10.

Thames Water logo
LONG TERM
Until
13 May 2025
Details
View Map
Share
Follow
Acacia Road

Thames Water are carrying out Utility asset works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 February 2025 at 08:00 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Feb 2025 at 09:15.

Thames Water logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are carrying out Utility asset works on Finchley Road, Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 February 2025 at 09:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Feb 2025 at 08:03.

London Borough Of Camden logo
LONG TERM
Between
10 Feb and 30 May 2025
Details
View Map
Share
Follow
Kingsway

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kingsway, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 20 Jan 2025 at 14:48.

London Borough Of Camden logo
LONG TERM
Between
10 Feb and 30 May 2025
Details
View Map
Share
Follow
Kingsway

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kingsway, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 24 Jan 2025 at 13:17.

LONG TERM
Between
10 Feb and 10 May 2025
Details
View Map
Share
Essex Road

London Borough Of Islington were proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 10 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 13 Jan 2025 at 10:49.

Cadent Gas logo
LONG TERM
Between
10 Feb and 4 May 2025
Details
View Map
Share
Follow
Sloane Square

Cadent Gas are proposing to carry out Utility asset works on Sloane Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 16:57.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:04.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 15:47.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:07.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2025 at 11:43.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are carrying out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:10.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2025 at 11:45.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:06.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Horseferry Road

Transport for London (TfL) are carrying out Highway improvement works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:06.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are carrying out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

City Of Westminster logo
LONG TERM
Between
10 Feb and 28 Apr 2025
Details
View Map
Share
Follow
White Horse Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on White Horse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 23 Oct 2024 at 08:42.

City Of Westminster logo
LONG TERM
Between
10 Feb and 28 Apr 2025
Details
View Map
Share
Follow
White Horse Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on White Horse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 10 Feb 2025 at 11:46.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Falcon Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:51.

London Borough Of Camden logo
LONG TERM
Between
16 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.

London Borough Of Camden logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are carrying out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:00 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Feb 2025 at 10:40.

Transport for London (TfL) logo
LONG TERM
Until
9 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 22:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Mar 2025 at 11:39.

Transport for London (TfL) logo
LONG TERM
Until
9 Jun 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 22:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Mar 2025 at 11:41.

Cadent Gas logo
LONG TERM
Between
17 Feb and 17 May 2025
Details
View Map
Share
Follow
Seward Street

Cadent Gas are proposing to carry out Utility asset works on Seward Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:25.

Cadent Gas logo
LONG TERM
Until
17 May 2025
Details
View Map
Share
Follow
Seward Street

Cadent Gas are carrying out Utility asset works on Seward Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:13 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Feb 2025 at 08:16.

London Borough Of Brent logo
LONG TERM
Between
17 Feb and 20 Jun 2025
Details
View Map
Share
Follow
Chamberlayne Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Chamberlayne Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 23 Jan 2025 at 17:29.

London Borough Of Camden logo
LONG TERM
Between
17 Feb and 9 May 2025
Details
View Map
Share
Market Road

London Borough Of Camden were proposing to carry out Highway improvement works on Market Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Apr 2025 at 15:14.

London Borough Of Camden logo
LONG TERM
Between
17 Feb and 9 May 2025
Details
View Map
Share
York Way

London Borough Of Camden were proposing to carry out Highway improvement works on York Way, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 9 May 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Camden on 8 Apr 2025 at 15:02.

London Borough Of Camden logo
LONG TERM
Between
17 Feb and 9 May 2025
Details
View Map
Share
Follow
York Way

London Borough Of Camden are proposing to carry out Highway improvement works on York Way, St Pancras And Somers Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 11 Feb 2025 at 11:52.

London Borough Of Camden logo
LONG TERM
Between
17 Feb and 9 May 2025
Details
View Map
Share
York Way

London Borough Of Camden were proposing to carry out Highway improvement works on York Way, St Pancras And Somers Town, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 13 Feb 2025 at 13:55.

National Highways logo
LONG TERM
Between
17 Feb and 10 May 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 6 Feb 2025 at 17:05.

National Highways logo
LONG TERM
Between
17 Feb and 10 May 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 14 Feb 2025 at 13:55.

Cadent Gas logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Tothill Street

Cadent Gas are carrying out Utility asset works on Tothill Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:35 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 13:51.

City Of Westminster logo
LONG TERM
Until
16 May 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:00 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Feb 2025 at 09:21.

Thames Water logo
LONG TERM
Between
19 Feb and 25 Jun 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:27.

Thames Water logo
LONG TERM
Between
19 Feb and 25 Jun 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 16:30.

Thames Water logo
LONG TERM
Between
19 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Belgrave Place

Thames Water are proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
20 Feb and 12 May 2025
Details
View Map
Share
Follow
Vauxhall Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 12 May 2025. The works will impact the carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:25.

Transport for London (TfL) logo
LONG TERM
Between
20 Feb and 12 May 2025
Details
View Map
Share
Vauxhall Bridge Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 12 May 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:42.

Transport for London (TfL) logo
LONG TERM
Between
20 Feb and 12 May 2025
Details
View Map
Share
Follow
Vauxhall Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 12 May 2025. The works will impact the carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 14:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Feb and 6 Jun 2025
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 11:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Feb and 6 Jun 2025
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 11:31.

Transport for London (TfL) logo
LONG TERM
Until
9 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 22:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Mar 2025 at 12:21.

Transport for London (TfL) logo
LONG TERM
Until
9 Jun 2025
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are carrying out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 22:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 12:55.

Transport for London (TfL) logo
LONG TERM
Until
9 Jun 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are carrying out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 22:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2025 at 13:57.

Transport for London (TfL) logo
LONG TERM
Until
29 Apr 2025
Details
View Map
Share
Follow
Parkgate Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Parkgate Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2025 at 16:04.

Transport for London (TfL) logo
LONG TERM
Until
29 Apr 2025
Details
View Map
Share
Follow
Westbridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westbridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2025 at 16:01.

Thames Water logo
LONG TERM
Until
28 Apr 2025
Details
View Map
Share
Follow
Eccleston Street

Thames Water are carrying out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:50 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 09:01.

Thames Water logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are carrying out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:50 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 13:17.

Thames Water logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Belgrave Place

Thames Water are carrying out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:50 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 09:02.

City Of Westminster logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
White Horse Street

City Of Westminster are carrying out Highway repair and maintenance works on White Horse Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 11:00 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Feb 2025 at 11:38.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Tavistock Road

UK Power Networks Eastern & London are carrying out New service connection on Tavistock Road, Westbourne, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2025 at 08:55 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 11:08.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:10.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 13:06.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:13.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
2 Mar and 27 Apr 2025
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 26 Feb 2025 at 11:54.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
27 Apr 2025
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 March 2025 at 08:00 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 2 Mar 2025 at 09:44.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
28 Apr 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Wood Lane, London.

The works started on 3 March 2025 at 09:52 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 3 Mar 2025 at 10:18.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 6 Jun 2025
Details
View Map
Share
Acton Lane

London Borough Of Ealing were proposing to carry out Highway improvement works on Acton Lane, Park Royal.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 9 Apr 2025 at 10:18.

London Borough Of Camden logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Follow
Camden Street

London Borough Of Camden are proposing to carry out Highway improvement works on Camden Street, Camden Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 11 Feb 2025 at 15:37.

London Borough Of Camden logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Camden Street

London Borough Of Camden are carrying out Highway improvement works on Camden Street, Camden Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 March 2025 at 09:40 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 6 Mar 2025 at 11:34.

London Borough Of Brent logo
LONG TERM
Between
3 Mar and 31 Aug 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 29 Jan 2025 at 11:57.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Follow
Salcott Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 08:28.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Follow
Winsham Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 08:27.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Follow
Jedburgh Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 08:28.

Thames Water logo
LONG TERM
Between
3 Mar and 4 Aug 2025
Details
View Map
Share
Follow
Mysore Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 08:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Mar and 11 May 2025
Details
View Map
Share
Falcon Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Falcon Road, Battersea, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 11 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Mar 2025 at 08:08.

Electricity Network Company logo
LONG TERM
Between
3 Mar and 2 May 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 24 Dec 2024 at 10:38.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
4 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

The works will start on or after 4 March 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 26 Mar 2025 at 10:35.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
4 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

The works will start on or after 4 March 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 31 Mar 2025 at 13:53.

Vodafone logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Aldersgate Street

Vodafone are carrying out Utility repair and maintenance works on Aldersgate Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2025 at 08:00 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 14 Mar 2025 at 09:50.

Transport for London (TfL) logo
LONG TERM
Between
4 Mar and 27 May 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 27 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 12:22.

Transport for London (TfL) logo
LONG TERM
Between
4 Mar and 27 May 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 27 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:27.

Transport for London (TfL) logo
LONG TERM
Between
4 Mar and 27 May 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2025 at 14:44.

Transport for London (TfL) logo
LONG TERM
Between
4 Mar and 27 May 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 27 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 12:03.

Transport for London (TfL) logo
LONG TERM
Between
4 Mar and 27 May 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 27 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 10:58.

LONG TERM
Between
4 Mar and 27 May 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 3 Feb 2025 at 10:41.

London Borough Of Lambeth logo
LONG TERM
Until
26 Apr 2025
Details
View Map
Share
Follow
Upper Ground

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Upper Ground, Waterloo & Southbank, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 March 2025 at 08:00 and could run through until 26 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 26 Mar 2025 at 12:11.

London Borough Of Southwark logo
LONG TERM
Between
7 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

The works will start on or after 7 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 13 Feb 2025 at 12:19.

London Borough Of Southwark logo
LONG TERM
Until
6 Jun 2025
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are carrying out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

The works started on 7 March 2025 at 06:43 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2025 at 06:49.

City Of Westminster logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Gloucester Terrace

City Of Westminster are carrying out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 March 2025 at 17:30 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 Mar 2025 at 09:36.

London Borough Of Camden logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Bonny Street

London Borough Of Camden are carrying out Highway improvement works on Bonny Street, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 08:00 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 31 Mar 2025 at 13:54.

London Borough Of Camden logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are carrying out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 08:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 12 Mar 2025 at 14:07.

Thames Water logo
LONG TERM
Between
10 Mar and 6 Oct 2025
Details
View Map
Share
Follow
High Road

Thames Water are proposing to carry out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.

Thames Water logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Chaplin Road

Thames Water are proposing to carry out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Normanby Road

Thames Water are proposing to carry out Utility asset works on Normanby Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:12.

London Borough Of Brent logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Fourth Way

London Borough Of Brent are carrying out Highway repair and maintenance works on Fourth Way, Wembley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 08:00 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 10 Apr 2025 at 08:19.

Network Rail logo
LONG TERM
Between
10 Mar and 7 May 2025
Details
View Map
Share
Brixton Station Road

Network Rail were proposing to carry out roadworks on Brixton Station Road, Brixton Windrush, London.

These works were categorised as Major.

The works were originally planned to start 10 March 2025 and run through until 7 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Dec 2024 at 14:22.

Transport for London (TfL) logo
LONG TERM
Between
10 Mar and 21 May 2025
Details
View Map
Share
Follow
Grosvenor Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Grosvenor Road, Churchill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 15:40.

Network Rail logo
LONG TERM
Between
11 Mar and 7 May 2025
Details
View Map
Share
Follow
Brixton Station Road

Network Rail are proposing to carry out roadworks on Brixton Station Road, Brixton Windrush, London.

These works are categorised as Major.

The works will start on or after 11 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 11 Dec 2024 at 15:13.

LONG TERM
Between
11 Mar and 10 May 2025
Details
View Map
Share
Follow
Randell's Road

London Borough Of Islington are proposing to carry out Highway improvement works on Randell's Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 18 Dec 2024 at 08:51.

Thames Water logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Lechmere Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lechmere Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 20 Feb 2025 at 08:42.

Cadent Gas logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
St Ann's Street

Cadent Gas are carrying out Utility repair and maintenance works on St Ann's Street, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2025 at 08:00 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 08:09.

Cadent Gas logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Great Smith Street

Cadent Gas are carrying out Utility repair and maintenance works on Great Smith Street, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2025 at 08:00 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 08:09.

City Of Westminster logo
LONG TERM
Between
14 Mar and 16 May 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:28.

City Of Westminster logo
LONG TERM
Between
14 Mar and 16 May 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:20.

City Of Westminster logo
LONG TERM
Between
14 Mar and 18 Jul 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 March 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Clapham Common North Side

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clapham Common North Side, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 09:48.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Clapham Common North Side

Southern Gas Networks are carrying out Utility repair and maintenance works on Clapham Common North Side, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:30 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 16:28.

London Borough Of Lambeth logo
LONG TERM
Until
9 May 2025
Details
View Map
Share
Follow
Brixton Station Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Brixton Station Road, Brixton Windrush, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 17 Mar 2025 at 09:06.

Thames Water logo
LONG TERM
Between
17 Mar and 27 Apr 2025
Details
View Map
Share
Follow
Upper Tachbrook Street

Thames Water are proposing to carry out Utility asset works on Upper Tachbrook Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Feb 2025 at 18:23.

Thames Water logo
LONG TERM
Until
28 Apr 2025
Details
View Map
Share
Follow
Upper Tachbrook Street

Thames Water are carrying out Utility asset works on Upper Tachbrook Street, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 12:00 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 12:05.

Cadent Gas logo
LONG TERM
Between
17 Mar and 25 Apr 2025
Details
View Map
Share
Follow
North Wharf Road

Cadent Gas are proposing to carry out Utility asset works on North Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 16:30.

London Borough Of Ealing logo
LONG TERM
Between
17 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Park Royal Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 16 Dec 2024 at 11:58.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Woburn Place

Thames Water are carrying out Utility asset works on Woburn Place, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:20 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:59.

LONG TERM
Until
4 Jun 2025
Details
View Map
Share
Follow
Freeling Street

London Borough Of Islington are carrying out Highway improvement works on Freeling Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 17 Mar 2025 at 08:23.

Thames Water logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
High Road

Thames Water are carrying out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 10:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 08:00.

Thames Water logo
LONG TERM
Until
13 May 2025
Details
View Map
Share
Follow
Brenthurst Road

Thames Water are carrying out Utility asset works on Brenthurst Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:30 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 07:49.

Thames Water logo
LONG TERM
Between
18 Mar and 13 May 2025
Details
View Map
Share
Follow
Brenthurst Road

Thames Water are proposing to carry out Utility asset works on Brenthurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Feb 2025 at 17:23.

Scottish Hydro Electric Power Dis logo
Finishing
Today
Details
View Map
Share
Noel Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Noel Road, Acton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 March 2025 and run through until 17 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Mar 2025 at 11:04.

Thames Water logo
LONG TERM
Between
19 Mar and 29 Jun 2025
Details
View Map
Share
Follow
Chadwell Street

Thames Water are proposing to carry out Utility asset works on Chadwell Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 14:02.

Thames Water logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Queen's Terrace

Thames Water are carrying out Utility asset works on Queen's Terrace, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 11:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 11:29.

Thames Water logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Finchley Place

Thames Water are carrying out Utility asset works on Finchley Place, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 11:00 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 11:34.

Thames Water logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Marlborough Place

Thames Water are carrying out Utility asset works on Marlborough Place, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 11:00 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 11:29.

Thames Water logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Queen's Grove

Thames Water are carrying out Utility asset works on Queen's Grove, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 11:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 11:33.

LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are carrying out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2025 at 08:00 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Mar 2025 at 08:26.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Aldersgate Street

Thames Water are carrying out Utility repair and maintenance works on Aldersgate Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 12:30 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:12.

Thames Water logo
LONG TERM
Until
1 May 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are carrying out Statutory Infrastructure Works on Twyford Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 11:00 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 17:01.

Thames Water logo
LONG TERM
Until
24 Apr 2025
Details
View Map
Share
Follow
Thornhill Crescent

Thames Water are carrying out Utility repair and maintenance works on Thornhill Crescent, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 09:30 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 07:51.

City Of Westminster logo
LONG TERM
Between
24 Mar and 7 May 2025
Details
View Map
Share
Follow
Pall Mall East

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall East, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 7 May 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 14 Feb 2025 at 13:41.

City Of Westminster logo
LONG TERM
Until
7 May 2025
Details
View Map
Share
Follow
Pall Mall East

City Of Westminster are carrying out Highway repair and maintenance works on Pall Mall East, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 7 May 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 24 Mar 2025 at 09:24.

London Borough Of Ealing logo
LONG TERM
Between
24 Mar and 7 Jun 2025
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 28 Feb 2025 at 16:09.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 May 2025
Details
View Map
Share
Follow
Central Way

UK Power Networks Eastern & London are carrying out Utility asset works on Central Way, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Mar 2025 at 08:14.

Thames Water logo
LONG TERM
Between
24 Mar and 18 May 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out New service connection on Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 18:39.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hillside

Cadent Gas are carrying out Utility asset works on Hillside, Stonebridge, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:21 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 09:18.

London Borough Of Camden logo
Finishing
Tomorrow
Details
View Map
Share
Follow
West End Lane

London Borough Of Camden are carrying out roadworks on West End Lane, West Hampstead, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 24 Mar 2025 at 16:25.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Brackenbury Road

Thames Water are proposing to carry out Utility asset works on Brackenbury Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 15:24.

Cadent Gas logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Victoria Street

Cadent Gas are carrying out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:44 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 13:51.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar and 18 Aug 2025
Details
View Map
Share
Follow
Bressenden Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Bressenden Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:44.

Cadent Gas logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Abbey Orchard Street

Cadent Gas are carrying out Utility asset works on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:35 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 13:51.

Cadent Gas logo
LONG TERM
Between
24 Mar and 5 May 2025
Details
View Map
Share
Follow
Dean Farrar Street

Cadent Gas are proposing to carry out Utility asset works on Dean Farrar Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:57.

Cadent Gas logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Dean Farrar Street

Cadent Gas are carrying out Utility asset works on Dean Farrar Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 10:26 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 13:49.

City Of Westminster logo
LONG TERM
Between
24 Mar and 28 Nov 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Mar 2025 at 09:04.

City Of Westminster logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Mar 2025 at 09:14.

UK Power Networks Eastern & London logo
LONG TERM
Until
16 May 2025
Details
View Map
Share
Follow
College Crescent

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2025 at 10:00 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 15:35.

London Borough Of Wandsworth logo
LONG TERM
Between
26 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Patmore Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Patmore Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Mar 2025 at 06:27.

London Borough Of Wandsworth logo
LONG TERM
Until
28 Apr 2025
Details
View Map
Share
Follow
Patmore Street

London Borough Of Wandsworth are carrying out Highway improvement works on Patmore Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 18:00 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Mar 2025 at 06:30.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Ormiston Grove

Cadent Gas were proposing to carry out Utility asset works on Ormiston Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 23 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 09:35.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ormiston Grove

Cadent Gas are proposing to carry out Utility asset works on Ormiston Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 10:00.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Ormiston Grove

Cadent Gas were proposing to carry out Utility asset works on Ormiston Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 23 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 15:07.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ormiston Grove

Cadent Gas are proposing to carry out Utility asset works on Ormiston Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 10:29.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Gresham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gresham Road, Brixton Windrush, London.

These works are categorised as Major.

The works will start on or after 31 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 14:42.

Thames Water logo
Until
29 Apr 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are carrying out Utility repair and maintenance works on Gresham Road, Brixton Windrush, London.

These works are categorised as Major.

The works started on 31 March 2025 at 11:34 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 15:21.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 20 May 2025
Details
View Map
Share
Follow
Miles Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:38.

Royal Borough Of Kensington And Chelsea logo
Finishing
Tomorrow
Details
View Map
Share
Earl's Court Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Earl's Court Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 26 Mar 2025 at 12:07.

Royal Borough Of Kensington And Chelsea logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hogarth Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Hogarth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Mar 2025 at 14:49.

Royal Borough Of Kensington And Chelsea logo
Finishing
Tomorrow
Details
View Map
Share
Hogarth Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Hogarth Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Mar 2025 at 15:01.

City Of Westminster logo
LONG TERM
Until
9 May 2025
Details
View Map
Share
Follow
Elizabeth Street

City Of Westminster are carrying out Highway repair and maintenance works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 08:00 and could run through until 9 May 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 31 Mar 2025 at 08:47.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
31 Mar and 24 Oct 2025
Details
View Map
Share
Follow
Eaton Square

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 25 Mar 2025 at 10:27.

Finishing
Tuesday
Details
View Map
Share
Follow
White Horse Street

Squire Energy are carrying out Utility asset works on White Horse Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 08:00 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 9 Apr 2025 at 06:55.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 13 Feb 2025 at 12:08.

Thames Water logo
Between
31 Mar and 28 Apr 2025
Details
View Map
Share
Follow
New Quebec Street

Thames Water are proposing to carry out Utility asset works on New Quebec Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 16:21.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Basinghall Avenue

Cadent Gas are carrying out Utility asset works on Basinghall Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 09:51 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 10:07.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Maple Street

London Borough Of Camden are proposing to carry out Remedial works on Maple Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 12:56.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Maple Street

London Borough Of Camden are proposing to carry out Remedial works on Maple Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 13 Mar 2025 at 20:49.

Thames Water logo
LONG TERM
Between
31 Mar and 12 May 2025
Details
View Map
Share
Follow
Harley Street

Thames Water are proposing to carry out Utility asset works on Harley Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 15:56.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Churchway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Churchway, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 08:00 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2025 at 17:10.

London Borough Of Camden logo
Between
31 Mar and 27 Apr 2025
Details
View Map
Share
Follow
Camden Gardens

London Borough Of Camden are proposing to carry out Highway improvement works on Camden Gardens, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 11 Feb 2025 at 15:21.

London Borough Of Camden logo
Until
27 Apr 2025
Details
View Map
Share
Follow
Camden Gardens

London Borough Of Camden are carrying out Highway improvement works on Camden Gardens, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 08:00 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 31 Mar 2025 at 09:44.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 3 May 2025
Details
View Map
Share
Follow
Stratford Villas

London Borough Of Camden are proposing to carry out Highway improvement works on Stratford Villas, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 12:53.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 3 May 2025
Details
View Map
Share
Follow
Stratford Villas

London Borough Of Camden are proposing to carry out Highway improvement works on Stratford Villas, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Mar 2025 at 15:56.

Thames Water logo
LONG TERM
Until
2 Jun 2025
Details
View Map
Share
Follow
Ballogie Avenue

Thames Water are carrying out Utility repair and maintenance works on Ballogie Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 16:00 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 16:20.

London Borough Of Camden logo
LONG TERM
Between
1 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:51.

London Borough Of Camden logo
LONG TERM
Between
1 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Shorts Gardens

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Shorts Gardens, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:00.

London Borough Of Camden logo
LONG TERM
Between
1 Apr and 27 Jun 2025
Details
View Map
Share
Shorts Gardens

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Shorts Gardens, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:07.

LONG TERM
Between
1 Apr and 23 May 2025
Details
View Map
Share
Follow
Hanger Lane

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

The works will start on or after 1 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 14 Jan 2025 at 10:05.

LONG TERM
Between
1 Apr and 23 May 2025
Details
View Map
Share
Hanger Lane

Advanced Electricty Networks Ltd were proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 24 Mar 2025 at 14:06.

London Borough Of Barnet logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Barnet are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 14:00.

London Borough Of Barnet logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Barnet are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Mar 2025 at 15:43.

London Borough Of Barnet logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Barnet are carrying out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 April 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 09:22.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Lonsdale Road

Thames Water were proposing to carry out Utility repair and maintenance works on Lonsdale Road, Barnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 21 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 07:25.

Thames Water logo
Until
25 Apr 2025
Details
View Map
Share
Follow
Lonsdale Road

Thames Water are carrying out Utility repair and maintenance works on Lonsdale Road, Barnes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 April 2025 at 11:00 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 15:32.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Earl's Court Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Earl's Court Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 10:55.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Earl's Court Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Earl's Court Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 April 2025 at 08:00 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Apr 2025 at 08:01.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Marney Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Marney Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2025 at 13:00 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 13:24.

City Of Westminster logo
LONG TERM
Between
2 Apr and 2 May 2025
Details
View Map
Share
Follow
Charing Cross Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Mar 2025 at 06:39.

City Of Westminster logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Charing Cross Road

City Of Westminster are carrying out Highway repair and maintenance works on Charing Cross Road, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 10:00 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Apr 2025 at 11:50.

Southern Gas Networks logo
Between
3 Apr and 1 May 2025
Details
View Map
Share
Follow
Thorncliffe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jan 2025 at 11:00.

Cadent Gas logo
Between
3 and 30 Apr 2025
Details
View Map
Share
Follow
Great Smith Street

Cadent Gas are proposing to carry out Utility asset works on Great Smith Street, St James's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 07:53.

Cadent Gas logo
Between
3 and 30 Apr 2025
Details
View Map
Share
Follow
Great Smith Street

Cadent Gas are proposing to carry out Utility asset works on Great Smith Street, St James's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 11:43.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are carrying out Utility repair and maintenance works on Avenue Road, Acton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2025 at 09:13 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 08:47.

City Of Westminster logo
LONG TERM
Between
3 Apr and 23 May 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Dec 2024 at 15:59.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
4 Apr and 30 May 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 19 Mar 2025 at 13:10.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Apr 2025 at 08:29.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
4 Apr and 30 May 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 19 Mar 2025 at 13:13.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Apr 2025 at 08:29.

Cadent Gas logo
Between
4 and 25 Apr 2025
Details
View Map
Share
Follow
Basinghall Avenue

Cadent Gas are proposing to carry out Utility asset works on Basinghall Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 13:13.

Cadent Gas logo
Between
4 and 25 Apr 2025
Details
View Map
Share
Follow
Basinghall Avenue

Cadent Gas are proposing to carry out Utility asset works on Basinghall Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:43.

Thames Water logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
Seymour Street

Thames Water are carrying out Utility asset works on Seymour Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 13:10 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 15:09.

Thames Water logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
New Quebec Street

Thames Water are carrying out Utility asset works on New Quebec Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 12:00 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 12:06.

Thames Water logo
LONG TERM
Between
5 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Park Avenue

Thames Water are proposing to carry out Utility asset works on Park Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 16:07.

Thames Water logo
LONG TERM
Until
1 Jun 2025
Details
View Map
Share
Follow
Park Avenue

Thames Water are carrying out Utility asset works on Park Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 10:00 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 08:01.

Thames Water logo
LONG TERM
Until
24 Jun 2025
Details
View Map
Share
Follow
Southview Avenue

Thames Water are carrying out Utility asset works on Southview Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 11:00 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:25.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Bellamy Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Bellamy Street, Balham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 08:00 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 07:04.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Mimosa Street

Thames Water were proposing to carry out roadworks on Mimosa Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 27 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 15:29.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Follow
Mimosa Street

Thames Water are proposing to carry out Utility repair and maintenance works on Mimosa Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:57.

Thames Water logo
Until
27 Apr 2025
Details
View Map
Share
Follow
Mimosa Street

Thames Water are carrying out Utility repair and maintenance works on Mimosa Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 11:00 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 07:38.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Chesilton Road

Thames Water were proposing to carry out roadworks on Chesilton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 27 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 15:18.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Follow
Chesilton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chesilton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:57.

Thames Water logo
Until
27 Apr 2025
Details
View Map
Share
Follow
Chesilton Road

Thames Water are carrying out Utility repair and maintenance works on Chesilton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 09:00 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 07:30.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Whittingstall Road

Thames Water were proposing to carry out roadworks on Whittingstall Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 27 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 15:25.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Follow
Whittingstall Road

Thames Water are proposing to carry out Utility repair and maintenance works on Whittingstall Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 10:09.

Thames Water logo
Until
27 Apr 2025
Details
View Map
Share
Follow
Whittingstall Road

Thames Water are carrying out Utility repair and maintenance works on Whittingstall Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 11:00 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 07:39.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Fulham Road

Thames Water were proposing to carry out Utility asset works on Fulham Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 27 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 12:13.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Follow
Fulham Road

Thames Water are proposing to carry out Utility asset works on Fulham Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 10:32.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Follow
Fulham Road

Thames Water are proposing to carry out Utility asset works on Fulham Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 10:20.

Thames Water logo
Until
27 Apr 2025
Details
View Map
Share
Follow
Fulham Road

Thames Water are carrying out Utility asset works on Fulham Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:58.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Follow
Radipole Road

Thames Water are proposing to carry out Utility asset works on Radipole Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:57.

Thames Water logo
Until
27 Apr 2025
Details
View Map
Share
Follow
Radipole Road

Thames Water are carrying out Utility asset works on Radipole Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 09:00 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:59.

Thames Water logo
Between
5 and 27 Apr 2025
Details
View Map
Share
Radipole Road

Thames Water were proposing to carry out Utility asset works on Radipole Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 27 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 15:11.

London Borough Of Camden logo
LONG TERM
Between
6 Apr and 31 Dec 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 16 Jan 2025 at 16:16.

Fulcrum Pipelines logo
Finishing
Today
Details
View Map
Share
Follow
Maiden Lane

Fulcrum Pipelines are proposing to carry out Utility asset works on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Fulcrum Pipelines on 6 Feb 2025 at 07:49.

UK Power Networks Eastern & London logo
Until
25 Apr 2025
Details
View Map
Share
Follow
Montreal Place

UK Power Networks Eastern & London are carrying out Utility asset works on Montreal Place, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Apr 2025 at 08:05.

Cadent Gas logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Phoenix Street

Cadent Gas are proposing to carry out Utility asset works on Phoenix Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 16:39.

Cadent Gas logo
Until
2 May 2025
Details
View Map
Share
Follow
Phoenix Street

Cadent Gas are carrying out Utility asset works on Phoenix Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:45 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 10:03.

City Of Westminster logo
LONG TERM
Between
7 Apr and 30 May 2025
Details
View Map
Share
Orchard Street

City Of Westminster were proposing to carry out Highway improvement works on Orchard Street, Marylebone High Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 08:38.

City Of Westminster logo
LONG TERM
Between
7 Apr and 30 May 2025
Details
View Map
Share
Portman Street

City Of Westminster were proposing to carry out Highway improvement works on Portman Street, Bryanston & Dorset Square, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 11:27.

City Of Westminster logo
LONG TERM
Between
7 Apr and 30 May 2025
Details
View Map
Share
Wigmore Street

City Of Westminster were proposing to carry out Highway improvement works on Wigmore Street, Marylebone High Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 29 Oct 2024 at 11:19.

City Of Westminster logo
LONG TERM
Between
7 Apr and 30 May 2025
Details
View Map
Share
Portman Square

City Of Westminster were proposing to carry out Highway improvement works on Portman Square, Marylebone High Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 08:42.

Transport for London (TfL) logo
Between
7 Apr and 5 May 2025
Details
View Map
Share
Harrow Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2024 at 10:18.

Transport for London (TfL) logo
Between
7 Apr and 5 May 2025
Details
View Map
Share
Harrow Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2024 at 10:18.

Transport for London (TfL) logo
Between
7 Apr and 5 May 2025
Details
View Map
Share
Harrow Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2024 at 10:18.

London Borough Of Ealing logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Park Royal Road

London Borough Of Ealing are carrying out Highway improvement works on Park Royal Road, Park Royal.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2025 at 16:49.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Devonshire Row Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:26.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Devonshire Row Mews

UK Power Networks Eastern & London are carrying out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:10 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Apr 2025 at 09:16.

Cadent Gas logo
LONG TERM
Between
7 Apr and 17 May 2025
Details
View Map
Share
Follow
Percival Street

Cadent Gas are proposing to carry out Utility asset works on Percival Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:23.

Cadent Gas logo
LONG TERM
Between
7 Apr and 19 May 2025
Details
View Map
Share
Follow
Ashby Street

Cadent Gas are proposing to carry out Utility asset works on Ashby Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 13:49.

Transport for London (TfL) logo
LONG TERM
Between
7 Apr and 14 Jun 2025
Details
View Map
Share
Follow
Gray's Inn Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Mar 2025 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
7 Apr and 14 Jun 2025
Details
View Map
Share
Follow
Swinton Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Swinton Street, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Mar 2025 at 11:20.

Transport for London (TfL) logo
Until
2 May 2025
Details
View Map
Share
Follow
Craven Park Road

Transport for London (TfL) are carrying out Highway improvement works on Craven Park Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 10:08.

Transport for London (TfL) logo
Until
2 May 2025
Details
View Map
Share
Follow
St Marys Road

Transport for London (TfL) are carrying out Highway improvement works on St Marys Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 10:09.

LONG TERM
Between
7 Apr and 5 Jul 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 15 Jan 2025 at 10:11.

Thames Water logo
LONG TERM
Between
7 Apr and 9 Jun 2025
Details
View Map
Share
Denzil Road

Thames Water were proposing to carry out Utility asset works on Denzil Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:24.

London Borough Of Haringey logo
LONG TERM
Until
10 May 2025
Details
View Map
Share
Follow
Hampstead Lane

London Borough Of Haringey are carrying out Highway improvement works on Hampstead Lane, Hornsey, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 11:26 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 7 Apr 2025 at 13:26.

National Highways logo
LONG TERM
Between
7 Apr and 25 Jun 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Mar 2025 at 13:21.

National Highways logo
LONG TERM
Between
7 Apr and 25 Jun 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Apr 2025 at 14:59.

National Highways logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are carrying out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 22:26 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Apr 2025 at 12:05.

London Borough Of Wandsworth logo
Between
7 and 28 Apr 2025
Details
View Map
Share
Follow
Garratt Lane

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Garratt Lane, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 13 Jan 2025 at 15:59.

Southern Gas Networks logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Bellamy Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellamy Street, Balham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 07:41.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Marney Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marney Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2025 at 10:19.

Transport for London (TfL) logo
Between
7 Apr and 1 May 2025
Details
View Map
Share
Clapham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Jan 2025 at 08:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Apr and 2 Jun 2025
Details
View Map
Share
Follow
Falcon Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2025 at 07:07.

UK Power Networks Eastern & London logo
LONG TERM
Until
2 Jun 2025
Details
View Map
Share
Follow
Falcon Road

UK Power Networks Eastern & London are carrying out Utility asset works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Apr 2025 at 08:29.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Killyon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Killyon Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 10:14.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Killyon Road

Thames Water are carrying out Utility repair and maintenance works on Killyon Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:25 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:33.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Lilford Road

Thames Water are carrying out Utility repair and maintenance works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 14:38.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Lilford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 12:44.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Lilford Road

Thames Water are proposing to carry out Remedial works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Feb 2025 at 14:10.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Follow
Paradise Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Paradise Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jan 2025 at 12:00.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Paradise Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Paradise Road, Stockwell West & Larkhall, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 20 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 14:49.

Transport for London (TfL) logo
Between
7 and 29 Apr 2025
Details
View Map
Share
Follow
Talgarth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Talgarth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Apr 2025 at 10:41.

Transport for London (TfL) logo
Between
7 and 29 Apr 2025
Details
View Map
Share
Follow
Talgarth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Talgarth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 15:36.

Transport for London (TfL) logo
Until
29 Apr 2025
Details
View Map
Share
Follow
Talgarth Road

Transport for London (TfL) are carrying out Highway improvement works on Talgarth Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 09:50.

London Borough Of Ealing logo
Finishing
Wednesday
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are carrying out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 00:00 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 11 Apr 2025 at 11:08.

Transport for London (TfL) logo
LONG TERM
Between
7 Apr and 28 May 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 28 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:30.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Kennington Road

Thames Water are carrying out Utility repair and maintenance works on Kennington Road, Kennington, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2025 at 09:00 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:21.

UK Power Networks Eastern & London logo
Finishing
Wednesday
Details
View Map
Share
Follow
Pavilion Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Pavilion Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 16:47.

UK Power Networks Eastern & London logo
Finishing
Wednesday
Details
View Map
Share
Follow
Pavilion Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Pavilion Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Mar 2025 at 17:16.

UK Power Networks Eastern & London logo
Finishing
Wednesday
Details
View Map
Share
Follow
Pavilion Road

UK Power Networks Eastern & London are carrying out New service connection on Pavilion Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2025 at 10:50 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 10:50.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Berkeley Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berkeley Square, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2025 at 10:08.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Berkeley Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berkeley Square, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Mar 2025 at 11:51.

UK Power Networks Eastern & London logo
Until
28 Apr 2025
Details
View Map
Share
Follow
Berkeley Square

UK Power Networks Eastern & London are carrying out Utility asset works on Berkeley Square, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2025 at 08:00 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 08:06.

Thames Water logo
LONG TERM
Between
8 Apr and 2 Jun 2025
Details
View Map
Share
Brenthurst Road

Thames Water were proposing to carry out Utility asset works on Brenthurst Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 2 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 08:04.

Thames Water logo
Until
1 May 2025
Details
View Map
Share
Follow
Bishop's Road

Thames Water are carrying out Utility repair and maintenance works on Bishop's Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 09:45 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:01.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Hollywood Road

Thames Water are carrying out Utility asset works on Hollywood Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 10:31 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 15:27.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Edgeley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jan 2025 at 14:52.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Aristotle Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Aristotle Road, Brixton North, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jan 2025 at 14:55.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 13:29.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2024 at 11:12.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 13:31.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2024 at 11:11.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
North Circular Road

Cadent Gas are carrying out Utility repair and maintenance works on North Circular Road, Neasden, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 11:33 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 11:29.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Banbury Court

Cadent Gas are carrying out Utility repair and maintenance works on Banbury Court, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 10:00 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 13:30.

City Of London Telecomms logo
Finishing
Today
Details
View Map
Share
Follow
Great Sutton Street

City Of London Telecomms are carrying out Utility asset works on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 08:00 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 11 Apr 2025 at 08:25.

Thames Water logo
Finishing
Today
Details
View Map
Share
Penton Rise

Thames Water were proposing to carry out Utility repair and maintenance works on Penton Rise, Islington, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 April 2025 and run through until 17 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 15:29.

Thames Water logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Villiers Road

Thames Water are carrying out Utility asset works on Villiers Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 10:00 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 10:42.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Ridge Hill

Thames Water are carrying out Utility repair and maintenance works on Ridge Hill, Golders Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 13:44 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 09:29.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Clarges Street

Thames Water are carrying out Utility repair and maintenance works on Clarges Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 13:22 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 09:17.

Cadent Gas logo
LONG TERM
Between
12 Apr and 31 May 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:42.

Cadent Gas logo
LONG TERM
Between
12 Apr and 31 May 2025
Details
View Map
Share
Follow
Perkin's Rents

Cadent Gas are proposing to carry out Utility asset works on Perkin's Rents, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:42.

Cadent Gas logo
LONG TERM
Between
12 Apr and 31 May 2025
Details
View Map
Share
Follow
Abbey Orchard Street

Cadent Gas are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:42.

Cadent Gas logo
LONG TERM
Between
12 Apr and 16 May 2025
Details
View Map
Share
Follow
Holland Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Holland Park Avenue, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 17:20.

Cadent Gas logo
LONG TERM
Between
12 Apr and 16 May 2025
Details
View Map
Share
Follow
Holland Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Holland Park Avenue, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 14:20.

Cadent Gas logo
LONG TERM
Until
16 May 2025
Details
View Map
Share
Follow
Holland Park Avenue

Cadent Gas are carrying out Utility asset works on Holland Park Avenue, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2025 at 08:32 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Apr 2025 at 09:02.

Cadent Gas logo
LONG TERM
Between
12 Apr and 16 May 2025
Details
View Map
Share
Follow
Addison Road

Cadent Gas are proposing to carry out Utility asset works on Addison Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 16:31.

Cadent Gas logo
LONG TERM
Between
12 Apr and 16 May 2025
Details
View Map
Share
Follow
Addison Road

Cadent Gas are proposing to carry out Utility asset works on Addison Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 15:46.

Cadent Gas logo
LONG TERM
Until
16 May 2025
Details
View Map
Share
Follow
Addison Road

Cadent Gas are carrying out Utility asset works on Addison Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2025 at 08:30 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Apr 2025 at 09:03.

City Of London Corporation logo
Between
12 and 26 Apr 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are proposing to carry out Highway improvement works on Cheapside, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 18 Feb 2025 at 20:28.

City Of London Corporation logo
Until
26 Apr 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are carrying out Highway improvement works on Cheapside, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2025 at 08:00 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 12 Apr 2025 at 08:52.

City Of London Corporation logo
Between
12 and 26 Apr 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are proposing to carry out Highway improvement works on Cheapside, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 18 Feb 2025 at 20:28.

City Of London Corporation logo
Until
26 Apr 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are carrying out Highway improvement works on Cheapside, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2025 at 08:00 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 12 Apr 2025 at 08:52.

City Of London Corporation logo
Between
12 and 26 Apr 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are proposing to carry out Highway improvement works on Cheapside, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 18 Feb 2025 at 20:27.

City Of London Corporation logo
Until
26 Apr 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are carrying out Highway improvement works on Cheapside, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2025 at 08:00 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 12 Apr 2025 at 08:51.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Sun Street

Thames Water were proposing to carry out Utility repair and maintenance works on Sun Street, Islington, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 April 2025 and run through until 22 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 09:16.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out New service connection on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jan 2025 at 11:19.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
New Bond Street

Thames Water are carrying out New service connection on New Bond Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 15:30 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:57.

Thames Water logo
Between
14 Apr and 12 May 2025
Details
View Map
Share
Follow
Seymour Street

Thames Water are proposing to carry out Utility asset works on Seymour Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 16:22.

Murphy Power Distribution logo
Between
14 Apr and 1 May 2025
Details
View Map
Share
Follow
Great Chapel Street

Murphy Power Distribution are proposing to carry out Utility asset works on Great Chapel Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 12 Nov 2024 at 11:50.

Murphy Power Distribution logo
LONG TERM
Until
1 Jun 2025
Details
View Map
Share
Follow
Great Chapel Street

Murphy Power Distribution are carrying out Utility asset works on Great Chapel Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:00 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 14 Apr 2025 at 08:00.

Murphy Power Distribution logo
LONG TERM
Between
14 Apr and 1 Jun 2025
Details
View Map
Share
Great Chapel Street

Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 1 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 12 Nov 2024 at 11:39.

UK Power Networks Eastern & London logo
Between
14 and 29 Apr 2025
Details
View Map
Share
Follow
Morwell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jan 2025 at 16:24.

UK Power Networks Eastern & London logo
Until
29 Apr 2025
Details
View Map
Share
Follow
Morwell Street

UK Power Networks Eastern & London are carrying out New service connection on Morwell Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:56 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 08:58.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Kinghorn Street

Thames Water are carrying out Utility repair and maintenance works on Kinghorn Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 22:26 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:02.

Cadent Gas logo
LONG TERM
Until
24 May 2025
Details
View Map
Share
Follow
Percival Street

Cadent Gas are carrying out Utility asset works on Percival Street, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:35 and could run through until 24 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 10:21.

Cadent Gas logo
LONG TERM
Until
27 May 2025
Details
View Map
Share
Follow
Ashby Street

Cadent Gas are carrying out Utility asset works on Ashby Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:30 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 10:20.

Thames Water logo
LONG TERM
Between
14 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Inglebert Street

Thames Water are proposing to carry out Utility asset works on Inglebert Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 14:35.

Thames Water logo
LONG TERM
Between
14 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Inglebert Street

Thames Water are proposing to carry out Utility asset works on Inglebert Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Mar 2025 at 07:24.

Thames Water logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Inglebert Street

Thames Water are carrying out Utility asset works on Inglebert Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 10:05 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 10:06.

Thames Water logo
LONG TERM
Between
14 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Great Percy Street

Thames Water are proposing to carry out Utility asset works on Great Percy Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 14:33.

Thames Water logo
LONG TERM
Between
14 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Great Percy Street

Thames Water are proposing to carry out Utility asset works on Great Percy Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Mar 2025 at 07:23.

Thames Water logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Great Percy Street

Thames Water are carrying out Utility asset works on Great Percy Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 10:05 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 10:06.

Thames Water logo
LONG TERM
Between
14 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Amwell Street

Thames Water are proposing to carry out Utility asset works on Amwell Street, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 14:37.

Thames Water logo
LONG TERM
Between
14 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Amwell Street

Thames Water are proposing to carry out Utility asset works on Amwell Street, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Mar 2025 at 07:24.

Thames Water logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Amwell Street

Thames Water are carrying out Utility asset works on Amwell Street, Islington, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 10:05 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 10:05.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Greenberry Street

Thames Water were proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 10:28.

Thames Water logo
LONG TERM
Between
14 Apr and 8 Jun 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out New service connection on Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 15:22.

Thames Water logo
LONG TERM
Between
14 Apr and 18 May 2025
Details
View Map
Share
Follow
Queen's Terrace

Thames Water are proposing to carry out Utility asset works on Queen's Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:03.

Thames Water logo
LONG TERM
Between
14 Apr and 18 May 2025
Details
View Map
Share
Follow
Finchley Place

Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:02.

Thames Water logo
LONG TERM
Between
14 Apr and 18 May 2025
Details
View Map
Share
Follow
Marlborough Place

Thames Water are proposing to carry out Utility asset works on Marlborough Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:02.

Thames Water logo
LONG TERM
Between
14 Apr and 18 May 2025
Details
View Map
Share
Follow
Queen's Grove

Thames Water are proposing to carry out Utility asset works on Queen's Grove, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:03.

UK Power Networks Eastern & London logo
Until
12 May 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 15:00 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 17:03.

Thames Water logo
Between
14 Apr and 11 May 2025
Details
View Map
Share
Chantry Crescent

Thames Water were proposing to carry out Utility asset works on Chantry Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 11 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 15:51.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hornsey Road

Network Rail are proposing to carry out Works for Rail Purposes on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Jan 2025 at 08:32.

Network Rail logo
Finishing
Saturday
Details
View Map
Share
Follow
Hornsey Road

Network Rail are carrying out Works for Rail Purposes on Hornsey Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 22:00 and could run through until 19 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Apr 2025 at 07:55.

Cadent Gas logo
Between
14 Apr and 12 May 2025
Details
View Map
Share
Follow
Dollis Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Dollis Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 16:30.

Cadent Gas logo
Between
14 Apr and 12 May 2025
Details
View Map
Share
Dollis Hill Lane

Cadent Gas were proposing to carry out Utility asset works on Dollis Hill Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 12 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 08:15.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lyndale Avenue

Thames Water are carrying out Utility repair and maintenance works on Lyndale Avenue, Cricklewood, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 10:47 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 14:06.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Oxgate Gardens

Thames Water were proposing to carry out New service connection on Oxgate Gardens, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Feb 2025 at 11:50.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Oxgate Gardens

Thames Water are proposing to carry out New service connection on Oxgate Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Feb 2025 at 14:03.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Oxgate Gardens

Thames Water are carrying out New service connection on Oxgate Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 07:47 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 07:47.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Claremont Road

Thames Water were proposing to carry out Utility repair and maintenance works on Claremont Road, Cricklewood, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 11:07.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Clitterhouse Road

Thames Water are carrying out Utility repair and maintenance works on Clitterhouse Road, Cricklewood, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 11:15 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 14:09.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Ravenscroft Avenue

Thames Water are carrying out Utility repair and maintenance works on Ravenscroft Avenue, Golders Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 06:31 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 10:33.

Southern Gas Networks logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
Bellamy Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellamy Street, Balham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Feb 2025 at 07:41.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
New King's Road

UK Power Networks Eastern & London are carrying out New service connection on New King's Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:41 and could run through until 19 April 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 08:41.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
Doria Road

UK Power Networks Eastern & London are carrying out New service connection on Doria Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:50 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 08:51.

Finishing
Saturday
Details
View Map
Share
Follow
Mirabel Road

G. Network Communications are proposing to carry out Utility repair and maintenance works on Mirabel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 7 Apr 2025 at 09:46.

Finishing
Saturday
Details
View Map
Share
Follow
Mirabel Road

G. Network Communications are carrying out Utility repair and maintenance works on Mirabel Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:00 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 14 Apr 2025 at 08:04.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Oxford Road South

Thames Water are carrying out Utility repair and maintenance works on Oxford Road South, Chiswick, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 14:11 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:09.

London Borough Of Lambeth logo
Between
14 and 30 Apr 2025
Details
View Map
Share
Follow
Reedworth Street

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Reedworth Street, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 13 Jan 2025 at 15:27.

UK Power Networks Eastern & London logo
Between
14 and 29 Apr 2025
Details
View Map
Share
Follow
Sedding Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sedding Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 08:51.

UK Power Networks Eastern & London logo
Between
14 and 29 Apr 2025
Details
View Map
Share
Follow
Lexham Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lexham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Feb 2025 at 11:15.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Abingdon Road

Thames Water are carrying out Utility repair and maintenance works on Abingdon Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 11:52 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 13:50.

Thames Water logo
LONG TERM
Between
14 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Catherine Place

Thames Water are proposing to carry out Utility asset works on Catherine Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Feb 2025 at 14:52.

City Of London Telecomms logo
Finishing
Today
Details
View Map
Share
Tanner Street

City Of London Telecomms were proposing to carry out Utility asset works on Tanner Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 17 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 19 Feb 2025 at 13:27.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Great George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great George Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 17 Dec 2024 at 06:15.

Transport for London (TfL) logo
LONG TERM
Between
14 Apr and 10 Aug 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 10 August 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 Dec 2024 at 15:58.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Down Street

Thames Water are proposing to carry out Utility asset works on Down Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Jan 2025 at 15:17.

Southern Gas Networks logo
Between
15 and 28 Apr 2025
Details
View Map
Share
Follow
Radbourne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radbourne Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Apr 2025 at 12:58.

Southern Gas Networks logo
Between
15 and 28 Apr 2025
Details
View Map
Share
Follow
Radbourne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radbourne Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 10:52.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Clapham Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Park Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jan 2025 at 17:50.

Transport for London (TfL) logo
Between
15 Apr and 9 May 2025
Details
View Map
Share
Clapham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 14:25.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Nelsons Row

Transport for London (TfL) are proposing to carry out Highway improvement works on Nelsons Row, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jan 2025 at 17:54.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Stonhouse Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Jan 2025 at 14:56.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Carpenter's Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Carpenter's Place, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Jan 2025 at 17:44.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Prescott Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Jan 2025 at 14:56.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Luke's Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on St Luke's Avenue, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jan 2025 at 17:53.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Clapham Manor Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Manor Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Jan 2025 at 14:57.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Tremadoc Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Jan 2025 at 17:49.

Transport for London (TfL) logo
Between
15 and 24 Apr 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Jan 2025 at 14:56.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Aristotle Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Aristotle Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jan 2025 at 17:49.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Gauden Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jan 2025 at 14:59.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Gauden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Jan 2025 at 14:57.

Transport for London (TfL) logo
Between
15 and 25 Apr 2025
Details
View Map
Share
Follow
Bedford Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Bedford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jan 2025 at 08:27.

Transport for London (TfL) logo
Between
15 and 25 Apr 2025
Details
View Map
Share
Follow
Landor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Landor Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jan 2025 at 08:27.

Transport for London (TfL) logo
Between
15 Apr and 1 May 2025
Details
View Map
Share
Clapham Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jan 2025 at 15:22.

Transport for London (TfL) logo
Between
15 Apr and 1 May 2025
Details
View Map
Share
Clapham Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Feb 2025 at 09:33.

Transport for London (TfL) logo
Between
15 Apr and 1 May 2025
Details
View Map
Share
Clapham Road Estate Internal Roads

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Road Estate Internal Roads, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Feb 2025 at 10:57.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Peterborough Road

Cadent Gas are carrying out Utility repair and maintenance works on Peterborough Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 11:55 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 09:20.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Studdridge Street

Cadent Gas are carrying out roadworks on Studdridge Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 12:05 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 09:20.

Cadent Gas logo
Until
25 Apr 2025
Details
View Map
Share
Follow
Gloucester Road

Cadent Gas are carrying out Utility repair and maintenance works on Gloucester Road, Kew.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 08:21 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 11:58.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Grosvenor Gardens

Cadent Gas are carrying out Utility repair and maintenance works on Grosvenor Gardens, Warwick, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 08:05 and could run through until 23 April 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 10:16.

Thames Water logo
Until
5 May 2025
Details
View Map
Share
Follow
Elvaston Place

Thames Water are carrying out Utility repair and maintenance works on Elvaston Place, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 10:40 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 12:36.

UK Power Networks Eastern & London logo
Between
15 and 30 Apr 2025
Details
View Map
Share
Follow
Duke Street St James's

UK Power Networks Eastern & London are proposing to carry out New service connection on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Feb 2025 at 07:01.

UK Power Networks Eastern & London logo
Between
15 and 26 Apr 2025
Details
View Map
Share
Follow
Duke Street St James's

UK Power Networks Eastern & London are proposing to carry out New service connection on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 26 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Mar 2025 at 06:28.

UK Power Networks Eastern & London logo
Until
26 Apr 2025
Details
View Map
Share
Follow
Duke Street St James's

UK Power Networks Eastern & London are carrying out New service connection on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 08:53 and could run through until 26 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:53.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Berners Mews

Thames Water were proposing to carry out New service connection on Berners Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2025 at 08:39.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Eversholt Street

Thames Water are carrying out Utility repair and maintenance works on Eversholt Street, St Pancras And Somers Town, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 13:30 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 16:30.

UK Power Networks Eastern & London logo
Until
13 May 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 09:48 and could run through until 13 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 09:52.

UK Power Networks Eastern & London logo
Until
29 Apr 2025
Details
View Map
Share
Follow
Grosvenor Square

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Grosvenor Square, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 12:05 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 12:07.

Thames Water logo
Until
24 Apr 2025
Details
View Map
Share
Follow
Fore Street

Thames Water are carrying out Utility repair and maintenance works on Fore Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 08:11 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 08:39.

UK Power Networks Eastern & London logo
Until
24 Apr 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 09:00 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 09:40.

London Borough Of Barnet logo
LONG TERM
Between
16 Apr and 16 May 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

The works will start on or after 16 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 11 Apr 2025 at 17:01.

London Borough Of Barnet logo
LONG TERM
Between
16 Apr and 16 May 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

The works will start on or after 16 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 11 Apr 2025 at 17:01.

BT logo
Finishing
Tuesday
Details
View Map
Share
Follow
Brixton Road

BT are carrying out Utility repair and maintenance works on Brixton Road, Brixton North, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 09:10 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Apr 2025 at 10:30.

Thames Water logo
Until
7 May 2025
Details
View Map
Share
Follow
Halkin Street

Thames Water are carrying out Utility repair and maintenance works on Halkin Street, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 10:00 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 13:07.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Highfield Avenue

Thames Water are carrying out Utility repair and maintenance works on Highfield Avenue, Golders Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 12:05 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 08:46.

London Borough Of Ealing logo
Finishing
Saturday
Details
View Map
Share
Follow
Twyford Crescent

London Borough Of Ealing are proposing to carry out Highway improvement works on Twyford Crescent, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 26 Mar 2025 at 11:31.

London Borough Of Ealing logo
Finishing
Saturday
Details
View Map
Share
Follow
Twyford Crescent

London Borough Of Ealing are proposing to carry out Highway improvement works on Twyford Crescent, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 16 Apr 2025 at 12:26.

London Borough Of Wandsworth logo
Finishing
Tuesday
Details
View Map
Share
Follow
Thirsk Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Thirsk Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2025 at 08:00 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Apr 2025 at 08:14.

Transport for London (TfL) logo
Between
17 Apr and 12 May 2025
Details
View Map
Share
Follow
Hester Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hester Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 10:38.

Transport for London (TfL) logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Battersea Bridge

Transport for London (TfL) are carrying out Highway repair and maintenance works on Battersea Bridge, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2025 at 08:00 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 08:16.

Cadent Gas logo
Between
17 and 26 Apr 2025
Details
View Map
Share
Follow
Jermyn Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 09:35.

Cadent Gas logo
Between
17 and 26 Apr 2025
Details
View Map
Share
Follow
Jermyn Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 13:30.

Cadent Gas logo
Until
26 Apr 2025
Details
View Map
Share
Follow
Jermyn Street

Cadent Gas are carrying out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2025 at 08:00 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 08:32.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Acton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Acton Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 16:30.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Acton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Acton Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 13:27.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jan 2025 at 11:26.

Southern Gas Networks logo
LONG TERM
Between
20 Apr and 30 May 2025
Details
View Map
Share
Follow
Webber Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Webber Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 April 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 13:37.

Southern Gas Networks logo
LONG TERM
Between
20 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Webber Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Webber Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 April 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 16:02.

Thames Water logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
Follow
The Pavement

Thames Water are proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 14:33.

Thames Water logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
Follow
The Pavement

Thames Water are proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jan 2025 at 08:18.

Thames Water logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
The Pavement

Thames Water were proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jan 2025 at 13:20.

Thames Water logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
The Pavement

Thames Water were proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 13:47.

Thames Water logo
Between
21 and 30 Apr 2025
Details
View Map
Share
Follow
Camberwell Church Street

Thames Water are proposing to carry out Utility repair and maintenance works on Camberwell Church Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 13:28.

Thames Water logo
Between
21 and 30 Apr 2025
Details
View Map
Share
Follow
Camberwell Church Street

Thames Water are proposing to carry out Utility repair and maintenance works on Camberwell Church Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 19:14.

Electricity Network Company logo
Between
21 Apr and 13 May 2025
Details
View Map
Share
Follow
Kennington Lane

Electricity Network Company are proposing to carry out Utility asset works on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 10 Mar 2025 at 15:53.

Electricity Network Company logo
Between
21 Apr and 13 May 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 27 Feb 2025 at 13:03.

Electricity Network Company logo
Between
21 Apr and 13 May 2025
Details
View Map
Share
Loughborough Street

Electricity Network Company were proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 13 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 27 Feb 2025 at 11:11.

Electricity Network Company logo
Between
21 Apr and 13 May 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 13 Mar 2025 at 11:47.

Southern Gas Networks logo
LONG TERM
Between
21 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Webber Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Webber Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Feb 2025 at 06:15.

Southern Gas Networks logo
LONG TERM
Between
21 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Webber Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Webber Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Feb 2025 at 09:24.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Victoria Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:53.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Underpass

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:52.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Queen Victoria Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Carmelite Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Carmelite Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Passage

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
New Bridge Street

Transport for London (TfL) were proposing to carry out Highway improvement works on New Bridge Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:54.

Thames Water logo
Between
21 and 26 Apr 2025
Details
View Map
Share
Follow
Bentinck Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Bentinck Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:46.

UK Power Networks Eastern & London logo
Between
21 Apr and 4 May 2025
Details
View Map
Share
Follow
Bloomsbury Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bloomsbury Place, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Mar 2025 at 11:27.

Thames Water logo
Between
21 Apr and 12 May 2025
Details
View Map
Share
Devonshire Street

Thames Water were proposing to carry out roadworks on Devonshire Street, Marylebone High Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 12 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 12:31.

Thames Water logo
Between
21 Apr and 12 May 2025
Details
View Map
Share
Follow
Devonshire Street

Thames Water are proposing to carry out Utility repair and maintenance works on Devonshire Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 11:18.

Thames Water logo
Between
21 Apr and 12 May 2025
Details
View Map
Share
Follow
Portland Place

Thames Water are proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 11:50.

UK Power Networks Eastern & London logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 12:46.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 12 Aug 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 10:09.

London Borough Of Brent logo
Between
21 Apr and 10 May 2025
Details
View Map
Share
Follow
Neasden Lane North

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 31 Mar 2025 at 12:23.

UK Power Networks Eastern & London logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Stafford Street

UK Power Networks Eastern & London were proposing to carry out New service connection on Stafford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 13:56.

UK Power Networks Eastern & London logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Bruton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bruton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jan 2025 at 13:55.

UK Power Networks Eastern & London logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Bruton Place

UK Power Networks Eastern & London were proposing to carry out New service connection on Bruton Place, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Feb 2025 at 10:00.

Transport for London (TfL) logo
Between
22 and 27 Apr 2025
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Gracechurch Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 19:52.

Transport for London (TfL) logo
LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 14:30.

City Of London Corporation logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are proposing to carry out Highway improvement works on Cheapside, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 3 Jul 2024 at 12:30.

Thames Water logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Fleet Street

Thames Water are proposing to carry out Utility repair and maintenance works on Fleet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 13:11.

Thames Water logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Fleet Street

Thames Water are proposing to carry out Utility repair and maintenance works on Fleet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Apr 2025 at 14:15.

Thames Water logo
Between
22 and 29 Apr 2025
Details
View Map
Share
Morwell Street

Thames Water were proposing to carry out New service connection on Morwell Street, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 29 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Feb 2025 at 14:35.

Thames Water logo
Between
22 and 29 Apr 2025
Details
View Map
Share
Follow
Morwell Street

Thames Water are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 09:52.

Thames Water logo
Between
22 and 29 Apr 2025
Details
View Map
Share
Follow
Moor Place

Thames Water are proposing to carry out New service connection on Moor Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Apr 2025 at 14:12.

Thames Water logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Luxborough Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Luxborough Street, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 08:52.

UK Power Networks Eastern & London logo
Between
22 and 30 Apr 2025
Details
View Map
Share
Follow
Mount Pleasant

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Feb 2025 at 10:29.

UK Power Networks Eastern & London logo
Between
22 Apr and 13 May 2025
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 13 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 11:34.

Thames Water logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Broadhurst Gardens

Thames Water are proposing to carry out New service connection on Broadhurst Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 17:52.

Thames Water logo
LONG TERM
Between
22 Apr and 14 Jul 2025
Details
View Map
Share
Follow
Villiers Road

Thames Water are proposing to carry out Utility asset works on Villiers Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.

Thames Water logo
Between
22 Apr and 5 May 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are proposing to carry out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Apr 2025 at 21:44.

Thames Water logo
Between
22 Apr and 12 May 2025
Details
View Map
Share
Follow
Midstrath Road

Thames Water are proposing to carry out Utility asset works on Midstrath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 13:12.

London Borough Of Brent logo
Between
22 Apr and 10 May 2025
Details
View Map
Share
Follow
Neasden Lane North

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Apr 2025 at 17:23.

London Borough Of Barnet logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Hermitage Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Hermitage Lane, Childs Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:11.

London Borough Of Lambeth logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Clapham Crescent

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Clapham Crescent, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 10 Jan 2025 at 13:11.

Thames Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
The Pavement

Thames Water are proposing to carry out New service connection on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 15:34.

Transport for London (TfL) logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Mayflower Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Mayflower Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jan 2025 at 17:53.

Transport for London (TfL) logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Mayflower Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Mayflower Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jan 2025 at 15:06.

Thames Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Cristowe Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cristowe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 10:10.

Thames Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Cristowe Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cristowe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 18:02.

Transport for London (TfL) logo
Between
22 Apr and 13 May 2025
Details
View Map
Share
Follow
Hester Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hester Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 08:57.

Electricity Network Company logo
Between
22 Apr and 13 May 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 14 Mar 2025 at 11:44.

Scottish Hydro Electric Power Dis logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Devonshire Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Devonshire Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Apr 2025 at 12:37.

Scottish Hydro Electric Power Dis logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Devonshire Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Devonshire Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Apr 2025 at 16:31.

London Borough Of Lambeth logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Gilbert Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Gilbert Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 10 Jan 2025 at 15:28.

London Borough Of Lambeth logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Wincott Street

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wincott Street, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 10 Jan 2025 at 15:30.

Thames Water logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Elizabeth Street

Thames Water are proposing to carry out New service connection on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 09:03.

Thames Water logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Victoria Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Victoria Street, St James's, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 12:58.

Thames Water logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Victoria Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Victoria Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Dec 2024 at 12:05.

Thames Water logo
LONG TERM
Between
22 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Feb 2025 at 10:54.

Thames Water logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Aldine Street

Thames Water are proposing to carry out Utility asset works on Aldine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Feb 2025 at 10:45.

Thames Water logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Aldine Street

Thames Water are proposing to carry out Utility asset works on Aldine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Feb 2025 at 13:05.

London Borough Of Southwark logo
LONG TERM
Between
22 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 1 Apr 2025 at 14:04.

London Borough Of Southwark logo
LONG TERM
Between
22 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2025 at 16:25.

London Borough Of Southwark logo
LONG TERM
Between
22 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2025 at 16:25.

UK Power Networks Eastern & London logo
Between
23 Apr and 16 May 2025
Details
View Map
Share
Amberley Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 15:41.

UK Power Networks Eastern & London logo
Between
23 Apr and 16 May 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 12:11.

UK Power Networks Eastern & London logo
Between
23 Apr and 16 May 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 12:10.

Thames Water logo
Between
23 and 30 Apr 2025
Details
View Map
Share
Follow
Broadfields Way

Thames Water are proposing to carry out Utility asset works on Broadfields Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 09:08.

Thames Water logo
Between
24 Apr and 12 May 2025
Details
View Map
Share
Follow
Bargehouse Street

Thames Water are proposing to carry out Utility asset works on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 10:48.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 16 Apr 2025 at 16:51.

Transport for London (TfL) logo
Between
24 and 26 Apr 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 15:17.

UK Power Networks Eastern & London logo
Between
24 Apr and 23 May 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2025 at 15:00.

Thames Water logo
Between
24 Apr and 6 May 2025
Details
View Map
Share
Follow
Osborne Road

Thames Water are proposing to carry out Utility asset works on Osborne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 17:23.

London Borough Of Wandsworth logo
Between
24 and 26 Apr 2025
Details
View Map
Share
Follow
Flowersmead

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Flowersmead, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Mar 2025 at 15:10.

Thames Water logo
LONG TERM
Between
24 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Catherine Place

Thames Water are proposing to carry out Utility asset works on Catherine Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:28.

Cadent Gas logo
Between
24 Apr and 23 May 2025
Details
View Map
Share
Follow
Ormiston Grove

Cadent Gas are proposing to carry out Utility asset works on Ormiston Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:53.

London Borough Of Hammersmith & Fulham logo
Between
25 and 27 Apr 2025
Details
View Map
Share
Follow
Bridge Avenue

London Borough Of Hammersmith & Fulham are proposing to carry out Remedial works on Bridge Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Apr 2025 at 17:37.

London Borough Of Hammersmith & Fulham logo
Between
25 and 27 Apr 2025
Details
View Map
Share
Follow
Bridge Avenue

London Borough Of Hammersmith & Fulham are proposing to carry out Remedial works on Bridge Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Apr 2025 at 15:33.

Thames Water logo
Between
25 and 27 Apr 2025
Details
View Map
Share
Follow
King Street

Thames Water are proposing to carry out Utility repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:41.

Between
25 and 27 Apr 2025
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway improvement works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 11 Apr 2025 at 15:30.

Murphy Gas Networks logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Bollo Lane

Murphy Gas Networks are proposing to carry out New service connection on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 25 Feb 2025 at 15:27.

City Of Westminster logo
Between
25 Apr and 16 May 2025
Details
View Map
Share
Follow
Henrietta Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Henrietta Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Apr 2025 at 10:32.

City Of Westminster logo
Between
25 Apr and 16 May 2025
Details
View Map
Share
Follow
Henrietta Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Henrietta Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Apr 2025 at 07:43.

City Of Westminster logo
Between
25 Apr and 16 May 2025
Details
View Map
Share
Follow
Henrietta Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Henrietta Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Apr 2025 at 12:48.

Transport for London (TfL) logo
Between
25 Apr and 3 May 2025
Details
View Map
Share
Follow
Fenchurch Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Fenchurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 14:33.

Sky UK logo
Between
25 and 28 Apr 2025
Details
View Map
Share
Follow
Great Titchfield Street

Sky UK are proposing to carry out Utility repair and maintenance works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sky UK on 22 Jan 2025 at 12:52.

Thames Water logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Fairhazel Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Fairhazel Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 09:05.

Thames Water logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Hilgrove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 12:07.

Thames Water logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Fairfax Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fairfax Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 09:18.

Thames Water logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Fairfax Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fairfax Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 11:03.

Transport for London (TfL) logo
Between
26 and 28 Apr 2025
Details
View Map
Share
Follow
Clapham Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Park Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2025 at 10:01.

Network Rail logo
Between
26 and 28 Apr 2025
Details
View Map
Share
Follow
Vine Road

Network Rail are proposing to carry out Works for Rail Purposes on Vine Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Mar 2025 at 12:04.

London Borough Of Southwark logo
Between
26 Apr and 3 May 2025
Details
View Map
Share
Follow
Weston Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Weston Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 3 May 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 15:31.

London Borough Of Southwark logo
Between
26 Apr and 3 May 2025
Details
View Map
Share
Follow
Weston Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Weston Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 3 May 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 15:31.

Transport for London (TfL) logo
Between
27 and 29 Apr 2025
Details
View Map
Share
Clapham Park Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Park Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 April 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:43.

Transport for London (TfL) logo
Between
27 Apr and 14 May 2025
Details
View Map
Share
Clapham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 April 2025 and run through until 14 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:41.

Transport for London (TfL) logo
Between
27 Apr and 2 May 2025
Details
View Map
Share
Nelsons Row

Transport for London (TfL) were proposing to carry out Highway improvement works on Nelsons Row, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:44.

Transport for London (TfL) logo
Between
27 Apr and 2 May 2025
Details
View Map
Share
Stonhouse Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:43.

Transport for London (TfL) logo
Between
27 Apr and 2 May 2025
Details
View Map
Share
Carpenter's Place

Transport for London (TfL) were proposing to carry out Highway improvement works on Carpenter's Place, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:44.

Transport for London (TfL) logo
Between
27 Apr and 2 May 2025
Details
View Map
Share
Prescott Place

Transport for London (TfL) were proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:45.

Transport for London (TfL) logo
Between
27 Apr and 2 May 2025
Details
View Map
Share
St Luke's Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Luke's Avenue, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:46.

Transport for London (TfL) logo
Between
27 Apr and 2 May 2025
Details
View Map
Share
Clapham Manor Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Clapham Manor Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:45.

Lumen Technologies logo
Between
27 and 29 Apr 2025
Details
View Map
Share
Follow
Storey's Gate

Lumen Technologies are proposing to carry out Utility asset works on Storey's Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 3 Feb 2025 at 09:43.

London Borough Of Lambeth logo
Between
28 Apr and 6 May 2025
Details
View Map
Share
Follow
Lynette Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lynette Avenue, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 13 Jan 2025 at 14:44.

Transport for London (TfL) logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Clapham Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Park Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jan 2025 at 14:59.

Transport for London (TfL) logo
Between
28 Apr and 1 May 2025
Details
View Map
Share
Follow
Aristotle Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Aristotle Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Jan 2025 at 09:06.

Transport for London (TfL) logo
Between
28 Apr and 1 May 2025
Details
View Map
Share
Follow
Stirling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Stirling Road, Stockwell East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jan 2025 at 08:37.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 08:55.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Kirtling Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Jan 2025 at 10:43.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Jan 2025 at 18:59.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Mar 2025 at 07:02.

Thames Water logo
Between
28 Apr and 1 May 2025
Details
View Map
Share
Follow
Kentwode Green

Thames Water are proposing to carry out New service connection on Kentwode Green, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 16:36.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 15:24.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Jan 2025 at 12:09.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jan 2025 at 16:06.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 10:09.

Transport for London (TfL) logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Feb 2025 at 15:07.

Transport for London (TfL) logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2025 at 15:46.

Transport for London (TfL) logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2025 at 16:06.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Brook Lane North

Thames Water are proposing to carry out New service connection on Brook Lane North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Feb 2025 at 09:14.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Brook Lane North

Thames Water are proposing to carry out New service connection on Brook Lane North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 08:23.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr and 29 May 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 15:41.

London Borough Of Southwark logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Feb 2025 at 12:12.

Thames Water logo
Between
28 Apr and 9 May 2025
Details
View Map
Share
Follow
Capital Interchange Way

Thames Water are proposing to carry out New service connection on Capital Interchange Way, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 16:28.

Thames Water logo
Between
28 Apr and 19 May 2025
Details
View Map
Share
Follow
Gillingham Row

Thames Water are proposing to carry out Utility asset works on Gillingham Row, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Feb 2025 at 18:23.

Thames Water logo
Between
28 Apr and 19 May 2025
Details
View Map
Share
Follow
Gillingham Row

Thames Water are proposing to carry out Utility asset works on Gillingham Row, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:10.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Harper Road

Thames Water are proposing to carry out Utility repair and maintenance works on Harper Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Feb 2025 at 09:23.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Harper Road

Thames Water are proposing to carry out Utility repair and maintenance works on Harper Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 10:39.

City Of Westminster logo
Between
28 Apr and 3 May 2025
Details
View Map
Share
Follow
Belgrave Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Feb 2025 at 09:45.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jan 2025 at 13:48.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Feb 2025 at 07:21.

Lumen Technologies logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Storey's Gate

Lumen Technologies are proposing to carry out Utility asset works on Storey's Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 14 Mar 2025 at 08:09.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr and 6 Jun 2025
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Statutory Infrastructure Works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 18:54.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Market Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Jan 2025 at 15:14.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Market Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:00.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Uxbridge Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Uxbridge Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 13:42.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Uxbridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 12:34.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Uxbridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 10:39.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Bloemfontein Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Bloemfontein Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 12:34.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Bloemfontein Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Bloemfontein Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 14:52.

Royal Borough Of Kensington And Chelsea logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Queensdale Walk

Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on Queensdale Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Apr 2025 at 15:34.

Royal Borough Of Kensington And Chelsea logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Queensdale Walk

Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on Queensdale Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Apr 2025 at 15:38.

Cadent Gas logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Pall Mall

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 08:08.

Cadent Gas logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Pall Mall

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 10:18.

Cadent Gas logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Ladbroke Walk

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Ladbroke Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 16:48.

Cadent Gas logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Ladbroke Walk

Cadent Gas are proposing to carry out New service connection on Ladbroke Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 13:53.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Mount Street

BT are proposing to carry out Utility asset works on Mount Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Dec 2024 at 13:46.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Mount Street

BT are proposing to carry out Utility asset works on Mount Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Apr 2025 at 09:15.

Transport for London (TfL) logo
Between
28 Apr and 4 May 2025
Details
View Map
Share
Follow
Fenchurch Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Fenchurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2025 at 14:20.

Cadent Gas logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 13:58.

Cadent Gas logo
Between
28 Apr and 14 May 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 11:23.

Transport for London (TfL) logo
Between
28 Apr and 4 May 2025
Details
View Map
Share
Gracechurch Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Gracechurch Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 4 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 14:26.

London Borough Of Hammersmith & Fulham logo
Between
28 Apr and 1 May 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 25 Mar 2025 at 09:58.

London Borough Of Camden logo
LONG TERM
Between
28 Apr and 27 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Mar 2025 at 15:42.

London Borough Of Camden logo
LONG TERM
Between
28 Apr and 25 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 26 Feb 2025 at 12:23.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Cheapside, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Cheapside, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 14 Apr 2025 at 19:54.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 14 Apr 2025 at 12:05.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Upper Berkeley Street

Thames Water were proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 12:13.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 14 Apr 2025 at 12:06.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
King Edward Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on King Edward Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
King Edward Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on King Edward Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 14 Apr 2025 at 11:58.

Thames Water logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Thayer Street

Thames Water are proposing to carry out Permanent reinstatement on Thayer Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 12:34.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Bentinck Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Bentinck Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 15:04.

Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Sherlock Mews

Abovenet Communications UK are proposing to carry out Utility repair and maintenance works on Sherlock Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 31 Mar 2025 at 08:48.

Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Sherlock Mews

Abovenet Communications UK are proposing to carry out Utility repair and maintenance works on Sherlock Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 4 Apr 2025 at 17:16.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Luxborough Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Luxborough Street, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 13:58.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Feb 2025 at 09:37.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 08:49.

London Borough Of Camden logo
LONG TERM
Between
28 Apr and 31 May 2025
Details
View Map
Share
Follow
York Way

London Borough Of Camden are proposing to carry out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 10 Apr 2025 at 08:24.

Thames Water logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Kentish Town Road

Thames Water were proposing to carry out Utility asset works on Kentish Town Road, Camden Town, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 09:34.

Thames Water logo
LONG TERM
Between
28 Apr and 3 Nov 2025
Details
View Map
Share
Follow
Bishopswood Road

Thames Water are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:48.

Thames Water logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Grafton Street

Thames Water are proposing to carry out Remedial works on Grafton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 15:07.

Transport for London (TfL) logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Upper Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Apr 2025 at 09:53.

Transport for London (TfL) logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Upper Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 12:59.

Thames Water logo
Between
29 Apr and 7 May 2025
Details
View Map
Share
Follow
Great Cumberland Place

Thames Water are proposing to carry out New service connection on Great Cumberland Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 19:15.

Thames Water logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Homer Street

Thames Water are proposing to carry out Remedial works on Homer Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 12:27.

Transport for London (TfL) logo
Between
29 Apr and 2 May 2025
Details
View Map
Share
Tremadoc Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Tremadoc Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:47.

Transport for London (TfL) logo
Between
29 Apr and 9 May 2025
Details
View Map
Share
Edgeley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:47.

Transport for London (TfL) logo
Between
29 Apr and 9 May 2025
Details
View Map
Share
Aristotle Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Aristotle Road, Brixton North, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:48.

Transport for London (TfL) logo
Between
29 Apr and 9 May 2025
Details
View Map
Share
Gauden Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:49.

Thames Water logo
Between
29 Apr and 7 May 2025
Details
View Map
Share
Follow
Cleaver Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cleaver Street, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jan 2025 at 15:09.

Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway improvement works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 6 Feb 2025 at 12:24.

Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway improvement works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 24 Mar 2025 at 15:24.

Thames Water logo
Between
29 Apr and 2 May 2025
Details
View Map
Share
Follow
Eaton Gate

Thames Water are proposing to carry out New service connection on Eaton Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 13:22.

City Of Westminster logo
Between
29 Apr and 26 May 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 7 Oct 2024 at 09:30.

Thames Water logo
LONG TERM
Between
30 Apr and 15 Sep 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:27.

Thames Water logo
LONG TERM
Between
30 Apr and 15 Sep 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 09:41.

UK Power Networks Eastern & London logo
Between
30 Apr and 14 May 2025
Details
View Map
Share
Follow
South Molton Street

UK Power Networks Eastern & London are proposing to carry out New service connection on South Molton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2025 at 11:51.

UK Power Networks Eastern & London logo
Between
30 Apr and 9 May 2025
Details
View Map
Share
South Molton Street

UK Power Networks Eastern & London were proposing to carry out New service connection on South Molton Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 April 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Feb 2025 at 11:05.

Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Linhope Street

G. Network Communications are proposing to carry out Utility repair and maintenance works on Linhope Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 4 Feb 2025 at 19:36.

Transport for London (TfL) logo
Between
30 Apr and 27 May 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 April 2025 and run through until 27 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 14:56.

Transport for London (TfL) logo
Between
1 and 31 May 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 10:11.

Transport for London (TfL) logo
Between
1 and 31 May 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 17:08.

Transport for London (TfL) logo
Between
1 and 31 May 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 17:08.

London Borough Of Hackney logo
Between
1 and 8 May 2025
Details
View Map
Share
Follow
Nile Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Nile Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 18 Feb 2025 at 10:46.

T-Mobile (UK) logo
Between
2 and 6 May 2025
Details
View Map
Share
Follow
Algarve Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Algarve Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 9 Feb 2025 at 16:31.

T-Mobile (UK) logo
Between
2 and 6 May 2025
Details
View Map
Share
Follow
Algarve Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Algarve Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 14 Feb 2025 at 08:20.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Wandsworth logo
Between
4 and 6 May 2025
Details
View Map
Share
Follow
Langside Avenue

London Borough Of Wandsworth are proposing to carry out roadworks on Langside Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 May 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 8 Apr 2025 at 15:56.

Hyperoptic logo
Between
5 and 7 May 2025
Details
View Map
Share
Follow
Kingwood Road

Hyperoptic are proposing to carry out Utility asset works on Kingwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 11 Feb 2025 at 13:51.

BT logo
Between
5 and 9 May 2025
Details
View Map
Share
Follow
Vauxhall Grove

BT are proposing to carry out Utility repair and maintenance works on Vauxhall Grove, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Mar 2025 at 11:53.

Virgin Media logo
Between
5 and 7 May 2025
Details
View Map
Share
Warwick Way

Virgin Media were proposing to carry out Utility asset works on Warwick Way, Warwick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 7 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 13 Jan 2025 at 15:21.

UK Power Networks Eastern & London logo
Between
5 and 22 May 2025
Details
View Map
Share
Follow
Chester Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Chester Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2025 at 18:22.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Medway Street

Cadent Gas are proposing to carry out Utility asset works on Medway Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:48.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Medway Street

Cadent Gas are proposing to carry out Utility asset works on Medway Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 08:15.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Monck Street

Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 06:23.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Monck Street

Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 08:00.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:14.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 08:16.

Cadent Gas logo
Between
5 and 9 May 2025
Details
View Map
Share
Motcomb Street

Cadent Gas were proposing to carry out Remedial works on Motcomb Street, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 08:31.

Cadent Gas logo
Between
5 and 9 May 2025
Details
View Map
Share
Motcomb Street

Cadent Gas were proposing to carry out Remedial works on Motcomb Street, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 10:25.

London Borough Of Ealing logo
LONG TERM
Between
5 May and 5 Jun 2025
Details
View Map
Share
Follow
The Common

London Borough Of Ealing are proposing to carry out Highway improvement works on The Common, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 16 Apr 2025 at 12:26.

Thames Water logo
Between
5 and 7 May 2025
Details
View Map
Share
Follow
Victoria Embankment Slip Road (N)

Thames Water are proposing to carry out Utility asset works on Victoria Embankment Slip Road (N), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Feb 2025 at 16:52.

Thames Water logo
Between
5 and 7 May 2025
Details
View Map
Share
Carmelite Street

Thames Water were proposing to carry out Utility asset works on Carmelite Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 7 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Feb 2025 at 21:03.

UK Power Networks Eastern & London logo
Between
5 and 25 May 2025
Details
View Map
Share
Follow
Montreal Place

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Montreal Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Feb 2025 at 08:23.

Thames Water logo
Between
5 and 7 May 2025
Details
View Map
Share
Follow
Shalimar Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Shalimar Gardens, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 10:41.

Thames Water logo
Between
5 and 7 May 2025
Details
View Map
Share
Follow
Shalimar Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Shalimar Gardens, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 13:50.

UK Power Networks Eastern & London logo
Between
5 and 15 May 2025
Details
View Map
Share
Portman Square

UK Power Networks Eastern & London were proposing to carry out New service connection on Portman Square, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 15 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2025 at 10:45.

Vodafone logo
Between
5 and 9 May 2025
Details
View Map
Share
Follow
St Martin's-le-grand

Vodafone are proposing to carry out Remedial works on St Martin's-le-grand, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 11 Apr 2025 at 09:44.

Vodafone logo
Between
5 and 9 May 2025
Details
View Map
Share
St Martin's-le-grand

Vodafone were proposing to carry out Remedial works on St Martin's-le-grand, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 16 Apr 2025 at 15:09.

London Borough Of Camden logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Follow
Bayley Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:54.

London Borough Of Camden logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Follow
Bayley Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Mar 2025 at 11:18.

UK Power Networks Eastern & London logo
Between
5 and 25 May 2025
Details
View Map
Share
Southampton Row

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Southampton Row, Holborn And Covent Garden, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 25 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 11:11.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:38.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:46.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 20 Jun 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 07:45.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:40.

LONG TERM
Between
5 May and 8 Aug 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:40.

London Borough Of Camden logo
LONG TERM
Between
5 May and 7 Jun 2025
Details
View Map
Share
Follow
St Paul's Crescent

London Borough Of Camden are proposing to carry out Highway improvement works on St Paul's Crescent, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 18:56.

London Borough Of Camden logo
LONG TERM
Between
5 May and 7 Jun 2025
Details
View Map
Share
Follow
St Paul's Crescent

London Borough Of Camden are proposing to carry out Highway improvement works on St Paul's Crescent, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 12:20.

Cadent Gas logo
Between
5 and 19 May 2025
Details
View Map
Share
Follow
Dollis Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Dollis Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 16:57.

Cadent Gas logo
Between
5 and 19 May 2025
Details
View Map
Share
Follow
Dollis Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Dollis Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 19:01.

UK Power Networks Eastern & London logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Mount Row

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Mount Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 07:44.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 16 Apr 2025 at 14:38.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
St Mary Axe

City Of London Corporation were proposing to carry out Highway repair and maintenance works on St Mary Axe, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 10 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 16 Apr 2025 at 15:01.

City Of Westminster logo
Between
6 and 29 May 2025
Details
View Map
Share
Follow
Sussex Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Sussex Gardens, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Apr 2025 at 09:14.

City Of Westminster logo
Between
6 and 29 May 2025
Details
View Map
Share
Follow
Sussex Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Sussex Gardens, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Apr 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 8 Jun 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 20:14.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 14:25.

Thames Water logo
LONG TERM
Between
6 May and 16 Jun 2025
Details
View Map
Share
Follow
Berkeley Mews

Thames Water are proposing to carry out Utility asset works on Berkeley Mews, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 16:04.

UK Power Networks Eastern & London logo
Between
6 and 15 May 2025
Details
View Map
Share
Portman Square

UK Power Networks Eastern & London were proposing to carry out New service connection on Portman Square, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 15 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Feb 2025 at 09:59.

City Of London Telecomms logo
Between
6 and 10 May 2025
Details
View Map
Share
Follow
Riding House Street

City Of London Telecomms are proposing to carry out Utility asset works on Riding House Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 11 Mar 2025 at 15:12.

Thames Water logo
Between
6 and 12 May 2025
Details
View Map
Share
Follow
St John's Lane

Thames Water are proposing to carry out New service connection on St John's Lane, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 06:55.

Thames Water logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Field Street

Thames Water are proposing to carry out New service connection on Field Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 10:14.

Electricity Network Company logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Willen Field Road

Electricity Network Company are proposing to carry out Utility asset works on Willen Field Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 15 Apr 2025 at 21:57.

Thames Water logo
Between
6 and 13 May 2025
Details
View Map
Share
Follow
Roman Way

Thames Water are proposing to carry out New service connection on Roman Way, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Feb 2025 at 09:07.

Thames Water logo
Between
6 and 13 May 2025
Details
View Map
Share
Follow
Roman Way

Thames Water are proposing to carry out New service connection on Roman Way, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:25.

Network Rail logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Gordon House Road

Network Rail are proposing to carry out Works for Rail Purposes on Gordon House Road, Gospel Oak, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Jan 2025 at 17:38.

Network Rail logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Gordon House Road

Network Rail are proposing to carry out Works for Rail Purposes on Gordon House Road, Gospel Oak, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Apr 2025 at 10:17.

Thames Water logo
Between
6 and 26 May 2025
Details
View Map
Share
Southview Avenue

Thames Water were proposing to carry out Utility asset works on Southview Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 26 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jan 2025 at 08:47.

Thames Water logo
LONG TERM
Between
6 May and 20 Jul 2025
Details
View Map
Share
Follow
Southview Avenue

Thames Water are proposing to carry out Utility asset works on Southview Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.

Transport for London (TfL) logo
Between
6 and 9 May 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 9 May 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2025 at 08:06.

Transport for London (TfL) logo
Between
6 and 9 May 2025
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 9 May 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 11 Mar 2025 at 09:53.

Transport for London (TfL) logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Kingston Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kingston Road, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 09:21.

Transport for London (TfL) logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Kingston Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kingston Road, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:01.

London Borough Of Wandsworth logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Balvernie Grove

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Balvernie Grove, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2025 at 08:35.

Transport for London (TfL) logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
West Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 11:52.

Transport for London (TfL) logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
West Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 09:59.

London Borough Of Lambeth logo
Between
6 and 23 May 2025
Details
View Map
Share
Follow
Cottage Grove

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Cottage Grove, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 15 Apr 2025 at 15:08.

Transport for London (TfL) logo
Between
6 and 14 May 2025
Details
View Map
Share
Bedford Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Bedford Road, Brixton North, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 14 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:51.

Transport for London (TfL) logo
Between
6 and 14 May 2025
Details
View Map
Share
Landor Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Landor Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 14 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:52.

Transport for London (TfL) logo
Between
6 and 14 May 2025
Details
View Map
Share
Clapham Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 14 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:42.

Transport for London (TfL) logo
Between
6 and 14 May 2025
Details
View Map
Share
Clapham Road Estate Internal Roads

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Road Estate Internal Roads, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 14 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 08:47.

Transport for London (TfL) logo
Between
6 and 14 May 2025
Details
View Map
Share
Mayflower Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Mayflower Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 14 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:52.

Transport for London (TfL) logo
Between
6 and 14 May 2025
Details
View Map
Share
Stirling Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Stirling Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 14 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Feb 2025 at 13:24.

London Borough Of Southwark logo
Between
6 and 22 May 2025
Details
View Map
Share
Follow
Albany Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Albany Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Apr 2025 at 17:28.

London Borough Of Southwark logo
LONG TERM
Between
6 May and 6 Jun 2025
Details
View Map
Share
Follow
Albany Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Albany Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 09:58.

London Borough Of Southwark logo
LONG TERM
Between
6 May and 6 Jun 2025
Details
View Map
Share
Follow
Albany Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Albany Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 13:23.

London Borough Of Southwark logo
Between
6 and 22 May 2025
Details
View Map
Share
Albany Road

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Albany Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 22 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Apr 2025 at 10:18.

London Borough Of Southwark logo
Between
6 and 22 May 2025
Details
View Map
Share
Follow
Albany Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Albany Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 12:24.

Electricity Network Company logo
Between
6 May and 4 Jun 2025
Details
View Map
Share
Follow
Pellant Road

Electricity Network Company are proposing to carry out Utility asset works on Pellant Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 14 Apr 2025 at 14:57.

Electricity Network Company logo
Between
6 and 30 May 2025
Details
View Map
Share
Follow
Lillie Road

Electricity Network Company are proposing to carry out Utility asset works on Lillie Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by Electricity Network Company on 3 Apr 2025 at 15:00.

Electricity Network Company logo
Between
6 May and 4 Jun 2025
Details
View Map
Share
Follow
Lillie Road

Electricity Network Company are proposing to carry out Utility asset works on Lillie Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Electricity Network Company on 8 Apr 2025 at 17:14.

London Borough Of Southwark logo
Between
6 and 29 May 2025
Details
View Map
Share
Merrow Street

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Merrow Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 29 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 8 Apr 2025 at 09:47.

London Borough Of Southwark logo
Between
6 and 29 May 2025
Details
View Map
Share
Lytham Street

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Lytham Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 29 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 8 Apr 2025 at 09:51.

Southern Gas Networks logo
Between
6 and 14 May 2025
Details
View Map
Share
Liverpool Grove

Southern Gas Networks were proposing to carry out New service connection on Liverpool Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 14 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 11:15.

London Borough Of Southwark logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Follow
Iliffe Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Iliffe Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Feb 2025 at 17:17.

London Borough Of Southwark logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Follow
Iliffe Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Iliffe Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 8 Apr 2025 at 09:59.

UK Power Networks Eastern & London logo
Between
6 and 16 May 2025
Details
View Map
Share
Follow
Lexham Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lexham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2025 at 14:45.

Thames Water logo
Between
6 and 27 May 2025
Details
View Map
Share
Cope Place

Thames Water were proposing to carry out Utility asset works on Cope Place, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 27 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 09:06.

BT logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Rysbrack Street

BT are proposing to carry out Utility asset works on Rysbrack Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Mar 2025 at 13:32.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Shepherd's Bush Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Apr 2025 at 13:11.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Shepherd's Bush Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Apr 2025 at 15:52.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Apr 2025 at 13:11.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Apr 2025 at 15:52.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 2 Apr 2025 at 17:04.

Thames Water logo
Between
6 and 12 May 2025
Details
View Map
Share
Follow
Stanhope Row

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanhope Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Jan 2025 at 15:10.

Royal Borough Of Kensington And Chelsea logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
King's Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 12 Feb 2025 at 15:49.

Thames Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Atwood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Atwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 11:08.

Thames Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Atwood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Atwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:49.

Thames Water logo
Between
7 and 13 May 2025
Details
View Map
Share
Follow
Luxborough Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Luxborough Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 13:36.

Thames Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Sixth Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Sixth Avenue, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 13:42.

Thames Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Sixth Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Sixth Avenue, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:02.

Transport for London (TfL) logo
Between
9 and 12 May 2025
Details
View Map
Share
Follow
Waterloo Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Waterloo Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 13:37.

Transport for London (TfL) logo
Between
9 and 12 May 2025
Details
View Map
Share
Follow
Waterloo Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Waterloo Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 13:18.

UK Power Networks Eastern & London logo
Between
9 and 11 May 2025
Details
View Map
Share
Uxbridge Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Uxbridge Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 May 2025 and run through until 11 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 09:36.

UK Power Networks Eastern & London logo
Between
9 and 13 May 2025
Details
View Map
Share
Uxbridge Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Uxbridge Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 May 2025 and run through until 13 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:01.

Southern Gas Networks logo
Between
12 May and 9 Jun 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 14:41.

Transport for London (TfL) logo
Between
12 and 15 May 2025
Details
View Map
Share
Ritherdon Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Ritherdon Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 15 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2025 at 08:08.

Transport for London (TfL) logo
Between
12 and 15 May 2025
Details
View Map
Share
Upper Tooting Park

Transport for London (TfL) were proposing to carry out Highway improvement works on Upper Tooting Park, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 15 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2025 at 08:08.

Transport for London (TfL) logo
Between
12 and 15 May 2025
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 15 May 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 11 Mar 2025 at 09:54.

BT logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Oakshaw Road

BT are proposing to carry out Utility asset works on Oakshaw Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Mar 2025 at 07:29.

BT logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Oakshaw Road

BT are proposing to carry out Utility asset works on Oakshaw Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Apr 2025 at 11:54.

Southern Gas Networks logo
LONG TERM
Between
12 May and 29 Jun 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:55.

Southern Gas Networks logo
LONG TERM
Between
12 May and 9 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 08:13.

Southern Gas Networks logo
LONG TERM
Between
12 May and 16 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 15:02.

London Borough Of Lambeth logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Union Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Union Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 6 Feb 2025 at 08:33.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Munro Terrace

Thames Water were proposing to carry out New service connection on Munro Terrace, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Feb 2025 at 16:20.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Munro Terrace

Thames Water are proposing to carry out New service connection on Munro Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 11:59.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Great Church Lane

Thames Water were proposing to carry out New service connection on Great Church Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 09:36.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Caxton Road

Thames Water are proposing to carry out New service connection on Caxton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 16:10.

Cadent Gas logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Jermyn Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 08:21.

Vodafone logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Savoy Street

Vodafone are proposing to carry out Permanent reinstatement on Savoy Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 31 Mar 2025 at 11:39.

City Of Westminster logo
Between
12 and 15 May 2025
Details
View Map
Share
Follow
Covent Garden

City Of Westminster are proposing to carry out Highway repair and maintenance works on Covent Garden, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Apr 2025 at 06:37.

Thames Water logo
Between
12 and 20 May 2025
Details
View Map
Share
Follow
Cannon Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Mar 2025 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
12 May and 22 Aug 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:33.

Cadent Gas logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Eastbourne Avenue

Cadent Gas are proposing to carry out New service connection on Eastbourne Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 11:56.

Thames Water logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Wimpole Street

Thames Water are proposing to carry out Permanent reinstatement on Wimpole Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 12:26.

Cadent Gas logo
Between
12 May and 7 Jun 2025
Details
View Map
Share
Wood Lane

Cadent Gas were proposing to carry out Utility asset works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 7 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 13:46.

Cadent Gas logo
Between
12 May and 9 Jun 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:36.

Cadent Gas logo
Between
12 May and 9 Jun 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 16:40.

Cadent Gas logo
Between
12 May and 9 Jun 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:36.

Cadent Gas logo
Between
12 May and 9 Jun 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 09:50.

Cadent Gas logo
Between
12 May and 7 Jun 2025
Details
View Map
Share
Scrubs Lane

Cadent Gas were proposing to carry out Utility asset works on Scrubs Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 7 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 13:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 15 Jun 2025
Details
View Map
Share
Follow
Southampton Row

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southampton Row, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Mar 2025 at 14:29.

Transport for London (TfL) logo
Between
12 May and 8 Jun 2025
Details
View Map
Share
Follow
Hanger Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2025 at 13:22.

UK Power Networks Eastern & London logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
John's Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on John's Mews, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2025 at 18:06.

City Of London Telecomms logo
Between
12 May and 1 Jun 2025
Details
View Map
Share
Great Sutton Street

City Of London Telecomms were proposing to carry out Utility asset works on Great Sutton Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 1 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 12 Feb 2025 at 11:31.

City Of London Telecomms logo
Between
12 May and 1 Jun 2025
Details
View Map
Share
Follow
Great Sutton Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 1 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 13 Feb 2025 at 07:26.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Lever Street

Thames Water are proposing to carry out Utility asset works on Lever Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 07:58.

UK Power Networks Eastern & London logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Granary Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2025 at 07:45.

UK Power Networks Eastern & London logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Granary Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 12:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 10:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 13:02.

Transport for London (TfL) logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Bewdley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Bewdley Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:33.

Transport for London (TfL) logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Bewdley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Bewdley Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 14:24.

Transport for London (TfL) logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Bewdley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Bewdley Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 07:33.

Transport for London (TfL) logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Islington Park Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington Park Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 17:05.

Transport for London (TfL) logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Islington Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington Park Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 09:15.

Transport for London (TfL) logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Islington Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington Park Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 10:24.

Transport for London (TfL) logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Islington Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington Park Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 07:21.

Transport for London (TfL) logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Liverpool Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Liverpool Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 15:25.

Transport for London (TfL) logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Liverpool Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Liverpool Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Sep 2024 at 09:22.

Transport for London (TfL) logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Liverpool Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Liverpool Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 10:09.

Transport for London (TfL) logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Liverpool Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Liverpool Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 07:21.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Adelaide Road

Thames Water were proposing to carry out New service connection on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 08:36.

London Borough Of Camden logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 Apr 2025 at 18:28.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Pilgrim's Lane

Thames Water are proposing to carry out New service connection on Pilgrim's Lane, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 15:09.

Thames Water logo
LONG TERM
Between
12 May and 13 Jul 2025
Details
View Map
Share
Follow
Ballogie Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Ballogie Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 18:06.

UK Power Networks Eastern & London logo
Between
13 and 23 May 2025
Details
View Map
Share
Follow
Stafford Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Stafford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:04.

City Of Westminster logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
Coventry Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Coventry Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Dec 2024 at 07:07.

City Of Westminster logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
Coventry Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Coventry Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Dec 2024 at 08:42.

City Of Westminster logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
Strand

City Of Westminster are proposing to carry out Highway repair and maintenance works on Strand, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Dec 2024 at 09:38.

UK Power Networks Eastern & London logo
Between
13 and 22 May 2025
Details
View Map
Share
Follow
South Molton Street

UK Power Networks Eastern & London are proposing to carry out New service connection on South Molton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 22 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 10:34.

UK Power Networks Eastern & London logo
Between
13 and 22 May 2025
Details
View Map
Share
Follow
South Molton Street

UK Power Networks Eastern & London are proposing to carry out New service connection on South Molton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 22 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Apr 2025 at 11:44.

Transport for London (TfL) logo
Between
13 May and 11 Jun 2025
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 15:11.

Transport for London (TfL) logo
Between
13 May and 11 Jun 2025
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 08:26.

Royal Borough Of Kensington And Chelsea logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
Old Brompton Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Old Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 12 Feb 2025 at 16:25.

Royal Borough Of Kensington And Chelsea logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
Old Brompton Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Old Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 12 Feb 2025 at 16:20.

Royal Borough Of Kensington And Chelsea logo
Between
13 and 15 May 2025
Details
View Map
Share
Old Brompton Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Old Brompton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 May 2025 and run through until 15 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 18 Feb 2025 at 13:41.

Thames Water logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
Wendell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wendell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 07:56.

Transport for London (TfL) logo
Between
14 and 21 May 2025
Details
View Map
Share
Follow
Rodenhurst Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rodenhurst Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 14:29.

Royal Borough Of Kensington And Chelsea logo
Between
14 and 16 May 2025
Details
View Map
Share
Follow
Old Brompton Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Old Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 3 Apr 2025 at 10:46.

Thames Water logo
Between
14 and 16 May 2025
Details
View Map
Share
Follow
Copperfield Street

Thames Water are proposing to carry out Remedial works on Copperfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 15:03.

UK Power Networks Eastern & London logo
Between
14 and 28 May 2025
Details
View Map
Share
Follow
Half Moon Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Half Moon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 09:45.

UK Power Networks Eastern & London logo
Between
14 and 23 May 2025
Details
View Map
Share
Follow
Half Moon Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Half Moon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2025 at 11:44.

UK Power Networks Eastern & London logo
Between
14 and 23 May 2025
Details
View Map
Share
Follow
Half Moon Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Half Moon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 12:04.

UK Power Networks Eastern & London logo
Between
14 and 18 May 2025
Details
View Map
Share
Bloemfontein Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Bloemfontein Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 May 2025 and run through until 18 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:13.

Thames Water logo
LONG TERM
Between
14 May and 9 Jul 2025
Details
View Map
Share
Follow
Clifford Way

Thames Water are proposing to carry out Utility repair and maintenance works on Clifford Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 12:10.

London Borough Of Barnet logo
Between
14 May and 12 Jun 2025
Details
View Map
Share
The Vale

London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 May 2025 and run through until 12 June 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:06.

London Borough Of Barnet logo
Between
14 May and 12 Jun 2025
Details
View Map
Share
The Vale

London Borough Of Barnet were proposing to carry out Utility repair and maintenance works on The Vale, Childs Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 May 2025 and run through until 12 June 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Feb 2025 at 10:27.

Royal Borough Of Kensington And Chelsea logo
Between
15 and 17 May 2025
Details
View Map
Share
Follow
Pembridge Villas

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pembridge Villas, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Feb 2025 at 16:59.

City Of London Corporation logo
LONG TERM
Between
15 May and 20 Sep 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are proposing to carry out Highway repair and maintenance works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Between
15 May and 20 Sep 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are proposing to carry out Highway repair and maintenance works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 14 Apr 2025 at 11:02.

Thames Water logo
Between
15 and 19 May 2025
Details
View Map
Share
Follow
Crestfield Street

Thames Water are proposing to carry out Utility repair and maintenance works on Crestfield Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 10:18.

Thames Water logo
Between
15 and 18 May 2025
Details
View Map
Share
Follow
Euston Road

Thames Water are proposing to carry out Utility repair and maintenance works on Euston Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jan 2025 at 11:53.

Thames Water logo
Between
15 and 18 May 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 14:10.

UK Power Networks Eastern & London logo
Between
15 and 19 May 2025
Details
View Map
Share
Bloemfontein Avenue

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Bloemfontein Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 May 2025 and run through until 19 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:14.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:29.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:20.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 09:14.

London Borough Of Southwark logo
Between
16 and 18 May 2025
Details
View Map
Share
Follow
Weston Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Weston Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 May 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 15:47.

London Borough Of Southwark logo
Between
16 and 18 May 2025
Details
View Map
Share
Follow
Weston Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Weston Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 May 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 15:47.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.

City Of Westminster logo
Between
16 and 22 May 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Shaftesbury Avenue, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Jan 2025 at 09:23.

City Of London Corporation logo
Between
16 and 18 May 2025
Details
View Map
Share
Follow
King William Street

City Of London Corporation are proposing to carry out Highway improvement works on King William Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 17 Jan 2025 at 10:23.

City Of London Corporation logo
Between
16 and 18 May 2025
Details
View Map
Share
Follow
King William Street

City Of London Corporation are proposing to carry out Highway improvement works on King William Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 17 Jan 2025 at 10:28.

UK Power Networks Eastern & London logo
Between
16 May and 10 Jun 2025
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 15:52.

Thames Water logo
Between
16 and 19 May 2025
Details
View Map
Share
Follow
Delancey Street

Thames Water are proposing to carry out Utility repair and maintenance works on Delancey Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 18:54.

Thames Water logo
Between
16 and 19 May 2025
Details
View Map
Share
Follow
Delancey Street

Thames Water are proposing to carry out Utility repair and maintenance works on Delancey Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 10:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 May and 20 Jun 2025
Details
View Map
Share
Follow
Eton Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Eton Avenue, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 13:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 May and 20 Jun 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 21:25.

Thames Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Bargehouse Street

Thames Water are proposing to carry out New service connection on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Feb 2025 at 09:08.

BT logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Irving Street

BT are proposing to carry out Utility repair and maintenance works on Irving Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 31 Mar 2025 at 10:31.

BT logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Irving Street

BT are proposing to carry out Utility repair and maintenance works on Irving Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Apr 2025 at 07:40.

UK Power Networks Eastern & London logo
Between
19 May and 2 Jun 2025
Details
View Map
Share
Follow
Denman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2025 at 12:53.

BT logo
Between
19 May and 5 Jun 2025
Details
View Map
Share
Follow
Strand

BT are proposing to carry out Utility repair and maintenance works on Strand, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 Mar 2025 at 09:07.

City Of Westminster logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Shaftesbury Avenue, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 12:41.

Cadent Gas logo
Between
19 May and 6 Jun 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 14:26.

Royal Borough Of Kensington And Chelsea logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Pembridge Villas

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pembridge Villas, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 24 Feb 2025 at 09:56.

Royal Borough Of Kensington And Chelsea logo
Between
19 and 22 May 2025
Details
View Map
Share
Follow
Pembridge Villas

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pembridge Villas, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 24 Mar 2025 at 12:27.

UK Power Networks Eastern & London logo
Between
19 May and 3 Jun 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:35.

UK Power Networks Eastern & London logo
Between
19 and 25 May 2025
Details
View Map
Share
Follow
Fleet Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Fleet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 13:11.

Thames Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Vere Street

Thames Water were proposing to carry out New service connection on Vere Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 12:34.

Thames Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Colville Road

Thames Water are proposing to carry out New service connection on Colville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Feb 2025 at 16:48.

Thames Water logo
Between
19 and 22 May 2025
Details
View Map
Share
Vere Street

Thames Water were proposing to carry out New service connection on Vere Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 22 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 12:45.

Thames Water logo
Between
19 and 22 May 2025
Details
View Map
Share
Follow
Vere Street

Thames Water are proposing to carry out New service connection on Vere Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 13:06.

Thames Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Berwick Street

Thames Water were proposing to carry out New service connection on Berwick Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Feb 2025 at 15:04.

Between
19 and 30 May 2025
Details
View Map
Share
Follow
Quebec Mews

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Permanent reinstatement on Quebec Mews, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Feb 2025 at 10:38.

Thames Water logo
Between
19 and 24 May 2025
Details
View Map
Share
Little Portland Street

Thames Water were proposing to carry out New service connection on Little Portland Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 24 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 10:37.

Thames Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Little Portland Street

Thames Water are proposing to carry out New service connection on Little Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:22.

UK Power Networks Eastern & London logo
Between
19 and 25 May 2025
Details
View Map
Share
Follow
Farringdon Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Farringdon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 10:40.

Thames Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
All Souls Place

Thames Water are proposing to carry out Permanent reinstatement on All Souls Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Feb 2025 at 13:47.

UK Power Networks Eastern & London logo
Between
19 May and 6 Jun 2025
Details
View Map
Share
Follow
Eagle Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eagle Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Jan 2025 at 13:32.

Thames Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Capper Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Capper Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 16:31.

Thames Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Capper Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Capper Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 17:24.

Between
19 and 21 May 2025
Details
View Map
Share
Follow
Northburgh Street

G. Network Communications are proposing to carry out Utility repair and maintenance works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 8 Apr 2025 at 06:31.

Thames Water logo
Between
19 May and 2 Jun 2025
Details
View Map
Share
Follow
Acacia Place

Thames Water are proposing to carry out Utility asset works on Acacia Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:04.

LONG TERM
Between
19 May and 7 Aug 2025
Details
View Map
Share
Follow
Freeling Street

London Borough Of Islington are proposing to carry out Highway improvement works on Freeling Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 27 Feb 2025 at 07:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 13:03.

Thames Water logo
LONG TERM
Between
19 May and 30 Jun 2025
Details
View Map
Share
Follow
Chantry Crescent

Thames Water are proposing to carry out Utility asset works on Chantry Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:51.

London Borough Of Barnet logo
LONG TERM
Between
19 May and 30 Jun 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 12:27.

London Borough Of Barnet logo
LONG TERM
Between
19 May and 15 Aug 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 09:50.

London Borough Of Barnet logo
LONG TERM
Between
19 May and 12 Sep 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 08:40.

London Borough Of Barnet logo
LONG TERM
Between
19 May and 12 Sep 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 11:31.

Southern Gas Networks logo
Between
19 and 27 May 2025
Details
View Map
Share
Follow
Replingham Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Replingham Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 08:12.

Thames Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Kenway Road

Thames Water were proposing to carry out Utility asset works on Kenway Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 15:09.

Thames Water logo
LONG TERM
Between
19 May and 14 Jul 2025
Details
View Map
Share
Follow
Elverton Street

Thames Water are proposing to carry out Utility asset works on Elverton Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 06:34.

Cadent Gas logo
Between
19 and 27 May 2025
Details
View Map
Share
Follow
Carlisle Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Carlisle Place, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 27 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Feb 2025 at 13:03.

Cadent Gas logo
Between
19 and 27 May 2025
Details
View Map
Share
Follow
Carlisle Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Carlisle Place, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 27 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 12:41.

Cadent Gas logo
LONG TERM
Between
19 May and 6 Jul 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 06:09.

Cadent Gas logo
LONG TERM
Between
19 May and 6 Jul 2025
Details
View Map
Share
Follow
Perkin's Rents

Cadent Gas are proposing to carry out Utility asset works on Perkin's Rents, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 06:09.

UK Power Networks Eastern & London logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Ovington Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Ovington Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 14:37.

Cadent Gas logo
LONG TERM
Between
19 May and 6 Jul 2025
Details
View Map
Share
Follow
Abbey Orchard Street

Cadent Gas are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 06:09.

Thames Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Woodstock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Woodstock Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Jan 2025 at 15:54.

Cadent Gas logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Motcomb Street

Cadent Gas are proposing to carry out Remedial works on Motcomb Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 10:45.

BT logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Redcross Way

BT are proposing to carry out Remedial works on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Feb 2025 at 13:40.

Thames Water logo
Between
19 and 22 May 2025
Details
View Map
Share
Follow
Warwick House Street

Thames Water are proposing to carry out New service connection on Warwick House Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 08:11.

London Borough Of Lambeth logo
Between
20 and 30 May 2025
Details
View Map
Share
Follow
Rodenhurst Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rodenhurst Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 11 Feb 2025 at 16:02.

London Borough Of Lambeth logo
Between
20 and 30 May 2025
Details
View Map
Share
Follow
Rodenhurst Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rodenhurst Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 11 Feb 2025 at 16:02.

Thames Water logo
Between
20 and 27 May 2025
Details
View Map
Share
St George Street

Thames Water were proposing to carry out New service connection on St George Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 May 2025 and run through until 27 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 12:06.

City Of London Telecomms logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
St George Street

City Of London Telecomms are proposing to carry out Utility asset works on St George Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 18 Feb 2025 at 08:55.

Thames Water logo
Between
21 and 27 May 2025
Details
View Map
Share
Follow
Field Street

Thames Water are proposing to carry out New service connection on Field Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 18:51.

London Borough Of Barnet logo
LONG TERM
Between
21 May and 14 Jul 2025
Details
View Map
Share
The Vale

London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 May 2025 and run through until 14 July 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:23.

London Borough Of Barnet logo
LONG TERM
Between
21 May and 14 Jul 2025
Details
View Map
Share
The Vale

London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 May 2025 and run through until 14 July 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 14:58.

London Borough Of Wandsworth logo
Between
21 and 24 May 2025
Details
View Map
Share
Follow
Dowdeswell Close

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Dowdeswell Close, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Mar 2025 at 07:17.

Southern Gas Networks logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Sawyer Street

Southern Gas Networks are proposing to carry out Remedial works on Sawyer Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 16:30.

UK Power Networks Eastern & London logo
Between
22 and 25 May 2025
Details
View Map
Share
Uxbridge Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Uxbridge Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 May 2025 and run through until 25 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:04.

UK Power Networks Eastern & London logo
Between
22 and 27 May 2025
Details
View Map
Share
Follow
Uxbridge Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Uxbridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 27 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:12.

Virgin Media logo
Between
22 and 27 May 2025
Details
View Map
Share
Tottenham Court Road

Virgin Media were proposing to carry out Permanent reinstatement on Tottenham Court Road, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 May 2025 and run through until 27 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 18 Feb 2025 at 12:29.

Virgin Media logo
Between
22 and 27 May 2025
Details
View Map
Share
Tottenham Court Road

Virgin Media were proposing to carry out Permanent reinstatement on Tottenham Court Road, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 May 2025 and run through until 27 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 26 Feb 2025 at 16:41.

Thames Water logo
Between
23 May and 7 Jun 2025
Details
View Map
Share
Follow
Lilford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 11:46.

UK Power Networks Eastern & London logo
Between
23 May and 17 Jun 2025
Details
View Map
Share
Follow
Eccleston Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2025 at 09:17.

Electricity Network Company logo
Between
24 May and 5 Jun 2025
Details
View Map
Share
Follow
Holdernesse Road

Electricity Network Company are proposing to carry out Utility asset works on Holdernesse Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Feb 2025 at 10:13.

Electricity Network Company logo
Between
24 May and 5 Jun 2025
Details
View Map
Share
Follow
Glenburnie Road

Electricity Network Company are proposing to carry out Utility asset works on Glenburnie Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 31 Jan 2025 at 14:55.

Thames Water logo
Between
24 and 28 May 2025
Details
View Map
Share
Follow
Balham Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Balham Station Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2025 at 08:46.

City Of London Telecomms logo
Between
24 May and 11 Jun 2025
Details
View Map
Share
Follow
Belgrave Place

City Of London Telecomms are proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 11 Apr 2025 at 08:59.

City Of London Telecomms logo
Between
24 May and 11 Jun 2025
Details
View Map
Share
Belgrave Place

City Of London Telecomms were proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 May 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 17 Mar 2025 at 11:18.

City Of London Telecomms logo
Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
Great Sutton Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 31 Mar 2025 at 08:48.

City Of London Telecomms logo
Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
Great Sutton Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 3 Apr 2025 at 11:42.

Thames Water logo
LONG TERM
Between
24 May and 7 Jul 2025
Details
View Map
Share
Follow
Kingsmill Terrace

Thames Water are proposing to carry out Utility asset works on Kingsmill Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:04.

Thames Water logo
LONG TERM
Between
24 May and 7 Jul 2025
Details
View Map
Share
Follow
Kingsmill Terrace

Thames Water are proposing to carry out Utility asset works on Kingsmill Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:21.

UK Power Networks Eastern & London logo
Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
Plender Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Plender Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 10:44.

Thames Water logo
Between
25 and 30 May 2025
Details
View Map
Share
Follow
Garratt Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 11:43.

Transport for London (TfL) logo
Between
26 May and 5 Jun 2025
Details
View Map
Share
Follow
Rodenhurst Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rodenhurst Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 14:34.

London Borough Of Lambeth logo
Between
26 May and 9 Jun 2025
Details
View Map
Share
Follow
Loughborough Park

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Loughborough Park, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 27 Jan 2025 at 09:09.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 22 Jan 2025 at 08:36.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 17 Feb 2025 at 09:26.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 11 Apr 2025 at 10:01.

UK Power Networks Eastern & London logo
Between
26 May and 4 Jun 2025
Details
View Map
Share
Coningham Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Coningham Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:15.

UK Power Networks Eastern & London logo
Between
26 May and 1 Jun 2025
Details
View Map
Share
Follow
Savoy Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Savoy Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 08:27.

UK Power Networks Eastern & London logo
Between
26 May and 1 Jun 2025
Details
View Map
Share
Follow
Savoy Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Savoy Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2025 at 06:24.

Thames Water logo
Between
26 and 28 May 2025
Details
View Map
Share
Lime Street

Thames Water were proposing to carry out Utility repair and maintenance works on Lime Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 28 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 12:05.

Cadent Gas logo
Between
26 May and 6 Jun 2025
Details
View Map
Share
Follow
Frith Street

Cadent Gas are proposing to carry out Utility asset works on Frith Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 10:27.

UK Power Networks Eastern & London logo
Between
26 May and 21 Jun 2025
Details
View Map
Share
Follow
Cock Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Cock Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 21 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 19:55.

Thames Water logo
Between
26 May and 6 Jun 2025
Details
View Map
Share
Follow
Balfour Road

Thames Water are proposing to carry out Utility asset works on Balfour Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 12:26.

Thames Water logo
LONG TERM
Between
26 May and 6 Jul 2025
Details
View Map
Share
Wales Farm Road

Thames Water were proposing to carry out Utility asset works on Wales Farm Road, Acton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 6 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 08:23.

Thames Water logo
Between
26 May and 22 Jun 2025
Details
View Map
Share
Follow
Victoria Road

Thames Water are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 13:00.

Between
26 and 29 May 2025
Details
View Map
Share
Follow
Northburgh Street

G. Network Communications are proposing to carry out Utility repair and maintenance works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 5 Mar 2025 at 11:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 30 Jun 2025
Details
View Map
Share
Follow
Abbey Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 15:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 1 Jul 2025
Details
View Map
Share
Follow
Barretts Green Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barretts Green Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2025 at 17:11.

LONG TERM
Between
26 May and 15 Jul 2025
Details
View Map
Share
Hanger Lane

Advanced Electricty Networks Ltd were proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 15 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 8 Apr 2025 at 15:36.

LONG TERM
Between
26 May and 15 Jul 2025
Details
View Map
Share
Follow
Hanger Lane

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 9 Apr 2025 at 10:41.

Thames Water logo
Between
26 May and 1 Jun 2025
Details
View Map
Share
Follow
Essex Road

Thames Water are proposing to carry out Utility repair and maintenance works on Essex Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 08:02.

Thames Water logo
Between
26 May and 1 Jun 2025
Details
View Map
Share
Follow
Essex Road

Thames Water are proposing to carry out Utility repair and maintenance works on Essex Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 07:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 25 Jun 2025
Details
View Map
Share
Follow
Brentfield Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Brentfield Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 25 Jun 2025
Details
View Map
Share
Follow
Brentfield Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Brentfield Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2025 at 17:03.

Thames Water logo
LONG TERM
Between
26 May and 27 Jul 2025
Details
View Map
Share
Follow
St Pauls Avenue

Thames Water are proposing to carry out Utility asset works on St Pauls Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:07.

UK Power Networks Eastern & London logo
Between
27 May and 9 Jun 2025
Details
View Map
Share
Follow
Denman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Feb 2025 at 14:26.

Cadent Gas logo
Between
27 May and 9 Jun 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:09.

UK Power Networks Eastern & London logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Follow
Maddox Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Maddox Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 13:40.

City Of Westminster logo
Between
27 May and 6 Jun 2025
Details
View Map
Share
Follow
Portsmouth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsmouth Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Mar 2025 at 08:34.

City Of Westminster logo
Between
27 May and 6 Jun 2025
Details
View Map
Share
Follow
Portsmouth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsmouth Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Mar 2025 at 06:28.

Thames Water logo
Between
27 May and 2 Jun 2025
Details
View Map
Share
Follow
Berwick Street

Thames Water are proposing to carry out New service connection on Berwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 08:08.

Thames Water logo
Between
27 May and 2 Jun 2025
Details
View Map
Share
Portobello Road

Thames Water were proposing to carry out New service connection on Portobello Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 2 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 09:49.

Thames Water logo
LONG TERM
Between
27 May and 20 Jul 2025
Details
View Map
Share
Follow
Westview Close

Thames Water are proposing to carry out Utility asset works on Westview Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.

London Borough Of Barnet logo
Between
27 and 28 May 2025
Details
View Map
Share
Edgware Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 28 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Feb 2025 at 13:38.

London Borough Of Barnet logo
Between
27 and 28 May 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Mar 2025 at 10:12.

BT logo
Between
27 and 29 May 2025
Details
View Map
Share
Winnington Road

BT were proposing to carry out Utility asset works on Winnington Road, East Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 29 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Mar 2025 at 15:50.

Network Rail logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Magdalen Road

Network Rail are proposing to carry out roadworks on Magdalen Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Apr 2025 at 14:35.

London Borough Of Wandsworth logo
Between
27 May and 3 Jun 2025
Details
View Map
Share
Follow
Prince Of Wales Drive

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Mar 2025 at 15:11.

London Borough Of Hammersmith & Fulham logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Fulham Palace Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Fulham Palace Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Mar 2025 at 15:18.

London Borough Of Hammersmith & Fulham logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Fulham Palace Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Fulham Palace Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Apr 2025 at 11:17.

Royal Borough Of Kensington And Chelsea logo
Between
27 May and 1 Jun 2025
Details
View Map
Share
Follow
Albert Bridge Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Albert Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 3 Apr 2025 at 14:48.

National Highways logo
Between
27 May and 3 Jun 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Mar 2025 at 10:31.

Thames Water logo
LONG TERM
Between
27 May and 16 Jul 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 15:21.

London Borough Of Southwark logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Joan Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Joan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Mar 2025 at 15:06.

City Of Westminster logo
LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 7 Oct 2024 at 09:30.

City Of Westminster logo
LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Follow
Shepherd Market

City Of Westminster are proposing to carry out Highway repair and maintenance works on Shepherd Market, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 28 Oct 2024 at 07:57.

Thames Water logo
Between
27 May and 4 Jun 2025
Details
View Map
Share
Follow
Charles Ii Street

Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 07:40.

Thames Water logo
Between
27 May and 4 Jun 2025
Details
View Map
Share
Follow
Charles Ii Street

Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 08:20.

Thames Water logo
Between
27 and 31 May 2025
Details
View Map
Share
Follow
Kensington Place

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 12:02.

UK Power Networks Eastern & London logo
Between
28 and 31 May 2025
Details
View Map
Share
Follow
Bloemfontein Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bloemfontein Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:14.

Transport for London (TfL) logo
Between
28 May and 25 Jun 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:31.

City Of London Telecomms logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
St George Street

City Of London Telecomms are proposing to carry out Utility asset works on St George Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 18 Feb 2025 at 11:33.

London Borough Of Barnet logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Pennine Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Pennine Drive, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 11:16.

London Borough Of Barnet logo
Between
28 and 31 May 2025
Details
View Map
Share
Claremont Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 18:37.

London Borough Of Barnet logo
Between
28 and 31 May 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 11:16.

Transport for London (TfL) logo
Between
29 and 31 May 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 15:18.

Between
29 and 31 May 2025
Details
View Map
Share
Follow
Paget Street

G. Network Communications are proposing to carry out Utility repair and maintenance works on Paget Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 25 Feb 2025 at 08:23.

London Borough Of Ealing logo
Between
29 May and 25 Jun 2025
Details
View Map
Share
Follow
West Gate

London Borough Of Ealing are proposing to carry out Remedial works on West Gate, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Mar 2025 at 11:26.

Transport for London (TfL) logo
Between
30 May and 2 Jun 2025
Details
View Map
Share
Follow
Strand

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Strand, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 07:27.

Transport for London (TfL) logo
Between
30 May and 2 Jun 2025
Details
View Map
Share
Follow
Strand

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Strand, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:15.

City Of London Corporation logo
Between
30 May and 1 Jun 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Jan 2025 at 13:22.

City Of London Corporation logo
Between
30 May and 1 Jun 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 3 Feb 2025 at 16:02.

Transport for London (TfL) logo
Between
30 May and 2 Jun 2025
Details
View Map
Share
Waterloo Bridge

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Waterloo Bridge, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 May 2025 and run through until 2 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2025 at 13:46.

Transport for London (TfL) logo
Between
30 May and 2 Jun 2025
Details
View Map
Share
Follow
Waterloo Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Waterloo Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Feb 2025 at 13:37.

Transport for London (TfL) logo
Between
30 May and 2 Jun 2025
Details
View Map
Share
Follow
Waterloo Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Waterloo Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 13:13.

Transport for London (TfL) logo
Between
30 May and 2 Jun 2025
Details
View Map
Share
Follow
Waterloo Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Waterloo Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 13:55.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Temperley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Temperley Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 15:53.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Margate Road

Thames Water were proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:08.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Margate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 13:14.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Margate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 10:25.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Margate Road

Thames Water were proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 08:33.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 16 Sep 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 11:34.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 16 Sep 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 11:33.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 26 Aug 2025
Details
View Map
Share
Follow
Beaufort Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beaufort Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Jan 2025 at 14:55.

Thames Water logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Lonsdale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lonsdale Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 10:15.

Electricity Network Company logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 27 Feb 2025 at 13:43.

Electricity Network Company logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Feb 2025 at 08:17.

Electricity Network Company logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Feb 2025 at 10:58.

London Borough Of Hammersmith & Fulham logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Butterwick

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Butterwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Mar 2025 at 14:57.

Thames Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are proposing to carry out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 11:36.

Thames Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are proposing to carry out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 15:48.

Thames Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are proposing to carry out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 17:33.

City Of Westminster logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Victoria Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Feb 2025 at 07:17.

City Of Westminster logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Victoria Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jan 2025 at 14:59.

Thames Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Lancelot Place

Thames Water are proposing to carry out New service connection on Lancelot Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 09:38.

Transport for London (TfL) logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Bermondsey Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Bermondsey Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:51.

Transport for London (TfL) logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Bermondsey Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:56.

Transport for London (TfL) logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Crucifix Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Crucifix Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:59.

Transport for London (TfL) logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Crucifix Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Crucifix Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 15:01.

Transport for London (TfL) logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Snowsfields

Transport for London (TfL) are proposing to carry out Highway improvement works on Snowsfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2025 at 09:04.

Transport for London (TfL) logo
Between
2 and 4 Jun 2025
Details
View Map
Share
St Thomas Street

Transport for London (TfL) were proposing to carry out Highway improvement works on St Thomas Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:56.

Transport for London (TfL) logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
St Thomas Street

Transport for London (TfL) are proposing to carry out Highway improvement works on St Thomas Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:58.

Transport for London (TfL) logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Shand Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Shand Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2025 at 09:04.

Network Rail logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Bermondsey Street

Network Rail are proposing to carry out Works for Rail Purposes on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Apr 2025 at 14:30.

London Borough Of Lambeth logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Upper Ground

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Upper Ground, Waterloo & Southbank, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 17 Feb 2025 at 10:17.

UK Power Networks Eastern & London logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Bloemfontein Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bloemfontein Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:15.

Thames Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Jermyn Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 11:25.

Thames Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Jermyn Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 07:31.

Thames Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Jermyn Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 06:48.

Cadent Gas logo
Between
2 and 15 Jun 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:18.

Cadent Gas logo
Between
2 and 15 Jun 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 16:02.

Cadent Gas logo
Between
2 and 15 Jun 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 09:21.

UK Power Networks Eastern & London logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Fenchurch Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fenchurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:33.

Thames Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Tavistock Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Tavistock Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 07:55.

London Borough Of Ealing logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 19 Mar 2025 at 12:00.

London Borough Of Ealing logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 20 Mar 2025 at 16:03.

Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 5 Mar 2025 at 13:14.

Thames Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Great Russell Street

Thames Water are proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 15:51.

Virgin Media logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Charterhouse Street

Virgin Media are proposing to carry out Utility asset works on Charterhouse Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Mar 2025 at 11:48.

Virgin Media logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Charterhouse Street

Virgin Media were proposing to carry out Utility asset works on Charterhouse Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 6 Mar 2025 at 11:54.

Thames Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Carburton Street

Thames Water are proposing to carry out New service connection on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 10:45.

Thames Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Carburton Street

Thames Water are proposing to carry out New service connection on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:56.

City Of London Telecomms logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Britton Street

City Of London Telecomms are proposing to carry out roadworks on Britton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 14 Feb 2025 at 08:08.

City Of Westminster logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Acacia Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Apr 2025 at 10:29.

BT logo
Between
2 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

BT are proposing to carry out Diversionary works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Feb 2025 at 16:56.

BT logo
Between
2 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

BT are proposing to carry out Diversionary works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Apr 2025 at 15:07.

Thames Water logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Maygrove Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Maygrove Road, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 07:42.

Thames Water logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Midstrath Road

Thames Water are proposing to carry out Utility asset works on Midstrath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 13:12.

Cadent Gas logo
Between
2 and 14 Jun 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 10:19.

Thames Water logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Balnacraig Avenue

Thames Water are proposing to carry out Utility asset works on Balnacraig Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:10.

UK Power Networks Eastern & London logo
Between
3 and 13 Jun 2025
Details
View Map
Share
Follow
Denman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 09:52.

UK Power Networks Eastern & London logo
Between
3 and 14 Jun 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:36.

National Highways logo
Between
3 and 10 Jun 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Mar 2025 at 10:31.

Transport for London (TfL) logo
Between
3 and 5 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 12:32.

Transport for London (TfL) logo
Between
3 and 5 Jun 2025
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 12:23.

London Borough Of Hammersmith & Fulham logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Follow
Lillie Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Mar 2025 at 14:57.

London Borough Of Hammersmith & Fulham logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Follow
Lillie Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 9 Apr 2025 at 12:31.

City Of London Telecomms logo
Between
4 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Eccleston Street

City Of London Telecomms are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 11 Apr 2025 at 09:03.

Transport for London (TfL) logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 11:58.

Transport for London (TfL) logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 11:55.

UK Power Networks Eastern & London logo
Between
4 and 13 Jun 2025
Details
View Map
Share
Follow
South Molton Street

UK Power Networks Eastern & London are proposing to carry out New service connection on South Molton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 14:47.

Between
5 and 24 Jun 2025
Details
View Map
Share
Follow
Carnoustie Drive

London Borough Of Islington are proposing to carry out Highway improvement works on Carnoustie Drive, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 27 Feb 2025 at 07:57.

Thames Water logo
Between
5 and 8 Jun 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 12:27.

London Borough Of Wandsworth logo
Between
5 and 7 Jun 2025
Details
View Map
Share
Follow
Duntshill Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Duntshill Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2025 at 08:27.

City Of Westminster logo
Between
5 and 7 Jun 2025
Details
View Map
Share
Follow
Elizabeth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Jan 2025 at 15:22.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Brixton Station Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Brixton Station Road, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Feb 2025 at 13:33.

Thames Water logo
Between
6 and 17 Jun 2025
Details
View Map
Share
Follow
Lilford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2025 at 09:46.

London Borough Of Southwark logo
Between
6 and 14 Jun 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Mar 2025 at 12:00.

City Of London Corporation logo
Between
6 and 8 Jun 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Jan 2025 at 13:23.

City Of London Corporation logo
Between
6 and 8 Jun 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 3 Feb 2025 at 16:03.

UK Power Networks Eastern & London logo
Between
7 and 20 Jun 2025
Details
View Map
Share
Follow
Coningham Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:16.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Atkins Road

Thames Water are proposing to carry out Utility repair and maintenance works on Atkins Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 15:03.

BT logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Putney Heath

BT are proposing to carry out Utility asset works on Putney Heath, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Mar 2025 at 07:28.

Transport for London (TfL) logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Clapham Common North Side

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Common North Side, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 10:46.

Transport for London (TfL) logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Elspeth Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elspeth Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 10:49.

Transport for London (TfL) logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Clapham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2025 at 11:05.

Transport for London (TfL) logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 07:26.

Transport for London (TfL) logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:41.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Nelsons Row

Transport for London (TfL) are proposing to carry out Highway improvement works on Nelsons Row, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:37.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Stonhouse Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 10:06.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Carpenter's Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Carpenter's Place, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:44.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Prescott Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 10:07.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
St Luke's Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on St Luke's Avenue, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:44.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Clapham Manor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Manor Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:32.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Lyric Road

Thames Water are proposing to carry out Remedial works on Lyric Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 15:59.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Hollywood Road

Thames Water were proposing to carry out Utility asset works on Hollywood Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 16:06.

BT logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Vauxhall Street

BT are proposing to carry out Utility repair and maintenance works on Vauxhall Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Mar 2025 at 13:35.

BT logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Vauxhall Street

BT are proposing to carry out Utility repair and maintenance works on Vauxhall Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Apr 2025 at 11:22.

Thames Water logo
Between
9 and 17 Jun 2025
Details
View Map
Share
Follow
Whitehead's Grove

Thames Water are proposing to carry out New service connection on Whitehead's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 09:51.

UK Power Networks Eastern & London logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Abbey Orchard Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 09:24.

UK Power Networks Eastern & London logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Abbey Orchard Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 10:11.

UK Power Networks Eastern & London logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Great Smith Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 09:24.

UK Power Networks Eastern & London logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Great Smith Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:28.

UK Power Networks Eastern & London logo
Between
9 and 19 Jun 2025
Details
View Map
Share
Follow
Stafford Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Stafford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 12:48.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Bruton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bruton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2025 at 10:46.

UK Power Networks Eastern & London logo
Between
9 and 18 Jun 2025
Details
View Map
Share
Follow
Bruton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bruton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 10:35.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Bourdon Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bourdon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2025 at 10:49.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Henrietta Street

Thames Water are proposing to carry out New service connection on Henrietta Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:29.

Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Brook Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 7 Mar 2025 at 11:50.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 21:22.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Sussex Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Sussex Gardens, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2025 at 09:30.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Berners Mews

Thames Water were proposing to carry out New service connection on Berners Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 13:37.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Old Marylebone Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Marylebone Road, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 21:17.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2025 at 15:39.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2025 at 15:41.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2025 at 15:40.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Portobello Road

Thames Water were proposing to carry out New service connection on Portobello Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 14:48.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Portobello Road

Thames Water are proposing to carry out New service connection on Portobello Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 14:51.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Sans Walk

Thames Water are proposing to carry out New service connection on Sans Walk, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Feb 2025 at 08:13.

London Borough Of Camden logo
LONG TERM
Between
9 Jun and 16 Aug 2025
Details
View Map
Share
Follow
North Villas

London Borough Of Camden are proposing to carry out Highway improvement works on North Villas, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 12:57.

London Borough Of Camden logo
LONG TERM
Between
9 Jun and 16 Aug 2025
Details
View Map
Share
Follow
North Villas

London Borough Of Camden are proposing to carry out Highway improvement works on North Villas, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Mar 2025 at 17:53.

Thames Water logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 14:42.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Winnington Road

BT are proposing to carry out Utility asset works on Winnington Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 31 Mar 2025 at 16:09.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Winnington Road

BT were proposing to carry out Utility asset works on Winnington Road, East Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Mar 2025 at 11:30.

Thames Water logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Carlton Vale

Thames Water are proposing to carry out New service connection on Carlton Vale, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 11:54.

Transport for London (TfL) logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Tremadoc Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:37.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:32.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Woodborough Road

BT are proposing to carry out Utility asset works on Woodborough Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Mar 2025 at 15:43.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Gauden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:31.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Rysbrack Street

BT are proposing to carry out Utility asset works on Rysbrack Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Mar 2025 at 11:28.

London Borough Of Ealing logo
Between
10 and 24 Jun 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 5 Mar 2025 at 21:30.

London Borough Of Ealing logo
Between
10 and 24 Jun 2025
Details
View Map
Share
Osborne Road

London Borough Of Ealing were proposing to carry out Utility asset works on Osborne Road, Acton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 7 Mar 2025 at 09:23.

City Of Westminster logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Knightsbridge

City Of Westminster are proposing to carry out Highway repair and maintenance works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Feb 2025 at 09:44.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 11:31.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 10:22.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 09:44.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 12:55.

Thames Water logo
Between
11 and 16 Jun 2025
Details
View Map
Share
Follow
Eaton Gate

Thames Water are proposing to carry out New service connection on Eaton Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 13:16.

Thames Water logo
Between
11 and 15 Jun 2025
Details
View Map
Share
Elephant And Castle

Thames Water were proposing to carry out Utility repair and maintenance works on Elephant And Castle, London.

These works were categorised as Major.

The works were originally planned to start 11 June 2025 and run through until 15 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 09:49.

Thames Water logo
Between
11 and 15 Jun 2025
Details
View Map
Share
Follow
Elephant And Castle

Thames Water are proposing to carry out Utility repair and maintenance works on Elephant And Castle, London.

These works are categorised as Major.

The works will start on or after 11 June 2025 and could run through until 15 June 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 14:47.

London Borough Of Barnet logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Hermitage Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Hermitage Lane, Childs Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 16:01.

London Borough Of Barnet logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Hermitage Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Hermitage Lane, Childs Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 11:38.

Thames Water logo
Between
12 and 18 Jun 2025
Details
View Map
Share
Follow
St John's Lane

Thames Water are proposing to carry out New service connection on St John's Lane, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 09:35.

City Of London Corporation logo
Between
13 and 15 Jun 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 3 Feb 2025 at 16:04.

BT logo
Between
13 and 17 Jun 2025
Details
View Map
Share
Follow
Graemesdyke Avenue

BT are proposing to carry out Utility asset works on Graemesdyke Avenue, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 10:34.

Murphy Gas Networks logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Bollo Lane

Murphy Gas Networks are proposing to carry out New service connection on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 19 Mar 2025 at 15:20.

London Borough Of Ealing logo
Between
13 and 27 Jun 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 19 Mar 2025 at 12:22.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Landor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Landor Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:40.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Clapham Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2025 at 11:08.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 07:17.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:45.

Southern Gas Networks logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Tilford Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 07:56.

Southern Gas Networks logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Tilford Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 11:18.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Westmead

BT are proposing to carry out Utility asset works on Westmead, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Mar 2025 at 15:47.

Thames Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
The Pavement

Thames Water are proposing to carry out New service connection on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:53.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Dealtry Road

BT are proposing to carry out Utility asset works on Dealtry Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Mar 2025 at 16:32.

Murphy Power Distribution logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Imperial Road

Murphy Power Distribution are proposing to carry out Utility asset works on Imperial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 7 Apr 2025 at 09:31.

London Borough Of Southwark logo
Between
16 and 21 Jun 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Mar 2025 at 12:09.

Thames Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Averill Street

Thames Water are proposing to carry out New service connection on Averill Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 10:46.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Chelsea Embankment

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 15:07.

BT logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Kennington Road

BT are proposing to carry out Utility repair and maintenance works on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Mar 2025 at 08:56.

Electricity Network Company logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 14 Mar 2025 at 14:48.

Electricity Network Company logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 16 Apr 2025 at 10:06.

London Borough Of Lambeth logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Gilbert Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Gilbert Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 7 Mar 2025 at 13:41.

Thames Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Palace Street

Thames Water are proposing to carry out Utility repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 10:21.

City Of Westminster logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Great George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great George Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 31 Dec 2024 at 07:06.

City Of Westminster logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Great George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great George Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 19 Feb 2025 at 11:00.

Thames Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Fletcher Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 09:33.

Thames Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Fletcher Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 08:57.

UK Power Networks Eastern & London logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Hamilton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Apr 2025 at 08:17.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Caxton Road

Thames Water are proposing to carry out New service connection on Caxton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 10:36.

Cadent Gas logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:08.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Winnett Street

Thames Water are proposing to carry out New service connection on Winnett Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 14:15.

Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Hanover Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 7 Mar 2025 at 11:45.

Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Old Broad Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Old Broad Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 31 Mar 2025 at 16:30.

UK Power Networks Eastern & London logo
Between
16 and 28 Jun 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:36.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Bentinck Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Bentinck Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 12:33.

Thames Water logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Wales Farm Road

Thames Water are proposing to carry out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 08:26.

Thames Water logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Victoria Road

Thames Water are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 08:15.

Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Bath Street

London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Bath Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 17 Mar 2025 at 07:09.

Cadent Gas logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Belsize Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 16:35.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Dudden Hill Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:42.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Randall Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Randall Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:18.

London Borough Of Barnet logo
Between
16 and 17 Jun 2025
Details
View Map
Share
Follow
Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:39.

Thames Water logo
Between
17 and 24 Jun 2025
Details
View Map
Share
Follow
Long Drive

Thames Water are proposing to carry out Utility asset works on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 11:47.

Thames Water logo
Between
17 and 20 Jun 2025
Details
View Map
Share
Follow
Pyrmont Road

Thames Water are proposing to carry out New service connection on Pyrmont Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 08:42.

London Borough Of Wandsworth logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Cicada Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Cicada Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 10 Mar 2025 at 15:03.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Kennington Road

BT are proposing to carry out Utility repair and maintenance works on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Apr 2025 at 10:55.

Thames Water logo
Between
18 and 25 Jun 2025
Details
View Map
Share
Follow
Regency Street

Thames Water are proposing to carry out New service connection on Regency Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 15:53.

City Of London Telecomms logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Eaton Square

City Of London Telecomms are proposing to carry out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 14 Apr 2025 at 09:15.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Park Street

BT are proposing to carry out Utility repair and maintenance works on Park Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Apr 2025 at 13:34.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Park Street

BT are proposing to carry out Utility repair and maintenance works on Park Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Apr 2025 at 15:13.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
South Audley Street

BT are proposing to carry out Utility repair and maintenance works on South Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Mar 2025 at 09:58.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Mount Street

BT are proposing to carry out Utility repair and maintenance works on Mount Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Mar 2025 at 10:05.

London Borough Of Barnet logo
LONG TERM
Between
18 Jun and 18 Aug 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

Transport for London (TfL) logo
Between
19 and 24 Jun 2025
Details
View Map
Share
Follow
Mayflower Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Mayflower Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:43.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:40.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 06:22.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 10:40.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:41.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 06:44.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:39.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 06:44.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 10:41.

Sky UK logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Great Titchfield Street

Sky UK are proposing to carry out Utility repair and maintenance works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sky UK on 16 Apr 2025 at 08:01.

Transport for London (TfL) logo
LONG TERM
Between
20 Jun and 8 Aug 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 10:12.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Walm Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Walm Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:37.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Knatchbull Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Knatchbull Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 18:53.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 12:35.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 13:42.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 12:10.

UK Power Networks Eastern & London logo
Between
23 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:42.

UK Power Networks Eastern & London logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2025 at 09:50.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Winnett Street

Thames Water are proposing to carry out New service connection on Winnett Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:25.

City Of Westminster logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Ingestre Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Ingestre Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Jan 2025 at 14:50.

Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Brook Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 13 Mar 2025 at 10:16.

Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Brook Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 9 Apr 2025 at 10:36.

Electricity Network Company logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Apr 2025 at 15:02.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Marylebone Lane

Thames Water are proposing to carry out New service connection on Marylebone Lane, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 10:38.

Thames Water logo
Between
23 and 28 Jun 2025
Details
View Map
Share
Follow
Little Portland Street

Thames Water are proposing to carry out New service connection on Little Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 11:20.

Virgin Media logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Hanway Street

Virgin Media are proposing to carry out Utility asset works on Hanway Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 11 Mar 2025 at 12:21.

Thames Water logo
Between
23 and 30 Jun 2025
Details
View Map
Share
Follow
Moor Place

Thames Water are proposing to carry out New service connection on Moor Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2025 at 13:14.

London Borough Of Camden logo
LONG TERM
Between
23 Jun and 2 Aug 2025
Details
View Map
Share
Follow
Chalcot Square

London Borough Of Camden are proposing to carry out Remedial works on Chalcot Square, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:45.

London Borough Of Camden logo
LONG TERM
Between
23 Jun and 2 Aug 2025
Details
View Map
Share
Follow
Chalcot Square

London Borough Of Camden are proposing to carry out Remedial works on Chalcot Square, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Mar 2025 at 17:52.

Thames Water logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Cavendish Road

Thames Water were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 16:28.

BT logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Solna Avenue

BT are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Mar 2025 at 15:56.

BT logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Solna Avenue

BT are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Apr 2025 at 14:44.

London Borough Of Wandsworth logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Balmuir Gardens

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Balmuir Gardens, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2025 at 09:12.

Thames Water logo
Between
23 and 30 Jun 2025
Details
View Map
Share
Follow
Kentwode Green

Thames Water are proposing to carry out New service connection on Kentwode Green, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 13:43.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Markham Street

Thames Water are proposing to carry out New service connection on Markham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 12:24.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Great Church Lane

Thames Water are proposing to carry out New service connection on Great Church Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 10:09.

City Of Westminster logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Victoria Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 20 Feb 2025 at 07:17.

City Of Westminster logo
Between
23 Jun and 12 Jul 2025
Details
View Map
Share
Follow
Victoria Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 14 Mar 2025 at 08:03.

Thames Water logo
LONG TERM
Between
23 Jun and 11 Aug 2025
Details
View Map
Share
Follow
Wilfred Street

Thames Water are proposing to carry out Utility asset works on Wilfred Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 07:57.

Cadent Gas logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Meon Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Meon Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 15:30.

BT logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Curzon Street

BT are proposing to carry out Utility repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Apr 2025 at 09:04.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Upper Tooting Park

Transport for London (TfL) were proposing to carry out Highway improvement works on Upper Tooting Park, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:55.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:57.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:36.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Marius Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:38.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:42.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 3 July 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:44.

Thames Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
Kings Scholars' Passage

Thames Water are proposing to carry out Utility asset works on Kings Scholars' Passage, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:11.

Thames Water logo
Between
24 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Upbrook Mews

Thames Water are proposing to carry out Utility repair and maintenance works on Upbrook Mews, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 10:07.

City Of Westminster logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
St Martin's Lane

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Martin's Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 07:03.

Transport for London (TfL) logo
Between
25 Jun and 11 Jul 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:32.

Thames Water logo
Between
25 and 29 Jun 2025
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 16:22.

UK Power Networks Eastern & London logo
Between
25 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Elm Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Elm Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 20:54.

National Highways logo
Between
25 Jun and 11 Jul 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Apr 2025 at 09:43.

London Borough Of Wandsworth logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Linstead Way

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Linstead Way, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2025 at 09:08.

Thames Water logo
LONG TERM
Between
25 Jun and 15 Sep 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:26.

Thames Water logo
LONG TERM
Between
25 Jun and 15 Sep 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 16:30.

London Borough Of Wandsworth logo
Between
26 and 30 Jun 2025
Details
View Map
Share
Follow
Linstead Way

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Linstead Way, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Mar 2025 at 07:44.

Thames Water logo
Between
26 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Maiden Lane

Thames Water are proposing to carry out Highway improvement works on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 10:51.

Transport for London (TfL) logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 15:18.

Transport for London (TfL) logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Ritherdon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ritherdon Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:26.

Transport for London (TfL) logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Upper Tooting Park

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Tooting Park, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:57.

Thames Water logo
Between
30 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Margate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:49.

BT logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lorn Road

BT are proposing to carry out Utility asset works on Lorn Road, Stockwell East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Apr 2025 at 08:32.

London Borough Of Hammersmith & Fulham logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Dunsany Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Dunsany Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Apr 2025 at 12:58.

City Of Westminster logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 07:24.

UK Power Networks Eastern & London logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Mar 2025 at 13:41.

Cadent Gas logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 15:30.

UK Power Networks Eastern & London logo
Between
30 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Billiter Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Billiter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:57.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 08:54.

UK Power Networks Eastern & London logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Livonia Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Livonia Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:48.

UK Power Networks Eastern & London logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Livonia Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Livonia Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 14:44.

UK Power Networks Eastern & London logo
Between
30 Jun and 19 Jul 2025
Details
View Map
Share
Follow
Camomile Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Camomile Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:32.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Coleman Street

Thames Water are proposing to carry out New service connection on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:13.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rathbone Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rathbone Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:19.

Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Hatton Garden

G. Network Communications were proposing to carry out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 31 Mar 2025 at 14:32.

UK Power Networks Eastern & London logo
Between
30 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Tottenham Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Tottenham Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2025 at 10:30.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out New service connection on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 14:31.

Electricity Network Company logo
LONG TERM
Between
30 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 10 Apr 2025 at 08:28.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Copenhagen Street

Thames Water were proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:27.

Thames Water logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are proposing to carry out Utility asset works on Denzil Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:03.

City Of Westminster logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Newman Passage

City Of Westminster are proposing to carry out Highway repair and maintenance works on Newman Passage, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Apr 2025 at 10:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Abbey Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2025 at 17:10.

LONG TERM
Between
1 Jul and 1 Sep 2025
Details
View Map
Share
Frederica Street

London Borough Of Islington were proposing to carry out Highway improvement works on Frederica Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 9 Apr 2025 at 08:13.

London Borough Of Camden logo
LONG TERM
Between
2 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Apr 2025 at 12:11.

London Borough Of Camden logo
LONG TERM
Between
2 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Apr 2025 at 21:56.

Thames Water logo
Between
4 and 9 Jul 2025
Details
View Map
Share
Follow
Goodwin Road

Thames Water are proposing to carry out New service connection on Goodwin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 16:38.

London Borough Of Ealing logo
LONG TERM
Between
5 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Strelley Way

London Borough Of Ealing are proposing to carry out Highway improvement works on Strelley Way, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 3 Apr 2025 at 14:47.

City Of Westminster logo
LONG TERM
Between
7 Jul 2025 and 7 Jul 2026
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Apr 2025 at 12:08.

Cadent Gas logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 10:27.

Electricity Network Company logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 10 Apr 2025 at 11:28.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Stukeley Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Stukeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2025 at 21:59.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Stukeley Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Stukeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 18:06.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Basinghall Street

Thames Water are proposing to carry out New service connection on Basinghall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 15:55.

Vodafone logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Northburgh Street

Vodafone are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 15 Apr 2025 at 13:11.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 15:22.

BT logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Princes Way

BT are proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Apr 2025 at 12:46.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Sherbrooke Road

Virgin Media are proposing to carry out Utility asset works on Sherbrooke Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 25 Mar 2025 at 12:31.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Allestree Road

Virgin Media are proposing to carry out Utility asset works on Allestree Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Mar 2025 at 12:08.

Thames Water logo
Between
7 and 12 Jul 2025
Details
View Map
Share
Follow
Albany Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Albany Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 13:44.

City Of Westminster logo
Between
7 and 12 Jul 2025
Details
View Map
Share
Follow
Belgrave Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Apr 2025 at 15:58.

London Borough Of Hammersmith & Fulham logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Aldensley Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Aldensley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Apr 2025 at 13:03.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out New service connection on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 16:25.

Thames Water logo
LONG TERM
Between
7 Jul and 23 Oct 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 09:59.

Thames Water logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Palmer Street

Thames Water are proposing to carry out Utility asset works on Palmer Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:15.

London Borough Of Hammersmith & Fulham logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Brackenbury Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Brackenbury Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Apr 2025 at 09:47.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Macfarlane Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Macfarlane Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Murphy Power Distribution logo
Between
8 and 29 Jul 2025
Details
View Map
Share
Follow
Greenwood Place

Murphy Power Distribution are proposing to carry out Utility asset works on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Murphy Power Distribution on 15 Apr 2025 at 18:18.

Affinity Water logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Fourth Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Fourth Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 22:02.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Loughborough Street

Electricity Network Company were proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 24 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 Apr 2025 at 12:52.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Follow
Kennington Lane

Electricity Network Company are proposing to carry out Utility asset works on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 Apr 2025 at 12:55.

City Of Westminster logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Buckingham Gate

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 07:43.

City Of Westminster logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Spenser Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Spenser Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Feb 2025 at 10:22.

City Of Westminster logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Buckingham Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jan 2025 at 16:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Jul and 29 Sep 2025
Details
View Map
Share
Follow
Lancaster Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 21:11.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 21:04.

UK Power Networks Eastern & London logo
Between
11 and 13 Jul 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 09:46.

Transport for London (TfL) logo
LONG TERM
Between
11 Jul and 5 Dec 2025
Details
View Map
Share
Follow
Bressenden Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Bressenden Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 15:54.

Thames Water logo
LONG TERM
Between
13 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Dean Bradley Street

Thames Water are proposing to carry out Utility asset works on Dean Bradley Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 06:21.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Thurleigh Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Thurleigh Road, Balham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 11 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Mar 2025 at 09:57.

London Borough Of Lambeth logo
LONG TERM
Between
14 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Cottage Grove

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Cottage Grove, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 7 Apr 2025 at 09:28.

London Borough Of Southwark logo
Between
14 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Picton Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Picton Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Apr 2025 at 17:09.

Virgin Media logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Clapham Road

Virgin Media are proposing to carry out Utility asset works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 14 Apr 2025 at 07:28.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Elizabeth Street

Thames Water are proposing to carry out New service connection on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:15.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Kennington Road

Thames Water are proposing to carry out New service connection on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 08:34.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Cadogan Place

Thames Water are proposing to carry out Utility asset works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:06.

Thames Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Hans Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hans Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 05:24.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.

UK Power Networks Eastern & London logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:37.

UK Power Networks Eastern & London logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:59.

Cadent Gas logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 07:02.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Broadwick Street

Thames Water are proposing to carry out Utility asset works on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 09:49.

Cadent Gas logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
West Central Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 18:16.

City Of Westminster logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Clifton Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Clifton Road, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Apr 2025 at 13:22.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Greenberry Street

Thames Water were proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:43.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenberry Street

Thames Water are proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:44.

BT logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenland Street

BT are proposing to carry out Utility repair and maintenance works on Greenland Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 17:26.

Thames Water logo
LONG TERM
Between
14 Jul and 14 Sep 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are proposing to carry out Utility asset works on Denzil Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 18:16.

UK Power Networks Eastern & London logo
Between
14 and 21 Jul 2025
Details
View Map
Share
Follow
Carey Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Carey Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 17:24.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Wayside

Thames Water are proposing to carry out New service connection on Wayside, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 15:06.

Thames Water logo
LONG TERM
Between
15 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are proposing to carry out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Feb 2025 at 08:42.

London Borough Of Barnet logo
LONG TERM
Between
15 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 08:40.

London Borough Of Barnet logo
LONG TERM
Between
15 Jul and 25 Aug 2025
Details
View Map
Share
Geron Way

London Borough Of Barnet were proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2025 and run through until 25 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:54.

London Borough Of Barnet logo
Between
15 Jul and 4 Aug 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 12:55.

London Borough Of Barnet logo
LONG TERM
Between
15 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.


Roadworks Map near to Gloucester Walk, LONDON, W8 4HY (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 17 Apr 2025 09:02
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Gloucester Walk, LONDON, W8 4HY (108 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Hyperoptic logo
CAMPDEN GROVE 
(0.1 miles)
Hyperoptic
Utility asset works - Footway - No carriageway incursion
Complete
16 Apr 2025 15:15 - 18:00
0.1
Details
Share
2
UK Power Networks Eastern & London logo
TOR GARDENS 
(0.1 miles)
UK Power Networks Eastern & London
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 4 Apr 2025 - 17 Apr 2025
0.1
Details
Share
Follow
3
Royal Borough Of Kensington And Chelsea logo
MAJOR
  
CAMPDEN HILL ROAD 
(0.1 miles)
Royal Borough Of Kensington And Chelsea
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 1 Apr 2025 - 23 Apr 2025
0.1
Details
Share
Follow
4
Royal Borough Of Kensington And Chelsea logo
MAJOR
  
CAMPDEN HILL ROAD 
(0.1 miles)
Royal Borough Of Kensington And Chelsea
Highway improvement works - Footway - Some carriageway incursion
In Progress
Since: 1 Apr 2025 08:00
(Scheduled: 1 Apr 2025 - 25 Apr 2025)
0.1
Details
Share
Follow
5
Cadent Gas logo
EMERGENCY
  
HOLLAND PLACE 
(0.2 miles)
Cadent Gas
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
11 Apr 2025 22:45 - 14 Apr 2025 15:00
0.2
Details
Share
6
Royal Borough Of Kensington And Chelsea logo
MAJOR
  
UPPER PHILLIMORE GARDENS 
(0.2 miles)
Royal Borough Of Kensington And Chelsea
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 6 Jan 2025 08:00
(Scheduled: 6 Jan 2025 - 30 May 2025)
0.2
Details
Share
Follow
7
Thames Water logo
MAJOR
  
KENSINGTON HIGH STREET 
(0.2 miles)
Thames Water
New service connection - Footway - Road closure
Cancelled
(Scheduled: 14 Apr 2025 - 17 Apr 2025)
0.2
Details
Share
8
Cadent Gas logo
URGENT
  
PHILLIMORE GARDENS 
(0.3 miles)
Cadent Gas
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
In Progress
Since: 26 Mar 2025 19:00
(Scheduled: 26 Mar 2025 - 25 Apr 2025)
0.3
Details
Share
Follow
9
Virgin Media logo
PHILLIMORE WALK 
(0.3 miles)
Virgin Media
Utility asset works - Footway - Give and take
Planned
Scheduled: 17 Apr 2025 - 19 Apr 2025
0.3
Details
Share
Follow
10
Hyperoptic logo
NOTTING HILL GATE 
(0.3 miles)
Hyperoptic
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 17 Apr 2025
0.3
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data