ROADWORKS SUMMARY
Ken Jones Close, TELFORD, TF7 5QT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Ken Jones Close, TF7 5QT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ken Jones Close, TELFORD, TF7 5QT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ken Jones Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Western Power Distribution (West Midlands) logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Much Wenlock Road

Western Power Distribution (West Midlands) are carrying out Utility asset works on Much Wenlock Road, Buildwas, Telford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 09:05 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Aug 2026 at 09:19.

Telford & Wrekin Council logo
LONG TERM
Until
24 Sep 2026
Details
View Map
Share
Follow
King Street

Telford & Wrekin Council are carrying out Highway improvement works on King Street, Wellington, Telford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:00 and could run through until 24 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telford & Wrekin Council on 20 Aug 2026 at 12:24.

Telford & Wrekin Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Stafford Park 11

Telford & Wrekin Council are carrying out Highway improvement works on Stafford Park 11, Stafford Park, Telford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 19:00 and could run through until 19 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 28 Aug 2026 at 07:56.

Telford & Wrekin Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Stafford Park 4

Telford & Wrekin Council are carrying out Highway improvement works on Stafford Park 4, Stafford Park, Telford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 19:00 and could run through until 19 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 28 Aug 2026 at 07:56.

Telford & Wrekin Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Stafford Park 1

Telford & Wrekin Council are carrying out Highway improvement works on Stafford Park 1, Stafford Park, Telford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 19:00 and could run through until 19 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 28 Aug 2026 at 08:00.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
The Lloyds

Cadent Gas are carrying out Utility repair and maintenance works on The Lloyds, Ironbridge, Telford.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 16:56 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 09:17.

Cadent Gas logo
LONG TERM
Between
10 Sep and 13 Oct 2026
Details
View Map
Share
Follow
Manor Rise

Cadent Gas are proposing to carry out Utility asset works on Manor Rise, Arleston, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 12:17.

Cadent Gas logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Arleston Lane

Cadent Gas are carrying out Utility asset works on Arleston Lane, Arleston, Telford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 12:40 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 12:59.

Western Power Distribution (West Midlands) logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Warwick Way

Western Power Distribution (West Midlands) are carrying out Utility asset works on Warwick Way, Leegomery, Telford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 11:50 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Sep 2026 at 12:05.

Telford & Wrekin Council logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Hillside Road

Telford & Wrekin Council are carrying out Highway improvement works on Hillside Road, Ketley Bank, Telford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 25 September 2026. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Telford & Wrekin Council on 14 Sep 2026 at 10:28.

Severn Trent Water logo
Finishing
Monday
Details
View Map
Share
Follow
Chapel Road

Severn Trent Water are carrying out Utility repair and maintenance works on Chapel Road, Telford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 13:29 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 13:33.

Telford & Wrekin Council logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Castle Farm Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Castle Farm Way, Priorslee, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 9 Sep 2026 at 09:43.

Western Power Distribution (West Midlands) logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
King Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on King Street, Much Wenlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Sep 2026 at 07:56.

Telford & Wrekin Council logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Limekiln Roundabout

Telford & Wrekin Council are proposing to carry out Highway improvement works on Limekiln Roundabout, Priorslee, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 9 Sep 2026 at 09:39.

Telford & Wrekin Council logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Redhill Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Redhill Way, Donnington Wood, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 9 Sep 2026 at 09:39.

Telford & Wrekin Council logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Telford Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Telford Way, Priorslee, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 9 Sep 2026 at 09:39.

Cadent Gas logo
LONG TERM
Between
21 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Crescent Road

Cadent Gas are proposing to carry out Utility asset works on Crescent Road, Hadley, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2026 at 10:41.

Cadent Gas logo
LONG TERM
Between
21 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Crescent Road

Cadent Gas are proposing to carry out Utility asset works on Crescent Road, Hadley, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 11:38.

Cadent Gas logo
LONG TERM
Between
21 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Crescent Road

Cadent Gas are proposing to carry out Utility asset works on Crescent Road, Hadley, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 14:40.

Western Power Distribution (West Midlands) logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
King Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on King Street, Much Wenlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Jun 2026 at 13:28.

BT logo
Between
25 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Hall Park Way

BT are proposing to carry out Utility repair and maintenance works on Hall Park Way, Telford Town Centre, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 9 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 2 Jul 2026 at 10:51.

BT logo
Between
25 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Hall Park Way

BT are proposing to carry out Utility repair and maintenance works on Hall Park Way, Telford Town Centre, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 9 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2026 at 11:10.

Severn Trent Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Lloyds Head

Severn Trent Water are proposing to carry out Utility asset works on Lloyds Head, Jackfield, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 6 Aug 2026 at 10:39.

Severn Trent Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Chapel Road

Severn Trent Water are proposing to carry out Utility asset works on Chapel Road, Jackfield, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 6 Aug 2026 at 10:39.

Severn Trent Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Back Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Back Lane, Much Wenlock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 2 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 09:04.

Severn Trent Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Shienton Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Shienton Street, Much Wenlock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 2 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 09:04.

Telford & Wrekin Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Lightmoor Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on Lightmoor Road, Lightmoor, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 10 Sep 2026 at 15:29.

Severn Trent Water logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
High Street

Severn Trent Water were proposing to carry out Utility asset works on High Street, Ironbridge, Telford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2026 and run through until 8 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 15:45.

Severn Trent Water logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Waterloo Street

Severn Trent Water are proposing to carry out Utility asset works on Waterloo Street, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Aug 2026 at 14:17.

Severn Trent Water logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Waterloo Street

Severn Trent Water are proposing to carry out Utility asset works on Waterloo Street, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 15:51.

Severn Trent Water logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Tontine Hill

Severn Trent Water are proposing to carry out Utility asset works on Tontine Hill, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 15:48.

Severn Trent Water logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Buildwas Road

Severn Trent Water are proposing to carry out Utility asset works on Buildwas Road, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 15:49.

Severn Trent Water logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Buildwas Road

Severn Trent Water were proposing to carry out Utility asset works on Buildwas Road, Ironbridge, Telford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2026 and run through until 8 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 15:48.

Severn Trent Water logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
The Wharfage

Severn Trent Water are proposing to carry out Utility asset works on The Wharfage, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 15:51.

Severn Trent Water logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
The Wharfage

Severn Trent Water were proposing to carry out Utility asset works on The Wharfage, Ironbridge, Telford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2026 and run through until 8 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 15:50.

Severn Trent Water logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Tontine Hill

Severn Trent Water were proposing to carry out Utility asset works on Tontine Hill, Ironbridge, Telford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2026 and run through until 8 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 15:47.

Severn Trent Water logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
High Street

Severn Trent Water are proposing to carry out Utility asset works on High Street, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 15:47.

Shropshire Council logo
Between
30 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Coalport Road End Of To Brockton Junction A442

Shropshire Council are proposing to carry out Highway improvement works on Coalport Road End Of To Brockton Junction A442, Brockton, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 15 Sep 2026 at 10:24.

Severn Trent Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Roseway

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Roseway, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Jul 2026 at 11:20.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
19 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Manor Farm Junction To Shrewsbury And Atcham District Boundary Tick Wood

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Manor Farm Junction To Shrewsbury And Atcham District Boundary Tick Wood, Wyke, Much Wenlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Aug 2026 at 11:35.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
19 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Former Bridgnorth District Boundary To A4169

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Former Bridgnorth District Boundary To A4169, Farley, Much Wenlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Aug 2026 at 11:35.

Severn Trent Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Hollies Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hollies Road, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Aug 2026 at 15:02.

Severn Trent Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Hollies Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hollies Road, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Sep 2026 at 14:09.

Western Power Distribution (West Midlands) logo
Between
2 and 16 Nov 2026
Details
View Map
Share
Follow
Arleston Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Arleston Lane, Arleston, Telford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 16 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Sep 2026 at 16:59.

Severn Trent Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Church Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Aug 2026 at 11:43.

Western Power Distribution (West Midlands) logo
Between
2 and 12 Nov 2026
Details
View Map
Share
Follow
Arleston Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Arleston Lane, Arleston, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Sep 2026 at 16:59.

Telford & Wrekin Council logo
Between
2 and 13 Nov 2026
Details
View Map
Share
Follow
Hillside Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on Hillside Road, Ketley Bank, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Telford & Wrekin Council on 18 Aug 2026 at 17:41.

Severn Trent Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Hall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hall Lane, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Aug 2026 at 11:05.

Severn Trent Water logo
Between
4 and 6 Nov 2026
Details
View Map
Share
Follow
Church Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2026 at 08:17.

Severn Trent Water logo
Between
4 and 6 Nov 2026
Details
View Map
Share
Follow
Church Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Aug 2026 at 12:04.

Shropshire Council logo
Between
4 and 11 Nov 2026
Details
View Map
Share
Follow
Coalport Road End Of To Brockton Junction A442

Shropshire Council are proposing to carry out Highway improvement works on Coalport Road End Of To Brockton Junction A442, Brockton, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 11 Aug 2026 at 15:08.

Severn Trent Water logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Hall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hall Lane, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Aug 2026 at 10:56.

Shropshire Council logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Queen Street

Shropshire Council are proposing to carry out Highway improvement works on Queen Street, Broseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 11 Aug 2026 at 15:26.

BT logo
Between
16 and 18 Nov 2026
Details
View Map
Share
Follow
New Works Farm To New Works Lane

BT are proposing to carry out Remedial works on New Works Farm To New Works Lane, New Works, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 1 Sep 2026 at 13:21.

Western Power Distribution (West Midlands) logo
Between
23 Nov and 22 Dec 2026
Details
View Map
Share
Follow
Warwick Way

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Warwick Way, Leegomery, Telford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Sep 2026 at 15:10.

Telford & Wrekin Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Lightmoor Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on Lightmoor Road, Lightmoor, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 2 Sep 2026 at 16:31.

Shropshire Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
A4169 From Kemberton Road End B4379 Junction To Start Of Bridgnorth Road Shifnal

Shropshire Council are proposing to carry out Highway improvement works on A4169 From Kemberton Road End B4379 Junction To Start Of Bridgnorth Road Shifnal, Kemberton, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 19 Aug 2026 at 19:23.

Shropshire Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Bridgnorth Road

Shropshire Council are proposing to carry out Highway improvement works on Bridgnorth Road, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 19 Aug 2026 at 19:24.

Shropshire Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Vicarage Drive

Shropshire Council are proposing to carry out Highway improvement works on Vicarage Drive, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 19 Aug 2026 at 19:23.

Shropshire Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Church Street

Shropshire Council are proposing to carry out Highway improvement works on Church Street, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 19 Aug 2026 at 19:24.

Shropshire Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Innage Road

Shropshire Council are proposing to carry out Highway improvement works on Innage Road, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 19 Aug 2026 at 19:22.

Telford & Wrekin Council logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Telford Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Telford Way, Priorslee, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 3 Sep 2026 at 16:21.

Telford & Wrekin Council logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Redhill Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Redhill Way, Donnington Wood, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 7 Sep 2026 at 14:06.

Telford & Wrekin Council logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Redhill Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Redhill Way, Donnington Wood, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 3 Sep 2026 at 16:16.

Telford & Wrekin Council logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Telford Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Telford Way, Priorslee, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 7 Sep 2026 at 14:01.

Telford & Wrekin Council logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Limekiln Roundabout

Telford & Wrekin Council are proposing to carry out Highway improvement works on Limekiln Roundabout, Priorslee, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 7 Sep 2026 at 14:06.

Telford & Wrekin Council logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Limekiln Roundabout

Telford & Wrekin Council are proposing to carry out Highway improvement works on Limekiln Roundabout, Priorslee, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 3 Sep 2026 at 16:16.

Western Power Distribution (West Midlands) logo
Between
30 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Arleston Village

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Arleston Village, Arleston, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 25 Aug 2026 at 15:09.

Telford & Wrekin Council logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Castle Farm Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Castle Farm Way, Priorslee, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 7 Sep 2026 at 14:06.

Telford & Wrekin Council logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Castle Farm Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Castle Farm Way, Priorslee, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 3 Sep 2026 at 16:21.

Shropshire Council logo
Between
7 and 16 Dec 2026
Details
View Map
Share
Follow
Barrow Street

Shropshire Council are proposing to carry out Highway improvement works on Barrow Street, Much Wenlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 11 Sep 2026 at 11:15.

Telford & Wrekin Council logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Leegate Avenue

Telford & Wrekin Council are proposing to carry out Highway improvement works on Leegate Avenue, Leegomery, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Telford & Wrekin Council on 1 Sep 2026 at 08:16.

Shropshire Council logo
Between
7 and 16 Dec 2026
Details
View Map
Share
Follow
Wilmore Street

Shropshire Council are proposing to carry out Highway improvement works on Wilmore Street, Much Wenlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 11 Sep 2026 at 11:15.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Arleston Avenue

Cadent Gas are proposing to carry out Utility asset works on Arleston Avenue, Arleston, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 14:39.

BT logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
Field Lane

BT are proposing to carry out Utility asset works on Field Lane, Kemberton, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 10 Sep 2026 at 15:09.

BT logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
Field Lane

BT are proposing to carry out Utility asset works on Field Lane, Kemberton, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2026 at 11:55.

Shropshire Council logo
Between
7 and 16 Dec 2026
Details
View Map
Share
Follow
Shienton Street

Shropshire Council are proposing to carry out Highway improvement works on Shienton Street, Much Wenlock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 11 Sep 2026 at 11:15.

Cadent Gas logo
Between
7 Dec 2026 and 5 Jan 2027
Details
View Map
Share
Follow
Manor Rise

Cadent Gas are proposing to carry out Utility asset works on Manor Rise, Arleston, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 5 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 14:29.

Cadent Gas logo
Between
7 and 30 Dec 2026
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Arleston, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 30 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 18:00.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Toll Road

Cadent Gas are proposing to carry out Utility asset works on Toll Road, Arleston, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 17:30.

Telford & Wrekin Council logo
LONG TERM
Between
14 Dec 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Heath Hill Roundabout

Telford & Wrekin Council are proposing to carry out Highway improvement works on Heath Hill Roundabout, Dawley, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telford & Wrekin Council on 11 Sep 2026 at 13:58.

Telford & Wrekin Council logo
LONG TERM
Between
14 Dec 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Heath Hill

Telford & Wrekin Council are proposing to carry out Highway improvement works on Heath Hill, Dawley, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telford & Wrekin Council on 11 Sep 2026 at 13:58.

Telford & Wrekin Council logo
LONG TERM
Between
14 Dec 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Dawley Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on Dawley Road, Dawley, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telford & Wrekin Council on 11 Sep 2026 at 13:53.

Cadent Gas logo
LONG TERM
Between
14 Dec 2026 and 19 Jan 2027
Details
View Map
Share
Follow
Arleston Lane

Cadent Gas are proposing to carry out Utility asset works on Arleston Lane, Arleston, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 19 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 15:44.

Telford & Wrekin Council logo
Between
14 and 16 Dec 2026
Details
View Map
Share
Follow
Church Street

Telford & Wrekin Council are proposing to carry out Highway improvement works on Church Street, Hadley, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 11 Sep 2026 at 13:11.

Telford & Wrekin Council logo
LONG TERM
Between
14 Dec 2026 and 5 Mar 2027
Details
View Map
Share
Follow
Dawley Green Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Dawley Green Way, Dawley Bank, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 5 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telford & Wrekin Council on 11 Sep 2026 at 13:58.


Roadworks Map near to Ken Jones Close, TELFORD, TF7 5QT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 05:30
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ken Jones Close, TELFORD, TF7 5QT (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Telford & Wrekin Council logo
CHERRY TREE HILL, COALBROOKDALE 
(0.4 miles)
Telford & Wrekin Council
Highway improvement works - Carriageway - Stop/go boards
Planned
Scheduled: 15 Sep 2026 - 17 Sep 2026
0.4
Details
Share
Follow
2
BT logo
FERRIDAYS FIELDS, WOODSIDE 
(0.4 miles)
BT
New service connection - Footway - Give and take
Planned
Scheduled: 16 Sep 2026 - 17 Sep 2026
0.4
Details
Share
Follow
3
Cadent Gas logo
EMERGENCY
  
WEYBRIDGE, WOODSIDE 
(0.5 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 11 Sep 2026 13:32
(Scheduled: 11 Sep 2026 - 17 Sep 2026)
0.5
Details
Share
Follow
4
Virgin Media logo
URGENT
  
WILLOWFIELD, WOODSIDE 
(0.6 miles)
Virgin Media
New service connection - Verge - No carriageway incursion
Complete
15 Sep 2026 10:30 - 15:45
0.6
Details
Share
5
Telford & Wrekin Council logo
CHURCH ROAD, COALBROOKDALE 
(0.8 miles)
Telford & Wrekin Council
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 14 Sep 2026 - 16 Sep 2026
0.8
Details
Share
Follow
6
Virgin Media logo
BRIDLE TERRACE, MADELEY 
(0.8 miles)
Virgin Media
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 16 Sep 2026
0.8
Details
Share
Follow
7
Telford & Wrekin Council logo
CASTLEFIELDS WAY, AQUEDUCT 
(0.9 miles)
Telford & Wrekin Council
Highway improvement works - Carriageway - Stop/go boards
Planned
Scheduled: 15 Sep 2026 - 17 Sep 2026
0.9
Details
Share
Follow
8
Telford & Wrekin Council logo
OLD VICARAGE ROAD, DAWLEY 
(1.0 miles)
Telford & Wrekin Council
Highway improvement works - Carriageway - Stop/go boards
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
1.0
Details
Share
Follow
9
Hutchinson 3G logo
MAJOR
  
MAYFIELD, MADELEY 
(1.0 miles)
Hutchinson 3G
Utility asset works - Footway - Road closure
Planned
Scheduled: 17 Sep 2026 - 25 Sep 2026
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.