ROADWORKS SUMMARY
Dallas Terrace, HAYES, UB3 4QN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Dallas Terrace, UB3 4QN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Dallas Terrace, HAYES, UB3 4QN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Dallas Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Egerton Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Egerton Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:27.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Elmsleigh Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Elmsleigh Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:23.

Transport for London (TfL) logo
LONG TERM
Until
24 Dec 2026
Details
View Map
Share
Follow
Pump Lane

Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2023 at 18:00 and could run through until 24 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2025 at 11:57.

London Borough Of Ealing logo
LONG TERM
Until
28 Jun 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 28 June 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 15 Jan 2025 at 11:58.

London Borough Of Ealing logo
LONG TERM
Until
28 Jun 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 15 Jan 2025 at 11:47.

Transport for London (TfL) logo
LONG TERM
Between
22 Jul 2024 and 22 Jul 2027
Details
View Map
Share
Follow
Stockley Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 22 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Jul 2024 at 08:56.

Transport for London (TfL) logo
LONG TERM
Between
27 Aug 2024 and 14 Jul 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:28.

Transport for London (TfL) logo
LONG TERM
Between
27 Aug 2024 and 14 Jul 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are proposing to carry out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:30.

Transport for London (TfL) logo
LONG TERM
Until
26 Jun 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 15:26.

Transport for London (TfL) logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are carrying out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 12:02.

Transport for London (TfL) logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 12:02.

Transport for London (TfL) logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 15:19.

Transport for London (TfL) logo
LONG TERM
Between
21 Oct 2024 and 25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 16:21.

Transport for London (TfL) logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 06:00 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Feb 2025 at 12:43.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Clare Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 13:59.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Clare Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 13:51.

London Borough Of Ealing logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are carrying out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 6 Mar 2025 at 10:29.

ESP Electricity logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Iron Bridge Road

ESP Electricity are carrying out Utility asset works on Iron Bridge Road, Yiewsley, West Drayton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 January 2025 at 08:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 7 Apr 2025 at 09:18.

Cadent Gas logo
LONG TERM
Between
20 Jan and 15 May 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 07:30.

Cadent Gas logo
LONG TERM
Until
16 May 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are carrying out Utility asset works on Central Avenue, Hayes.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 17:47 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 07:57.

Cadent Gas logo
LONG TERM
Between
20 Jan and 2 Jun 2025
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 10:16.

London Borough Of Ealing logo
LONG TERM
Between
28 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Ruislip Road, Northolt.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 31 Oct 2024 at 16:15.

Cadent Gas logo
LONG TERM
Between
3 Feb and 30 May 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:07.

London Borough Of Hounslow logo
LONG TERM
Between
10 Feb and 31 Jul 2025
Details
View Map
Share
Follow
Southall Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 July 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 9 Dec 2024 at 10:27.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:25.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 10:17.

Cadent Gas logo
LONG TERM
Between
10 Feb and 23 Jun 2025
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 14:35.

London Borough Of Hounslow logo
LONG TERM
Between
17 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Vicarage Farm Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Vicarage Farm Road, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 13 Feb 2025 at 15:37.

London Borough Of Hounslow logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Vicarage Farm Road

London Borough Of Hounslow are carrying out Highway improvement works on Vicarage Farm Road, Hounslow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 7 Apr 2025 at 16:11.

London Borough Of Hillingdon logo
LONG TERM
Between
17 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Dawley Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Dawley Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hillingdon on 5 Feb 2025 at 07:29.

London Borough Of Hillingdon logo
LONG TERM
Between
24 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Dawley Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Dawley Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 08:26.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Swallow Street

Cadent Gas were proposing to carry out Utility asset works on Swallow Street, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 21 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:34.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 31 Jul 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are proposing to carry out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 15 Nov 2024 at 15:04.

Eunetworks logo
LONG TERM
Until
24 Apr 2025
Details
View Map
Share
Follow
Coldharbour Lane

Eunetworks are carrying out Utility asset works on Coldharbour Lane, Hayes.

These works are categorised as Major.

The works started on 10 March 2025 at 08:45 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 28 Mar 2025 at 09:03.

G2 Energy IDNO logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Adelphi Crescent

G2 Energy IDNO are proposing to carry out Utility asset works on Adelphi Crescent, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 31 Jan 2025 at 09:36.

London Borough Of Hillingdon logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Dawley Road

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Dawley Road, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2025 at 08:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Apr 2025 at 14:41.

G2 Energy IDNO logo
LONG TERM
Between
11 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Balmoral Drive

G2 Energy IDNO are proposing to carry out Utility asset works on Balmoral Drive, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 14:58.

G2 Energy IDNO logo
LONG TERM
Between
11 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Balmoral Drive

G2 Energy IDNO are proposing to carry out Utility asset works on Balmoral Drive, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 9 Jan 2025 at 11:28.

G2 Energy IDNO logo
LONG TERM
Between
11 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Balmoral Drive

G2 Energy IDNO are proposing to carry out Utility asset works on Balmoral Drive, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 7 Jan 2025 at 07:23.

G2 Energy IDNO logo
LONG TERM
Between
12 Mar and 24 Apr 2025
Details
View Map
Share
Follow
Adelphi Crescent

G2 Energy IDNO are proposing to carry out Utility asset works on Adelphi Crescent, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 5 Mar 2025 at 11:18.

G2 Energy IDNO logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Adelphi Crescent

G2 Energy IDNO are carrying out Utility asset works on Adelphi Crescent, Hayes.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 March 2025 at 08:00 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 13 Mar 2025 at 09:15.

G2 Energy IDNO logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Lansbury Drive

G2 Energy IDNO are proposing to carry out Utility asset works on Lansbury Drive, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 31 Jan 2025 at 09:34.

G2 Energy IDNO logo
LONG TERM
Between
14 Mar and 1 May 2025
Details
View Map
Share
Follow
Balmoral Drive

G2 Energy IDNO are proposing to carry out Utility asset works on Balmoral Drive, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 14:58.

G2 Energy IDNO logo
LONG TERM
Between
14 Mar and 1 May 2025
Details
View Map
Share
Balmoral Drive

G2 Energy IDNO were proposing to carry out Utility asset works on Balmoral Drive, Hayes.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 March 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 8 Jan 2025 at 14:57.

G2 Energy IDNO logo
LONG TERM
Between
14 Mar and 1 May 2025
Details
View Map
Share
Follow
Shakespeare Avenue

G2 Energy IDNO are proposing to carry out Utility asset works on Shakespeare Avenue, Hayes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 13 Jan 2025 at 10:34.

Thames Water logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Hatton Road

Thames Water are carrying out Utility repair and maintenance works on Hatton Road, Feltham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 10:30 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 16:26.

London Borough Of Hounslow logo
LONG TERM
Between
17 Mar and 31 Jul 2025
Details
View Map
Share
Hayes Road

London Borough Of Hounslow were proposing to carry out Highway improvement works on Hayes Road, Southall.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 31 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 1 Apr 2025 at 13:22.

Cadent Gas logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Featherstone Road

Cadent Gas are carrying out Utility repair and maintenance works on Featherstone Road, Southall.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 11:10 and could run through until 25 April 2025. The works will impact the footway only.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 11:06.

Heathrow Airport logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Longford Roundabout Access Road

Heathrow Airport are proposing to carry out Highway repair and maintenance works on Longford Roundabout Access Road, London Heathrow Airport, Heathrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Heathrow Airport on 26 Feb 2025 at 09:37.

Heathrow Airport logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Longford Roundabout Access Road

Heathrow Airport are carrying out Highway repair and maintenance works on Longford Roundabout Access Road, London Heathrow Airport, Heathrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 23:30 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Heathrow Airport on 25 Mar 2025 at 06:58.

London Borough Of Hounslow logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Summerhouse Avenue

London Borough Of Hounslow are carrying out Highway improvement works on Summerhouse Avenue, Hounslow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 2 Apr 2025 at 15:34.

Heathrow Airport logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Stanwell Moor Road

Heathrow Airport are proposing to carry out Highway repair and maintenance works on Stanwell Moor Road, Heathrow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Heathrow Airport on 26 Feb 2025 at 09:37.

Heathrow Airport logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Stanwell Moor Road

Heathrow Airport are carrying out Highway repair and maintenance works on Stanwell Moor Road, Heathrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 23:30 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Heathrow Airport on 25 Mar 2025 at 06:58.

London Borough Of Hounslow logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
North Hyde Lane

London Borough Of Hounslow are carrying out Highway improvement works on North Hyde Lane, Southall.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 15 Apr 2025 at 15:10.

London Borough Of Ealing logo
LONG TERM
Between
24 Mar and 31 May 2025
Details
View Map
Share
Follow
Windmill Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Windmill Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 5 Mar 2025 at 10:59.

London Borough Of Ealing logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Windmill Road

London Borough Of Ealing are carrying out Highway improvement works on Windmill Road, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 31 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 2 Apr 2025 at 13:54.

London Borough Of Hounslow logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Twickenham Road

London Borough Of Hounslow are carrying out Highway improvement works on Twickenham Road, Isleworth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2025 at 08:00 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 15 Apr 2025 at 16:30.

G2 Energy IDNO logo
LONG TERM
Until
11 May 2025
Details
View Map
Share
Follow
Balmoral Drive

G2 Energy IDNO are carrying out Utility asset works on Balmoral Drive, Hayes.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 11:00 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 26 Mar 2025 at 12:29.

G2 Energy IDNO logo
LONG TERM
Until
4 May 2025
Details
View Map
Share
Follow
Lansbury Drive

G2 Energy IDNO are carrying out Utility asset works on Lansbury Drive, Hayes.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 11:00 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 26 Mar 2025 at 12:28.

Surrey County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Feltham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Feltham Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 24 Mar 2025 at 07:43.

Thames Water logo
Between
31 Mar and 29 Apr 2025
Details
View Map
Share
Vicarage Farm Road

Thames Water were proposing to carry out Utility repair and maintenance works on Vicarage Farm Road, Hounslow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 29 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 10:07.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
31 Mar and 30 May 2025
Details
View Map
Share
Follow
Ruislip Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Ruislip Road, Northolt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Mar 2025 at 13:36.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
31 Mar and 30 May 2025
Details
View Map
Share
Ruislip Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Ruislip Road, Northolt.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Mar 2025 at 09:01.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Vicarage Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Dec 2024 at 10:23.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Cumberland Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cumberland Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:06.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Clare Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 08:19.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Clare Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 08:25.

London Borough Of Hounslow logo
Finishing
Today
Details
View Map
Share
Follow
Clunbury Avenue

London Borough Of Hounslow are carrying out Highway improvement works on Clunbury Avenue, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2025 at 08:00 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 7 Apr 2025 at 15:13.

G2 Energy IDNO logo
LONG TERM
Until
20 May 2025
Details
View Map
Share
Follow
Shakespeare Avenue

G2 Energy IDNO are carrying out Utility asset works on Shakespeare Avenue, Hayes.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2025 at 09:00 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 1 Apr 2025 at 10:51.

Surrey County Council logo
Between
4 and 24 Apr 2025
Details
View Map
Share
Follow
Village Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Village Way, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Mar 2025 at 07:45.

Surrey County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Village Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Village Way, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Mar 2025 at 09:57.

Surrey County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Village Way

Surrey County Council are carrying out Highway repair and maintenance works on Village Way, Ashford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 08:00 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Apr 2025 at 08:25.

Surrey County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Knapp Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Knapp Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Mar 2025 at 07:43.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Sussex Road

Cadent Gas are proposing to carry out Utility asset works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 20:42.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Sussex Road

Cadent Gas were proposing to carry out Utility asset works on Sussex Road, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 13:33.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
5 Apr and 31 May 2025
Details
View Map
Share
Follow
Oldfield Lane North

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Oldfield Lane North, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 19:16.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Knapp Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Knapp Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Mar 2025 at 09:47.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Knapp Road

Surrey County Council are carrying out Highway repair and maintenance works on Knapp Road, Ashford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:30 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 7 Apr 2025 at 10:17.

Affinity Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sparrow Farm Drive

Affinity Water are proposing to carry out Utility asset works on Sparrow Farm Drive, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Feb 2025 at 09:53.

Affinity Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sparrow Farm Drive

Affinity Water are proposing to carry out Utility asset works on Sparrow Farm Drive, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Mar 2025 at 11:57.

Affinity Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sparrow Farm Drive

Affinity Water are carrying out Utility asset works on Sparrow Farm Drive, Feltham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 10:00 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 10:07.

Thames Water logo
LONG TERM
Between
7 Apr and 18 May 2025
Details
View Map
Share
Bath Road

Thames Water were proposing to carry out Utility asset works on Bath Road, Hounslow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 18 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Feb 2025 at 10:25.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bath Road

Cadent Gas are carrying out Utility repair and maintenance works on Bath Road, Hounslow.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 15:23 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 07:34.

Cadent Gas logo
Tomorrow
Details
View Map
Share
Wood Lane

Cadent Gas carried out Utility repair and maintenance works on Wood Lane, Isleworth.

The road was closed for some or all of the period.

The works were originally planned between 7 Apr 2025 and 18 Apr 2025 and were actually completed between 7 Apr 2025 (10:45) and 17 Apr 2025 (05:16). The works impacted the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 10:53.

London Borough Of Hounslow logo
LONG TERM
Between
7 Apr and 26 Sep 2025
Details
View Map
Share
Southall Lane

London Borough Of Hounslow were proposing to carry out Highway improvement works on Southall Lane, Heston, Hounslow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 26 September 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 4 Apr 2025 at 17:01.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Sussex Road

Cadent Gas were proposing to carry out Utility asset works on Sussex Road, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 22 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 14:31.

Murphy Power Distribution logo
Between
7 and 27 Apr 2025
Details
View Map
Share
Follow
Uxbridge Road

Murphy Power Distribution are proposing to carry out Utility asset works on Uxbridge Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 7 Feb 2025 at 15:48.

Murphy Power Distribution logo
Until
27 Apr 2025
Details
View Map
Share
Follow
Uxbridge Road

Murphy Power Distribution are carrying out Utility asset works on Uxbridge Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:45 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 7 Apr 2025 at 08:57.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
St Stephens Avenue

Cadent Gas are proposing to carry out Utility asset works on St Stephens Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 09:19.

Cadent Gas logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Sherborne Gardens

Cadent Gas are proposing to carry out Utility asset works on Sherborne Gardens, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 09:19.

Cadent Gas logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Sherborne Gardens

Cadent Gas were proposing to carry out Utility asset works on Sherborne Gardens, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 10:54.

Scottish Hydro Electric Power Dis logo
Until
6 May 2025
Details
View Map
Share
Follow
Lady Margaret Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Lady Margaret Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:00 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Apr 2025 at 09:53.

Cadent Gas logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Follow
Greenford Road

Cadent Gas are proposing to carry out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 15:50.

Cadent Gas logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Follow
Greenford Road

Cadent Gas are proposing to carry out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 16:12.

Cadent Gas logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Follow
Greenford Road

Cadent Gas are proposing to carry out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 15:04.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
North Avenue

Thames Water are carrying out Utility repair and maintenance works on North Avenue, Southall.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2025 at 11:00 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 12:29.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Gordon Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Gordon Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:23.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Violet Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Violet Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:22.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Violet Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Violet Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:23.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Hayes End Drive

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Hayes End Drive, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:23.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:24.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Cedars Drive

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Cedars Drive, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:24.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Kings Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:23.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Weald Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Weald Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:22.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Glisson Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Glisson Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:24.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Harvey Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Harvey Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:23.

London Borough Of Hillingdon logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Myddleton Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Myddleton Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Jan 2025 at 09:23.

London Borough Of Ealing logo
Until
25 Apr 2025
Details
View Map
Share
Follow
Islip Manor Road

London Borough Of Ealing are carrying out Highway improvement works on Islip Manor Road, Northolt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 08:00 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 17 Apr 2025 at 07:28.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Rockingham Road

Cadent Gas are carrying out Utility repair and maintenance works on Rockingham Road, Uxbridge.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 09:00 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 14:57.

London Borough Of Hounslow logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
Southall Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 11 Apr 2025 at 12:49.

London Borough Of Hounslow logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
Southall Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 14 Apr 2025 at 08:32.

Affinity Water logo
Until
25 Apr 2025
Details
View Map
Share
Follow
Lavender Rise

Affinity Water are carrying out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:35 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 14 Apr 2025 at 08:35.

Eunetworks logo
LONG TERM
Between
14 Apr and 16 May 2025
Details
View Map
Share
Follow
Clivesdale Drive

Eunetworks are proposing to carry out Utility asset works on Clivesdale Drive, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 5 Mar 2025 at 08:17.

Cadent Gas logo
LONG TERM
Between
14 Apr and 25 Jun 2025
Details
View Map
Share
Follow
Harlington Road

Cadent Gas are proposing to carry out Utility asset works on Harlington Road, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 15:44.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Harlington Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Harlington Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Jan 2025 at 08:42.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Harlington Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Harlington Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Jan 2025 at 08:42.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Harlington Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Harlington Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Jan 2025 at 09:28.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Harlington Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Harlington Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Jan 2025 at 07:27.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Eastmead Avenue

Cadent Gas are proposing to carry out New service connection on Eastmead Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jan 2025 at 10:25.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Eastmead Avenue

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Eastmead Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 08:10.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Eastcote Lane

Affinity Water are proposing to carry out Utility asset works on Eastcote Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 16:48.

London Borough Of Ealing logo
Finishing
Today
Details
View Map
Share
Follow
Ennismore Avenue

London Borough Of Ealing are carrying out Highway improvement works on Ennismore Avenue, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:00 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 16 Apr 2025 at 11:39.

London Borough Of Hounslow logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Crossways

London Borough Of Hounslow are proposing to carry out Highway improvement works on The Crossways, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 16 Jan 2025 at 15:44.

London Borough Of Hounslow logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Crossways

London Borough Of Hounslow are proposing to carry out Highway improvement works on The Crossways, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 2 Apr 2025 at 15:24.

London Borough Of Hounslow logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Vicarage Farm Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Vicarage Farm Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 16 Jan 2025 at 15:58.

London Borough Of Hounslow logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Vicarage Farm Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Vicarage Farm Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 2 Apr 2025 at 15:20.

Eunetworks logo
LONG TERM
Between
16 Apr and 20 May 2025
Details
View Map
Share
Follow
Clivesdale Drive

Eunetworks are proposing to carry out Utility asset works on Clivesdale Drive, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 14 Mar 2025 at 08:52.

Eunetworks logo
Between
16 and 24 Apr 2025
Details
View Map
Share
Follow
Minet Drive

Eunetworks are proposing to carry out Utility asset works on Minet Drive, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 5 Mar 2025 at 08:16.

Eunetworks logo
Until
24 Apr 2025
Details
View Map
Share
Follow
Minet Drive

Eunetworks are carrying out Utility asset works on Minet Drive, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 08:00 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 16 Apr 2025 at 08:48.

Eunetworks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Showers Way

Eunetworks are proposing to carry out Utility asset works on Showers Way, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 5 Mar 2025 at 08:08.

Eunetworks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Showers Way

Eunetworks are proposing to carry out Utility asset works on Showers Way, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 6 Mar 2025 at 08:59.

Eunetworks logo
Between
16 and 24 Apr 2025
Details
View Map
Share
Follow
Birchway

Eunetworks are proposing to carry out Utility asset works on Birchway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 5 Mar 2025 at 08:25.

Eunetworks logo
Between
16 and 24 Apr 2025
Details
View Map
Share
Follow
Birchway

Eunetworks are proposing to carry out Utility asset works on Birchway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 6 Mar 2025 at 09:14.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Horton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Horton Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Jan 2025 at 10:34.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Horton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Horton Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Jan 2025 at 13:58.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Horton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Horton Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Jan 2025 at 08:30.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Horton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Horton Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Jan 2025 at 11:34.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Kingston Lane

Affinity Water are carrying out Utility repair and maintenance works on Kingston Lane, Uxbridge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 20:51 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Apr 2025 at 09:30.

Scottish Hydro Electric Power Dis logo
Between
17 and 25 Apr 2025
Details
View Map
Share
Follow
Neal Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Neal Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 10:58.

Scottish Hydro Electric Power Dis logo
Until
25 Apr 2025
Details
View Map
Share
Follow
Neal Avenue

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Neal Avenue, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2025 at 09:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Apr 2025 at 09:24.

London Borough Of Hounslow logo
Between
21 Apr and 7 May 2025
Details
View Map
Share
Follow
Wellington Road South

London Borough Of Hounslow are proposing to carry out Highway improvement works on Wellington Road South, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 12 Mar 2025 at 09:31.

Cadent Gas logo
Between
21 Apr and 7 May 2025
Details
View Map
Share
Follow
Fairview

Cadent Gas are proposing to carry out Utility asset works on Fairview, Ruislip.

These works are categorised as Major.

The works will start on or after 21 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 07:34.

London Borough Of Hounslow logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
North Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on North Street, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 7 Mar 2025 at 16:10.

London Borough Of Hounslow logo
Between
22 Apr and 13 May 2025
Details
View Map
Share
Follow
London Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on London Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 9 Apr 2025 at 09:26.

London Borough Of Hounslow logo
Between
22 Apr and 13 May 2025
Details
View Map
Share
Follow
London Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on London Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 14 Apr 2025 at 14:08.

Cadent Gas logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Wood Lane

Cadent Gas were proposing to carry out Remedial works on Wood Lane, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 11:50.

London Borough Of Hillingdon logo
Between
22 Apr and 22 May 2025
Details
View Map
Share
Follow
Romney Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Romney Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Apr 2025 at 08:45.

London Borough Of Hillingdon logo
Between
22 Apr and 22 May 2025
Details
View Map
Share
Follow
Romney Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Romney Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Apr 2025 at 08:46.

Eunetworks logo
LONG TERM
Between
23 Apr and 25 May 2025
Details
View Map
Share
Follow
Clivesdale Drive

Eunetworks are proposing to carry out Utility asset works on Clivesdale Drive, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 19 Mar 2025 at 09:46.

Eunetworks logo
LONG TERM
Between
23 Apr and 25 May 2025
Details
View Map
Share
Follow
Clivesdale Drive

Eunetworks are proposing to carry out Utility asset works on Clivesdale Drive, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 26 Mar 2025 at 08:48.

London Borough Of Hillingdon logo
Between
23 Apr and 23 May 2025
Details
View Map
Share
Follow
Central Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Apr 2025 at 09:18.

London Borough Of Hillingdon logo
Between
24 Apr and 23 May 2025
Details
View Map
Share
Follow
Star Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Star Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Apr 2025 at 07:40.

Thames Water logo
Between
25 Apr and 4 May 2025
Details
View Map
Share
New Heston Road

Thames Water were proposing to carry out New service connection on New Heston Road, Hounslow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 April 2025 and run through until 4 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 13:44.

Thames Water logo
Between
25 Apr and 4 May 2025
Details
View Map
Share
New Heston Road

Thames Water were proposing to carry out New service connection on New Heston Road, Hounslow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 April 2025 and run through until 4 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:26.

Thames Water logo
Between
25 Apr and 4 May 2025
Details
View Map
Share
Follow
New Heston Road

Thames Water are proposing to carry out New service connection on New Heston Road, Hounslow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:27.

Boldyn Networks logo
Between
28 Apr and 17 May 2025
Details
View Map
Share
Follow
Causeway

Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Boldyn Networks on 16 Apr 2025 at 10:04.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Manor Avenue

Thames Water are proposing to carry out New service connection on Manor Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:11.

Cadent Gas logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
High Street Service Road Outside 373-387

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street Service Road Outside 373-387, Harlington, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 13:47.

Cadent Gas logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
High Street Service Road Outside 373-387

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street Service Road Outside 373-387, Harlington, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 11:08.

Cadent Gas logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
High Street Service Road Outside 373-387

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street Service Road Outside 373-387, Harlington, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:48.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Brook Lane North

Thames Water are proposing to carry out New service connection on Brook Lane North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Feb 2025 at 09:14.

Thames Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Brook Lane North

Thames Water are proposing to carry out New service connection on Brook Lane North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 08:23.

BT logo
Between
28 Apr and 8 May 2025
Details
View Map
Share
Follow
Broadway

BT are proposing to carry out Utility repair and maintenance works on Broadway, West Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 31 Jan 2025 at 21:46.

BT logo
Between
28 Apr and 8 May 2025
Details
View Map
Share
Follow
Broadway

BT are proposing to carry out Utility repair and maintenance works on Broadway, West Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Apr 2025 at 14:17.

BT logo
Between
28 Apr and 8 May 2025
Details
View Map
Share
Follow
Broadway

BT are proposing to carry out Utility repair and maintenance works on Broadway, West Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 07:03.

Cadent Gas logo
LONG TERM
Between
28 Apr and 2 Jun 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Cowley, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 14:42.

Cadent Gas logo
LONG TERM
Between
28 Apr and 2 Jun 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Cowley, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 11:10.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
28 Apr and 20 Jun 2025
Details
View Map
Share
Follow
Ruislip Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Ruislip Road, Northolt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Apr 2025 at 15:26.

London Borough Of Hillingdon logo
Between
28 Apr and 28 May 2025
Details
View Map
Share
Follow
Chiltern View Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Chiltern View Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Apr 2025 at 15:41.

Cadent Gas logo
LONG TERM
Between
29 Apr and 9 Jun 2025
Details
View Map
Share
Waldeck Road

Cadent Gas were proposing to carry out Utility asset works on Waldeck Road, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 14:44.

Cadent Gas logo
LONG TERM
Between
29 Apr and 9 Jun 2025
Details
View Map
Share
Follow
Waldeck Road

Cadent Gas are proposing to carry out Utility asset works on Waldeck Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 10:11.

Cadent Gas logo
LONG TERM
Between
29 Apr and 9 Jun 2025
Details
View Map
Share
Waldeck Road

Cadent Gas were proposing to carry out Utility asset works on Waldeck Road, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 11:16.

London Borough Of Hillingdon logo
Between
29 Apr and 22 May 2025
Details
View Map
Share
Follow
Attle Close

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Attle Close, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Apr 2025 at 09:07.

London Borough Of Hillingdon logo
Between
29 Apr and 29 May 2025
Details
View Map
Share
Follow
Gainsborough Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Gainsborough Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Apr 2025 at 15:42.

BT logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Cherry Lane

BT are proposing to carry out Utility asset works on Cherry Lane, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 4 Feb 2025 at 10:38.

BT logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Cherry Lane

BT are proposing to carry out Utility asset works on Cherry Lane, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 6 Feb 2025 at 07:45.

Affinity Water logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Kings Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kings Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Jan 2025 at 16:59.

Affinity Water logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Kings Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kings Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Apr 2025 at 09:17.

London Borough Of Hillingdon logo
Between
30 Apr and 30 May 2025
Details
View Map
Share
Follow
Hilliards Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Hilliards Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Apr 2025 at 10:13.

BT logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Verulam Road

BT were proposing to carry out Utility asset works on Verulam Road, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Apr 2025 at 15:47.

London Borough Of Hillingdon logo
LONG TERM
Between
1 May and 1 Jun 2025
Details
View Map
Share
Follow
Magnolia Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Magnolia Street, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Apr 2025 at 10:14.

London Borough Of Hillingdon logo
LONG TERM
Between
1 May and 1 Jun 2025
Details
View Map
Share
Follow
Magnolia Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Magnolia Street, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Apr 2025 at 10:14.

Boldyn Networks logo
Between
3 and 22 May 2025
Details
View Map
Share
Follow
Causeway

Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Boldyn Networks on 16 Apr 2025 at 10:08.

On
5 May 2025
Details
View Map
Share
Follow
Lyndhurst Avenue

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Lyndhurst Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 5 May 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 12 Mar 2025 at 14:45.

Affinity Water logo
Between
5 May and 2 Jun 2025
Details
View Map
Share
Follow
Stanwell Moor Road

Affinity Water are proposing to carry out Utility asset works on Stanwell Moor Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 10 Feb 2025 at 08:59.

Affinity Water logo
Between
5 May and 2 Jun 2025
Details
View Map
Share
Follow
Stanwell Moor Road

Affinity Water are proposing to carry out Utility asset works on Stanwell Moor Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 20 Mar 2025 at 13:07.

Thames Water logo
Between
5 and 7 May 2025
Details
View Map
Share
Follow
Maswell Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Maswell Park Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 07:59.

Cadent Gas logo
LONG TERM
Between
5 May and 9 Jun 2025
Details
View Map
Share
Follow
Harlington Road

Cadent Gas are proposing to carry out Utility asset works on Harlington Road, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 13:03.

Boldyn Networks logo
Between
6 and 25 May 2025
Details
View Map
Share
Follow
Causeway

Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Boldyn Networks on 16 Apr 2025 at 10:05.

Cadent Gas logo
Between
6 May and 2 Jun 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 10:17.

Scottish Hydro Electric Power Dis logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Dagmar Mews

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Dagmar Mews, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Mar 2025 at 12:54.

Scottish Hydro Electric Power Dis logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Dagmar Mews

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Dagmar Mews, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Apr 2025 at 13:21.

Thames Water logo
Between
6 and 12 May 2025
Details
View Map
Share
Follow
Green Man Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 16:27.

Thames Water logo
Between
6 and 12 May 2025
Details
View Map
Share
Follow
Green Man Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 20:45.

Thames Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Sydney Road

Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 14:49.

Thames Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Sydney Road

Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 15:44.

London Borough Of Hillingdon logo
LONG TERM
Between
8 May and 9 Jun 2025
Details
View Map
Share
Follow
Magnolia Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Magnolia Street, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Apr 2025 at 10:15.

London Borough Of Hillingdon logo
LONG TERM
Between
9 May and 9 Jun 2025
Details
View Map
Share
Follow
New Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on New Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Apr 2025 at 10:17.

Network Rail logo
Between
10 and 12 May 2025
Details
View Map
Share
Follow
Wood Lane

Network Rail are proposing to carry out Works for Rail Purposes on Wood Lane, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Mar 2025 at 10:50.

Network Rail logo
Between
10 and 12 May 2025
Details
View Map
Share
Follow
Wood Lane

Network Rail are proposing to carry out Works for Rail Purposes on Wood Lane, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Apr 2025 at 14:45.

Cadent Gas logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Dudley Road

Cadent Gas are proposing to carry out Utility asset works on Dudley Road, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 15:31.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Manor Avenue

Thames Water are proposing to carry out New service connection on Manor Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 15:00.

London Borough Of Hounslow logo
LONG TERM
Between
12 May and 16 Jun 2025
Details
View Map
Share
Follow
Ridgeway Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Ridgeway Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 8 Apr 2025 at 16:30.

Cadent Gas logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Oldfield Lane North

Cadent Gas are proposing to carry out Utility asset works on Oldfield Lane North, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 16:00.

Thames Water logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Holyrood Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Holyrood Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 14:34.

Cadent Gas logo
LONG TERM
Between
13 May and 16 Jul 2025
Details
View Map
Share
Follow
St Stephens Road

Cadent Gas are proposing to carry out Utility asset works on St Stephens Road, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:16.

London Borough Of Hillingdon logo
LONG TERM
Between
14 May and 14 Jun 2025
Details
View Map
Share
Follow
Rosemary Close

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Rosemary Close, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Apr 2025 at 10:18.

London Borough Of Hillingdon logo
Between
15 May and 13 Jun 2025
Details
View Map
Share
Follow
The Green

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Green, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Apr 2025 at 15:54.

London Borough Of Hillingdon logo
Between
16 May and 13 Jun 2025
Details
View Map
Share
Follow
The Green

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Green, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Apr 2025 at 15:55.

London Borough Of Hillingdon logo
LONG TERM
Between
16 May and 16 Jun 2025
Details
View Map
Share
Follow
The Green

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Green, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Apr 2025 at 15:53.

Between
19 and 22 May 2025
Details
View Map
Share
Follow
Buckingham Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Buckingham Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Feb 2025 at 11:41.

Between
19 and 22 May 2025
Details
View Map
Share
Follow
Buckingham Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Buckingham Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Feb 2025 at 12:46.

Cadent Gas logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
St Heliers Avenue

Cadent Gas are proposing to carry out New service connection on St Heliers Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 12:52.

London Borough Of Ealing logo
LONG TERM
Between
19 May and 29 Aug 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are proposing to carry out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 27 Mar 2025 at 07:02.

Surrey County Council logo
Between
20 and 24 May 2025
Details
View Map
Share
Follow
Vicarage Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Apr 2025 at 08:36.

Buckinghamshire Council logo
Between
22 and 27 May 2025
Details
View Map
Share
Follow
Syke Ings

Buckinghamshire Council are proposing to carry out Highway improvement works on Syke Ings, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 27 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 12:00.

London Borough Of Hillingdon logo
LONG TERM
Between
23 May and 23 Jun 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Vale, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Apr 2025 at 10:10.

Surrey County Council logo
Between
25 May and 14 Jun 2025
Details
View Map
Share
Feltham Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Feltham Road, Ashford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 May 2025 and run through until 14 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 15 Apr 2025 at 11:10.

Surrey County Council logo
Between
26 May and 14 Jun 2025
Details
View Map
Share
Feltham Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Feltham Road, Ashford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 14 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 11 Apr 2025 at 14:57.

Surrey County Council logo
Between
26 May and 14 Jun 2025
Details
View Map
Share
Follow
Feltham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Feltham Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Apr 2025 at 08:05.

Cadent Gas logo
Between
26 and 30 May 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Remedial works on Wood Lane, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 15:41.

Cadent Gas logo
LONG TERM
Between
26 May and 1 Aug 2025
Details
View Map
Share
Follow
Harlington Road

Cadent Gas are proposing to carry out Utility asset works on Harlington Road, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 08:29.

Affinity Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Service Road Fronting 155 To 171 Horton Road

Affinity Water are proposing to carry out Remedial works on Service Road Fronting 155 To 171 Horton Road, Stanwell Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Feb 2025 at 07:59.

Thames Water logo
Between
27 May and 25 Jun 2025
Details
View Map
Share
Follow
Vicarage Farm Road

Thames Water are proposing to carry out Utility repair and maintenance works on Vicarage Farm Road, Hounslow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 11:46.

National Highways logo
Between
27 May and 3 Jun 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Mar 2025 at 10:31.

London Borough Of Hillingdon logo
LONG TERM
Between
27 May and 27 Jun 2025
Details
View Map
Share
Follow
Townfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Townfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Apr 2025 at 15:57.

Cityfibre Metro Networks logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Norwood Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Norwood Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Mar 2025 at 15:27.

Affinity Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Charville Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 4 Mar 2025 at 09:36.

Affinity Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Charville Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 08:22.

BT logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
St Stephens Road

BT are proposing to carry out Utility asset works on St Stephens Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Mar 2025 at 13:45.

BT logo
Between
28 and 30 May 2025
Details
View Map
Share
Cherry Lane

BT were proposing to carry out Utility asset works on Cherry Lane, West Drayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 30 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 26 Feb 2025 at 15:29.

Affinity Water logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Kings Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kings Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 15:04.

Affinity Water logo
Between
28 and 30 May 2025
Details
View Map
Share
Kings Avenue

Affinity Water were proposing to carry out Utility repair and maintenance works on Kings Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 09:39.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Benen-stock Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Benen-stock Road, Stanwell Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Mar 2025 at 12:43.

Surrey County Council logo
Between
2 and 7 Jun 2025
Details
View Map
Share
Follow
Groveley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Groveley Road, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Dec 2024 at 09:40.

Cadent Gas logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Essex Avenue

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Essex Avenue, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:39.

London Borough Of Hillingdon logo
LONG TERM
Between
2 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Bath Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bath Road, Longford, Heathrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 19 Nov 2024 at 11:24.

London Borough Of Hillingdon logo
LONG TERM
Between
2 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Bath Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bath Road, Longford, Heathrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hillingdon on 22 Nov 2024 at 08:55.

Thames Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Northumberland Avenue

Thames Water are proposing to carry out Remedial works on Northumberland Avenue, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:25.

Buckinghamshire Council logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Syke Cluan

Buckinghamshire Council are proposing to carry out Highway improvement works on Syke Cluan, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 12:06.

London Borough Of Ealing logo
LONG TERM
Between
2 Jun and 19 Dec 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 25 Feb 2025 at 12:42.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Magnolia Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Magnolia Street, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:45.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Magnolia Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Magnolia Street, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:46.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Magnolia Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Magnolia Street, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:45.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
The Green

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Green, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:57.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
The Green

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Green, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:55.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
The Green

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Green, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:55.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Townfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Townfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:59.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Central Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:41.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Hilliards Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Hilliards Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:44.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Rosemary Close

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Rosemary Close, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:53.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
New Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on New Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:48.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Star Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Star Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:54.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Romney Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Romney Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:47.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Romney Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Romney Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:52.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Attle Close

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Attle Close, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:40.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Gainsborough Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Gainsborough Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:43.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Chiltern View Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Chiltern View Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:42.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Vale, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:58.

National Highways logo
Between
12 and 14 Jun 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Mar 2025 at 10:32.

Transport for London (TfL) logo
Between
15 Jun and 11 Jul 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Cranford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2025 at 11:06.

Transport for London (TfL) logo
Between
15 Jun and 11 Jul 2025
Details
View Map
Share
Follow
The Parkway

Transport for London (TfL) are proposing to carry out Highway improvement works on The Parkway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2025 at 11:21.

Thames Water logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Hampton Road West

Thames Water are proposing to carry out Utility repair and maintenance works on Hampton Road West, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 10:26.

Thames Water logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Hampton Road West

Thames Water were proposing to carry out Utility repair and maintenance works on Hampton Road West, Feltham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 19 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 14:55.

Transport for London (TfL) logo
Between
17 and 20 Jun 2025
Details
View Map
Share
Chertsey Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Jan 2025 at 13:23.

Transport for London (TfL) logo
Between
17 and 20 Jun 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:29.

Transport for London (TfL) logo
Between
17 and 20 Jun 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Mar 2025 at 10:58.

London Borough Of Hounslow logo
Between
17 and 24 Jun 2025
Details
View Map
Share
Follow
Whitton Dene

London Borough Of Hounslow are proposing to carry out Highway improvement works on Whitton Dene, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 31 Mar 2025 at 16:03.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Sixth Cross Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sixth Cross Road, Twickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Apr 2025 at 12:13.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Sixth Cross Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sixth Cross Road, Twickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Apr 2025 at 13:12.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Staines Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Staines Road, Twickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Apr 2025 at 12:16.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Staines Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Staines Road, Twickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Apr 2025 at 13:12.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Hospital Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hospital Bridge Road, Twickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Apr 2025 at 12:15.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Hospital Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hospital Bridge Road, Twickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Apr 2025 at 13:12.

Thames Water logo
Between
23 and 30 Jun 2025
Details
View Map
Share
Follow
Worple Road

Thames Water are proposing to carry out New service connection on Worple Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:07.

Affinity Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
Lewin Terrace

Affinity Water are proposing to carry out Remedial works on Lewin Terrace, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Mar 2025 at 15:36.

Surrey County Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Cumberland Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cumberland Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Apr 2025 at 08:41.

Surrey County Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Cumberland Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cumberland Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Apr 2025 at 07:46.

Cadent Gas logo
Between
30 Jun and 23 Jul 2025
Details
View Map
Share
Follow
East Walk

Cadent Gas are proposing to carry out Utility asset works on East Walk, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 14:31.

Thames Water logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Tavistock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tavistock Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 08:35.

Scottish Hydro Electric Power Dis logo
Between
30 Jun and 14 Jul 2025
Details
View Map
Share
Yeading Lane Service Road Outside 234-386

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Apr 2025 at 08:58.

Scottish Hydro Electric Power Dis logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Yeading Lane Service Road Outside 234-386

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Apr 2025 at 16:42.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Turks Head Footpath To Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Turks Head Footpath To Uxbridge Road, Uxbridge.

These works are categorised as Major.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 09:39.

Scottish Hydro Electric Power Dis logo
Between
3 and 24 Jul 2025
Details
View Map
Share
Follow
Thornbury Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Thornbury Road, Isleworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Apr 2025 at 10:44.

Scottish Hydro Electric Power Dis logo
Between
3 and 24 Jul 2025
Details
View Map
Share
Follow
Heston Road

Scottish Hydro Electric Power Dis are proposing to carry out Highway repair and maintenance works on Heston Road, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Apr 2025 at 10:21.

Cadent Gas logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Sutton Lane

Cadent Gas are proposing to carry out Utility asset works on Sutton Lane, Slough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 14:30.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Leamington Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Leamington Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Apr 2025 at 12:35.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Merlins Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Merlins Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Apr 2025 at 16:33.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Merlins Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Merlins Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Apr 2025 at 16:53.

London Borough Of Hillingdon logo
Between
9 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Violet Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Violet Avenue, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Apr 2025 at 10:26.

Scottish Hydro Electric Power Dis logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Yeading Lane Service Road Outside 234-386

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Apr 2025 at 09:18.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Walton Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Walton Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 Apr 2025 at 08:44.

Scottish Hydro Electric Power Dis logo
Between
13 and 15 Jul 2025
Details
View Map
Share
Follow
Western Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Feb 2025 at 10:53.

Scottish Hydro Electric Power Dis logo
Between
13 and 21 Jul 2025
Details
View Map
Share
Western Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Mar 2025 at 11:58.

Scottish Hydro Electric Power Dis logo
Between
13 and 21 Jul 2025
Details
View Map
Share
Western Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Mar 2025 at 12:07.

Scottish Hydro Electric Power Dis logo
Between
13 and 15 Jul 2025
Details
View Map
Share
Western Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 July 2025 and run through until 15 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Mar 2025 at 08:33.

Cadent Gas logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Dagmar Mews

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Dagmar Mews, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 13:00.

Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Blackmore Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Blackmore Way, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 16 Apr 2025 at 13:43.


Roadworks Map near to Dallas Terrace, HAYES, UB3 4QN (51 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Apr 2025 12:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Dallas Terrace, HAYES, UB3 4QN (51 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Eunetworks logo
NESTLES AVENUE 
(0.1 miles)
Eunetworks
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 14 Apr 2025 - 29 Apr 2025
0.1
Details
Share
Follow
2
Eunetworks logo
NESTLES AVENUE 
(0.1 miles)
Eunetworks
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 14 Apr 2025 08:00
(Scheduled: 14 Apr 2025 - 29 Apr 2025)
0.1
Details
Share
Follow
3
BT logo
URGENT
  
NESTLES AVENUE 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 16 Apr 2025 08:00
(Scheduled: 16 Apr 2025 - 1 May 2025)
0.1
Details
Share
Follow
4
London Borough Of Hillingdon logo
MAJOR
  
NORTH HYDE ROAD 
(0.1 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 3 Mar 2025 08:00
(Scheduled: 3 Mar 2025 - 2 May 2025)
0.1
Details
Share
Follow
5
Scottish Hydro Electric Power Dis logo
URGENT
  
ALBERT ROAD 
(0.2 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 15 Apr 2025 11:41
(Scheduled: 15 Apr 2025 - 23 Apr 2025)
0.2
Details
Share
Follow
6
Scottish Hydro Electric Power Dis logo
WYRE GROVE 
(0.3 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 8 Apr 2025 - 21 Apr 2025)
0.3
Details
Share
7
BT logo
STATION ROAD SERVICE ROAD OUTSIDE 225-303 
(0.3 miles)
BT
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 17 Apr 2025 10:07
(Scheduled: 17 Apr 2025 - 23 Apr 2025)
0.3
Details
Share
Follow
8
Eunetworks logo
MAJOR
  
SILVERDALE ROAD 
(0.3 miles)
Eunetworks
Optional permit (no fee) e.g. for traffic management etc - Verge - No carriageway incursion
In Progress
Since: 21 Mar 2025 08:00
(Scheduled: 20 Mar 2025 - 28 Apr 2025)
0.3
Details
Share
Follow
9
Transport for London (TfL) logo
THE PARKWAY 
(0.4 miles)
Transport for London (TfL)
Highway repair and maintenance works - Carriageway - Lane closure
In Progress
Since: 17 Apr 2025 10:00
(Scheduled: 17 Apr 2025)
0.4
Details
Share
Follow
10
Scottish Hydro Electric Power Dis logo
HILLBOURNE CLOSE 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 8 Apr 2025 12:00
(Scheduled: 7 Apr 2025 - 22 Apr 2025)
0.4
Details