ROADWORKS SUMMARY
St. Augustines Avenue, LONDON, W5 1ED

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for St. Augustines Avenue, W5 1ED and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to St. Augustines Avenue, LONDON, W5 1ED

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Augustines Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Ealing logo
LONG TERM
Until
31 Jan 2026
Details
View Map
Share
Follow
Friary Road

London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2021 at 00:00 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 28 May 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Until
31 Mar 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:24.

London Borough Of Barnet logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2024 and 22 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 22 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2025 at 09:40.

Thames Water logo
LONG TERM
Until
23 Jan 2026
Details
View Map
Share
Follow
High Road

Thames Water are carrying out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 10:00 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 07:22.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 10:05 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 Aug 2025 at 11:20.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Ealing logo
LONG TERM
Between
2 Jun and 19 Dec 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 25 Feb 2025 at 12:42.

Affinity Water logo
LONG TERM
Between
2 Jun and 24 Nov 2025
Details
View Map
Share
Harrow Road

Affinity Water were proposing to carry out Utility asset works on Harrow Road, Wembley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 24 November 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Affinity Water on 30 May 2025 at 16:13.

Thames Water logo
LONG TERM
Until
29 Oct 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are carrying out Utility asset works on Denzil Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 07:45 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 15:00.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 08:00 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Oct 2025 at 10:30.

Thames Water logo
LONG TERM
Between
30 Jun 2025 and 26 Jan 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are proposing to carry out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 11:40.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul and 27 Oct 2025
Details
View Map
Share
Follow
Great West Road

Transport for London (TfL) are proposing to carry out roadworks on Great West Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 15:07.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
King Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on King Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Sep 2025 at 16:01.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
King Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on King Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 October 2025. The works were due to impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Sep 2025 at 16:03.

London Borough Of Barnet logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
North Street

London Borough Of Barnet are carrying out Highway improvement works on North Street, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2025 at 15:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 26 Sep 2025 at 14:33.

Thames Water logo
LONG TERM
Between
18 Jul 2025 and 15 Feb 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are proposing to carry out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 15 February 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 10:33.

Thames Water logo
LONG TERM
Until
16 Feb 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are carrying out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 July 2025 at 08:30 and could run through until 16 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 09:12.

Network Rail logo
LONG TERM
Between
20 Jul and 30 Nov 2025
Details
View Map
Share
Follow
Linkfield Road

Network Rail are proposing to carry out Works for Rail Purposes on Linkfield Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 28 May 2025 at 14:42.

Network Rail logo
LONG TERM
Between
20 Jul and 30 Nov 2025
Details
View Map
Share
Linkfield Road

Network Rail were proposing to carry out Works for Rail Purposes on Linkfield Road, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 July 2025 and run through until 30 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Jul 2025 at 14:45.

Network Rail logo
LONG TERM
Between
20 Jul and 30 Nov 2025
Details
View Map
Share
Follow
London Road

Network Rail are proposing to carry out Works for Rail Purposes on London Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 28 May 2025 at 14:18.

Network Rail logo
LONG TERM
Between
20 Jul and 30 Nov 2025
Details
View Map
Share
London Road

Network Rail were proposing to carry out Works for Rail Purposes on London Road, Isleworth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 July 2025 and run through until 30 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Jul 2025 at 14:27.

City Of Westminster logo
LONG TERM
Between
21 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 23 Apr 2025 at 12:58.

City Of Westminster logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are carrying out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2025 at 08:00 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 09:13.

Thames Water logo
LONG TERM
Between
28 Jul and 30 Dec 2025
Details
View Map
Share
Abbey Road

Thames Water were proposing to carry out Statutory Infrastructure Works on Abbey Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 09:45.

Thames Water logo
LONG TERM
Between
28 Jul and 30 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 16:00.

Thames Water logo
LONG TERM
Until
30 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are carrying out Statutory Infrastructure Works on Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 13:40 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jul 2025 at 15:20.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Victoria Road

Cadent Gas were proposing to carry out Utility asset works on Victoria Road, Ruislip.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 13:58.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Greenside Road

Cadent Gas are carrying out Utility asset works on Greenside Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 March 2025 at 08:27 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 12:46.

Cadent Gas logo
LONG TERM
Between
4 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Imperial Drive

Cadent Gas are proposing to carry out Utility asset works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 12:26.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 08:39.

Transport for London (TfL) logo
LONG TERM
Between
18 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 10:29.

Transport for London (TfL) logo
LONG TERM
Between
18 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 16:08.

Transport for London (TfL) logo
LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 12 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.

HS2 logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

HS2 are carrying out Section 50 on Alexandra Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 00:01 and could run through until 26 October 2025. The works will impact the footway, carriageway, parking place and cycle hire docking station.

This roadwork event was last updated by HS2 on 8 Sep 2025 at 11:00.

Thames Water logo
LONG TERM
Until
24 Nov 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are carrying out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:00 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 09:32.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Macfarlane Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Macfarlane Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Affinity Water logo
LONG TERM
Between
1 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Dane Road

Affinity Water are proposing to carry out Utility asset works on Dane Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 8 May 2025 at 07:23.

Affinity Water logo
LONG TERM
Until
15 Dec 2025
Details
View Map
Share
Follow
Dane Road

Affinity Water are carrying out Utility asset works on Dane Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:52 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 10:55.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Mount Avenue

Thames Water are carrying out Utility repair and maintenance works on Mount Avenue, Ealing.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:30 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 14:48.

Thames Water logo
LONG TERM
Between
1 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Prout Grove

Thames Water are proposing to carry out Utility asset works on Prout Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:30.

Thames Water logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Prout Grove

Thames Water are carrying out Utility asset works on Prout Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:00 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:59.

Thames Water logo
LONG TERM
Friday
Details
View Map
Share
Birse Crescent

Thames Water carried out Utility asset works on Birse Crescent, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 1 Sep 2025 and 10 Oct 2025 and were actually completed between 1 Sep 2025 (12:00) and 8 Oct 2025 (12:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 13:39.

London Borough Of Barnet logo
LONG TERM
Between
3 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

London Borough Of Barnet logo
LONG TERM
Finishing
Today
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 13:03.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Leamington Park

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Leamington Park, Acton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 September 2025 at 10:35 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Sep 2025 at 11:31.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Acton Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Acton Lane, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 10:59.

Cadent Gas logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are carrying out Utility asset works on Pound Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 09:49 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 10:41.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2025 at 14:23.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 10:14.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Finchley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 16:09.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 12:37.

Transport for London (TfL) logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are carrying out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 10:38 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 08:59.

Eunetworks logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
North Acton Road

Eunetworks were proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 11 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 12 Aug 2025 at 11:49.

Eunetworks logo
LONG TERM
Between
9 Sep and 16 Oct 2025
Details
View Map
Share
Follow
North Acton Road

Eunetworks are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Sep 2025 at 12:15.

Eunetworks logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
North Acton Road

Eunetworks are carrying out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 08:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Sep 2025 at 08:13.

Thames Water logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Rutland Park Gardens

Thames Water are carrying out Utility asset works on Rutland Park Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 09:00 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:09.

Thames Water logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Rutland Park

Thames Water are carrying out Utility asset works on Rutland Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 09:00 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:08.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2025 at 10:23.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Sutherland Avenue

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 15:45.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Hall Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2025 at 16:16.

National Highways logo
LONG TERM
Until
29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are carrying out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 22:00 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 23 Sep 2025 at 10:01.

National Highways logo
LONG TERM
Between
11 Sep and 29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Jun 2025 at 12:16.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Shirland Road

Cadent Gas are carrying out Utility repair and maintenance works on Shirland Road, Harrow Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 13:09 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 09:27.

London Borough Of Brent logo
LONG TERM
Between
15 Sep 2025 and 28 Feb 2026
Details
View Map
Share
Follow
High Street

London Borough Of Brent are proposing to carry out Highway improvement works on High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 19 Aug 2025 at 07:34.

London Borough Of Brent logo
LONG TERM
Between
15 Sep 2025 and 28 Feb 2026
Details
View Map
Share
Follow
High Street

London Borough Of Brent are proposing to carry out Highway improvement works on High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 15 Sep 2025 at 07:45.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.

Thames Water logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Beaconsfield Road

Thames Water are proposing to carry out Utility asset works on Beaconsfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:32.

Thames Water logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Beaconsfield Road

Thames Water were proposing to carry out Utility asset works on Beaconsfield Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:05.

Cadent Gas logo
LONG TERM
Between
15 Sep and 27 Nov 2025
Details
View Map
Share
Follow
Imperial Drive

Cadent Gas are proposing to carry out Utility asset works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 10:13.

London Borough Of Barnet logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:10.

London Borough Of Barnet logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
The Hyde

London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:49.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Mollison Way

Cadent Gas were proposing to carry out Utility asset works on Mollison Way, Edgware.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 11:31.

LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Hanger Lane

Advanced Electricty Networks Ltd are carrying out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 07:55 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 17 Sep 2025 at 08:37.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
New Heston Road

Cadent Gas are carrying out Utility repair and maintenance works on New Heston Road, Hounslow.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 September 2025 at 19:30 and could run through until 9 October 2025. The works will impact the footway only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 15:06.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
St Quintin Avenue

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on St Quintin Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Sep 2025 at 12:11.

Royal Borough Of Kensington And Chelsea logo
Finishing
Friday
Details
View Map
Share
Follow
St Quintin Avenue

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on St Quintin Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 22 Sep 2025 at 08:40.

City Of Westminster logo
LONG TERM
Between
22 Sep and 26 Oct 2025
Details
View Map
Share
Elgin Avenue

City Of Westminster were proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jul 2025 at 14:23.

Scottish Hydro Electric Power Dis logo
Finishing
Today
Details
View Map
Share
Follow
Cuckoo Avenue

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Cuckoo Avenue, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Jun 2025 at 11:13.

Scottish Hydro Electric Power Dis logo
Finishing
Today
Details
View Map
Share
Ruislip Road East

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Ruislip Road East, Hanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Jun 2025 at 12:05.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Finchley Road

Thames Water were proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 09:26.

Thames Water logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:23.

Thames Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are carrying out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:40 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 13:15.

London Borough Of Barnet logo
LONG TERM
Between
22 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:35.

Cadent Gas logo
Until
21 Oct 2025
Details
View Map
Share
Follow
Pasture Road

Cadent Gas are carrying out Utility repair and maintenance works on Pasture Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 11:30 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 15:51.

London Borough Of Barnet logo
LONG TERM
Between
23 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Sep 2025 at 15:14.

London Borough Of Barnet logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are carrying out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 12:00 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Sep 2025 at 15:58.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 10:30.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 10:50.

Cadent Gas logo
Until
16 Oct 2025
Details
View Map
Share
Follow
Lower Richmond Road

Cadent Gas are carrying out roadworks on Lower Richmond Road, Richmond.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 13:55.

Cadent Gas logo
Until
16 Oct 2025
Details
View Map
Share
Follow
Great Chertsey Road

Cadent Gas are carrying out roadworks on Great Chertsey Road, Chiswick, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 12:21.

Cadent Gas logo
Until
16 Oct 2025
Details
View Map
Share
Follow
Great Chertsey Road

Cadent Gas are carrying out roadworks on Great Chertsey Road, Chiswick, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 12:21.

Cadent Gas logo
Until
16 Oct 2025
Details
View Map
Share
Follow
Burlington Lane

Cadent Gas are carrying out Utility repair and maintenance works on Burlington Lane, Chiswick, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 12:20.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
29 Sep 2025 and 22 Apr 2026
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 22 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Sep 2025 at 09:34.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
22 Apr 2026
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 22 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 29 Sep 2025 at 08:44.

Affinity Water logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Norman Avenue

Affinity Water are proposing to carry out Utility asset works on Norman Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 May 2025 at 07:23.

Affinity Water logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Norman Avenue

Affinity Water are carrying out Utility asset works on Norman Avenue, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 13:05 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 29 Sep 2025 at 15:02.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
St Stephens Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on St Stephens Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 14:59.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
St Stephens Avenue

Thames Water are carrying out Utility repair and maintenance works on St Stephens Avenue, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 08:35.

Thames Water logo
LONG TERM
Between
29 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Rutland Park Gardens

Thames Water are proposing to carry out Utility asset works on Rutland Park Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:33.

Thames Water logo
LONG TERM
Between
29 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Rutland Park

Thames Water are proposing to carry out Utility asset works on Rutland Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:33.

Thames Water logo
LONG TERM
Between
29 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Wharton Close

Thames Water are proposing to carry out Utility asset works on Wharton Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:32.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

London Borough Of Brent logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Crest Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Crest Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 09:10.

London Borough Of Barnet logo
Until
15 Oct 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are carrying out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:30 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Oct 2025 at 15:21.

Thames Water logo
Until
17 Oct 2025
Details
View Map
Share
Follow
Princes Drive

Thames Water are carrying out Utility repair and maintenance works on Princes Drive, Harrow.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 14:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 15:43.

London Borough Of Brent logo
Finishing
Saturday
Details
View Map
Share
Follow
St Andrews Avenue

London Borough Of Brent are carrying out Highway improvement works on St Andrews Avenue, Wembley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2025 at 08:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 8 Oct 2025 at 12:25.

Cadent Gas logo
Tomorrow
Details
View Map
Share
Norwood Road

Cadent Gas carried out Utility repair and maintenance works on Norwood Road, Southall.

Two-way signals were in place for some or all of the period.

The works were originally planned between 1 Oct 2025 and 9 Oct 2025 and were actually completed between 1 Oct 2025 (14:37) and 8 Oct 2025 (09:11). The works impacted the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 09:46.

Eunetworks logo
Until
22 Oct 2025
Details
View Map
Share
Follow
Lionel Road North

Eunetworks are carrying out Utility asset works on Lionel Road North, Brentford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 08:00 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2025 at 08:33.

Eunetworks logo
Finishing
Sunday
Details
View Map
Share
Follow
Kilburn Lane

Eunetworks are proposing to carry out Utility asset works on Kilburn Lane, North Kensington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
2 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Barretts Green Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barretts Green Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:27.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Eagle Road

Affinity Water are carrying out Utility repair and maintenance works on Eagle Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 13:43 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Oct 2025 at 12:59.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Ealing Road

Affinity Water are carrying out Utility repair and maintenance works on Ealing Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 13:43 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Oct 2025 at 12:59.

Cadent Gas logo
Until
16 Oct 2025
Details
View Map
Share
Follow
The Fairway

Cadent Gas are carrying out Utility repair and maintenance works on The Fairway, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 09:30 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 19:19.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Butler Road

Cadent Gas are carrying out Utility repair and maintenance works on Butler Road, West Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 10:43 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 09:41.

Thames Water logo
Friday
Details
View Map
Share
Pitshanger Lane

Thames Water carried out Utility repair and maintenance works on Pitshanger Lane, Ealing.

The road was closed for some or all of the period.

The works were originally planned between 4 Oct 2025 and 10 Oct 2025 and were actually completed between 4 Oct 2025 (09:41) and 8 Oct 2025 (12:02). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 12:38.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Sandringham Road

Thames Water were proposing to carry out Utility asset works on Sandringham Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2025 and run through until 14 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 08:32.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Whitton Avenue East

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Whitton Avenue East, Greenford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2025 at 15:56 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2025 at 12:57.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
North Circular Road

Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 10:55.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
North Circular Road

Network Rail are carrying out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2025 at 21:00 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Oct 2025 at 08:57.

LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
St Margarets Road

London Borough Of Richmond Upon Thames are carrying out roadworks on St Margarets Road, Twickenham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 12 December 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 8 Oct 2025 at 11:46.

Scottish Hydro Electric Power Dis logo
Between
6 and 29 Oct 2025
Details
View Map
Share
Bridge Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Bridge Road, Isleworth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Aug 2025 at 12:02.

Scottish Hydro Electric Power Dis logo
Between
6 and 29 Oct 2025
Details
View Map
Share
Bridge Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Bridge Road, Isleworth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2025 at 13:43.

Scottish Hydro Electric Power Dis logo
Between
6 and 29 Oct 2025
Details
View Map
Share
Follow
Bridge Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Bridge Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Oct 2025 at 09:34.

Scottish Hydro Electric Power Dis logo
Between
6 and 29 Oct 2025
Details
View Map
Share
Bridge Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Bridge Road, Isleworth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Oct 2025 at 10:28.

London Borough Of Ealing logo
Finishing
Today
Details
View Map
Share
Follow
Broadway

London Borough Of Ealing are proposing to carry out Highway improvement works on Broadway, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 11 Aug 2025 at 14:31.

London Borough Of Ealing logo
Finishing
Today
Details
View Map
Share
Follow
Broadway

London Borough Of Ealing are proposing to carry out Highway improvement works on Broadway, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 7 Aug 2025 at 15:53.

Cadent Gas logo
LONG TERM
Between
6 Oct and 17 Nov 2025
Details
View Map
Share
Du Cane Road

Cadent Gas were proposing to carry out Utility asset works on Du Cane Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:37.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 21 Nov 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
St Mark's Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on St Mark's Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Oxford Gardens

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on Oxford Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Oxford Gardens

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on Oxford Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
St Mark's Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on St Mark's Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
College Road

Network Rail are proposing to carry out Works for Rail Purposes on College Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2025 at 09:29.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
College Road

Network Rail are proposing to carry out Works for Rail Purposes on College Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 14:23.

Network Rail logo
Friday
Details
View Map
Share
College Road

Network Rail carried out Works for Rail Purposes on College Road, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 6 Oct 2025 and 10 Oct 2025 and were actually completed between 6 Oct 2025 (08:00) and 8 Oct 2025 (10:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2025 at 10:14.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Churchill Road

Thames Water are proposing to carry out Utility asset works on Churchill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 10:52.

Thames Water logo
Until
15 Oct 2025
Details
View Map
Share
Follow
Churchill Road

Thames Water are carrying out Utility asset works on Churchill Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 11:00 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 12:26.

Thames Water logo
LONG TERM
Until
21 Dec 2025
Details
View Map
Share
Follow
Wharton Close

Thames Water are carrying out Utility asset works on Wharton Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 11:00 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 11:10.

Thames Water logo
LONG TERM
Between
6 Oct 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Deacon Road

Thames Water are proposing to carry out Utility asset works on Deacon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:31.

Affinity Water logo
Until
17 Oct 2025
Details
View Map
Share
Follow
Brookside Close

Affinity Water are carrying out Utility asset works on Brookside Close, South Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Oct 2025 at 09:01.

London Borough Of Brent logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Forty Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:55.

London Borough Of Barnet logo
LONG TERM
Until
10 Dec 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are carrying out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 09:30 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2025 at 11:25.

Cadent Gas logo
LONG TERM
Until
18 Dec 2025
Details
View Map
Share
Follow
Imperial Drive

Cadent Gas are carrying out Utility asset works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 08:58 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 09:29.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Alfriston Avenue

Cadent Gas are carrying out Utility asset works on Alfriston Avenue, North Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 08:52 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 09:20.

Electricity Network Company logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 Sep 2025 at 12:33.

Electricity Network Company logo
Until
24 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are carrying out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:30 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 6 Oct 2025 at 12:11.

London Borough Of Barnet logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 15:12.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Adelaide Grove

Thames Water are carrying out Utility repair and maintenance works on Adelaide Grove, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 10:00 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 12:05.

Cadent Gas logo
LONG TERM
Between
7 Oct and 15 Nov 2025
Details
View Map
Share
Follow
Du Cane Road

Cadent Gas are proposing to carry out Utility asset works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:21.

Thames Water logo
Between
7 and 21 Oct 2025
Details
View Map
Share
Castlebar Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Castlebar Hill, Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 12:19.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bollo Lane

Thames Water are proposing to carry out Utility asset works on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 13:27.

London Borough Of Barnet logo
LONG TERM
Between
8 Oct and 11 Nov 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 13:10.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Elmgrove Road

Affinity Water are carrying out Utility repair and maintenance works on Elmgrove Road, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 09:50 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 8 Oct 2025 at 12:39.

London Borough Of Brent logo
Finishing
Saturday
Details
View Map
Share
Follow
Hay Lane

London Borough Of Brent are carrying out Highway improvement works on Hay Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 08:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 8 Oct 2025 at 08:11.

Eunetworks logo
Finishing
Monday
Details
View Map
Share
Follow
Whitmore Gardens

Eunetworks are proposing to carry out roadworks on Whitmore Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 12 Aug 2025 at 16:05.

Thames Water logo
LONG TERM
Between
9 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Heathfield Park

Thames Water are proposing to carry out Utility asset works on Heathfield Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 14:51.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Queensway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 08:56.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Queensway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Oct 2025 at 11:28.

Thames Water logo
Between
10 and 29 Oct 2025
Details
View Map
Share
Wood Lane

Thames Water were proposing to carry out New service connection on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 29 October 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 13:26.

Thames Water logo
Between
10 and 29 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Thames Water are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 12:29.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Porchester Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Square, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 10:59.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Porchester Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Square, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 08:55.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Gardens, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 10:37.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Gardens, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 08:48.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Gloucester Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2025 at 12:09.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Gloucester Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 08:47.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Park Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Park Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2025 at 12:09.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Park Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Park Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Oct 2025 at 09:31.

London Borough Of Brent logo
Between
10 and 31 Oct 2025
Details
View Map
Share
Follow
Forty Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Lane, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:53.

Lumen Technologies logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Kensington High Street

Lumen Technologies are proposing to carry out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 26 Aug 2025 at 15:32.

Lumen Technologies logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Kensington High Street

Lumen Technologies are proposing to carry out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 9 Sep 2025 at 11:33.

Lumen Technologies logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Kensington High Street

Lumen Technologies are proposing to carry out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 10 Sep 2025 at 10:53.

Eunetworks logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Langley Drive

Eunetworks are proposing to carry out roadworks on Langley Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 20 Aug 2025 at 09:44.

Eunetworks logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Langley Drive

Eunetworks are proposing to carry out roadworks on Langley Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 11:22.

Eunetworks logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Langley Drive

Eunetworks are proposing to carry out roadworks on Langley Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Sep 2025 at 10:44.

Transport for London (TfL) logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:39.

London Borough Of Ealing logo
LONG TERM
Between
13 Oct 2025 and 28 Mar 2026
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 28 March 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 12 Aug 2025 at 08:13.

London Borough Of Hammersmith & Fulham logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:30.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 14:20.

Cadent Gas logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
North Pole Road

Cadent Gas are proposing to carry out Utility asset works on North Pole Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:30.

Cadent Gas logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
North Pole Road

Cadent Gas are proposing to carry out Utility asset works on North Pole Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 14:20.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 14:20.

London Borough Of Ealing logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Old Oak Common Lane

London Borough Of Ealing are proposing to carry out Remedial works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 31 Jul 2025 at 16:01.

London Borough Of Ealing logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Old Oak Common Lane

London Borough Of Ealing were proposing to carry out Remedial works on Old Oak Common Lane, Acton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 Sep 2025 at 14:04.

London Borough Of Ealing logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 19 Sep 2025 at 15:39.

Affinity Water logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Copland Avenue

Affinity Water are proposing to carry out Utility asset works on Copland Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.

Thames Water logo
Between
13 and 20 Oct 2025
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 08:37.

BT logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Whitmore Road

BT were proposing to carry out Utility repair and maintenance works on Whitmore Road, West Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Jul 2025 at 08:25.

BT logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Bessborough Road

BT were proposing to carry out Utility repair and maintenance works on Bessborough Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Jul 2025 at 08:25.

Cadent Gas logo
Between
13 and 18 Oct 2025
Details
View Map
Share
Follow
The Drive

Cadent Gas are proposing to carry out Utility asset works on The Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2025 at 16:30.

Cadent Gas logo
Between
13 and 19 Oct 2025
Details
View Map
Share
Follow
Farm Avenue

Cadent Gas are proposing to carry out Utility asset works on Farm Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 17:57.

London Borough Of Barnet logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2025 at 11:01.

Virgin Media logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Park Way

Virgin Media are proposing to carry out Utility asset works on Park Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Jul 2025 at 09:01.

Virgin Media logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Park Way

Virgin Media are proposing to carry out Utility asset works on Park Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Sep 2025 at 10:31.

Virgin Media logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Brondesbury Park

Virgin Media are proposing to carry out Utility asset works on Brondesbury Park, Brondesbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Jul 2025 at 16:57.

Virgin Media logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Brondesbury Park

Virgin Media are proposing to carry out Utility asset works on Brondesbury Park, Brondesbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 2 Oct 2025 at 09:39.

Between
15 and 17 Oct 2025
Details
View Map
Share
Kingsfield Avenue

London Borough Of Harrow were proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:37.

Between
15 and 17 Oct 2025
Details
View Map
Share
Southfield Park

London Borough Of Harrow were proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2025 at 07:35.

Between
15 and 17 Oct 2025
Details
View Map
Share
Station Road

London Borough Of Harrow were proposing to carry out Highway improvement works on Station Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:42.

Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Sheen Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Sheen Lane, Mortlake, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 20 May 2025 at 13:06.

Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Sheen Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Sheen Lane, Mortlake, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 20 May 2025 at 14:17.

Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Sheen Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Sheen Lane, Mortlake, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 22 May 2025 at 11:53.

Virgin Media logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Standard Road

Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Aug 2025 at 10:56.

Virgin Media logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Standard Road

Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Oct 2025 at 09:58.

Thames Water logo
Between
17 and 23 Oct 2025
Details
View Map
Share
Follow
Crediton Hill

Thames Water are proposing to carry out New service connection on Crediton Hill, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 12:25.

Scottish Hydro Electric Power Dis logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Hartham Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Hartham Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Sep 2025 at 12:30.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Aldensley Road

Thames Water are proposing to carry out New service connection on Aldensley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 09:50.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 13:56.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 11:10.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Chapel Side

Thames Water were proposing to carry out Remedial works on Chapel Side, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 12:25.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Chapel Side

Thames Water are proposing to carry out Remedial works on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 15:15.

Lumen Technologies logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Coronation Road

Lumen Technologies are proposing to carry out Utility asset works on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 27 Aug 2025 at 14:18.

Lumen Technologies logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Coronation Road

Lumen Technologies are proposing to carry out Utility asset works on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 28 Aug 2025 at 10:31.

Thames Water logo
LONG TERM
Between
20 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Heathfield Park

Thames Water are proposing to carry out Utility asset works on Heathfield Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 09:52.

Affinity Water logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Turner Close

Affinity Water are proposing to carry out Utility asset works on Turner Close, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Affinity Water logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Talbot Road

Affinity Water are proposing to carry out Utility asset works on Talbot Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Oct 2025 at 08:40.

Affinity Water logo
LONG TERM
Between
20 Oct 2025 and 21 Apr 2026
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 April 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 Oct 2025 at 13:57.

Affinity Water logo
LONG TERM
Between
20 Oct 2025 and 21 Apr 2026
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 April 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 6 Oct 2025 at 13:47.

Affinity Water logo
LONG TERM
Between
20 Oct 2025 and 21 Apr 2026
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 April 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 8 Oct 2025 at 12:52.

Affinity Water logo
Between
20 Oct and 18 Nov 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility asset works on High Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2025 at 14:15.

Affinity Water logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility asset works on High Road, Wembley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Oct 2025 at 09:04.

Affinity Water logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Crawford Avenue

Affinity Water are proposing to carry out Utility asset works on Crawford Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Oct 2025 at 13:55.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 25 Jul 2025 at 14:58.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 9 Sep 2025 at 11:07.

Energy Assets Pipelines logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 25 Jul 2025 at 15:01.

Energy Assets Pipelines logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 9 Sep 2025 at 11:05.

Thames Water logo
Between
20 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 10:43.

UK Power Networks Eastern & London logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Sudbury Croft

UK Power Networks Eastern & London are proposing to carry out New service connection on Sudbury Croft, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Aug 2025 at 13:26.

UK Power Networks Eastern & London logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Sudbury Croft

UK Power Networks Eastern & London are proposing to carry out New service connection on Sudbury Croft, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2025 at 08:00.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
The Vale

Transport for London (TfL) are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2025 at 10:11.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Hendon Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Hendon Way, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2025 at 17:30.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2025 at 13:41.

Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:56.

Affinity Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Jul 2025 at 09:21.

Scottish Hydro Electric Power Dis logo
Between
21 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Hartham Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Hartham Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2025 at 13:39.

UK Power Networks Eastern & London logo
Between
21 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Fulham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2025 at 10:25.

UK Power Networks Eastern & London logo
Between
21 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Fulham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2025 at 12:44.

London Borough Of Barnet logo
Between
21 and 24 Oct 2025
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Barnet are proposing to carry out Highway improvement works on The Ridgeway, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Sep 2025 at 14:57.

Scottish Hydro Electric Power Dis logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Western Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Western Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2025 at 10:29.

Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:57.

BT logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Maze Road

BT are proposing to carry out Utility asset works on Maze Road, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 23 Jul 2025 at 16:43.

Thames Water logo
Between
23 and 29 Oct 2025
Details
View Map
Share
Follow
St Andrews Road

Thames Water are proposing to carry out New service connection on St Andrews Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 09:49.

City Of Westminster logo
Between
23 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Warwick Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warwick Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Oct 2025 at 09:17.

Thames Water logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 17:25.

London Borough Of Ealing logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 22 Sep 2025 at 06:36.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Place, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Porchester Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

UK Power Networks Eastern & London logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Fulham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 11:59.

UK Power Networks Eastern & London logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Rosedew Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rosedew Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 12:21.

UK Power Networks Eastern & London logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Rosedew Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Rosedew Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2025 at 09:14.

Cadent Gas logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Norwood Road Service Road To Numbers 168-186

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Norwood Road Service Road To Numbers 168-186, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 06:25.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
East Acton Lane

Eunetworks were proposing to carry out Utility asset works on East Acton Lane, Acton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 2 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 13 Aug 2025 at 11:58.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
East Acton Lane

Eunetworks are proposing to carry out Utility asset works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 11:34.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
East Acton Lane

Eunetworks are proposing to carry out Utility asset works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 4 Sep 2025 at 10:31.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Old Oak Road

Eunetworks are proposing to carry out Utility asset works on Old Oak Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 26 Aug 2025 at 11:07.

London Borough Of Barnet logo
Between
26 and 31 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 12:58.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Upper Richmond Road West

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Richmond Road West, East Sheen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 13:02.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Vernon Road

Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 11:23.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Vernon Road

Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 12:55.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Vernon Road

Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 15:55.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Vernon Road

Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 15:49.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on London Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 10:17.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Wood Lane

BT are proposing to carry out Utility asset works on Wood Lane, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Jul 2025 at 15:43.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 10:19.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
South Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on South Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Aug 2025 at 11:07.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
South Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on South Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Aug 2025 at 15:57.

London Borough Of Ealing logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Minterne Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Minterne Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 Sep 2025 at 21:44.

Cadent Gas logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Sussex Road

Cadent Gas are proposing to carry out Utility asset works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 06:25.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Kensington Church Court

Thames Water are proposing to carry out New service connection on Kensington Church Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 17:41.

London Borough Of Ealing logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Derwentwater Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Derwentwater Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 10 Sep 2025 at 15:15.

London Borough Of Ealing logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Talbot Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Talbot Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 10 Sep 2025 at 15:26.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Blenheim Crescent

Thames Water were proposing to carry out Remedial works on Blenheim Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:49.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Blenheim Crescent

Thames Water are proposing to carry out Remedial works on Blenheim Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 16:30.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Bridstow Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bridstow Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:33.

London Borough Of Ealing logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Woodbury Park Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Woodbury Park Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 10 Sep 2025 at 15:15.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
27 Oct and 6 Dec 2025
Details
View Map
Share
Follow
Scrubs Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Scrubs Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 6 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 6 Oct 2025 at 10:36.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 11 Nov 2025
Details
View Map
Share
North Acton Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Sep 2025 at 15:33.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 11 Nov 2025
Details
View Map
Share
North Acton Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Oct 2025 at 09:05.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 11 Nov 2025
Details
View Map
Share
Follow
North Acton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Sep 2025 at 16:26.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 11 Nov 2025
Details
View Map
Share
Follow
North Acton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Oct 2025 at 09:09.

Affinity Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Horsenden Lane South

Affinity Water are proposing to carry out Utility repair and maintenance works on Horsenden Lane South, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Jul 2025 at 17:02.

Cadent Gas logo
LONG TERM
Between
27 Oct and 31 Dec 2025
Details
View Map
Share
Follow
Longstone Avenue

Cadent Gas are proposing to carry out Utility asset works on Longstone Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 12:11.

Thames Water logo
LONG TERM
Between
27 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Meyrick Road

Thames Water are proposing to carry out Utility asset works on Meyrick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:29.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Meyrick Road

Thames Water are proposing to carry out Utility asset works on Meyrick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:15.

Affinity Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Talbot Road

Affinity Water are proposing to carry out Utility asset works on Talbot Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Affinity Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility asset works on High Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 08:26.

Affinity Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Crawford Avenue

Affinity Water are proposing to carry out Utility asset works on Crawford Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Affinity Water logo
LONG TERM
Between
27 Oct 2025 and 21 Apr 2026
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Affinity Water on 2 Oct 2025 at 13:57.

Affinity Water logo
LONG TERM
Between
27 Oct 2025 and 21 Apr 2026
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Affinity Water on 6 Oct 2025 at 09:05.

London Borough Of Barnet logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Jul 2025 at 10:26.

London Borough Of Barnet logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2025 at 15:18.

London Borough Of Barnet logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Oct 2025 at 15:49.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Roxborough Avenue

BT were proposing to carry out Utility repair and maintenance works on Roxborough Avenue, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2025 at 09:25.

UK Power Networks Eastern & London logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Princes Park Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Princes Park Avenue, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 14:03.

UK Power Networks Eastern & London logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Princes Park Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Princes Park Avenue, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2025 at 08:04.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Farm Avenue

Cadent Gas are proposing to carry out Utility asset works on Farm Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2025 at 16:29.

Between
27 Oct and 5 Nov 2025
Details
View Map
Share
Burnt Oak Broadway

NWP Street (formerly New World Payphones) were proposing to carry out roadworks on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by NWP Street (formerly New World Payphones) on 26 Sep 2025 at 13:37.

Between
27 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Burnt Oak Broadway

NWP Street (formerly New World Payphones) are proposing to carry out Remedial works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by NWP Street (formerly New World Payphones) on 26 Sep 2025 at 15:22.

Between
27 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Burnt Oak Broadway

NWP Street (formerly New World Payphones) are proposing to carry out Remedial works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by NWP Street (formerly New World Payphones) on 3 Oct 2025 at 15:49.

Thames Water logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Goodwin Road

Thames Water are proposing to carry out New service connection on Goodwin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 14:31.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Erica Street

Thames Water are proposing to carry out Utility repair and maintenance works on Erica Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 13:34.

Affinity Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Bideford Avenue

Affinity Water are proposing to carry out Highway repair and maintenance works on Bideford Avenue, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Jul 2025 at 06:18.

Affinity Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Bideford Avenue

Affinity Water are proposing to carry out Highway repair and maintenance works on Bideford Avenue, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 4 Aug 2025 at 14:41.

Affinity Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Bideford Avenue

Affinity Water are proposing to carry out Highway repair and maintenance works on Bideford Avenue, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Aug 2025 at 07:22.

BT logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Victoria Terrace

BT are proposing to carry out Utility repair and maintenance works on Victoria Terrace, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2025 at 09:07.

BT logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Victoria Terrace

BT are proposing to carry out Utility repair and maintenance works on Victoria Terrace, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Oct 2025 at 11:19.

BT logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
West Street

BT are proposing to carry out Utility repair and maintenance works on West Street, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2025 at 09:07.

BT logo
Between
28 and 30 Oct 2025
Details
View Map
Share
West Street

BT were proposing to carry out Utility repair and maintenance works on West Street, Harrow On The Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Oct 2025 at 11:30.

Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:59.

London Borough Of Hammersmith & Fulham logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Bolingbroke Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Bolingbroke Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 25 Feb 2025 at 10:10.

London Borough Of Hammersmith & Fulham logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Bolingbroke Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Bolingbroke Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 15:47.

London Borough Of Ealing logo
Between
29 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Ribblesdale Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Ribblesdale Avenue, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 3 Oct 2025 at 06:30.

BT logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
West Street

BT are proposing to carry out Utility repair and maintenance works on West Street, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Oct 2025 at 11:18.

London Borough Of Ealing logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Brants Walk

London Borough Of Ealing are proposing to carry out Highway improvement works on Brants Walk, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 11 Sep 2025 at 07:15.

London Borough Of Ealing logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Brants Walk

London Borough Of Ealing are proposing to carry out Highway improvement works on Brants Walk, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 3 Oct 2025 at 06:30.

London Borough Of Ealing logo
Between
30 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Riverside Close

London Borough Of Ealing are proposing to carry out Highway improvement works on Riverside Close, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 3 Oct 2025 at 06:30.

Transport for London (TfL) logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 14:37.

Network Rail logo
Between
31 Oct and 3 Nov 2025
Details
View Map
Share
Grove Park Terrace

Network Rail were proposing to carry out Works for Rail Purposes on Grove Park Terrace, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 October 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Sep 2025 at 10:11.

London Borough Of Ealing logo
Between
31 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Ribblesdale Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Ribblesdale Avenue, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 Sep 2025 at 20:28.

Network Rail logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Wood Lane

Network Rail were proposing to carry out Works for Rail Purposes on Wood Lane, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 09:45.

Network Rail logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Follow
Wood Lane

Network Rail are proposing to carry out Works for Rail Purposes on Wood Lane, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Sep 2025 at 14:27.

Network Rail logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Wood Lane

Network Rail were proposing to carry out Works for Rail Purposes on Wood Lane, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2025 at 08:20.

London Borough Of Ealing logo
Between
1 and 6 Nov 2025
Details
View Map
Share
Follow
Riverside Close

London Borough Of Ealing are proposing to carry out Highway improvement works on Riverside Close, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 11 Sep 2025 at 07:15.

Network Rail logo
Between
1 and 9 Nov 2025
Details
View Map
Share
East Lane

Network Rail were proposing to carry out Works for Rail Purposes on East Lane, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2025 and run through until 9 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Aug 2025 at 14:56.

LONG TERM
Between
1 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 31 Jul 2025 at 14:25.

LONG TERM
Between
1 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 31 Jul 2025 at 14:22.

BT logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Gloucester Road

BT are proposing to carry out Utility asset works on Gloucester Road, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 1 Aug 2025 at 08:11.

Thames Water logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Mary Place

Thames Water are proposing to carry out Utility repair and maintenance works on Mary Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 11:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2025 at 08:14.

London Borough Of Hammersmith & Fulham logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:12.

London Borough Of Hammersmith & Fulham logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

Transport for London (TfL) logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Hanger Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 11:33.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Douglas Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Douglas Crescent, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Aug 2025 at 11:27.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Douglas Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Douglas Crescent, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 15:31.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Douglas Crescent

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Douglas Crescent, Hayes.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Aug 2025 at 15:39.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Douglas Crescent

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Douglas Crescent, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Aug 2025 at 13:42.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Kilburn Lane

Thames Water are proposing to carry out New service connection on Kilburn Lane, North Kensington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:40.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Chamberlayne Road

Thames Water are proposing to carry out New service connection on Chamberlayne Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 08:50.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Kilburn Lane

Thames Water are proposing to carry out New service connection on Kilburn Lane, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 09:07.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Banister Road

Thames Water are proposing to carry out New service connection on Banister Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:40.

London Borough Of Ealing logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 19 Sep 2025 at 15:18.

Cadent Gas logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 11:38.

Cadent Gas logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 13:43.

Cadent Gas logo
Between
3 and 28 Nov 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2025 at 15:59.

London Borough Of Ealing logo
Between
3 and 10 Nov 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 3 Oct 2025 at 06:29.

Thames Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Dartmouth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dartmouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:34.

Affinity Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Central Road

Affinity Water are proposing to carry out Utility asset works on Central Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Aug 2025 at 13:27.

Thames Water logo
LONG TERM
Between
3 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Bermans Way

Thames Water are proposing to carry out Utility asset works on Bermans Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:30.

Thames Water logo
LONG TERM
Between
3 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Bermans Way

Thames Water are proposing to carry out Utility asset works on Bermans Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 09:02.

London Borough Of Barnet logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2025 at 15:11.

BT logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
West Street

BT are proposing to carry out Utility repair and maintenance works on West Street, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Sep 2025 at 14:59.

Cadent Gas logo
LONG TERM
Between
5 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 17:23.

Electricity Network Company logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 15 Sep 2025 at 11:56.

City Of Westminster logo
LONG TERM
Between
6 Nov 2025 and 10 Jan 2026
Details
View Map
Share
Follow
Droop Street

City Of Westminster are proposing to carry out Highway improvement works on Droop Street, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 10 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 10:51.

Thames Water logo
Between
6 and 13 Nov 2025
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 15:14.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
West Gate

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 25 Jun 2025 at 15:11.

Between
7 and 30 Nov 2025
Details
View Map
Share
Follow
West Gate

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 4 Sep 2025 at 13:23.

BT logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Chiswick High Road

BT are proposing to carry out Utility repair and maintenance works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Aug 2025 at 14:40.

BT logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Chiswick High Road

BT are proposing to carry out Utility repair and maintenance works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Aug 2025 at 12:23.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Newton Road

Thames Water are proposing to carry out New service connection on Newton Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 13:53.

Transport for London (TfL) logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:13.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Du Cane Road

Cadent Gas are proposing to carry out Utility asset works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:00.

Transport for London (TfL) logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:08.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Nascot Street

Cadent Gas are proposing to carry out Utility asset works on Nascot Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:30.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Glenroy Street

Cadent Gas are proposing to carry out Utility asset works on Glenroy Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:30.

Virgin Media logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Cambridge Gardens

Virgin Media were proposing to carry out Utility repair and maintenance works on Cambridge Gardens, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 13 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Sep 2025 at 14:56.

UK Power Networks Eastern & London logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Abercorn Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Abercorn Close, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 09:48.

UK Power Networks Eastern & London logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Abercorn Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Abercorn Close, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2025 at 08:50.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Messina Avenue

Thames Water are proposing to carry out New service connection on Messina Avenue, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 17:39.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Messina Avenue

Thames Water are proposing to carry out New service connection on Messina Avenue, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 18:08.

Thames Water logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Belvue Close

Thames Water are proposing to carry out Utility asset works on Belvue Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 07:22.

Thames Water logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Belvue Close

Thames Water are proposing to carry out Utility asset works on Belvue Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 12:54.

Thames Water logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Belvue Close

Thames Water are proposing to carry out Utility asset works on Belvue Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 12:03.

Affinity Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Brookside Close

Affinity Water are proposing to carry out Utility asset works on Brookside Close, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Sep 2025 at 12:12.

UK Power Networks Eastern & London logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Jackman Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Jackman Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2025 at 13:31.

Affinity Water logo
Between
11 and 26 Nov 2025
Details
View Map
Share
Follow
Turner Close

Affinity Water are proposing to carry out Utility asset works on Turner Close, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2025 at 14:16.

London Borough Of Brent logo
Between
11 and 28 Nov 2025
Details
View Map
Share
Follow
Dudden Hill Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:21.

Thames Water logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Turnham Green Terrace

Thames Water are proposing to carry out Utility asset works on Turnham Green Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 11:45.

Thames Water logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Turnham Green Terrace

Thames Water are proposing to carry out Utility asset works on Turnham Green Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 07:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 Nov 2025 and 13 Jan 2026
Details
View Map
Share
Follow
Central Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 13 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:23.

London Borough Of Barnet logo
Between
12 and 20 Nov 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Aug 2025 at 16:06.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 13:10.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 May 2025 at 12:06.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 12:34.

Thames Water logo
Between
13 and 18 Nov 2025
Details
View Map
Share
Follow
East Acton Lane Service Road To Numbers 115-129 And Beechwood Grove

Thames Water are proposing to carry out Utility asset works on East Acton Lane Service Road To Numbers 115-129 And Beechwood Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 18 November 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 10:36.

London Borough Of Ealing logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 3 Oct 2025 at 06:28.

London Borough Of Barnet logo
Between
13 and 18 Nov 2025
Details
View Map
Share
West Heath Road

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on West Heath Road, Hampstead, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 18 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Aug 2025 at 14:28.

London Borough Of Hammersmith & Fulham logo
Between
14 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
Between
14 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 17:32.

Thames Water logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 14:37.

Thames Water logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 11:30.

Thames Water logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:51.

Network Rail logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Wood Lane

Network Rail were proposing to carry out Works for Rail Purposes on Wood Lane, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 09:25.

Electricity Network Company logo
Between
17 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Ealing Road

Electricity Network Company are proposing to carry out Utility asset works on Ealing Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Sep 2025 at 07:17.

Electricity Network Company logo
Between
17 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Ealing Road

Electricity Network Company are proposing to carry out Utility asset works on Ealing Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 30 Sep 2025 at 09:51.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Goodwin Road

Thames Water are proposing to carry out New service connection on Goodwin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 10:57.

Electricity Network Company logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Queensway

Electricity Network Company are proposing to carry out Utility asset works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Sep 2025 at 08:21.

Thames Water logo
LONG TERM
Between
17 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Belton Road

Thames Water are proposing to carry out Utility asset works on Belton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 15:47.

London Borough Of Barnet logo
Between
17 and 29 Nov 2025
Details
View Map
Share
Finchley Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Finchley Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Jul 2025 at 16:10.

UK Power Networks Eastern & London logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Bolton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Bolton Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 10:49.

Affinity Water logo
Between
19 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Copland Avenue

Affinity Water are proposing to carry out Utility asset works on Copland Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2025 at 14:08.

London Borough Of Brent logo
Between
19 and 23 Nov 2025
Details
View Map
Share
Follow
Crest Road

London Borough Of Brent are proposing to carry out Highway improvement works on Crest Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:26.

Eunetworks logo
Between
20 and 24 Nov 2025
Details
View Map
Share
Follow
Buller Road

Eunetworks are proposing to carry out roadworks on Buller Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 13 Aug 2025 at 08:20.

Between
21 and 25 Nov 2025
Details
View Map
Share
Elmgrove Road

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Elmgrove Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Aug 2025 at 12:49.

Thames Water logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
North Drive

Thames Water are proposing to carry out Remedial works on North Drive, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 12:09.

Transport for London (TfL) logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Boston Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Boston Park Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 13:39.

Transport for London (TfL) logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Great West Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 12:00.

Virgin Media logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Dukes Lane

Virgin Media are proposing to carry out Utility asset works on Dukes Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Sep 2025 at 15:43.

Thames Water logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Follow
Aubrey Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Aubrey Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 16:58.

London Borough Of Barnet logo
Between
24 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Briardale Gardens

London Borough Of Barnet are proposing to carry out roadworks on Briardale Gardens, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Jul 2025 at 15:15.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Kew Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:00.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Kew Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 27 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 17:33.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 14:31.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:14.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Lower Mortlake Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 27 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 17:33.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:02.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Lower Richmond Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 27 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 17:32.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:03.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Clifford Avenue

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 27 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 17:31.

Cadent Gas logo
Between
25 and 30 Nov 2025
Details
View Map
Share
Follow
Aubrey Walk

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Aubrey Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 15:22.

National Highways logo
Between
26 and 29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Jun 2025 at 12:11.

National Highways logo
Between
26 and 29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jul 2025 at 17:28.

Thames Water logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Westfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Westfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 10:24.

Thames Water logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Westfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Westfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 14:55.

Transport for London (TfL) logo
Between
27 and 29 Nov 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 14:41.

Thames Water logo
Between
28 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Aldensley Road

Thames Water are proposing to carry out New service connection on Aldensley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 14:19.

Transport for London (TfL) logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Boston Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Boston Park Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 15:33.

Transport for London (TfL) logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Great West Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 15:15.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Mayfield Avenue

Thames Water are proposing to carry out New service connection on Mayfield Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 12:08.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Queensway

Thames Water were proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 14:53.

HS2 logo
LONG TERM
Between
1 Dec 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Alexandra Road

HS2 are proposing to carry out Section 50 on Alexandra Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 17 July 2026. The works will impact the footway, carriageway, parking place and cycle hire docking station.

This roadwork event was last updated by HS2 on 2 Jul 2025 at 14:40.

Affinity Water logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2025 at 14:09.

Affinity Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Dunster Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunster Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 4 Jul 2025 at 15:11.

Affinity Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Dunster Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunster Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Jul 2025 at 21:23.

UK Power Networks Eastern & London logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
West Street

UK Power Networks Eastern & London are proposing to carry out New service connection on West Street, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2025 at 14:38.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 12:49.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 09:44.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:35.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 09:30.

London Borough Of Brent logo
Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Fryent Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:20.

London Borough Of Brent logo
Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Fryent Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 23 Sep 2025 at 08:02.

Between
1 and 8 Dec 2025
Details
View Map
Share
Follow
Priory Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Aug 2025 at 08:49.

London Borough Of Ealing logo
LONG TERM
Between
2 Dec 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Boston Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Boston Road, Hanwell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 3 Sep 2025 at 13:55.

Thames Water logo
Between
2 and 4 Dec 2025
Details
View Map
Share
Follow
Glenfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 14:06.

Network Rail logo
Between
5 and 8 Dec 2025
Details
View Map
Share
Follow
Burlington Lane

Network Rail are proposing to carry out Works for Rail Purposes on Burlington Lane, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2025 at 12:07.

Network Rail logo
Between
5 and 8 Dec 2025
Details
View Map
Share
Follow
Sutton Court Road

Network Rail are proposing to carry out Works for Rail Purposes on Sutton Court Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2025 at 12:07.

Thames Water logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Mora Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mora Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 11:01.

Between
8 and 15 Dec 2025
Details
View Map
Share
Follow
Manor Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Manor Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2025 at 09:22.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

T-Mobile (UK) logo
Between
14 and 21 Dec 2025
Details
View Map
Share
Northfield Avenue

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Northfield Avenue, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 December 2025 and run through until 21 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 24 Jul 2025 at 15:19.

T-Mobile (UK) logo
Between
14 and 21 Dec 2025
Details
View Map
Share
Follow
Northfield Avenue

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Northfield Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 20 Aug 2025 at 10:06.

Affinity Water logo
LONG TERM
Between
15 Dec 2025 and 29 Jan 2026
Details
View Map
Share
Follow
Chaplin Road

Affinity Water are proposing to carry out Utility asset works on Chaplin Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 29 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2025 at 14:08.

Thames Water logo
Between
29 Dec 2025 and 2 Jan 2026
Details
View Map
Share
Newton Road

Thames Water were proposing to carry out New service connection on Newton Road, Bayswater, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 December 2025 and run through until 2 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 09:16.

Thames Water logo
Between
29 Dec 2025 and 1 Jan 2026
Details
View Map
Share
Malton Road

Thames Water were proposing to carry out New service connection on Malton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 December 2025 and run through until 1 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
2 Jan and 6 Feb 2026
Details
View Map
Share
Follow
Abbey Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2026 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:30.

UK Power Networks Eastern & London logo
Between
5 and 17 Jan 2026
Details
View Map
Share
Follow
South Worple Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on South Worple Avenue, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 17 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 09:15.

Affinity Water logo
LONG TERM
Between
5 Jan and 26 Mar 2026
Details
View Map
Share
Follow
Oswald Road

Affinity Water are proposing to carry out Utility asset works on Oswald Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 26 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Jun 2025 at 11:14.

Affinity Water logo
LONG TERM
Between
5 Jan and 26 Mar 2026
Details
View Map
Share
Follow
Oswald Road

Affinity Water are proposing to carry out Utility asset works on Oswald Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 26 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Sep 2025 at 09:59.

Affinity Water logo
LONG TERM
Between
5 Jan and 26 Mar 2026
Details
View Map
Share
Follow
Oswald Road

Affinity Water are proposing to carry out Utility asset works on Oswald Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 26 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 Oct 2025 at 13:22.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Mar 2025 at 11:43.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 25 Apr 2025 at 11:07.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 15 May 2025 at 17:04.

Virgin Media logo
Between
5 and 7 Jan 2026
Details
View Map
Share
Follow
Brownlow Road

Virgin Media are proposing to carry out Utility asset works on Brownlow Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 7 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 19 Sep 2025 at 12:37.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Campbell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Campbell Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 11:50.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Queensway

Thames Water are proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 14:55.

Thames Water logo
Between
5 and 21 Jan 2026
Details
View Map
Share
Follow
Wood Lane

Thames Water are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 21 January 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 15:07.

Thames Water logo
LONG TERM
Between
5 Jan and 22 Mar 2026
Details
View Map
Share
Follow
Deacon Road

Thames Water are proposing to carry out Utility asset works on Deacon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 22 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 14:42.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Cooper Road

Thames Water are proposing to carry out New service connection on Cooper Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 10:20.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 10:21.

Cadent Gas logo
LONG TERM
Between
5 Jan and 20 Feb 2026
Details
View Map
Share
Follow
Fulton Road

Cadent Gas are proposing to carry out Utility asset works on Fulton Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 08:47.

Cadent Gas logo
Between
5 and 23 Jan 2026
Details
View Map
Share
Follow
Neasden Lane North

Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 09:29.

Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
Alexandra Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Alexandra Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Oct 2025 at 11:46.

Virgin Media logo
Between
5 and 7 Jan 2026
Details
View Map
Share
Follow
Park Road

Virgin Media are proposing to carry out Utility asset works on Park Road, West Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 7 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Sep 2025 at 12:35.

Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
Village Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Village Way, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Oct 2025 at 12:21.

Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
Village Way East

London Borough Of Harrow are proposing to carry out Highway improvement works on Village Way East, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Oct 2025 at 12:28.

Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Oct 2025 at 12:14.

Between
5 and 10 Jan 2026
Details
View Map
Share
Rayners Lane

London Borough Of Harrow were proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2026 and run through until 10 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Oct 2025 at 12:09.


Roadworks Map near to St. Augustines Avenue, LONDON, W5 1ED (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 8 Oct 2025 22:38
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to St. Augustines Avenue, LONDON, W5 1ED (58 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
CLEVELEY CRESCENT 
(0.1 miles)
BT
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 6 Oct 2025 12:19
(Scheduled: 6 Oct 2025 - 8 Oct 2025)
0.1
Details
Share
Follow
2
MAJOR
  
HANGER LANE 
(0.2 miles)
Advanced Electricty Networks Ltd
Utility asset works - Footway, Carriageway - Lane closure
In Progress
Since: 17 Sep 2025 07:55
(Scheduled: 17 Sep 2025 - 7 Nov 2025)
0.2
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
RIVERSIDE GARDENS 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 6 Oct 2025 - 25 Nov 2025
0.2
Details
Share
Follow
4
Transport for London (TfL) logo
MAJOR
  
HANGER LANE ROUNDABOUT 
(0.2 miles)
Transport for London (TfL)
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 20 Oct 2024 - 7 Apr 2026
0.2
Details
Share
Follow
5
BT logo
TWYFORD ABBEY ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 6 Oct 2025 15:07
(Scheduled: 3 Oct 2025 - 9 Oct 2025)
0.2
Details
Share
Follow
6
HS2 logo
WEST GATE 
(0.2 miles)
HS2
Utility asset works - Footway, Cycleway - Road closure
Planned
Scheduled: 6 Oct 2025 - 14 Nov 2025
0.2
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
EALING ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 29 Sep 2025 - 24 Oct 2025
0.2
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
EALING ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 3 Oct 2025 13:23
(Scheduled: 29 Sep 2025 - 24 Oct 2025)
0.2
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
QUEENSBURY ROAD 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 11 Sep 2025 13:30
(Scheduled: 11 Sep 2025 - 30 Oct 2025)
0.3
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
MARSH ROAD 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 12 Sep 2025 10:00
(Scheduled: 12 Sep 2025 - 10 Nov 2025)
0.3
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data