ROADWORKS SUMMARY
Romney Road, HAYES, UB4 8PU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Romney Road, UB4 8PU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Romney Road, HAYES, UB4 8PU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Romney Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Until
24 Dec 2026
Details
View Map
Share
Follow
Pump Lane

Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2023 at 18:00 and could run through until 24 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2025 at 11:57.

Transport for London (TfL) logo
LONG TERM
Between
22 Jul 2024 and 22 Jul 2027
Details
View Map
Share
Follow
Stockley Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 22 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Jul 2024 at 08:56.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Uxbridge Road

Buckinghamshire Council were proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 27 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 16 Jan 2025 at 13:15.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Pinewood Road

Buckinghamshire Council were proposing to carry out Highway improvement works on Pinewood Road, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 27 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 16 Jan 2025 at 13:16.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Wood Lane

Buckinghamshire Council were proposing to carry out Highway improvement works on Wood Lane, Iver Heath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 27 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 16 Jan 2025 at 13:18.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Uxbridge Road

Buckinghamshire Council were proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 27 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 16 Jan 2025 at 13:15.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Slough Road

Buckinghamshire Council were proposing to carry out Highway improvement works on Slough Road, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 27 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 16 Jan 2025 at 13:17.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Church Road

Buckinghamshire Council were proposing to carry out Highway improvement works on Church Road, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 27 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 16 Jan 2025 at 13:16.

London Borough Of Hounslow logo
LONG TERM
Between
7 Apr and 26 Sep 2025
Details
View Map
Share
Southall Lane

London Borough Of Hounslow were proposing to carry out Highway improvement works on Southall Lane, Heston, Hounslow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 26 September 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 4 Apr 2025 at 17:01.

Cadent Gas logo
LONG TERM
Between
7 Apr 2025 and 1 Sep 2026
Details
View Map
Share
Cecil Park

Cadent Gas were proposing to carry out Utility asset works on Cecil Park, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 1 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 10:31.

London Borough Of Ealing logo
LONG TERM
Between
2 Jun and 19 Dec 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 25 Feb 2025 at 12:42.

London Borough Of Hillingdon logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Harvil Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Harvil Road, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hillingdon on 21 May 2025 at 08:38.

London Borough Of Hillingdon logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Harvil Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Harvil Road, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hillingdon on 21 May 2025 at 14:21.

Cadent Gas logo
LONG TERM
Between
27 Jul and 30 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 09:47.

Cadent Gas logo
LONG TERM
Between
27 Jul and 30 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 08:21.

Cadent Gas logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are carrying out Utility asset works on Uxbridge Road, Hayes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 10:41 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 15:07.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Southall Lane

Cadent Gas are proposing to carry out Utility asset works on Southall Lane, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 14:40.

Cadent Gas logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are carrying out Utility asset works on High Street, Cowley, Uxbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 10:44 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2025 at 18:44.

Cadent Gas logo
LONG TERM
Between
28 Jul and 9 Nov 2025
Details
View Map
Share
Follow
Harlington Road

Cadent Gas are proposing to carry out Utility asset works on Harlington Road, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 14:02.

Cadent Gas logo
LONG TERM
Between
28 Jul and 13 Oct 2025
Details
View Map
Share
Victoria Road

Cadent Gas were proposing to carry out Utility asset works on Victoria Road, Ruislip.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 13:58.

Cadent Gas logo
LONG TERM
Between
4 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Imperial Drive

Cadent Gas are proposing to carry out Utility asset works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 12:26.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Swakeleys Road

Cadent Gas were proposing to carry out Utility asset works on Swakeleys Road, Ickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 14:35.

London Borough Of Hillingdon logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
West Drayton Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on West Drayton Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:14.

London Borough Of Hillingdon logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
West Drayton Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on West Drayton Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jul 2025 at 07:22.

London Borough Of Hillingdon logo
Between
1 Sep and 1 Oct 2025
Details
View Map
Share
Follow
High Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Street, Harlington, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:18.

Affinity Water logo
LONG TERM
Between
1 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Dane Road

Affinity Water are proposing to carry out Utility asset works on Dane Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 8 May 2025 at 07:23.

Affinity Water logo
LONG TERM
Until
15 Dec 2025
Details
View Map
Share
Follow
Dane Road

Affinity Water are carrying out Utility asset works on Dane Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:52 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 10:55.

Affinity Water logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Spikes Bridge Road

Affinity Water are proposing to carry out Utility asset works on Spikes Bridge Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 May 2025 at 07:24.

Affinity Water logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Spikes Bridge Road

Affinity Water are carrying out Utility asset works on Spikes Bridge Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:52 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 10:53.

Buckinghamshire Council logo
LONG TERM
Between
1 Sep 2025 and 31 Jan 2027
Details
View Map
Share
Follow
Wood Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Wood Lane, Iver Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 14 Jan 2025 at 09:43.

Buckinghamshire Council logo
LONG TERM
Between
1 Sep 2025 and 31 Jan 2027
Details
View Map
Share
Follow
Slough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 14 Jan 2025 at 09:43.

Buckinghamshire Council logo
LONG TERM
Between
1 Sep 2025 and 31 Jan 2027
Details
View Map
Share
Follow
Church Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Church Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 14 Jan 2025 at 09:42.

Buckinghamshire Council logo
LONG TERM
Between
1 Sep 2025 and 31 Jan 2027
Details
View Map
Share
Follow
Pinewood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Pinewood Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 14 Jan 2025 at 09:33.

Buckinghamshire Council logo
LONG TERM
Between
1 Sep 2025 and 31 Jan 2027
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 14 Jan 2025 at 09:45.

London Borough Of Hillingdon logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hillingdon are proposing to carry out Works for road purposes on Uxbridge Road, Uxbridge.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the verge only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Aug 2025 at 09:41.

London Borough Of Hillingdon logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hillingdon are carrying out Works for road purposes on Uxbridge Road, Uxbridge.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 1 September 2025 at 08:00 and could run through until 26 September 2025. The works will impact the verge only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Sep 2025 at 08:39.

London Borough Of Hillingdon logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Uxbridge Road

London Borough Of Hillingdon were proposing to carry out Works for road purposes on Uxbridge Road, Uxbridge.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 26 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Aug 2025 at 09:03.

London Borough Of Hillingdon logo
Between
1 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Moorhall Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Moorhall Road, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 26 Jun 2025 at 09:51.

Eunetworks logo
Between
2 and 26 Sep 2025
Details
View Map
Share
Follow
Judge Heath Lane

Eunetworks are proposing to carry out Utility asset works on Judge Heath Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Jul 2025 at 09:45.

Eunetworks logo
Between
2 and 26 Sep 2025
Details
View Map
Share
Follow
Judge Heath Lane

Eunetworks are proposing to carry out Utility asset works on Judge Heath Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 1 Aug 2025 at 07:26.

Eunetworks logo
Between
2 and 26 Sep 2025
Details
View Map
Share
Follow
Judge Heath Lane

Eunetworks are proposing to carry out Utility asset works on Judge Heath Lane, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 28 Aug 2025 at 15:16.

Heathrow Airport logo
LONG TERM
Between
4 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Stanwell Moor Road

Heathrow Airport are proposing to carry out Highway repair and maintenance works on Stanwell Moor Road, Heathrow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Heathrow Airport on 28 Aug 2025 at 15:19.

Heathrow Airport logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Stanwell Moor Road

Heathrow Airport are carrying out Highway repair and maintenance works on Stanwell Moor Road, Heathrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 21:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Heathrow Airport on 5 Sep 2025 at 09:41.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Charville Lane West

Scottish Hydro Electric Power Dis are carrying out New service connection on Charville Lane West, Uxbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 September 2025 at 07:45 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Sep 2025 at 08:03.

Thames Water logo
Finishing
Today
Details
View Map
Share
Broad Walk

Thames Water were proposing to carry out Utility repair and maintenance works on Broad Walk, Hounslow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 10:33.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Broad Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Broad Walk, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 08:08.

Cadent Gas logo
LONG TERM
Between
8 Sep and 15 Oct 2025
Details
View Map
Share
Glebe Road

Cadent Gas were proposing to carry out Utility asset works on Glebe Road, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 09:50.

Cadent Gas logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Pield Heath Road

Cadent Gas were proposing to carry out Utility asset works on Pield Heath Road, Uxbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2025 at 10:56.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are carrying out Utility asset works on Uxbridge Road, Uxbridge.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 15:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 16:07.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 09:29.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Nellgrove Road

Cadent Gas are proposing to carry out Utility asset works on Nellgrove Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 09:29.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Nellgrove Road

Cadent Gas are carrying out Utility asset works on Nellgrove Road, Uxbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 15:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 16:11.

Cadent Gas logo
LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are carrying out Utility asset works on Uxbridge Road, Uxbridge.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 11:33 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 06:52.

Affinity Water logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
St Catherines Road

Affinity Water were proposing to carry out Utility asset works on St Catherines Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 3 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 11 Feb 2025 at 15:30.

Affinity Water logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
St Catherines Road

Affinity Water are proposing to carry out Utility asset works on St Catherines Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 6 Feb 2025 at 07:39.

Affinity Water logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
St Catherines Road

Affinity Water are proposing to carry out Utility asset works on St Catherines Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 08:33.

Affinity Water logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
St Catherines Road

Affinity Water are proposing to carry out Utility asset works on St Catherines Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 17 Jul 2025 at 14:14.

London Borough Of Hillingdon logo
Between
9 Sep and 9 Oct 2025
Details
View Map
Share
Follow
North Hyde Gardens

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on North Hyde Gardens, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jul 2025 at 07:20.

Eunetworks logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Clayton Road

Eunetworks were proposing to carry out Utility asset works on Clayton Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 22 Jul 2025 at 13:25.

Eunetworks logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Clayton Road

Eunetworks are proposing to carry out Utility asset works on Clayton Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 5 Aug 2025 at 09:34.

Eunetworks logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Clayton Road

Eunetworks were proposing to carry out Utility asset works on Clayton Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 29 Aug 2025 at 10:54.

Eunetworks logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Clayton Road

Eunetworks were proposing to carry out Utility asset works on Clayton Road, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 29 Aug 2025 at 10:54.

Buckinghamshire Council logo
Between
14 and 30 Sep 2025
Details
View Map
Share
Follow
Longstone Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Longstone Road, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 15 May 2025 at 15:42.

Buckinghamshire Council logo
Between
14 and 30 Sep 2025
Details
View Map
Share
Follow
The Parkway

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on The Parkway, Iver Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 15 May 2025 at 15:42.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Dorset Waye

Cadent Gas are proposing to carry out New service connection on Dorset Waye, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 08:44.

London Borough Of Hounslow logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Southall Lane

London Borough Of Hounslow are carrying out Highway improvement works on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 21:00 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 16 Sep 2025 at 08:29.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 1 Nov 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Cranford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 1 Nov 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 15:01.

Scottish Hydro Electric Power Dis logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Shakespeare Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Shakespeare Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jun 2025 at 13:53.

Scottish Hydro Electric Power Dis logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Shakespeare Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Shakespeare Road, Hanwell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 17:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Sep 2025 at 08:24.

Scottish Hydro Electric Power Dis logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Evelyn Grove

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Evelyn Grove, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Jun 2025 at 09:30.

Scottish Hydro Electric Power Dis logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Evelyn Grove

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Evelyn Grove, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Jun 2025 at 09:32.

Scottish Hydro Electric Power Dis logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Evelyn Grove

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Evelyn Grove, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Jun 2025 at 07:33.

Scottish Hydro Electric Power Dis logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Evelyn Grove

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Evelyn Grove, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:30 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Sep 2025 at 09:05.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Yeading Lane

Cadent Gas are proposing to carry out Utility asset works on Yeading Lane, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 07:51.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Yeading Lane

Cadent Gas are proposing to carry out Utility asset works on Yeading Lane, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 17:29.

Cadent Gas logo
Between
15 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Iver Lane

Cadent Gas are proposing to carry out Utility asset works on Iver Lane, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 09:14.

Cadent Gas logo
Between
15 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Iver Lane

Cadent Gas are proposing to carry out Utility asset works on Iver Lane, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 14:36.

Cadent Gas logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Iver Lane

Cadent Gas are carrying out Utility asset works on Iver Lane, Uxbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 16:15 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 16:54.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Ingram Way

Affinity Water are carrying out Utility repair and maintenance works on Ingram Way, Greenford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 22:00 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Sep 2025 at 16:26.

Cadent Gas logo
LONG TERM
Between
15 Sep and 27 Nov 2025
Details
View Map
Share
Follow
Imperial Drive

Cadent Gas are proposing to carry out Utility asset works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 10:13.

London Borough Of Hillingdon logo
Until
10 Oct 2025
Details
View Map
Share
Follow
Moorhall Road

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Moorhall Road, Harefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 15 Sep 2025 at 08:56.

Eunetworks logo
Between
16 and 29 Sep 2025
Details
View Map
Share
Follow
Harmondsworth Lane

Eunetworks are proposing to carry out Utility asset works on Harmondsworth Lane, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 7 Jul 2025 at 15:09.

Eunetworks logo
Between
16 and 29 Sep 2025
Details
View Map
Share
Follow
Harmondsworth Lane

Eunetworks are proposing to carry out Utility asset works on Harmondsworth Lane, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 8 Jul 2025 at 09:06.

Eunetworks logo
Between
16 and 29 Sep 2025
Details
View Map
Share
Follow
Harmondsworth Lane

Eunetworks are proposing to carry out Utility asset works on Harmondsworth Lane, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 23 Jul 2025 at 08:03.

Transport for London (TfL) logo
LONG TERM
Between
16 Sep and 7 Nov 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Cranford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 15:01.

Transport for London (TfL) logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are carrying out Highway improvement works on The Parkway, Cranford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:00 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 08:05.

Transport for London (TfL) logo
LONG TERM
Between
16 Sep and 7 Nov 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 15:01.

Transport for London (TfL) logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are carrying out Highway improvement works on The Parkway, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:00 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 08:02.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Kingston Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Kingston Avenue, Yiewsley, West Drayton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 12:25 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 13:19.

Scottish Hydro Electric Power Dis logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Rectory Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Rectory Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 08:30 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Sep 2025 at 09:18.

London Borough Of Hillingdon logo
Between
17 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Hillingdon Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Hillingdon Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 26 Jun 2025 at 09:51.

Buckinghamshire Council logo
Between
17 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Oxford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Jul 2025 at 13:15.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are carrying out Utility repair and maintenance works on Cheney Street, Eastcote.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 15:39 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 08:26.

Buckinghamshire Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Thorney Mill Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Thorney Mill Road, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 11:43.

London Borough Of Hillingdon logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Townfield Road

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Townfield Road, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 08:00 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 18 Sep 2025 at 08:31.

London Borough Of Hounslow logo
Between
19 and 26 Sep 2025
Details
View Map
Share
Follow
Hayes Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Hayes Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 4 Aug 2025 at 10:10.

London Borough Of Hillingdon logo
Between
19 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Norfolk Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Norfolk Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 12 Sep 2025 at 10:56.

London Borough Of Hillingdon logo
Between
19 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Norfolk Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Norfolk Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 18 Sep 2025 at 10:45.

Eunetworks logo
Between
22 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Harmondsworth Lane

Eunetworks are proposing to carry out Utility asset works on Harmondsworth Lane, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 23 Jul 2025 at 13:51.

Scottish Hydro Electric Power Dis logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Crown Close

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Crown Close, Hayes.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Sep 2025 at 10:35.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Botwell Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Botwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Jun 2025 at 11:00.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Botwell Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Botwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Jul 2025 at 07:59.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Botwell Lane

Affinity Water were proposing to carry out Utility repair and maintenance works on Botwell Lane, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Sep 2025 at 10:50.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Botwell Crescent

Affinity Water are proposing to carry out Utility repair and maintenance works on Botwell Crescent, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 08:03.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Botwell Crescent

Affinity Water are proposing to carry out Utility repair and maintenance works on Botwell Crescent, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 09:14.

London Borough Of Hillingdon logo
Between
22 and 29 Sep 2025
Details
View Map
Share
Peel Way

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Peel Way, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Sep 2025 at 15:28.

London Borough Of Hillingdon logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Peel Way

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Peel Way, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 12 Sep 2025 at 11:01.

Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Pield Heath Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Pield Heath Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 22 Jul 2025 at 09:42.

Scottish Hydro Electric Power Dis logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Cuckoo Avenue

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Cuckoo Avenue, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Jun 2025 at 11:13.

Scottish Hydro Electric Power Dis logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Ruislip Road East

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Ruislip Road East, Hanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Jun 2025 at 12:05.

LONG TERM
Between
22 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Pinewood Green

Optimal Power Networks are proposing to carry out Utility asset works on Pinewood Green, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 9 Sep 2025 at 11:30.

Cadent Gas logo
LONG TERM
Between
22 Sep and 1 Dec 2025
Details
View Map
Share
Swakeleys Road

Cadent Gas were proposing to carry out Utility asset works on Swakeleys Road, Ickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 14:35.

Cadent Gas logo
LONG TERM
Between
22 Sep and 4 Dec 2025
Details
View Map
Share
Follow
Imperial Drive

Cadent Gas are proposing to carry out Utility asset works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 16:43.

Cadent Gas logo
Between
22 and 28 Sep 2025
Details
View Map
Share
Follow
Alfriston Avenue

Cadent Gas are proposing to carry out Utility asset works on Alfriston Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 17:56.

Cadent Gas logo
Between
22 and 28 Sep 2025
Details
View Map
Share
Follow
Alfriston Avenue

Cadent Gas are proposing to carry out Utility asset works on Alfriston Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 16:26.

Eunetworks logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Botwell Lane

Eunetworks are proposing to carry out Utility asset works on Botwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 25 Aug 2025 at 16:30.

Eunetworks logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Botwell Lane

Eunetworks are proposing to carry out Utility asset works on Botwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 11:26.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
24 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Parkfield Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Parkfield Avenue, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Aug 2025 at 16:24.

Affinity Water logo
Between
25 and 30 Sep 2025
Details
View Map
Share
Follow
Horsenden Lane South

Affinity Water are proposing to carry out Utility repair and maintenance works on Horsenden Lane South, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Jun 2025 at 14:24.

Affinity Water logo
Between
25 and 30 Sep 2025
Details
View Map
Share
Horsenden Lane South

Affinity Water were proposing to carry out Utility repair and maintenance works on Horsenden Lane South, Perivale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 10:56.

Scottish Hydro Electric Power Dis logo
Between
29 Sep and 6 Oct 2025
Details
View Map
Share
Boltons Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Boltons Lane, Heathrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Jun 2025 at 08:56.

Scottish Hydro Electric Power Dis logo
Between
29 Sep and 6 Oct 2025
Details
View Map
Share
Boltons Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Boltons Lane, Heathrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jul 2025 at 15:46.

Scottish Hydro Electric Power Dis logo
Between
29 Sep and 6 Oct 2025
Details
View Map
Share
Boltons Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Boltons Lane, Heathrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Jul 2025 at 09:44.

Scottish Hydro Electric Power Dis logo
Between
29 Sep and 6 Oct 2025
Details
View Map
Share
Boltons Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Boltons Lane, Heathrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 09:16.

Scottish Hydro Electric Power Dis logo
Between
29 Sep and 6 Oct 2025
Details
View Map
Share
Boltons Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Boltons Lane, Heathrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Jul 2025 at 12:45.

Scottish Hydro Electric Power Dis logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Crown Close

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Crown Close, Hayes.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Aug 2025 at 12:00.

Cadent Gas logo
LONG TERM
Between
29 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Pump Lane

Cadent Gas are proposing to carry out Utility asset works on Pump Lane, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 09:50.

Cadent Gas logo
LONG TERM
Between
29 Sep and 22 Dec 2025
Details
View Map
Share
Follow
Botwell Common Road

Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 09:06.

Cadent Gas logo
LONG TERM
Between
29 Sep and 22 Nov 2025
Details
View Map
Share
Follow
Botwell Common Road

Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 09:44.

Cadent Gas logo
LONG TERM
Between
29 Sep and 24 Nov 2025
Details
View Map
Share
Follow
Botwell Common Road

Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 15:20.

Cadent Gas logo
LONG TERM
Between
29 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Botwell Common Road

Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 11:16.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Barra Hall Road

Cadent Gas are proposing to carry out Utility asset works on Barra Hall Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 09:07.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Barra Hall Road

Cadent Gas are proposing to carry out Utility asset works on Barra Hall Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 09:47.

Cadent Gas logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Barra Hall Road

Cadent Gas are proposing to carry out Utility asset works on Barra Hall Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2025 at 09:20.

Affinity Water logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Norman Avenue

Affinity Water are proposing to carry out Utility asset works on Norman Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 May 2025 at 07:23.

Affinity Water logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Norman Avenue

Affinity Water are proposing to carry out Utility asset works on Norman Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Aug 2025 at 07:17.

London Borough Of Hillingdon logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Peel Way

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Peel Way, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 18 Sep 2025 at 10:46.

Cadent Gas logo
Between
29 Sep and 5 Oct 2025
Details
View Map
Share
Follow
The Drive

Cadent Gas are proposing to carry out Utility asset works on The Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 17:57.

Cadent Gas logo
Between
29 Sep and 5 Oct 2025
Details
View Map
Share
Follow
The Drive

Cadent Gas are proposing to carry out Utility asset works on The Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 00:10.

London Borough Of Hillingdon logo
LONG TERM
Between
1 Oct and 1 Nov 2025
Details
View Map
Share
Follow
North Hyde Gardens

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on North Hyde Gardens, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:29.

London Borough Of Hillingdon logo
LONG TERM
Between
1 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Minet Drive

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Minet Drive, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:29.

London Borough Of Hillingdon logo
LONG TERM
Between
1 Oct and 1 Nov 2025
Details
View Map
Share
Follow
St Laurence Close

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on St Laurence Close, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:20.

London Borough Of Hillingdon logo
LONG TERM
Between
1 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Frogmore Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Frogmore Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:31.

London Borough Of Hillingdon logo
LONG TERM
Between
1 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Charville Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:33.

Affinity Water logo
LONG TERM
Between
1 Oct and 23 Dec 2025
Details
View Map
Share
Follow
Wallasey Crescent

Affinity Water are proposing to carry out Utility asset works on Wallasey Crescent, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 May 2025 at 10:08.

Affinity Water logo
LONG TERM
Between
1 Oct and 23 Dec 2025
Details
View Map
Share
Follow
Wallasey Crescent

Affinity Water are proposing to carry out Utility asset works on Wallasey Crescent, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Aug 2025 at 11:09.

Affinity Water logo
LONG TERM
Between
1 Oct and 23 Dec 2025
Details
View Map
Share
Follow
Wallasey Crescent

Affinity Water are proposing to carry out Utility asset works on Wallasey Crescent, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 08:05.

Buckinghamshire Council logo
Between
1 and 4 Oct 2025
Details
View Map
Share
Follow
Penn Drive

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Drive, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Jun 2025 at 12:22.

London Borough Of Hillingdon logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Richards Close

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Richards Close, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:16.

London Borough Of Hillingdon logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Western View

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Western View, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:11.

London Borough Of Hillingdon logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Wood End

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood End, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:09.

London Borough Of Hillingdon logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Spencer Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Spencer Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:15.

London Borough Of Hillingdon logo
Between
2 and 31 Oct 2025
Details
View Map
Share
Follow
Weymouth Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Weymouth Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Jul 2025 at 09:09.

Eunetworks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Hatch Lane

Eunetworks are proposing to carry out Utility asset works on Hatch Lane, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 23 Jul 2025 at 13:51.

Eunetworks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Hatch Lane

Eunetworks are proposing to carry out Utility asset works on Hatch Lane, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 4 Aug 2025 at 07:35.

Cadent Gas logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Southall Lane

Cadent Gas are proposing to carry out Utility asset works on Southall Lane, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 08:24.

Affinity Water logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Brookside Close

Affinity Water are proposing to carry out Utility asset works on Brookside Close, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Sep 2025 at 09:33.

Cadent Gas logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Tilehouse Lane

Cadent Gas are proposing to carry out Utility asset works on Tilehouse Lane, Denham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 14:17.

Affinity Water logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
Newyears Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Newyears Green Lane, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Jul 2025 at 14:20.

Affinity Water logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
Newyears Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Newyears Green Lane, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Jul 2025 at 09:41.

Cityfibre Metro Networks logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Follow
Southlands Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Southlands Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Jul 2025 at 12:51.

Scottish Hydro Electric Power Dis logo
Between
8 and 29 Oct 2025
Details
View Map
Share
Uxbridge Road Service Road Outside New Broadway Parade

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road Service Road Outside New Broadway Parade, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2025 at 16:14.

Scottish Hydro Electric Power Dis logo
Between
8 and 29 Oct 2025
Details
View Map
Share
Uxbridge Road Service Road Outside New Broadway Parade

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road Service Road Outside New Broadway Parade, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Jul 2025 at 12:04.

Scottish Hydro Electric Power Dis logo
Between
8 and 29 Oct 2025
Details
View Map
Share
Uxbridge Road Service Road Outside New Broadway Parade

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road Service Road Outside New Broadway Parade, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Aug 2025 at 14:43.

Buckinghamshire Council logo
Between
8 and 14 Oct 2025
Details
View Map
Share
Follow
Penn Drive

Buckinghamshire Council are proposing to carry out Highway improvement works on Penn Drive, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Mar 2025 at 12:25.

Eunetworks logo
Between
10 and 12 Oct 2025
Details
View Map
Share
Cromwell Road

Eunetworks were proposing to carry out Utility asset works on Cromwell Road, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Aug 2025 at 08:33.

London Borough Of Ealing logo
LONG TERM
Between
13 Oct 2025 and 28 Mar 2026
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 28 March 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 12 Aug 2025 at 08:13.

London Borough Of Hillingdon logo
LONG TERM
Between
13 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Hillingdon Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Hillingdon Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Sep 2025 at 13:50.

London Borough Of Hillingdon logo
LONG TERM
Between
13 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Hillingdon Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Hillingdon Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 18 Sep 2025 at 10:44.

BT logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Whitmore Road

BT were proposing to carry out Utility repair and maintenance works on Whitmore Road, West Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Jul 2025 at 08:25.

BT logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Bessborough Road

BT were proposing to carry out Utility repair and maintenance works on Bessborough Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Jul 2025 at 08:25.

Cityfibre Metro Networks logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Old Rectory Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old Rectory Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Aug 2025 at 14:59.

Cadent Gas logo
Between
13 and 19 Oct 2025
Details
View Map
Share
Follow
Farm Avenue

Cadent Gas are proposing to carry out Utility asset works on Farm Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 17:57.

Cadent Gas logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Tilehouse Lane

Cadent Gas are proposing to carry out Utility asset works on Tilehouse Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 14:16.

Between
15 and 17 Oct 2025
Details
View Map
Share
Kingsfield Avenue

London Borough Of Harrow were proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:37.

Between
15 and 17 Oct 2025
Details
View Map
Share
Southfield Park

London Borough Of Harrow were proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2025 at 07:35.

Scottish Hydro Electric Power Dis logo
Between
17 Oct and 2 Nov 2025
Details
View Map
Share
Uxbridge Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Sep 2025 at 10:28.

Scottish Hydro Electric Power Dis logo
Between
17 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Uxbridge Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Sep 2025 at 10:49.

Scottish Hydro Electric Power Dis logo
Between
17 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Uxbridge Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Sep 2025 at 15:46.

Scottish Hydro Electric Power Dis logo
Between
17 and 21 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road Service Road Outside New Broadway Parade

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Uxbridge Road Service Road Outside New Broadway Parade, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2025 at 13:57.

Scottish Hydro Electric Power Dis logo
Between
18 and 29 Oct 2025
Details
View Map
Share
Uxbridge Road Service Road Outside New Broadway Parade

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road Service Road Outside New Broadway Parade, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jul 2025 at 15:41.

Cadent Gas logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Bath Road

Cadent Gas are proposing to carry out Utility asset works on Bath Road, Longford, Heathrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 09:36.

Cadent Gas logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Iver Lane

Cadent Gas are proposing to carry out Utility asset works on Iver Lane, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 12:18.

Cadent Gas logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Heath Road

Cadent Gas were proposing to carry out Utility asset works on Heath Road, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 14:43.

Cadent Gas logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Heath Road

Cadent Gas are proposing to carry out Utility asset works on Heath Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 07:16.

Cadent Gas logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Heath Road

Cadent Gas are proposing to carry out Utility asset works on Heath Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 14:23.

LONG TERM
Between
20 Oct and 29 Nov 2025
Details
View Map
Share
Follow
Pinewood Green

Optimal Power Networks are proposing to carry out Utility asset works on Pinewood Green, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 10 Sep 2025 at 14:52.

UK Power Networks Eastern & London logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Sudbury Croft

UK Power Networks Eastern & London are proposing to carry out New service connection on Sudbury Croft, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Aug 2025 at 13:26.

Affinity Water logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Greenacres Avenue

Affinity Water are proposing to carry out Utility asset works on Greenacres Avenue, Ickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Sep 2025 at 18:25.

Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:56.

Affinity Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Jul 2025 at 09:21.

Cityfibre Metro Networks logo
Between
21 and 24 Oct 2025
Details
View Map
Share
Follow
Hollybush Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Hollybush Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Aug 2025 at 09:11.

Affinity Water logo
Between
21 and 24 Oct 2025
Details
View Map
Share
Follow
Meadow Close

Affinity Water are proposing to carry out Utility asset works on Meadow Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Aug 2025 at 09:26.

Scottish Hydro Electric Power Dis logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Western Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Western Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2025 at 10:29.

Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:57.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Harmondsworth Lane

Eunetworks are proposing to carry out Utility asset works on Harmondsworth Lane, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 4 Aug 2025 at 07:41.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Harmondsworth Lane

Eunetworks are proposing to carry out Utility asset works on Harmondsworth Lane, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 5 Aug 2025 at 15:02.

Cadent Gas logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Norwood Road Service Road To Numbers 168-186

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Norwood Road Service Road To Numbers 168-186, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 06:25.

Cadent Gas logo
Between
25 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Southall Lane

Cadent Gas are proposing to carry out Utility asset works on Southall Lane, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 10:30.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Hemmen Lane

Eunetworks are proposing to carry out Utility asset works on Hemmen Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 5 Aug 2025 at 09:23.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Hemmen Lane

Eunetworks are proposing to carry out Utility asset works on Hemmen Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 5 Aug 2025 at 15:04.

Scottish Hydro Electric Power Dis logo
Between
25 Oct and 12 Nov 2025
Details
View Map
Share
Uxbridge Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road, Uxbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Jul 2025 at 08:09.

Scottish Hydro Electric Power Dis logo
Between
25 Oct and 12 Nov 2025
Details
View Map
Share
Uxbridge Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Uxbridge Road, Uxbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Aug 2025 at 09:53.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Boltons Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Boltons Lane, Heathrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Aug 2025 at 09:22.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Boltons Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Boltons Lane, Heathrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Aug 2025 at 10:38.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
High Street

BT are proposing to carry out Utility asset works on High Street, Cranford, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Aug 2025 at 07:40.

London Borough Of Ealing logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Minterne Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Minterne Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 Sep 2025 at 21:44.

Cadent Gas logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Sussex Road

Cadent Gas are proposing to carry out Utility asset works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 06:25.

London Borough Of Ealing logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Talbot Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Talbot Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 10 Sep 2025 at 15:26.

Eunetworks logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Hemmen Lane

Eunetworks are proposing to carry out Utility asset works on Hemmen Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 24 Jul 2025 at 10:22.

Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Pield Heath Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Pield Heath Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Aug 2025 at 09:25.

Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Pield Heath Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Pield Heath Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Aug 2025 at 15:19.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Lees Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Lees Road, Uxbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 09:49.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Lees Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Lees Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Sep 2025 at 10:32.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Lees Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Lees Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Sep 2025 at 15:08.

Affinity Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Horsenden Lane South

Affinity Water are proposing to carry out Utility repair and maintenance works on Horsenden Lane South, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Jul 2025 at 17:02.

Affinity Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Charville Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 4 Jun 2025 at 11:35.

Affinity Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Charville Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 11 Jun 2025 at 07:36.

Affinity Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Charville Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 18 Jun 2025 at 13:20.

Cityfibre Metro Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Cheapside Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cheapside Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Aug 2025 at 09:16.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Roxborough Avenue

BT were proposing to carry out Utility repair and maintenance works on Roxborough Avenue, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2025 at 09:25.

Affinity Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Joel Street

Affinity Water are proposing to carry out Utility asset works on Joel Street, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 1 Aug 2025 at 07:16.

Affinity Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Joel Street

Affinity Water are proposing to carry out Utility asset works on Joel Street, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 27 Aug 2025 at 11:24.

London Borough Of Hillingdon logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Linksway

London Borough Of Hillingdon are proposing to carry out New service connection on Linksway, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2025 at 10:38.

London Borough Of Hillingdon logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Linksway

London Borough Of Hillingdon are proposing to carry out New service connection on Linksway, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2025 at 10:39.

BT logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Victoria Terrace

BT are proposing to carry out Utility repair and maintenance works on Victoria Terrace, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2025 at 09:07.

BT logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
West Street

BT are proposing to carry out Utility repair and maintenance works on West Street, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2025 at 09:07.

Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:59.

London Borough Of Ealing logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Brants Walk

London Borough Of Ealing are proposing to carry out Highway improvement works on Brants Walk, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 11 Sep 2025 at 07:15.

London Borough Of Ealing logo
Between
31 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Ribblesdale Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Ribblesdale Avenue, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 Sep 2025 at 20:28.

London Borough Of Ealing logo
Between
1 and 6 Nov 2025
Details
View Map
Share
Follow
Riverside Close

London Borough Of Ealing are proposing to carry out Highway improvement works on Riverside Close, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 11 Sep 2025 at 07:15.

Buckinghamshire Council logo
Between
1 and 4 Nov 2025
Details
View Map
Share
Follow
Penn Drive

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Drive, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Jul 2025 at 10:36.

LONG TERM
Between
1 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Kingsfield Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 31 Jul 2025 at 14:25.

LONG TERM
Between
1 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Southfield Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Southfield Park, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 31 Jul 2025 at 14:22.

Scottish Hydro Electric Power Dis logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Crown Close

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Crown Close, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Aug 2025 at 10:18.

Eunetworks logo
Between
3 and 16 Nov 2025
Details
View Map
Share
Follow
Judge Heath Lane

Eunetworks are proposing to carry out Utility asset works on Judge Heath Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 11:31.

Eunetworks logo
Between
3 and 16 Nov 2025
Details
View Map
Share
Follow
Judge Heath Lane

Eunetworks are proposing to carry out Utility asset works on Judge Heath Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 15 Sep 2025 at 08:07.

Eunetworks logo
Between
3 and 16 Nov 2025
Details
View Map
Share
Follow
Judge Heath Lane

Eunetworks are proposing to carry out Utility asset works on Judge Heath Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 18 Sep 2025 at 14:47.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Douglas Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Douglas Crescent, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Aug 2025 at 11:27.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Douglas Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Douglas Crescent, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2025 at 15:31.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Douglas Crescent

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Douglas Crescent, Hayes.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Aug 2025 at 15:39.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Douglas Crescent

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Douglas Crescent, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Aug 2025 at 13:42.

Cadent Gas logo
Between
3 and 30 Nov 2025
Details
View Map
Share
Follow
Butler Street

Cadent Gas are proposing to carry out Utility asset works on Butler Street, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 16:30.

Cadent Gas logo
Between
3 and 30 Nov 2025
Details
View Map
Share
Follow
Alpha Road

Cadent Gas are proposing to carry out Utility asset works on Alpha Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 16:30.

London Borough Of Ealing logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 18 Sep 2025 at 17:02.

LONG TERM
Between
3 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Ashford Road

Optimal Power Networks are proposing to carry out Utility asset works on Ashford Road, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 9 Sep 2025 at 11:31.

BT logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
West Street

BT are proposing to carry out Utility repair and maintenance works on West Street, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Sep 2025 at 14:59.

Eunetworks logo
Between
7 and 9 Nov 2025
Details
View Map
Share
Follow
Cromwell Road

Eunetworks are proposing to carry out Utility asset works on Cromwell Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 26 Aug 2025 at 10:59.

Eunetworks logo
Between
7 and 9 Nov 2025
Details
View Map
Share
Follow
Cromwell Road

Eunetworks are proposing to carry out Utility asset works on Cromwell Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 18 Sep 2025 at 10:24.

Thames Water logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Belvue Close

Thames Water are proposing to carry out Utility asset works on Belvue Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 07:22.

Thames Water logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Belvue Close

Thames Water are proposing to carry out Utility asset works on Belvue Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 12:54.

Thames Water logo
LONG TERM
Between
10 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Belvue Close

Thames Water are proposing to carry out Utility asset works on Belvue Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 12:03.

Affinity Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Brookside Close

Affinity Water are proposing to carry out Utility asset works on Brookside Close, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Sep 2025 at 12:12.

Between
11 and 17 Nov 2025
Details
View Map
Share
Follow
Pield Heath Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Pield Heath Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Sep 2025 at 08:04.

Between
11 and 17 Nov 2025
Details
View Map
Share
Follow
Pield Heath Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Pield Heath Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Sep 2025 at 10:20.

Affinity Water logo
Between
17 Nov and 2 Dec 2025
Details
View Map
Share
Harlington Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Harlington Road, Uxbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 2 December 2025. The works were due to impact the verge only.

This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 09:32.

Affinity Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Hollybush Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Hollybush Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Aug 2025 at 14:41.

Affinity Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Hollybush Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Hollybush Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Aug 2025 at 16:21.

Affinity Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Hollybush Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Hollybush Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 11:56.

Affinity Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Hollybush Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Hollybush Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Sep 2025 at 11:00.

Cadent Gas logo
LONG TERM
Between
17 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Church Avenue

Cadent Gas are proposing to carry out Utility asset works on Church Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 09:06.

National Highways logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
High Street

National Highways are proposing to carry out Works for road purposes on High Street, Harlington, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 26 Aug 2025 at 11:12.

Cadent Gas logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Turks Head Footpath To Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Turks Head Footpath To Uxbridge Road, Uxbridge.

These works are categorised as Major.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 10:08.

Cadent Gas logo
Between
1 and 17 Dec 2025
Details
View Map
Share
Iver Lane

Cadent Gas were proposing to carry out Utility asset works on Iver Lane, Uxbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 17 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 10:15.

Affinity Water logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Edinburgh Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Edinburgh Drive, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Sep 2025 at 10:13.

Affinity Water logo
Between
1 and 23 Dec 2025
Details
View Map
Share
Follow
Copthall Road East

Affinity Water are proposing to carry out Utility asset works on Copthall Road East, Ickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 23 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 May 2025 at 10:38.

UK Power Networks Eastern & London logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
West Street

UK Power Networks Eastern & London are proposing to carry out New service connection on West Street, Harrow On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2025 at 14:38.

Between
1 and 8 Dec 2025
Details
View Map
Share
Follow
Priory Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Aug 2025 at 08:49.

Cityfibre Metro Networks logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Village Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Village Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Sep 2025 at 08:47.

Cityfibre Metro Networks logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Old Rectory Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Old Rectory Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Sep 2025 at 16:28.

Between
8 and 15 Dec 2025
Details
View Map
Share
Follow
Manor Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Manor Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2025 at 09:22.

Cadent Gas logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Glebe Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Glebe Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 07:57.

Cadent Gas logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Glebe Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Glebe Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 09:30.

Cityfibre Metro Networks logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
North Orbital Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on North Orbital Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Sep 2025 at 12:46.

Cityfibre Metro Networks logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Green Tiles Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Green Tiles Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Sep 2025 at 12:40.


Roadworks Map near to Romney Road, HAYES, UB4 8PU (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 19 Sep 2025 00:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Romney Road, HAYES, UB4 8PU (48 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
HOPPNER ROAD 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Sep 2025 - 22 Sep 2025
0.1
Details
Share
Follow
2
BT logo
GAINSBOROUGH ROAD 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 18 Sep 2025 17:01
(Scheduled: 17 Sep 2025 - 22 Sep 2025)
0.1
Details
Share
Follow
3
BT logo
GAINSBOROUGH ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Sep 2025 - 22 Sep 2025
0.2
Details
Share
Follow
4
BT logo
GAINSBOROUGH ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Sep 2025 - 22 Sep 2025
0.2
Details
Share
Follow
5
BT logo
GAINSBOROUGH ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Sep 2025 - 22 Sep 2025
0.2
Details
Share
Follow
6
Scottish Hydro Electric Power Dis logo
URGENT
  
CHARVILLE LANE 
(0.2 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 17 Sep 2025 16:00
(Scheduled: 17 Sep 2025 - 23 Sep 2025)
0.2
Details
Share
Follow
7
BT logo
GAINSBOROUGH ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Sep 2025 - 24 Sep 2025
0.2
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
HARROW VIEW 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 8 Sep 2025 - 24 Sep 2025
0.5
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
HARROW VIEW 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 16 Sep 2025 13:00
(Scheduled: 15 Sep 2025 - 6 Oct 2025)
0.5
Details
Share
Follow
10
Cadent Gas logo
POLE HILL ROAD 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 15 Sep 2025 - 26 Sep 2025
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data