ROADWORKS SUMMARY
TELFORD, TF6 6WB
Introduction

View current and future planned roadworks and road closures for TF6 6WB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to TELFORD, TF6 6WB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
12 Sep 2025
Shropshire Council are carrying out Highway improvement works on Leighton Road, Buildwas.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 October 2021 at 08:51 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Shropshire Council on 2 Sep 2024 at 15:35.
1 May 2026
Telford & Wrekin Council are carrying out Highway improvement works on Coalmoor Road, Little Worth, Telford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 13:33 and could run through until 1 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 4 Mar 2025 at 12:06.
7 Mar 2026
Shropshire Council are carrying out Highway repair and maintenance works on Much Wenlock Road, Buildwas, Telford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 07:00 and could run through until 7 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Shropshire Council on 21 Mar 2025 at 10:33.
Friday
Telford & Wrekin Council are carrying out Highway improvement works on Queen Street, Wellington, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:38 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 29 Apr 2025 at 15:59.
Friday
Telford & Wrekin Council are carrying out Highway improvement works on Church Street, Wellington, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:38 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 29 Apr 2025 at 15:59.
18 Jan 2025 and 19 Jan 2028
Severn Trent Water were proposing to carry out Remedial works on Stafford Road, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 19 January 2028. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Sep 2024 at 12:48.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stafford Park 2, Stafford Park, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:04.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stafford Park 1, Stafford Park, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:04.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hollinswood Interchange, Hollinswood, Telford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:50.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Telford Way, Priorslee, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:50.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Priorslee Roundabout, Priorslee, Telford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:19.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Holyhead Road, Snedshill, Telford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:17.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Snedshill Way, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:21.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Priorslee Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:15.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Furnace Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:21.
Today
Western Power Distribution (West Midlands) are carrying out Utility asset works on Telford Way, Priorslee, Telford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 April 2025 at 11:02 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 1 May 2025 at 15:55.
Friday
Telford & Wrekin Council are carrying out Highway improvement works on Vineyard Road, Wellington, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:21 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 29 Apr 2025 at 15:59.
Friday
Cadent Gas were proposing to carry out Utility asset works on Coniston Drive, Priorslee, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 09:37.
16 Jun 2025
Telford & Wrekin Council are carrying out Highway improvement works on Mill Farm Drive, Randlay, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 09:16 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 20 May 2025 at 09:18.
19 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Coniston Drive, Priorslee, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 11:00.
19 May and 13 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Coniston Drive, Priorslee, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 13:38.
19 May and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Pool Meadow, Hadley, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 10:18.
13 Jun 2025
Telford & Wrekin Council are carrying out Highway improvement works on Oakengates Road, Donnington, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 11:01 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 19 May 2025 at 11:04.
27 May and 13 Jun 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Mound Way, Woodside, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 24 Feb 2025 at 15:06.
27 May and 13 Jun 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Mill Farm Drive, Randlay, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 13 Feb 2025 at 14:03.
27 May and 13 Jun 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Garfield Road, Overdale, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 27 Feb 2025 at 16:07.
27 May and 13 Jun 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Shepherds Lane, Red Lake, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 27 Feb 2025 at 13:39.
27 May and 7 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Pool Meadow, Hadley, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 7 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 13:15.
27 May and 13 Jun 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Oakengates Road, Donnington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 4 Mar 2025 at 13:34.
27 May and 23 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Muxton Lane, Muxton, Telford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:33.
Saturday
Telford & Wrekin Council are carrying out Highway improvement works on Queensway Dual Carriage Brookside To Trench Lock, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 00:00 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 3 Jun 2025 at 07:50.
2 and 27 Jun 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Castle Farm Way, Priorslee, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 27 Mar 2025 at 08:25.
2 and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Derwent Drive, Priorslee, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 11:19.
2 and 20 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Derwent Drive, Priorslee, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 13:43.
2 Jun and 31 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Priorslee Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Jan 2025 at 16:13.
2 Jun and 31 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Priorslee Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Feb 2025 at 15:24.
2 Jun and 31 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Priorslee Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Feb 2025 at 09:40.
2 Jun and 31 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Priorslee Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 25 Mar 2025 at 13:24.
31 Jul 2025
Western Power Distribution (West Midlands) are carrying out Utility asset works on Priorslee Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 17:00 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Jun 2025 at 08:27.
6 and 10 Jun 2025
BT were proposing to carry out Utility repair and maintenance works on Pool Hill Road, Horsehay, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 June 2025 and run through until 10 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 17 Mar 2025 at 10:28.
9 and 13 Jun 2025
Shropshire Council are proposing to carry out Highway repair and maintenance works on Much Wenlock Road, Buildwas, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Shropshire Council on 16 Apr 2025 at 14:52.
9 and 12 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Crescent, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 25 Mar 2025 at 14:23.
10 and 12 Jun 2025
BT were proposing to carry out Utility asset works on St Leonards Road, Malinslee, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Mar 2025 at 15:30.
11 and 16 Jun 2025
Virgin Media are proposing to carry out New service connection on Hill Top Road, Oakengates, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 28 Mar 2025 at 09:34.
11 and 13 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on Kynnersley To Tibberton Junction, Kynnersley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 24 Mar 2025 at 12:01.
16 and 18 Jun 2025
BT were proposing to carry out Utility repair and maintenance works on Pool Hill Road, Horsehay, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 18 Mar 2025 at 10:31.
16 and 30 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Snedshill Way, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Jan 2025 at 16:13.
16 and 18 Jun 2025
BT are proposing to carry out Utility asset works on Ketley Brook, Ketley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 27 Mar 2025 at 14:39.
16 Jun and 11 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Boundary At Walcot To Withington Junction B4394, Walcot, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 16 Apr 2025 at 14:50.
16 and 20 Jun 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Boundary At Walcot To Withington Junction B4394, Walcot, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 16 Apr 2025 at 15:52.
16 and 20 Jun 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Boundary At Walcot To Withington Junction B4394, Walcot, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 6 May 2025 at 14:49.
16 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Crescent Road, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 13:32.
16 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Crescent Road, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 00:10.
16 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Church Street, Hadley, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 10:23.
16 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Union Street, Hadley, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 10:18.
17 and 19 Jun 2025
BT are proposing to carry out Utility asset works on St Leonards Road, Malinslee, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Mar 2025 at 08:48.
17 Jun and 24 Jul 2025
Shropshire Council were proposing to carry out Highway improvement works on B5061 From Uppington Junction To Telford And Wrekin District Boundary, Blue Bell, Uppington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 June 2025 and run through until 24 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Shropshire Council on 7 Apr 2025 at 11:46.
23 and 26 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Haybridge Avenue, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Mar 2025 at 13:38.
23 Jun and 18 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Church Street, Hadley, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 13:16.
23 Jun and 7 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Union Street, Hadley, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 7 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 13:17.
23 Jun and 24 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Wellington Road, Admaston, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 24 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 15:56.
30 Jun and 25 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Castle Farm Way, Priorslee, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 17 Apr 2025 at 09:36.
30 Jun and 11 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Castle Farm Way, Priorslee, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 14 May 2025 at 10:32.
30 Jun and 2 Jul 2025
BT were proposing to carry out Utility asset works on Walker Street, Wellington, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Apr 2025 at 11:48.
2 and 4 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holly Road, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 7 Apr 2025 at 11:54.
2 and 4 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holly Road, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 28 Apr 2025 at 08:04.
2 and 4 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kynnersley To Tibberton Junction, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 22 Apr 2025 at 14:05.
2 and 4 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kynnersley To Tibberton Junction, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 29 Apr 2025 at 12:04.
7 and 18 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Castle Farm Way, Priorslee, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 21 May 2025 at 13:55.
7 and 23 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Limekiln Roundabout To Scc Boundary Redhill, Redhill, Telford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 23 July 2025. The works will impact the verge only.
This roadwork event was last updated by Telford & Wrekin Council on 28 May 2025 at 13:29.
8 and 10 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Queensway Dual Carriage Brookside To Trench Lock, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 26 Mar 2025 at 11:25.
8 and 10 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Queensway Dual Carriage Brookside To Trench Lock, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 1 Apr 2025 at 09:45.
8 and 11 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Trench Lock, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Apr 2025 at 16:30.
8 and 11 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Trench Lock, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Apr 2025 at 16:30.
8 and 11 Jul 2025
Western Power Distribution (West Midlands) were proposing to carry out Remedial works on Trench Lock, Hadley, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Apr 2025 at 14:09.
14 and 18 Jul 2025
Shropshire Council are proposing to carry out Highway repair and maintenance works on Much Wenlock Road, Buildwas, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Shropshire Council on 10 Apr 2025 at 17:08.
14 Jul and 5 Sep 2025
Severn Trent Water are proposing to carry out Diversionary works on Buildwas Road, Ironbridge, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 2 Jun 2025 at 14:44.
14 Jul and 5 Sep 2025
Severn Trent Water are proposing to carry out Diversionary works on Much Wenlock Road, Buildwas, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 2 Jun 2025 at 14:42.
14 Jul and 5 Sep 2025
Severn Trent Water are proposing to carry out Diversionary works on B4380 From Junction With Park View To Junction With A4169 Much Wenlock Road, Buildwas, Shropshire.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 2 Jun 2025 at 14:39.
14 Jul and 8 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Holyhead Road, Snedshill, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Telford & Wrekin Council on 17 Apr 2025 at 09:45.
14 and 18 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Holyhead Road, Snedshill, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Telford & Wrekin Council on 7 May 2025 at 09:37.
14 and 18 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Holyhead Road, Snedshill, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Telford & Wrekin Council on 20 May 2025 at 11:04.
14 Jul and 10 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Waterloo Road, Hadley, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 16:08.
18 and 22 Jul 2025
BT were proposing to carry out Utility asset works on St Leonards Road, Malinslee, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 July 2025 and run through until 22 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 9 May 2025 at 10:52.
21 Jul and 15 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Stafford Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 17 Apr 2025 at 09:52.
21 Jul and 1 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Stafford Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 24 Apr 2025 at 09:21.
21 and 25 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Stafford Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 27 May 2025 at 15:07.
21 Jul and 15 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on West Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 17 Apr 2025 at 09:52.
21 Jul and 1 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on West Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 24 Apr 2025 at 09:47.
21 and 25 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on West Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 27 May 2025 at 15:07.
21 Jul and 15 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Gower Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 17 Apr 2025 at 10:02.
21 Jul and 1 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Gower Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 24 Apr 2025 at 09:43.
21 and 25 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Gower Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 27 May 2025 at 15:07.
21 Jul and 15 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Church Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 17 Apr 2025 at 09:52.
21 Jul and 1 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Church Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 24 Apr 2025 at 09:43.
21 and 25 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Church Street, St Georges, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 27 May 2025 at 15:07.
21 and 25 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Boundary At Walcot To Withington Junction B4394, Walcot, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 29 Apr 2025 at 15:40.
21 Jul and 15 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Sunningdale, Hadley, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 15:58.
21 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Hadley, Telford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 15:17.
21 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Hadley, Telford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:28.
21 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Stadium Way, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 15:22.
21 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Stadium Way, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 9 May 2025 at 08:10.
21 Jul and 15 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Stadium Way, Hadley, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 14:51.
21 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Court, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 14:49.
22 and 24 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Queensway Jiggers Bank Roundabout To Brookside Roundabout, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 26 Mar 2025 at 12:26.
22 and 24 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Queensway Jiggers Bank Roundabout To Brookside Roundabout, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 1 Apr 2025 at 09:18.
22 and 24 Jul 2025
Telford & Wrekin Council were proposing to carry out Highway improvement works on Brockton Way, Cuckoo Oak, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 July 2025 and run through until 24 July 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 24 Mar 2025 at 07:47.
22 and 24 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Brockton Way, Cuckoo Oak, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 26 Mar 2025 at 12:26.
22 and 24 Jul 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Brockton Way, Cuckoo Oak, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 1 Apr 2025 at 09:41.
22 Jul 2025 and 22 Jul 2026
Severn Trent Water are proposing to carry out Utility repair and maintenance works on A518 Hortonwood Roundabout To Trench Lock Interchange, Hortonwood, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 22 July 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 9 May 2025 at 09:53.
23 Jul and 11 Aug 2025
Western Power Distribution (West Midlands) are proposing to carry out Diversionary works on Buildwas Bank, Buildwas, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 27 May 2025 at 14:18.
28 Jul and 1 Aug 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Holly Road, Little Dawley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 9 Apr 2025 at 13:08.
28 Jul and 1 Aug 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Holly Road, Little Dawley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 May 2025 at 13:50.
28 and 30 Jul 2025
BT were proposing to carry out Utility asset works on Aston Lane, Aston, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 2 May 2025 at 13:40.
28 and 30 Jul 2025
BT are proposing to carry out Utility asset works on Walker Street, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 8 May 2025 at 10:32.
28 and 30 Jul 2025
BT were proposing to carry out Utility asset works on Walker Street, Wellington, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 20 May 2025 at 15:46.
28 Jul and 22 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Haybridge Avenue, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 17 Apr 2025 at 10:07.
28 Jul and 8 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Haybridge Avenue, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 13 May 2025 at 10:15.
28 Jul and 8 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Haybridge Avenue, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 15 May 2025 at 09:29.
29 Jul and 18 Aug 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Furnace Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Jan 2025 at 16:13.
29 Jul and 18 Aug 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Furnace Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Feb 2025 at 15:24.
29 Jul and 18 Aug 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Furnace Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Feb 2025 at 09:40.
29 Jul and 18 Aug 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Furnace Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Mar 2025 at 14:23.
4 and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Castlefields Way, Aqueduct, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 11:57.
4 and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Castlefields Way, Aqueduct, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 14:46.
4 and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Castlefields Way, Aqueduct, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 14:05.
4 and 8 Aug 2025
Independent Water Networks are proposing to carry out Utility asset works on Duce Drive, Dawley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Independent Water Networks on 20 May 2025 at 16:01.
4 and 8 Aug 2025
Independent Water Networks are proposing to carry out Utility asset works on Duce Drive, Dawley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Independent Water Networks on 21 May 2025 at 13:44.
4 and 6 Aug 2025
BT are proposing to carry out Utility asset works on Aston Lane, Aston, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 6 May 2025 at 11:37.
5 and 7 Aug 2025
Severn Trent Water are proposing to carry out New service connection on Rodway Crudgington Moors Road Junction T, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 9 May 2025 at 13:36.
5 and 7 Aug 2025
Severn Trent Water are proposing to carry out New service connection on Rodway Crudgington Moors Road Junction T, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 May 2025 at 15:04.
11 and 29 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Shutfield Road, Aqueduct, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 29 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 16:12.
11 and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Shutfield Road, Aqueduct, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 14:10.
11 and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Shutfield Road, Aqueduct, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 09:49.
11 and 29 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Garbett Road, Aqueduct, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 12:59.
11 and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Garbett Road, Aqueduct, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 14:14.
11 and 13 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Lawley Drive, Lawley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 20 May 2025 at 15:13.
11 and 13 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Lawley Drive, Lawley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 21 May 2025 at 16:10.
11 and 13 Aug 2025
BT were proposing to carry out Utility asset works on St Leonards Road, Malinslee, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 13 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 14 May 2025 at 10:21.
11 and 13 Aug 2025
Cadent Gas are proposing to carry out Remedial works on The Rock, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:40.
11 Aug and 5 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on High Street, Hadley, Telford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 15:39.
11 Aug and 5 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Stadium Way, Hadley, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 15:37.
11 Aug and 5 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Victoria Court, Hadley, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 14:02.
11 Aug and 5 Sep 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Church Road, Wrockwardine Wood, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 17 Apr 2025 at 10:23.
13 and 15 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Kynnersley To Tibberton Junction, Kynnersley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 May 2025 at 15:05.
13 and 15 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Kynnersley To Tibberton Junction, Kynnersley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 May 2025 at 11:57.
18 and 20 Aug 2025
BT are proposing to carry out Utility asset works on Crackshall Lane, Coalbrookdale, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 May 2025 at 10:21.
18 and 22 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Church Road, Wrockwardine Wood, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 24 Apr 2025 at 15:40.
18 and 22 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Church Road, Wrockwardine Wood, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 20 May 2025 at 15:43.
18 and 20 Aug 2025
BT are proposing to carry out Remedial works on Donnington Drive, The Humbers, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 23 May 2025 at 10:02.
19 and 21 Aug 2025
Cadent Gas are proposing to carry out Remedial works on The Rock, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 10:21.
19 and 29 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Roseway, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 29 Apr 2025 at 14:13.
19 and 22 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Roseway, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 15 May 2025 at 09:15.
19 and 29 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Wrekin Road, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 29 Apr 2025 at 14:26.
19 and 22 Aug 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Wrekin Road, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 15 May 2025 at 09:15.
19 and 21 Aug 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 May 2025 at 14:03.
22 Aug and 5 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Pool Meadow, Hadley, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 15:59.
25 Aug and 1 Sep 2025
Independent Water Networks are proposing to carry out Utility asset works on Duce Drive, Dawley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Independent Water Networks on 27 May 2025 at 13:51.
25 Aug and 1 Sep 2025
Independent Water Networks are proposing to carry out Utility asset works on Duce Drive, Dawley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Independent Water Networks on 30 May 2025 at 13:18.
25 and 28 Aug 2025
BT are proposing to carry out Utility asset works on Walker Street, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 22 May 2025 at 16:47.
26 and 28 Aug 2025
BT are proposing to carry out Utility asset works on King Street, Dawley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 23 May 2025 at 14:01.
26 and 28 Aug 2025
BT are proposing to carry out Utility asset works on Johnston Road, Dawley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 23 May 2025 at 13:54.
27 and 29 Aug 2025
Cadent Gas are proposing to carry out Remedial works on The Rock, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:13.
27 and 29 Aug 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lincoln Road, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 29 May 2025 at 09:23.
Roadworks Map near to TELFORD, TF6 6WB (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to TELFORD, TF6 6WB (40 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 May 2025 - 19 Jun 2025)
(Scheduled: 19 May 2025 - 19 Jun 2025)
(Scheduled: 6 Jan 2025 - 6 Jun 2025)
(Scheduled: 12 May 2025 - 27 Jun 2025)
(Scheduled: 2 Jun 2025 - 13 Jun 2025)
(Scheduled: 6 Jan 2025 - 6 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.