ROADWORKS SUMMARY
Ormsby Gardens, GREENFORD, UB6 9NR
Introduction
View current and future planned roadworks and road closures for Ormsby Gardens, UB6 9NR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Ormsby Gardens, GREENFORD, UB6 9NR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ormsby Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
18 May 2025
London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 08:28.
31 Mar 2025
Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2023 at 18:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 May 2023 at 12:00.
Wednesday
London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:23.
Wednesday
London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:22.
13 Mar 2025
Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.
22 Jul 2024 and 22 Jul 2027
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stockley Road, West Drayton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 22 July 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 19 Jul 2024 at 08:56.
28 Feb 2025
London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 09:30 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 20 Dec 2024 at 08:52.
25 Feb 2025
London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.
2 Sep 2024 and 28 Mar 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on Wellington Road North, Hounslow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hounslow on 30 May 2024 at 13:18.
21 Oct 2024 and 28 Mar 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:54.
21 Oct 2024 and 28 Mar 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.
21 Oct 2024 and 28 Mar 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.
28 Feb 2025
London Borough Of Ealing are carrying out Highway improvement works on Greenford Road, Greenford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 13 Nov 2024 at 09:00.
6 Jan 2025
Thames Water are carrying out Utility repair and maintenance works on Abbey Road, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 12:50 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 07:53.
6 Jan 2025
Thames Water are carrying out Utility repair and maintenance works on Cumberland Avenue, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 12:50 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 07:52.
20 Jan 2025
ESP Electricity are carrying out Utility repair and maintenance works on Bramshill Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 09:11 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 19 Dec 2024 at 09:08.
10 Jan 2025
London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Sipson Lane, Hayes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hillingdon on 20 Dec 2024 at 09:29.
15 Jan 2025
London Borough Of Ealing are carrying out Highway improvement works on Rowdell Road, Northolt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:30 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 29 Nov 2024 at 16:48.
2 Dec 2024 and 25 May 2025
Thames Water are proposing to carry out Utility asset works on Chapter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.
25 May 2025
Thames Water are carrying out Utility asset works on Chapter Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:30 and could run through until 25 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:55.
11 Dec 2024 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:46.
11 Dec 2024 and 3 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:47.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Spring Grove Road, Isleworth.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 10:01 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 15:44.
10 Jan 2025
Thames Water are carrying out Utility repair and maintenance works on Lancelot Road, Wembley.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 10:00 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:55.
20 Dec 2024 and 20 Jan 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 December 2024 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 1 Oct 2024 at 07:22.
Tuesday
Affinity Water are carrying out Utility repair and maintenance works on Corringham Road, Wembley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 December 2024 at 11:25 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Dec 2024 at 13:19.
3 Jan 2025
Cadent Gas are carrying out Utility repair and maintenance works on Long Lane, Ickenham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 December 2024 at 10:14 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 11:53.
7 Jan 2025
Cadent Gas are carrying out Utility repair and maintenance works on Salmon Street, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 December 2024 at 09:48 and could run through until 7 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 09:55.
28 Dec 2024 and 6 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Rosebank Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:14.
28 Dec 2024 and 29 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 10 Oct 2024 at 17:58.
28 Dec 2024 and 29 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Oct 2024 at 13:42.
28 Dec 2024 and 29 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Dec 2024 at 18:36.
1 and 17 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Bromyard Avenue, Acton.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:14.
2 Jan and 29 Mar 2025
National Highways are proposing to carry out Highway improvement works on Stockley Road, West Drayton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2024 at 07:22.
2 Jan and 6 Feb 2025
ESP Electricity are proposing to carry out Utility asset works on Iron Bridge Road, Yiewsley, West Drayton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 20 Dec 2024 at 08:53.
2 Jan and 6 Feb 2025
ESP Electricity are proposing to carry out Utility asset works on Iron Bridge Road, Yiewsley, West Drayton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 23 Dec 2024 at 14:36.
2 and 21 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Noel Road, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Dec 2024 at 13:07.
2 and 21 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Noel Road, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Dec 2024 at 12:06.
2 and 21 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Noel Road, Acton.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 21 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Dec 2024 at 13:04.
2 and 29 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Noel Road, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Dec 2024 at 11:21.
2 and 29 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Noel Road, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Dec 2024 at 12:06.
2 and 29 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Noel Road, Acton.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Dec 2024 at 11:20.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:53.
6 and 8 Jan 2025
Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:27.
6 and 17 Jan 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Beech Avenue, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Dec 2024 at 11:27.
6 and 10 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Dagmar Mews, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 12:00.
6 and 19 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 19 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:17.
6 and 19 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:30.
6 and 19 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 10:22.
6 and 19 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 14:42.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Drenon Square, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 10:10.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Drenon Square, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 14:35.
6 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 11:50.
6 Jan and 6 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on West Drayton Road, Uxbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 08:37.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on New Road, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:38.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on New Road, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 08:58.
6 and 31 Jan 2025
London Borough Of Ealing were proposing to carry out Utility asset works on West Gate, Ealing.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 6 Dec 2024 at 22:09.
6 and 31 Jan 2025
London Borough Of Ealing are proposing to carry out Utility asset works on West Gate, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 6 Dec 2024 at 22:21.
6 and 31 Jan 2025
London Borough Of Ealing are proposing to carry out Utility asset works on West Gate, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 9 Dec 2024 at 12:51.
6 Jan and 2 Mar 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:30.
6 Jan and 2 Mar 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:39.
6 Jan and 10 Mar 2025
Thames Water were proposing to carry out Utility asset works on Mulgrave Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 07:28.
6 and 17 Jan 2025
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on The Avenue, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 18 Oct 2024 at 13:15.
6 and 13 Jan 2025
London Borough Of Harrow are proposing to carry out Highway improvement works on Junction Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:50.
6 and 13 Jan 2025
London Borough Of Harrow are proposing to carry out Highway improvement works on Havelock Place, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:43.
6 and 8 Jan 2025
BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Nov 2024 at 10:18.
7 and 9 Jan 2025
Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:26.
7 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 13:39.
7 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 09:35.
9 and 13 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Pebworth Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 18 Dec 2024 at 06:16.
10 Jan and 10 Feb 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 16 Dec 2024 at 13:53.
10 Jan and 10 Feb 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 23 Dec 2024 at 09:40.
11 and 18 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 22 Oct 2024 at 14:25.
11 and 18 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 23 Oct 2024 at 15:48.
13 and 24 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:29.
13 and 24 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 15:18.
13 Jan and 21 Feb 2025
London Borough Of Hounslow were proposing to carry out Highway improvement works on North Street, Isleworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 11 Dec 2024 at 10:01.
13 Jan and 21 Feb 2025
London Borough Of Hounslow were proposing to carry out Highway improvement works on St Johns Road, Isleworth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 11 Dec 2024 at 10:02.
13 Jan and 21 Feb 2025
London Borough Of Hounslow were proposing to carry out Highway improvement works on Twickenham Road, Isleworth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 11 Dec 2024 at 10:01.
13 and 27 Jan 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on Capital Interchange Way, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 17 Dec 2024 at 13:02.
13 and 15 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 10:51.
13 and 15 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 16:24.
13 Jan and 18 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:51.
13 Jan and 18 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Oct 2024 at 14:10.
13 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Costons Avenue, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 14:48.
13 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Costons Avenue, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 16:59.
13 and 21 Jan 2025
Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:36.
13 and 21 Jan 2025
Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 07:31.
13 Jan and 30 May 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 24 Nov 2024 at 22:17.
13 Jan and 4 Apr 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 4 Oct 2024 at 10:43.
13 Jan and 30 May 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 24 Nov 2024 at 22:17.
13 and 24 Jan 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 18 Sep 2024 at 08:43.
13 and 24 Jan 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:44.
13 and 24 Jan 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 6 Nov 2024 at 07:48.
14 and 16 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on King Street, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 14:03.
14 and 16 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on King Street, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 15:06.
14 and 17 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 16:33.
14 Jan and 14 Feb 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 16 Dec 2024 at 13:54.
14 Jan and 14 Feb 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 17 Dec 2024 at 07:46.
20 Jan and 7 Feb 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Great West Road, Hounslow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by National Grid Electricity Transmission on 23 Dec 2024 at 13:54.
20 Jan and 7 Feb 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Great West Road, Hounslow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Grid Electricity Transmission on 23 Dec 2024 at 13:53.
20 Jan and 9 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:07.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Cherington Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:29.
20 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Creffield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:10.
20 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Creffield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 12:14.
20 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Longfield Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 16:25.
20 Jan and 15 May 2025
Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 07:30.
20 Jan and 15 May 2025
Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 07:35.
20 Jan and 2 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Uxbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 10:16.
20 and 23 Jan 2025
Affinity Water were proposing to carry out Utility asset works on Eastcote Lane, Northolt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 12:25.
20 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 07:51.
20 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:38.
20 Jan and 20 Feb 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Pond Green, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 20 Dec 2024 at 09:31.
20 Jan and 20 Feb 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Pond Green, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 23 Dec 2024 at 09:36.
20 Jan and 10 Feb 2025
London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 18 Dec 2024 at 15:45.
20 and 28 Jan 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 22 Nov 2024 at 07:21.
21 Jan and 16 Mar 2025
ESP Electricity are proposing to carry out Utility asset works on Eastwood Road, West Drayton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 10 Oct 2024 at 13:59.
24 and 28 Jan 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Wharncliffe Drive, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Nov 2024 at 13:57.
27 Jan and 14 Mar 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on Twickenham Road, Isleworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 16 Dec 2024 at 15:46.
27 Jan and 9 Feb 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on York Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 09:02.
27 Jan and 27 Mar 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 16 Dec 2024 at 13:53.
27 Jan and 27 Mar 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 17 Dec 2024 at 07:45.
27 Jan and 27 Mar 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 17 Dec 2024 at 08:57.
27 Jan and 2 Feb 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Shelley Crescent, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 10:40.
27 and 30 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 09:48.
27 and 30 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 16:09.
28 Jan and 30 Apr 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Ruislip Road, Northolt.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Ealing on 31 Oct 2024 at 16:15.
28 and 31 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 16:02.
28 and 31 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Dec 2024 at 08:19.
29 and 31 Jan 2025
Thames Water were proposing to carry out New service connection on Northfield Avenue, West Ealing.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 13:41.
29 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 11:45.
31 Jan and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Selbie Avenue, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:17.
31 Jan and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Selbie Avenue, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 18:06.
31 Jan and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Denzil Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:01.
31 Jan and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Denzil Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 18:05.
31 Jan and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Severn Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:01.
3 and 16 Feb 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Strelley Way, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 09:02.
3 and 5 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Amherst Avenue, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 10:35.
3 Feb and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:07.
3 Feb and 16 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 10:07.
3 Feb and 3 Mar 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 16 Dec 2024 at 13:54.
3 Feb and 3 Mar 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 17 Dec 2024 at 07:46.
3 Feb and 3 Mar 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 17 Dec 2024 at 08:57.
3 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Green Lane, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 15:25.
3 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Green Lane, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Dec 2024 at 10:45.
3 and 18 Feb 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Hillingdon Hill, Uxbridge.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 15:00.
3 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bowrons Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:02.
3 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Castleton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 3 Nov 2024 at 19:10.
4 and 7 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 11:23.
4 and 7 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 23:04.
5 Feb and 5 Mar 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 9 Dec 2024 at 05:37.
6 and 27 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Neal Avenue, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 14:14.
6 and 27 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Nov 2024 at 13:48.
6 and 27 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Dec 2024 at 12:09.
7 and 10 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Eastcote Lane, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 1 Nov 2024 at 16:55.
9 Feb and 13 Mar 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Aug 2024 at 09:49.
10 and 14 Feb 2025
Thames Water are proposing to carry out New service connection on Pembroke Place, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:20.
10 Feb and 31 Jul 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on Southall Lane, Heston, Hounslow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 July 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Hounslow on 9 Dec 2024 at 10:27.
10 and 22 Feb 2025
National Highways are proposing to carry out Works for road purposes on Southall Lane, Heston, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Dec 2024 at 16:30.
10 and 14 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Dagmar Mews, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 16:07.
10 Feb and 14 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Freemans Lane, Hayes.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 11:53.
10 and 13 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsway, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 11:07.
10 Feb and 21 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:25.
10 Feb and 21 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 10:17.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 14:32.
10 and 12 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Blenheim Road, West Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 10:47.
11 and 13 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Alexandra Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 10 Dec 2024 at 12:56.
14 and 16 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Dec 2024 at 13:17.
14 and 16 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Dec 2024 at 10:00.
14 Feb and 19 Mar 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Court Drive, Uxbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 14:59.
14 and 20 Feb 2025
G2 Energy IDNO were proposing to carry out New service connection on Field End Road, Ruislip.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 February 2025 and run through until 20 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 28 Nov 2024 at 10:45.
14 and 20 Feb 2025
G2 Energy IDNO were proposing to carry out New service connection on Field End Road, Ruislip.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 February 2025 and run through until 20 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 5 Dec 2024 at 08:29.
14 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chessington Court, Pinner.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 14:40.
15 and 24 Feb 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hawkins Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 15 Oct 2024 at 11:10.
15 and 24 Feb 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 23 Oct 2024 at 09:07.
17 and 19 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Worton Gardens, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 12:30.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Carville Crescent, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 12:31.
17 and 20 Feb 2025
Virgin Media are proposing to carry out Utility asset works on Greenford Road Service Road To Numbers 20-60, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 13 Dec 2024 at 16:48.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Sep 2024 at 10:03.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 09:50.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 11:00.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:23.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 11:14.
17 Feb and 24 Mar 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:01.
17 Feb and 24 Mar 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 07:57.
17 and 19 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Clarendon Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 21:31.
17 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 16:05.
17 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:57.
17 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on The Chase, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:39.
18 and 20 Feb 2025
Vodafone are proposing to carry out Remedial works on Caple Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 9 Dec 2024 at 16:30.
18 and 21 Feb 2025
Affinity Water were proposing to carry out Utility asset works on Eastcote Lane, Northolt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 14:24.
18 and 20 Feb 2025
London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 23 Dec 2024 at 12:19.
18 and 20 Feb 2025
London Borough Of Harrow are proposing to carry out Highway improvement works on The Close, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 23 Dec 2024 at 12:20.
18 Feb and 3 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Palmerston Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Dec 2024 at 12:21.
18 Feb and 3 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Palmerston Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Dec 2024 at 13:56.
19 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 15:54.
19 and 21 Feb 2025
Thames Water were proposing to carry out New service connection on Kingsdown Avenue, West Ealing.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 10:00.
19 Feb and 4 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 19 Dec 2024 at 07:27.
19 Feb and 4 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 19 Dec 2024 at 09:59.
19 and 21 Feb 2025
Affinity Water are proposing to carry out Highway repair and maintenance works on Northolt Road, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 12:28.
21 and 24 Feb 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenmore Avenue, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 19 Dec 2024 at 10:57.
24 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility asset works on Long Drive, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 14:29.
24 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Clifton Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 04:32.
24 Feb and 4 Apr 2025
Thames Water are proposing to carry out Utility asset works on Severn Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:51.
24 and 28 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Greenford Road, Sudbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 19 Dec 2024 at 10:56.
24 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Blackbird Hill, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 08:35.
25 Feb and 1 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 11:12.
25 Feb and 1 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 15:58.
26 Feb and 5 Apr 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Charville Lane, Hayes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 5 April 2025. The works will impact the verge only.
This roadwork event was last updated by G2 Energy IDNO on 20 Dec 2024 at 10:23.
1 and 5 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Nestles Avenue, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Nov 2024 at 13:50.
1 and 5 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Nestles Avenue, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 11:15.
1 and 5 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Nestles Avenue, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 14:34.
1 and 4 Mar 2025
Vodafone are proposing to carry out Remedial works on Station Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 24 Dec 2024 at 09:01.
3 Mar and 11 Apr 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Adelphi Crescent, Hayes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 14:57.
3 Mar and 6 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Acton Lane, Park Royal.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Ealing on 6 Nov 2024 at 11:23.
3 Mar and 31 Jul 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Oldfield Lane North, Greenford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 15 Nov 2024 at 15:04.
3 and 7 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 15:11.
4 and 6 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Boxtree Lane, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Dec 2024 at 10:53.
5 and 7 Mar 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on George Street, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 22 Nov 2024 at 13:27.
5 and 7 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lancelot Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 28 Nov 2024 at 12:04.
6 Mar and 11 Apr 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Lansbury Drive, Hayes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 15:00.
8 Mar and 6 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Greenford Road, Greenford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 16:59.
8 Mar and 6 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Rockware Avenue, Greenford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 16:48.
10 Mar and 21 Apr 2025
Thames Water are proposing to carry out Utility asset works on Normanby Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:12.
10 and 28 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hillcroft Crescent, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 19:52.
11 Mar and 25 Apr 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Balmoral Drive, Hayes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 14:58.
13 and 17 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Cambridge Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Dec 2024 at 09:50.
14 Mar and 1 May 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Balmoral Drive, Hayes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 14:58.
14 and 20 Mar 2025
G2 Energy IDNO are proposing to carry out New service connection on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 19 Dec 2024 at 07:32.
14 and 20 Mar 2025
G2 Energy IDNO are proposing to carry out New service connection on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 19 Dec 2024 at 14:05.
17 and 31 Mar 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on North Street, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 16 Dec 2024 at 15:59.
17 Mar and 31 Jul 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on Hayes Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 12 Dec 2024 at 10:03.
17 and 28 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Botwell Common Road, Hayes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Dec 2024 at 10:43.
17 and 28 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Botwell Common Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Dec 2024 at 11:15.
17 Mar and 30 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Park Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 16 Dec 2024 at 11:58.
17 Mar and 4 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on London Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 15:48.
17 and 19 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Pebworth Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 15 Dec 2024 at 21:26.
18 and 24 Mar 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Hatfield Road, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 12:48.
18 and 24 Mar 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Grosvenor Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 11:22.
20 and 24 Mar 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Ribblesdale Avenue, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 12:39.
21 and 25 Mar 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Clarence Street, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 12:28.
22 and 25 Mar 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Ennismore Avenue, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 23 Dec 2024 at 12:39.
24 Mar and 6 May 2025
Thames Water are proposing to carry out Utility asset works on Normanby Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 10:36.
24 and 29 Mar 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 Dec 2024 at 13:31.
25 and 27 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Westmorland Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Dec 2024 at 11:51.
26 Mar and 7 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on Hartington Close, Sudbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 7 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Oct 2024 at 09:24.
26 and 31 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Hartington Close, Sudbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 2 Dec 2024 at 13:39.
Roadworks Map near to Ormsby Gardens, GREENFORD, UB6 9NR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Ormsby Gardens, GREENFORD, UB6 9NR (53 Events)
(Scheduled Dates)
(miles)
(Scheduled: 23 Dec 2024 - 22 Jan 2025)
(Scheduled: 23 Dec 2024 - 22 Jan 2025)
(Scheduled: 25 Nov 2024 - 26 Jan 2025)
(Scheduled: 11 Nov 2024 - 28 Feb 2025)
(Scheduled: 23 Dec 2024 - 22 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data