ROADWORKS SUMMARY
Wallshead Way, NEWPORT, TF10 9LT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wallshead Way, TF10 9LT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wallshead Way, NEWPORT, TF10 9LT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wallshead Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
LONG TERM
Between
16 Jun 2025 and 21 Aug 2026
Details
View Map
Share
Chatwell Lane

Severn Trent Water were proposing to carry out Utility asset works on Chatwell Lane, Weston Cross Roads, Blymhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 21 August 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Mar 2025 at 13:23.

Severn Trent Water logo
LONG TERM
Between
1 Jul 2025 and 24 Sep 2026
Details
View Map
Share
A41 From Pickmere Roundabout Watling Street To Kings Street Weston Heath End Of

Severn Trent Water were proposing to carry out Utility asset works on A41 From Pickmere Roundabout Watling Street To Kings Street Weston Heath End Of, Gorsey Bank.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 24 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Jul 2025 at 08:41.

Severn Trent Water logo
LONG TERM
Between
22 Jul 2025 and 22 Jul 2026
Details
View Map
Share
A518 Hortonwood Roundabout To Trench Lock Interchange

Severn Trent Water were proposing to carry out Utility repair and maintenance works on A518 Hortonwood Roundabout To Trench Lock Interchange, Hortonwood, Telford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 22 July 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 11 Jul 2025 at 13:23.

Severn Trent Water logo
LONG TERM
Between
29 Jul 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Road From Great Chatwell To Blymhill Marsh

Severn Trent Water are proposing to carry out Utility asset works on Road From Great Chatwell To Blymhill Marsh, Brineton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 30 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 19 May 2025 at 13:49.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Limekiln Lane

Cadent Gas are carrying out Utility asset works on Limekiln Lane, Lilleshall, Newport.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 17:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:47.

Telford & Wrekin Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Cherrington Grange To Sheep Bridge

Telford & Wrekin Council are carrying out Highway improvement works on Cherrington Grange To Sheep Bridge, Sheep Bridge, Newport.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 08:45 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Telford & Wrekin Council on 11 Aug 2025 at 08:49.

Severn Trent Water logo
LONG TERM
Between
11 Aug 2025 and 30 Oct 2026
Details
View Map
Share
Road From Great Chatwell To Blymhill Marsh

Severn Trent Water were proposing to carry out Utility asset works on Road From Great Chatwell To Blymhill Marsh, Brineton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 30 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Aug 2025 at 09:28.

Telford & Wrekin Council logo
LONG TERM
Between
11 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Cherrington Grange To Sheep Bridge

Telford & Wrekin Council are proposing to carry out Highway improvement works on Cherrington Grange To Sheep Bridge, Sheep Bridge, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Telford & Wrekin Council on 23 Jul 2025 at 15:18.

Cadent Gas logo
LONG TERM
Between
18 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Limekiln Lane

Cadent Gas are proposing to carry out Utility asset works on Limekiln Lane, Lilleshall, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 15:16.

Cadent Gas logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Willmoor Lane

Cadent Gas are proposing to carry out Utility asset works on Willmoor Lane, Lilleshall, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 15:16.

Cadent Gas logo
Between
8 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Chetwynd Grove

Cadent Gas are proposing to carry out Utility asset works on Chetwynd Grove, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:53.

BT logo
Finishing
Today
Details
View Map
Share
Pickstock Grange To Pickstock

BT were proposing to carry out Utility repair and maintenance works on Pickstock Grange To Pickstock, Pickstock, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 19 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 16 Jul 2025 at 11:30.

Staffordshire County Council logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Middle Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Middle Lane, Norbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 16:15.

Cadent Gas logo
LONG TERM
Between
22 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Avon Dale

Cadent Gas are proposing to carry out Utility asset works on Avon Dale, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:53.

Severn Trent Water logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Marsh Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Marsh Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Jul 2025 at 14:58.

Cadent Gas logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Strine Way

Cadent Gas are proposing to carry out Utility asset works on Strine Way, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:53.

Severn Trent Water logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Lincoln Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lincoln Road, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Jul 2025 at 16:06.

Staffordshire County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Lower Bromstead Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lower Bromstead Lane, Bromstead Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 May 2025 at 12:05.

Severn Trent Water logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Lincoln Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lincoln Road, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2025 at 11:49.

BT logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Pickstock To Ovens Bottom

BT are proposing to carry out Utility asset works on Pickstock To Ovens Bottom, Pickstock, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 21 Jul 2025 at 15:39.

BT logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Pickstock To Ovens Bottom

BT were proposing to carry out Utility asset works on Pickstock To Ovens Bottom, Pickstock, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 18 Jul 2025 at 15:23.

BT logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Greenvale

BT were proposing to carry out Utility asset works on Greenvale, Church Aston, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Jul 2025 at 08:33.

Telford & Wrekin Council logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
A41 Junction To Pave Lane Farm

Telford & Wrekin Council are proposing to carry out Highway improvement works on A41 Junction To Pave Lane Farm, Woodcote, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 17 Sep 2025 at 16:45.

Telford & Wrekin Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
High Street

Telford & Wrekin Council are proposing to carry out Highway improvement works on High Street, Edgmond, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 18 Jul 2025 at 10:31.

Telford & Wrekin Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
School Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on School Road, Edgmond, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 18 Jul 2025 at 10:35.

Cadent Gas logo
LONG TERM
Between
13 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Fair Oak

Cadent Gas are proposing to carry out Utility asset works on Fair Oak, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Jun 2025 at 11:10.

Cadent Gas logo
LONG TERM
Between
13 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Fair Oak

Cadent Gas are proposing to carry out Utility asset works on Fair Oak, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:53.

Telford & Wrekin Council logo
LONG TERM
Between
16 Oct and 1 Dec 2025
Details
View Map
Share
Follow
A41 Bloomsbury Sc Boundary To Chester Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on A41 Bloomsbury Sc Boundary To Chester Road, Woodcote, Newport.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 17 Sep 2025 at 15:11.

Telford & Wrekin Council logo
LONG TERM
Between
16 Oct and 1 Dec 2025
Details
View Map
Share
Follow
A41 Bloomsbury Sc Boundary To Chester Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on A41 Bloomsbury Sc Boundary To Chester Road, Woodcote, Newport.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 17 Sep 2025 at 15:29.

Cadent Gas logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Chetwynd Grove

Cadent Gas are proposing to carry out Utility asset works on Chetwynd Grove, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 08:45.

BT logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Pickstock To Ovens Bottom

BT are proposing to carry out Utility asset works on Pickstock To Ovens Bottom, Pickstock, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Jul 2025 at 11:18.

BT logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Pickstock To Ovens Bottom

BT are proposing to carry out Utility asset works on Pickstock To Ovens Bottom, Pickstock, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Sep 2025 at 11:22.

Severn Trent Water logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Kynnersley To Tibberton Junction

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kynnersley To Tibberton Junction, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Aug 2025 at 12:27.

Severn Trent Water logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Kynnersley To Tibberton Junction

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kynnersley To Tibberton Junction, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Aug 2025 at 16:46.

Cadent Gas logo
Between
27 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Mere Close

Cadent Gas are proposing to carry out Utility asset works on Mere Close, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:53.

Shropshire Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Lizard Lane

Shropshire Council are proposing to carry out Highway improvement works on Lizard Lane, Tong, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 17 Jun 2025 at 14:18.

Telford & Wrekin Council logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
School Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on School Road, Edgmond, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 18 Jul 2025 at 10:31.

Staffordshire County Council logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Beffcote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Beffcote Road, Church Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2025 at 10:20.

Cadent Gas logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Avon Dale

Cadent Gas are proposing to carry out Utility asset works on Avon Dale, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 08:54.

Telford & Wrekin Council logo
LONG TERM
Between
3 Nov and 3 Dec 2025
Details
View Map
Share
Follow
A41 Bloomsbury Sc Boundary To Chester Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on A41 Bloomsbury Sc Boundary To Chester Road, Woodcote, Newport.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 17 Sep 2025 at 15:25.

Telford & Wrekin Council logo
LONG TERM
Between
3 Nov and 3 Dec 2025
Details
View Map
Share
Follow
A41 Bloomsbury Sc Boundary To Chester Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on A41 Bloomsbury Sc Boundary To Chester Road, Woodcote, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 17 Sep 2025 at 15:42.

Severn Trent Water logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Kynnersley To Tibberton Junction

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kynnersley To Tibberton Junction, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 21 Aug 2025 at 12:46.

Severn Trent Water logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Kynnersley To Tibberton Junction

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kynnersley To Tibberton Junction, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 26 Aug 2025 at 10:41.

BT logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Pickstock Grange To Pickstock

BT are proposing to carry out Utility repair and maintenance works on Pickstock Grange To Pickstock, Pickstock, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 15 Aug 2025 at 11:43.

BT logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Pickstock Grange To Pickstock

BT were proposing to carry out Utility repair and maintenance works on Pickstock Grange To Pickstock, Pickstock, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2025 and run through until 7 November 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 28 Jul 2025 at 16:16.

Cadent Gas logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Strine Way

Cadent Gas are proposing to carry out Utility asset works on Strine Way, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 08:57.

BT logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Masons Place

BT are proposing to carry out Utility asset works on Masons Place, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Aug 2025 at 13:32.

BT logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Pickstock To Ovens Bottom

BT are proposing to carry out Utility asset works on Pickstock To Ovens Bottom, Pickstock, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 28 Aug 2025 at 08:48.

Cadent Gas logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Islington Close

Cadent Gas are proposing to carry out Utility asset works on Islington Close, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:53.

Staffordshire County Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Beffcote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Beffcote Road, Church Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2025 at 08:54.

Staffordshire County Council logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Middle Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Middle Lane, Norbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 13:23.

BT logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Pickstock To Ovens Bottom

BT are proposing to carry out Utility asset works on Pickstock To Ovens Bottom, Pickstock, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2025 at 12:48.

Cadent Gas logo
Between
1 and 24 Dec 2025
Details
View Map
Share
Follow
Mere Close

Cadent Gas are proposing to carry out Utility asset works on Mere Close, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 09:18.

Severn Trent Water logo
LONG TERM
Between
2 Dec 2025 and 30 Jun 2026
Details
View Map
Share
Follow
A518 Hortonwood Roundabout To Trench Lock Interchange

Severn Trent Water are proposing to carry out Statutory Infrastructure Works on A518 Hortonwood Roundabout To Trench Lock Interchange, Hortonwood, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Sep 2025 at 12:54.

Severn Trent Water logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Cordingley Way

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cordingley Way, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 12 Sep 2025 at 12:00.

Severn Trent Water logo
Between
11 and 13 Dec 2025
Details
View Map
Share
Follow
Marsh Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Marsh Road, Edgmond, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2025 and could run through until 13 December 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2025 at 09:20.

Severn Trent Water logo
Between
11 and 13 Dec 2025
Details
View Map
Share
Marsh Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Marsh Road, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2025 and run through until 13 December 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2025 at 12:44.

Cadent Gas logo
Between
15 and 31 Dec 2025
Details
View Map
Share
Follow
Forton Road

Cadent Gas are proposing to carry out Utility asset works on Forton Road, Newport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 10:00.


Roadworks Map near to Wallshead Way, NEWPORT, TF10 9LT (16 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Last Updated: 19 Sep 2025 00:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wallshead Way, NEWPORT, TF10 9LT (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Severn Trent Water logo
URGENT
  
ST ANDREWS WAY 
(0.1 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Give and take
Complete
18 Sep 2025 11:58 - 14:45
0.1
Details
Share
2
BT logo
GREENVALE, CHURCH ASTON 
(0.3 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 19 Sep 2025 - 22 Sep 2025
0.3
Details
Share
Follow
3
BT logo
FROM THE SPINNEY TO WALLSHEAD WAY, CHURCH ASTON 
(0.3 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 19 Sep 2025
0.3
Details
Share
Follow
4
Telford & Wrekin Council logo
UPPER BAR 
(0.3 miles)
Telford & Wrekin Council
Highway improvement works - Carriageway - Stop/go boards
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.3
Details
Share
Follow
5
Telford & Wrekin Council logo
GRAVELLY DRIVE 
(0.5 miles)
Telford & Wrekin Council
Highway improvement works - Carriageway - Stop/go boards
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.5
Details
Share
Follow
6
Telford & Wrekin Council logo
GRAVELLY DRIVE 
(0.5 miles)
Telford & Wrekin Council
Highway improvement works - Carriageway - Stop/go boards
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.5
Details
Share
Follow
7
Telford & Wrekin Council logo
GRAVELLY DRIVE 
(0.5 miles)
Telford & Wrekin Council
Highway improvement works - Carriageway - Stop/go boards
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.5
Details
Share
Follow
8
Telford & Wrekin Council logo
GRAVELLY DRIVE 
(0.5 miles)
Telford & Wrekin Council
Highway improvement works - Carriageway - Stop/go boards
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.5
Details
Share
Follow
9
Telford & Wrekin Council logo
VAUXHALL CRESCENT 
(0.6 miles)
Telford & Wrekin Council
Highway improvement works - Carriageway - Give and take
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.6
Details
Share
Follow
10
Telford & Wrekin Council logo
MAJOR
  
WATER LANE 
(0.7 miles)
Telford & Wrekin Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 20 Sep 2025 - 21 Sep 2025
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.