ROADWORKS SUMMARY
Whitton Avenue West, NORTHOLT, UB5 4JZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Whitton Avenue West, UB5 4JZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Whitton Avenue West, NORTHOLT, UB5 4JZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Whitton Avenue West are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Ealing logo
LONG TERM
Until
31 Jan 2026
Details
View Map
Share
Follow
Friary Road

London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2021 at 00:00 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 28 May 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Until
24 Dec 2026
Details
View Map
Share
Follow
Pump Lane

Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2023 at 18:00 and could run through until 24 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2025 at 11:57.

London Borough Of Hounslow logo
LONG TERM
Between
7 Apr and 26 Sep 2025
Details
View Map
Share
Southall Lane

London Borough Of Hounslow were proposing to carry out Highway improvement works on Southall Lane, Heston, Hounslow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 26 September 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 4 Apr 2025 at 17:01.

Cadent Gas logo
LONG TERM
Between
7 Apr 2025 and 1 Sep 2026
Details
View Map
Share
Cecil Park

Cadent Gas were proposing to carry out Utility asset works on Cecil Park, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 1 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 10:31.

London Borough Of Ealing logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are carrying out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 3 Sep 2025 at 10:44.

London Borough Of Ealing logo
LONG TERM
Between
2 Jun and 19 Dec 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 25 Feb 2025 at 12:42.

Affinity Water logo
LONG TERM
Between
2 Jun and 24 Nov 2025
Details
View Map
Share
Harrow Road

Affinity Water were proposing to carry out Utility asset works on Harrow Road, Wembley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 24 November 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Affinity Water on 30 May 2025 at 16:13.

London Borough Of Brent logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Alperton Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Alperton Lane, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 25 Mar 2025 at 10:33.

London Borough Of Brent logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Alperton Lane

London Borough Of Brent are carrying out Highway repair and maintenance works on Alperton Lane, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 June 2025 at 12:00 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 24 Jun 2025 at 13:09.

Thames Water logo
LONG TERM
Until
14 Sep 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are carrying out Utility asset works on Denzil Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 07:45 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jun 2025 at 08:01.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Pield Heath Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Pield Heath Road, Uxbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 13:32.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Pield Heath Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Pield Heath Road, Uxbridge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2025 at 07:00 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Aug 2025 at 09:36.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul and 27 Oct 2025
Details
View Map
Share
Follow
Great West Road

Transport for London (TfL) are proposing to carry out roadworks on Great West Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 15:07.

National Highways logo
LONG TERM
Between
8 Jul and 11 Sep 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 30 Jun 2025 at 12:05.

National Highways logo
LONG TERM
Until
11 Sep 2025
Details
View Map
Share
Follow
Great West Road

National Highways are carrying out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 July 2025 at 22:00 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Jul 2025 at 11:41.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Jul and 22 Sep 2025
Details
View Map
Share
Follow
Harvil Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Harvil Road, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hillingdon on 21 May 2025 at 08:38.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Jul and 22 Sep 2025
Details
View Map
Share
Follow
Harvil Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Harvil Road, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hillingdon on 21 May 2025 at 14:21.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Avondale Drive

Cadent Gas are proposing to carry out Utility asset works on Avondale Drive, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 11:11.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Avondale Drive

Cadent Gas are proposing to carry out Utility asset works on Avondale Drive, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 10:55.

Cadent Gas logo
LONG TERM
Between
27 Jul and 30 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 09:47.

Cadent Gas logo
LONG TERM
Between
27 Jul and 30 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 08:21.

Cadent Gas logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are carrying out Utility asset works on Uxbridge Road, Hayes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 10:41 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 15:07.

Cadent Gas logo
LONG TERM
Between
28 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Southall Lane

Cadent Gas are proposing to carry out Utility asset works on Southall Lane, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 14:40.

Cadent Gas logo
LONG TERM
Between
28 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Southall Lane

Cadent Gas are proposing to carry out Utility asset works on Southall Lane, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 11 Jul 2025 at 00:10.

Thames Water logo
LONG TERM
Between
28 Jul and 30 Dec 2025
Details
View Map
Share
Abbey Road

Thames Water were proposing to carry out Statutory Infrastructure Works on Abbey Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 09:45.

Thames Water logo
LONG TERM
Between
28 Jul and 30 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 16:00.

Thames Water logo
LONG TERM
Until
30 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are carrying out Statutory Infrastructure Works on Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 13:40 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jul 2025 at 15:20.

Cadent Gas logo
LONG TERM
Between
28 Jul and 9 Nov 2025
Details
View Map
Share
Follow
Harlington Road

Cadent Gas are proposing to carry out Utility asset works on Harlington Road, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 14:02.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Harlington Road

Cadent Gas are proposing to carry out Utility asset works on Harlington Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 11 Jul 2025 at 08:29.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Harlington Road

Cadent Gas are proposing to carry out Utility asset works on Harlington Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 Jul 2025 at 14:49.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Harlington Road

Cadent Gas were proposing to carry out Utility asset works on Harlington Road, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 7 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 09:29.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Greenford Road

Cadent Gas are carrying out Utility repair and maintenance works on Greenford Road, Greenford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 11:09 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 09:58.

Cadent Gas logo
LONG TERM
Between
28 Jul and 13 Oct 2025
Details
View Map
Share
Victoria Road

Cadent Gas were proposing to carry out Utility asset works on Victoria Road, Ruislip.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 13:58.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Marsh Road

Cadent Gas are carrying out Utility asset works on Marsh Road, Pinner.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 09:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 15:27.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Bacon Lane

Cadent Gas are proposing to carry out Utility asset works on Bacon Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 10:45.

LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 6 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2025 at 09:33.

LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 6 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2025 at 09:31.

Affinity Water logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Station Approach

Affinity Water were proposing to carry out Utility asset works on Station Approach, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Aug 2025 at 07:08.

Affinity Water logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Fishers Way

Affinity Water were proposing to carry out Utility asset works on Fishers Way, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Aug 2025 at 07:08.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Victoria Road

Cadent Gas are proposing to carry out Utility asset works on Victoria Road, Ruislip.

These works are categorised as Major.

The works will start on or after 4 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 15:07.

Cadent Gas logo
LONG TERM
Between
4 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Imperial Drive

Cadent Gas are proposing to carry out Utility asset works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 12:26.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:13.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 16:10.

Cadent Gas logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:12.

Cadent Gas logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 16:05.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Horsenden Lane North

Cadent Gas are carrying out Utility repair and maintenance works on Horsenden Lane North, Greenford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 August 2025 at 13:15 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 09:58.

Thames Water logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Hindes Road

Thames Water are carrying out Utility repair and maintenance works on Hindes Road, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 11:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 09:54.

London Borough Of Ealing logo
Finishing
Today
Details
View Map
Share
Follow
Enfield Road

London Borough Of Ealing are carrying out Remedial works on Enfield Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 August 2025 at 00:00 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 28 Aug 2025 at 15:41.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Angel Lane

Cadent Gas are carrying out Utility asset works on Angel Lane, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 August 2025 at 17:08 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 07:56.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Salmon Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 16:58.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Salmon Street

Affinity Water were proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Jun 2025 at 13:59.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Salmon Street

Affinity Water were proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Jun 2025 at 14:13.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Salmon Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Jun 2025 at 16:02.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Salmon Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 22:23.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Salmon Street

Affinity Water are carrying out Utility repair and maintenance works on Salmon Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:23 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Aug 2025 at 09:23.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Tudor Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 16:58.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Tudor Gardens

Affinity Water are carrying out Utility repair and maintenance works on Tudor Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:23 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 12 Aug 2025 at 16:12.

Eunetworks logo
LONG TERM
Between
12 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Popes Lane

Eunetworks are proposing to carry out Utility asset works on Popes Lane, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 6 Aug 2025 at 10:36.

Eunetworks logo
LONG TERM
Until
18 Sep 2025
Details
View Map
Share
Follow
Popes Lane

Eunetworks are carrying out Utility asset works on Popes Lane, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2025 at 09:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 12 Aug 2025 at 09:44.

London Borough Of Hillingdon logo
LONG TERM
Between
12 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Blackpool Gardens

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Blackpool Gardens, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 13 May 2025 at 09:27.

Eunetworks logo
Until
10 Sep 2025
Details
View Map
Share
Follow
York Avenue

Eunetworks are carrying out Utility asset works on York Avenue, Hayes.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 August 2025 at 08:00 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Sep 2025 at 15:59.

London Borough Of Hounslow logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southall Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 29 Jul 2025 at 16:01.

London Borough Of Hillingdon logo
Finishing
Friday
Details
View Map
Share
Follow
Crane Gardens

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Crane Gardens, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 22 Aug 2025 at 08:47.

London Borough Of Hillingdon logo
Finishing
Friday
Details
View Map
Share
Follow
Harold Avenue

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Harold Avenue, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 22 Aug 2025 at 08:47.

London Borough Of Hillingdon logo
Finishing
Friday
Details
View Map
Share
Follow
North Hyde Road

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on North Hyde Road, Hayes.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 22 Aug 2025 at 08:48.

London Borough Of Hillingdon logo
LONG TERM
Until
18 Sep 2025
Details
View Map
Share
Follow
Wood End

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Wood End, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 18 Aug 2025 at 08:12.

Eunetworks logo
Between
18 Aug and 16 Sep 2025
Details
View Map
Share
Follow
North Acton Road

Eunetworks are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 16 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Jul 2025 at 09:21.

Eunetworks logo
Between
18 Aug and 16 Sep 2025
Details
View Map
Share
North Acton Road

Eunetworks were proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 16 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 12 Aug 2025 at 09:53.

Thames Water logo
LONG TERM
Between
18 Aug and 28 Sep 2025
Details
View Map
Share
Follow
Clifford Way

Thames Water are proposing to carry out Utility repair and maintenance works on Clifford Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 12:31.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Princes Way

Cadent Gas are proposing to carry out Utility asset works on Princes Way, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 15:06.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Princes Way

Cadent Gas are carrying out Utility asset works on Princes Way, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 10:06 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 11:26.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Field End Road

Cadent Gas are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 11:32.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Field End Road

Cadent Gas are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 09:46.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Field End Road

Cadent Gas are carrying out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 10:06 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 11:29.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Neasden Lane North

Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Mar 2025 at 07:28.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Neasden Lane North

Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 10:47.

Cadent Gas logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Swakeleys Road

Cadent Gas were proposing to carry out Utility asset works on Swakeleys Road, Ickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 14:35.

Cadent Gas logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Old Church Lane

Cadent Gas are carrying out Utility asset works on Old Church Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 10:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 11:05.

Finishing
Friday
Details
View Map
Share
Follow
Porlock Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Porlock Avenue, West Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Aug 2025 at 10:59.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Kenton Road

Affinity Water are proposing to carry out Utility asset works on Kenton Road, Harrow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 7 Aug 2025 at 10:57.

Affinity Water logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Kenton Road

Affinity Water are carrying out Utility asset works on Kenton Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 09:15 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 Sep 2025 at 16:30.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, North Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:30.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, North Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2025 at 16:21.

Transport for London (TfL) logo
Between
19 Aug and 16 Sep 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Cranford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 17:39.

Transport for London (TfL) logo
Between
19 Aug and 16 Sep 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Cranford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Jun 2025 at 10:18.

Transport for London (TfL) logo
Between
19 Aug and 16 Sep 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 17:40.

Transport for London (TfL) logo
Between
19 Aug and 16 Sep 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Jun 2025 at 10:17.

London Borough Of Hillingdon logo
LONG TERM
Between
19 Aug and 19 Sep 2025
Details
View Map
Share
Follow
West Drayton Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on West Drayton Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:14.

London Borough Of Hillingdon logo
LONG TERM
Between
19 Aug and 19 Sep 2025
Details
View Map
Share
Follow
West Drayton Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on West Drayton Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jul 2025 at 07:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Acton Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Acton Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.

London Borough Of Hillingdon logo
Finishing
Friday
Details
View Map
Share
Follow
West Drayton Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on West Drayton Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 24 Aug 2025 at 15:09.

Scottish Hydro Electric Power Dis logo
Between
23 Aug and 12 Sep 2025
Details
View Map
Share
Leamington Park

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Leamington Park, Acton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jul 2025 at 08:21.

Scottish Hydro Electric Power Dis logo
Between
23 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Leamington Park

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Leamington Park, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jul 2025 at 08:22.

Thames Water logo
Between
25 Aug and 15 Sep 2025
Details
View Map
Share
Churchfield Road

Thames Water were proposing to carry out Utility repair and maintenance works on Churchfield Road, Acton.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 10:49.

Thames Water logo
Between
25 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Churchfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Churchfield Road, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 12:39.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Gunnersbury Avenue (North Circular Road)

Cadent Gas are carrying out Utility repair and maintenance works on Gunnersbury Avenue (North Circular Road), London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 10:02 and could run through until 3 September 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 13:10.

Thames Water logo
Until
16 Sep 2025
Details
View Map
Share
Follow
Churchfield Road

Thames Water are carrying out Utility repair and maintenance works on Churchfield Road, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 10:30 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 13:30.

Thames Water logo
LONG TERM
Until
24 Nov 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are carrying out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:00 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 09:32.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
The Green

Cadent Gas are carrying out Utility repair and maintenance works on The Green, Southall.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 13:26 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 11:31.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Disraeli Road

Thames Water are carrying out Utility repair and maintenance works on Disraeli Road, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 07:07 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 08:55.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Greenford Avenue

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Greenford Avenue, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2025 at 15:24.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Greenford Avenue

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Greenford Avenue, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 16:30.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Dog Lane

Thames Water are carrying out roadworks on Dog Lane, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2025 at 07:53 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:26.

London Borough Of Ealing logo
Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Derwentwater Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Derwentwater Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 27 Aug 2025 at 12:28.

London Borough Of Ealing logo
Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Derwentwater Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Derwentwater Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 28 Aug 2025 at 12:06.

London Borough Of Ealing logo
Finishing
Monday
Details
View Map
Share
Follow
Talbot Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Talbot Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 27 Aug 2025 at 11:47.

London Borough Of Ealing logo
Finishing
Monday
Details
View Map
Share
Follow
Talbot Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Talbot Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 28 Aug 2025 at 12:06.

Affinity Water logo
LONG TERM
Between
1 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Dane Road

Affinity Water are proposing to carry out Utility asset works on Dane Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 8 May 2025 at 07:23.

Affinity Water logo
LONG TERM
Until
15 Dec 2025
Details
View Map
Share
Follow
Dane Road

Affinity Water are carrying out Utility asset works on Dane Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:52 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 10:55.

Affinity Water logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Spikes Bridge Road

Affinity Water are proposing to carry out Utility asset works on Spikes Bridge Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 May 2025 at 07:24.

Affinity Water logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Spikes Bridge Road

Affinity Water are carrying out Utility asset works on Spikes Bridge Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:52 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 10:53.

Scottish Hydro Electric Power Dis logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Saxon Drive

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Saxon Drive, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Jun 2025 at 15:08.

Scottish Hydro Electric Power Dis logo
Until
15 Sep 2025
Details
View Map
Share
Follow
Saxon Drive

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Saxon Drive, Acton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:10 and could run through until 15 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 09:34.

Scottish Hydro Electric Power Dis logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Lady Margaret Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Jun 2025 at 09:42.

Scottish Hydro Electric Power Dis logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Denbigh Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Denbigh Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Jun 2025 at 15:49.

Scottish Hydro Electric Power Dis logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Denbigh Road

Scottish Hydro Electric Power Dis are carrying out New service connection on Denbigh Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:10 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Sep 2025 at 09:27.

Thames Water logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Mount Avenue

Thames Water are carrying out Utility repair and maintenance works on Mount Avenue, Ealing.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 15:59.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 14:59.

Transport for London (TfL) logo
Today
Details
View Map
Share
The Parkway

Transport for London (TfL) carried out Highway improvement works on The Parkway, Hayes.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 1 Sep 2025 and 3 Sep 2025 and were actually completed between 1 Sep 2025 (21:00) and 3 Sep 2025 (05:00). The works impacted the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 08:34.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Willow Tree Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Willow Tree Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 23 Jul 2025 at 13:50.

Scottish Hydro Electric Power Dis logo
Between
1 and 17 Sep 2025
Details
View Map
Share
Follow
Cuckoo Avenue

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Cuckoo Avenue, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 12:52.

Scottish Hydro Electric Power Dis logo
Between
1 and 17 Sep 2025
Details
View Map
Share
Ruislip Road East

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Ruislip Road East, Hanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 17 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 May 2025 at 12:57.

Scottish Hydro Electric Power Dis logo
Between
1 and 17 Sep 2025
Details
View Map
Share
Follow
Ruislip Road East

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Ruislip Road East, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 May 2025 at 12:58.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Craven Park

Network Rail are proposing to carry out Works for Rail Purposes on Craven Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 14:23.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Craven Park

Network Rail are proposing to carry out Works for Rail Purposes on Craven Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Sep 2025 at 09:22.

Thames Water logo
LONG TERM
Between
1 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Prout Grove

Thames Water are proposing to carry out Utility asset works on Prout Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:30.

Thames Water logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Prout Grove

Thames Water are carrying out Utility asset works on Prout Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:00 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:59.

Thames Water logo
LONG TERM
Until
2 Oct 2025
Details
View Map
Share
Follow
Birse Crescent

Thames Water are carrying out Utility asset works on Birse Crescent, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:00 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:58.

Cadent Gas logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Hill Road

Cadent Gas are carrying out Utility repair and maintenance works on Hill Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:15 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 08:28.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Rayners Lane

BT are proposing to carry out Utility asset works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Jun 2025 at 13:50.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Oxleay Road

BT are proposing to carry out Utility asset works on Oxleay Road, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Jun 2025 at 13:23.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Oxleay Road

BT are carrying out Utility asset works on Oxleay Road, Rayners Lane.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 14:25 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2025 at 14:37.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Rayners Lane

BT are carrying out Utility asset works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 14:25 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2025 at 14:38.

London Borough Of Barnet logo
Finishing
Saturday
Details
View Map
Share
The Hyde

London Borough Of Barnet were proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 6 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 5 Jun 2025 at 14:34.

Finishing
Monday
Details
View Map
Share
Priory Way

London Borough Of Harrow were proposing to carry out Highway improvement works on Priory Way, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Aug 2025 at 08:44.

Finishing
Monday
Details
View Map
Share
Follow
Priory Way

London Borough Of Harrow are carrying out Highway improvement works on Priory Way, North Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2025 at 09:06.

London Borough Of Barnet logo
Finishing
Saturday
Details
View Map
Share
Follow
The Hyde

London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Jun 2025 at 08:31.

Affinity Water logo
LONG TERM
Between
1 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Meredith Close

Affinity Water are proposing to carry out Utility asset works on Meredith Close, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 13:37.

Affinity Water logo
LONG TERM
Between
1 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Meredith Close

Affinity Water are proposing to carry out Utility asset works on Meredith Close, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Aug 2025 at 14:17.

Affinity Water logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Meredith Close

Affinity Water are carrying out Utility asset works on Meredith Close, Hatch End.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 11:32 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 Sep 2025 at 11:39.

Thames Water logo
Until
12 Sep 2025
Details
View Map
Share
Follow
The Avenue

Thames Water are carrying out Utility repair and maintenance works on The Avenue, Hatch End.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 13:00 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 12:18.

Eunetworks logo
Between
2 and 26 Sep 2025
Details
View Map
Share
Follow
Judge Heath Lane

Eunetworks are proposing to carry out Utility asset works on Judge Heath Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Jul 2025 at 09:45.

Eunetworks logo
Between
2 and 26 Sep 2025
Details
View Map
Share
Follow
Judge Heath Lane

Eunetworks are proposing to carry out Utility asset works on Judge Heath Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 1 Aug 2025 at 07:26.

Eunetworks logo
Between
2 and 26 Sep 2025
Details
View Map
Share
Follow
Judge Heath Lane

Eunetworks are proposing to carry out Utility asset works on Judge Heath Lane, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 28 Aug 2025 at 15:16.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
West End Road

BT are proposing to carry out Utility asset works on West End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Jul 2025 at 09:29.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
West End Road

BT are carrying out Utility asset works on West End Road, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 23:00 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2025 at 12:23.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
West End Road

BT are proposing to carry out Utility asset works on West End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Jun 2025 at 08:03.

BT logo
Finishing
Tomorrow
Details
View Map
Share
West End Road

BT were proposing to carry out Utility asset works on West End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 12 Jun 2025 at 08:19.

Hertfordshire County Council logo
Between
3 and 17 Sep 2025
Details
View Map
Share
Follow
Little Oxhey Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Oxhey Lane, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:17.

Hertfordshire County Council logo
Until
18 Sep 2025
Details
View Map
Share
Follow
Little Oxhey Lane

Hertfordshire County Council are carrying out Highway repair and maintenance works on Little Oxhey Lane, South Oxhey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:30 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Sep 2025 at 10:54.

Hertfordshire County Council logo
Between
3 and 17 Sep 2025
Details
View Map
Share
Follow
Prestwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Jul 2025 at 10:12.

Hertfordshire County Council logo
Until
18 Sep 2025
Details
View Map
Share
Follow
Prestwick Road

Hertfordshire County Council are carrying out Highway repair and maintenance works on Prestwick Road, South Oxhey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:30 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Sep 2025 at 10:53.

Eunetworks logo
Finishing
Saturday
Details
View Map
Share
Follow
Cromwell Road

Eunetworks are proposing to carry out Utility asset works on Cromwell Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 1 Aug 2025 at 07:29.

Finishing
Saturday
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Jul 2025 at 12:39.

Finishing
Saturday
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Jul 2025 at 15:58.

Finishing
Saturday
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Jul 2025 at 15:40.

Finishing
Saturday
Details
View Map
Share
Follow
Dennis Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Dennis Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 26 Jun 2025 at 16:02.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Leamington Park

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Leamington Park, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Aug 2025 at 12:49.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Charville Lane West

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Charville Lane West, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jul 2025 at 11:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Acton Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Acton Lane, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 10:59.

National Highways logo
Between
8 and 13 Sep 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Jun 2025 at 12:13.

National Highways logo
Between
8 and 13 Sep 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jul 2025 at 17:28.

Cadent Gas logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Crowther Avenue

Cadent Gas are proposing to carry out Utility asset works on Crowther Avenue, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2025 at 10:50.

Cadent Gas logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Crowther Avenue

Cadent Gas are proposing to carry out Utility asset works on Crowther Avenue, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 12:46.

Thames Water logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Carlyle Road

Thames Water are proposing to carry out New service connection on Carlyle Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 11:34.

Thames Water logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Carlyle Road

Thames Water are proposing to carry out New service connection on Carlyle Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 08:55.

Scottish Hydro Electric Power Dis logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Crown Street

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Crown Street, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 12:02.

Cadent Gas logo
LONG TERM
Between
8 Sep and 15 Oct 2025
Details
View Map
Share
Glebe Road

Cadent Gas were proposing to carry out Utility asset works on Glebe Road, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 09:50.

Eunetworks logo
Between
8 and 14 Sep 2025
Details
View Map
Share
Follow
Botwell Lane

Eunetworks are proposing to carry out Utility asset works on Botwell Lane, Hayes.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Sep 2025 at 12:44.

Cadent Gas logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Pield Heath Road

Cadent Gas are proposing to carry out Utility asset works on Pield Heath Road, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 09:38.

Cadent Gas logo
Between
8 and 24 Sep 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 14:39.

Cadent Gas logo
Between
8 and 24 Sep 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 09:29.

Cadent Gas logo
Between
8 and 24 Sep 2025
Details
View Map
Share
Follow
Nellgrove Road

Cadent Gas are proposing to carry out Utility asset works on Nellgrove Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 09:29.

Cadent Gas logo
Between
8 and 24 Sep 2025
Details
View Map
Share
Follow
Nellgrove Road

Cadent Gas are proposing to carry out Utility asset works on Nellgrove Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 07:37.

Cadent Gas logo
LONG TERM
Between
8 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 17:24.

UK Power Networks Eastern & London logo
Between
8 and 21 Sep 2025
Details
View Map
Share
Follow
Knatchbull Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 12:00.

Cadent Gas logo
LONG TERM
Between
8 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are proposing to carry out Utility asset works on Pound Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 08:34.

Affinity Water logo
Between
8 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Chaplin Road

Affinity Water are proposing to carry out Utility asset works on Chaplin Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Affinity Water logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Empire Way

Affinity Water are proposing to carry out Utility asset works on Empire Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Jun 2025 at 09:34.

Cadent Gas logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
Blackbird Hill

Cadent Gas are proposing to carry out Utility asset works on Blackbird Hill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Mar 2025 at 07:28.

Affinity Water logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Meadow Close

Affinity Water are proposing to carry out Utility asset works on Meadow Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Jun 2025 at 08:03.

Affinity Water logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Meadow Close

Affinity Water are proposing to carry out Utility asset works on Meadow Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Jun 2025 at 09:40.

Affinity Water logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Meadow Close

Affinity Water are proposing to carry out Utility asset works on Meadow Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 14:19.

Affinity Water logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Meadow Close

Affinity Water are proposing to carry out Utility asset works on Meadow Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 17 Jul 2025 at 09:42.

Affinity Water logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
St Catherines Road

Affinity Water were proposing to carry out Utility asset works on St Catherines Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 3 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 11 Feb 2025 at 15:30.

Affinity Water logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
St Catherines Road

Affinity Water are proposing to carry out Utility asset works on St Catherines Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 6 Feb 2025 at 07:39.

Affinity Water logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
St Catherines Road

Affinity Water are proposing to carry out Utility asset works on St Catherines Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 08:33.

Affinity Water logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
St Catherines Road

Affinity Water are proposing to carry out Utility asset works on St Catherines Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 17 Jul 2025 at 14:14.

Between
8 and 15 Sep 2025
Details
View Map
Share
Follow
Manor Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Manor Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2025 at 14:05.

Cadent Gas logo
LONG TERM
Between
8 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.

Cadent Gas logo
LONG TERM
Between
8 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 14:14.

London Borough Of Hillingdon logo
Between
9 Sep and 9 Oct 2025
Details
View Map
Share
Follow
North Hyde Gardens

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on North Hyde Gardens, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jul 2025 at 07:20.

Eunetworks logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Clayton Road

Eunetworks were proposing to carry out Utility asset works on Clayton Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 22 Jul 2025 at 13:25.

Eunetworks logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Clayton Road

Eunetworks are proposing to carry out Utility asset works on Clayton Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 5 Aug 2025 at 09:34.

Eunetworks logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Clayton Road

Eunetworks were proposing to carry out Utility asset works on Clayton Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 29 Aug 2025 at 10:54.

Eunetworks logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Clayton Road

Eunetworks were proposing to carry out Utility asset works on Clayton Road, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 29 Aug 2025 at 10:54.

Eunetworks logo
LONG TERM
Between
9 Sep and 11 Oct 2025
Details
View Map
Share
North Acton Road

Eunetworks were proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 11 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 12 Aug 2025 at 11:49.

Eunetworks logo
LONG TERM
Between
9 Sep and 16 Oct 2025
Details
View Map
Share
Follow
North Acton Road

Eunetworks are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Sep 2025 at 12:15.

Eunetworks logo
LONG TERM
Between
9 Sep and 16 Oct 2025
Details
View Map
Share
Follow
North Acton Road

Eunetworks are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Sep 2025 at 12:27.

Affinity Water logo
Between
9 and 12 Sep 2025
Details
View Map
Share
Follow
Empire Way

Affinity Water are proposing to carry out Utility asset works on Empire Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Jul 2025 at 15:43.

Affinity Water logo
Between
9 and 12 Sep 2025
Details
View Map
Share
Follow
Empire Way

Affinity Water are proposing to carry out Utility asset works on Empire Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Aug 2025 at 12:16.

Affinity Water logo
Between
9 and 12 Sep 2025
Details
View Map
Share
Follow
Empire Way

Affinity Water are proposing to carry out Utility asset works on Empire Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Aug 2025 at 15:13.

Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Canning Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Canning Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 25 Jun 2025 at 15:58.

Affinity Water logo
Between
10 and 16 Sep 2025
Details
View Map
Share
Follow
Empire Way

Affinity Water are proposing to carry out Utility asset works on Empire Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 16 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Jun 2025 at 08:52.

National Highways logo
LONG TERM
Between
11 Sep and 29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jul 2025 at 17:27.

National Highways logo
LONG TERM
Between
11 Sep and 29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Jun 2025 at 12:16.

Between
14 and 16 Sep 2025
Details
View Map
Share
Follow
The Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Gardens, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jun 2025 at 13:23.

London Borough Of Hounslow logo
Between
15 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Southall Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 2 Sep 2025 at 15:24.

Eunetworks logo
Between
15 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Lionel Road North

Eunetworks are proposing to carry out Utility asset works on Lionel Road North, Brentford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Aug 2025 at 09:04.

Eunetworks logo
Between
15 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Lionel Road North

Eunetworks are proposing to carry out Utility asset works on Lionel Road North, Brentford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 15:55.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 1 Nov 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Cranford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 1 Nov 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 15:01.

Scottish Hydro Electric Power Dis logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Shakespeare Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Shakespeare Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jun 2025 at 13:53.

Scottish Hydro Electric Power Dis logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Shakespeare Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Shakespeare Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jul 2025 at 15:59.

Scottish Hydro Electric Power Dis logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Evelyn Grove

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Evelyn Grove, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Jun 2025 at 09:30.

Scottish Hydro Electric Power Dis logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Evelyn Grove

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Evelyn Grove, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Jun 2025 at 09:32.

Scottish Hydro Electric Power Dis logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Evelyn Grove

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Evelyn Grove, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Jun 2025 at 07:33.

Scottish Hydro Electric Power Dis logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Evelyn Grove

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Evelyn Grove, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jul 2025 at 15:24.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Yeading Lane

Cadent Gas are proposing to carry out Utility asset works on Yeading Lane, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 07:51.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Yeading Lane

Cadent Gas are proposing to carry out Utility asset works on Yeading Lane, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 17:29.

London Borough Of Brent logo
LONG TERM
Between
15 Sep 2025 and 28 Feb 2026
Details
View Map
Share
Follow
High Street

London Borough Of Brent are proposing to carry out Highway improvement works on High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 19 Aug 2025 at 07:34.

London Borough Of Brent logo
LONG TERM
Between
15 Sep 2025 and 28 Feb 2026
Details
View Map
Share
Follow
High Street

London Borough Of Brent are proposing to carry out Highway improvement works on High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 19 Aug 2025 at 15:11.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.

Thames Water logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Beaconsfield Road

Thames Water are proposing to carry out Utility asset works on Beaconsfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:32.

Thames Water logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Beaconsfield Road

Thames Water are proposing to carry out Utility asset works on Beaconsfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 08:40.

Cadent Gas logo
LONG TERM
Between
15 Sep and 27 Nov 2025
Details
View Map
Share
Follow
Imperial Drive

Cadent Gas are proposing to carry out Utility asset works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 10:13.

Thames Water logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Pinner Road

Thames Water were proposing to carry out Utility repair and maintenance works on Pinner Road, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 17 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jun 2025 at 19:11.

London Borough Of Barnet logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 20 Jun 2025 at 08:45.

London Borough Of Barnet logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
The Hyde

London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:49.

Cadent Gas logo
Between
15 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Mollison Way

Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 12:57.

Hertfordshire County Council logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Foxgrove Path

Hertfordshire County Council are proposing to carry out Section 50 on Foxgrove Path, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 11 Aug 2025 at 12:16.

Transport for London (TfL) logo
LONG TERM
Between
16 Sep and 7 Nov 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Cranford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2025 at 09:42.

Transport for London (TfL) logo
LONG TERM
Between
16 Sep and 7 Nov 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2025 at 09:44.

Cadent Gas logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Crescent Parade

Cadent Gas were proposing to carry out Remedial works on Crescent Parade, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 14:45.

Cadent Gas logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Crescent Parade

Cadent Gas were proposing to carry out Remedial works on Crescent Parade, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 11:34.

Cadent Gas logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Follow
Crescent Parade

Cadent Gas are proposing to carry out Remedial works on Crescent Parade, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 11:23.

London Borough Of Brent logo
Between
16 and 26 Sep 2025
Details
View Map
Share
Follow
Princes Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Princes Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 11 Jun 2025 at 17:39.

Scottish Hydro Electric Power Dis logo
Between
17 and 30 Sep 2025
Details
View Map
Share
Follow
Rectory Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rectory Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2025 at 09:49.

LONG TERM
Between
17 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Hanger Lane

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 25 Jun 2025 at 13:09.

Affinity Water logo
Between
17 and 23 Sep 2025
Details
View Map
Share
Follow
Palmerston Road

Affinity Water are proposing to carry out Utility asset works on Palmerston Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Jul 2025 at 12:18.

London Borough Of Hillingdon logo
Between
18 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Townfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Townfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Sep 2025 at 14:19.

Thames Water logo
Between
18 and 23 Sep 2025
Details
View Map
Share
Follow
Wimborne Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Wimborne Gardens, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 14:48.

Thames Water logo
Between
18 and 23 Sep 2025
Details
View Map
Share
Follow
Wimborne Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Wimborne Gardens, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Jun 2025 at 12:29.

London Borough Of Hounslow logo
Between
19 and 26 Sep 2025
Details
View Map
Share
Follow
Hayes Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Hayes Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 4 Aug 2025 at 10:10.

Network Rail logo
Between
21 and 25 Sep 2025
Details
View Map
Share
Follow
North Circular Road

Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 10:00.

Affinity Water logo
Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
Botwell Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Botwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Jun 2025 at 11:00.

Affinity Water logo
Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
Botwell Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Botwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Jul 2025 at 07:59.

Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Pield Heath Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Pield Heath Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 22 Jul 2025 at 09:42.

Scottish Hydro Electric Power Dis logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Cuckoo Avenue

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Cuckoo Avenue, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Jun 2025 at 11:13.

Scottish Hydro Electric Power Dis logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Ruislip Road East

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Ruislip Road East, Hanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Jun 2025 at 12:05.

Affinity Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Empire Way

Affinity Water are proposing to carry out Utility asset works on Empire Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Jul 2025 at 07:31.

Cadent Gas logo
LONG TERM
Between
22 Sep and 1 Dec 2025
Details
View Map
Share
Swakeleys Road

Cadent Gas were proposing to carry out Utility asset works on Swakeleys Road, Ickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 14:35.

Cadent Gas logo
LONG TERM
Between
22 Sep and 4 Dec 2025
Details
View Map
Share
Follow
Imperial Drive

Cadent Gas are proposing to carry out Utility asset works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 16:43.

Cadent Gas logo
Between
22 and 28 Sep 2025
Details
View Map
Share
Follow
Alfriston Avenue

Cadent Gas are proposing to carry out Utility asset works on Alfriston Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 17:56.

Hertfordshire County Council logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Heysham Drive

Hertfordshire County Council are proposing to carry out Section 50 on Heysham Drive, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 11:32.

Hertfordshire County Council logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Heysham Drive

Hertfordshire County Council are proposing to carry out Section 50 on Heysham Drive, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Aug 2025 at 11:36.

Hertfordshire County Council logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Foxgrove Path

Hertfordshire County Council are proposing to carry out Section 50 on Foxgrove Path, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 19 Aug 2025 at 14:34.

Eunetworks logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Botwell Lane

Eunetworks are proposing to carry out Utility asset works on Botwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 25 Aug 2025 at 16:30.

Eunetworks logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Botwell Lane

Eunetworks are proposing to carry out Utility asset works on Botwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 11:26.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
24 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Parkfield Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Parkfield Avenue, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Aug 2025 at 16:24.

Transport for London (TfL) logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 14:38.

Affinity Water logo
Between
25 and 30 Sep 2025
Details
View Map
Share
Follow
Horsenden Lane South

Affinity Water are proposing to carry out Utility repair and maintenance works on Horsenden Lane South, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Jun 2025 at 14:24.

Affinity Water logo
Between
25 and 30 Sep 2025
Details
View Map
Share
Horsenden Lane South

Affinity Water were proposing to carry out Utility repair and maintenance works on Horsenden Lane South, Perivale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 10:56.

Scottish Hydro Electric Power Dis logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Crown Close

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Crown Close, Hayes.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Aug 2025 at 12:00.

Cadent Gas logo
LONG TERM
Between
29 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Pump Lane

Cadent Gas are proposing to carry out Utility asset works on Pump Lane, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 09:50.

Cadent Gas logo
LONG TERM
Between
29 Sep and 22 Dec 2025
Details
View Map
Share
Follow
Botwell Common Road

Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 09:06.

Cadent Gas logo
LONG TERM
Between
29 Sep and 22 Nov 2025
Details
View Map
Share
Follow
Botwell Common Road

Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 09:44.

Cadent Gas logo
LONG TERM
Between
29 Sep and 24 Nov 2025
Details
View Map
Share
Follow
Botwell Common Road

Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 15:20.

Cadent Gas logo
LONG TERM
Between
29 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Botwell Common Road

Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 11:16.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Barra Hall Road

Cadent Gas are proposing to carry out Utility asset works on Barra Hall Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 09:07.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Barra Hall Road

Cadent Gas are proposing to carry out Utility asset works on Barra Hall Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 09:47.

Affinity Water logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Norman Avenue

Affinity Water are proposing to carry out Utility asset works on Norman Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 May 2025 at 07:23.

Affinity Water logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Norman Avenue

Affinity Water are proposing to carry out Utility asset works on Norman Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Aug 2025 at 07:17.

Thames Water logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Follow
St Stephens Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on St Stephens Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 14:59.

Thames Water logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Follow
St Stephens Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on St Stephens Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Jun 2025 at 12:29.

Transport for London (TfL) logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Hanger Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 14:58.

Network Rail logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Hawkins Road

Network Rail are proposing to carry out Works for Rail Purposes on Hawkins Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2025 at 16:06.

Thames Water logo
LONG TERM
Between
29 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Wharton Close

Thames Water are proposing to carry out Utility asset works on Wharton Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:32.

Thames Water logo
LONG TERM
Between
29 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Wharton Close

Thames Water are proposing to carry out Utility asset works on Wharton Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 13:57.

Affinity Water logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

London Borough Of Brent logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Crest Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Crest Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 09:10.

Cadent Gas logo
Between
29 Sep and 5 Oct 2025
Details
View Map
Share
Follow
The Drive

Cadent Gas are proposing to carry out Utility asset works on The Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 17:57.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Crummock Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Crummock Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 15:09.

Thames Water logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Hindes Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hindes Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:01.

Thames Water logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Hindes Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hindes Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 08:17.

Affinity Water logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Nibthwaite Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Nibthwaite Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Jul 2025 at 15:14.

London Borough Of Hillingdon logo
LONG TERM
Between
1 Oct and 1 Nov 2025
Details
View Map
Share
Follow
North Hyde Gardens

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on North Hyde Gardens, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:29.

London Borough Of Hillingdon logo
LONG TERM
Between
1 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Minet Drive

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Minet Drive, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:29.

London Borough Of Hillingdon logo
LONG TERM
Between
1 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Frogmore Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Frogmore Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:31.

London Borough Of Hillingdon logo
LONG TERM
Between
1 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Charville Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:33.

Affinity Water logo
LONG TERM
Between
1 Oct and 23 Dec 2025
Details
View Map
Share
Follow
Wallasey Crescent

Affinity Water are proposing to carry out Utility asset works on Wallasey Crescent, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 May 2025 at 10:08.

Affinity Water logo
LONG TERM
Between
1 Oct and 23 Dec 2025
Details
View Map
Share
Follow
Wallasey Crescent

Affinity Water are proposing to carry out Utility asset works on Wallasey Crescent, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Aug 2025 at 11:09.

Eunetworks logo
Between
2 and 22 Oct 2025
Details
View Map
Share
Follow
Lionel Road North

Eunetworks are proposing to carry out Utility asset works on Lionel Road North, Brentford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Sep 2025 at 08:28.

London Borough Of Hillingdon logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Western View

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Western View, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:11.

London Borough Of Hillingdon logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Wood End

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood End, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:09.

London Borough Of Hillingdon logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Spencer Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Spencer Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
2 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Barretts Green Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barretts Green Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:27.

London Borough Of Hillingdon logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Weymouth Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Weymouth Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:09.

London Borough Of Brent logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Randall Avenue

London Borough Of Brent are proposing to carry out Highway improvement works on Randall Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 18 Aug 2025 at 14:23.

Network Rail logo
Between
5 and 8 Oct 2025
Details
View Map
Share
Follow
North Circular Road

Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 10:55.

Network Rail logo
Between
5 and 9 Oct 2025
Details
View Map
Share
Follow
North Circular Road

Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Aug 2025 at 14:27.

London Borough Of Ealing logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Broadway

London Borough Of Ealing are proposing to carry out Highway improvement works on Broadway, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 11 Aug 2025 at 14:31.

London Borough Of Ealing logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Broadway

London Borough Of Ealing are proposing to carry out Highway improvement works on Broadway, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 7 Aug 2025 at 15:53.

London Borough Of Ealing logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Broadway

London Borough Of Ealing are proposing to carry out Highway improvement works on Broadway, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 11 Aug 2025 at 16:44.

Thames Water logo
LONG TERM
Between
6 Oct 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Deacon Road

Thames Water are proposing to carry out Utility asset works on Deacon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:31.

Thames Water logo
LONG TERM
Between
6 Oct 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Deacon Road

Thames Water are proposing to carry out Utility asset works on Deacon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 08:33.

London Borough Of Brent logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Forty Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:55.

Affinity Water logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
Newyears Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Newyears Green Lane, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 14:20.

Affinity Water logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
Newyears Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Newyears Green Lane, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Jul 2025 at 09:41.

Thames Water logo
Between
7 and 21 Oct 2025
Details
View Map
Share
Follow
Castlebar Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Castlebar Hill, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 14:59.

Scottish Hydro Electric Power Dis logo
Between
8 and 29 Oct 2025
Details
View Map
Share
Uxbridge Road Service Road Outside New Broadway Parade

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road Service Road Outside New Broadway Parade, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2025 at 16:14.

Scottish Hydro Electric Power Dis logo
Between
8 and 29 Oct 2025
Details
View Map
Share
Uxbridge Road Service Road Outside New Broadway Parade

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road Service Road Outside New Broadway Parade, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Jul 2025 at 12:04.

Scottish Hydro Electric Power Dis logo
Between
8 and 29 Oct 2025
Details
View Map
Share
Uxbridge Road Service Road Outside New Broadway Parade

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road Service Road Outside New Broadway Parade, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Aug 2025 at 14:43.

London Borough Of Brent logo
Between
8 and 11 Oct 2025
Details
View Map
Share
Follow
Hay Lane

London Borough Of Brent are proposing to carry out Highway improvement works on Hay Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 18 Aug 2025 at 14:19.

Eunetworks logo
Between
10 and 12 Oct 2025
Details
View Map
Share
Cromwell Road

Eunetworks were proposing to carry out Utility asset works on Cromwell Road, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Aug 2025 at 08:33.

London Borough Of Brent logo
Between
10 and 31 Oct 2025
Details
View Map
Share
Follow
Forty Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Lane, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:53.

Eunetworks logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Langley Drive

Eunetworks are proposing to carry out roadworks on Langley Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 20 Aug 2025 at 09:44.

Eunetworks logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Langley Drive

Eunetworks are proposing to carry out roadworks on Langley Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 11:22.

Eunetworks logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Langley Drive

Eunetworks are proposing to carry out roadworks on Langley Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Sep 2025 at 10:44.

London Borough Of Ealing logo
LONG TERM
Between
13 Oct 2025 and 28 Mar 2026
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 28 March 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 12 Aug 2025 at 08:13.

Affinity Water logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Copland Avenue

Affinity Water are proposing to carry out Utility asset works on Copland Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.

BT logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Whitmore Road

BT were proposing to carry out Utility repair and maintenance works on Whitmore Road, West Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Jul 2025 at 08:25.

BT logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Bessborough Road

BT were proposing to carry out Utility repair and maintenance works on Bessborough Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Jul 2025 at 08:25.

Cadent Gas logo
Between
13 and 19 Oct 2025
Details
View Map
Share
Follow
Farm Avenue

Cadent Gas are proposing to carry out Utility asset works on Farm Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 17:57.

Cadent Gas logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Jellicoe Gardens

Cadent Gas are proposing to carry out Utility asset works on Jellicoe Gardens, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 09:30.

Virgin Media logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Park Way

Virgin Media are proposing to carry out Utility asset works on Park Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Jul 2025 at 09:01.

Between
15 and 17 Oct 2025
Details
View Map
Share
Kingsfield Avenue

London Borough Of Harrow were proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:37.

Between
15 and 17 Oct 2025
Details
View Map
Share
Southfield Park

London Borough Of Harrow were proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2025 at 07:35.

Between
15 and 17 Oct 2025
Details
View Map
Share
Station Road

London Borough Of Harrow were proposing to carry out Highway improvement works on Station Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:42.

Virgin Media logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Standard Road

Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Aug 2025 at 10:56.

Scottish Hydro Electric Power Dis logo
Between
17 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Uxbridge Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Aug 2025 at 08:57.

Scottish Hydro Electric Power Dis logo
Between
17 and 21 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road Service Road Outside New Broadway Parade

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Uxbridge Road Service Road Outside New Broadway Parade, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2025 at 13:57.

Scottish Hydro Electric Power Dis logo
Between
18 and 29 Oct 2025
Details
View Map
Share
Uxbridge Road Service Road Outside New Broadway Parade

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road Service Road Outside New Broadway Parade, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jul 2025 at 15:41.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 13:56.

Lumen Technologies logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Coronation Road

Lumen Technologies are proposing to carry out Utility asset works on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 27 Aug 2025 at 14:18.

Lumen Technologies logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Coronation Road

Lumen Technologies are proposing to carry out Utility asset works on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 28 Aug 2025 at 10:31.

Cadent Gas logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Heath Road

Cadent Gas were proposing to carry out Utility asset works on Heath Road, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 14:43.

Cadent Gas logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Heath Road

Cadent Gas are proposing to carry out Utility asset works on Heath Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 07:16.

Cadent Gas logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Heath Road

Cadent Gas are proposing to carry out Utility asset works on Heath Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 14:23.

Affinity Water logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Turner Close

Affinity Water are proposing to carry out Utility asset works on Turner Close, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

UK Power Networks Eastern & London logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Sudbury Croft

UK Power Networks Eastern & London are proposing to carry out New service connection on Sudbury Croft, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Aug 2025 at 13:26.

Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:56.

Affinity Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Jul 2025 at 09:21.

Affinity Water logo
Between
21 and 24 Oct 2025
Details
View Map
Share
Follow
Meadow Close

Affinity Water are proposing to carry out Utility asset works on Meadow Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Aug 2025 at 09:26.

Scottish Hydro Electric Power Dis logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Western Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Western Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2025 at 10:29.

Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:57.

Cadent Gas logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Norwood Road Service Road To Numbers 168-186

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Norwood Road Service Road To Numbers 168-186, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 06:25.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Hemmen Lane

Eunetworks are proposing to carry out Utility asset works on Hemmen Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 5 Aug 2025 at 09:23.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Hemmen Lane

Eunetworks are proposing to carry out Utility asset works on Hemmen Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 5 Aug 2025 at 15:04.

Scottish Hydro Electric Power Dis logo
Between
25 Oct and 12 Nov 2025
Details
View Map
Share
Uxbridge Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road, Uxbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 08:09.

Scottish Hydro Electric Power Dis logo
Between
25 Oct and 12 Nov 2025
Details
View Map
Share
Uxbridge Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road, Uxbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Aug 2025 at 09:53.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Wood Lane

BT are proposing to carry out Utility asset works on Wood Lane, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Jul 2025 at 15:43.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
South Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on South Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Aug 2025 at 11:07.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
South Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on South Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Aug 2025 at 15:57.

Eunetworks logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Hemmen Lane

Eunetworks are proposing to carry out Utility asset works on Hemmen Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 24 Jul 2025 at 10:22.

Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Pield Heath Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Pield Heath Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Aug 2025 at 09:25.

Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Pield Heath Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Pield Heath Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Aug 2025 at 15:19.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Lees Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Lees Road, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 09:49.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Lees Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Lees Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 09:52.

Affinity Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Horsenden Lane South

Affinity Water are proposing to carry out Utility repair and maintenance works on Horsenden Lane South, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Jul 2025 at 17:02.

Affinity Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Charville Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 4 Jun 2025 at 11:35.

Affinity Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Charville Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 11 Jun 2025 at 07:36.

Affinity Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Charville Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 18 Jun 2025 at 13:20.

Thames Water logo
LONG TERM
Between
27 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Meyrick Road

Thames Water are proposing to carry out Utility asset works on Meyrick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:29.

Affinity Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Talbot Road

Affinity Water are proposing to carry out Utility asset works on Talbot Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Affinity Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility asset works on High Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 08:26.

Affinity Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Crawford Avenue

Affinity Water are proposing to carry out Utility asset works on Crawford Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Roxborough Avenue

BT were proposing to carry out Utility repair and maintenance works on Roxborough Avenue, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2025 at 09:25.

Affinity Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Joel Street

Affinity Water are proposing to carry out Utility asset works on Joel Street, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 1 Aug 2025 at 07:16.

Affinity Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Joel Street

Affinity Water are proposing to carry out Utility asset works on Joel Street, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 27 Aug 2025 at 11:24.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Potter Street Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Potter Street Hill, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:12.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Chartley Avenue

Cadent Gas are proposing to carry out Utility asset works on Chartley Avenue, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 11:00.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:00.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Masefield Avenue

Cadent Gas were proposing to carry out Utility asset works on Masefield Avenue, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 10:23.

Affinity Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Bideford Avenue

Affinity Water are proposing to carry out Highway repair and maintenance works on Bideford Avenue, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Jul 2025 at 06:18.

Affinity Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Bideford Avenue

Affinity Water are proposing to carry out Highway repair and maintenance works on Bideford Avenue, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 4 Aug 2025 at 14:41.

Affinity Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Bideford Avenue

Affinity Water are proposing to carry out Highway repair and maintenance works on Bideford Avenue, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Aug 2025 at 07:22.

BT logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Victoria Terrace

BT are proposing to carry out Utility repair and maintenance works on Victoria Terrace, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2025 at 09:07.

BT logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
West Street

BT are proposing to carry out Utility repair and maintenance works on West Street, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2025 at 09:07.

Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:59.

Transport for London (TfL) logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 14:37.

Network Rail logo
Between
1 and 9 Nov 2025
Details
View Map
Share
East Lane

Network Rail were proposing to carry out Works for Rail Purposes on East Lane, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2025 and run through until 9 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Aug 2025 at 14:56.

LONG TERM
Between
1 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 31 Jul 2025 at 14:25.

LONG TERM
Between
1 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 31 Jul 2025 at 14:22.

Scottish Hydro Electric Power Dis logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Crown Close

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Crown Close, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Aug 2025 at 10:18.

Eunetworks logo
Between
3 and 16 Nov 2025
Details
View Map
Share
Follow
Judge Heath Lane

Eunetworks are proposing to carry out Utility asset works on Judge Heath Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 11:31.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Douglas Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Douglas Crescent, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Aug 2025 at 11:27.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Douglas Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Douglas Crescent, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 15:31.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Douglas Crescent

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Douglas Crescent, Hayes.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Aug 2025 at 15:39.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Douglas Crescent

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Douglas Crescent, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Aug 2025 at 13:42.

Cadent Gas logo
Between
3 and 30 Nov 2025
Details
View Map
Share
Follow
Butler Street

Cadent Gas are proposing to carry out Utility asset works on Butler Street, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 16:30.

Cadent Gas logo
Between
3 and 30 Nov 2025
Details
View Map
Share
Follow
Alpha Road

Cadent Gas are proposing to carry out Utility asset works on Alpha Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 16:30.

Affinity Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Central Road

Affinity Water are proposing to carry out Utility asset works on Central Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Aug 2025 at 13:27.

Thames Water logo
LONG TERM
Between
3 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Bermans Way

Thames Water are proposing to carry out Utility asset works on Bermans Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:30.

BT logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
West Street

BT are proposing to carry out Utility repair and maintenance works on West Street, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Aug 2025 at 20:53.

Cadent Gas logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 12:00.

Cadent Gas logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Sandy Lane

Cadent Gas were proposing to carry out Utility asset works on Sandy Lane, Northwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 17:24.

Cadent Gas logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Chenduit Way

Cadent Gas are proposing to carry out Utility asset works on Chenduit Way, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 11:00.

Eunetworks logo
Between
7 and 9 Nov 2025
Details
View Map
Share
Follow
Cromwell Road

Eunetworks are proposing to carry out Utility asset works on Cromwell Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 26 Aug 2025 at 10:59.

Eunetworks logo
Between
7 and 9 Nov 2025
Details
View Map
Share
Follow
Cromwell Road

Eunetworks are proposing to carry out Utility asset works on Cromwell Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 09:08.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
West Gate

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 25 Jun 2025 at 15:11.

Between
7 and 30 Nov 2025
Details
View Map
Share
Follow
West Gate

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 1 Sep 2025 at 14:12.

Thames Water logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Belvue Close

Thames Water are proposing to carry out Utility asset works on Belvue Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 07:22.

Thames Water logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Belvue Close

Thames Water are proposing to carry out Utility asset works on Belvue Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 12:54.

Thames Water logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Belvue Close

Thames Water are proposing to carry out Utility asset works on Belvue Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 10:52.

Affinity Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Brookside Close

Affinity Water are proposing to carry out Utility asset works on Brookside Close, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Sep 2025 at 12:12.

Affinity Water logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Holmdene Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Holmdene Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Sep 2025 at 12:06.

Cadent Gas logo
LONG TERM
Between
10 Nov and 26 Dec 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:40.

London Borough Of Brent logo
Between
11 and 28 Nov 2025
Details
View Map
Share
Follow
Dudden Hill Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 Nov 2025 and 13 Jan 2026
Details
View Map
Share
Follow
Central Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 13 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:23.

Affinity Water logo
Between
17 Nov and 2 Dec 2025
Details
View Map
Share
Harlington Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Harlington Road, Uxbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 2 December 2025. The works were due to impact the verge only.

This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:32.

Affinity Water logo
LONG TERM
Between
17 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Scot Grove

Affinity Water are proposing to carry out Remedial works on Scot Grove, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 13:33.

Affinity Water logo
LONG TERM
Between
17 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Scot Grove

Affinity Water are proposing to carry out Remedial works on Scot Grove, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 14:05.

Affinity Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Silverston Way

Affinity Water are proposing to carry out roadworks on Silverston Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Aug 2025 at 13:26.

Affinity Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Silverston Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Silverston Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Aug 2025 at 14:36.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Greyfell Close

Cadent Gas are proposing to carry out Utility asset works on Greyfell Close, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 15:00.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Stangate Gardens

Cadent Gas are proposing to carry out Utility asset works on Stangate Gardens, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Hewett Close

Cadent Gas are proposing to carry out Utility asset works on Hewett Close, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.

Cadent Gas logo
LONG TERM
Between
17 Nov 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Stanmore Hill

Cadent Gas are proposing to carry out Utility asset works on Stanmore Hill, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 14:30.

London Borough Of Brent logo
Between
19 and 23 Nov 2025
Details
View Map
Share
Follow
Crest Road

London Borough Of Brent are proposing to carry out Highway improvement works on Crest Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:26.

Between
21 and 25 Nov 2025
Details
View Map
Share
Elmgrove Road

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Elmgrove Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Aug 2025 at 12:49.

Transport for London (TfL) logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Boston Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Boston Park Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 13:39.

Transport for London (TfL) logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Great West Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 12:00.

Cadent Gas logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Turks Head Footpath To Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Turks Head Footpath To Uxbridge Road, Uxbridge.

These works are categorised as Major.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 10:08.

National Highways logo
Between
26 and 29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Jun 2025 at 12:11.

National Highways logo
Between
26 and 29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jul 2025 at 17:28.

Transport for London (TfL) logo
Between
27 and 29 Nov 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 14:41.

Transport for London (TfL) logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Boston Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Boston Park Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 15:33.

Transport for London (TfL) logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Great West Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 15:15.

Affinity Water logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Edinburgh Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Edinburgh Drive, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Aug 2025 at 09:49.

Affinity Water logo
Between
1 and 23 Dec 2025
Details
View Map
Share
Follow
Copthall Road East

Affinity Water are proposing to carry out Utility asset works on Copthall Road East, Ickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 23 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 May 2025 at 10:38.

Affinity Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Dunster Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunster Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 4 Jul 2025 at 15:11.

Affinity Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Dunster Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunster Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Jul 2025 at 21:23.

UK Power Networks Eastern & London logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
West Street

UK Power Networks Eastern & London are proposing to carry out New service connection on West Street, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2025 at 11:39.

London Borough Of Brent logo
Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Fryent Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:20.

Between
1 and 8 Dec 2025
Details
View Map
Share
Follow
Priory Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Aug 2025 at 08:49.


Roadworks Map near to Whitton Avenue West, NORTHOLT, UB5 4JZ (65 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Whitton Avenue West, NORTHOLT, UB5 4JZ (65 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Ealing logo
URGENT
  
WHITTON AVENUE WEST 
(0.0 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
Complete
21 Aug 2025 00:00 - 22 Aug 2025 23:59
0.0
Details
Share
2
London Borough Of Ealing logo
URGENT
  
WOOD END LANE 
(0.1 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - Some carriageway incursion
Complete
21 Aug 2025 00:00 - 26 Aug 2025 23:59
0.1
Details
Share
3
London Borough Of Ealing logo
URGENT
  
WOOD END GARDENS 
(0.2 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - Some carriageway incursion
Complete
21 Aug 2025 00:00 - 26 Aug 2025 23:59
0.2
Details
Share
4
London Borough Of Ealing logo
URGENT
  
PETTS HILL 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
In Progress
Since: 1 Sep 2025 00:00
(Scheduled: 1 Sep 2025 - 1 Oct 2025)
0.3
Details
Share
Follow
5
London Borough Of Ealing logo
URGENT
  
PETTS HILL 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
In Progress
Since: 1 Sep 2025 00:00
(Scheduled: 1 Sep 2025 - 1 Oct 2025)
0.3
Details
Share
Follow
6
London Borough Of Ealing logo
URGENT
  
PETTS HILL 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
In Progress
Since: 1 Sep 2025 00:00
(Scheduled: 1 Sep 2025 - 1 Oct 2025)
0.3
Details
Share
Follow
7
London Borough Of Ealing logo
URGENT
  
CARR ROAD 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - Some carriageway incursion
Complete
14 Aug 2025 00:00 - 20 Aug 2025 23:59
0.3
Details
Share
8
London Borough Of Ealing logo
URGENT
  
PETTS HILL 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
In Progress
Since: 1 Sep 2025 00:00
(Scheduled: 1 Sep 2025 - 1 Oct 2025)
0.3
Details
Share
Follow
9
London Borough Of Ealing logo
URGENT
  
PETTS HILL 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
In Progress
Since: 1 Sep 2025 00:00
(Scheduled: 1 Sep 2025 - 1 Oct 2025)
0.3
Details
Share
Follow
10
London Borough Of Ealing logo
URGENT
  
PETTS HILL 
(0.3 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
Complete
1 Sep 2025 00:00 - 2 Sep 2025 23:59
0.3
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data