ROADWORKS SUMMARY
Hawthorn Hatch, BRENTFORD, TW8 8NX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hawthorn Hatch, TW8 8NX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hawthorn Hatch, BRENTFORD, TW8 8NX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hawthorn Hatch are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Until
24 Dec 2026
Details
View Map
Share
Follow
Pump Lane

Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2023 at 18:00 and could run through until 24 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2025 at 11:57.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 November 2025 at 08:00 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 28 Aug 2026 at 09:05.

London Borough Of Ealing logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Lady Margaret Road

London Borough Of Ealing are carrying out Highway improvement works on Lady Margaret Road, Southall.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2025 at 08:00 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 7 Jul 2026 at 17:03.

National Highways logo
LONG TERM
Between
3 Mar and 30 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 9 Dec 2025 at 14:46.

National Highways logo
LONG TERM
Until
6 Nov 2026
Details
View Map
Share
Follow
Great West Road

National Highways are carrying out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 March 2026 at 22:00 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 Mar 2026 at 11:46.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 April 2026 at 07:00 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2026 at 08:25.

London Borough Of Ealing logo
LONG TERM
Between
5 May and 1 Dec 2026
Details
View Map
Share
Follow
Victoria Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Victoria Road, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 29 Oct 2025 at 14:54.

London Borough Of Ealing logo
LONG TERM
Between
5 May and 1 Dec 2026
Details
View Map
Share
Follow
Old Oak Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on Old Oak Lane, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 29 Oct 2025 at 14:54.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
23 Sep 2026
Details
View Map
Share
Follow
Macfarlane Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Macfarlane Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2026 at 07:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Jun 2026 at 11:43.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Victoria Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 May 2026 at 17:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 May 2026 at 09:11.

London Borough Of Ealing logo
LONG TERM
Until
31 Mar 2027
Details
View Map
Share
Follow
Boston Road

London Borough Of Ealing are carrying out Highway improvement works on Boston Road, Hanwell.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 June 2026 at 08:00 and could run through until 31 March 2027. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 6 Aug 2026 at 11:48.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

The works started on 4 June 2026 at 22:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Aug 2026 at 12:20.

London Borough Of Ealing logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Lower Boston Road

London Borough Of Ealing are carrying out Highway improvement works on Lower Boston Road, Hanwell.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 June 2026 at 08:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 7 Sep 2026 at 10:28.

Affinity Water logo
LONG TERM
Until
24 Sep 2026
Details
View Map
Share
Follow
The Broadway

Affinity Water are carrying out Utility asset works on The Broadway, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 June 2026 at 11:00 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Sep 2026 at 10:37.

London Borough Of Ealing logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are carrying out Highway improvement works on Uxbridge Road, Hanwell.

These works are categorised as Major.

The works started on 17 June 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Sep 2026 at 15:37.

London Borough Of Ealing logo
LONG TERM
Until
26 Sep 2026
Details
View Map
Share
Follow
Leeland Road

London Borough Of Ealing are carrying out Highway improvement works on Leeland Road, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 08:00 and could run through until 26 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2026 at 17:38.

Transport for London (TfL) logo
LONG TERM
Until
28 Feb 2027
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are carrying out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 19:00 and could run through until 28 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2026 at 16:59.

Affinity Water logo
LONG TERM
Until
16 Nov 2026
Details
View Map
Share
Follow
Twyford Abbey Road

Affinity Water are carrying out Utility asset works on Twyford Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 08:30 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Jun 2026 at 09:06.

Thames Water logo
LONG TERM
Until
8 Oct 2026
Details
View Map
Share
Follow
Argyle Road

Thames Water are carrying out Statutory Infrastructure Works on Argyle Road, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 July 2026 at 09:46 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 14:12.

Cadent Gas logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Southdown Avenue

Cadent Gas are carrying out Utility asset works on Southdown Avenue, Hanwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 July 2026 at 12:13 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2026 at 13:11.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Park View Road

Cadent Gas are carrying out Utility asset works on Park View Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 06:33 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jul 2026 at 08:20.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Oldfield Lane South

Scottish Hydro Electric Power Dis are carrying out New service connection on Oldfield Lane South, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2026 at 08:30 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Jul 2026 at 08:47.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Martindale Road

Cadent Gas are carrying out Utility asset works on Martindale Road, Hounslow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 12:16 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jul 2026 at 13:18.

Cadent Gas logo
LONG TERM
Today
Details
View Map
Share
Ham Street

Cadent Gas carried out Utility asset works on Ham Street, Ham.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 7 Aug 2026 and 15 Sep 2026 and were actually completed between 11 Aug 2026 (10:05) and 15 Sep 2026 (16:31). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 16:36.

LONG TERM
Between
8 Aug 2026 and 26 Mar 2027
Details
View Map
Share
Follow
Paradise Road

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Paradise Road, Richmond.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2026 and could run through until 26 March 2027. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 29 May 2026 at 13:19.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Aug and 24 Sep 2026
Details
View Map
Share
Wood Lane

London Borough Of Hammersmith & Fulham were proposing to carry out Highway improvement works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 August 2026 and run through until 24 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 21 Aug 2026 at 16:20.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 19 May 2026 at 09:43.

Electricity Network Company logo
LONG TERM
Until
23 Sep 2026
Details
View Map
Share
Follow
Beresford Avenue

Electricity Network Company are carrying out Utility asset works on Beresford Avenue, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2026 at 08:30 and could run through until 23 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 26 Aug 2026 at 22:17.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2026 at 09:15 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2026 at 08:36.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Windmill Road

Cadent Gas are carrying out Utility asset works on Windmill Road, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 August 2026 at 08:07 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:55.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Windmill Road

Cadent Gas were proposing to carry out Utility asset works on Windmill Road, Brentford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 August 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 10:15.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Windmill Road

Cadent Gas are proposing to carry out Utility asset works on Windmill Road, Brentford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 00:16.

London Borough Of Hounslow logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Whitestile Road

London Borough Of Hounslow are carrying out Highway improvement works on Whitestile Road, Brentford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 24 Aug 2026 at 13:12.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Raymond Avenue

Cadent Gas are carrying out Utility asset works on Raymond Avenue, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2026 at 17:38 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 11:12.

Cadent Gas logo
LONG TERM
Until
24 Oct 2026
Details
View Map
Share
Follow
Aldbourne Road

Cadent Gas are carrying out Utility asset works on Aldbourne Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:59 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 15:28.

Cadent Gas logo
LONG TERM
Until
26 Oct 2026
Details
View Map
Share
Follow
Wormholt Road

Cadent Gas are carrying out Utility asset works on Wormholt Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 09:01 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 09:02.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Baldwyn Gardens

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Baldwyn Gardens, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 August 2026 at 09:20 and could run through until 17 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Aug 2026 at 09:40.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Springfield Road

Thames Water are carrying out Disconnection or alteration of supply on Springfield Road, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 08:21.

Finishing
Friday
Details
View Map
Share
Follow
Coombe Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Coombe Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2026 at 09:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Aug 2026 at 10:30.

Finishing
Friday
Details
View Map
Share
Follow
Galsworthy Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Galsworthy Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Aug 2026 at 10:29.

Thames Water logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Holmesdale Road

Thames Water are carrying out Disconnection or alteration of supply on Holmesdale Road, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 08:00 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 09:09.

London Borough Of Hounslow logo
Today
Details
View Map
Share
Exeter Road

London Borough Of Hounslow carried out Section 50 on Exeter Road, Feltham.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 24 Aug 2026 and 15 Sep 2026 and were actually completed between 24 Aug 2026 (08:30) and 15 Sep 2026 (11:00). The works impacted the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 15 Sep 2026 at 11:02.

Thames Water logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Grange Avenue

Thames Water are carrying out Disconnection or alteration of supply on Grange Avenue, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 08:00 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 08:47.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 07:30 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 16:35.

Affinity Water logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Twyford Abbey Road

Affinity Water are carrying out Utility asset works on Twyford Abbey Road, Park Royal.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 14:00 and could run through until 29 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 25 Aug 2026 at 08:30.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
15 Oct 2026
Details
View Map
Share
Follow
Farndale Crescent

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Farndale Crescent, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 11:00 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2026 at 11:57.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Caple Road

Thames Water are carrying out Utility asset works on Caple Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 10:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 08:30.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
26 Aug and 30 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 16:15.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
26 Aug and 30 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 9 Sep 2026 at 10:09.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Herbert Road

Affinity Water are carrying out Utility asset works on Herbert Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:00 and could run through until 15 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 Sep 2026 at 10:06.

London Borough Of Hounslow logo
LONG TERM
Between
28 Aug 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Clifton Gardens (South)

London Borough Of Hounslow are proposing to carry out Highway improvement works on Clifton Gardens (South), Chiswick, London.

These works are categorised as Major.

The works will start on or after 28 August 2026 and could run through until 29 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 31 Jul 2026 at 08:15.

Affinity Water logo
Until
24 Sep 2026
Details
View Map
Share
Follow
Greenford Avenue

Affinity Water are carrying out Utility asset works on Greenford Avenue, Southall.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 11:44 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Aug 2026 at 13:12.

Affinity Water logo
LONG TERM
Between
28 Aug and 30 Sep 2026
Details
View Map
Share
Iveagh Avenue

Affinity Water were proposing to carry out Utility asset works on Iveagh Avenue, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2026 and run through until 30 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 09:39.

Eunetworks logo
Finishing
Today
Details
View Map
Share
Follow
Trevor Road

Eunetworks are carrying out Utility asset works on Trevor Road, Hayes.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 August 2026 at 08:00 and could run through until 15 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Sep 2026 at 13:19.

Eunetworks logo
Finishing
Today
Details
View Map
Share
Follow
Printing House Lane

Eunetworks are carrying out Utility asset works on Printing House Lane, Hayes.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 August 2026 at 08:00 and could run through until 15 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Sep 2026 at 07:40.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Union Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Union Street, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:30 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2026 at 09:54.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Crabtree Lane

Cadent Gas are carrying out Utility asset works on Crabtree Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:21 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:56.

Cadent Gas logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Orchard Avenue

Cadent Gas are carrying out Utility asset works on Orchard Avenue, Hounslow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 August 2026 at 09:00 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 31 Aug 2026 at 09:13.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
31 Aug and 5 Dec 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2026 at 12:11.

Transport for London (TfL) logo
LONG TERM
Until
5 Dec 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 August 2026 at 21:00 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:13.

Affinity Water logo
LONG TERM
Between
31 Aug and 16 Nov 2026
Details
View Map
Share
Twyford Abbey Road

Affinity Water were proposing to carry out Utility asset works on Twyford Abbey Road, Park Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 August 2026 and run through until 16 November 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 24 Aug 2026 at 15:47.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Grange Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Grange Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:19.

Eunetworks logo
Between
1 and 23 Sep 2026
Details
View Map
Share
Follow
The Parkway

Eunetworks are proposing to carry out Utility asset works on The Parkway, Cranford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Aug 2026 at 09:27.

Cadent Gas logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Grove Road

Cadent Gas are carrying out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 08:05 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 08:20.

G2 Energy IDNO logo
LONG TERM
Between
1 Sep and 17 Nov 2026
Details
View Map
Share
Follow
Hayes Road

G2 Energy IDNO are proposing to carry out Utility asset works on Hayes Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 24 Aug 2026 at 14:04.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Grosvenor Road

Cadent Gas are carrying out Utility repair and maintenance works on Grosvenor Road, Hanwell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:55 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:43.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Broadway

Cadent Gas are carrying out Utility repair and maintenance works on Broadway, West Ealing.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:58 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:43.

Scottish Hydro Electric Power Dis logo
Finishing
Today
Details
View Map
Share
Follow
Queens Walk

Scottish Hydro Electric Power Dis are carrying out New service connection on Queens Walk, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 15:45 and could run through until 15 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Sep 2026 at 15:48.

Cadent Gas logo
Between
1 and 28 Sep 2026
Details
View Map
Share
Follow
Brunner Road

Cadent Gas are proposing to carry out Utility asset works on Brunner Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 11:56.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Brunner Road

Cadent Gas are carrying out Utility asset works on Brunner Road, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 14:50 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 15:00.

Thames Water logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Cecil Road

Thames Water are carrying out Utility asset works on Cecil Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 12:00 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 12:57.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Slip Road From Kensington Road To Western Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Slip Road From Kensington Road To Western Avenue, Northolt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2026 and run through until 18 September 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 08:37.

Thames Water logo
Until
29 Sep 2026
Details
View Map
Share
Follow
Yeading Lane

Thames Water are carrying out Utility repair and maintenance works on Yeading Lane, Hayes.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 14:00 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 08:44.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
New Heston Road

Cadent Gas are proposing to carry out Utility asset works on New Heston Road, Hounslow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 15:25.

Eunetworks logo
Between
3 and 25 Sep 2026
Details
View Map
Share
Follow
The Parkway

Eunetworks are proposing to carry out Utility asset works on The Parkway, Cranford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Sep 2026 at 10:12.

Eunetworks logo
Until
25 Sep 2026
Details
View Map
Share
Follow
The Parkway

Eunetworks are carrying out Utility asset works on The Parkway, Cranford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Sep 2026 at 09:47.

London Borough Of Ealing logo
LONG TERM
Until
3 Oct 2026
Details
View Map
Share
Follow
Footpath From 444-500 Church Road

London Borough Of Ealing are carrying out Highway improvement works on Footpath From 444-500 Church Road, Northolt.

The works started on 3 September 2026 at 00:00 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 4 Sep 2026 at 09:20.

Thames Water logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Wolsey Road

Thames Water are carrying out Disconnection or alteration of supply on Wolsey Road, Hampton Hill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 10:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 10:25.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Claremont Road

Thames Water are carrying out Utility repair and maintenance works on Claremont Road, Twickenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 10:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:00.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Claremont Road

Thames Water were proposing to carry out Utility repair and maintenance works on Claremont Road, Twickenham.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 10:11.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Thornbury Road

Cadent Gas are carrying out Utility repair and maintenance works on Thornbury Road, Isleworth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 22:35 and could run through until 17 September 2026. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 15:30.

UK Power Networks South Eastern logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Sury Basin

UK Power Networks South Eastern are carrying out Utility asset works on Sury Basin, Kingston Upon Thames.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2026 at 09:55.

Cadent Gas logo
LONG TERM
Until
15 Oct 2026
Details
View Map
Share
Follow
Strawberry Vale

Cadent Gas are carrying out Utility asset works on Strawberry Vale, Twickenham.

These works are categorised as Major.

The works started on 7 September 2026 at 09:22 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:33.

Cadent Gas logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Berwyn Road

Cadent Gas are carrying out Utility asset works on Berwyn Road, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 10:34 and could run through until 1 October 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 11:04.

UK Power Networks South Eastern logo
Finishing
Sunday
Details
View Map
Share
Follow
Kew Road

UK Power Networks South Eastern are proposing to carry out New service connection on Kew Road, Kew.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Aug 2026 at 12:50.

Cadent Gas logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Hatton Road

Cadent Gas are carrying out Utility asset works on Hatton Road, Feltham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 08:24.

London Borough Of Ealing logo
LONG TERM
Between
7 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Coldershaw Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Coldershaw Road, West Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Aug 2026 at 14:54.

London Borough Of Ealing logo
LONG TERM
Between
7 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Coldershaw Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Coldershaw Road, West Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 14 Sep 2026 at 14:55.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Aycliffe Road

Cadent Gas are carrying out Utility asset works on Aycliffe Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:23 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 13:22.

London Borough Of Ealing logo
LONG TERM
Between
7 Sep and 29 Nov 2026
Details
View Map
Share
Follow
Leeland Terrace

London Borough Of Ealing are proposing to carry out Highway improvement works on Leeland Terrace, West Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Aug 2026 at 14:47.

London Borough Of Ealing logo
LONG TERM
Until
29 Nov 2026
Details
View Map
Share
Follow
Leeland Terrace

London Borough Of Ealing are carrying out Highway improvement works on Leeland Terrace, West Ealing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 7 Sep 2026 at 16:48.

Affinity Water logo
Until
24 Sep 2026
Details
View Map
Share
Follow
South Road

Affinity Water are carrying out Utility asset works on South Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 18:00 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 07:07.

Affinity Water logo
Until
30 Sep 2026
Details
View Map
Share
Follow
Greenford Avenue

Affinity Water are carrying out Utility asset works on Greenford Avenue, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 18:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 07:06.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Hanger Lane

Cadent Gas are carrying out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 14:50 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 15:21.

Cadent Gas logo
LONG TERM
Until
22 Nov 2026
Details
View Map
Share
Follow
Creffield Road

Cadent Gas are carrying out Utility asset works on Creffield Road, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 14:50 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 15:33.

Scottish Hydro Electric Power Dis logo
Between
7 and 25 Sep 2026
Details
View Map
Share
Follow
Grafton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Grafton Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2026 at 11:12.

Cadent Gas logo
Between
7 and 29 Sep 2026
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 13:32.

Cadent Gas logo
Between
7 and 29 Sep 2026
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 10:30.

Cadent Gas logo
Until
29 Sep 2026
Details
View Map
Share
Follow
Park Road

Cadent Gas are carrying out Utility asset works on Park Road, Hanwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 14:58 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 15:32.

Cadent Gas logo
LONG TERM
Between
7 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Carlyle Avenue

Cadent Gas are proposing to carry out Utility asset works on Carlyle Avenue, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 15:36.

Cadent Gas logo
Between
7 and 25 Sep 2026
Details
View Map
Share
Follow
Drayton Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Drayton Bridge Road, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 13:24.

Cadent Gas logo
LONG TERM
Between
7 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Castlebar Hill

Cadent Gas are proposing to carry out Utility asset works on Castlebar Hill, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 16:31.

Cadent Gas logo
LONG TERM
Until
22 Oct 2026
Details
View Map
Share
Follow
Hillcrest Road

Cadent Gas are carrying out Utility asset works on Hillcrest Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 10:11 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 12:00.

London Borough Of Ealing logo
Until
30 Sep 2026
Details
View Map
Share
Follow
Marnham Crescent

London Borough Of Ealing are carrying out Remedial works on Marnham Crescent, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 00:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 8 Sep 2026 at 09:44.

Thames Water logo
Between
9 and 29 Sep 2026
Details
View Map
Share
Follow
St James's Road

Thames Water are proposing to carry out Disconnection or alteration of supply on St James's Road, Hampton Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 10:29.

Cadent Gas logo
Between
9 and 25 Sep 2026
Details
View Map
Share
Follow
Ham Common

Cadent Gas are proposing to carry out Utility asset works on Ham Common, Ham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jun 2026 at 11:59.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Great West Road

Cadent Gas were proposing to carry out Utility repair and maintenance works on Great West Road, Isleworth.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2026 and run through until 15 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:50.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Great West Road

Cadent Gas are carrying out Utility repair and maintenance works on Great West Road, Isleworth.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 14:45 and could run through until 15 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:02.

Eunetworks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Park Avenue

Eunetworks are carrying out Utility repair and maintenance works on Park Avenue, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 09:30 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Sep 2026 at 14:27.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Bradley Gardens

Thames Water are carrying out Utility repair and maintenance works on Bradley Gardens, West Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:58 and could run through until 15 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 11:20.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Coombe Lane West

Southern Gas Networks are carrying out Utility repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 10:16 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2026 at 11:03.

UK Power Networks South Eastern logo
Finishing
Sunday
Details
View Map
Share
Follow
Kew Road

UK Power Networks South Eastern are carrying out New service connection on Kew Road, Kew.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 08:45 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Sep 2026 at 08:57.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Marys Road

Thames Water are carrying out Utility repair and maintenance works on St Marys Road, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 21:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:44.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Park Place

Thames Water are carrying out Utility repair and maintenance works on Park Place, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 09:29 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 12:50.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Ravenor Park Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Ravenor Park Road, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:40 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Sep 2026 at 08:46.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Station Crescent

Cadent Gas are carrying out Utility repair and maintenance works on Station Crescent, Wembley.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 11:33 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 14:54.

UK Power Networks South Eastern logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Canbury Park Road

UK Power Networks South Eastern are carrying out Utility asset works on Canbury Park Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 08:30 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2026 at 08:39.

Thames Water logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Gomer Place

Thames Water are carrying out Disconnection or alteration of supply on Gomer Place, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 10:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 10:30.

Thames Water logo
Between
11 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Belmont Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Belmont Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 16:02.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Nightingale Lane

Thames Water are carrying out Utility repair and maintenance works on Nightingale Lane, Richmond.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 10:18 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:43.

G2 Energy IDNO logo
Between
11 Sep and 6 Oct 2026
Details
View Map
Share
Knatchbull Road

G2 Energy IDNO were proposing to carry out New service connection on Knatchbull Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2026 and run through until 6 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:51.

G2 Energy IDNO logo
Between
11 Sep and 1 Oct 2026
Details
View Map
Share
Craven Park

G2 Energy IDNO were proposing to carry out New service connection on Craven Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2026 and run through until 1 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:51.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bond Street

Thames Water are carrying out Utility repair and maintenance works on Bond Street, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 13:03 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:22.

Cadent Gas logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Ham Common

Cadent Gas are carrying out Utility asset works on Ham Common, Ham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:35 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 08:57.

Transport for London (TfL) logo
Between
14 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 16:31.

T-Mobile (UK) logo
Finishing
Thursday
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 24 Jul 2026 at 13:14.

T-Mobile (UK) logo
Finishing
Thursday
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 21 Aug 2026 at 08:03.

Finishing
Monday
Details
View Map
Share
Follow
The Vineyard

London Borough Of Richmond Upon Thames are carrying out New service connection on The Vineyard, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Sep 2026 at 13:45.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Parkfields

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Parkfields, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 16:12.

London Borough Of Wandsworth logo
Finishing
Friday
Details
View Map
Share
Follow
Felsham Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Felsham Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 18 Aug 2026 at 08:59.

London Borough Of Wandsworth logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Felsham Road

London Borough Of Wandsworth are carrying out Highway improvement works on Felsham Road, Putney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 14 Sep 2026 at 08:20.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wood Lane

Network Rail are carrying out Works for Rail Purposes on Wood Lane, Isleworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 23:50 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Sep 2026 at 09:07.

Cadent Gas logo
Between
14 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Parke Road

Cadent Gas are proposing to carry out Utility asset works on Parke Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 12:46.

Cadent Gas logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Rainville Road

Cadent Gas are carrying out Utility asset works on Rainville Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 10:02 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:42.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chancellors Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 13:02.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Chancellors Road

Thames Water are carrying out Utility repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 09:40 and could run through until 17 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 11:26.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Kingswood Road

Thames Water are carrying out Statutory Infrastructure Works on Kingswood Road, Chiswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:25.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Weston Road

Thames Water are carrying out Statutory Infrastructure Works on Weston Road, Chiswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:25.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Kingswood Road

Thames Water are carrying out Statutory Infrastructure Works on Kingswood Road, Chiswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:25.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
14 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 3 Sep 2026 at 12:19.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Sep 2026 at 13:35.

Scottish Hydro Electric Power Dis logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Grafton Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Grafton Road, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:42 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 12:49.

Scottish Hydro Electric Power Dis logo
Between
14 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 3 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

Scottish Hydro Electric Power Dis logo
Until
3 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 15:00 and could run through until 3 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 15:37.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
14 Sep and 30 Oct 2026
Details
View Map
Share
Follow
North Acton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
North Acton Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:21 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 09:55.

London Borough Of Ealing logo
LONG TERM
Between
14 Sep and 11 Dec 2026
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are proposing to carry out Remedial works on Ruislip Road, Greenford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 10 Sep 2026 at 09:43.

Thames Water logo
LONG TERM
Until
19 Oct 2026
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility asset works on High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 14:30 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 15:59.

London Borough Of Brent logo
LONG TERM
Between
14 Sep 2026 and 28 Feb 2027
Details
View Map
Share
Follow
High Street

London Borough Of Brent are proposing to carry out Highway improvement works on High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 28 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 29 Mar 2026 at 23:42.

London Borough Of Brent logo
LONG TERM
Between
14 Sep and 19 Dec 2026
Details
View Map
Share
Follow
Station Approach

London Borough Of Brent are proposing to carry out Highway improvement works on Station Approach, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 19 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 14 Jul 2026 at 12:50.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hurlingham Road

Thames Water are carrying out Utility repair and maintenance works on Hurlingham Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:04 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:19.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Jersey Road

Thames Water are carrying out Remedial works on Jersey Road, Hounslow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:20 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:29.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Ranelagh Road

Thames Water are carrying out Utility repair and maintenance works on Ranelagh Road, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 13:35 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:24.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Court Way

Thames Water are carrying out Utility repair and maintenance works on Court Way, Acton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:49 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:21.

G2 Energy IDNO logo
LONG TERM
Between
15 Sep 2026 and 6 Oct 2029
Details
View Map
Share
Emerald Road

G2 Energy IDNO were proposing to carry out New service connection on Emerald Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 6 October 2029. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:52.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Albert Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Albert Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 16:11.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Albert Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Albert Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2026 at 11:30.

Thames Water logo
Between
16 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Heath Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Heath Gardens, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:37.

Eunetworks logo
Between
16 and 23 Sep 2026
Details
View Map
Share
Follow
Golden Crescent

Eunetworks are proposing to carry out Utility asset works on Golden Crescent, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 30 Jun 2026 at 15:12.

Eunetworks logo
Between
16 and 23 Sep 2026
Details
View Map
Share
Follow
Golden Crescent

Eunetworks are proposing to carry out Utility asset works on Golden Crescent, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 20 Aug 2026 at 10:16.

Thames Water logo
Between
18 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Bridgeman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Bridgeman Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 13:39.

UK Power Networks South Eastern logo
Between
20 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Albert Road

UK Power Networks South Eastern are proposing to carry out roadworks on Albert Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Aug 2026 at 09:27.

UK Power Networks South Eastern logo
Between
20 Sep and 10 Oct 2026
Details
View Map
Share
London Road

UK Power Networks South Eastern were proposing to carry out Utility asset works on London Road, Kingston Upon Thames.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 September 2026 and run through until 10 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Aug 2026 at 16:10.

UK Power Networks South Eastern logo
Between
20 Sep and 10 Oct 2026
Details
View Map
Share
Follow
London Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on London Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Aug 2026 at 09:35.

London Borough Of Ealing logo
Between
20 and 22 Sep 2026
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 19 Aug 2026 at 07:03.

Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Wensleydale Road

London Borough Of Richmond Upon Thames are proposing to carry out Section 50 on Wensleydale Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 11 Sep 2026 at 10:09.

Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Wensleydale Road

London Borough Of Richmond Upon Thames are proposing to carry out Section 50 on Wensleydale Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 11 Sep 2026 at 12:09.

Thames Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Queens Road

Thames Water are proposing to carry out Utility repair and maintenance works on Queens Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 10:51.

Thames Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Elfin Grove

Thames Water are proposing to carry out Utility asset works on Elfin Grove, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:34.

Thames Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Elfin Grove

Thames Water are proposing to carry out Utility asset works on Elfin Grove, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 09:26.

Thames Water logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Belmont Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Belmont Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:21.

Network Rail logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Marys Terrace

Network Rail are proposing to carry out Works for Rail Purposes on Marys Terrace, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Jun 2026 at 09:11.

Network Rail logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Marys Terrace

Network Rail are proposing to carry out Works for Rail Purposes on Marys Terrace, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Aug 2026 at 08:37.

Cadent Gas logo
LONG TERM
Between
21 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Cranbrook Road

Cadent Gas are proposing to carry out Utility asset works on Cranbrook Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 15:51.

London Borough Of Hounslow logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Worton Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Worton Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 2 Sep 2026 at 09:24.

Cadent Gas logo
Between
21 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Brandon Road

Cadent Gas are proposing to carry out Utility asset works on Brandon Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 07:45.

Cadent Gas logo
Between
21 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Brandon Road

Cadent Gas are proposing to carry out Utility asset works on Brandon Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 08:36.

London Borough Of Hounslow logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Windmill Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Windmill Road, Brentford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 3 Sep 2026 at 11:43.

London Borough Of Hammersmith & Fulham logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:02.

Cadent Gas logo
Between
21 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Wellmeadow Road

Cadent Gas are proposing to carry out Utility asset works on Wellmeadow Road, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 15:18.

Thames Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Rothschild Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Rothschild Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2026 at 14:52.

London Borough Of Ealing logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Southfield Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Southfield Road, Chiswick.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 15 Sep 2026 at 16:29.

BT logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Lime Grove

BT are proposing to carry out Utility asset works on Lime Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Jul 2026 at 15:24.

BT logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Lime Grove

BT are proposing to carry out Utility asset works on Lime Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Sep 2026 at 20:23.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Sep 2026 at 11:42.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
21 Sep and 29 Dec 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 29 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Sep 2026 at 11:42.

Cadent Gas logo
Between
21 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Woodville Gardens

Cadent Gas are proposing to carry out Utility asset works on Woodville Gardens, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 13:01.

Cadent Gas logo
LONG TERM
Between
21 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Park Hill

Cadent Gas are proposing to carry out Utility asset works on Park Hill, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2026 at 15:05.

Cadent Gas logo
LONG TERM
Between
21 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Park Hill

Cadent Gas are proposing to carry out Utility asset works on Park Hill, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 12:51.

Cadent Gas logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Neville Road

Cadent Gas are proposing to carry out Utility asset works on Neville Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 14:32.

Thames Water logo
LONG TERM
Between
21 Sep and 2 Nov 2026
Details
View Map
Share
Follow
Bramshill Road

Thames Water are proposing to carry out Utility asset works on Bramshill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 14:27.

London Borough Of Ealing logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Greenford Roundabout

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Roundabout, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 10 Sep 2026 at 17:29.

London Borough Of Ealing logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Greenford Roundabout

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Roundabout, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 15 Sep 2026 at 21:12.

Thames Water logo
Between
21 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Baker Road

Thames Water are proposing to carry out Utility asset works on Baker Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Aug 2026 at 13:22.

Thames Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Standish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Standish Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 15:05.

Cadent Gas logo
Between
22 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Drayton Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Drayton Bridge Road, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 11:16.

Scottish Hydro Electric Power Dis logo
Between
22 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Stanhope Park Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Stanhope Park Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 May 2026 at 18:35.

Thames Water logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
School Road

Thames Water are proposing to carry out Utility repair and maintenance works on School Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jul 2026 at 10:24.

Thames Water logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
School Road

Thames Water are proposing to carry out Utility repair and maintenance works on School Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 08:45.

Thames Water logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
Seymour Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seymour Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jul 2026 at 10:21.

Thames Water logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
Seymour Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seymour Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 08:44.

Thames Water logo
Between
23 Sep and 14 Oct 2026
Details
View Map
Share
Follow
Melbourne Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Melbourne Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 13:42.

Thames Water logo
Between
23 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Lindsay Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lindsay Road, Hampton Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 10:30.

Thames Water logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
Steele Road

Thames Water are proposing to carry out Utility repair and maintenance works on Steele Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2026 at 10:07.

G2 Energy IDNO logo
LONG TERM
Between
24 Sep and 4 Nov 2026
Details
View Map
Share
Follow
Balfour Road

G2 Energy IDNO are proposing to carry out Utility asset works on Balfour Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 13 Jul 2026 at 13:46.

Scottish Hydro Electric Power Dis logo
Between
24 Sep and 17 Oct 2026
Details
View Map
Share
Follow
Haven Green

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Haven Green, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 17 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Sep 2026 at 14:27.

BT logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Duncan Grove

BT are proposing to carry out Utility asset works on Duncan Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Jul 2026 at 10:00.

BT logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Long Drive

BT are proposing to carry out Utility asset works on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Jul 2026 at 11:01.

BT logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Long Drive

BT are proposing to carry out Utility asset works on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Sep 2026 at 12:51.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Aug 2026 at 09:26.

Thames Water logo
Between
25 Sep and 23 Oct 2026
Details
View Map
Share
Follow
St James's Road

Thames Water are proposing to carry out Disconnection or alteration of supply on St James's Road, Hampton Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 10:29.

National Highways logo
Between
25 and 28 Sep 2026
Details
View Map
Share
Follow
High Street

National Highways are proposing to carry out Works for road purposes on High Street, Harlington, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Jul 2026 at 14:10.

G2 Energy IDNO logo
LONG TERM
Between
26 Sep and 21 Dec 2026
Details
View Map
Share
Follow
Western Road

G2 Energy IDNO are proposing to carry out Utility asset works on Western Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 21 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 16 Jul 2026 at 14:09.

Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Market Place

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Market Place, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 4 Sep 2026 at 16:04.

Thames Water logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Court Close

Thames Water are proposing to carry out Remedial works on Court Close, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Jul 2026 at 10:21.

London Borough Of Hounslow logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Summerwood Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Summerwood Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 14 Sep 2026 at 08:35.

Cadent Gas logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 13:53.

Cadent Gas logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Dawes Road

Cadent Gas are proposing to carry out New service connection on Dawes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 12:07.

Eunetworks logo
Between
28 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Market Place

Eunetworks are proposing to carry out Utility asset works on Market Place, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Aug 2026 at 08:26.

Eunetworks logo
Between
28 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Market Place

Eunetworks are proposing to carry out Utility asset works on Market Place, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Sep 2026 at 13:57.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Winslow Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Winslow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 08:10.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Chancellors Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 14:13.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Distillery Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Distillery Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 14:13.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Windmill Road

Cadent Gas were proposing to carry out Utility asset works on Windmill Road, Brentford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 7 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 15:23.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Windmill Road

Cadent Gas are proposing to carry out Utility asset works on Windmill Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 00:15.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 07:50.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:07.

Thames Water logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Rothschild Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Rothschild Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2026 at 14:53.

G2 Energy IDNO logo
LONG TERM
Between
28 Sep and 9 Nov 2026
Details
View Map
Share
Follow
Balfour Road

G2 Energy IDNO are proposing to carry out Utility asset works on Balfour Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 27 Aug 2026 at 13:01.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
St Marks Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Marks Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 10:08.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
St Leonards Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on St Leonards Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Jul 2026 at 09:24.

Cadent Gas logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
Follow
The Croft

Cadent Gas are proposing to carry out Utility asset works on The Croft, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2026 at 15:05.

Cadent Gas logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
Follow
The Croft

Cadent Gas are proposing to carry out Utility asset works on The Croft, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 00:15.

Cadent Gas logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Helena Road

Cadent Gas are proposing to carry out Utility asset works on Helena Road, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2026 at 12:32.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
28 Sep and 13 Nov 2026
Details
View Map
Share
Alliance Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Alliance Road, Acton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 13 November 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Aug 2026 at 14:17.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Alliance Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Alliance Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Sep 2026 at 13:59.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Alliance Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Alliance Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Sep 2026 at 13:51.

Cadent Gas logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Neville Road

Cadent Gas are proposing to carry out Utility asset works on Neville Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 11:56.

Thames Water logo
Between
28 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Buckingham Road

Thames Water are proposing to carry out Utility asset works on Buckingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2026 at 13:45.

UK Power Networks Eastern & London logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Newton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Newton Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jul 2026 at 11:47.

UK Power Networks Eastern & London logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Newton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Newton Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 11:56.

Thames Water logo
LONG TERM
Between
29 Sep and 2 Nov 2026
Details
View Map
Share
Follow
King Edwards Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on King Edwards Grove, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 10:33.

Thames Water logo
Between
29 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Gomer Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Gomer Gardens, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 13:40.

National Highways logo
Between
29 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Aug 2026 at 08:33.

National Highways logo
Between
29 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Aug 2026 at 08:21.

National Highways logo
Between
29 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Sep 2026 at 08:40.

National Highways logo
Between
29 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Aug 2026 at 14:57.

BT logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Carlisle Avenue

BT are proposing to carry out Utility asset works on Carlisle Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Jul 2026 at 11:01.

BT logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Carlisle Avenue

BT are proposing to carry out Utility asset works on Carlisle Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Sep 2026 at 11:42.

Transport for London (TfL) logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Ruislip Road

Transport for London (TfL) are proposing to carry out Section 50 on Ruislip Road, Northolt.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 14:52.

Thames Water logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Redan Street

Thames Water are proposing to carry out New service connection on Redan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 09:34.

Thames Water logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Redan Street

Thames Water are proposing to carry out New service connection on Redan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:09.

G2 Energy IDNO logo
LONG TERM
Between
30 Sep and 11 Dec 2026
Details
View Map
Share
Follow
Hillside

G2 Energy IDNO are proposing to carry out New service connection on Hillside, Stonebridge, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 17:32.

London Borough Of Ealing logo
Between
1 and 23 Oct 2026
Details
View Map
Share
Follow
Ferrymead Avenue

London Borough Of Ealing are proposing to carry out Remedial works on Ferrymead Avenue, Greenford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 3 Aug 2026 at 15:49.

UK Power Networks South Eastern logo
LONG TERM
Between
2 Oct and 3 Nov 2026
Details
View Map
Share
Kew Road

UK Power Networks South Eastern were proposing to carry out New service connection on Kew Road, Kew.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 3 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2026 at 09:59.

National Highways logo
Between
2 and 5 Oct 2026
Details
View Map
Share
Follow
High Street

National Highways are proposing to carry out Works for road purposes on High Street, Harlington, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Jul 2026 at 14:10.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:41.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 11:29.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:39.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 11:28.

Eunetworks logo
Between
3 and 20 Oct 2026
Details
View Map
Share
Follow
The Parkway

Eunetworks are proposing to carry out Utility asset works on The Parkway, Cranford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 20 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 15 Sep 2026 at 13:16.

Eunetworks logo
Between
3 and 20 Oct 2026
Details
View Map
Share
Follow
The Parkway

Eunetworks are proposing to carry out Utility asset works on The Parkway, Cranford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 20 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 15 Sep 2026 at 13:38.

Eunetworks logo
Between
3 and 20 Oct 2026
Details
View Map
Share
Follow
Clayton Road

Eunetworks are proposing to carry out Utility asset works on Clayton Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 27 Aug 2026 at 09:29.

Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Union Street

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Union Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 4 Sep 2026 at 16:05.

Southern Gas Networks logo
LONG TERM
Between
5 Oct and 13 Dec 2026
Details
View Map
Share
Follow
Thames Side

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thames Side, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 12:00.

Southern Gas Networks logo
LONG TERM
Between
5 Oct and 13 Dec 2026
Details
View Map
Share
Follow
Thames Side

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thames Side, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 16:19.

Southern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Hampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2026 at 14:06.

Southern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Hampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 10:13.

Cadent Gas logo
LONG TERM
Between
5 Oct 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Hounslow Road

Cadent Gas are proposing to carry out Utility asset works on Hounslow Road, Hanworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 08:25.

Thames Water logo
LONG TERM
Between
5 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Heath Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Heath Gardens, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:22.

Scottish Hydro Electric Power Dis logo
Between
5 and 20 Oct 2026
Details
View Map
Share
Follow
Bedfont Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bedfont Lane, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Aug 2026 at 09:30.

T-Mobile (UK) logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 14 Sep 2026 at 14:35.

London Borough Of Wandsworth logo
Between
5 and 31 Oct 2026
Details
View Map
Share
Follow
Putney High Street

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Putney High Street, Putney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2026 at 08:57.

Cadent Gas logo
Between
5 and 14 Oct 2026
Details
View Map
Share
Follow
Lowther Road

Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 14:13.

Cadent Gas logo
Between
5 and 14 Oct 2026
Details
View Map
Share
Follow
Lowther Road

Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:37.

Cadent Gas logo
LONG TERM
Between
5 Oct and 15 Nov 2026
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2026 at 08:10.

Thames Water logo
Between
5 and 11 Oct 2026
Details
View Map
Share
Follow
West Way

Thames Water are proposing to carry out Utility repair and maintenance works on West Way, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Aug 2026 at 15:23.

Thames Water logo
Between
5 and 11 Oct 2026
Details
View Map
Share
Follow
West Way

Thames Water are proposing to carry out Utility repair and maintenance works on West Way, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:49.

Cadent Gas logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Star Road

Cadent Gas are proposing to carry out Utility asset works on Star Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:35.

Cadent Gas logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Vereker Road

Cadent Gas are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2026 at 16:11.

Cadent Gas logo
LONG TERM
Between
5 Oct and 4 Dec 2026
Details
View Map
Share
Follow
North End Road

Cadent Gas are proposing to carry out Utility asset works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:47.

London Borough Of Hammersmith & Fulham logo
Between
5 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:07.

G2 Energy IDNO logo
LONG TERM
Between
5 Oct and 11 Dec 2026
Details
View Map
Share
Follow
Western Road

G2 Energy IDNO are proposing to carry out Utility asset works on Western Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 27 Aug 2026 at 13:00.

G2 Energy IDNO logo
LONG TERM
Between
5 Oct and 11 Dec 2026
Details
View Map
Share
Follow
Western Road

G2 Energy IDNO are proposing to carry out Utility asset works on Western Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 28 Aug 2026 at 10:17.

BT logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Beauclerc Road

BT are proposing to carry out Utility asset works on Beauclerc Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Jul 2026 at 12:03.

Thames Water logo
Between
5 and 24 Oct 2026
Details
View Map
Share
Follow
Goldhawk Road

Thames Water are proposing to carry out Utility repair and maintenance works on Goldhawk Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:03.

Thames Water logo
Between
5 and 24 Oct 2026
Details
View Map
Share
Follow
Pennard Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pennard Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:07.

Transport for London (TfL) logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Bilton Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bilton Way, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 16:05.

Cadent Gas logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Wormholt Road

Cadent Gas are proposing to carry out Utility asset works on Wormholt Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2026 at 11:14.

Cadent Gas logo
LONG TERM
Between
5 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2026 at 13:40.

London Borough Of Hammersmith & Fulham logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Sep 2026 at 11:42.

Cadent Gas logo
LONG TERM
Between
5 Oct and 18 Dec 2026
Details
View Map
Share
Follow
Mount Park Road

Cadent Gas are proposing to carry out Utility asset works on Mount Park Road, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 09:34.

Scottish Hydro Electric Power Dis logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Portal Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Portal Way, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2026 at 09:34.

Scottish Hydro Electric Power Dis logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Wales Farm Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2026 at 09:34.

Scottish Hydro Electric Power Dis logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2026 at 09:34.

Cadent Gas logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Woodfield Crescent

Cadent Gas are proposing to carry out Utility asset works on Woodfield Crescent, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2026 at 13:46.

Cadent Gas logo
LONG TERM
Between
5 Oct and 13 Dec 2026
Details
View Map
Share
Follow
Ealing Road

Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2026 at 14:30.

London Borough Of Hounslow logo
Between
6 and 8 Oct 2026
Details
View Map
Share
Follow
Cambridge Road South

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cambridge Road South, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 15 Sep 2026 at 12:00.

London Borough Of Hounslow logo
Between
6 and 8 Oct 2026
Details
View Map
Share
Follow
Oxford Road South

London Borough Of Hounslow are proposing to carry out Highway improvement works on Oxford Road South, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 15 Sep 2026 at 09:57.

Scottish Hydro Electric Power Dis logo
Between
6 and 16 Oct 2026
Details
View Map
Share
Follow
Heathfield Terrace

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Heathfield Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2026 at 09:47.

Scottish Hydro Electric Power Dis logo
Between
6 and 16 Oct 2026
Details
View Map
Share
Follow
Heathfield Terrace

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Heathfield Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2026 at 15:19.

Thames Water logo
Between
7 and 22 Oct 2026
Details
View Map
Share
Follow
Trowlock Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Trowlock Avenue, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 15:37.

Cadent Gas logo
Between
7 and 21 Oct 2026
Details
View Map
Share
Follow
New Heston Road

Cadent Gas are proposing to carry out Utility asset works on New Heston Road, Hounslow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 09:11.

National Highways logo
Between
7 and 15 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Sep 2026 at 08:47.

National Highways logo
Between
7 and 15 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Aug 2026 at 14:58.

G2 Energy IDNO logo
LONG TERM
Between
7 Oct and 24 Nov 2026
Details
View Map
Share
Winchelsea Road

G2 Energy IDNO were proposing to carry out New service connection on Winchelsea Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2026 and run through until 24 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:52.

London Borough Of Hillingdon logo
Between
8 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Northfield Park

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Northfield Park, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 14 Sep 2026 at 09:07.

London Borough Of Ealing logo
LONG TERM
Between
8 Oct 2026 and 5 Feb 2027
Details
View Map
Share
Follow
Drayton Green Road

London Borough Of Ealing are proposing to carry out Remedial works on Drayton Green Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 5 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 7 Aug 2026 at 09:19.

Between
10 and 14 Oct 2026
Details
View Map
Share
Follow
Sydney Road

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Sydney Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 10 Sep 2026 at 11:16.

Between
12 Oct and 2 Nov 2026
Details
View Map
Share
Fife Road

Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Fife Road, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 2 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 4 Sep 2026 at 07:02.

Thames Water logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Manorgate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manorgate Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 09:55.

Thames Water logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Clifton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clifton Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 09:55.

Southern Gas Networks logo
Between
12 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Oak Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oak Avenue, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 2 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 May 2026 at 14:05.

Southern Gas Networks logo
Between
12 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Oak Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oak Avenue, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 2 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 10:26.

Cadent Gas logo
LONG TERM
Between
12 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Ham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:37.

Cadent Gas logo
Between
12 and 21 Oct 2026
Details
View Map
Share
Follow
Fern Lane

Cadent Gas are proposing to carry out Utility asset works on Fern Lane, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 13:42.

Scottish Hydro Electric Power Dis logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Chiswick High Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Chiswick High Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 14 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2026 at 12:55.

Scottish Hydro Electric Power Dis logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Chiswick High Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Chiswick High Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2026 at 12:35.

London Borough Of Hammersmith & Fulham logo
Between
12 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:59.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Sinclair Gardens

Thames Water are proposing to carry out Remedial works on Sinclair Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 09:12.

Murphy Power Distribution logo
Between
12 and 17 Oct 2026
Details
View Map
Share
Follow
Merrick Road

Murphy Power Distribution are proposing to carry out Utility asset works on Merrick Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 17 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 11 Sep 2026 at 11:25.

Murphy Power Distribution logo
Between
12 and 18 Oct 2026
Details
View Map
Share
Follow
Merrick Road

Murphy Power Distribution are proposing to carry out Utility asset works on Merrick Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 11 Sep 2026 at 13:37.

London Borough Of Ealing logo
Between
12 and 14 Oct 2026
Details
View Map
Share
South Road

London Borough Of Ealing were proposing to carry out Highway improvement works on South Road, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 14 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 27 Aug 2026 at 12:02.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Galloway Road

Cadent Gas are proposing to carry out Utility asset works on Galloway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 16:06.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Freeland Road

Cadent Gas are proposing to carry out Utility asset works on Freeland Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2026 at 11:36.

Cadent Gas logo
Between
12 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Castlebar Road

Cadent Gas are proposing to carry out Utility asset works on Castlebar Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jun 2026 at 11:49.

Affinity Water logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Towers Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Towers Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Feb 2026 at 07:01.

London Borough Of Ealing logo
Between
12 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Tangmere Gardens

London Borough Of Ealing are proposing to carry out Highway improvement works on Tangmere Gardens, Northolt.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 7 November 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 14 Sep 2026 at 15:18.

Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
George Street

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on George Street, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Jun 2026 at 12:01.

Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
George Street

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on George Street, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Jun 2026 at 12:02.

London Borough Of Hounslow logo
Between
13 and 16 Oct 2026
Details
View Map
Share
Follow
Worton Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Worton Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 15 Sep 2026 at 12:16.

Thames Water logo
Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
Tunis Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tunis Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 15:35.

Thames Water logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Rosebery Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rosebery Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 09:52.

BT logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2026 at 08:43.

BT logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2026 at 14:22.

Affinity Water logo
Between
15 and 19 Oct 2026
Details
View Map
Share
Follow
Ruskin Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Ruskin Avenue, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Jul 2026 at 21:43.

Virgin Media logo
Between
15 and 17 Oct 2026
Details
View Map
Share
Follow
Brook Lane North

Virgin Media are proposing to carry out Utility asset works on Brook Lane North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Sep 2026 at 08:12.

Cadent Gas logo
Between
17 and 19 Oct 2026
Details
View Map
Share
Follow
Dawes Road

Cadent Gas are proposing to carry out New service connection on Dawes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 12:00.

London Borough Of Ealing logo
Between
17 and 19 Oct 2026
Details
View Map
Share
Follow
Twyford Abbey Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 21 Aug 2026 at 10:34.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out New service connection on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 08:55.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out New service connection on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 10:23.

Cadent Gas logo
Between
19 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Strawberry Vale

Cadent Gas are proposing to carry out Utility asset works on Strawberry Vale, Twickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:38.

Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
The Terrace

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on The Terrace, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Jun 2026 at 12:03.

Thames Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Worton Way

Thames Water are proposing to carry out Utility repair and maintenance works on Worton Way, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 11:56.

Cadent Gas logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Star Road

Cadent Gas are proposing to carry out Utility asset works on Star Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:35.

Cadent Gas logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Vereker Road

Cadent Gas are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:16.

Murphy Power Distribution logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
The Green

Murphy Power Distribution are proposing to carry out Utility asset works on The Green, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 11 Sep 2026 at 11:31.

Scottish Hydro Electric Power Dis logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Grasmere Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Grasmere Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2026 at 11:12.

Thames Water logo
Between
19 and 25 Oct 2026
Details
View Map
Share
Follow
Marchwood Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Marchwood Crescent, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 25 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2026 at 11:06.

Thames Water logo
LONG TERM
Between
19 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Greenhill Park

Thames Water are proposing to carry out Utility asset works on Greenhill Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 14:54.

Thames Water logo
Between
20 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Ringwood Way

Thames Water are proposing to carry out Disconnection or alteration of supply on Ringwood Way, Hampton Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jun 2026 at 12:25.

Eunetworks logo
Between
20 and 24 Oct 2026
Details
View Map
Share
Follow
Alliance Road

Eunetworks are proposing to carry out Utility asset works on Alliance Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 24 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 8 Sep 2026 at 15:03.

Thames Water logo
Between
21 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Gomer Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Gomer Place, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 13:40.

Thames Water logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
Church Path

Thames Water are proposing to carry out Statutory Infrastructure Works on Church Path, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 12:20.

Thames Water logo
Between
23 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Grosvenor Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Grosvenor Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:23.

Scottish Hydro Electric Power Dis logo
Between
23 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Chase Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Chase Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

Thames Water logo
Between
25 and 27 Oct 2026
Details
View Map
Share
Follow
Amyand Park Road

Thames Water are proposing to carry out Remedial works on Amyand Park Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jul 2026 at 09:27.

UK Power Networks South Eastern logo
LONG TERM
Between
26 Oct 2026 and 3 Mar 2027
Details
View Map
Share
Follow
London Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on London Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 3 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 13:51.

Cadent Gas logo
Between
26 Oct and 25 Nov 2026
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Ham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 11:19.

Thames Water logo
Between
26 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Hampton Road West

Thames Water are proposing to carry out Utility repair and maintenance works on Hampton Road West, Feltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2026 at 13:28.

Thames Water logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Heath Road

Thames Water are proposing to carry out Utility repair and maintenance works on Heath Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2026 at 11:27.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Heath Road

Thames Water are proposing to carry out Utility repair and maintenance works on Heath Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 15:31.

Thames Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Whitton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Whitton Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:43.

BT logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Solna Avenue

BT are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Jul 2026 at 08:45.

Thames Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Colonial Avenue

Thames Water are proposing to carry out Remedial works on Colonial Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2026 at 15:13.

BT logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Jul 2026 at 08:06.

Thames Water logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Wymond Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Wymond Street, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:05.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Munster Road

Thames Water are proposing to carry out New service connection on Munster Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 07:48.

London Borough Of Hounslow logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Syon Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Syon Lane, Isleworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 3 Sep 2026 at 08:52.

London Borough Of Hounslow logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Great West Road

London Borough Of Hounslow were proposing to carry out Highway improvement works on Great West Road, Isleworth.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 13 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 20 Aug 2026 at 14:03.

Thames Water logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
North Hyde Lane

Thames Water are proposing to carry out Remedial works on North Hyde Lane, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 09:26.

London Borough Of Hammersmith & Fulham logo
Between
26 Oct and 21 Nov 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:58.

London Borough Of Hammersmith & Fulham logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Shepherd's Bush Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Sep 2026 at 13:03.

Eunetworks logo
Between
26 Oct and 9 Nov 2026
Details
View Map
Share
Follow
The Parkway

Eunetworks are proposing to carry out Utility asset works on The Parkway, Cranford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Aug 2026 at 12:28.

London Borough Of Ealing logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Minterne Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Minterne Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 21 Aug 2026 at 14:06.

Affinity Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Norwood Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Norwood Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Sep 2026 at 13:05.

Eunetworks logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Park Avenue

Eunetworks are proposing to carry out Utility asset works on Park Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Jun 2026 at 11:56.

Network Rail logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Uxbridge Road

Network Rail were proposing to carry out Works for Rail Purposes on Uxbridge Road, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 29 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Sep 2026 at 11:44.

Network Rail logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Uxbridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Uxbridge Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Sep 2026 at 13:33.

London Borough Of Ealing logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 20 Aug 2026 at 16:34.

London Borough Of Ealing logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 26 Aug 2026 at 13:55.

Transport for London (TfL) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 12:28.

National Highways logo
Between
27 and 31 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Dec 2025 at 14:54.

Affinity Water logo
Between
27 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Woodlands Road

Affinity Water are proposing to carry out Utility asset works on Woodlands Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Aug 2026 at 11:27.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
New King's Road

Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 12:39.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
New King's Road

Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 07:44.

Murphy Power Distribution logo
LONG TERM
Between
28 Oct and 11 Dec 2026
Details
View Map
Share
Merrick Road

Murphy Power Distribution were proposing to carry out Utility asset works on Merrick Road, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2026 and run through until 11 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 9 Sep 2026 at 10:45.

G2 Energy IDNO logo
LONG TERM
Between
28 Oct and 22 Dec 2026
Details
View Map
Share
Follow
Hillside

G2 Energy IDNO are proposing to carry out New service connection on Hillside, Stonebridge, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 22 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Aug 2026 at 13:15.

Transport for London (TfL) logo
Between
29 and 31 Oct 2026
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 13:44.

BT logo
Between
30 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Duncan Grove

BT are proposing to carry out Utility asset works on Duncan Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2026 at 15:10.

UK Power Networks South Eastern logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Church Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Aug 2026 at 12:04.

Between
2 and 23 Nov 2026
Details
View Map
Share
Follow
Clarence Street

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Clarence Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 24 Jun 2026 at 15:08.

Southern Gas Networks logo
LONG TERM
Between
2 Nov and 13 Dec 2026
Details
View Map
Share
Follow
Oldfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oldfield Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2026 at 15:14.

Southern Gas Networks logo
Between
2 and 16 Nov 2026
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Hampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 16 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2026 at 15:14.

Thames Water logo
Between
2 and 24 Nov 2026
Details
View Map
Share
Follow
Radnor Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Radnor Gardens, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:34.

Transport for London (TfL) logo
LONG TERM
Between
2 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 16:31.

Cadent Gas logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Parke Road

Cadent Gas are proposing to carry out Utility asset works on Parke Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:00.

Cadent Gas logo
Between
2 and 23 Nov 2026
Details
View Map
Share
Follow
Footpath From London Road To Brent Lea

Cadent Gas are proposing to carry out Utility asset works on Footpath From London Road To Brent Lea, Brentford.

These works are categorised as Major.

The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2026 at 11:46.

Cadent Gas logo
Between
2 and 15 Nov 2026
Details
View Map
Share
Follow
Westbrook Road

Cadent Gas are proposing to carry out Utility asset works on Westbrook Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jul 2026 at 09:09.

Cadent Gas logo
Between
2 and 16 Nov 2026
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jul 2026 at 10:59.

BT logo
Between
2 and 7 Nov 2026
Details
View Map
Share
Follow
Colet Gardens

BT are proposing to carry out Utility asset works on Colet Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Aug 2026 at 13:48.

Between
2 and 14 Nov 2026
Details
View Map
Share
Follow
Bollo Lane

Leep Utilities Electric are proposing to carry out New service connection on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 11 Sep 2026 at 09:06.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Venetia Road

Thames Water are proposing to carry out Utility repair and maintenance works on Venetia Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:27.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Venetia Road

Thames Water are proposing to carry out Utility repair and maintenance works on Venetia Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 11:45.

Murphy Power Distribution logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Merrick Road

Murphy Power Distribution are proposing to carry out Utility asset works on Merrick Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 11 Sep 2026 at 11:55.

Murphy Power Distribution logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Merrick Road

Murphy Power Distribution are proposing to carry out Utility asset works on Merrick Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 11 Sep 2026 at 13:35.

London Borough Of Ealing logo
LONG TERM
Between
2 Nov 2026 and 31 Mar 2027
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 31 March 2027. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 6 Aug 2026 at 13:47.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Westbourne Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Westbourne Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Sep 2026 at 12:41.

Cadent Gas logo
LONG TERM
Between
2 Nov 2026 and 10 Jan 2027
Details
View Map
Share
Follow
Framfield Road

Cadent Gas are proposing to carry out Utility asset works on Framfield Road, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 10 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 16:03.

Thames Water logo
Between
3 and 4 Nov 2026
Details
View Map
Share
Follow
Coval Passage

Thames Water are proposing to carry out Utility repair and maintenance works on Coval Passage, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 12:48.

UK Power Networks South Eastern logo
Between
4 and 22 Nov 2026
Details
View Map
Share
Kew Road

UK Power Networks South Eastern were proposing to carry out New service connection on Kew Road, Kew.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2026 and run through until 22 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2026 at 10:01.

G2 Energy IDNO logo
Between
4 and 24 Nov 2026
Details
View Map
Share
Follow
Sussex Road

G2 Energy IDNO are proposing to carry out Utility asset works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 24 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 13 Jul 2026 at 12:42.

G2 Energy IDNO logo
Between
4 and 24 Nov 2026
Details
View Map
Share
Follow
Sussex Road

G2 Energy IDNO are proposing to carry out Utility asset works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 24 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 10 Sep 2026 at 13:57.

Thames Water logo
Between
5 and 19 Nov 2026
Details
View Map
Share
Follow
Oak Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Oak Lane, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:25.

BT logo
Between
6 and 10 Nov 2026
Details
View Map
Share
Follow
Windsor Park Road

BT are proposing to carry out Utility asset works on Windsor Park Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2026 and could run through until 10 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Aug 2026 at 08:24.

BT logo
Between
6 and 10 Nov 2026
Details
View Map
Share
Follow
Eton Road

BT are proposing to carry out Utility asset works on Eton Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2026 and could run through until 10 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Aug 2026 at 08:25.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Chase Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Chase Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

On
8 Nov 2026
Details
View Map
Share
Follow
Unnamed Footpath - Petersham Road To Petersham Meadows

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Unnamed Footpath - Petersham Road To Petersham Meadows, Petersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 8 November 2026 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 15 Sep 2026 at 16:11.

Thames Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Dolphin Street

Thames Water were proposing to carry out Remedial works on Dolphin Street, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 13:53.

Thames Water logo
Between
9 and 26 Nov 2026
Details
View Map
Share
Follow
Broom Water West

Thames Water are proposing to carry out Disconnection or alteration of supply on Broom Water West, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:35.

City Of London Telecomms logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Follow
Berkeley Avenue

City Of London Telecomms are proposing to carry out Utility asset works on Berkeley Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 2 Sep 2026 at 09:52.

Cadent Gas logo
LONG TERM
Between
9 Nov 2026 and 7 Jan 2027
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 7 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 10:35.

Cadent Gas logo
Between
9 and 26 Nov 2026
Details
View Map
Share
Follow
Montpelier Road

Cadent Gas are proposing to carry out Utility asset works on Montpelier Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 08:49.

Cadent Gas logo
LONG TERM
Between
9 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Glencairn Drive

Cadent Gas are proposing to carry out Utility asset works on Glencairn Drive, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 15:21.

Cadent Gas logo
LONG TERM
Between
9 Nov 2026 and 12 Jan 2027
Details
View Map
Share
Follow
Queens Walk

Cadent Gas are proposing to carry out Utility asset works on Queens Walk, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 15:21.

G2 Energy IDNO logo
Between
9 and 24 Nov 2026
Details
View Map
Share
Mordaunt Road

G2 Energy IDNO were proposing to carry out New service connection on Mordaunt Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 24 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:53.

Thames Water logo
Between
10 and 24 Nov 2026
Details
View Map
Share
Follow
Cornwall Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Cornwall Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:26.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Newton Avenue

Thames Water are proposing to carry out Statutory Infrastructure Works on Newton Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 13:46.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Ramsay Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Ramsay Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 13:46.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Bollo Bridge Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Bollo Bridge Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 13:46.

Thames Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
Chiswick Mall

Thames Water are proposing to carry out Utility asset works on Chiswick Mall, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 16:32.

Cadent Gas logo
Between
12 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Temple Sheen

Cadent Gas are proposing to carry out Utility asset works on Temple Sheen, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 13:30.

Between
13 and 21 Nov 2026
Details
View Map
Share
Follow
Colville Road

Leep Utilities Electric are proposing to carry out New service connection on Colville Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 11 Sep 2026 at 09:09.

Thames Water logo
Between
14 and 22 Nov 2026
Details
View Map
Share
Lower Richmond Road

Thames Water were proposing to carry out New service connection on Lower Richmond Road, Putney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2026 and run through until 22 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 16:51.

Southern Gas Networks logo
Between
16 and 30 Nov 2026
Details
View Map
Share
Follow
Gomer Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gomer Gardens, Teddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 11:16.

Cadent Gas logo
LONG TERM
Between
16 Nov 2026 and 15 Jan 2027
Details
View Map
Share
Follow
Bear Road

Cadent Gas are proposing to carry out Utility asset works on Bear Road, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 11:06.

Thames Water logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Winthorpe Road

Thames Water were proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2026 and run through until 11 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 11:10.

Thames Water logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Winthorpe Road

Thames Water are proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 11:16.

Cadent Gas logo
Between
16 and 26 Nov 2026
Details
View Map
Share
Follow
Cumberland Road

Cadent Gas are proposing to carry out Utility asset works on Cumberland Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:00.

Cadent Gas logo
Between
16 and 30 Nov 2026
Details
View Map
Share
Follow
Rainville Road

Cadent Gas are proposing to carry out Utility asset works on Rainville Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 14:28.

Cadent Gas logo
Between
16 and 22 Nov 2026
Details
View Map
Share
Follow
Blossom Waye

Cadent Gas are proposing to carry out Utility asset works on Blossom Waye, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 09:14.

Cadent Gas logo
LONG TERM
Between
16 Nov 2026 and 24 Jan 2027
Details
View Map
Share
Follow
Cranford Lane

Cadent Gas are proposing to carry out Utility asset works on Cranford Lane, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 24 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 09:13.

Thames Water logo
Between
16 and 29 Nov 2026
Details
View Map
Share
Follow
Lionel Road North

Thames Water are proposing to carry out Utility asset works on Lionel Road North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:58.

London Borough Of Ealing logo
LONG TERM
Between
16 Nov 2026 and 4 Apr 2028
Details
View Map
Share
Follow
Minerva Road

London Borough Of Ealing are proposing to carry out Remedial works on Minerva Road, Park Royal.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 4 April 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 11 Sep 2026 at 15:21.

Affinity Water logo
Between
16 and 27 Nov 2026
Details
View Map
Share
Follow
Courthope Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Courthope Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 30 Jul 2026 at 09:53.

Affinity Water logo
Between
16 and 27 Nov 2026
Details
View Map
Share
Follow
Courthope Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Courthope Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Sep 2026 at 11:45.

Thames Water logo
LONG TERM
Between
17 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jul 2026 at 08:15.

Thames Water logo
Between
17 Nov and 1 Dec 2026
Details
View Map
Share
Follow
Devoncroft Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Devoncroft Gardens, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:27.

Thames Water logo
Between
18 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Radnor Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Radnor Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:34.

Thames Water logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Perryn Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Perryn Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jul 2026 at 10:47.

G2 Energy IDNO logo
LONG TERM
Between
18 Nov and 18 Dec 2026
Details
View Map
Share
Acton Lane

G2 Energy IDNO were proposing to carry out New service connection on Acton Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2026 and run through until 18 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:53.

BT logo
Between
19 and 27 Nov 2026
Details
View Map
Share
Follow
Thornbury Road

BT are proposing to carry out Utility asset works on Thornbury Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Sep 2026 at 08:27.

Transport for London (TfL) logo
Between
19 and 28 Nov 2026
Details
View Map
Share
Follow
Ruislip Road

Transport for London (TfL) are proposing to carry out Section 50 on Ruislip Road, Northolt.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 19 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 11:24.

Thames Water logo
Between
20 Nov and 4 Dec 2026
Details
View Map
Share
Follow
North Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on North Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jul 2026 at 08:14.

Network Rail logo
Between
21 and 23 Nov 2026
Details
View Map
Share
Follow
Vine Road

Network Rail are proposing to carry out Works for Rail Purposes on Vine Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2026 at 14:20.

BT logo
Between
21 and 25 Nov 2026
Details
View Map
Share
Follow
Windsor Park Road

BT are proposing to carry out Utility asset works on Windsor Park Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 Aug 2026 at 10:14.

BT logo
Between
21 and 25 Nov 2026
Details
View Map
Share
Follow
Eton Road

BT are proposing to carry out Utility asset works on Eton Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 Aug 2026 at 10:14.

Network Rail logo
Between
21 and 23 Nov 2026
Details
View Map
Share
Follow
Bollo Lane

Network Rail are proposing to carry out Works for Rail Purposes on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Feb 2026 at 14:28.

Southern Gas Networks logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Cromwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Road, Teddington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2026 at 14:49.

Cadent Gas logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Cole Park Road

Cadent Gas are proposing to carry out Utility asset works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Aug 2026 at 15:44.

Transport for London (TfL) logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 16:31.

Cadent Gas logo
Between
23 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Hatton Road

Cadent Gas are proposing to carry out Utility asset works on Hatton Road, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 11:23.

Cadent Gas logo
LONG TERM
Between
23 Nov 2026 and 24 Jan 2027
Details
View Map
Share
Follow
Mortlake Road

Cadent Gas are proposing to carry out Utility asset works on Mortlake Road, Kew.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 24 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 12:30.

Scottish Hydro Electric Power Dis logo
Between
23 Nov and 3 Dec 2026
Details
View Map
Share
Follow
The Broadway

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on The Broadway, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 3 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Sep 2026 at 10:21.

Cadent Gas logo
LONG TERM
Between
23 Nov 2026 and 24 Jan 2027
Details
View Map
Share
Follow
Carlyle Avenue

Cadent Gas are proposing to carry out Utility asset works on Carlyle Avenue, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 24 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2026 at 11:57.

Thames Water logo
Between
24 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Haggard Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Haggard Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:28.

Transport for London (TfL) logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:42.

Transport for London (TfL) logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:38.

Transport for London (TfL) logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:37.

Between
24 Nov and 18 Dec 2026
Details
View Map
Share
Follow
The Parkway

WHP Telecoms Ltd are proposing to carry out Utility asset works on The Parkway, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by WHP Telecoms Ltd on 10 Sep 2026 at 21:25.

Thames Water logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Elmore Close

Thames Water are proposing to carry out Utility repair and maintenance works on Elmore Close, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 11:58.

Thames Water logo
Between
25 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Park Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jul 2026 at 08:14.

BT logo
Between
25 and 27 Nov 2026
Details
View Map
Share
Follow
Colet Gardens

BT are proposing to carry out Utility asset works on Colet Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2026 at 08:55.

Transport for London (TfL) logo
Between
26 and 28 Nov 2026
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:43.

Transport for London (TfL) logo
Between
26 and 28 Nov 2026
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 13:55.

Eunetworks logo
Between
28 Nov and 15 Dec 2026
Details
View Map
Share
The Parkway

Eunetworks were proposing to carry out Utility asset works on The Parkway, Cranford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 November 2026 and run through until 15 December 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 28 Aug 2026 at 07:19.

Southern Gas Networks logo
Between
30 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Cromwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Road, Teddington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 14 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 10:19.

Southern Gas Networks logo
Between
30 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Gomer Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gomer Gardens, Teddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 14 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 08:28.

Thames Water logo
Between
30 Nov and 3 Dec 2026
Details
View Map
Share
Follow
Richmond Hill

Thames Water are proposing to carry out New service connection on Richmond Hill, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 3 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:06.

Thames Water logo
Between
30 Nov and 9 Dec 2026
Details
View Map
Share
Follow
Water Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Water Lane, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 9 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:45.

BT logo
Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Lime Grove

BT were proposing to carry out Utility asset works on Lime Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 8 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2026 at 08:20.

London Borough Of Ealing logo
LONG TERM
Between
30 Nov 2026 and 17 Sep 2027
Details
View Map
Share
Follow
Minerva Road

London Borough Of Ealing are proposing to carry out Remedial works on Minerva Road, Park Royal.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 17 September 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Aug 2026 at 11:45.

London Borough Of Ealing logo
LONG TERM
Between
30 Nov 2026 and 17 Sep 2027
Details
View Map
Share
Minerva Road

London Borough Of Ealing were proposing to carry out Remedial works on Minerva Road, Park Royal.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 17 September 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 25 Aug 2026 at 10:44.

London Borough Of Ealing logo
LONG TERM
Between
30 Nov 2026 and 4 Apr 2028
Details
View Map
Share
Follow
Minerva Road

London Borough Of Ealing are proposing to carry out Remedial works on Minerva Road, Park Royal.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 April 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 25 Aug 2026 at 10:55.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 8 Feb 2027
Details
View Map
Share
Follow
St Albans Road

Thames Water are proposing to carry out Utility asset works on St Albans Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 15:02.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Park Road

Thames Water are proposing to carry out Utility asset works on Park Road, Harlesden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 13:22.

Thames Water logo
Between
1 and 17 Dec 2026
Details
View Map
Share
Follow
Bridgeman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Bridgeman Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 17 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 10:43.

Network Rail logo
Between
1 and 4 Dec 2026
Details
View Map
Share
Follow
Wellesley Road

Network Rail are proposing to carry out Works for Rail Purposes on Wellesley Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Jul 2026 at 16:04.

Network Rail logo
Between
1 and 4 Dec 2026
Details
View Map
Share
Follow
Tower Road

Network Rail are proposing to carry out roadworks on Tower Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Jul 2026 at 17:06.

Transport for London (TfL) logo
Between
1 and 4 Dec 2026
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:47.

Cadent Gas logo
Between
1 and 21 Dec 2026
Details
View Map
Share
Follow
Cheriton Close

Cadent Gas are proposing to carry out Utility asset works on Cheriton Close, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 11:46.

London Borough Of Ealing logo
LONG TERM
Between
2 Dec 2026 and 30 Jul 2027
Details
View Map
Share
Follow
Victoria Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 30 July 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2026 at 11:31.

Cadent Gas logo
LONG TERM
Between
2 Dec 2026 and 3 Feb 2027
Details
View Map
Share
Follow
Ruislip Road East

Cadent Gas are proposing to carry out Utility asset works on Ruislip Road East, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 3 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 11:57.

London Borough Of Ealing logo
LONG TERM
Between
2 Dec 2026 and 30 Jul 2027
Details
View Map
Share
Follow
Old Oak Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on Old Oak Lane, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 30 July 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2026 at 11:43.

Thames Water logo
Between
3 Dec 2026 and 1 Jan 2027
Details
View Map
Share
Follow
Lion Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lion Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 1 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:30.

Thames Water logo
LONG TERM
Between
4 Dec 2026 and 12 Jan 2027
Details
View Map
Share
Follow
Riverview Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Riverview Gardens, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2026 and could run through until 12 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:36.

BT logo
Between
4 and 8 Dec 2026
Details
View Map
Share
Follow
Windsor Park Road

BT are proposing to carry out Utility asset works on Windsor Park Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2026 and could run through until 8 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Sep 2026 at 07:17.

Network Rail logo
Between
5 and 7 Dec 2026
Details
View Map
Share
Follow
Bollo Lane

Network Rail are proposing to carry out Works for Rail Purposes on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Feb 2026 at 14:28.

Southern Gas Networks logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Cromwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 15:04.

Southern Gas Networks logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Kingston Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingston Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 15:03.

Southern Gas Networks logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Teddington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2026 at 14:30.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 11 Jan 2027
Details
View Map
Share
Follow
Swan Road

Cadent Gas are proposing to carry out Utility asset works on Swan Road, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 08:19.

Scottish Hydro Electric Power Dis logo
Between
7 and 18 Dec 2026
Details
View Map
Share
The Broadway

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on The Broadway, Southall.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 18 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 16:25.

Cadent Gas logo
Between
7 and 31 Dec 2026
Details
View Map
Share
Follow
Gurnell Grove

Cadent Gas are proposing to carry out Utility asset works on Gurnell Grove, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 17:00.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Talbot Road

Cadent Gas are proposing to carry out Utility asset works on Talbot Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 13:50.

G2 Energy IDNO logo
Between
13 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Acton Lane

G2 Energy IDNO were proposing to carry out New service connection on Acton Lane, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2026 and run through until 6 January 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:54.


Roadworks Map near to Hawthorn Hatch, BRENTFORD, TW8 8NX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 15 Sep 2026 23:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hawthorn Hatch, BRENTFORD, TW8 8NX (29 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MULBERRY CRESCENT 
(0.2 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 15 Sep 2026 - 16 Sep 2026
0.2
Details
Share
Follow
2
Cadent Gas logo
HALF MOON CLOSE 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 29 Sep 2026
0.2
Details
Share
Follow
3
Cadent Gas logo
BRENT LEA 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 7 Sep 2026 - 18 Sep 2026
0.2
Details
Share
Follow
4
Cadent Gas logo
EMERGENCY
  
HAZEL CLOSE 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 10 Sep 2026 - 18 Sep 2026)
0.3
Details
Share
5
Scottish Hydro Electric Power Dis logo
URGENT
  
BRENTSIDE 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
9 Sep 2026 19:26 - 15 Sep 2026 14:20
0.5
Details
Share
6
Thames Water logo
OTTERBURN GARDENS 
(0.5 miles)
Thames Water
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.5
Details
Share
Follow
7
Cadent Gas logo
ROBIN GROVE 
(0.5 miles)
Cadent Gas
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 15 Sep 2026 - 16 Sep 2026
0.5
Details
Share
Follow
8
Thames Water logo
URGENT
  
PARKWOOD ROAD 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 12 Sep 2026 17:30
(Scheduled: 12 Sep 2026 - 16 Sep 2026)
0.5
Details
Share
Follow
9
Scottish Hydro Electric Power Dis logo
URGENT
  
TWICKENHAM ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Cycleway - Multi-way signals
Complete
9 Sep 2026 15:30 - 14 Sep 2026 09:40
0.5
Details
Share
10
Thames Water logo
URGENT
  
PARKWOOD ROAD 
(0.5 miles)
Thames Water
Utility asset works - Footway - Give and take
Cancelled
(Scheduled: 12 Sep 2026 - 18 Sep 2026)
0.5
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data