ROADWORKS SUMMARY
High Street, UXBRIDGE, UB9 6DB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for High Street, UB9 6DB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to High Street, UXBRIDGE, UB9 6DB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for High Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Denham Way

Thames Water are carrying out Utility asset works on Denham Way, Maple Cross.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2024 at 10:00 and could run through until 30 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 14:46.

Cadent Gas logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Northwood Way

Cadent Gas are carrying out Utility asset works on Northwood Way, Northwood.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 11:03 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 14:52.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:30.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Pinewood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Pinewood Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Wood Lane, Iver Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:37.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 5 Jun 2024 at 15:39.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Slough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:36.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Church Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Church Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Park Road

UK Power Networks Eastern & London are carrying out New service connection on Park Road, Rickmansworth.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 11:00 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Oct 2024 at 15:37.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are carrying out Utility asset works on Sandy Lane, Northwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 23:21 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 08:05.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Highfield Avenue

Cadent Gas are carrying out Utility asset works on Highfield Avenue, Pinner.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 08:30 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 16:04.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are carrying out Utility asset works on Windsor Road, Gerrards Cross.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 11:02 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:10.

London Borough Of Hillingdon logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Park Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 13:42.

London Borough Of Hillingdon logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Park Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:09.

London Borough Of Hillingdon logo
LONG TERM
Between
7 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Park Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:42.

Hertfordshire County Council logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Denham Way

Hertfordshire County Council are carrying out Section 50 on Denham Way, Maple Cross.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 25 Oct 2024 at 12:51.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Swiss Avenue

Cadent Gas are proposing to carry out Utility asset works on Swiss Avenue, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jun 2024 at 10:56.

London Borough Of Hillingdon logo
LONG TERM
Between
8 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Herlwyn Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Herlwyn Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:40.

Buckinghamshire Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Amersham Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Amersham Road, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Jun 2024 at 11:27.

London Borough Of Hillingdon logo
LONG TERM
Between
8 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Moorhall Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Moorhall Road, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 13:41.

London Borough Of Hillingdon logo
LONG TERM
Between
8 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Moorhall Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Moorhall Road, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:08.

London Borough Of Hillingdon logo
LONG TERM
Between
8 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Moorhall Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Moorhall Road, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 07:43.

London Borough Of Hillingdon logo
LONG TERM
Between
9 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 14:07.

London Borough Of Hillingdon logo
LONG TERM
Between
9 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:09.

London Borough Of Hillingdon logo
LONG TERM
Between
9 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:43.

Thames Water logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Chalfont St Peter Bypass

Thames Water are carrying out roadworks on Chalfont St Peter Bypass, Chalfont St Peter.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 08:00 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 08:17.

Thames Water logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility asset works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 08:00 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 08:18.

UK Power Networks Eastern & London logo
Between
12 Oct and 8 Nov 2024
Details
View Map
Share
Rectory Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Rectory Road, Rickmansworth.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 12:20.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Northwood Hills Circus

Cadent Gas are proposing to carry out Utility asset works on Northwood Hills Circus, Northwood.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 11:39.

Thames Water logo
LONG TERM
Between
14 Oct and 5 Dec 2024
Details
View Map
Share
Follow
Chalfont St Peter Bypass

Thames Water are proposing to carry out roadworks on Chalfont St Peter Bypass, Chalfont St Peter.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 13:03.

Cadent Gas logo
Between
14 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Swiss Avenue

Cadent Gas are proposing to carry out Utility asset works on Swiss Avenue, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 15:58.

Cadent Gas logo
Until
11 Nov 2024
Details
View Map
Share
Follow
Swiss Avenue

Cadent Gas are carrying out Utility asset works on Swiss Avenue, Watford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 October 2024 at 10:22 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:28.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Dukes Wood Drive

Cadent Gas are carrying out Utility asset works on Dukes Wood Drive, Gerrards Cross.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 11:10 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 13:18.

Hertfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Harefield Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harefield Road, East, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Oct 2024 at 15:12.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Harefield Road

Hertfordshire County Council are carrying out Highway repair and maintenance works on Harefield Road, East, Rickmansworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:30 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 Oct 2024 at 10:18.

Cadent Gas logo
Between
20 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Park Way

Cadent Gas are proposing to carry out Utility asset works on Park Way, Rickmansworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 May 2024 at 14:16.

London Borough Of Hillingdon logo
LONG TERM
Between
21 Oct and 21 Nov 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Park Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 30 Sep 2024 at 14:18.

Cadent Gas logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
King Edwards Road

Cadent Gas are proposing to carry out Utility asset works on King Edwards Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 10:53.

Cadent Gas logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
King Edwards Road

Cadent Gas are proposing to carry out Utility asset works on King Edwards Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 14:36.

Cadent Gas logo
Until
12 Nov 2024
Details
View Map
Share
Follow
King Edwards Road

Cadent Gas are carrying out Utility asset works on King Edwards Road, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:30 and could run through until 12 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 09:53.

Cadent Gas logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Sharps Lane

Cadent Gas are carrying out Utility asset works on Sharps Lane, Ruislip.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:40 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:33.

Cadent Gas logo
LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
West Common

Cadent Gas are carrying out Utility asset works on West Common, Gerrards Cross.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 09:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 09:35.

Cadent Gas logo
LONG TERM
Between
21 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are proposing to carry out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:00.

Cadent Gas logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are carrying out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 13:05 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:28.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Denham Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Denham Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Jul 2024 at 10:11.

Buckinghamshire Council logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Denham Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on Denham Lane, Chalfont St Peter.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:30 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Oct 2024 at 10:13.

Cadent Gas logo
LONG TERM
Between
21 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Gade Avenue

Cadent Gas are proposing to carry out Utility asset works on Gade Avenue, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jun 2024 at 11:18.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Oct and 22 Nov 2024
Details
View Map
Share
Follow
West End Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on West End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 20 Aug 2024 at 15:13.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 30 Sep 2024 at 14:17.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Cheapside Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Cheapside Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Apr 2024 at 08:05.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Oxford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Apr 2024 at 08:01.

Thames Water logo
LONG TERM
Between
25 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Old Rectory Lane

Thames Water are proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 25 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 11:03.

Thames Water logo
LONG TERM
Between
25 Oct and 25 Nov 2024
Details
View Map
Share
Old Rectory Lane

Thames Water were proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2024 and run through until 25 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:03.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Austenwood Lane

Affinity Water are proposing to carry out Utility asset works on Austenwood Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 12 Sep 2024 at 15:54.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Austenwood Lane

Affinity Water are proposing to carry out Utility asset works on Austenwood Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Oct 2024 at 09:54.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Austenwood Lane

Affinity Water are carrying out Utility asset works on Austenwood Lane, Chalfont St Peter.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 08:46 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Oct 2024 at 09:11.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Park Road

UK Power Networks Eastern & London are carrying out New service connection on Park Road, Rickmansworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:45 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Oct 2024 at 15:36.

Affinity Water logo
Friday
Details
View Map
Share
Marsh Road

Affinity Water carried out Utility repair and maintenance works on Marsh Road, Pinner.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 28 Oct 2024 and 1 Nov 2024 and were actually completed between 28 Oct 2024 (09:01) and 30 Oct 2024 (12:19). The works impacted the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Oct 2024 at 12:23.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Eastglade

UK Power Networks Eastern & London are carrying out New service connection on Eastglade, Northwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:28 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 09:28.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Northway

UK Power Networks Eastern & London are proposing to carry out New service connection on Northway, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Jul 2024 at 10:17.

Hertfordshire County Council logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Victoria Close

Hertfordshire County Council are proposing to carry out Section 50 on Victoria Close, Rickmansworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 28 Oct 2024 at 07:46.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cleveland Road

Affinity Water are proposing to carry out Utility asset works on Cleveland Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Jul 2024 at 10:53.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cleveland Road

Affinity Water are carrying out Utility asset works on Cleveland Road, Uxbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 17:00 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 30 Oct 2024 at 08:23.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Long Bottom Lane

Thames Water are carrying out Utility repair and maintenance works on Long Bottom Lane, Jordans.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 22:30 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 09:45.

Affinity Water logo
Finishing
Sunday
Details
View Map
Share
Deanway

Affinity Water were proposing to carry out Utility repair and maintenance works on Deanway, Chalfont St Giles.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 3 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 29 Oct 2024 at 13:21.

Buckinghamshire Council logo
Tomorrow
Details
View Map
Share
Slade Oak Lane

Buckinghamshire Council carried out Highway repair and maintenance works on Slade Oak Lane, Denham.

The road was closed for some or all of the period.

The works were originally planned between 30 Oct 2024 and 31 Oct 2024 and were actually completed on 30 Oct 2024 between 09:30 and 15:00. The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Oct 2024 at 15:52.

London Borough Of Hillingdon logo
LONG TERM
Between
30 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Fore Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:56.

Buckinghamshire Council logo
Tomorrow
Details
View Map
Share
Layters End

Buckinghamshire Council carried out Highway repair and maintenance works on Layters End, Chalfont St Peter.

The road was closed for some or all of the period.

The works were originally planned between 30 Oct 2024 and 31 Oct 2024 and were actually completed on 30 Oct 2024 between 09:30 and 15:00. The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Oct 2024 at 15:50.

Finishing
Saturday
Details
View Map
Share
Follow
Latimer Gardens

London Borough Of Harrow are proposing to carry out Highway improvement works on Latimer Gardens, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:43.

Finishing
Saturday
Details
View Map
Share
Latimer Gardens

London Borough Of Harrow were proposing to carry out Highway improvement works on Latimer Gardens, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 October 2024 and run through until 2 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Oct 2024 at 11:31.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Harefield Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harefield Road, East, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 30 Sep 2024 at 15:39.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Harefield Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Harefield Road, East, Rickmansworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 October 2024 and run through until 4 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 25 Oct 2024 at 14:44.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Oxford Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Oxford Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:48.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Station Approach

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Approach, South Ruislip, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 22 Oct 2024 at 08:55.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Station Approach

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Approach, South Ruislip, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 24 Oct 2024 at 10:53.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Station Approach

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Approach, South Ruislip, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 28 Oct 2024 at 10:28.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
West End Road

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on West End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 20 Aug 2024 at 15:01.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:39.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:58.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
High Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:53.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Fore Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:59.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Kings Close

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings Close, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:51.

Buckinghamshire Council logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Wood Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wood Lane, Iver Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Oct 2024 at 14:54.

Affinity Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Cleveland Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Cleveland Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 31 Jul 2024 at 13:00.

Affinity Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Cleveland Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Cleveland Road, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 4 Sep 2024 at 09:21.

Buckinghamshire Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Iver.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 12:09.

Buckinghamshire Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Iver.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Oct 2024 at 11:43.

Scottish Hydro Electric Power Dis logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Bangors Road North

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Bangors Road North, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 11:51.

Scottish Hydro Electric Power Dis logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Bangors Road North

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Bangors Road North, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:16.

Buckinghamshire Council logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Fulmer Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Fulmer Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 12:27.

Buckinghamshire Council logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Dukes Wood Drive

Buckinghamshire Council are proposing to carry out Core Sampling on Dukes Wood Drive, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 07:54.

Affinity Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Hedgerley Lane

Affinity Water are proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Aug 2024 at 11:17.

Affinity Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Hedgerley Lane

Affinity Water are proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 19 Aug 2024 at 15:19.

Affinity Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Hedgerley Lane

Affinity Water are proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 23 Aug 2024 at 12:48.

Affinity Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Hedgerley Lane

Affinity Water are proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 23 Sep 2024 at 11:32.

Affinity Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Hedgerley Lane

Affinity Water are proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 14:34.

London Borough Of Hillingdon logo
Between
4 and 28 Nov 2024
Details
View Map
Share
Follow
Kings College Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings College Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 30 Oct 2024 at 09:55.

Buckinghamshire Council logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Dukes Wood Avenue

Buckinghamshire Council are proposing to carry out Core Sampling on Dukes Wood Avenue, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 07:54.

Between
4 and 8 Nov 2024
Details
View Map
Share
Cannon Lane

London Borough Of Harrow were proposing to carry out Highway improvement works on Cannon Lane, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Aug 2024 at 15:09.

Thames Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 13:32.

Hertfordshire County Council logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Gosforth Lane

Hertfordshire County Council are proposing to carry out Works for road purposes on Gosforth Lane, Hayling, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Sep 2024 at 15:55.

Hertfordshire County Council logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Gosforth Lane

Hertfordshire County Council are proposing to carry out Works for road purposes on Gosforth Lane, Hayling, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 24 Oct 2024 at 12:38.

Buckinghamshire Council logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Deanway

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Deanway, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Jul 2024 at 13:21.

Buckinghamshire Council logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Deanway

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Deanway, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 1 Oct 2024 at 13:41.

Buckinghamshire Council logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Jul 2024 at 13:22.

Buckinghamshire Council logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 1 Oct 2024 at 13:41.

Cadent Gas logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Elm Way

Cadent Gas are proposing to carry out Utility asset works on Elm Way, Rickmansworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 May 2024 at 14:21.

Hertfordshire County Council logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Field Way

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Field Way, Rickmansworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Sep 2024 at 15:59.

Hertfordshire County Council logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Field Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Field Way, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Sep 2024 at 14:32.

Hertfordshire County Council logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Field Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Field Way, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 09:51.

Hertfordshire County Council logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Victoria Close

Hertfordshire County Council are proposing to carry out Section 50 on Victoria Close, Rickmansworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 30 Oct 2024 at 07:47.

Cadent Gas logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Gade Avenue

Cadent Gas are proposing to carry out Utility asset works on Gade Avenue, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:02.

Scottish Hydro Electric Power Dis logo
Between
5 and 22 Nov 2024
Details
View Map
Share
Follow
Trewarden Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Trewarden Avenue, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 16:34.

Scottish Hydro Electric Power Dis logo
Between
5 and 22 Nov 2024
Details
View Map
Share
Trewarden Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Trewarden Avenue, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:10.

Affinity Water logo
Between
5 and 8 Nov 2024
Details
View Map
Share
Follow
Cornwall Road

Affinity Water are proposing to carry out Utility asset works on Cornwall Road, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 08:07.

Affinity Water logo
Between
5 and 8 Nov 2024
Details
View Map
Share
Follow
Cornwall Road

Affinity Water are proposing to carry out Utility asset works on Cornwall Road, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 16:06.

Affinity Water logo
Between
5 and 7 Nov 2024
Details
View Map
Share
Follow
Chalfont Lane

Affinity Water are proposing to carry out Utility asset works on Chalfont Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 14:55.

National Highways logo
Between
7 and 9 Nov 2024
Details
View Map
Share
Follow
Sevenhills Road

National Highways are proposing to carry out Works for road purposes on Sevenhills Road, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Oct 2024 at 15:02.

Thames Water logo
Between
8 and 11 Nov 2024
Details
View Map
Share
Follow
Old Rectory Lane

Thames Water are proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 11 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:17.

Buckinghamshire Council logo
LONG TERM
Between
11 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Framewood Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Framewood Road, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Aug 2024 at 14:05.

Buckinghamshire Council logo
Between
11 and 12 Nov 2024
Details
View Map
Share
Follow
Fulmer Common Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Fulmer Common Road, Wexham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 15 Aug 2024 at 11:59.

London Borough Of Hillingdon logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:38.

London Borough Of Hillingdon logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 13:40.

Between
11 and 15 Nov 2024
Details
View Map
Share
Chester Drive

London Borough Of Harrow were proposing to carry out Highway improvement works on Chester Drive, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Oct 2024 at 12:26.

BT logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Marsham Lane

BT are proposing to carry out Utility asset works on Marsham Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Oct 2024 at 15:05.

London Borough Of Hillingdon logo
Between
11 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:58.

Buckinghamshire Council logo
Between
11 and 17 Nov 2024
Details
View Map
Share
Follow
Gold Hill East

Buckinghamshire Council are proposing to carry out Highway improvement works on Gold Hill East, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 14:06.

Cadent Gas logo
LONG TERM
Between
11 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Whippendell Road

Cadent Gas are proposing to carry out Utility asset works on Whippendell Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 11:00.

Affinity Water logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Permanent reinstatement on Station Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Aug 2024 at 09:53.

Affinity Water logo
Between
12 and 17 Nov 2024
Details
View Map
Share
Victoria Close

Affinity Water were proposing to carry out Utility asset works on Victoria Close, Rickmansworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 17 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 09:45.

Affinity Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Gainsborough Road

Affinity Water are proposing to carry out Utility asset works on Gainsborough Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Aug 2024 at 11:56.

Affinity Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Gainsborough Road

Affinity Water are proposing to carry out Utility asset works on Gainsborough Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Aug 2024 at 09:03.

Affinity Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Gainsborough Road

Affinity Water are proposing to carry out Utility asset works on Gainsborough Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Oct 2024 at 15:13.

Buckinghamshire Council logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Hawkswood Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Hawkswood Lane, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Oct 2024 at 09:23.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:26.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:52.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Moorhall Road

Cadent Gas are proposing to carry out Utility asset works on Moorhall Road, Harefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 14:43.

London Borough Of Hillingdon logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 28 Oct 2024 at 13:01.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Orchehill Avenue

Cadent Gas are proposing to carry out Utility asset works on Orchehill Avenue, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 11:37.

Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Pinner Green

London Borough Of Harrow are proposing to carry out Highway improvement works on Pinner Green, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:39.

Between
18 and 20 Nov 2024
Details
View Map
Share
Paines Lane

London Borough Of Harrow were proposing to carry out Highway improvement works on Paines Lane, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2024 at 13:20.

Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Paines Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Paines Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 24 Sep 2024 at 12:33.

Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Altham Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Altham Road, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 10:04.

Buckinghamshire Council logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Roughwood Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Roughwood Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 1 Oct 2024 at 13:41.

Cadent Gas logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Rickmansworth Road

Cadent Gas are proposing to carry out Utility asset works on Rickmansworth Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 14:50.

Hertfordshire County Council logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Sarratt Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sarratt Lane, Loudwater.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Oct 2024 at 15:46.

Between
19 and 23 Nov 2024
Details
View Map
Share
Pinner Green

London Borough Of Harrow were proposing to carry out Highway improvement works on Pinner Green, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2024 at 13:18.

Between
19 and 24 Nov 2024
Details
View Map
Share
Follow
Pinner Green

London Borough Of Harrow are proposing to carry out Highway improvement works on Pinner Green, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 13:12.

Between
20 and 22 Nov 2024
Details
View Map
Share
Sylvia Avenue

London Borough Of Harrow were proposing to carry out Highway improvement works on Sylvia Avenue, Hatch End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Oct 2024 at 12:40.

Thames Water logo
Between
25 Nov and 25 Dec 2024
Details
View Map
Share
Follow
Old Rectory Lane

Thames Water are proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 25 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 16:08.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
East Towers

London Borough Of Harrow are proposing to carry out Highway improvement works on East Towers, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
East Towers

London Borough Of Harrow are proposing to carry out Highway improvement works on East Towers, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:01.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
West End Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.

Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
West End Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 4 Sep 2024 at 14:34.

Affinity Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Bowstridge Lane

Affinity Water are proposing to carry out Utility asset works on Bowstridge Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Aug 2024 at 12:53.

Affinity Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Bowstridge Lane

Affinity Water are proposing to carry out Utility asset works on Bowstridge Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Sep 2024 at 11:34.

UK Power Networks Eastern & London logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Eastglade

UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 15:54.

UK Power Networks Eastern & London logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Townfield

UK Power Networks Eastern & London are proposing to carry out New service connection on Townfield, Rickmansworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:19.

UK Power Networks Eastern & London logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Greenhill Crescent

UK Power Networks Eastern & London are proposing to carry out New service connection on Greenhill Crescent, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 14:06.

Hertfordshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Quickley Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Quickley Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 24 Jun 2024 at 11:21.

Hertfordshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Quickley Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Quickley Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Aug 2024 at 14:42.

Between
27 and 29 Nov 2024
Details
View Map
Share
Rosecroft Walk

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Rosecroft Walk, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:42.

Between
27 and 29 Nov 2024
Details
View Map
Share
West End Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on West End Avenue, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:49.

Between
27 and 29 Nov 2024
Details
View Map
Share
Woodhall Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Woodhall Avenue, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Oct 2024 at 08:55.

Between
27 and 29 Nov 2024
Details
View Map
Share
Woodhall Drive

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Woodhall Drive, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:56.

Between
2 and 4 Dec 2024
Details
View Map
Share
Milman Close

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Milman Close, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:50.

Between
2 and 4 Dec 2024
Details
View Map
Share
Marsworth Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Marsworth Avenue, Hatch End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:55.

Hertfordshire County Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
The Woods

Hertfordshire County Council are proposing to carry out Highway improvement works on The Woods, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 17 Oct 2024 at 14:18.

Buckinghamshire Council logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Dukes Wood Drive

Buckinghamshire Council are proposing to carry out Highway improvement works on Dukes Wood Drive, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 10:56.

Buckinghamshire Council logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Dukes Wood Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Dukes Wood Avenue, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 10:57.

Hertfordshire County Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Valley Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Valley Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 11:46.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Watford Heath

Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Sep 2024 at 12:40.

Buckinghamshire Council logo
Between
12 and 19 Dec 2024
Details
View Map
Share
Follow
Gold Hill East

Buckinghamshire Council are proposing to carry out Highway improvement works on Gold Hill East, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 09:20.

London Borough Of Hillingdon logo
LONG TERM
Between
16 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 10:11.

Thames Water logo
LONG TERM
Between
20 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 13:02.

Thames Water logo
LONG TERM
Between
27 Dec 2024 and 17 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:58.

Cityfibre Metro Networks logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Mount Hill Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Mount Hill Lane, Hedgerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 14:31.

Cadent Gas logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Batchworth Lane

Cadent Gas are proposing to carry out Utility asset works on Batchworth Lane, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 16 May 2024 at 13:54.

Cadent Gas logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Maythorne Close

Cadent Gas are proposing to carry out Utility asset works on Maythorne Close, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 14:46.

Buckinghamshire Council logo
Between
3 and 14 Jan 2025
Details
View Map
Share
Follow
Denham Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Denham Avenue, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 23 Sep 2024 at 12:08.

Cadent Gas logo
LONG TERM
Between
3 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Whippendell Road

Cadent Gas are proposing to carry out Utility asset works on Whippendell Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 May 2024 at 08:38.

Buckinghamshire Council logo
Between
4 and 15 Jan 2025
Details
View Map
Share
Follow
Deanway

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Deanway, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 14:13.

Buckinghamshire Council logo
Between
4 and 15 Jan 2025
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 14:14.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Moorfield Road

Cadent Gas were proposing to carry out Utility asset works on Moorfield Road, Denham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:09.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Marsham Lane

BT are proposing to carry out Utility asset works on Marsham Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Oct 2024 at 13:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
West Common

Cadent Gas are proposing to carry out Utility asset works on West Common, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 15:05.

Hertfordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
London Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 11:52.

Hertfordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Dickinson Square

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dickinson Square, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 10:54.

UK Power Networks Eastern & London logo
Between
7 and 28 Jan 2025
Details
View Map
Share
Follow
Rectory Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:13.

Hertfordshire County Council logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Greenhills Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenhills Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 10:47.

UK Power Networks Eastern & London logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Berry Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:04.

Cadent Gas logo
LONG TERM
Between
10 Jan and 20 Feb 2025
Details
View Map
Share
Hedgerley Lane

Cadent Gas were proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 15:17.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 18 Sep 2024 at 08:43.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:44.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:46.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Clitheroe Gardens

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 15:30.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
The Watergate

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Watergate, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 15:26.

Cadent Gas logo
LONG TERM
Between
14 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:16.

Hertfordshire County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Clitheroe Gardens

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:44.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Gordon Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Gordon Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 14:35.

Cadent Gas logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:07.


Roadworks Map near to High Street, UXBRIDGE, UB9 6DB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Oct 2024 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to High Street, UXBRIDGE, UB9 6DB (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Affinity Water logo
NORTHWOOD ROAD 
(0.6 miles)
Affinity Water
Utility repair and maintenance works - Verge - Two-way signals
In Progress
Since: 30 Oct 2024 11:28
(Scheduled: 30 Oct 2024 - 1 Nov 2024)
0.6
Details
Share
Follow
2
HS2 logo
U34 PUBLIC FOOTPATH DELLSIDE TO HARVIL ROAD 
(0.8 miles)
HS2
Works for Rail Purposes - Footway - No carriageway incursion
In Progress
Since: 1 Oct 2020 08:00
(Scheduled: 28 Sep 2020 - 30 Sep 2025)
0.8
Details
Share
Follow
3
London Borough Of Hillingdon logo
MAJOR
  
MOORHALL ROAD 
(0.9 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 8 Oct 2024 - 8 Nov 2024
0.9
Details
Share
Follow
4
London Borough Of Hillingdon logo
MAJOR
  
MOORHALL ROAD 
(0.9 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 8 Oct 2024 - 8 Nov 2024
0.9
Details
Share
Follow
5
London Borough Of Hillingdon logo
MAJOR
  
MOORHALL ROAD 
(0.9 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 8 Oct 2024 - 7 Nov 2024
0.9
Details
Share
Follow
6
HS2 logo
NORTH ORBITAL ROAD 
(1.0 miles)
HS2
Works for road purposes - Verge - No carriageway incursion
In Progress
Since: 11 Apr 2023 08:00
(Scheduled: 11 Apr 2023 - 11 Mar 2025)
1.0
Details
Share
Follow
7
HS2 logo
NORTH ORBITAL ROAD 
(1.0 miles)
HS2
Works for road purposes - Carriageway - No carriageway incursion
Planned
Scheduled: 1 Mar 2023 - 31 Dec 2025
1.0
Details
Share
Follow
8
HS2 logo
NORTH ORBITAL ROAD 
(1.0 miles)
HS2
Works for road purposes - Carriageway - No carriageway incursion
In Progress
Since: 23 Sep 2024 11:00
(Scheduled: 23 Sep 2024 - 31 Dec 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data