ROADWORKS SUMMARY
Talgarth Road, LONDON, W6 8BJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Talgarth Road, W6 8BJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Talgarth Road, LONDON, W6 8BJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Talgarth Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
31 Jan 2027
Details
View Map
Share
Follow
Tanner Lane

Network Rail are carrying out Works for Rail Purposes on Tanner Lane, Westminster, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2022 at 07:30 and could run through until 31 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Aug 2026 at 08:24.

Network Rail logo
LONG TERM
Until
31 Jan 2027
Details
View Map
Share
Follow
South Wharf Road

Network Rail are carrying out Works for Rail Purposes on South Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 07:30 and could run through until 31 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Aug 2026 at 13:25.

London Borough Of Wandsworth logo
LONG TERM
Until
27 Mar 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 27 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 08:43.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are carrying out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:06.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are carrying out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:06.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are carrying out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:11.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are carrying out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 June 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2026 at 12:19.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 June 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:50.

Transport for London (TfL) logo
LONG TERM
Until
31 May 2027
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are carrying out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 00:01 and could run through until 31 May 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 16:32.

UK Power Networks Eastern & London logo
LONG TERM
Until
28 Sep 2026
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:00 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2026 at 12:30.

Transport for London (TfL) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out roadworks on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 16 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2026 at 10:37.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 November 2025 at 08:00 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 28 Aug 2026 at 09:05.

Transport for London (TfL) logo
LONG TERM
Between
29 Nov 2025 and 30 Oct 2027
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out roadworks on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2025 and could run through until 30 October 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2025 at 13:25.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Grosvenor Gardens

Transport for London (TfL) are proposing to carry out roadworks on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2026 and could run through until 19 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2026 at 11:24.

Transport for London (TfL) logo
LONG TERM
Between
15 Jan 2026 and 14 Jan 2027
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2026 and could run through until 14 January 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 2 Feb 2026 at 15:06.

Thames Water logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Balham High Road

Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 January 2026 at 13:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:14.

Network Rail logo
LONG TERM
Until
30 Aug 2027
Details
View Map
Share
Follow
Old York Road

Network Rail are carrying out Works for Rail Purposes on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 February 2026 at 07:00 and could run through until 30 August 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2026 at 13:37.

Transport for London (TfL) logo
LONG TERM
Between
9 Feb 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 February 2026 and could run through until 8 February 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2026 at 14:20.

National Highways logo
LONG TERM
Between
3 Mar and 30 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 9 Dec 2025 at 14:46.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Ordnance Hill

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Ordnance Hill, Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 March 2026 at 14:30 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2026 at 12:01.

National Highways logo
LONG TERM
Until
6 Nov 2026
Details
View Map
Share
Follow
Great West Road

National Highways are carrying out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 March 2026 at 22:00 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 Mar 2026 at 11:46.

Thames Water logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Balham Park Road

Thames Water are carrying out Utility asset works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 April 2026 at 11:00 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 07:50.

HS2 logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Hilgrove Road

HS2 are carrying out Section 50 on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 April 2026 at 00:01 and could run through until 27 September 2026. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 27 Aug 2026 at 13:03.

HS2 logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Finchley Road

HS2 are carrying out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 April 2026 at 00:01 and could run through until 27 September 2026. The works will impact the footway, carriageway, parking place and bus stop or stand.

This roadwork event was last updated by HS2 on 28 Aug 2026 at 09:25.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 April 2026 at 07:00 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2026 at 08:25.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
28 Feb 2027
Details
View Map
Share
Follow
Albert Bridge Road

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Albert Bridge Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2026 at 00:00 and could run through until 28 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 28 Apr 2026 at 16:31.

HS2 logo
LONG TERM
Until
26 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 08:00 and could run through until 26 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by HS2 on 30 Jun 2026 at 09:19.

HS2 logo
LONG TERM
Until
26 Oct 2026
Details
View Map
Share
Follow
Varndell Street

HS2 are carrying out Utility asset works on Varndell Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 08:00 and could run through until 26 October 2026. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 10 Jun 2026 at 11:17.

London Borough Of Camden logo
LONG TERM
Between
4 May 2026 and 28 Jan 2027
Details
View Map
Share
Follow
Granary Street

London Borough Of Camden are proposing to carry out Highway improvement works on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 May 2026 and could run through until 28 January 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 28 Apr 2026 at 19:33.

London Borough Of Ealing logo
LONG TERM
Between
5 May and 1 Dec 2026
Details
View Map
Share
Follow
Victoria Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Victoria Road, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 29 Oct 2025 at 14:54.

London Borough Of Ealing logo
LONG TERM
Between
5 May and 1 Dec 2026
Details
View Map
Share
Follow
Old Oak Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on Old Oak Lane, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 29 Oct 2025 at 14:54.

London Borough Of Camden logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Kilburn High Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2026 at 07:28 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 11 Sep 2026 at 18:08.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
23 Sep 2026
Details
View Map
Share
Follow
Macfarlane Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Macfarlane Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2026 at 07:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Jun 2026 at 11:43.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Victoria Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 May 2026 at 17:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 May 2026 at 09:11.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Onslow Gardens

Cadent Gas are carrying out Utility asset works on Onslow Gardens, London.

These works are categorised as Major.

The works started on 26 May 2026 at 10:27 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:57.

London Borough Of Ealing logo
LONG TERM
Until
31 Mar 2027
Details
View Map
Share
Follow
Boston Road

London Borough Of Ealing are carrying out Highway improvement works on Boston Road, Hanwell.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 June 2026 at 08:00 and could run through until 31 March 2027. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 6 Aug 2026 at 11:48.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

The works started on 4 June 2026 at 22:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Aug 2026 at 12:20.

Thames Water logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Wakehurst Road

Thames Water are carrying out Disconnection or alteration of supply on Wakehurst Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 08:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jun 2026 at 08:07.

Network Rail logo
LONG TERM
Until
30 Nov 2026
Details
View Map
Share
Follow
Sail Street

Network Rail are carrying out Works for Rail Purposes on Sail Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 08:00 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Jun 2026 at 08:44.

Network Rail logo
LONG TERM
Until
30 Nov 2026
Details
View Map
Share
Follow
Lambeth Road

Network Rail are carrying out Works for Rail Purposes on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 06:00 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Jun 2026 at 08:43.

City Of Westminster logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Paddington Street

City Of Westminster are carrying out Highway repair and maintenance works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 12:06.

City Of Westminster logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Chiltern Street

City Of Westminster are carrying out Highway repair and maintenance works on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 08:00 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 12:08.

City Of Westminster logo
LONG TERM
Until
14 Dec 2026
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are carrying out Highway improvement works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 June 2026 at 08:00 and could run through until 14 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jun 2026 at 08:53.

G2 Energy IDNO logo
LONG TERM
Between
17 Jun and 17 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 15 Jun 2026 at 12:07.

Affinity Water logo
LONG TERM
Until
16 Nov 2026
Details
View Map
Share
Follow
Twyford Abbey Road

Affinity Water are carrying out Utility asset works on Twyford Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 08:30 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Jun 2026 at 09:06.

London Borough Of Ealing logo
LONG TERM
Until
26 Sep 2026
Details
View Map
Share
Follow
Leeland Road

London Borough Of Ealing are carrying out Highway improvement works on Leeland Road, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 08:00 and could run through until 26 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2026 at 17:38.

Transport for London (TfL) logo
LONG TERM
Until
28 Feb 2027
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are carrying out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 19:00 and could run through until 28 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2026 at 16:59.

Transport for London (TfL) logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, Harrow Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 11:05.

Transport for London (TfL) logo
LONG TERM
Between
6 Jul 2026 and 5 Jul 2027
Details
View Map
Share
Follow
Harleyford Street

Transport for London (TfL) are proposing to carry out roadworks on Harleyford Street, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2026 and could run through until 5 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2026 at 13:40.

Thames Water logo
LONG TERM
Until
8 Oct 2026
Details
View Map
Share
Follow
Argyle Road

Thames Water are carrying out Statutory Infrastructure Works on Argyle Road, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 July 2026 at 09:46 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 14:12.

HS2 logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
North Gower Street

HS2 are carrying out Works for Rail Purposes on North Gower Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2026 at 08:00 and could run through until 12 October 2026. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 25 Aug 2026 at 10:17.

Cadent Gas logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Chapter Street

Cadent Gas are carrying out Utility asset works on Chapter Street, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 July 2026 at 10:13 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 10:19.

Cadent Gas logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Southdown Avenue

Cadent Gas are carrying out Utility asset works on Southdown Avenue, Hanwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 July 2026 at 12:13 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2026 at 13:11.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Park View Road

Cadent Gas are carrying out Utility asset works on Park View Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 06:33 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jul 2026 at 08:20.

Thames Water logo
LONG TERM
Until
29 Mar 2027
Details
View Map
Share
Follow
High Road

Thames Water are carrying out Utility asset works on High Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 16:45 and could run through until 29 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2026 at 08:13.

Thames Water logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Marmion Road

Thames Water are carrying out Disconnection or alteration of supply on Marmion Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 13:00 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:26.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Bridgend Road

London Borough Of Wandsworth are carrying out Highway improvement works on Bridgend Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:04.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Between
27 Jul and 28 Sep 2026
Details
View Map
Share
Follow
Pump House Lane

London Borough Of Wandsworth are proposing to carry out Section 50 on Pump House Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 Aug 2026 at 11:01.

London Borough Of Wandsworth logo
LONG TERM
Between
27 Jul and 28 Sep 2026
Details
View Map
Share
Follow
Kirtling Street

London Borough Of Wandsworth are proposing to carry out Section 50 on Kirtling Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 30 Jun 2026 at 10:40.

UK Power Networks Eastern & London logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Kensington Road

UK Power Networks Eastern & London are carrying out Utility asset works on Kensington Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 11:00 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jul 2026 at 15:37.

Transport for London (TfL) logo
LONG TERM
Between
27 Jul and 29 Sep 2026
Details
View Map
Share
Follow
Hampstead Road

Transport for London (TfL) are proposing to carry out Section 50 on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Jun 2026 at 10:26.

City Of Westminster logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Cleveland Street

City Of Westminster are carrying out Highway repair and maintenance works on Cleveland Street, Bloomsbury, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Aug 2026 at 21:19.

G2 Energy IDNO logo
LONG TERM
Between
29 Jul and 23 Sep 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 21 Jul 2026 at 09:22.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Acacia Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 14:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 11:03.

London Borough Of Camden logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
King Henry's Road

London Borough Of Camden are carrying out Highway repair and maintenance works on King Henry's Road, Swiss Cottage, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 8 Sep 2026 at 17:43.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug 2026 and 2 Aug 2027
Details
View Map
Share
Follow
Avenue Road

Transport for London (TfL) are proposing to carry out roadworks on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 August 2026 and could run through until 2 August 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2026 at 10:37.

G2 Energy IDNO logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Wrottesley Road

G2 Energy IDNO are carrying out New service connection on Wrottesley Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 August 2026 at 08:00 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Sep 2026 at 13:19.

LONG TERM
Between
8 Aug 2026 and 26 Mar 2027
Details
View Map
Share
Follow
Paradise Road

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Paradise Road, Richmond.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2026 and could run through until 26 March 2027. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 29 May 2026 at 13:19.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Aug and 24 Sep 2026
Details
View Map
Share
Wood Lane

London Borough Of Hammersmith & Fulham were proposing to carry out Highway improvement works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 August 2026 and run through until 24 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 21 Aug 2026 at 16:20.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 19 May 2026 at 09:43.

HS2 logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Stanhope Street

HS2 are carrying out Works for Rail Purposes on Stanhope Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 08:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 26 Aug 2026 at 14:14.

Electricity Network Company logo
LONG TERM
Until
23 Sep 2026
Details
View Map
Share
Follow
Beresford Avenue

Electricity Network Company are carrying out Utility asset works on Beresford Avenue, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2026 at 08:30 and could run through until 23 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 26 Aug 2026 at 22:17.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2026 at 09:15 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2026 at 08:36.

City Of Westminster logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Wymering Road

City Of Westminster are proposing to carry out Highway improvement works on Wymering Road, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 10 Aug 2026 at 18:29.

Thames Water logo
LONG TERM
Until
23 Sep 2026
Details
View Map
Share
Follow
Wisley Road

Thames Water are carrying out Disconnection or alteration of supply on Wisley Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2026 at 09:00 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 09:13.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
St Giles High Street

Cadent Gas are carrying out Utility repair and maintenance works on St Giles High Street, Holborn And Covent Garden, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 August 2026 at 04:47 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 09:01.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Windmill Road

Cadent Gas are carrying out Utility asset works on Windmill Road, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 August 2026 at 08:07 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:55.

Transport for London (TfL) logo
LONG TERM
Between
16 Aug and 20 Dec 2026
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out roadworks on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2026 at 17:33.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Windmill Road

Cadent Gas were proposing to carry out Utility asset works on Windmill Road, Brentford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 August 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 10:15.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Windmill Road

Cadent Gas are proposing to carry out Utility asset works on Windmill Road, Brentford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 00:16.

London Borough Of Hounslow logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Whitestile Road

London Borough Of Hounslow are carrying out Highway improvement works on Whitestile Road, Brentford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 24 Aug 2026 at 13:12.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Raymond Avenue

Cadent Gas are carrying out Utility asset works on Raymond Avenue, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2026 at 17:38 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 11:12.

Cadent Gas logo
LONG TERM
Until
24 Oct 2026
Details
View Map
Share
Follow
Aldbourne Road

Cadent Gas are carrying out Utility asset works on Aldbourne Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:59 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 15:28.

Cadent Gas logo
LONG TERM
Until
26 Oct 2026
Details
View Map
Share
Follow
Wormholt Road

Cadent Gas are carrying out Utility asset works on Wormholt Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 09:01 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 09:02.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Old Compton Street

Thames Water are carrying out Utility repair and maintenance works on Old Compton Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 14:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 09:14.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Baldwyn Gardens

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Baldwyn Gardens, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 August 2026 at 09:20 and could run through until 17 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Aug 2026 at 09:40.

Transport for London (TfL) logo
LONG TERM
Until
23 Nov 2026
Details
View Map
Share
Follow
Marylebone Road

Transport for London (TfL) are carrying out Highway improvement works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:00 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Aug 2026 at 09:55.

Thames Water logo
LONG TERM
Between
18 Aug and 27 Oct 2026
Details
View Map
Share
Follow
Salamanca Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Salamanca Place, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2026 at 09:29.

City Of Westminster logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are carrying out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2026 at 09:00 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 Aug 2026 at 09:56.

City Of Westminster logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Waterloo Place

City Of Westminster are carrying out Highway repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 13:00 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 10 Sep 2026 at 14:31.

City Of Westminster logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Sherlock Mews

City Of Westminster are carrying out Highway repair and maintenance works on Sherlock Mews, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Sep 2026 at 08:46.

UK Power Networks Eastern & London logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Kensington High Street

UK Power Networks Eastern & London are carrying out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2026 at 08:00 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2026 at 09:25.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Rampayne Street

Cadent Gas are carrying out Utility asset works on Rampayne Street, Tachbrook, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:32 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 09:32.

Thames Water logo
LONG TERM
Between
24 Aug and 26 Oct 2026
Details
View Map
Share
Follow
Kennington Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kennington Road, Kennington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Jun 2026 at 15:29.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 07:30 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 16:35.

City Of Westminster logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are carrying out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 08:00 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Aug 2026 at 08:53.

Affinity Water logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Twyford Abbey Road

Affinity Water are carrying out Utility asset works on Twyford Abbey Road, Park Royal.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 14:00 and could run through until 29 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 25 Aug 2026 at 08:30.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Caple Road

Thames Water are carrying out Utility asset works on Caple Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 10:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 08:30.

London Borough Of Camden logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Harley Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Harley Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 Aug 2026 at 08:06.

G2 Energy IDNO logo
LONG TERM
Between
25 Aug and 14 Dec 2026
Details
View Map
Share
Follow
Sutherland Avenue

G2 Energy IDNO are proposing to carry out New service connection on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by G2 Energy IDNO on 12 Aug 2026 at 14:28.

Thames Water logo
LONG TERM
Between
26 Aug and 12 Oct 2026
Details
View Map
Share
Follow
Gowrie Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gowrie Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 12:59.

Thames Water logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Gowrie Road

Thames Water are carrying out Disconnection or alteration of supply on Gowrie Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 08:45 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 09:00.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
26 Aug and 30 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 16:15.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
26 Aug and 30 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 9 Sep 2026 at 10:09.

Thames Water logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Marylebone Road

Thames Water are carrying out Statutory Infrastructure Works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 14:21.

UK Power Networks Eastern & London logo
LONG TERM
Until
28 Sep 2026
Details
View Map
Share
Follow
Circus Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Circus Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 09:00 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2026 at 10:43.

Cadent Gas logo
LONG TERM
Until
5 Oct 2026
Details
View Map
Share
Follow
Nine Elms Lane

Cadent Gas are carrying out Utility asset works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 09:51 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 10:27.

London Borough Of Hounslow logo
LONG TERM
Between
28 Aug 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Clifton Gardens (South)

London Borough Of Hounslow are proposing to carry out Highway improvement works on Clifton Gardens (South), Chiswick, London.

These works are categorised as Major.

The works will start on or after 28 August 2026 and could run through until 29 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 31 Jul 2026 at 08:15.

HS2 logo
Finishing
Monday
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 9 Sep 2026 at 11:38.

HS2 logo
Finishing
Monday
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 18:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 9 Sep 2026 at 12:12.

HS2 logo
LONG TERM
Between
28 Aug and 2 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 9 Sep 2026 at 11:06.

HS2 logo
LONG TERM
Between
28 Aug and 2 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 9 Sep 2026 at 11:49.

HS2 logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 18:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 9 Sep 2026 at 12:10.

Affinity Water logo
LONG TERM
Between
28 Aug and 30 Sep 2026
Details
View Map
Share
Iveagh Avenue

Affinity Water were proposing to carry out Utility asset works on Iveagh Avenue, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2026 and run through until 30 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 09:39.

Affinity Water logo
LONG TERM
Between
31 Aug and 16 Nov 2026
Details
View Map
Share
Twyford Abbey Road

Affinity Water were proposing to carry out Utility asset works on Twyford Abbey Road, Park Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 August 2026 and run through until 16 November 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 24 Aug 2026 at 15:47.

Thames Water logo
LONG TERM
Until
24 Nov 2026
Details
View Map
Share
Follow
Strode Road

Thames Water are carrying out roadworks on Strode Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 24 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 08:58.

Thames Water logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Bertie Road

Thames Water are carrying out roadworks on Bertie Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 08:57.

Thames Water logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Belton Road

Thames Water are carrying out Utility asset works on Belton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 08:56.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Crabtree Lane

Cadent Gas are carrying out Utility asset works on Crabtree Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:21 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:56.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
31 Aug and 5 Dec 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2026 at 12:11.

Transport for London (TfL) logo
LONG TERM
Until
5 Dec 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 August 2026 at 21:00 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:13.

HS2 logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 08:00 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 14 Sep 2026 at 10:43.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Marryat Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Marryat Road, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2026 at 09:24.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Marryat Road

UK Power Networks Eastern & London are carrying out New service connection on Marryat Road, Wimbledon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:50 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:42.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Burghley Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Burghley Road, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2026 at 09:28.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Burghley Road

UK Power Networks Eastern & London are carrying out New service connection on Burghley Road, Wimbledon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:50 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:41.

Cadent Gas logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Grove Road

Cadent Gas are carrying out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 08:05 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 08:20.

London Borough Of Lambeth logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Albert Embankment

London Borough Of Lambeth are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:10 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 1 Sep 2026 at 12:06.

London Borough Of Lambeth logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Salamanca Street

London Borough Of Lambeth are carrying out Highway improvement works on Salamanca Street, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:10 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 1 Sep 2026 at 12:05.

Thames Water logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Thirleby Road

Thames Water are carrying out Utility asset works on Thirleby Road, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 08:37.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Grosvenor Road

Cadent Gas are carrying out Utility repair and maintenance works on Grosvenor Road, Hanwell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:55 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:43.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Broadway

Cadent Gas are carrying out Utility repair and maintenance works on Broadway, West Ealing.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:58 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:43.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 15:22.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 14:50.

City Of Westminster logo
Finishing
Today
Details
View Map
Share
Follow
Langham Street

City Of Westminster are carrying out Highway repair and maintenance works on Langham Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Sep 2026 at 15:36.

Thames Water logo
Until
26 Sep 2026
Details
View Map
Share
Follow
Cramer Street

Thames Water are carrying out Utility asset works on Cramer Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 26 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:35.

G2 Energy IDNO logo
LONG TERM
Until
17 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are carrying out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 12:30 and could run through until 17 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 14 Sep 2026 at 12:55.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Hampstead Road

Transport for London (TfL) are carrying out Section 50 on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:10 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 14:05.

Cadent Gas logo
Between
1 and 28 Sep 2026
Details
View Map
Share
Follow
Brunner Road

Cadent Gas are proposing to carry out Utility asset works on Brunner Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 11:56.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Brunner Road

Cadent Gas are carrying out Utility asset works on Brunner Road, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 14:50 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 15:00.

HS2 logo
Between
1 and 25 Sep 2026
Details
View Map
Share
Follow
Delancey Street

HS2 are proposing to carry out Works for Rail Purposes on Delancey Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 13 Aug 2026 at 11:11.

HS2 logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Delancey Street

HS2 are carrying out Works for Rail Purposes on Delancey Street, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 10:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 3 Sep 2026 at 13:42.

Thames Water logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Cecil Road

Thames Water are carrying out Utility asset works on Cecil Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 12:00 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 12:57.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Kilburn Lane

Thames Water are carrying out Utility repair and maintenance works on Kilburn Lane, North Kensington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 10:00 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 15:06.

Thames Water logo
LONG TERM
Between
2 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Tyers Terrace

Thames Water are proposing to carry out Disconnection or alteration of supply on Tyers Terrace, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jun 2026 at 08:34.

City Of Westminster logo
LONG TERM
Between
2 Sep and 5 Nov 2026
Details
View Map
Share
Follow
Henrietta Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Henrietta Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Oct 2025 at 14:27.

City Of Westminster logo
LONG TERM
Until
5 Nov 2026
Details
View Map
Share
Follow
Henrietta Street

City Of Westminster are carrying out Highway repair and maintenance works on Henrietta Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Sep 2026 at 09:42.

City Of Westminster logo
LONG TERM
Between
2 Sep and 5 Nov 2026
Details
View Map
Share
Follow
Bedford Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bedford Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Oct 2025 at 14:34.

City Of Westminster logo
LONG TERM
Until
5 Nov 2026
Details
View Map
Share
Follow
Bedford Street

City Of Westminster are carrying out Highway repair and maintenance works on Bedford Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Sep 2026 at 09:42.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:07.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Oxford Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2026 and run through until 16 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 12:34.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:06.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Great Portland Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2026 and run through until 16 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 12:34.

G2 Energy IDNO logo
Between
2 and 27 Sep 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 27 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 1 Sep 2026 at 12:14.

G2 Energy IDNO logo
LONG TERM
Between
3 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Aug 2026 at 11:40.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Claremont Road

Thames Water are carrying out Utility repair and maintenance works on Claremont Road, Twickenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 10:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:00.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Claremont Road

Thames Water were proposing to carry out Utility repair and maintenance works on Claremont Road, Twickenham.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 10:11.

City Of Westminster logo
Finishing
Today
Details
View Map
Share
Follow
St Margaret Street

City Of Westminster are carrying out Highway improvement works on St Margaret Street, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 16:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Sep 2026 at 09:57.

City Of Westminster logo
LONG TERM
Until
13 Nov 2026
Details
View Map
Share
Follow
Jerome Crescent

City Of Westminster are carrying out Highway repair and maintenance works on Jerome Crescent, Church Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 14:00 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Sep 2026 at 14:11.

Transport for London (TfL) logo
LONG TERM
Between
7 Sep 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 8 February 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:29.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Balham Hill

Transport for London (TfL) are carrying out Highway improvement works on Balham Hill, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:48.

Transport for London (TfL) logo
Between
7 and 24 Sep 2026
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:16.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are carrying out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 14:00.

Transport for London (TfL) logo
Between
7 and 24 Sep 2026
Details
View Map
Share
Follow
Yukon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Yukon Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:13.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Yukon Road

Transport for London (TfL) are carrying out Highway improvement works on Yukon Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 14:35.

Thames Water logo
Until
26 Sep 2026
Details
View Map
Share
Follow
Mauleverer Road

Thames Water are carrying out Utility repair and maintenance works on Mauleverer Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 13:00 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 14:04.

Cadent Gas logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Berwyn Road

Cadent Gas are carrying out Utility asset works on Berwyn Road, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 10:34 and could run through until 1 October 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 11:04.

UK Power Networks South Eastern logo
Finishing
Sunday
Details
View Map
Share
Follow
Kew Road

UK Power Networks South Eastern are proposing to carry out New service connection on Kew Road, Kew.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Aug 2026 at 12:50.

London Borough Of Wandsworth logo
Finishing
Today
Details
View Map
Share
Follow
Albert Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:00.

London Borough Of Wandsworth logo
Finishing
Today
Details
View Map
Share
Follow
Albert Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Sep 2026 at 16:21.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Rampayne Street

Cadent Gas are carrying out Utility asset works on Rampayne Street, Tachbrook, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:45 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:53.

ESP Electricity logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Aubrey Walk

ESP Electricity are carrying out Utility asset works on Aubrey Walk, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:10 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 11:16.

ESP Electricity logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Aubrey Road

ESP Electricity are carrying out Utility asset works on Aubrey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:10 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 11:15.

London Borough Of Ealing logo
LONG TERM
Between
7 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Coldershaw Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Coldershaw Road, West Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Aug 2026 at 14:54.

London Borough Of Ealing logo
LONG TERM
Between
7 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Coldershaw Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Coldershaw Road, West Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 14 Sep 2026 at 14:55.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Aycliffe Road

Cadent Gas are carrying out Utility asset works on Aycliffe Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:23 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 13:22.

London Borough Of Ealing logo
LONG TERM
Between
7 Sep and 29 Nov 2026
Details
View Map
Share
Follow
Leeland Terrace

London Borough Of Ealing are proposing to carry out Highway improvement works on Leeland Terrace, West Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Aug 2026 at 14:47.

London Borough Of Ealing logo
LONG TERM
Until
29 Nov 2026
Details
View Map
Share
Follow
Leeland Terrace

London Borough Of Ealing are carrying out Highway improvement works on Leeland Terrace, West Ealing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 7 Sep 2026 at 16:48.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Hanger Lane

Cadent Gas are carrying out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 14:50 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 15:21.

Cadent Gas logo
LONG TERM
Until
22 Nov 2026
Details
View Map
Share
Follow
Creffield Road

Cadent Gas are carrying out Utility asset works on Creffield Road, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 14:50 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 15:33.

Scottish Hydro Electric Power Dis logo
Between
7 and 25 Sep 2026
Details
View Map
Share
Follow
Grafton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Grafton Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2026 at 11:12.

Cadent Gas logo
Between
7 and 25 Sep 2026
Details
View Map
Share
Follow
Drayton Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Drayton Bridge Road, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 13:24.

Cadent Gas logo
LONG TERM
Between
7 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Castlebar Hill

Cadent Gas are proposing to carry out Utility asset works on Castlebar Hill, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 16:31.

Cadent Gas logo
LONG TERM
Until
22 Oct 2026
Details
View Map
Share
Follow
Hillcrest Road

Cadent Gas are carrying out Utility asset works on Hillcrest Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 10:11 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 12:00.

Thames Water logo
LONG TERM
Until
9 Nov 2026
Details
View Map
Share
Follow
Third Avenue

Thames Water are carrying out Utility asset works on Third Avenue, Queen's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:07.

Thames Water logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Dean Road

Thames Water are carrying out Utility asset works on Dean Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 13:28.

Thames Water logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Park Avenue

Thames Water are carrying out Utility asset works on Park Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 08:50.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Kilburn Lane

Cadent Gas are carrying out Utility repair and maintenance works on Kilburn Lane, Queen's Park, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2026 at 10:07 and could run through until 16 September 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 12:53.

G2 Energy IDNO logo
LONG TERM
Between
8 Sep and 2 Nov 2026
Details
View Map
Share
Wrottesley Road

G2 Energy IDNO were proposing to carry out New service connection on Wrottesley Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2026 and run through until 2 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 21:03.

London Borough Of Brent logo
Between
8 and 25 Sep 2026
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out New service connection on High Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 4 Sep 2026 at 15:45.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Wellington Road

Thames Water are carrying out Utility repair and maintenance works on Wellington Road, Regent's Park, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 11:57 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 10:58.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Wellington Place

Thames Water are carrying out roadworks on Wellington Place, Regent's Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 11:57 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:52.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Wellington Place

Thames Water are carrying out roadworks on Wellington Place, Regent's Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 11:57 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:52.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Dudden Hill Lane

Cadent Gas are carrying out Utility repair and maintenance works on Dudden Hill Lane, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 10:55 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 14:28.

Transport for London (TfL) logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are carrying out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:30 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:20.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are carrying out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:30 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:19.

Transport for London (TfL) logo
Between
9 and 27 Sep 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2026 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 13:00.

Transport for London (TfL) logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are carrying out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:30 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:18.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Great Castle Street

Transport for London (TfL) are carrying out Highway improvement works on Great Castle Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:30 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:19.

Electricity Network Company logo
Finishing
Tuesday
Details
View Map
Share
Follow
Great Portland Street

Electricity Network Company are carrying out Utility asset works on Great Portland Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 09:45 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 9 Sep 2026 at 10:11.

Transport for London (TfL) logo
Between
10 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Rinaldo Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Rinaldo Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Apr 2026 at 12:52.

UK Power Networks South Eastern logo
Finishing
Sunday
Details
View Map
Share
Follow
Kew Road

UK Power Networks South Eastern are carrying out New service connection on Kew Road, Kew.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 08:45 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Sep 2026 at 08:57.

City Of Westminster logo
Until
24 Sep 2026
Details
View Map
Share
Follow
Waterloo Place

City Of Westminster are carrying out Highway repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 13:00 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 10 Sep 2026 at 14:31.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
St Marys Road

Thames Water are carrying out Utility repair and maintenance works on St Marys Road, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 21:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:44.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Park Place

Thames Water are carrying out Utility repair and maintenance works on Park Place, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 09:29 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 12:50.

Royal Borough Of Kensington And Chelsea logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Fulham Road

Royal Borough Of Kensington And Chelsea are carrying out roadworks on Fulham Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 17:00 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Sep 2026 at 15:26.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Lumley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Lumley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:10.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Marylebone Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Lane, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:10.

UK Power Networks Eastern & London logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Duke Street

UK Power Networks Eastern & London are carrying out New service connection on Duke Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 09:31.

G2 Energy IDNO logo
Between
11 Sep and 6 Oct 2026
Details
View Map
Share
Knatchbull Road

G2 Energy IDNO were proposing to carry out New service connection on Knatchbull Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2026 and run through until 6 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:51.

G2 Energy IDNO logo
Between
11 Sep and 1 Oct 2026
Details
View Map
Share
Craven Park

G2 Energy IDNO were proposing to carry out New service connection on Craven Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2026 and run through until 1 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:51.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Charles Lane

Thames Water are carrying out Utility repair and maintenance works on Charles Lane, Regent's Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 14:15 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:10.

UK Power Networks Eastern & London logo
Between
12 and 25 Sep 2026
Details
View Map
Share
Follow
Courtfield Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Courtfield Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Aug 2026 at 16:23.

UK Power Networks Eastern & London logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Courtfield Gardens

UK Power Networks Eastern & London are carrying out New service connection on Courtfield Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 08:30 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2026 at 08:30.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bond Street

Thames Water are carrying out Utility repair and maintenance works on Bond Street, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 13:03 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:22.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Clapham Park Road

Thames Water were proposing to carry out Utility repair and maintenance works on Clapham Park Road, Clapham East, London.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:07.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
St James's Place

Thames Water are carrying out Utility repair and maintenance works on St James's Place, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 14:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 09:51.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
St James's Place

Thames Water are carrying out Utility repair and maintenance works on St James's Place, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 12:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 09:53.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hay's Mews

Thames Water are carrying out Utility repair and maintenance works on Hay's Mews, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 15:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:09.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Kingdon Road

Thames Water are carrying out Utility repair and maintenance works on Kingdon Road, West Hampstead, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 15:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2026 at 15:42.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
14 Sep and 30 Oct 2026
Details
View Map
Share
Follow
North Acton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
North Acton Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:21 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 09:55.

HS2 logo
LONG TERM
Between
14 Sep and 17 Dec 2026
Details
View Map
Share
Mornington Street

HS2 were proposing to carry out Works for Rail Purposes on Mornington Street, Regent's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 17 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by HS2 on 8 Sep 2026 at 10:18.

Thames Water logo
LONG TERM
Until
19 Oct 2026
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility asset works on High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 14:30 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 15:59.

London Borough Of Brent logo
LONG TERM
Between
14 Sep 2026 and 28 Feb 2027
Details
View Map
Share
High Street

London Borough Of Brent were proposing to carry out Highway improvement works on High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 28 February 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2026 at 07:49.

London Borough Of Camden logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
Pratt Street

London Borough Of Camden are proposing to carry out Highway improvement works on Pratt Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Sep 2026 at 15:39.

London Borough Of Camden logo
Between
14 and 25 Sep 2026
Details
View Map
Share
Belsize Avenue

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Belsize Avenue, Belsize, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 25 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 7 Sep 2026 at 08:51.

London Borough Of Barnet logo
Between
14 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Jul 2026 at 15:33.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Belvedere Drive

Southern Gas Networks are carrying out roadworks on Belvedere Drive, Wimbledon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:24 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 11:17.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Kingscliffe Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingscliffe Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:18.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Kingscliffe Gardens

Thames Water were proposing to carry out Disconnection or alteration of supply on Kingscliffe Gardens, Southfields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 08:23.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Southdean Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 10:46.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lynn Road

Thames Water are carrying out Utility repair and maintenance works on Lynn Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:03.

Thames Water logo
Until
9 Oct 2026
Details
View Map
Share
Follow
Wroughton Road

Thames Water are carrying out Disconnection or alteration of supply on Wroughton Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:00 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:42.

T-Mobile (UK) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 24 Jul 2026 at 13:14.

T-Mobile (UK) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 21 Aug 2026 at 08:03.

Finishing
Monday
Details
View Map
Share
Follow
The Vineyard

London Borough Of Richmond Upon Thames are carrying out New service connection on The Vineyard, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Sep 2026 at 13:45.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 10 Sep 2026 at 10:17.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:14.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 8 Sep 2026 at 08:55.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Parkfields

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Parkfields, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 16:12.

London Borough Of Wandsworth logo
Finishing
Friday
Details
View Map
Share
Follow
Felsham Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Felsham Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 18 Aug 2026 at 08:59.

London Borough Of Wandsworth logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Felsham Road

London Borough Of Wandsworth are carrying out Highway improvement works on Felsham Road, Putney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 14 Sep 2026 at 08:20.

Network Rail logo
Today
Details
View Map
Share
Wood Lane

Network Rail carried out Works for Rail Purposes on Wood Lane, Isleworth.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 14 Sep 2026 and 16 Sep 2026 and were actually completed between 14 Sep 2026 (23:50) and 16 Sep 2026 (04:30). The works impacted the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2026 at 07:59.

Cadent Gas logo
Between
14 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Parke Road

Cadent Gas are proposing to carry out Utility asset works on Parke Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 12:46.

Cadent Gas logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Rainville Road

Cadent Gas are carrying out Utility asset works on Rainville Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 10:02 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:42.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Ifield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ifield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 14:55.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Ifield Road

Thames Water are carrying out Utility repair and maintenance works on Ifield Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:48 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:48.

Thames Water logo
Finishing
Today
Details
View Map
Share
Ifield Road

Thames Water were proposing to carry out Utility repair and maintenance works on Ifield Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 16 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 13:47.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Redesdale Street

Thames Water are proposing to carry out New service connection on Redesdale Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jul 2026 at 16:38.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Redesdale Street

Thames Water are carrying out New service connection on Redesdale Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 11:49 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:13.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lupus Street

Cadent Gas are carrying out Utility repair and maintenance works on Lupus Street, Warwick, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:18 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 13:43.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
St George's Square

Cadent Gas are carrying out Utility repair and maintenance works on St George's Square, Tachbrook, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:21 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 13:43.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Chancellors Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 13:02.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chancellors Road

Thames Water are carrying out Utility repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 09:40 and could run through until 17 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 11:26.

London Borough Of Lambeth logo
LONG TERM
Between
14 Sep and 11 Nov 2026
Details
View Map
Share
Follow
Albert Embankment

London Borough Of Lambeth are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Jun 2026 at 09:05.

London Borough Of Lambeth logo
LONG TERM
Between
14 Sep and 11 Nov 2026
Details
View Map
Share
Follow
Salamanca Street

London Borough Of Lambeth are proposing to carry out Highway improvement works on Salamanca Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Jun 2026 at 09:05.

Vodafone logo
Finishing
Saturday
Details
View Map
Share
Victoria Street

Vodafone were proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 19 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 1 Sep 2026 at 09:26.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Kingswood Road

Thames Water are carrying out Statutory Infrastructure Works on Kingswood Road, Chiswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:25.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Weston Road

Thames Water are carrying out Statutory Infrastructure Works on Weston Road, Chiswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:25.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Kingswood Road

Thames Water are carrying out Statutory Infrastructure Works on Kingswood Road, Chiswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:25.

UK Power Networks Eastern & London logo
Between
14 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Whitehall

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Whitehall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 11:24.

Vodafone logo
Finishing
Friday
Details
View Map
Share
Pall Mall

Vodafone were proposing to carry out Utility asset works on Pall Mall, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 15 Sep 2026 at 09:08.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
14 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 3 Sep 2026 at 12:19.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Sep 2026 at 13:35.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Romilly Street

Thames Water are proposing to carry out Utility repair and maintenance works on Romilly Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Jul 2026 at 08:20.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Drury Lane

Thames Water are carrying out Utility repair and maintenance works on Drury Lane, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 09:58.

Scottish Hydro Electric Power Dis logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Grafton Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Grafton Road, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:42 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 12:49.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Queensway

Thames Water are carrying out Disconnection or alteration of supply on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:28 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 09:43.

Scottish Hydro Electric Power Dis logo
Between
14 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 3 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

Scottish Hydro Electric Power Dis logo
Until
3 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 15:00 and could run through until 3 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 15:37.

HS2 logo
LONG TERM
Between
14 Sep 2026 and 8 Jul 2027
Details
View Map
Share
Follow
Eversholt Street

HS2 are proposing to carry out Works for Rail Purposes on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 8 July 2027. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 17 Aug 2026 at 14:50.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Randolph Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Randolph Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 09:39.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Randolph Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Randolph Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 12:40.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Randolph Avenue

Thames Water are carrying out Utility repair and maintenance works on Randolph Avenue, Maida Vale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:35.

Thames Water logo
LONG TERM
Between
15 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Dulka Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Dulka Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:56.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hurlingham Road

Thames Water are carrying out Utility repair and maintenance works on Hurlingham Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:04 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:19.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Cromwell Road

Thames Water are carrying out Utility repair and maintenance works on Cromwell Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 20:30 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 20:49.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Gordon Place

Thames Water are proposing to carry out Utility repair and maintenance works on Gordon Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 12:25.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Ranelagh Road

Thames Water are carrying out Utility repair and maintenance works on Ranelagh Road, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 13:35 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:24.

City Of Westminster logo
Between
15 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Northumberland Avenue

City Of Westminster are proposing to carry out Highway improvement works on Northumberland Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2026 at 09:26.

City Of Westminster logo
Until
7 Oct 2026
Details
View Map
Share
Follow
Northumberland Avenue

City Of Westminster are carrying out Highway improvement works on Northumberland Avenue, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 09:13.

Cadent Gas logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Berkeley Street

Cadent Gas are carrying out Utility repair and maintenance works on Berkeley Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 13:34 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 16:59.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lexington Street

Thames Water are proposing to carry out New service connection on Lexington Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 08:19.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lexington Street

Thames Water are carrying out New service connection on Lexington Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:07 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 10:48.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Great Titchfield Street

City Of Westminster are carrying out Highway repair and maintenance works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 09:12.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Upper Wimpole Street

Thames Water are carrying out Utility repair and maintenance works on Upper Wimpole Street, Marylebone High Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:04 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:06.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Court Way

Thames Water are carrying out Utility repair and maintenance works on Court Way, Acton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:49 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:21.

G2 Energy IDNO logo
LONG TERM
Between
15 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Sep 2026 at 08:43.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Okehampton Road

Thames Water are carrying out Utility repair and maintenance works on Okehampton Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:15 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 10:20.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hanover Road

Thames Water are carrying out roadworks on Hanover Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:15 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 15:21.

G2 Energy IDNO logo
LONG TERM
Between
15 Sep 2026 and 6 Oct 2029
Details
View Map
Share
Emerald Road

G2 Energy IDNO were proposing to carry out New service connection on Emerald Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 6 October 2029. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:52.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Grange Road

Thames Water are carrying out Utility repair and maintenance works on Grange Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 07:33 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 11:19.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Churchill Road

Thames Water are carrying out Utility repair and maintenance works on Churchill Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 07:30 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 07:55.

London Borough Of Wandsworth logo
Between
16 and 25 Sep 2026
Details
View Map
Share
Follow
Albert Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:00.

London Borough Of Wandsworth logo
Between
16 and 25 Sep 2026
Details
View Map
Share
Follow
Albert Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Sep 2026 at 16:23.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Strand

Virgin Media were proposing to carry out Utility asset works on Strand, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 7 Sep 2026 at 10:07.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:08.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2026 at 13:19.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Great Castle Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Great Castle Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2026 and run through until 21 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:18.

City Of London Telecomms logo
Finishing
Friday
Details
View Map
Share
Follow
Lincoln's Inn Fields

City Of London Telecomms are proposing to carry out Utility asset works on Lincoln's Inn Fields, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 19 Aug 2026 at 22:04.

City Of Westminster logo
Between
16 and 29 Sep 2026
Details
View Map
Share
Follow
Duchess Street

City Of Westminster are proposing to carry out Highway improvement works on Duchess Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 20 Jul 2026 at 15:35.

City Of Westminster logo
Between
17 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Great Peter Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Sep 2026 at 14:52.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Marylebone Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Lane, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:11.

HS2 logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 14 Sep 2026 at 10:58.

Thames Water logo
Until
24 Sep 2026
Details
View Map
Share
Follow
Gordon Place

Thames Water are carrying out Utility repair and maintenance works on Gordon Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 13:08 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 13:10.

Transport for London (TfL) logo
Between
20 and 25 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:49.

Transport for London (TfL) logo
Between
20 and 25 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:51.

Eunetworks logo
Between
20 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Ladbroke Grove

Eunetworks are proposing to carry out Utility asset works on Ladbroke Grove, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 11 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 19 Aug 2026 at 10:46.

London Borough Of Wandsworth logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Openview, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 16:07.

London Borough Of Wandsworth logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Openview, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Aug 2026 at 14:46.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Bridgend Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bridgend Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Jul 2026 at 15:27.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Jul 2026 at 15:25.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 13:45.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 15:06.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Wandsworth Bridge

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Wandsworth Bridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 30 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 12:49.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Aug 2026 at 08:45.

Cadent Gas logo
Between
21 and 29 Sep 2026
Details
View Map
Share
Follow
Mallord Street

Cadent Gas are proposing to carry out Utility asset works on Mallord Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 14:54.

Thames Water logo
LONG TERM
Between
21 Sep and 20 Dec 2026
Details
View Map
Share
Follow
Jonathan Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jonathan Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Jul 2026 at 11:10.

Thames Water logo
LONG TERM
Between
21 Sep and 27 Oct 2026
Details
View Map
Share
Follow
Salamanca Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Salamanca Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2026 at 09:29.

London Borough Of Hounslow logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Windmill Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Windmill Road, Brentford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 3 Sep 2026 at 11:43.

Thames Water logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Warwick Way

Thames Water are proposing to carry out Utility repair and maintenance works on Warwick Way, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2026 at 10:37.

Thames Water logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Warwick Way

Thames Water are proposing to carry out Utility repair and maintenance works on Warwick Way, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 12:54.

Thames Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Queensberry Mews West

Thames Water are proposing to carry out Disconnection or alteration of supply on Queensberry Mews West, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 15:32.

Thames Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Queensberry Mews West

Thames Water are proposing to carry out Disconnection or alteration of supply on Queensberry Mews West, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 17:53.

London Borough Of Hammersmith & Fulham logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:02.

Cadent Gas logo
Between
21 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Wellmeadow Road

Cadent Gas are proposing to carry out Utility asset works on Wellmeadow Road, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 15:18.

Thames Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Rothschild Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Rothschild Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2026 at 14:52.

Virgin Media logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Abbey Orchard Street

Virgin Media are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Aug 2026 at 16:04.

Virgin Media logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Abbey Orchard Street

Virgin Media are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 14 Sep 2026 at 16:11.

Virgin Media logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Victoria Street

Virgin Media are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 24 Aug 2026 at 07:40.

Virgin Media logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Victoria Street

Virgin Media are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 14 Sep 2026 at 16:08.

London Borough Of Ealing logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Southfield Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Southfield Road, Chiswick.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 15 Sep 2026 at 16:29.

BT logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Lime Grove

BT are proposing to carry out Utility asset works on Lime Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Jul 2026 at 15:24.

BT logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Lime Grove

BT are proposing to carry out Utility asset works on Lime Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Sep 2026 at 20:23.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Sep 2026 at 11:42.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
21 Sep and 29 Dec 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 29 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Sep 2026 at 11:42.

Thames Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
North Row

Thames Water are proposing to carry out Utility asset works on North Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2026 at 10:38.

Transport for London (TfL) logo
LONG TERM
Between
21 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Section 50 on Oxford Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 16:08.

Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Berwick Street

G. Network Communications are proposing to carry out New service connection on Berwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 3 Aug 2026 at 10:40.

Transport for London (TfL) logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Argyll Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Argyll Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:50.

Transport for London (TfL) logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:52.

Transport for London (TfL) logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:53.

Transport for London (TfL) logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:50.

Transport for London (TfL) logo
Between
21 and 26 Sep 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:42.

Transport for London (TfL) logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Market Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Market Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 10:48.

Transport for London (TfL) logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Market Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Market Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 15:56.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Great Castle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Castle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 08:45.

Cadent Gas logo
Between
21 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Woodville Gardens

Cadent Gas are proposing to carry out Utility asset works on Woodville Gardens, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 13:01.

Cadent Gas logo
LONG TERM
Between
21 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Park Hill

Cadent Gas are proposing to carry out Utility asset works on Park Hill, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2026 at 15:05.

Cadent Gas logo
LONG TERM
Between
21 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Park Hill

Cadent Gas are proposing to carry out Utility asset works on Park Hill, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 12:51.

Cadent Gas logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Neville Road

Cadent Gas are proposing to carry out Utility asset works on Neville Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 14:32.

Thames Water logo
LONG TERM
Between
21 Sep and 2 Nov 2026
Details
View Map
Share
Follow
Bramshill Road

Thames Water are proposing to carry out Utility asset works on Bramshill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 14:27.

Thames Water logo
Between
21 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Baker Road

Thames Water are proposing to carry out Utility asset works on Baker Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Aug 2026 at 13:22.

Cadent Gas logo
LONG TERM
Between
21 Sep and 30 Nov 2026
Details
View Map
Share
Follow
Willesden Lane

Cadent Gas are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2026 at 15:33.

Cadent Gas logo
LONG TERM
Between
21 Sep and 30 Nov 2026
Details
View Map
Share
Follow
Willesden Lane

Cadent Gas are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 08:53.

London Borough Of Camden logo
LONG TERM
Between
21 Sep and 24 Dec 2026
Details
View Map
Share
South End Road

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on South End Road, Hampstead Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 24 December 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Camden on 4 Sep 2026 at 11:34.

London Borough Of Camden logo
Between
21 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Fleet Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Fleet Road, Gospel Oak, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Sep 2026 at 11:32.

Thames Water logo
Between
22 and 27 Sep 2026
Details
View Map
Share
Follow
Ansell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:06.

Thames Water logo
Between
22 and 27 Sep 2026
Details
View Map
Share
Follow
Ansell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 14:45.

Cadent Gas logo
Between
22 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Novello Street

Cadent Gas are proposing to carry out Utility asset works on Novello Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

Thames Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Symons Street

Thames Water are proposing to carry out Utility repair and maintenance works on Symons Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 17:28.

Thames Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Symons Street

Thames Water are proposing to carry out Utility repair and maintenance works on Symons Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 19:19.

Thames Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Standish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Standish Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 15:05.

Vodafone logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Derry Street

Vodafone are proposing to carry out Utility asset works on Derry Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 19 Jun 2026 at 10:39.

Vodafone logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Derry Street

Vodafone are proposing to carry out Utility asset works on Derry Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 11 Sep 2026 at 14:12.

Cadent Gas logo
Between
22 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Drayton Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Drayton Bridge Road, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 11:16.

London Borough Of Wandsworth logo
Between
23 Sep and 20 Oct 2026
Details
View Map
Share
Dulka Road

London Borough Of Wandsworth were proposing to carry out Utility repair and maintenance works on Dulka Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2026 and run through until 20 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Sep 2026 at 14:53.

Thames Water logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
Steele Road

Thames Water are proposing to carry out Utility repair and maintenance works on Steele Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2026 at 10:07.

Network Rail logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Sandell Street

Network Rail were proposing to carry out Works for Rail Purposes on Sandell Street, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Sep 2026 at 14:36.

Network Rail logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Cornwall Road

Network Rail were proposing to carry out Works for Rail Purposes on Cornwall Road, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Sep 2026 at 14:33.

Thames Water logo
Between
23 and 30 Sep 2026
Details
View Map
Share
Follow
Queensway

Thames Water are proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Aug 2026 at 15:13.

Transport for London (TfL) logo
Between
23 and 29 Sep 2026
Details
View Map
Share
Follow
Binney Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Binney Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:09.

Transport for London (TfL) logo
Between
23 and 29 Sep 2026
Details
View Map
Share
Follow
Gilbert Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gilbert Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:09.

Transport for London (TfL) logo
Between
23 and 29 Sep 2026
Details
View Map
Share
Follow
James Street

Transport for London (TfL) are proposing to carry out Highway improvement works on James Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:09.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

Transport for London (TfL) are proposing to carry out Section 50 on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2026 at 16:06.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

Transport for London (TfL) are proposing to carry out Section 50 on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 10:26.

Its Technology Group logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Balham Park Road

Its Technology Group are proposing to carry out New service connection on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 9 Sep 2026 at 08:39.

Transport for London (TfL) logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 13:49.

Transport for London (TfL) logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 16:23.

Thames Water logo
LONG TERM
Between
24 Sep and 28 Oct 2026
Details
View Map
Share
Follow
Freke Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Freke Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:35.

Cadent Gas logo
Between
24 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Parsons Green

Cadent Gas are proposing to carry out Utility asset works on Parsons Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

Cadent Gas logo
Between
24 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Parsons Green Lane

Cadent Gas are proposing to carry out Utility asset works on Parsons Green Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

Thames Water logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jul 2026 at 09:29.

Transport for London (TfL) logo
Between
24 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:05.

Transport for London (TfL) logo
Between
24 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:05.

Scottish Hydro Electric Power Dis logo
Between
24 Sep and 17 Oct 2026
Details
View Map
Share
Follow
Haven Green

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Haven Green, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 17 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Sep 2026 at 14:27.

BT logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Duncan Grove

BT are proposing to carry out Utility asset works on Duncan Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Jul 2026 at 10:00.

BT logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Long Drive

BT are proposing to carry out Utility asset works on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Jul 2026 at 11:01.

BT logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Long Drive

BT are proposing to carry out Utility asset works on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Sep 2026 at 12:51.

G2 Energy IDNO logo
LONG TERM
Between
24 Sep and 29 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 18 Aug 2026 at 14:18.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Aug 2026 at 09:26.

London Borough Of Wandsworth logo
Between
25 and 29 Sep 2026
Details
View Map
Share
Follow
Battersea High Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Battersea High Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:04.

London Borough Of Wandsworth logo
Between
25 and 29 Sep 2026
Details
View Map
Share
Follow
Battersea High Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Battersea High Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 07:21.

Transport for London (TfL) logo
Between
25 and 30 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:56.

Transport for London (TfL) logo
Between
25 and 30 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:48.

UK Power Networks Eastern & London logo
Between
26 Sep and 14 Oct 2026
Details
View Map
Share
Follow
Manchester Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Manchester Square, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 19:35.

Thames Water logo
LONG TERM
Between
26 Sep and 9 Nov 2026
Details
View Map
Share
Follow
Moxon Street

Thames Water are proposing to carry out Utility asset works on Moxon Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:34.

Transport for London (TfL) logo
Between
27 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 12:14.

Transport for London (TfL) logo
Between
27 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:52.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Southdean Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 13:09.

Transport for London (TfL) logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 10:00.

Southern Gas Networks logo
Between
28 Sep and 19 Oct 2026
Details
View Map
Share
Follow
Concanon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Concanon Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Jul 2026 at 14:58.

Southern Gas Networks logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Santley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Santley Street, Brixton Acre Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jul 2026 at 13:21.

Southern Gas Networks logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Santley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Santley Street, Brixton Acre Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2026 at 15:19.

Cadent Gas logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 13:53.

Cadent Gas logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Dawes Road

Cadent Gas are proposing to carry out New service connection on Dawes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 12:07.

Eunetworks logo
Between
28 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Market Place

Eunetworks are proposing to carry out Utility asset works on Market Place, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Aug 2026 at 08:26.

Eunetworks logo
Between
28 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Market Place

Eunetworks are proposing to carry out Utility asset works on Market Place, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Sep 2026 at 13:57.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Winslow Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Winslow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 08:10.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Chancellors Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 14:13.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Distillery Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Distillery Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 14:13.

Thames Water logo
LONG TERM
Between
28 Sep and 7 Dec 2026
Details
View Map
Share
Follow
Glasshouse Walk

Thames Water are proposing to carry out Disconnection or alteration of supply on Glasshouse Walk, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:01.

Royal Borough Of Kensington And Chelsea logo
Between
28 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Stewart's Grove

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Stewart's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Sep 2026 at 13:15.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Windmill Road

Cadent Gas were proposing to carry out Utility asset works on Windmill Road, Brentford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 7 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 15:23.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Windmill Road

Cadent Gas are proposing to carry out Utility asset works on Windmill Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 00:15.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 07:50.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:07.

UK Power Networks Eastern & London logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Millbank

UK Power Networks Eastern & London are proposing to carry out New service connection on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jul 2026 at 14:13.

Thames Water logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Rothschild Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Rothschild Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2026 at 14:53.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
White Horse Street

Thames Water are proposing to carry out New service connection on White Horse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 15:34.

Thames Water logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Lower John Street

Thames Water are proposing to carry out New service connection on Lower John Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 09:08.

Thames Water logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Rupert Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rupert Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Jul 2026 at 10:01.

Thames Water logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Rupert Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rupert Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 10:23.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Bark Place

Thames Water are proposing to carry out New service connection on Bark Place, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 08:00.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
St Leonards Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on St Leonards Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Jul 2026 at 09:24.

Transport for London (TfL) logo
Between
28 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:39.

Transport for London (TfL) logo
Between
28 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:40.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Whetstone Park

Thames Water are proposing to carry out Utility asset works on Whetstone Park, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 16:35.

Thames Water logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 19:36.

Cadent Gas logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
Follow
The Croft

Cadent Gas are proposing to carry out Utility asset works on The Croft, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2026 at 15:05.

Cadent Gas logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
Follow
The Croft

Cadent Gas are proposing to carry out Utility asset works on The Croft, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 00:15.

Cadent Gas logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Helena Road

Cadent Gas are proposing to carry out Utility asset works on Helena Road, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2026 at 12:32.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
28 Sep and 13 Nov 2026
Details
View Map
Share
Alliance Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Alliance Road, Acton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 13 November 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Aug 2026 at 14:17.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Alliance Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Alliance Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Sep 2026 at 13:59.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Alliance Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Alliance Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Sep 2026 at 13:51.

Cadent Gas logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Neville Road

Cadent Gas are proposing to carry out Utility asset works on Neville Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 11:56.

HS2 logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Lidlington Place

HS2 are proposing to carry out Works for Rail Purposes on Lidlington Place, Camden Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 14 Sep 2026 at 09:50.

HS2 logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Lidlington Place

HS2 are proposing to carry out Works for Rail Purposes on Lidlington Place, Camden Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 14 Sep 2026 at 10:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Sep and 12 Nov 2026
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jun 2026 at 17:11.

Thames Water logo
Between
28 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Buckingham Road

Thames Water are proposing to carry out Utility asset works on Buckingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2026 at 13:45.

London Borough Of Camden logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Wadham Gardens

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Wadham Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 8 Jun 2026 at 07:38.

London Borough Of Camden logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Wadham Gardens

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Wadham Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 16:56.

HS2 logo
LONG TERM
Between
28 Sep and 20 Dec 2026
Details
View Map
Share
Follow
Hilgrove Road

HS2 are proposing to carry out Section 50 on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 24 Aug 2026 at 13:17.

HS2 logo
LONG TERM
Between
28 Sep and 20 Dec 2026
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 20 December 2026. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 24 Aug 2026 at 13:21.

UK Power Networks Eastern & London logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Newton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Newton Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jul 2026 at 11:47.

UK Power Networks Eastern & London logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Newton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Newton Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 11:56.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Drury Way

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Drury Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 18 Aug 2026 at 14:16.

London Borough Of Camden logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Pond Street

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Pond Street, Hampstead Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 23 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Sep 2026 at 11:34.

London Borough Of Camden logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Fleet Road

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Fleet Road, Gospel Oak, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 23 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Sep 2026 at 11:32.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Bedford Hill

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bedford Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 11:56.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Bolingbroke Grove

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bolingbroke Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 11:52.

National Highways logo
Between
29 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Aug 2026 at 08:33.

National Highways logo
Between
29 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Aug 2026 at 08:21.

National Highways logo
Between
29 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Sep 2026 at 08:40.

National Highways logo
Between
29 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Aug 2026 at 14:57.

Thames Water logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Broadwick Street

Thames Water are proposing to carry out Remedial works on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jun 2026 at 10:16.

BT logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Carlisle Avenue

BT are proposing to carry out Utility asset works on Carlisle Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Jul 2026 at 11:01.

BT logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Carlisle Avenue

BT are proposing to carry out Utility asset works on Carlisle Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Sep 2026 at 11:42.

City Of Westminster logo
Between
29 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Foley Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Foley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Aug 2026 at 14:37.

Thames Water logo
Between
29 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Dorset Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Dorset Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Aug 2026 at 16:33.

London Borough Of Lambeth logo
LONG TERM
Between
30 Sep and 6 Nov 2026
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 12 Aug 2026 at 16:01.

Thames Water logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Redan Street

Thames Water are proposing to carry out New service connection on Redan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 09:34.

Thames Water logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Redan Street

Thames Water are proposing to carry out New service connection on Redan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:09.

G2 Energy IDNO logo
LONG TERM
Between
30 Sep and 11 Dec 2026
Details
View Map
Share
Follow
Hillside

G2 Energy IDNO are proposing to carry out New service connection on Hillside, Stonebridge, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 17:32.

Transport for London (TfL) logo
Between
1 and 6 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:53.

Transport for London (TfL) logo
Between
1 and 6 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:51.

G2 Energy IDNO logo
LONG TERM
Between
1 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 30 Jul 2026 at 15:49.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Balham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:30.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 May 2026 at 11:49.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Alderbrook Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 09:06.

Thames Water logo
LONG TERM
Between
2 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Burland Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Burland Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:14.

UK Power Networks South Eastern logo
LONG TERM
Between
2 Oct and 3 Nov 2026
Details
View Map
Share
Kew Road

UK Power Networks South Eastern were proposing to carry out New service connection on Kew Road, Kew.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 3 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2026 at 09:59.

UK Power Networks Eastern & London logo
Between
2 and 4 Oct 2026
Details
View Map
Share
Follow
Kensington Church Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Kensington Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 12:18.

Transport for London (TfL) logo
Between
2 and 5 Oct 2026
Details
View Map
Share
Oxford Street

Transport for London (TfL) were proposing to carry out roadworks on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 5 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 10:30.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:41.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 11:29.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:39.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 11:28.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2026 at 12:11.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 14:37.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:40.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 11:28.

Transport for London (TfL) logo
Between
4 and 6 Oct 2026
Details
View Map
Share
Oxford Street

Transport for London (TfL) were proposing to carry out roadworks on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2026 and run through until 6 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 11:26.

Transport for London (TfL) logo
Between
4 and 6 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 12:11.

T-Mobile (UK) logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 14 Sep 2026 at 14:35.

Southern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Acre Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2026 at 10:27.

Southern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Acre Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2026 at 08:24.

Thames Water logo
LONG TERM
Between
5 Oct 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Northcote Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northcote Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:15.

London Borough Of Wandsworth logo
Between
5 and 31 Oct 2026
Details
View Map
Share
Follow
Putney High Street

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Putney High Street, Putney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2026 at 08:57.

Thames Water logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Perrymead Street

Thames Water are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:05.

Thames Water logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Perrymead Street

Thames Water are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:34.

Thames Water logo
LONG TERM
Between
5 Oct and 7 Dec 2026
Details
View Map
Share
Follow
Studdridge Street

Thames Water are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:54.

Thames Water logo
LONG TERM
Between
5 Oct and 7 Dec 2026
Details
View Map
Share
Follow
Studdridge Street

Thames Water are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:34.

Cadent Gas logo
Between
5 and 14 Oct 2026
Details
View Map
Share
Follow
Lowther Road

Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 14:13.

Cadent Gas logo
Between
5 and 14 Oct 2026
Details
View Map
Share
Follow
Lowther Road

Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:37.

Cadent Gas logo
LONG TERM
Between
5 Oct and 15 Nov 2026
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2026 at 08:10.

Thames Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Farm Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Farm Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2026 at 15:50.

Thames Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Farm Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Farm Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:08.

Cadent Gas logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Star Road

Cadent Gas are proposing to carry out Utility asset works on Star Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:35.

Cadent Gas logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Vereker Road

Cadent Gas are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2026 at 16:11.

Cadent Gas logo
LONG TERM
Between
5 Oct and 4 Dec 2026
Details
View Map
Share
Follow
North End Road

Cadent Gas are proposing to carry out Utility asset works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:47.

Thames Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Whitgift Street

Thames Water are proposing to carry out Utility asset works on Whitgift Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jul 2026 at 09:00.

London Borough Of Hammersmith & Fulham logo
Between
5 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:07.

BT logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Beauclerc Road

BT are proposing to carry out Utility asset works on Beauclerc Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Jul 2026 at 12:03.

Thames Water logo
Between
5 and 24 Oct 2026
Details
View Map
Share
Follow
Goldhawk Road

Thames Water are proposing to carry out Utility repair and maintenance works on Goldhawk Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:03.

Thames Water logo
Between
5 and 24 Oct 2026
Details
View Map
Share
Follow
Pennard Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pennard Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:07.

Cadent Gas logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Wormholt Road

Cadent Gas are proposing to carry out Utility asset works on Wormholt Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2026 at 11:14.

Thames Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
William Iv Street

Thames Water are proposing to carry out Utility repair and maintenance works on William Iv Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 16:59.

Thames Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Regent Street

Thames Water are proposing to carry out Remedial works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jun 2026 at 15:11.

UK Power Networks Eastern & London logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Haunch Of Venison Yard

UK Power Networks Eastern & London are proposing to carry out New service connection on Haunch Of Venison Yard, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jun 2026 at 10:29.

UK Power Networks Eastern & London logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Haunch Of Venison Yard

UK Power Networks Eastern & London are proposing to carry out New service connection on Haunch Of Venison Yard, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2026 at 14:04.

London Borough Of Hammersmith & Fulham logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Sep 2026 at 11:42.

Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Porchester Gardens

Aurora Utilities Limited are proposing to carry out New service connection on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 17 Aug 2026 at 07:51.

Cadent Gas logo
LONG TERM
Between
5 Oct and 18 Dec 2026
Details
View Map
Share
Follow
Mount Park Road

Cadent Gas are proposing to carry out Utility asset works on Mount Park Road, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 09:34.

Cadent Gas logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Bainbridge Street

Cadent Gas are proposing to carry out New service connection on Bainbridge Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 10:33.

Thames Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Berners Mews

Thames Water are proposing to carry out New service connection on Berners Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 09:06.

London Borough Of Camden logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Theobald's Road

London Borough Of Camden are proposing to carry out Highway improvement works on Theobald's Road, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 17:45.

Scottish Hydro Electric Power Dis logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Portal Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Portal Way, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2026 at 09:34.

City Of Westminster logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Carburton Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Aug 2026 at 11:23.

Scottish Hydro Electric Power Dis logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Wales Farm Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2026 at 09:34.

Scottish Hydro Electric Power Dis logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2026 at 09:34.

G2 Energy IDNO logo
LONG TERM
Between
5 Oct and 12 Dec 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 12 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 15 Sep 2026 at 12:07.

G2 Energy IDNO logo
LONG TERM
Between
5 Oct 2026 and 23 Jan 2027
Details
View Map
Share
Follow
Sutherland Avenue

G2 Energy IDNO are proposing to carry out New service connection on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:20.

Cadent Gas logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Woodfield Crescent

Cadent Gas are proposing to carry out Utility asset works on Woodfield Crescent, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2026 at 13:46.

G2 Energy IDNO logo
LONG TERM
Between
5 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Hamilton Terrace

G2 Energy IDNO are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 21:06.

HS2 logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Lidlington Place

HS2 were proposing to carry out Works for Rail Purposes on Lidlington Place, Camden Town, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 6 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by HS2 on 14 Sep 2026 at 09:51.

UK Power Networks Eastern & London logo
LONG TERM
Between
5 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Wellington Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wellington Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 13:48.

UK Power Networks Eastern & London logo
LONG TERM
Between
5 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Finchley Road, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 13:47.

Cadent Gas logo
LONG TERM
Between
5 Oct and 15 Nov 2026
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2026 at 13:15.

Thames Water logo
LONG TERM
Between
5 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Bruce Road

Thames Water are proposing to carry out Utility asset works on Bruce Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2026 at 07:38.

Cadent Gas logo
LONG TERM
Between
5 Oct and 13 Dec 2026
Details
View Map
Share
Follow
Ealing Road

Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2026 at 14:30.

London Borough Of Hounslow logo
Between
6 and 8 Oct 2026
Details
View Map
Share
Follow
Cambridge Road South

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cambridge Road South, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 15 Sep 2026 at 12:00.

London Borough Of Hounslow logo
Between
6 and 8 Oct 2026
Details
View Map
Share
Follow
Oxford Road South

London Borough Of Hounslow are proposing to carry out Highway improvement works on Oxford Road South, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 15 Sep 2026 at 09:57.

Scottish Hydro Electric Power Dis logo
Between
6 and 16 Oct 2026
Details
View Map
Share
Follow
Heathfield Terrace

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Heathfield Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2026 at 09:47.

Scottish Hydro Electric Power Dis logo
Between
6 and 16 Oct 2026
Details
View Map
Share
Follow
Heathfield Terrace

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Heathfield Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2026 at 15:19.

National Highways logo
Between
7 and 15 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Sep 2026 at 08:47.

National Highways logo
Between
7 and 15 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Aug 2026 at 14:58.

ESP Electricity logo
LONG TERM
Between
7 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Broadway

ESP Electricity are proposing to carry out New service connection on Broadway, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 13:14.

City Of Westminster logo
Between
7 and 10 Oct 2026
Details
View Map
Share
Follow
Jermyn Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Sep 2026 at 13:01.

Transport for London (TfL) logo
Between
7 and 12 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:48.

Transport for London (TfL) logo
Between
7 and 12 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:50.

Eunetworks logo
Between
7 and 11 Oct 2026
Details
View Map
Share
Follow
Cambridge Gardens

Eunetworks are proposing to carry out Utility asset works on Cambridge Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 19 Aug 2026 at 10:49.

G2 Energy IDNO logo
LONG TERM
Between
7 Oct and 24 Nov 2026
Details
View Map
Share
Winchelsea Road

G2 Energy IDNO were proposing to carry out New service connection on Winchelsea Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2026 and run through until 24 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:52.

Thames Water logo
Between
7 and 20 Oct 2026
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility asset works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 15:05.

City Of Westminster logo
Between
8 and 30 Oct 2026
Details
View Map
Share
Follow
Northumberland Avenue

City Of Westminster are proposing to carry out Highway improvement works on Northumberland Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 Aug 2026 at 09:49.

City Of Westminster logo
Between
8 and 30 Oct 2026
Details
View Map
Share
Follow
Northumberland Avenue

City Of Westminster are proposing to carry out Highway improvement works on Northumberland Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 26 Aug 2026 at 08:07.

London Borough Of Ealing logo
LONG TERM
Between
8 Oct 2026 and 5 Feb 2027
Details
View Map
Share
Follow
Drayton Green Road

London Borough Of Ealing are proposing to carry out Remedial works on Drayton Green Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 5 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 7 Aug 2026 at 09:19.

City Of Westminster logo
Between
8 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Dean Street

City Of Westminster are proposing to carry out Highway improvement works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2026 at 14:20.

City Of Westminster logo
Between
9 and 11 Oct 2026
Details
View Map
Share
Follow
Regent Street St James's

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2026 at 11:01.

Between
10 and 14 Oct 2026
Details
View Map
Share
Follow
Sydney Road

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Sydney Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 10 Sep 2026 at 11:16.

BT logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Carminia Road

BT are proposing to carry out Utility asset works on Carminia Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Aug 2026 at 16:07.

BT logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Carminia Road

BT are proposing to carry out Utility asset works on Carminia Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 Sep 2026 at 07:09.

Thames Water logo
LONG TERM
Between
12 Oct and 14 Dec 2026
Details
View Map
Share
Follow
Chivalry Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Chivalry Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:35.

Transport for London (TfL) logo
LONG TERM
Between
12 Oct and 20 Nov 2026
Details
View Map
Share
Follow
King's Road

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 12:23.

Scottish Hydro Electric Power Dis logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Chiswick High Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Chiswick High Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 14 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2026 at 12:55.

Scottish Hydro Electric Power Dis logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Chiswick High Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Chiswick High Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2026 at 12:35.

Thames Water logo
LONG TERM
Between
12 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Stillington Street

Thames Water are proposing to carry out Utility asset works on Stillington Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 11:02.

London Borough Of Hammersmith & Fulham logo
Between
12 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:59.

Cadent Gas logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Caxton Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Caxton Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Aug 2026 at 08:34.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Sinclair Gardens

Thames Water are proposing to carry out Remedial works on Sinclair Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 09:12.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Brick Street

Thames Water were proposing to carry out Utility asset works on Brick Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 10:29.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Brick Street

Thames Water were proposing to carry out Utility asset works on Brick Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 17:26.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Galloway Road

Cadent Gas are proposing to carry out Utility asset works on Galloway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 16:06.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Freeland Road

Cadent Gas are proposing to carry out Utility asset works on Freeland Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2026 at 11:36.

City Of Westminster logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Hanover Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Hanover Square, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Jul 2026 at 08:33.

Electricity Network Company logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Electricity Network Company are proposing to carry out Utility asset works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 7 Sep 2026 at 16:35.

Transport for London (TfL) logo
Between
12 and 15 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:17.

Transport for London (TfL) logo
Between
12 and 15 Oct 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:50.

Transport for London (TfL) logo
Between
12 and 15 Oct 2026
Details
View Map
Share
Follow
Great Castle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Castle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 11:32.

Thames Water logo
Between
12 and 18 Oct 2026
Details
View Map
Share
Follow
Southampton Row

Thames Water are proposing to carry out New service connection on Southampton Row, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 15:10.

Cadent Gas logo
Between
12 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Castlebar Road

Cadent Gas are proposing to carry out Utility asset works on Castlebar Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jun 2026 at 11:49.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Guilford Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Guilford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2026 at 10:13.

Thames Water logo
Between
12 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Droop Street

Thames Water are proposing to carry out Utility asset works on Droop Street, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 13:21.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Elsworthy Road

Thames Water were proposing to carry out New service connection on Elsworthy Road, Swiss Cottage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 13:47.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Elsworthy Road

Thames Water are proposing to carry out New service connection on Elsworthy Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 16:09.

Thames Water logo
LONG TERM
Between
12 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Northcote Road

Thames Water are proposing to carry out Utility asset works on Northcote Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 May 2026 at 09:09.

London Borough Of Wandsworth logo
Between
13 and 16 Oct 2026
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:12.

London Borough Of Wandsworth logo
Between
13 and 20 Oct 2026
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 08:57.

Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
George Street

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on George Street, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Jun 2026 at 12:01.

Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
George Street

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on George Street, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Jun 2026 at 12:02.

Thames Water logo
Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
Tunis Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tunis Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 15:35.

Transport for London (TfL) logo
Between
13 and 16 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:49.

Transport for London (TfL) logo
Between
13 and 16 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:56.

Thames Water logo
Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
Drummond Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Drummond Crescent, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 22:03.

BT logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2026 at 08:43.

BT logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2026 at 14:22.

Thames Water logo
Between
14 and 20 Oct 2026
Details
View Map
Share
Follow
Brick Street

Thames Water are proposing to carry out Utility asset works on Brick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 17:27.

UK Power Networks Eastern & London logo
Between
14 Oct and 3 Nov 2026
Details
View Map
Share
Follow
New Bond Street

UK Power Networks Eastern & London are proposing to carry out New service connection on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 08:34.

Virgin Media logo
Between
15 and 17 Oct 2026
Details
View Map
Share
Follow
Brook Lane North

Virgin Media are proposing to carry out Utility asset works on Brook Lane North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Sep 2026 at 08:12.

Thames Water logo
Between
15 and 27 Oct 2026
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility asset works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jun 2026 at 09:14.

Electricity Network Company logo
Between
16 and 29 Oct 2026
Details
View Map
Share
Follow
Wyvil Road

Electricity Network Company are proposing to carry out Utility asset works on Wyvil Road, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 31 Jul 2026 at 09:02.

Cadent Gas logo
Between
17 and 19 Oct 2026
Details
View Map
Share
Follow
Dawes Road

Cadent Gas are proposing to carry out New service connection on Dawes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 12:00.

London Borough Of Ealing logo
Between
17 and 19 Oct 2026
Details
View Map
Share
Follow
Twyford Abbey Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 21 Aug 2026 at 10:34.

Thames Water logo
Between
18 and 22 Oct 2026
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 09:16.

Thames Water logo
Between
19 and 27 Oct 2026
Details
View Map
Share
Princes Way

Thames Water were proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 27 October 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 07:43.

Thames Water logo
Between
19 and 24 Oct 2026
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 10:22.

ESP Electricity logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Bridges Court Road

ESP Electricity are proposing to carry out Utility asset works on Bridges Court Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 6 Aug 2026 at 11:36.

London Borough Of Wandsworth logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Bridges Court Road

London Borough Of Wandsworth are proposing to carry out Utility repair and maintenance works on Bridges Court Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 19 Aug 2026 at 13:52.

Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
The Terrace

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on The Terrace, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Jun 2026 at 12:03.

Thames Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
North End Road

Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Aug 2026 at 08:45.

Thames Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
North End Road

Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 15:45.

Cadent Gas logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Star Road

Cadent Gas are proposing to carry out Utility asset works on Star Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:35.

Cadent Gas logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Vereker Road

Cadent Gas are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:16.

Cadent Gas logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Dartmouth Street

Cadent Gas are proposing to carry out New service connection on Dartmouth Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 10:52.

BT logo
Between
19 and 27 Oct 2026
Details
View Map
Share
Follow
Berkeley Street

BT are proposing to carry out Utility repair and maintenance works on Berkeley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Jul 2026 at 10:01.

UK Power Networks Eastern & London logo
Between
19 and 31 Oct 2026
Details
View Map
Share
Follow
Kensington Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 12:17.

Scottish Hydro Electric Power Dis logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Grasmere Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Grasmere Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2026 at 11:12.

Transport for London (TfL) logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:55.

Transport for London (TfL) logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:52.

Thames Water logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Dorset Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Dorset Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 11:31.

Thames Water logo
Between
19 and 25 Oct 2026
Details
View Map
Share
Follow
Marchwood Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Marchwood Crescent, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 25 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2026 at 11:06.

Thames Water logo
LONG TERM
Between
19 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Greenhill Park

Thames Water are proposing to carry out Utility asset works on Greenhill Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 14:54.

London Borough Of Camden logo
LONG TERM
Between
19 Oct and 28 Nov 2026
Details
View Map
Share
Follow
Glenmore Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Glenmore Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 28 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 15 Sep 2026 at 07:05.

Thames Water logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Sneyd Road

Thames Water are proposing to carry out Utility repair and maintenance works on Sneyd Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 15:43.

Thames Water logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Sneyd Road

Thames Water are proposing to carry out Utility repair and maintenance works on Sneyd Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2026 at 09:25.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Ashford Road

Thames Water were proposing to carry out New service connection on Ashford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 11:15.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Ashford Road

Thames Water were proposing to carry out New service connection on Ashford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 08:18.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Ashford Road

Thames Water are proposing to carry out New service connection on Ashford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 08:31.

Thames Water logo
Between
20 and 23 Oct 2026
Details
View Map
Share
Follow
Loveridge Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Loveridge Road, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 16:02.

London Borough Of Wandsworth logo
Between
20 and 23 Oct 2026
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 09:55.

Thames Water logo
LONG TERM
Between
20 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Keildon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Keildon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:15.

Eunetworks logo
Between
20 and 24 Oct 2026
Details
View Map
Share
Follow
Alliance Road

Eunetworks are proposing to carry out Utility asset works on Alliance Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 24 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 8 Sep 2026 at 15:03.

City Of Westminster logo
Between
21 and 23 Oct 2026
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Aug 2026 at 14:04.

Thames Water logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
Church Path

Thames Water are proposing to carry out Statutory Infrastructure Works on Church Path, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 12:20.

Transport for London (TfL) logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 14:32.

Transport for London (TfL) logo
Between
23 and 28 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:52.

Transport for London (TfL) logo
Between
23 and 28 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:51.

Transport for London (TfL) logo
Between
23 and 28 Oct 2026
Details
View Map
Share
Follow
John Prince's Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Prince's Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:49.

Transport for London (TfL) logo
Between
23 and 26 Oct 2026
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 13:19.

Transport for London (TfL) logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:42.

Transport for London (TfL) logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2026 at 18:41.

Transport for London (TfL) logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Marylebone Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2026 at 18:42.

Transport for London (TfL) logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:51.

Scottish Hydro Electric Power Dis logo
Between
23 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Chase Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Chase Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

Thames Water logo
Between
24 and 30 Oct 2026
Details
View Map
Share
Princes Way

Thames Water were proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2026 and run through until 30 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 11:55.

Thames Water logo
Between
24 and 30 Oct 2026
Details
View Map
Share
Follow
Princes Way

Thames Water are proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 12:23.

Vodafone logo
Between
24 and 26 Oct 2026
Details
View Map
Share
Follow
Old Court Place

Vodafone are proposing to carry out Utility repair and maintenance works on Old Court Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 1 Sep 2026 at 15:47.

Transport for London (TfL) logo
Between
24 and 26 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:44.

Thames Water logo
Between
24 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Utility repair and maintenance works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 09:55.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Brondesbury Villas

Thames Water are proposing to carry out Utility repair and maintenance works on Brondesbury Villas, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Aug 2026 at 13:27.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Brondesbury Villas

Thames Water are proposing to carry out Utility repair and maintenance works on Brondesbury Villas, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 08:43.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Woodville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Woodville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Aug 2026 at 13:27.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Woodville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Woodville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 08:41.

Thames Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Pratt Mews

Thames Water are proposing to carry out Utility asset works on Pratt Mews, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 16:57.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 15:08.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 11:05.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Rinaldo Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Rinaldo Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 08:14.

Thames Water logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Cavendish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2026 at 12:14.

BT logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Solna Avenue

BT are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Jul 2026 at 08:45.

BT logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Jul 2026 at 08:06.

Thames Water logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Wymond Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Wymond Street, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:05.

London Borough Of Wandsworth logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Wickersley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wickersley Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 12 Aug 2026 at 11:17.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Munster Road

Thames Water are proposing to carry out New service connection on Munster Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 07:48.

London Borough Of Hounslow logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Syon Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Syon Lane, Isleworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 3 Sep 2026 at 08:52.

London Borough Of Hounslow logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Great West Road

London Borough Of Hounslow were proposing to carry out Highway improvement works on Great West Road, Isleworth.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 13 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 20 Aug 2026 at 14:03.

Cadent Gas logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Onslow Square

Cadent Gas are proposing to carry out New service connection on Onslow Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 13:30.

Thames Water logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Wilton Road

Thames Water are proposing to carry out New service connection on Wilton Road, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 10:25.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Wilton Road

Thames Water are proposing to carry out New service connection on Wilton Road, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 08:39.

London Borough Of Hammersmith & Fulham logo
Between
26 Oct and 21 Nov 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:58.

London Borough Of Hammersmith & Fulham logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Shepherd's Bush Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Sep 2026 at 13:03.

Cadent Gas logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Dartmouth Street

Cadent Gas are proposing to carry out New service connection on Dartmouth Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 17:30.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Wright's Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Wright's Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:31.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:29.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:09.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Hornton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Hornton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 11:11.

Thames Water logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Kensington Church Street

Thames Water are proposing to carry out Utility asset works on Kensington Church Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:05.

Thames Water logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Notting Hill Gate

Thames Water are proposing to carry out Utility asset works on Notting Hill Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:07.

London Borough Of Ealing logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 20 Aug 2026 at 16:34.

London Borough Of Ealing logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 26 Aug 2026 at 13:55.

Transport for London (TfL) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 12:28.

City Of Westminster logo
LONG TERM
Between
26 Oct and 25 Nov 2026
Details
View Map
Share
Follow
Lexington Street

City Of Westminster are proposing to carry out Highway improvement works on Lexington Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 3 Sep 2026 at 13:36.

UK Power Networks Eastern & London logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
St Charles Square

UK Power Networks Eastern & London are proposing to carry out New service connection on St Charles Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 15:32.

City Of Westminster logo
Between
26 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Portland Place

City Of Westminster are proposing to carry out Highway improvement works on Portland Place, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 Jun 2026 at 09:30.

Thames Water logo
LONG TERM
Between
26 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Ashbridge Street

Thames Water are proposing to carry out roadworks on Ashbridge Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jul 2026 at 16:31.

Thames Water logo
LONG TERM
Between
26 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 06:28.

Thames Water logo
LONG TERM
Between
26 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 06:30.

National Highways logo
Between
27 and 31 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Dec 2025 at 14:54.

Between
27 and 29 Oct 2026
Details
View Map
Share
Follow
Piccadilly

Abovenet Communications UK are proposing to carry out Utility asset works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 19 Aug 2026 at 06:54.

City Of Westminster logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Warrington Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warrington Crescent, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2026 at 12:42.

City Of Westminster logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Warrington Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warrington Crescent, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Sep 2026 at 16:13.

Thames Water logo
Between
27 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility asset works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jun 2026 at 09:09.

G2 Energy IDNO logo
LONG TERM
Between
28 Oct and 22 Dec 2026
Details
View Map
Share
Follow
Hillside

G2 Energy IDNO are proposing to carry out New service connection on Hillside, Stonebridge, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 22 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Aug 2026 at 13:15.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
New King's Road

Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 12:39.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
New King's Road

Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 07:44.

Transport for London (TfL) logo
Between
29 and 31 Oct 2026
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 13:44.

BT logo
Between
30 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Duncan Grove

BT are proposing to carry out Utility asset works on Duncan Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2026 at 15:10.

Transport for London (TfL) logo
Between
30 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:17.

Transport for London (TfL) logo
Between
30 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 13:45.

Transport for London (TfL) logo
Between
1 and 3 Nov 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 12:03.

Transport for London (TfL) logo
Between
1 and 3 Nov 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:08.

Thames Water logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grayshott Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grayshott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2026 at 13:25.

London Borough Of Wandsworth logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grayshott Road

London Borough Of Wandsworth are proposing to carry out Utility repair and maintenance works on Grayshott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 19 Aug 2026 at 14:47.

Cadent Gas logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Parke Road

Cadent Gas are proposing to carry out Utility asset works on Parke Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:00.

Cadent Gas logo
Between
2 and 23 Nov 2026
Details
View Map
Share
Follow
Footpath From London Road To Brent Lea

Cadent Gas are proposing to carry out Utility asset works on Footpath From London Road To Brent Lea, Brentford.

These works are categorised as Major.

The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2026 at 11:46.

BT logo
Between
2 and 7 Nov 2026
Details
View Map
Share
Follow
Colet Gardens

BT are proposing to carry out Utility asset works on Colet Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Aug 2026 at 13:48.

Between
2 and 14 Nov 2026
Details
View Map
Share
Follow
Bollo Lane

Leep Utilities Electric are proposing to carry out New service connection on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 11 Sep 2026 at 09:06.

Thames Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Great George Street

Thames Water were proposing to carry out New service connection on Great George Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 6 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 11:22.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Venetia Road

Thames Water are proposing to carry out Utility repair and maintenance works on Venetia Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:27.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Venetia Road

Thames Water are proposing to carry out Utility repair and maintenance works on Venetia Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 11:45.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jul 2026 at 10:16.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:52.

Cadent Gas logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Agar Street

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Agar Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 6 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 15:19.

Cadent Gas logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Agar Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Agar Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 15:30.

UK Power Networks Eastern & London logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
New Bond Street

UK Power Networks Eastern & London are proposing to carry out New service connection on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:54.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Westbourne Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Westbourne Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Sep 2026 at 12:41.

UK Power Networks Eastern & London logo
Between
2 and 10 Nov 2026
Details
View Map
Share
Follow
Lincoln's Inn Fields

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Lincoln's Inn Fields, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2026 at 21:24.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Coptic Street

Thames Water are proposing to carry out roadworks on Coptic Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 10:43.

Thames Water logo
Between
2 and 5 Nov 2026
Details
View Map
Share
Follow
Blandford Street

Thames Water are proposing to carry out Utility asset works on Blandford Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 15:54.

Thames Water logo
Between
2 and 23 Nov 2026
Details
View Map
Share
Follow
Garbutt Place

Thames Water are proposing to carry out Utility asset works on Garbutt Place, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 11:30.

G2 Energy IDNO logo
Between
2 and 13 Nov 2026
Details
View Map
Share
Foscote Mews

G2 Energy IDNO were proposing to carry out New service connection on Foscote Mews, Westbourne, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 13 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:49.

Thames Water logo
LONG TERM
Between
2 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Nutbourne Street

Thames Water are proposing to carry out Utility asset works on Nutbourne Street, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 13:10.

Thames Water logo
LONG TERM
Between
2 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Fifth Avenue

Thames Water are proposing to carry out Utility asset works on Fifth Avenue, Queen's Park, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 13:10.

Network Rail logo
LONG TERM
Between
2 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Pancras Road

Network Rail are proposing to carry out Works for Rail Purposes on Pancras Road, St Pancras And Somers Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Aug 2026 at 15:36.

Thames Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2026 at 10:12.

Thames Water logo
LONG TERM
Between
2 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Conley Road

Thames Water are proposing to carry out Utility asset works on Conley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2026 at 16:30.

Thames Water logo
LONG TERM
Between
2 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Conley Road

Thames Water are proposing to carry out Utility asset works on Conley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 14:14.

Thames Water logo
Between
3 and 4 Nov 2026
Details
View Map
Share
Follow
Coval Passage

Thames Water are proposing to carry out Utility repair and maintenance works on Coval Passage, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 12:48.

Thames Water logo
Between
3 and 6 Nov 2026
Details
View Map
Share
Follow
Devonshire Street

Thames Water are proposing to carry out New service connection on Devonshire Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 18:47.

Transport for London (TfL) logo
Between
3 and 24 Nov 2026
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 24 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 14:17.

UK Power Networks Eastern & London logo
Between
3 and 19 Nov 2026
Details
View Map
Share
Follow
St John's Wood Road

UK Power Networks Eastern & London are proposing to carry out New service connection on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jun 2026 at 11:42.

G2 Energy IDNO logo
LONG TERM
Between
3 Nov and 22 Dec 2026
Details
View Map
Share
Follow
Hamilton Terrace

G2 Energy IDNO are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 22 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 31 Jul 2026 at 12:36.

UK Power Networks South Eastern logo
Between
4 and 22 Nov 2026
Details
View Map
Share
Kew Road

UK Power Networks South Eastern were proposing to carry out New service connection on Kew Road, Kew.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2026 and run through until 22 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2026 at 10:01.

Virgin Media logo
Between
4 and 6 Nov 2026
Details
View Map
Share
Follow
Strand

Virgin Media are proposing to carry out Utility asset works on Strand, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 7 Sep 2026 at 11:48.

City Of Westminster logo
Between
4 and 27 Nov 2026
Details
View Map
Share
Follow
Broadwick Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Sep 2026 at 13:32.

Transport for London (TfL) logo
Between
5 and 9 Nov 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:49.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Chase Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Chase Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

On
8 Nov 2026
Details
View Map
Share
Follow
Unnamed Footpath - Petersham Road To Petersham Meadows

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Unnamed Footpath - Petersham Road To Petersham Meadows, Petersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 8 November 2026 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 15 Sep 2026 at 16:11.

Cadent Gas logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Anderson Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Anderson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 17:42.

Thames Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
Pavilion Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pavilion Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 11:20.

Thames Water logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Audley Square

Thames Water are proposing to carry out New service connection on Audley Square, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Aug 2026 at 10:35.

City Of Westminster logo
Between
9 and 20 Nov 2026
Details
View Map
Share
Follow
Haymarket

City Of Westminster are proposing to carry out Highway repair and maintenance works on Haymarket, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Aug 2026 at 13:54.

City Of Westminster logo
Between
9 and 20 Nov 2026
Details
View Map
Share
Follow
Haymarket

City Of Westminster are proposing to carry out Highway repair and maintenance works on Haymarket, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Aug 2026 at 13:40.

Thames Water logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Follow
Duke Street St James's

Thames Water are proposing to carry out Disconnection or alteration of supply on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 16:40.

Thames Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Pembridge Road

Thames Water were proposing to carry out Utility repair and maintenance works on Pembridge Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 13:28.

UK Power Networks Eastern & London logo
Between
9 and 20 Nov 2026
Details
View Map
Share
Follow
Arne Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Arne Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Sep 2026 at 20:17.

UK Power Networks Eastern & London logo
Between
9 and 20 Nov 2026
Details
View Map
Share
Follow
Dryden Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Dryden Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Sep 2026 at 20:16.

UK Power Networks Eastern & London logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Catton Street

UK Power Networks Eastern & London are proposing to carry out Remedial works on Catton Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:55.

Thames Water logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Follow
Torrington Place

Thames Water are proposing to carry out New service connection on Torrington Place, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 15:38.

Cadent Gas logo
Between
9 and 26 Nov 2026
Details
View Map
Share
Follow
Montpelier Road

Cadent Gas are proposing to carry out Utility asset works on Montpelier Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 08:49.

City Of Westminster logo
Between
9 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Portland Place

City Of Westminster are proposing to carry out Highway improvement works on Portland Place, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jun 2026 at 09:40.

Cadent Gas logo
LONG TERM
Between
9 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Glencairn Drive

Cadent Gas are proposing to carry out Utility asset works on Glencairn Drive, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 15:21.

Cadent Gas logo
LONG TERM
Between
9 Nov 2026 and 12 Jan 2027
Details
View Map
Share
Follow
Queens Walk

Cadent Gas are proposing to carry out Utility asset works on Queens Walk, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 15:21.

G2 Energy IDNO logo
Between
9 and 24 Nov 2026
Details
View Map
Share
Mordaunt Road

G2 Energy IDNO were proposing to carry out New service connection on Mordaunt Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 24 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:53.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Glenburnie Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenburnie Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2026 at 12:53.

City Of London Telecomms logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Thorney Street

City Of London Telecomms are proposing to carry out Utility asset works on Thorney Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 26 Aug 2026 at 08:39.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Murphy Street

Thames Water are proposing to carry out Utility asset works on Murphy Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Aug 2026 at 08:46.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Newton Avenue

Thames Water are proposing to carry out Statutory Infrastructure Works on Newton Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 13:46.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Ramsay Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Ramsay Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 13:46.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Bollo Bridge Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Bollo Bridge Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 13:46.

Thames Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
Bromfelde Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bromfelde Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2026 at 09:04.

Thames Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
Chiswick Mall

Thames Water are proposing to carry out Utility asset works on Chiswick Mall, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 16:32.

London Borough Of Camden logo
LONG TERM
Between
11 Nov and 18 Dec 2026
Details
View Map
Share
Follow
South End Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on South End Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Camden on 7 Sep 2026 at 14:56.

Cadent Gas logo
Between
12 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Temple Sheen

Cadent Gas are proposing to carry out Utility asset works on Temple Sheen, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 13:30.

Between
13 and 21 Nov 2026
Details
View Map
Share
Follow
Colville Road

Leep Utilities Electric are proposing to carry out New service connection on Colville Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 11 Sep 2026 at 09:09.

Thames Water logo
Between
14 and 22 Nov 2026
Details
View Map
Share
Lower Richmond Road

Thames Water were proposing to carry out New service connection on Lower Richmond Road, Putney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2026 and run through until 22 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 16:51.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 15:56.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:25.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Putney Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Putney Bridge Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:32.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Wandsworth Plain

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Plain, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:35.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Ram Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Ram Street, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:40.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Fairfield Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Fairfield Street, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:43.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Frogmore

Transport for London (TfL) are proposing to carry out Highway improvement works on Frogmore, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 09:08.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Old York Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:29.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Dormay Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Dormay Street, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 09:09.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Armoury Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Armoury Way, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:24.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Putney Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Putney Bridge Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 08:59.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Swandon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Swandon Way, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:45.

Network Rail logo
Between
15 and 18 Nov 2026
Details
View Map
Share
Follow
Pancras Road

Network Rail are proposing to carry out Works for Rail Purposes on Pancras Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Aug 2026 at 16:08.

Transport for London (TfL) logo
LONG TERM
Between
16 Nov 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 25 January 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:52.

Network Rail logo
Between
16 and 18 Nov 2026
Details
View Map
Share
Follow
Bedford Hill

Network Rail are proposing to carry out Works for Rail Purposes on Bedford Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Mar 2026 at 09:00.

Thames Water logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Pickets Street

Thames Water are proposing to carry out New service connection on Pickets Street, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:11.

Thames Water logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Winthorpe Road

Thames Water were proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2026 and run through until 11 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 11:10.

Thames Water logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Winthorpe Road

Thames Water are proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 07:12.

Cadent Gas logo
Between
16 and 26 Nov 2026
Details
View Map
Share
Follow
Cumberland Road

Cadent Gas are proposing to carry out Utility asset works on Cumberland Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:00.

Cadent Gas logo
Between
16 and 30 Nov 2026
Details
View Map
Share
Follow
Rainville Road

Cadent Gas are proposing to carry out Utility asset works on Rainville Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 14:28.

Thames Water logo
Between
16 and 29 Nov 2026
Details
View Map
Share
Follow
Lionel Road North

Thames Water are proposing to carry out Utility asset works on Lionel Road North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:58.

Cadent Gas logo
Between
16 and 29 Nov 2026
Details
View Map
Share
Follow
Monck Street

Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 16:00.

Thames Water logo
Between
16 and 19 Nov 2026
Details
View Map
Share
Follow
Great George Street

Thames Water are proposing to carry out New service connection on Great George Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 11:25.

Southern Gas Networks logo
Between
16 and 23 Nov 2026
Details
View Map
Share
Follow
Concert Hall Approach

Southern Gas Networks are proposing to carry out New service connection on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2026 at 09:38.

Thames Water logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Sackville Street

Thames Water are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 09:23.

London Borough Of Ealing logo
LONG TERM
Between
16 Nov 2026 and 4 Apr 2028
Details
View Map
Share
Follow
Minerva Road

London Borough Of Ealing are proposing to carry out Remedial works on Minerva Road, Park Royal.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 4 April 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 11 Sep 2026 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
17 Nov 2026 and 14 Jan 2027
Details
View Map
Share
Follow
Balham Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 14 January 2027. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 11 May 2026 at 11:49.

Thames Water logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Perryn Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Perryn Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jul 2026 at 10:47.

G2 Energy IDNO logo
LONG TERM
Between
18 Nov and 18 Dec 2026
Details
View Map
Share
Acton Lane

G2 Energy IDNO were proposing to carry out New service connection on Acton Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2026 and run through until 18 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:53.

Transport for London (TfL) logo
Between
20 Nov and 5 Dec 2026
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 13:54.

Transport for London (TfL) logo
Between
20 Nov and 5 Dec 2026
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 14:22.

Network Rail logo
Between
21 and 23 Nov 2026
Details
View Map
Share
Follow
Vine Road

Network Rail are proposing to carry out Works for Rail Purposes on Vine Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2026 at 14:20.

Network Rail logo
Between
21 and 23 Nov 2026
Details
View Map
Share
Follow
Bollo Lane

Network Rail are proposing to carry out Works for Rail Purposes on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Feb 2026 at 14:28.

Southern Gas Networks logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Crescent Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Lane, Clapham Common & Abbeville, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2026 at 14:44.

Cadent Gas logo
LONG TERM
Between
23 Nov 2026 and 24 Jan 2027
Details
View Map
Share
Follow
Mortlake Road

Cadent Gas are proposing to carry out Utility asset works on Mortlake Road, Kew.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 24 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 12:30.

Thames Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Wyvil Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Wyvil Road, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 09:04.

City Of Westminster logo
Between
23 Nov and 16 Dec 2026
Details
View Map
Share
Follow
Eccleston Place

City Of Westminster are proposing to carry out Highway improvement works on Eccleston Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2026 at 08:10.

Vodafone logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Victoria Street

Vodafone are proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 1 Sep 2026 at 10:28.

Network Rail logo
Between
23 and 26 Nov 2026
Details
View Map
Share
Follow
Virgil Street

Network Rail are proposing to carry out Works for Rail Purposes on Virgil Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jul 2026 at 13:24.

Network Rail logo
Between
23 and 26 Nov 2026
Details
View Map
Share
Follow
Virgil Street

Network Rail are proposing to carry out Works for Rail Purposes on Virgil Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Sep 2026 at 08:39.

Thames Water logo
LONG TERM
Between
23 Nov 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Casselden Road

Thames Water are proposing to carry out Utility asset works on Casselden Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 12:39.

Thames Water logo
Between
23 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Brownlow Road

Thames Water are proposing to carry out Utility asset works on Brownlow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jun 2026 at 05:41.

Thames Water logo
Between
23 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Brownlow Road

Thames Water are proposing to carry out Utility asset works on Brownlow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 14:14.

Thames Water logo
LONG TERM
Between
23 Nov 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Maybury Gardens

Thames Water are proposing to carry out roadworks on Maybury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 15 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2026 at 00:01.

Thames Water logo
LONG TERM
Between
23 Nov 2026 and 4 Jan 2027
Details
View Map
Share
Follow
Hawthorn Road

Thames Water are proposing to carry out roadworks on Hawthorn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 4 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2026 at 00:02.

Thames Water logo
LONG TERM
Between
23 Nov 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Villiers Road

Thames Water are proposing to carry out Utility asset works on Villiers Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2026 at 16:31.

Thames Water logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Elmore Close

Thames Water are proposing to carry out Utility repair and maintenance works on Elmore Close, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 11:58.

Transport for London (TfL) logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:42.

Transport for London (TfL) logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:38.

Transport for London (TfL) logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:37.

Thames Water logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:00.

BT logo
Between
25 and 27 Nov 2026
Details
View Map
Share
Follow
Colet Gardens

BT are proposing to carry out Utility asset works on Colet Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2026 at 08:55.

Transport for London (TfL) logo
Between
26 and 28 Nov 2026
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 13:55.

UK Power Networks Eastern & London logo
Between
27 Nov and 1 Dec 2026
Details
View Map
Share
Follow
Seymour Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Seymour Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2026 and could run through until 1 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 May 2026 at 10:14.

Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Lebanon Road

GRID LINE POWER NETWORKS LIMITED are proposing to carry out New service connection on Lebanon Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by GRID LINE POWER NETWORKS LIMITED on 27 Aug 2026 at 09:06.

Thames Water logo
Between
30 Nov and 3 Dec 2026
Details
View Map
Share
Follow
Richmond Hill

Thames Water are proposing to carry out New service connection on Richmond Hill, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 3 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:06.

Thames Water logo
Between
30 Nov and 9 Dec 2026
Details
View Map
Share
Follow
Water Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Water Lane, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 9 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:45.

Thames Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Bromfelde Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bromfelde Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 12:07.

BT logo
Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Lime Grove

BT were proposing to carry out Utility asset works on Lime Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 8 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2026 at 08:20.

Thames Water logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Mercer Street

Thames Water are proposing to carry out Utility asset works on Mercer Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 16:19.

Thames Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Harewood Place

Thames Water are proposing to carry out Utility repair and maintenance works on Harewood Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 10:56.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 11 Jan 2027
Details
View Map
Share
Follow
Salisbury Street

Thames Water are proposing to carry out roadworks on Salisbury Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2026 at 16:31.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 11 Jan 2027
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 06:32.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 18 Jan 2027
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 18 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 06:30.

London Borough Of Ealing logo
LONG TERM
Between
30 Nov 2026 and 17 Sep 2027
Details
View Map
Share
Follow
Minerva Road

London Borough Of Ealing are proposing to carry out Remedial works on Minerva Road, Park Royal.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 17 September 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Aug 2026 at 11:45.

London Borough Of Ealing logo
LONG TERM
Between
30 Nov 2026 and 17 Sep 2027
Details
View Map
Share
Minerva Road

London Borough Of Ealing were proposing to carry out Remedial works on Minerva Road, Park Royal.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 17 September 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 25 Aug 2026 at 10:44.

London Borough Of Ealing logo
LONG TERM
Between
30 Nov 2026 and 4 Apr 2028
Details
View Map
Share
Follow
Minerva Road

London Borough Of Ealing are proposing to carry out Remedial works on Minerva Road, Park Royal.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 April 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 25 Aug 2026 at 10:55.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 8 Feb 2027
Details
View Map
Share
Follow
St Albans Road

Thames Water are proposing to carry out Utility asset works on St Albans Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 15:02.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Park Road

Thames Water are proposing to carry out Utility asset works on Park Road, Harlesden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 13:22.

Thames Water logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 14:16.

Cadent Gas logo
Between
1 and 21 Dec 2026
Details
View Map
Share
Follow
Cheriton Close

Cadent Gas are proposing to carry out Utility asset works on Cheriton Close, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 11:46.

London Borough Of Ealing logo
LONG TERM
Between
2 Dec 2026 and 30 Jul 2027
Details
View Map
Share
Follow
Victoria Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 30 July 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2026 at 11:31.

London Borough Of Ealing logo
LONG TERM
Between
2 Dec 2026 and 30 Jul 2027
Details
View Map
Share
Follow
Old Oak Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on Old Oak Lane, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 30 July 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2026 at 11:43.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 10:13.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2026 and 17 Feb 2027
Details
View Map
Share
Finchley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Finchley Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2026 and run through until 17 February 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 09:35.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 09:51.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Lyndale Avenue

Transport for London (TfL) are proposing to carry out roadworks on Lyndale Avenue, Cricklewood, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 08:50.

Transport for London (TfL) logo
LONG TERM
Between
3 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Follow
Slip Road Leading From Atkins Road To Poynders Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Slip Road Leading From Atkins Road To Poynders Road, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 15:24.

Transport for London (TfL) logo
LONG TERM
Between
3 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Follow
Poynders Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Poynders Road, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2026 at 17:31.

Network Rail logo
Between
5 and 7 Dec 2026
Details
View Map
Share
Follow
Bollo Lane

Network Rail are proposing to carry out Works for Rail Purposes on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Feb 2026 at 14:28.

Transport for London (TfL) logo
LONG TERM
Between
7 Dec 2026 and 25 Jan 2027
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 25 January 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 12:53.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Peterborough Road

Cadent Gas are proposing to carry out Utility asset works on Peterborough Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:34.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Coniger Road

Cadent Gas are proposing to carry out Utility asset works on Coniger Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Bradbourne Street

Cadent Gas are proposing to carry out Utility asset works on Bradbourne Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:49.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Chiddingstone Street

Cadent Gas are proposing to carry out Utility asset works on Chiddingstone Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Quarrendon Street

Cadent Gas are proposing to carry out Utility asset works on Quarrendon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Chipstead Street

Cadent Gas are proposing to carry out Utility asset works on Chipstead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Perrymead Street

Cadent Gas are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:49.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 7 Feb 2027
Details
View Map
Share
Follow
Studdridge Street

Cadent Gas are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 7 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Bowerdean Street

Cadent Gas are proposing to carry out Utility asset works on Bowerdean Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Thames Water logo
Between
7 and 14 Dec 2026
Details
View Map
Share
Follow
Maddox Street

Thames Water are proposing to carry out New service connection on Maddox Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:24.

BT logo
Between
7 and 10 Dec 2026
Details
View Map
Share
Follow
Clipstone Street

BT are proposing to carry out Utility asset works on Clipstone Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 10 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Sep 2026 at 08:39.

BT logo
Between
7 and 10 Dec 2026
Details
View Map
Share
Maple Street

BT were proposing to carry out Utility asset works on Maple Street, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 10 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 14 Sep 2026 at 07:17.

BT logo
Between
7 and 10 Dec 2026
Details
View Map
Share
Cleveland Street

BT were proposing to carry out Utility asset works on Cleveland Street, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 10 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 14 Sep 2026 at 07:10.

Thames Water logo
Between
8 and 10 Dec 2026
Details
View Map
Share
Follow
Lyham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lyham Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2026 and could run through until 10 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 08:21.

City Of Westminster logo
LONG TERM
Between
8 Dec 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Portland Place

City Of Westminster are proposing to carry out Highway improvement works on Portland Place, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 Jun 2026 at 09:31.

BT logo
Between
9 and 11 Dec 2026
Details
View Map
Share
Follow
Belgrove Street

BT are proposing to carry out Diversionary works on Belgrove Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Sep 2026 at 10:32.

G2 Energy IDNO logo
Between
13 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Acton Lane

G2 Energy IDNO were proposing to carry out New service connection on Acton Lane, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2026 and run through until 6 January 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:54.

G2 Energy IDNO logo
LONG TERM
Between
14 Dec 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Brentfield

G2 Energy IDNO are proposing to carry out New service connection on Brentfield, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 8 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:47.

London Borough Of Camden logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Pond Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Pond Street, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 11 Sep 2026 at 11:39.

UK Power Networks Eastern & London logo
Between
14 and 22 Dec 2026
Details
View Map
Share
Follow
Petersfield Rise

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Petersfield Rise, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 14:16.

Cadent Gas logo
Between
14 and 21 Dec 2026
Details
View Map
Share
Follow
Woodlawn Road

Cadent Gas are proposing to carry out Utility asset works on Woodlawn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 10:00.

Cadent Gas logo
Between
14 and 21 Dec 2026
Details
View Map
Share
Follow
Harbord Street

Cadent Gas are proposing to carry out Utility asset works on Harbord Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 10:00.


Roadworks Map near to Talgarth Road, LONDON, W6 8BJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 08:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Talgarth Road, LONDON, W6 8BJ (85 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
FULHAM PALACE ROAD 
(0.1 miles)
BT
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 14 Sep 2026 11:10
(Scheduled: 14 Sep 2026 - 16 Sep 2026)
0.1
Details
Share
Follow
2
Virgin Media logo
HAMMERSMITH ROAD 
(0.2 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.2
Details
Share
Follow
3
Thames Water logo
MAJOR
  
CHANCELLORS ROAD 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 14 Sep 2026 - 16 Sep 2026
0.2
Details
Share
Follow
4
Thames Water logo
MAJOR
  
CHANCELLORS ROAD 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 15 Sep 2026 09:40
(Scheduled: 14 Sep 2026 - 17 Sep 2026)
0.2
Details
Share
Follow
5
London Borough Of Hammersmith & Fulham logo
URGENT
  
ST DUNSTAN'S ROAD 
(0.2 miles)
London Borough Of Hammersmith & Fulham
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
12 Sep 2026 11:23 - 11:23
0.2
Details
Share
6
London Borough Of Hammersmith & Fulham logo
URGENT
  
ST DUNSTAN'S ROAD 
(0.2 miles)
London Borough Of Hammersmith & Fulham
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
14 Sep 2026 11:10 - 11:11
0.2
Details
Share
7
City Of London Telecomms logo
QUEEN CAROLINE STREET 
(0.2 miles)
City Of London Telecomms
Permanent reinstatement - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 15 Sep 2026 09:15
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
0.2
Details
Share
Follow
8
BT logo
FULHAM PALACE ROAD 
(0.2 miles)
BT
Utility asset works - Footway - Contra-flow
In Progress
Since: 15 Sep 2026 08:05
(Scheduled: 14 Sep 2026 - 16 Sep 2026)
0.2
Details
Share
Follow
9
Virgin Media logo
WOLVERTON GARDENS 
(0.2 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.2
Details
Share
Follow
10
London Borough Of Hammersmith & Fulham logo
MAJOR
  
CHANCELLORS ROAD 
(0.2 miles)
London Borough Of Hammersmith & Fulham
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 17 Aug 2026 08:00
(Scheduled: 17 Aug 2026 - 3 Oct 2026)
0.2
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.