ROADWORKS SUMMARY
Heath Road, LONDON, SW8 3BB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Heath Road, SW8 3BB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Heath Road, LONDON, SW8 3BB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Heath Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Wandsworth logo
LONG TERM
Until
24 Feb 2026
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.

Thames Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Vulcan Road

Thames Water are carrying out roadworks on Vulcan Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2021 at 10:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 15:26.

London Borough Of Southwark logo
LONG TERM
Until
1 Jan 2026
Details
View Map
Share
Follow
Croft Street

London Borough Of Southwark are carrying out Highway improvement works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2022 at 00:00 and could run through until 1 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Oct 2025 at 10:51.

Network Rail logo
LONG TERM
Until
30 Jul 2026
Details
View Map
Share
Follow
Tanner Lane

Network Rail are carrying out Works for Rail Purposes on Tanner Lane, Westminster, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2022 at 07:30 and could run through until 30 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 Oct 2025 at 07:03.

Network Rail logo
LONG TERM
Until
30 Jul 2026
Details
View Map
Share
Follow
South Wharf Road

Network Rail are carrying out Works for Rail Purposes on South Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 07:30 and could run through until 30 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2025 at 07:03.

Network Rail logo
LONG TERM
Until
30 Jul 2026
Details
View Map
Share
Follow
Junction Place

Network Rail are carrying out Works for Rail Purposes on Junction Place, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 07:30 and could run through until 30 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2025 at 07:03.

London Borough Of Southwark logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 July 2023 at 00:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Sep 2025 at 22:44.

Transport for London (TfL) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.

Transport for London (TfL) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 21:46.

Transport for London (TfL) logo
LONG TERM
Between
17 Jan 2024 and 14 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.

Thames Water logo
LONG TERM
Until
13 Dec 2025
Details
View Map
Share
Follow
Eaton Square

Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 08:59.

Transport for London (TfL) logo
LONG TERM
Until
31 Mar 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:24.

Transport for London (TfL) logo
LONG TERM
Between
24 May 2024 and 7 Dec 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out roadworks on New Bridge Street, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 May 2024 and could run through until 7 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 15:51.

Transport for London (TfL) logo
LONG TERM
Between
10 Jun 2024 and 13 Apr 2026
Details
View Map
Share
Follow
Kennington Lane

Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2024 at 10:34.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2026
Details
View Map
Share
Follow
King William Street

City Of London Corporation are carrying out Highway repair and maintenance works on King William Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 30 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 8 Jul 2024 at 07:30.

London Borough Of Southwark logo
LONG TERM
Between
2 Jul 2024 and 27 Jan 2026
Details
View Map
Share
Follow
Sceaux Gardens

London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.

These works are categorised as Major.

The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.

London Borough Of Lambeth logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2025 at 09:44.

London Borough Of Wandsworth logo
LONG TERM
Until
27 Mar 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 27 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 08:43.

City Of Westminster logo
LONG TERM
Between
6 Oct 2024 and 31 Mar 2026
Details
View Map
Share
Oxford Street

City Of Westminster were proposing to carry out Section 50 on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2024 and run through until 31 March 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 13:24.

Transport for London (TfL) logo
LONG TERM
Between
11 Oct 2024 and 9 Jan 2026
Details
View Map
Share
Follow
Grosvenor Gardens

Transport for London (TfL) are proposing to carry out roadworks on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 9 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:26.

London Borough Of Southwark logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Colombo Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 1 Oct 2024 at 10:57.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 4 Oct 2024 at 12:17.

HS2 logo
LONG TERM
Between
28 Oct 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.

HS2 logo
LONG TERM
Until
28 Feb 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 01:00 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 4 Jul 2025 at 16:39.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.

Transport for London (TfL) logo
LONG TERM
Between
26 Nov 2024 and 5 Aug 2026
Details
View Map
Share
Follow
Bressenden Place

Transport for London (TfL) are proposing to carry out roadworks on Bressenden Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 5 August 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 18:13.

Thames Water logo
LONG TERM
Until
14 Dec 2025
Details
View Map
Share
Follow
Myddelton Square

Thames Water are carrying out Utility asset works on Myddelton Square, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:08 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:36.

Cadent Gas logo
LONG TERM
Until
19 Oct 2025
Details
View Map
Share
Follow
Lever Street

Cadent Gas are carrying out Utility asset works on Lever Street, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:54 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 11:37.

Thames Water logo
LONG TERM
Between
26 Jan and 28 Oct 2025
Details
View Map
Share
Renfrew Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 January 2025 and run through until 28 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 07:58.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:04.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 15:47.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:07.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2025 at 11:43.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are carrying out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:10.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2025 at 11:45.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:06.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Horseferry Road

Transport for London (TfL) are carrying out Highway improvement works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:06.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are carrying out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

London Borough Of Camden logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are carrying out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:00 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 1 Jul 2025 at 16:18.

Thames Water logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are carrying out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:50 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 06:37.

City Of Westminster logo
LONG TERM
Between
24 Mar and 28 Nov 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 6 Mar 2025 at 09:04.

City Of Westminster logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Mar 2025 at 09:14.

Thames Water logo
LONG TERM
Until
14 Dec 2025
Details
View Map
Share
Follow
Chadwell Street

Thames Water are carrying out Utility asset works on Chadwell Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 08:45 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:37.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
31 Mar and 24 Oct 2025
Details
View Map
Share
Eaton Square

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Eaton Square, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 6 May 2025 at 10:52.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:43.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:53.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are carrying out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Kirtling Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Jan 2025 at 10:43.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Jan 2025 at 18:59.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are carrying out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are carrying out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Jan 2025 at 12:09.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are carrying out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 10:09.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 10:05 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 Aug 2025 at 11:20.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Medway Street

Cadent Gas are proposing to carry out Utility asset works on Medway Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:48.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Monck Street

Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 06:23.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:14.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:42.

City Of London Corporation logo
LONG TERM
Until
10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are carrying out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 6 May 2025 at 09:10.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
St Mary Axe

City Of London Corporation were proposing to carry out Highway repair and maintenance works on St Mary Axe, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 10 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 16 Apr 2025 at 15:01.

Southern Gas Networks logo
LONG TERM
Between
12 May and 9 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 08:13.

Southern Gas Networks logo
LONG TERM
Between
12 May and 16 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 15:02.

Cadent Gas logo
LONG TERM
Until
6 Mar 2026
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are carrying out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:30 and could run through until 6 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 14:30.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Great Marlborough Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 May 2025 at 16:38.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Great Marlborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 14:35.

Cadent Gas logo
LONG TERM
Until
2 Dec 2025
Details
View Map
Share
Follow
Medway Street

Cadent Gas are carrying out Utility asset works on Medway Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 June 2025 at 10:33 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 11:20.

Cadent Gas logo
LONG TERM
Until
6 Mar 2026
Details
View Map
Share
Follow
Monck Street

Cadent Gas are carrying out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 June 2025 at 10:54 and could run through until 6 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 14:31.

LONG TERM
Between
9 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 1 May 2025 at 18:13.

LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are carrying out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 June 2025 at 08:00 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 18 Aug 2025 at 12:43.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 11:31.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 09:44.

Thames Water logo
LONG TERM
Until
1 Dec 2025
Details
View Map
Share
Follow
Kensington Gore

Thames Water are carrying out Utility repair and maintenance works on Kensington Gore, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 June 2025 at 13:30 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 09:59.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun 2025 and 23 Jun 2027
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 23 June 2027. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Jun 2025 at 17:32.

Southern Gas Networks logo
LONG TERM
Until
18 Oct 2025
Details
View Map
Share
Follow
Wakehurst Road

Southern Gas Networks are carrying out roadworks on Wakehurst Road, Battersea, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 June 2025 at 13:00 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2025 at 14:26.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 June 2025 at 08:00 and could run through until 20 June 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 June 2025 at 08:00 and could run through until 20 June 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 07:55.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 08:00 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Oct 2025 at 10:30.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment Slip Road (N)

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment Slip Road (N), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Temple Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Temple Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the footway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 13:56.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Temple Place

Transport for London (TfL) were proposing to carry out Highway improvement works on Temple Place, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 14:03.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Blackfriars Passage

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 13:58.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Carmelite Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Carmelite Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

London Borough Of Southwark logo
LONG TERM
Between
1 Jul 2025 and 22 Feb 2026
Details
View Map
Share
Follow
Stoney Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 22 February 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 24 Jul 2025 at 15:58.

London Borough Of Camden logo
LONG TERM
Between
2 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 2 Apr 2025 at 12:11.

London Borough Of Southwark logo
LONG TERM
Between
4 Jul 2025 and 3 Jul 2026
Details
View Map
Share
Follow
Great Dover Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Great Dover Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 3 July 2026. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 13 Jun 2025 at 11:21.

London Borough Of Southwark logo
LONG TERM
Between
4 Jul 2025 and 3 Jul 2026
Details
View Map
Share
Great Dover Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Great Dover Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 3 July 2026. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Jun 2025 at 07:13.

Transport for London (TfL) logo
LONG TERM
Between
6 Jul and 24 Nov 2025
Details
View Map
Share
Follow
Gray's Inn Road

Transport for London (TfL) are proposing to carry out roadworks on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Aug 2025 at 08:54.

City Of Westminster logo
LONG TERM
Between
7 Jul 2025 and 7 Jul 2026
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 July 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 3 Apr 2025 at 12:08.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
King Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on King Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Sep 2025 at 16:01.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
King Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on King Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 October 2025. The works were due to impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Sep 2025 at 16:03.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Jul and 12 Dec 2025
Details
View Map
Share
Follow
Falcon Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 22 May 2025 at 08:21.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul 2025 and 12 Jul 2027
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 12:41.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul 2025 and 12 Jul 2027
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 July 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 14:21.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

London Borough Of Wandsworth logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Falcon Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 08:00 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 09:33.

City Of Westminster logo
LONG TERM
Between
21 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 23 Apr 2025 at 12:58.

City Of Westminster logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are carrying out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2025 at 08:00 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 09:13.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 6 Jan 2026
Details
View Map
Share
Follow
King's Cross Road

Transport for London (TfL) are proposing to carry out roadworks on King's Cross Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 11:20.

Thames Tideway Tunnel logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Croft Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2025 at 00:00 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 29 Sep 2025 at 10:07.

London Borough Of Southwark logo
LONG TERM
Until
20 Feb 2026
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 08:07.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:38.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 20 Oct 2025
Details
View Map
Share
Follow
Curtain Road

Transport for London (TfL) are proposing to carry out roadworks on Curtain Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Aug 2025 at 09:57.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 19 Dec 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 19 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 09:38.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 14 Nov 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 10:07.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 1 Jun 2026
Details
View Map
Share
St John Street

Thames Water were proposing to carry out Utility asset works on St John Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 1 June 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jun 2025 at 13:35.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:56.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Chadwick Road

Thames Water are proposing to carry out Utility asset works on Chadwick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Chadwick Road

Thames Water are carrying out Utility asset works on Chadwick Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 08:30 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:58.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Grove Park

Thames Water are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Grove Park

Thames Water are carrying out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 08:30 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:57.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Linwood Close

Thames Water are proposing to carry out Utility asset works on Linwood Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 16:51.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Linwood Close

Thames Water are carrying out Utility asset works on Linwood Close, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2025 at 08:30 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:57.

UK Power Networks Eastern & London logo
LONG TERM
Between
30 Jul and 20 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2025 at 11:35.

Transport for London (TfL) logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Westminster Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westminster Bridge Road, St James's, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2025 at 12:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 14:57.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Victoria Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:55.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Blackfriars Underpass

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:54.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Blackfriars Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:53.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Victoria Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Victoria Embankment, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:54.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Victoria Embankment Slip Road (N)

Transport for London (TfL) were proposing to carry out Highway improvement works on Victoria Embankment Slip Road (N), London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:55.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Temple Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Temple Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the footway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 09:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Temple Place

Transport for London (TfL) were proposing to carry out Highway improvement works on Temple Place, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:56.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Blackfriars Passage

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 09:48.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Carmelite Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Carmelite Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 09:49.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Queen Victoria Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:55.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
New Bridge Street

Transport for London (TfL) were proposing to carry out Highway improvement works on New Bridge Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:56.

Transport for London (TfL) logo
LONG TERM
Between
2 Aug and 21 Dec 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 August 2025 and run through until 21 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 10:03.

Transport for London (TfL) logo
LONG TERM
Between
2 Aug and 23 Dec 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 August 2025 and run through until 23 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 09:58.

Cadent Gas logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Greenside Road

Cadent Gas are carrying out Utility asset works on Greenside Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 March 2025 at 08:27 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 10:30.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:07.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:02.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 26 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 10:17.

Transport for London (TfL) logo
LONG TERM
Until
27 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are carrying out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:07.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:04.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are carrying out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:06.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are carrying out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:28.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are carrying out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:50.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Glengarry Road

Thames Water are carrying out Remedial works on Glengarry Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 29 Oct 2025
Details
View Map
Share
Walworth Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Walworth Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 13:24.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 29 Oct 2025
Details
View Map
Share
Elephant And Castle

Transport for London (TfL) were proposing to carry out Highway improvement works on Elephant And Castle, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 13:25.

Thames Water logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are carrying out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:30 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 06:36.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Nelson Street

Thames Water were proposing to carry out Utility asset works on Nelson Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 13:25.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Nelson Street

Thames Water are proposing to carry out Utility asset works on Nelson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:56.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Ashfield Street

Thames Water were proposing to carry out Utility asset works on Ashfield Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 09:22.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Ashfield Street

Thames Water are proposing to carry out Utility asset works on Ashfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:50.

LONG TERM
Between
4 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
St John Street

London Borough Of Islington are proposing to carry out Highway improvement works on St John Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 3 Apr 2025 at 11:45.

LONG TERM
Between
4 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Cowcross Street

London Borough Of Islington are proposing to carry out Highway improvement works on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 27 February 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 8 Apr 2025 at 13:19.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 26 Dec 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 26 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jul 2025 at 16:58.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 26 Dec 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 15:43.

Transport for London (TfL) logo
LONG TERM
Until
26 Dec 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are carrying out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 26 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 11:40.

Thames Water logo
LONG TERM
Between
5 Aug 2025 and 5 Jan 2026
Details
View Map
Share
Follow
Salcott Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 5 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Jedburgh Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.

Thames Water logo
LONG TERM
Between
12 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Mysore Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:39.

Thames Water logo
LONG TERM
Between
18 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Millbank

Thames Water are proposing to carry out Utility asset works on Millbank, Vincent Square, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 08:35.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 08:39.

Transport for London (TfL) logo
LONG TERM
Between
18 Aug 2025 and 2 Mar 2026
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out roadworks on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The works will start on or after 18 August 2025 and could run through until 2 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 13:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 11:41.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Aug 2025 at 13:33.

Transport for London (TfL) logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are carrying out Highway improvement works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 08:00 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 15:34.

Transport for London (TfL) logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Sussex Gardens

Transport for London (TfL) are carrying out Highway improvement works on Sussex Gardens, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 08:00 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 15:46.

Transport for London (TfL) logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Old Marylebone Road

Transport for London (TfL) are carrying out Highway improvement works on Old Marylebone Road, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 08:00 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 15:20.

Transport for London (TfL) logo
LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 12 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.

Thames Water logo
LONG TERM
Between
25 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Chadwick Street

Thames Water are proposing to carry out Utility repair and maintenance works on Chadwick Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 07:36.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Chadwick Street

Thames Water are carrying out Utility repair and maintenance works on Chadwick Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 13:43.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 13:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 15:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Surrey Quays Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 11:47.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 Aug and 28 Oct 2025
Details
View Map
Share
Follow
Kemble Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Kemble Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jun 2025 at 08:03.

UK Power Networks Eastern & London logo
LONG TERM
Until
28 Oct 2025
Details
View Map
Share
Follow
Kemble Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Kemble Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 11:55 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Aug 2025 at 12:38.

UK Power Networks Eastern & London logo
LONG TERM
Until
22 Oct 2025
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:00 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 11:01.

BT logo
LONG TERM
Between
27 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

BT are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by BT on 27 May 2025 at 08:11.

BT logo
LONG TERM
Between
27 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Redriff Road

BT are proposing to carry out Utility repair and maintenance works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by BT on 27 May 2025 at 08:11.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Aug and 28 Oct 2025
Details
View Map
Share
Follow
Wild Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wild Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jun 2025 at 18:27.

London Borough Of Camden logo
LONG TERM
Between
28 Aug and 20 Dec 2025
Details
View Map
Share
Follow
Keeley Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Keeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 14 Jul 2025 at 16:04.

London Borough Of Camden logo
LONG TERM
Between
28 Aug and 20 Dec 2025
Details
View Map
Share
Follow
Keeley Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Keeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 14 Aug 2025 at 07:26.

London Borough Of Camden logo
LONG TERM
Until
20 Dec 2025
Details
View Map
Share
Follow
Keeley Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Keeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 08:00 and could run through until 20 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 28 Aug 2025 at 08:57.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Swinton Street

Transport for London (TfL) are carrying out Highway improvement works on Swinton Street, King's Cross, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2025 at 14:58.

LONG TERM
Until
3 Mar 2026
Details
View Map
Share
Follow
St John Street

London Borough Of Islington are carrying out Highway improvement works on St John Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 3 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 1 Sep 2025 at 08:40.

UK Power Networks Eastern & London logo
LONG TERM
Until
14 May 2026
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:00 and could run through until 14 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 10:11.

UK Power Networks Eastern & London logo
LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Acacia Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:30 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 13:14.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on St John's Wood Park, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 09:26.

UK Power Networks Eastern & London logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on St John's Wood Park, Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:30 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 13:13.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Fieldend Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldend Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:43.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Greenock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenock Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:26.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Churchmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchmore Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Stockport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockport Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Woodmansterne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.

London Borough Of Lambeth logo
LONG TERM
Between
1 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 27 May 2025 at 14:20.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Lordship Lane

Thames Water were proposing to carry out Utility asset works on Lordship Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:00.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lordship Lane

Thames Water are carrying out Utility asset works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 14:15 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 16:03.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 13:04.

Southern Gas Networks logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 07:30 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 07:58.

London Borough Of Southwark logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 29 Jul 2025 at 09:31.

London Borough Of Southwark logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2025 at 08:24.

London Borough Of Southwark logo
LONG TERM
Until
28 Oct 2025
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are carrying out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Sep 2025 at 08:35.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Champion Grove

London Borough Of Southwark were proposing to carry out Highway improvement works on Champion Grove, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 12 Jun 2025 at 08:07.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Grove Lane

London Borough Of Southwark were proposing to carry out Highway improvement works on Grove Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 12 Jun 2025 at 08:05.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Stories Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Stories Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 12 Jun 2025 at 08:06.

London Borough Of Lambeth logo
LONG TERM
Between
2 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 23 May 2025 at 14:25.

London Borough Of Lambeth logo
LONG TERM
Between
2 Sep and 1 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 30 May 2025 at 11:00.

BT logo
LONG TERM
Between
3 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Queenstown Road

BT are proposing to carry out Utility repair and maintenance works on Queenstown Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by BT on 28 Aug 2025 at 08:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Varcoe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Varcoe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 13:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Varcoe Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 16:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 14:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 12:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Bramcote Grove

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 16:32.

London Borough Of Bromley logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Auckland Road

London Borough Of Bromley are carrying out Highway improvement works on Auckland Road, Anerley.

These works are categorised as Major.

The works started on 4 September 2025 at 12:57 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 7 Oct 2025 at 17:19.

Transport for London (TfL) logo
LONG TERM
Between
4 Sep and 25 Dec 2025
Details
View Map
Share
Follow
Walworth Road

Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 25 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2025 at 14:49.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Hinde Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hinde Street, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 06:55.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Lancaster Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lancaster Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 17:20.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Lancaster Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lancaster Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 14:38.

Southern Gas Networks logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Lancaster Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Lancaster Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 12:28.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Webber Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Webber Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 17:20.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Webber Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Webber Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 14:46.

Southern Gas Networks logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Webber Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Webber Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 12:28.

City Of Westminster logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Shepherd Market

City Of Westminster are carrying out Highway repair and maintenance works on Shepherd Market, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 15:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 8 Sep 2025 at 15:48.

City Of Westminster logo
LONG TERM
Between
8 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Connaught Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 13:58.

City Of Westminster logo
LONG TERM
Until
17 Nov 2025
Details
View Map
Share
Follow
Connaught Street

City Of Westminster are carrying out Highway repair and maintenance works on Connaught Street, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 08:00 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Sep 2025 at 09:20.

City Of Westminster logo
LONG TERM
Between
8 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 14:05.

City Of Westminster logo
LONG TERM
Until
17 Nov 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are carrying out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 08:00 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Sep 2025 at 09:20.

City Of Westminster logo
LONG TERM
Between
8 Sep and 14 Nov 2025
Details
View Map
Share
Connaught Square

City Of Westminster were proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Jul 2025 at 13:25.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Howland Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Howland Street, Bloomsbury, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:48.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Whitfield Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Whitfield Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:41.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Pentonville Road

Thames Water are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works will start on or after 8 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 14:51.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Pentonville Road

Thames Water are carrying out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works started on 8 September 2025 at 13:26 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 13:53.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:35.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:36.

BT logo
LONG TERM
Until
15 Dec 2025
Details
View Map
Share
Follow
Queenstown Road

BT are carrying out Utility repair and maintenance works on Queenstown Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 10:04 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Oct 2025 at 15:55.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 11:52 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Oct 2025 at 13:11.

London Borough Of Southwark logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are carrying out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 11:51 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Sep 2025 at 11:57.

Thames Water logo
LONG TERM
Between
8 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Ambrosden Avenue

Thames Water are proposing to carry out Utility asset works on Ambrosden Avenue, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 08:04.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep and 30 Dec 2025
Details
View Map
Share
Bishopsgate

Transport for London (TfL) were proposing to carry out roadworks on Bishopsgate, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 30 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2025 at 11:15.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep and 30 Dec 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2025 at 11:41.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Shirland Road

Cadent Gas are carrying out Utility repair and maintenance works on Shirland Road, Harrow Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 13:09 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Oct 2025 at 09:06.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Alexandra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:22.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Alexandra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:55.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:21.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:53.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 11:16.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
St Stephen's Crescent

Southern Gas Networks are carrying out Utility repair and maintenance works on St Stephen's Crescent, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2025 at 16:45 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2025 at 10:29.

London Borough Of Croydon logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Beulah Crescent

London Borough Of Croydon are proposing to carry out Section 50 on Beulah Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Croydon on 10 Sep 2025 at 12:47.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Hawkes Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 08:11.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 14:42.

Thames Water logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are carrying out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 11:00 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 11:06.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Barry Road

Thames Water are carrying out Utility repair and maintenance works on Barry Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 18:00 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 11:39.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Guildford Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Guildford Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jun 2025 at 14:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep 2025 and 9 Jan 2026
Details
View Map
Share
Raymouth Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 9 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 15:09.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Cowley Street

Thames Water are proposing to carry out Utility asset works on Cowley Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:26.

Thames Water logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Cowley Street

Thames Water are carrying out Utility asset works on Cowley Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:30 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:37.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Lord North Street

Thames Water are proposing to carry out Utility asset works on Lord North Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:26.

Thames Water logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Lord North Street

Thames Water are carrying out Utility asset works on Lord North Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:30 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:55.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Barton Street

Thames Water are proposing to carry out Utility asset works on Barton Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:27.

Thames Water logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Barton Street

Thames Water are carrying out Utility asset works on Barton Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:30 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:54.

UK Power Networks Eastern & London logo
LONG TERM
Until
5 Dec 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:00 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2025 at 10:11.

London Borough Of Southwark logo
LONG TERM
Between
15 Sep and 26 Nov 2025
Details
View Map
Share
Follow
Wilson Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Wilson Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Jul 2025 at 10:55.

London Borough Of Southwark logo
LONG TERM
Until
26 Nov 2025
Details
View Map
Share
Follow
Wilson Grove

London Borough Of Southwark are carrying out Highway improvement works on Wilson Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Sep 2025 at 08:01.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 15:49.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 11:32.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 15:49.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 16:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Park Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jul 2025 at 13:47.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Park Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2025 at 14:47.

UK Power Networks Eastern & London logo
LONG TERM
Until
18 Nov 2025
Details
View Map
Share
Follow
Park Street

UK Power Networks Eastern & London are carrying out Utility asset works on Park Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2025 at 19:15.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep 2025 and 26 May 2026
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out roadworks on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 14:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep 2025 and 20 Jan 2026
Details
View Map
Share
Gresham Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Gresham Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 20 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2025 at 23:31.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Southwick Street

Thames Water are carrying out Utility repair and maintenance works on Southwick Street, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 08:06.

City Of London Corporation logo
LONG TERM
Between
15 Sep 2025 and 15 Sep 2026
Details
View Map
Share
Follow
South Place

City Of London Corporation are proposing to carry out Highway improvement works on South Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 15 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 23 Jun 2025 at 15:06.

City Of London Corporation logo
LONG TERM
Until
15 Sep 2026
Details
View Map
Share
Follow
South Place

City Of London Corporation are carrying out Highway improvement works on South Place, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 15 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 15 Sep 2025 at 09:17.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 12:23.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Larkhall Rise

Thames Water are carrying out Utility repair and maintenance works on Larkhall Rise, Clapham Town, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 10:00 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 08:53.

National Grid Electricity Transmission logo
Finishing
Wednesday
Details
View Map
Share
Follow
Magdalen Road

National Grid Electricity Transmission are carrying out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 10:30 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Grid Electricity Transmission on 29 Sep 2025 at 12:23.

Thames Water logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Ambrosden Avenue

Thames Water are carrying out Utility asset works on Ambrosden Avenue, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 11:00 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 12:58.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Tarbert Road

Thames Water are carrying out Disconnection or alteration of supply on Tarbert Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2025 at 14:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 15:15.

London Borough Of Hammersmith & Fulham logo
Finishing
Tuesday
Details
View Map
Share
Follow
Woolneigh Street

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Woolneigh Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2025 at 08:00 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 6 Oct 2025 at 14:42.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
19 Sep and 20 Nov 2025
Details
View Map
Share
Follow
Woolneigh Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 09:25.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
19 Sep and 20 Nov 2025
Details
View Map
Share
Woolneigh Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 20 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 14:58.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
19 Sep and 20 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 09:25.

City Of London Corporation logo
LONG TERM
Between
19 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 23 Jun 2025 at 15:03.

City Of London Corporation logo
LONG TERM
Between
19 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Jul 2025 at 16:30.

City Of London Corporation logo
LONG TERM
Until
27 Oct 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are carrying out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2025 at 19:00 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 20 Sep 2025 at 00:24.

London Borough Of Southwark logo
LONG TERM
Between
22 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Lavington Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Lavington Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 17:35.

London Borough Of Southwark logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Lavington Street

London Borough Of Southwark are carrying out Highway improvement works on Lavington Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 09:13 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2025 at 09:21.

City Of Westminster logo
LONG TERM
Between
22 Sep and 23 Oct 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 09:40.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
St Quintin Avenue

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on St Quintin Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Sep 2025 at 12:11.

London Borough Of Camden logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Howland Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Howland Street, Bloomsbury, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:00 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Sep 2025 at 09:09.

London Borough Of Camden logo
LONG TERM
Until
5 Dec 2025
Details
View Map
Share
Follow
Whitfield Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Whitfield Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:00 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 22 Sep 2025 at 09:10.

City Of Westminster logo
LONG TERM
Between
22 Sep and 26 Oct 2025
Details
View Map
Share
Elgin Avenue

City Of Westminster were proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jul 2025 at 14:23.

London Borough Of Camden logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:00 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Sep 2025 at 09:09.

London Borough Of Camden logo
LONG TERM
Between
22 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 6 Aug 2025 at 18:06.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Euston Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 12:03.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:32.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
King's Cross Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:52.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
King's Cross Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 12:07.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:57.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:47.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:35.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:29.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Caledonian Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:45.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Caledonian Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 10:51.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 12:18.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 2 Nov 2025
Details
View Map
Share
Follow
St Anns Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:01.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Abbeville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 13:52.

London Borough Of Southwark logo
Between
22 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

The works will start on or after 22 September 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2025 at 10:10.

Thames Water logo
LONG TERM
Between
23 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Adderley Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Adderley Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:46.

Thames Water logo
Until
19 Oct 2025
Details
View Map
Share
Follow
King's Road

Thames Water are carrying out Utility repair and maintenance works on King's Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 11:30 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 13:18.

Thames Water logo
Until
19 Oct 2025
Details
View Map
Share
Follow
King's Road

Thames Water are carrying out Utility repair and maintenance works on King's Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 11:30 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 13:05.

London Borough Of Southwark logo
Finishing
Friday
Details
View Map
Share
Follow
Park Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Sep 2025 at 09:47.

London Borough Of Southwark logo
Finishing
Friday
Details
View Map
Share
Follow
Park Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Sep 2025 at 12:28.

City Of Westminster logo
LONG TERM
Between
23 Sep 2025 and 17 Feb 2027
Details
View Map
Share
Winnett Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Winnett Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 17 February 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 16:35.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Fitzhardinge Street

UK Power Networks Eastern & London are carrying out New service connection on Fitzhardinge Street, Marylebone High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 08:00 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2025 at 08:39.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Hinde Street

UK Power Networks Eastern & London are carrying out New service connection on Hinde Street, Marylebone High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 08:00 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2025 at 08:40.

City Of Westminster logo
LONG TERM
Between
24 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 5 November 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 3 Jun 2025 at 07:07.

City Of Westminster logo
LONG TERM
Until
5 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

City Of Westminster are carrying out Highway repair and maintenance works on Old Queen Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 September 2025 at 08:00 and could run through until 5 November 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 24 Sep 2025 at 09:05.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Enford Street

Thames Water are carrying out Utility repair and maintenance works on Enford Street, Bryanston & Dorset Square, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2025 at 09:45 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 14:38.

City Of Westminster logo
Finishing
Tuesday
Details
View Map
Share
Follow
Portsea Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsea Place, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 14:05.

London Borough Of Wandsworth logo
LONG TERM
Between
26 Sep 2025 and 28 Feb 2026
Details
View Map
Share
Follow
Burntwood Lane

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Burntwood Lane, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Sep 2025 at 12:24.

London Borough Of Wandsworth logo
LONG TERM
Until
28 Feb 2026
Details
View Map
Share
Follow
Burntwood Lane

London Borough Of Wandsworth are carrying out Works for road purposes on Burntwood Lane, Tooting, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 September 2025 at 08:00 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 3 Oct 2025 at 08:16.

Southern Gas Networks logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2025 at 01:00 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 08:29.

Southern Gas Networks logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Western Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2025 at 01:00 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 08:27.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Great Chertsey Road

Cadent Gas are carrying out roadworks on Great Chertsey Road, Chiswick, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 12:21.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Battersea Bridge Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2025 and run through until 13 October 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 12:05.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Great Chertsey Road

Cadent Gas are carrying out roadworks on Great Chertsey Road, Chiswick, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 12:21.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Burlington Lane

Cadent Gas are carrying out Utility repair and maintenance works on Burlington Lane, Chiswick, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 12:20.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 13:18.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:44.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 10:21.

Southern Gas Networks logo
Until
26 Oct 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:46 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 10:05.

Southern Gas Networks logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Beeches Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Beeches Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:47 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 10:01.

Southern Gas Networks logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Gateside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gateside Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 09:59.

London Borough Of Lambeth logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Palace Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 25 Sep 2025 at 16:10.

London Borough Of Lambeth logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Daysbrook Road

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Daysbrook Road, Streatham Hill East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 26 Sep 2025 at 13:32.

London Borough Of Lambeth logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Palace Road

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 26 Sep 2025 at 13:48.

London Borough Of Lambeth logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Palace Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 8 Oct 2025 at 14:35.

Southern Gas Networks logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Atheldene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 08:15.

Southern Gas Networks logo
Until
27 Oct 2025
Details
View Map
Share
Follow
Atheldene Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 10:30 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 11:29.

Southern Gas Networks logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:56.

Southern Gas Networks logo
Until
27 Oct 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 10:30 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 11:30.

London Borough Of Southwark logo
LONG TERM
Between
29 Sep and 8 Nov 2025
Details
View Map
Share
Follow
Mount Adon Park

London Borough Of Southwark are proposing to carry out Highway improvement works on Mount Adon Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Sep 2025 at 16:17.

London Borough Of Southwark logo
LONG TERM
Between
29 Sep and 8 Nov 2025
Details
View Map
Share
Follow
Dunstans Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Dunstans Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Sep 2025 at 16:17.

Electricity Network Company logo
Finishing
Wednesday
Details
View Map
Share
Follow
Oakshaw Road

Electricity Network Company are proposing to carry out Utility asset works on Oakshaw Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Jul 2025 at 08:19.

Electricity Network Company logo
Finishing
Wednesday
Details
View Map
Share
Oakshaw Road

Electricity Network Company were proposing to carry out Utility asset works on Oakshaw Road, Wandsworth, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 30 Sep 2025 at 09:47.

London Borough Of Southwark logo
LONG TERM
Between
29 Sep and 8 Nov 2025
Details
View Map
Share
Follow
Dunstans Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Dunstans Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Sep 2025 at 16:17.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Plough Lane

Thames Water are proposing to carry out Utility asset works on Plough Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 07:56.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:45.

Southern Gas Networks logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:00 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 10:27.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Longstaff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2025 at 14:54.

Southern Gas Networks logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Longstaff Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:00 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2025 at 11:36.

Southern Gas Networks logo
Between
29 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:47.

Southern Gas Networks logo
Until
26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:45 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 11:17.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Harbut Road

Thames Water were proposing to carry out Utility repair and maintenance works on Harbut Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 10:24.

Thames Water logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Yelverton Road

Thames Water are proposing to carry out Utility asset works on Yelverton Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 11:35.

Thames Water logo
LONG TERM
Until
18 Jan 2026
Details
View Map
Share
Follow
Yelverton Road

Thames Water are carrying out Utility asset works on Yelverton Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 11:30 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 11:45.

UK Power Networks Eastern & London logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 15:40 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Sep 2025 at 15:44.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Rotherhithe New Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 11:14.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2025 at 11:28.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 07:03.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jul 2025 at 11:41.

UK Power Networks Eastern & London logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 12:33.

UK Power Networks Eastern & London logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 09:04.

UK Power Networks Eastern & London logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jul 2025 at 11:41.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Raymouth Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 11:16.

Royal Borough Of Kensington And Chelsea logo
Finishing
Monday
Details
View Map
Share
Sloane Square

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Sloane Square, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 13 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 2 Oct 2025 at 09:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep and 19 Dec 2025
Details
View Map
Share
Southwark Park Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2025 at 14:22.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mossop Street

Thames Water are carrying out Utility repair and maintenance works on Mossop Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 14:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 12:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 16:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 09:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 08:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 16:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 26 Jan 2026
Details
View Map
Share
Poolmans Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 26 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 11:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2025 at 10:43.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2025 at 15:15.

UK Power Networks Eastern & London logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Beak Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Beak Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 09:12.

UK Power Networks Eastern & London logo
Until
24 Oct 2025
Details
View Map
Share
Follow
Beak Street

UK Power Networks Eastern & London are carrying out New service connection on Beak Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Sep 2025 at 08:14.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Lime Street

UK Power Networks Eastern & London are carrying out Utility asset works on Lime Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 15:12.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Leadenhall Street

UK Power Networks Eastern & London are carrying out Utility asset works on Leadenhall Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 15:11.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
29 Sep 2025 and 22 Apr 2026
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 22 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Sep 2025 at 09:34.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
22 Apr 2026
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 22 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 29 Sep 2025 at 08:44.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Tottenham Street

Thames Water are carrying out Utility repair and maintenance works on Tottenham Street, Bloomsbury, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 10:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 09:52.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 12 Nov 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 16:03.

Transport for London (TfL) logo
LONG TERM
Until
12 Nov 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are carrying out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 08:27.

Transport for London (TfL) logo
LONG TERM
Until
12 Nov 2025
Details
View Map
Share
Follow
Hamilton Terrace

Transport for London (TfL) are carrying out Highway improvement works on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 08:25.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Goswell Road

Thames Water are carrying out Utility repair and maintenance works on Goswell Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 11:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 10:39.

London Borough Of Camden logo
Between
29 Sep and 18 Oct 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:49.

London Borough Of Camden logo
Until
18 Oct 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 29 Sep 2025 at 09:07.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Blomfield Road

Thames Water are carrying out Utility repair and maintenance works on Blomfield Road, Little Venice, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2025 at 13:43 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 12:16.

London Borough Of Hammersmith & Fulham logo
Between
30 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Townmead Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Townmead Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
Until
28 Oct 2025
Details
View Map
Share
Follow
Townmead Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Townmead Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 07:30 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 07:39.

Thames Water logo
LONG TERM
Until
2 Dec 2025
Details
View Map
Share
Follow
Pont Street

Thames Water are carrying out Utility asset works on Pont Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 08:00 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 08:17.

Thames Water logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are carrying out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 08:15 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 08:29.

UK Power Networks Eastern & London logo
LONG TERM
Until
1 Dec 2025
Details
View Map
Share
Follow
Wild Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Wild Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 09:00 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2025 at 09:45.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Sussex Gardens

Transport for London (TfL) are carrying out Highway improvement works on Sussex Gardens, Hyde Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 08:00 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:49.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Mortimer Street

Cadent Gas are carrying out Utility repair and maintenance works on Mortimer Street, West End, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 18:47 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 14:49.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Camden Street

Transport for London (TfL) are carrying out Section 50 on Camden Street, Camden Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 09:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2025 at 13:58.

Thames Water logo
LONG TERM
Between
2 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Tregarvon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Tregarvon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:48.

London Borough Of Hammersmith & Fulham logo
Between
2 and 30 Oct 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Sep 2025 at 14:33.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Battersea Park Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2025 and run through until 13 October 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 12:08.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
St George's Square

Cadent Gas are carrying out Utility repair and maintenance works on St George's Square, Tachbrook, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 15:00 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 14:03.

Cadent Gas logo
Between
3 and 24 Oct 2025
Details
View Map
Share
Follow
Fleet Street

Cadent Gas are proposing to carry out Utility asset works on Fleet Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 13:49.

Cadent Gas logo
Until
24 Oct 2025
Details
View Map
Share
Follow
Fleet Street

Cadent Gas are carrying out Utility asset works on Fleet Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:22 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 09:08.

Cadent Gas logo
Between
3 and 24 Oct 2025
Details
View Map
Share
Follow
Stonecutter Street

Cadent Gas are proposing to carry out Utility asset works on Stonecutter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jul 2025 at 09:59.

Cadent Gas logo
Between
3 and 24 Oct 2025
Details
View Map
Share
Follow
Stonecutter Street

Cadent Gas are proposing to carry out Utility asset works on Stonecutter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 14:08.

Cadent Gas logo
Until
24 Oct 2025
Details
View Map
Share
Follow
Stonecutter Street

Cadent Gas are carrying out Utility asset works on Stonecutter Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:27 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 09:12.

T-Mobile (UK) logo
Until
18 Oct 2025
Details
View Map
Share
Follow
Minories

T-Mobile (UK) are carrying out Utility repair and maintenance works on Minories, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2025 at 08:00 and could run through until 18 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 4 Oct 2025 at 08:22.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:14.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:57.

London Borough Of Camden logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Oct 2025 at 08:19.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Kenton Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kenton Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:09.

London Borough Of Camden logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Kenton Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Kenton Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Oct 2025 at 08:19.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Colestown Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Colestown Street, Battersea, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2025 and run through until 14 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 11:34.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Battersea Park Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2025 and run through until 14 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 11:39.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:15.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are carrying out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 October 2025 at 20:00 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Oct 2025 at 09:43.

Transport for London (TfL) logo
Between
5 and 22 Oct 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:54.

Transport for London (TfL) logo
Until
22 Oct 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are carrying out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2025 at 20:00 and could run through until 22 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 6 Oct 2025 at 09:38.

Southern Gas Networks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 12:44.

Southern Gas Networks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 11:30.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Melrose Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Melrose Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:33.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 16:29.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are carrying out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 08:52.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:35.

London Borough Of Lambeth logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Brockwell Park Gardens

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Brockwell Park Gardens, West Dulwich, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 6 Oct 2025 at 08:10.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Waverton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:55.

Southern Gas Networks logo
Between
6 and 26 Oct 2025
Details
View Map
Share
Merton Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Merton Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 26 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2025 at 14:26.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Longstaff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 12:34.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 16 Nov 2025
Details
View Map
Share
Longstaff Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 16 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2025 at 13:44.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
The Pavement

Thames Water are proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2025 at 09:43.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
The Pavement

Thames Water are carrying out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 10:21 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 10:28.

Thames Water logo
Finishing
Friday
Details
View Map
Share
The Pavement

Thames Water were proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 15:28.

Thames Water logo
Between
6 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Denman Road

Thames Water are proposing to carry out Utility repair and maintenance works on Denman Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 12:28.

UK Power Networks Eastern & London logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Bagley's Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Bagley's Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 15:35.

UK Power Networks Eastern & London logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Bagley's Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Bagley's Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2025 at 13:10.

UK Power Networks Eastern & London logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Bagley's Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Bagley's Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2025 at 09:50.

UK Power Networks Eastern & London logo
Until
21 Oct 2025
Details
View Map
Share
Follow
Bagley's Lane

UK Power Networks Eastern & London are carrying out New service connection on Bagley's Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:29 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 09:30.

London Borough Of Lewisham logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Grinstead Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Grinstead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 15 Sep 2025 at 10:46.

London Borough Of Lewisham logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Grinstead Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Grinstead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 15 Sep 2025 at 11:50.

UK Power Networks Eastern & London logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Ilderton Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 14:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 14:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2025 at 14:00.

Southern Gas Networks logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Newington Butts

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newington Butts, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 12:08.

Southern Gas Networks logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Newington Butts

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newington Butts, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2025 at 15:56.

Southern Gas Networks logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Newington Butts

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newington Butts, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2025 at 10:43.

Southern Gas Networks logo
Until
2 Nov 2025
Details
View Map
Share
Follow
Newington Butts

Southern Gas Networks are carrying out Utility repair and maintenance works on Newington Butts, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:15 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Oct 2025 at 08:29.

London Borough Of Lambeth logo
LONG TERM
Between
6 Oct and 26 Nov 2025
Details
View Map
Share
Salamanca Street

London Borough Of Lambeth were proposing to carry out Highway improvement works on Salamanca Street, Vauxhall, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 26 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 6 Oct 2025 at 15:40.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 26 Nov 2025
Details
View Map
Share
Albert Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 26 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 14:31.

London Borough Of Lambeth logo
LONG TERM
Between
6 Oct and 26 Nov 2025
Details
View Map
Share
Albert Embankment

London Borough Of Lambeth were proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 26 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 6 Oct 2025 at 15:40.

UK Power Networks Eastern & London logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 12:10.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Courtfield Gardens

Thames Water are carrying out New service connection on Courtfield Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 14:58 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 14:24.

Thames Water logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Eccleston Street

Thames Water are carrying out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 09:00.

Thames Water logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Belgrave Place

Thames Water are carrying out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 09:00.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Hamilton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jun 2025 at 08:21.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Hamilton Place

UK Power Networks Eastern & London are carrying out New service connection on Hamilton Place, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 09:01.

Vodafone logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Waterloo Place

Vodafone are proposing to carry out Utility repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 2 Jul 2025 at 10:59.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Charles Ii Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Jun 2025 at 07:34.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Charles Ii Street

City Of Westminster are carrying out Highway repair and maintenance works on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 10:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Oct 2025 at 10:26.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
New Row

UK Power Networks Eastern & London were proposing to carry out New service connection on New Row, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 11:35.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
New Row

UK Power Networks Eastern & London are proposing to carry out New service connection on New Row, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 14:08.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
New Row

UK Power Networks Eastern & London are carrying out New service connection on New Row, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:09 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 09:11.

Cadent Gas logo
Between
6 and 20 Oct 2025
Details
View Map
Share
New Burlington Street

Cadent Gas were proposing to carry out Remedial works on New Burlington Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 20 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 12:07.

Cadent Gas logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Regent Street

Cadent Gas are proposing to carry out Remedial works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Jul 2025 at 13:15.

Fulcrum Pipelines logo
Finishing
Friday
Details
View Map
Share
Follow
Dukes Place

Fulcrum Pipelines are proposing to carry out Utility asset works on Dukes Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Fulcrum Pipelines on 18 Jul 2025 at 11:48.

City Of Westminster logo
Until
22 Oct 2025
Details
View Map
Share
Follow
Portsea Place

City Of Westminster are carrying out Highway repair and maintenance works on Portsea Place, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 13:00 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Oct 2025 at 13:26.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
New Quebec Street

Thames Water are carrying out Remedial works on New Quebec Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:30 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 12:12.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 21 Nov 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:11.

City Of London Corporation logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Coleman Street

City Of London Corporation are proposing to carry out Highway improvement works on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 10 Aug 2025 at 21:59.

City Of London Corporation logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Coleman Street

City Of London Corporation are carrying out Highway improvement works on Coleman Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 6 Oct 2025 at 09:31.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
St Mark's Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on St Mark's Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Oxford Gardens

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on Oxford Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Oxford Gardens

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on Oxford Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
St Mark's Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on St Mark's Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 8 Dec 2025
Details
View Map
Share
Marylebone Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marylebone Road, Marylebone High Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 09:34.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Marylebone Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2025 at 11:52.

Transport for London (TfL) logo
LONG TERM
Until
8 Dec 2025
Details
View Map
Share
Follow
Marylebone Road

Transport for London (TfL) are carrying out Highway improvement works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 22:00 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:51.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Park Crescent Mews West

Thames Water are proposing to carry out Utility asset works on Park Crescent Mews West, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 11:30.

City Of Westminster logo
LONG TERM
Until
6 Feb 2026
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are carrying out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:00 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 6 Oct 2025 at 10:28.

London Borough Of Camden logo
LONG TERM
Until
17 Nov 2025
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 6 Oct 2025 at 09:14.

London Borough Of Camden logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Camden Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Camden Street, Camden Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 14:25.

London Borough Of Camden logo
Until
24 Oct 2025
Details
View Map
Share
Follow
Camden Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Camden Street, Camden Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 08:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 7 Oct 2025 at 08:47.

City Of London Corporation logo
Finishing
Today
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 26 Sep 2024 at 10:18.

City Of London Corporation logo
Finishing
Today
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are carrying out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 22:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 8 Oct 2025 at 09:26.

City Of London Corporation logo
Finishing
Today
Details
View Map
Share
Follow
Tower Bridge

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 29 Aug 2024 at 13:52.

City Of London Corporation logo
Finishing
Today
Details
View Map
Share
Follow
Tower Bridge

City Of London Corporation are carrying out Highway improvement works on Tower Bridge, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 22:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 8 Oct 2025 at 09:30.

City Of London Corporation logo
Finishing
Today
Details
View Map
Share
Follow
Tower Bridge Approach

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 29 Aug 2024 at 13:54.

City Of London Corporation logo
Finishing
Today
Details
View Map
Share
Follow
Tower Bridge Approach

City Of London Corporation are carrying out Highway improvement works on Tower Bridge Approach, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 22:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 8 Oct 2025 at 09:29.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Adelaide Grove

Thames Water are carrying out Utility repair and maintenance works on Adelaide Grove, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 10:00 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 12:05.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 30 Dec 2025
Details
View Map
Share
Blackfriars Underpass

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2025 and run through until 30 December 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 10:39.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Charles Square

Thames Water are carrying out Utility repair and maintenance works on Charles Square, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 10:32 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 14:31.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Woodcombe Crescent

Thames Water are carrying out Utility repair and maintenance works on Woodcombe Crescent, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 13:29 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 13:12.

Transport for London (TfL) logo
Until
22 Oct 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are carrying out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 21:00 and could run through until 22 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 21:43.

London Borough Of Lewisham logo
Finishing
Today
Details
View Map
Share
Follow
Jerningham Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Jerningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 09:40.

London Borough Of Lewisham logo
Finishing
Today
Details
View Map
Share
Follow
Jerningham Road

London Borough Of Lewisham are carrying out Highway improvement works on Jerningham Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 20:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 8 Oct 2025 at 07:10.

London Borough Of Wandsworth logo
Finishing
Today
Details
View Map
Share
Jerningham Road

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Jerningham Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2025 and run through until 11 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 11 Jun 2025 at 15:01.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Petworth Street

Transport for London (TfL) are carrying out roadworks on Petworth Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 21:00 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 21:33.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hyde Lane

Transport for London (TfL) are carrying out Highway improvement works on Hyde Lane, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 21:00 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 21:38.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ethelburga Street

Transport for London (TfL) are carrying out Highway improvement works on Ethelburga Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 21:00 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 21:43.

UK Power Networks South Eastern logo
Finishing
Tuesday
Details
View Map
Share
Follow
Leander Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Leander Road, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 11:36 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2025 at 15:04.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Wimbledon Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wimbledon Park Road, Southfields, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 13:45 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2025 at 15:03.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Pearscroft Road

Cadent Gas are carrying out Utility repair and maintenance works on Pearscroft Road, London.

The works started on 8 October 2025 at 22:51 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 13:38.

Thames Water logo
Until
28 Oct 2025
Details
View Map
Share
Follow
Hartismere Road

Thames Water are carrying out Utility repair and maintenance works on Hartismere Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 09:00 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 11:29.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Lambeth Palace Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 12 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2025 at 13:13.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 16:45.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 21:00 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2025 at 07:14.

City Of Westminster logo
Between
8 and 21 Oct 2025
Details
View Map
Share
Follow
Bridge Street

City Of Westminster are proposing to carry out Highway improvement works on Bridge Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 26 Jun 2025 at 12:08.

City Of Westminster logo
Between
8 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 09:41.

UK Power Networks Eastern & London logo
Between
8 and 21 Oct 2025
Details
View Map
Share
Follow
Sackville Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2025 at 12:13.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Orange Street

Cadent Gas are carrying out Utility repair and maintenance works on Orange Street, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 08:15 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 09:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Oct 2025 and 12 Feb 2026
Details
View Map
Share
Follow
Gresham Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gresham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 16:42.

UK Power Networks Eastern & London logo
Between
8 and 21 Oct 2025
Details
View Map
Share
Follow
Tavistock Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Tavistock Place, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2025 at 16:09.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Campden Hill Road

Thames Water are carrying out Utility repair and maintenance works on Campden Hill Road, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 08:50 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 14:59.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Bowling Green Lane

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Bowling Green Lane, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 08:02 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2025 at 08:29.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Colebrooke Row

Thames Water are carrying out Utility repair and maintenance works on Colebrooke Row, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 06:25 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 13:03.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
London Road

Thames Water are carrying out Utility repair and maintenance works on London Road, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 17:41 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 08:37.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Telford Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Telford Avenue, Streatham Hill West & Thornton, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 09:20 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2025 at 10:32.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Plough Road

Thames Water are carrying out Utility repair and maintenance works on Plough Road, Battersea, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 14:02 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 15:03.

London Borough Of Hammersmith & Fulham logo
Between
9 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 09:15.

Transport for London (TfL) logo
Between
9 and 18 Oct 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 18 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:54.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Colestown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Colestown Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:09.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Banbury Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Banbury Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:10.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Bridge Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Bridge Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:17.

Transport for London (TfL) logo
Until
22 Oct 2025
Details
View Map
Share
Follow
Bridge Lane

Transport for London (TfL) are carrying out Highway improvement works on Bridge Lane, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 21:00 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 09:58.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:41.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Cambridge Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2025 at 17:22.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Rosenau Crescent

Transport for London (TfL) are proposing to carry out Highway improvement works on Rosenau Crescent, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:16.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Kersley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kersley Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 14:24.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 12:51.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Surrey Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Surrey Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:09.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway improvement works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:52.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Devonshire Road

Thames Water are carrying out Utility repair and maintenance works on Devonshire Road, Chiswick, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 09:15 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 13:50.

Thames Water logo
LONG TERM
Between
10 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Bowood Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Bowood Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:01.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Clapham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Clapham Road, Oval, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2025 at 10:45 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2025 at 14:29.

Vodafone logo
Finishing
Today
Details
View Map
Share
Follow
Shelton Street

Vodafone are carrying out Remedial works on Shelton Street, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2025 at 16:45 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 10 Oct 2025 at 16:52.

Thames Water logo
Until
30 Oct 2025
Details
View Map
Share
Follow
Shorts Gardens

Thames Water are carrying out Utility repair and maintenance works on Shorts Gardens, Holborn And Covent Garden, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2025 at 10:30 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 14:33.

Finishing
Monday
Details
View Map
Share
Follow
Nelson Street

London Borough Of Tower Hamlets are carrying out Highway repair and maintenance works on Nelson Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2025 at 15:00 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 10 Oct 2025 at 15:33.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Queensway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 08:56.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Queensway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Oct 2025 at 11:28.

Thames Water logo
Between
10 and 29 Oct 2025
Details
View Map
Share
Wood Lane

Thames Water were proposing to carry out New service connection on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 29 October 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 13:26.

Thames Water logo
Between
10 and 29 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Thames Water are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 12:29.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Porchester Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Square, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 10:59.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Porchester Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Square, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 08:55.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Gardens, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 10:37.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Gardens, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 08:48.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Gloucester Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2025 at 12:09.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Gloucester Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 08:47.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Park Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Park Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2025 at 12:09.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Park Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Park Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Oct 2025 at 09:31.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Fore Street

Cadent Gas are carrying out Utility repair and maintenance works on Fore Street, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 October 2025 at 14:18 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 14:19.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Northdown Street

Thames Water are carrying out Utility repair and maintenance works on Northdown Street, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2025 at 06:01 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 08:20.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Waverley Place

Thames Water are proposing to carry out Utility repair and maintenance works on Waverley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 15:47.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Finchley Place

Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 15:47.

London Borough Of Camden logo
LONG TERM
Between
11 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:38.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Balham Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Balham Station Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 14:18.

T-Mobile (UK) logo
Between
11 and 19 Oct 2025
Details
View Map
Share
Battersea Bridge Road

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 October 2025 and run through until 19 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 23 Sep 2025 at 13:16.

Transport for London (TfL) logo
Between
12 and 22 Oct 2025
Details
View Map
Share
Follow
Colestown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Colestown Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 15:37.

Transport for London (TfL) logo
Between
12 and 22 Oct 2025
Details
View Map
Share
Follow
Banbury Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Banbury Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 15:33.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Rosenau Crescent

Transport for London (TfL) are proposing to carry out Highway improvement works on Rosenau Crescent, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 15:34.

Transport for London (TfL) logo
Between
12 and 20 Oct 2025
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 11:31.

Transport for London (TfL) logo
Between
12 and 20 Oct 2025
Details
View Map
Share
Follow
Kersley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kersley Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2025 at 08:28.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Surrey Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Surrey Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2025 at 08:27.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway improvement works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 11:23.

Southern Gas Networks logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Bridport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Oct 2025 at 11:45.

Network Rail logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Leigham Vale

Network Rail are proposing to carry out Works for Rail Purposes on Leigham Vale, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Sep 2025 at 09:30.

Network Rail logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Leigham Vale

Network Rail are proposing to carry out Works for Rail Purposes on Leigham Vale, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Sep 2025 at 13:55.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 13:40.

London Borough Of Lambeth logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Emmanuel Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Emmanuel Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Jul 2025 at 11:26.

London Borough Of Lambeth logo
Finishing
Friday
Details
View Map
Share
Follow
Daysbrook Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Daysbrook Road, Streatham Hill East, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 3 Oct 2025 at 13:03.

Southern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 14:42.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Wilna Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:55.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Inman Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Inman Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:56.

Thames Water logo
Between
13 Oct and 3 Nov 2025
Details
View Map
Share
Abbeville Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 09:00.

Thames Water logo
Between
13 Oct and 3 Nov 2025
Details
View Map
Share
Abbeville Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 07:11.

Thames Water logo
Between
13 Oct and 3 Nov 2025
Details
View Map
Share
Abbeville Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 07:17.

Thames Water logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Abbeville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 14:27.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 17:21.

London Borough Of Lambeth logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cottage Grove

London Borough Of Lambeth are proposing to carry out Core Sampling on Cottage Grove, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 9 Jul 2025 at 15:59.

Thames Water logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Lausanne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lausanne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 09:57.

Thames Water logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Lausanne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lausanne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 08:38.

London Borough Of Wandsworth logo
Finishing
Thursday
Details
View Map
Share
Howie Street

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Howie Street, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Oct 2025 at 09:43.

London Borough Of Wandsworth logo
Finishing
Thursday
Details
View Map
Share
Elcho Street

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Elcho Street, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Oct 2025 at 09:43.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Foxley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Foxley Road, Myatt's Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 09:26.

Thames Water logo
Between
13 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Macleod Street

Thames Water are proposing to carry out Utility repair and maintenance works on Macleod Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:48.

Thames Water logo
Between
13 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Macleod Street

Thames Water are proposing to carry out Utility repair and maintenance works on Macleod Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 07:56.

London Borough Of Southwark logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Aug 2025 at 13:04.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 18 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2025 at 08:33.

Lumen Technologies logo
Finishing
Thursday
Details
View Map
Share
Follow
Victoria Street

Lumen Technologies are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 5 Aug 2025 at 11:29.

City Of Westminster logo
Finishing
Thursday
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Apr 2025 at 07:27.

Lumen Technologies logo
Finishing
Friday
Details
View Map
Share
Follow
Kensington High Street

Lumen Technologies are proposing to carry out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 26 Aug 2025 at 15:32.

Lumen Technologies logo
Finishing
Friday
Details
View Map
Share
Follow
Kensington High Street

Lumen Technologies are proposing to carry out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 9 Sep 2025 at 11:33.

Lumen Technologies logo
Finishing
Friday
Details
View Map
Share
Follow
Kensington High Street

Lumen Technologies are proposing to carry out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 10 Sep 2025 at 10:53.

City Of London Corporation logo
Between
13 and 18 Oct 2025
Details
View Map
Share
Tower Bridge Road

City Of London Corporation were proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 23 May 2025 at 15:51.

Transport for London (TfL) logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:39.

UK Power Networks Eastern & London logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
Savoy Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Savoy Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Mar 2025 at 08:06.

UK Power Networks Eastern & London logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
Savoy Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Savoy Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 09:53.

UK Power Networks Eastern & London logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2025 at 21:41.

Thames Water logo
Between
13 and 20 Oct 2025
Details
View Map
Share
Follow
Connaught Street

Thames Water are proposing to carry out New service connection on Connaught Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 07:43.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Drury Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Drury Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:28.

City Of Westminster logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 14:04.

City Of Westminster logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Oct 2025 at 08:51.

London Borough Of Hammersmith & Fulham logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

Virgin Media logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hanway Street

Virgin Media are proposing to carry out Utility asset works on Hanway Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 2 Jul 2025 at 11:25.

Cadent Gas logo
Between
13 and 21 Oct 2025
Details
View Map
Share
Follow
Brick Lane

Cadent Gas are proposing to carry out Utility asset works on Brick Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 15:22.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:30.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 14:20.

Cadent Gas logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
North Pole Road

Cadent Gas are proposing to carry out Utility asset works on North Pole Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:30.

Cadent Gas logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
North Pole Road

Cadent Gas are proposing to carry out Utility asset works on North Pole Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 14:20.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 14:20.

Thames Water logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Russell Square

Thames Water were proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Cunningham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Cunningham Place, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Jun 2025 at 14:32.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Whidborne Street

Cadent Gas were proposing to carry out Utility asset works on Whidborne Street, King's Cross, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 12:33.

Lumen Technologies logo
Between
14 and 18 Oct 2025
Details
View Map
Share
Follow
Victoria Street

Lumen Technologies are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 18 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 16 Jul 2025 at 07:03.

Lumen Technologies logo
Between
14 and 19 Oct 2025
Details
View Map
Share
Follow
Storey's Gate

Lumen Technologies are proposing to carry out Utility asset works on Storey's Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 19 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 16 Jul 2025 at 07:00.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Regent Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Sep 2025 at 12:58.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Regent Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2025 at 08:48.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Foubert's Place

Thames Water are proposing to carry out Remedial works on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 14:52.

Transport for London (TfL) logo
Between
14 Oct and 6 Nov 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 6 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:50.

Transport for London (TfL) logo
Between
14 Oct and 6 Nov 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 6 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:53.

London Borough Of Southwark logo
Finishing
Thursday
Details
View Map
Share
Follow
Lordship Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Jun 2025 at 14:33.

London Borough Of Southwark logo
Finishing
Thursday
Details
View Map
Share
Follow
Lordship Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Sep 2025 at 17:33.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 17:21.

Between
14 and 27 Oct 2025
Details
View Map
Share
Billington Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Billington Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 6 Aug 2025 at 10:32.

UK Power Networks Eastern & London logo
Between
14 and 27 Oct 2025
Details
View Map
Share
Follow
Abbey Orchard Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 13:49.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 11:48.

Thames Water logo
Between
15 and 21 Oct 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are proposing to carry out New service connection on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 15:21.

Thames Water logo
Between
15 and 21 Oct 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are proposing to carry out New service connection on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 13:41.

Electricity Network Company logo
Between
15 Oct and 2 Nov 2025
Details
View Map
Share
Garratt Lane

Electricity Network Company were proposing to carry out Utility asset works on Garratt Lane, Tooting, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Oct 2025 at 13:51.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Fentiman Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Fentiman Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:09.

Vodafone logo
Finishing
Friday
Details
View Map
Share
Follow
Bressenden Place

Vodafone are proposing to carry out New service connection on Bressenden Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 5 Aug 2025 at 10:42.

Vodafone logo
Finishing
Friday
Details
View Map
Share
Follow
Bressenden Place

Vodafone are proposing to carry out New service connection on Bressenden Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 6 Oct 2025 at 18:32.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Charles Street

Thames Water were proposing to carry out Remedial works on Charles Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 09:43.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Charles Street

Thames Water are proposing to carry out Remedial works on Charles Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Sep 2025 at 09:37.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2025 at 14:51.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Oct 2025 at 13:39.

Transport for London (TfL) logo
Between
15 and 18 Oct 2025
Details
View Map
Share
Follow
Euston Underpass

Transport for London (TfL) are proposing to carry out roadworks on Euston Underpass, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 11:37.

London Borough Of Wandsworth logo
LONG TERM
Between
16 Oct 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Totterdown Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Totterdown Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 1 Oct 2025 at 14:31.

London Borough Of Southwark logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
East Dulwich Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on East Dulwich Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Jun 2025 at 19:55.

London Borough Of Southwark logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
East Dulwich Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on East Dulwich Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Sep 2025 at 17:33.

City Of Westminster logo
Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 06:55.

City Of Westminster logo
Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 09:19.

City Of Westminster logo
Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Sep 2025 at 16:04.

Thames Water logo
Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Southwark Street

Thames Water are proposing to carry out Utility repair and maintenance works on Southwark Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 09:03.

UK Power Networks Eastern & London logo
Between
17 and 19 Oct 2025
Details
View Map
Share
Follow
Whitefriars Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Whitefriars Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2025 at 09:16.

UK Power Networks Eastern & London logo
LONG TERM
Between
17 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Ordnance Hill

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ordnance Hill, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 08:41.

UK Power Networks Eastern & London logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Follow
Bedford Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bedford Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2025 at 10:44.

UK Power Networks Eastern & London logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Bedford Street

UK Power Networks Eastern & London were proposing to carry out New service connection on Bedford Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 October 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2025 at 10:43.

Transport for London (TfL) logo
LONG TERM
Between
19 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Streatham Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 10:09.

Southern Gas Networks logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Wiltshire Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2025 at 15:39.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 19:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Leopold Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Leopold Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Aug 2025 at 14:19.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Gleneldon Road

London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:13.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Gleneldon Road

London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:16.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Gleneldon Road

London Borough Of Lambeth are proposing to carry out Works for road purposes on Gleneldon Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:22.

Southern Gas Networks logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 14:10.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Daysbrook Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Daysbrook Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 25 Sep 2025 at 16:20.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Palace Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 25 Sep 2025 at 16:20.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Palace Road

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 29 Sep 2025 at 09:43.

London Borough Of Wandsworth logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Balham Park Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 9 Oct 2025 at 10:08.

London Borough Of Lambeth logo
Between
20 and 30 Oct 2025
Details
View Map
Share
Norwood Road

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Norwood Road, St Martin's, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 23 Sep 2025 at 12:10.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 09:22.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
St Anns Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:36.

Transport for London (TfL) logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 17:11.

Transport for London (TfL) logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 13:50.

London Borough Of Southwark logo
Between
20 Oct and 8 Nov 2025
Details
View Map
Share
Bellenden Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Bellenden Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 8 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 24 Jun 2025 at 08:30.

London Borough Of Southwark logo
Between
20 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Maxted Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Maxted Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2025 at 09:44.

London Borough Of Southwark logo
Between
20 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Maxted Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Maxted Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2025 at 09:46.

London Borough Of Southwark logo
Between
20 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Danby Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Danby Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2025 at 10:00.

London Borough Of Southwark logo
Between
20 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Danby Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Danby Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2025 at 09:46.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Falcon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:10.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Falcon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 15:50.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2025 at 14:59.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2025 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 14:56.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2025 at 14:58.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2025 at 14:27.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea High Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea High Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 15:50.

London Borough Of Lambeth logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Lilford Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 19 Jun 2025 at 16:13.

London Borough Of Lewisham logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Faulkner Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Faulkner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 3 Oct 2025 at 08:52.

London Borough Of Lewisham logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Faulkner Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Faulkner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 8 Oct 2025 at 05:36.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Varcoe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2025 at 07:14.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Varcoe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2025 at 08:11.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2025 at 14:58.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2025 at 14:10.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 08:05.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 13:25.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Jul 2025 at 11:12.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 13:25.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Barkston Gardens

Thames Water are proposing to carry out New service connection on Barkston Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 11:08.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
20 Oct and 29 Nov 2025
Details
View Map
Share
Follow
King Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 November 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Oct 2025 at 15:57.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
20 Oct and 29 Nov 2025
Details
View Map
Share
Follow
King Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Oct 2025 at 15:50.

Between
20 and 30 Oct 2025
Details
View Map
Share
Follow
Eccleston Place

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Eccleston Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 18 Sep 2025 at 08:49.

Between
20 and 30 Oct 2025
Details
View Map
Share
Follow
Eccleston Place

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Eccleston Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 29 Sep 2025 at 07:21.

Between
20 and 30 Oct 2025
Details
View Map
Share
Follow
Eccleston Place

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Eccleston Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 16 Sep 2025 at 06:20.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Aldensley Road

Thames Water are proposing to carry out New service connection on Aldensley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 09:50.

UK Power Networks Eastern & London logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Old Pye Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Old Pye Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 08:25.

UK Power Networks Eastern & London logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Strutton Ground

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Strutton Ground, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 08:26.

UK Power Networks Eastern & London logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Victoria Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 08:28.

Thames Water logo
Between
20 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 09:55.

BT logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Hertford Street

BT are proposing to carry out Utility repair and maintenance works on Hertford Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2025 at 10:16.

Thames Water logo
Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Irving Street

Thames Water were proposing to carry out New service connection on Irving Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 4 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 11:36.

Murphy Power Distribution logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Leinster Terrace

Murphy Power Distribution are proposing to carry out New service connection on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 26 Jun 2025 at 11:11.

Murphy Power Distribution logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Leinster Terrace

Murphy Power Distribution are proposing to carry out New service connection on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 10 Oct 2025 at 08:10.

Murphy Power Distribution logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Leinster Terrace

Murphy Power Distribution are proposing to carry out New service connection on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 17 Jul 2025 at 07:08.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
King Street

UK Power Networks Eastern & London were proposing to carry out New service connection on King Street, St James's East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 09:36.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
King Street

UK Power Networks Eastern & London are proposing to carry out New service connection on King Street, St James's East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jul 2025 at 07:02.

UK Power Networks Eastern & London logo
Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
King Street

UK Power Networks Eastern & London are proposing to carry out New service connection on King Street, St James's East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jul 2025 at 08:34.

UK Power Networks Eastern & London logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
King Street

UK Power Networks Eastern & London are proposing to carry out New service connection on King Street, St James's East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 07:58.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Chapel Side

Thames Water were proposing to carry out Remedial works on Chapel Side, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 12:25.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Chapel Side

Thames Water are proposing to carry out Remedial works on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 15:15.

City Of London Corporation logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Garlick Hill

City Of London Corporation are proposing to carry out Highway improvement works on Garlick Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 11 Aug 2025 at 11:07.

City Of London Corporation logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Garlick Hill

City Of London Corporation are proposing to carry out Highway improvement works on Garlick Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 17 Aug 2025 at 16:10.

London Borough Of Camden logo
LONG TERM
Between
20 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Upper St Martin's Lane

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Upper St Martin's Lane, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Oct 2025 at 21:11.

London Borough Of Camden logo
LONG TERM
Between
20 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Upper St Martin's Lane

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Upper St Martin's Lane, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 10 Oct 2025 at 15:44.

London Borough Of Camden logo
LONG TERM
Between
20 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Oct 2025 at 21:13.

London Borough Of Camden logo
LONG TERM
Between
20 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Oct 2025 at 22:04.

City Of Westminster logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Woodstock Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Woodstock Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jul 2025 at 09:12.

Thames Water logo
Between
20 and 27 Oct 2025
Details
View Map
Share
Follow
Albion Street

Thames Water are proposing to carry out New service connection on Albion Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 07:45.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Great Cumberland Place

City Of Westminster were proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Jul 2025 at 12:49.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Great Cumberland Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Aug 2025 at 12:25.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Great Cumberland Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Oct 2025 at 16:09.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Wallenberg Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Wallenberg Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2025 at 06:40.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Wallenberg Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Wallenberg Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Oct 2025 at 16:10.

City Of London Corporation logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are proposing to carry out Highway improvement works on St Martin's-le-grand, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 10 Aug 2025 at 22:10.

City Of London Corporation logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are proposing to carry out Highway improvement works on St Martin's-le-grand, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 13 Aug 2025 at 14:37.

Thames Water logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
West Central Street

Thames Water are proposing to carry out Utility asset works on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 08:03.

Thames Water logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
West Central Street

Thames Water are proposing to carry out Utility asset works on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 14:48.

UK Power Networks Eastern & London logo
Between
20 and 31 Oct 2025
Details
View Map
Share
New Fetter Lane

UK Power Networks Eastern & London were proposing to carry out Utility asset works on New Fetter Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2025 at 14:01.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 12:27.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Park Crescent Mews West

Thames Water are proposing to carry out Utility asset works on Park Crescent Mews West, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 08:52.

UK Power Networks Eastern & London logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Bolsover Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bolsover Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jul 2025 at 14:20.

Thames Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Broadley Street

Thames Water were proposing to carry out Utility repair and maintenance works on Broadley Street, Church Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 23 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 09:35.

Cadent Gas logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Tottenham Court Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Tottenham Court Road, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 16:49.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Anning Street

Thames Water are proposing to carry out New service connection on Anning Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 13:16.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Anning Street

Thames Water are proposing to carry out New service connection on Anning Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 09:43.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Lever Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Lever Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 16:12.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Avenue Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Avenue Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jun 2025 at 11:47.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Avenue Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Avenue Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Aug 2025 at 12:00.

Thames Water logo
Between
21 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Trossachs Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Trossachs Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:55.

Transport for London (TfL) logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 17:12.

UK Power Networks Eastern & London logo
Between
21 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Fulham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2025 at 10:25.

UK Power Networks Eastern & London logo
Between
21 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Fulham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2025 at 12:44.

London Borough Of Lewisham logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Bestwood Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Bestwood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:52.

London Borough Of Lewisham logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Bestwood Street

London Borough Of Lewisham were proposing to carry out Highway improvement works on Bestwood Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2025 and run through until 23 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:32.

London Borough Of Southwark logo
Between
22 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2025 at 10:02.

City Of Westminster logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Buckingham Gate

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 26 Jun 2025 at 12:10.

City Of Westminster logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Buckingham Gate

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Jun 2025 at 12:21.

City Of Westminster logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Spenser Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Spenser Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 15:24.

City Of Westminster logo
Between
22 and 25 Oct 2025
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Sep 2025 at 13:40.

City Of Westminster logo
LONG TERM
Between
22 Oct 2025 and 2 Mar 2026
Details
View Map
Share
Follow
White Horse Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on White Horse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 2 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Sep 2025 at 08:46.

UK Power Networks Eastern & London logo
Between
22 and 26 Oct 2025
Details
View Map
Share
Follow
King Street

UK Power Networks Eastern & London are proposing to carry out New service connection on King Street, St James's East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2025 at 14:37.

Transport for London (TfL) logo
LONG TERM
Between
22 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 11:58.

UK Power Networks Eastern & London logo
Between
22 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Bolsover Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bolsover Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Aug 2025 at 09:23.

UK Power Networks Eastern & London logo
Between
22 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Bolsover Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bolsover Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Aug 2025 at 13:14.

London Borough Of Southwark logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Borough Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Borough Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Jul 2025 at 11:46.

London Borough Of Southwark logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Borough Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Borough Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2025 at 15:00.

Thames Water logo
Between
23 and 29 Oct 2025
Details
View Map
Share
Follow
Duke Street St James's

Thames Water are proposing to carry out New service connection on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 09:29.

Lumen Technologies logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Finsbury Square

Lumen Technologies are proposing to carry out Utility asset works on Finsbury Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 3 Oct 2025 at 09:24.

Lumen Technologies logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Finsbury Square

Lumen Technologies are proposing to carry out Utility asset works on Finsbury Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 8 Oct 2025 at 16:12.

Lumen Technologies logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Finsbury Square

Lumen Technologies are proposing to carry out Utility asset works on Finsbury Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 9 Oct 2025 at 06:12.

City Of Westminster logo
Between
23 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Warwick Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warwick Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Oct 2025 at 09:17.

City Of Westminster logo
Between
23 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Warwick Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warwick Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Oct 2025 at 16:14.

Thames Water logo
Between
23 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Utility asset works on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 15:44.

Thames Water logo
Between
23 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Utility asset works on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 15:48.

Thames Water logo
LONG TERM
Between
23 Oct 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Greencoat Row

Thames Water are proposing to carry out Utility asset works on Greencoat Row, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 09:09.

Thames Water logo
LONG TERM
Between
23 Oct 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Greencoat Place

Thames Water are proposing to carry out Utility asset works on Greencoat Place, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 06:56.

Thames Water logo
Between
24 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Sydney Street

Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 13:48.

City Of Westminster logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2025 at 11:06.

City Of Westminster logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 09:20.

City Of Westminster logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Sep 2025 at 16:05.

Thames Water logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Southwark Street

Thames Water are proposing to carry out Utility repair and maintenance works on Southwark Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 16:53.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Place, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Place, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Oct 2025 at 09:18.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Porchester Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Porchester Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Oct 2025 at 09:17.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Oct 2025 at 09:17.

Virgin Media logo
Between
24 and 28 Oct 2025
Details
View Map
Share
Follow
Chandos Street

Virgin Media are proposing to carry out Utility asset works on Chandos Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Aug 2025 at 13:29.

Virgin Media logo
Between
24 and 28 Oct 2025
Details
View Map
Share
Follow
Chandos Street

Virgin Media are proposing to carry out Utility asset works on Chandos Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Oct 2025 at 13:14.

Thames Water logo
Between
25 and 28 Oct 2025
Details
View Map
Share
Follow
The Highway

Thames Water are proposing to carry out Utility repair and maintenance works on The Highway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 15:50.

Thames Water logo
Between
25 and 28 Oct 2025
Details
View Map
Share
Follow
Cannon Street Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 14:10.

Thames Water logo
Between
25 and 28 Oct 2025
Details
View Map
Share
Follow
Cannon Street Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:21.

Thames Water logo
Between
25 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Long Road

Thames Water are proposing to carry out Utility repair and maintenance works on Long Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 14:56.

UK Power Networks Eastern & London logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Fulham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 11:59.

UK Power Networks Eastern & London logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Rosedew Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rosedew Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 12:21.

UK Power Networks Eastern & London logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Rosedew Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Rosedew Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2025 at 09:14.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 10:46.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 13:15.

T-Mobile (UK) logo
Between
26 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Battersea Bridge Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 26 Sep 2025 at 15:34.

T-Mobile (UK) logo
Between
26 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Battersea Bridge Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 1 Oct 2025 at 15:54.

Thames Water logo
Between
26 and 29 Oct 2025
Details
View Map
Share
Follow
Lillie Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 14:37.

Thames Water logo
Between
26 and 29 Oct 2025
Details
View Map
Share
Lillie Road

Thames Water were proposing to carry out Utility repair and maintenance works on Lillie Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 11:34.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Wiltshire Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 12:13.

London Borough Of Merton logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cricket Green

London Borough Of Merton are proposing to carry out Highway improvement works on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 29 Oct 2024 at 16:15.

London Borough Of Merton logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cricket Green

London Borough Of Merton are proposing to carry out Highway improvement works on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 13 Dec 2024 at 07:46.

London Borough Of Bromley logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Lawrie Park Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 8 Oct 2025 at 10:28.

Southern Gas Networks logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2025 at 15:20.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Summerstown

Thames Water are proposing to carry out New service connection on Summerstown, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 08:22.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:28.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:38.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 22:40.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:35.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 13:41.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Tierney Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Tierney Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 11:52.

London Borough Of Wandsworth logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Balham Park Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 31 Jul 2025 at 15:16.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Brockley Park

Thames Water are proposing to carry out Utility repair and maintenance works on Brockley Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 12:14.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Brockley Park

Thames Water are proposing to carry out Utility repair and maintenance works on Brockley Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 14:41.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Brockley Park

Thames Water are proposing to carry out Utility repair and maintenance works on Brockley Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 11:42.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Streatham Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 13:01.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:18.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:36.

Southern Gas Networks logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Wilna Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 08:41.

Southern Gas Networks logo
Between
27 Oct and 23 Nov 2025
Details
View Map
Share
Follow
St Anns Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:46.

London Borough Of Lambeth logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Clarence Crescent

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Clarence Crescent, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 8 Oct 2025 at 15:33.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Marcilly Road

Thames Water are proposing to carry out Utility repair and maintenance works on Marcilly Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 15:31.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Marcilly Road

Thames Water are proposing to carry out Utility repair and maintenance works on Marcilly Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 14:11.

Transport for London (TfL) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Clapham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:30.

Transport for London (TfL) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Edgeley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 12:44.

Between
27 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Pepys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 4 Aug 2025 at 11:38.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Anselm Road

Cadent Gas are proposing to carry out New service connection on Anselm Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 08:59.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 14:00.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Churton Street

Thames Water are proposing to carry out Remedial works on Churton Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2025 at 13:54.

Thames Water logo
Between
27 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Sydney Street

Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 14:39.

London Borough Of Southwark logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Cope Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Cope Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 16:42.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kenway Road

Thames Water are proposing to carry out Utility asset works on Kenway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 16:49.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kenway Road

Thames Water are proposing to carry out Utility asset works on Kenway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 14:30.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kenway Road

Thames Water are proposing to carry out Utility asset works on Kenway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jul 2025 at 15:30.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kenway Road

Thames Water are proposing to carry out Utility asset works on Kenway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Jul 2025 at 14:32.

London Borough Of Hammersmith & Fulham logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
King Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on King Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 9 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Oct 2025 at 15:53.

Thames Water logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Old Brompton Road

Thames Water are proposing to carry out New service connection on Old Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 15:35.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Greycoat Lane

Thames Water are proposing to carry out Utility asset works on Greycoat Lane, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 10:01.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Greycoat Lane

Thames Water are proposing to carry out Utility asset works on Greycoat Lane, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 14:31.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Greycoat Street

Thames Water are proposing to carry out Utility asset works on Greycoat Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 08:30.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Greycoat Street

Thames Water are proposing to carry out Utility asset works on Greycoat Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 07:19.

Thames Water logo
Between
27 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 10:24.

Thames Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Dacre Street

Thames Water are proposing to carry out Utility asset works on Dacre Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 14:29.

Thames Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Dacre Street

Thames Water are proposing to carry out Utility asset works on Dacre Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 16:24.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Kensington Church Court

Thames Water are proposing to carry out New service connection on Kensington Church Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 17:41.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Market Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 09:06.

Vodafone logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Waterloo Place

Vodafone are proposing to carry out Utility repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 2 Jul 2025 at 11:32.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Duke Street St James's

Thames Water are proposing to carry out New service connection on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 08:48.

Thames Water logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Heddon Street

Thames Water are proposing to carry out New service connection on Heddon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jul 2025 at 15:45.

Thames Water logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Heddon Street

Thames Water are proposing to carry out New service connection on Heddon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 09:32.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct and 30 Dec 2025
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 10:42.

UK Power Networks Eastern & London logo
Between
27 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Rupert Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Rupert Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 09:17.

UK Power Networks Eastern & London logo
Between
27 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Rupert Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Rupert Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 08:56.

Thames Water logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
South Molton Street

Thames Water are proposing to carry out Disconnection or alteration of supply on South Molton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 11:32.

Thames Water logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
South Molton Street

Thames Water are proposing to carry out Disconnection or alteration of supply on South Molton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 08:23.

Cadent Gas logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Farringdon Street

Cadent Gas are proposing to carry out Utility asset works on Farringdon Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2025 at 14:27.

Cadent Gas logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Farringdon Street

Cadent Gas are proposing to carry out Utility asset works on Farringdon Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 16:35.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Dean Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Dean Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 15:16.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:33.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Blenheim Crescent

Thames Water were proposing to carry out Remedial works on Blenheim Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:49.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Blenheim Crescent

Thames Water are proposing to carry out Remedial works on Blenheim Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 16:30.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Bridstow Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bridstow Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:33.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Bridstow Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bridstow Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 00:10.

London Borough Of Camden logo
LONG TERM
Between
27 Oct and 29 Nov 2025
Details
View Map
Share
Follow
Bedford Avenue

London Borough Of Camden are proposing to carry out Highway improvement works on Bedford Avenue, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:53.

London Borough Of Camden logo
LONG TERM
Between
27 Oct and 29 Nov 2025
Details
View Map
Share
Follow
Bedford Avenue

London Borough Of Camden are proposing to carry out Highway improvement works on Bedford Avenue, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Oct 2025 at 21:55.

Thames Water logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Vallance Road

Thames Water are proposing to carry out Utility repair and maintenance works on Vallance Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 12:55.

Thames Water logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Vallance Road

Thames Water are proposing to carry out Utility repair and maintenance works on Vallance Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 13:31.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Vallance Road

Thames Water were proposing to carry out Utility repair and maintenance works on Vallance Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 09:02.

City Of Westminster logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Paddington Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 26 Sep 2025 at 13:21.

City Of Westminster logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Paddington Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 10 Oct 2025 at 09:34.

Transport for London (TfL) logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Old Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2025 at 09:36.

Thames Water logo
Between
27 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Hoxton Street

Thames Water are proposing to carry out Statutory Infrastructure Works on Hoxton Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:55.

Thames Water logo
Between
27 Oct and 6 Nov 2025
Details
View Map
Share
Hoxton Street

Thames Water were proposing to carry out Statutory Infrastructure Works on Hoxton Street, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 6 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 12:50.

Thames Water logo
Between
27 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Hoxton Street

Thames Water are proposing to carry out Statutory Infrastructure Works on Hoxton Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:43.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Bath Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Bath Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 30 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 11:32.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:50.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 12:30.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
King's Cross Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 12:10.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
King's Cross Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 09:57.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
King's Cross Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 09:40.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 12:03.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 09:09.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 09:46.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 10:46.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 09:47.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 09:44.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Caledonian Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 07:22.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Caledonian Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:54.

Thames Water logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Goodwin Road

Thames Water are proposing to carry out New service connection on Goodwin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 14:31.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Erica Street

Thames Water are proposing to carry out Utility repair and maintenance works on Erica Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 13:34.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Erica Street

Thames Water are proposing to carry out Utility repair and maintenance works on Erica Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 15:01.

UK Power Networks Eastern & London logo
Between
28 Oct and 11 Nov 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2025 at 21:42.

City Of Westminster logo
Between
28 Oct and 24 Nov 2025
Details
View Map
Share
Great Cumberland Place

City Of Westminster were proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 24 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 31 Jul 2025 at 12:49.

Thames Water logo
LONG TERM
Between
28 Oct 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Marjorie Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Marjorie Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:46.

Transport for London (TfL) logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Clapham Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:47.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Gilstead Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gilstead Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 09:14.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Gilstead Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gilstead Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Sep 2025 at 10:18.

Between
28 Oct and 12 Nov 2025
Details
View Map
Share
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Pepys Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:42.

Between
28 Oct and 12 Nov 2025
Details
View Map
Share
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Pepys Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:45.

Between
28 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Pepys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:52.

Between
28 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Pepys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 26 Sep 2025 at 11:22.

UK Power Networks Eastern & London logo
Between
28 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Sep 2025 at 17:41.

UK Power Networks Eastern & London logo
Between
28 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Sep 2025 at 17:41.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Pimlico Road

Thames Water are proposing to carry out Remedial works on Pimlico Road, Churchill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 08:38.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:52.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:55.

Thames Water logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Wardo Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Wardo Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 08:11.

Thames Water logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Wardo Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Wardo Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 14:10.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Fentiman Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Fentiman Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 12:51.

London Borough Of Southwark logo
LONG TERM
Between
29 Oct 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Jun 2025 at 19:24.

London Borough Of Southwark logo
LONG TERM
Between
29 Oct 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 26 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Jun 2025 at 08:24.

City Of Westminster logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Buckingham Gate

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jul 2025 at 14:12.

London Borough Of Hammersmith & Fulham logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Bolingbroke Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Bolingbroke Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 25 Feb 2025 at 10:10.

London Borough Of Hammersmith & Fulham logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Bolingbroke Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Bolingbroke Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 15:47.

BT logo
Between
29 Oct and 10 Nov 2025
Details
View Map
Share
Hertford Street

BT were proposing to carry out Utility repair and maintenance works on Hertford Street, West End, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Aug 2025 at 12:20.

City Of London Corporation logo
Between
29 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Southwark Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Southwark Bridge Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 15 Aug 2025 at 08:08.

UK Power Networks Eastern & London logo
Between
29 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Leadenhall Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2025 at 14:45.

UK Power Networks Eastern & London logo
Between
29 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Leadenhall Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2025 at 08:02.

City Of Westminster logo
LONG TERM
Between
29 Oct and 17 Dec 2025
Details
View Map
Share
Follow
Long Acre

City Of Westminster are proposing to carry out Highway repair and maintenance works on Long Acre, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 29 Sep 2025 at 15:59.

Vodafone logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Great Queen Street

Vodafone are proposing to carry out Remedial works on Great Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 25 Jul 2025 at 12:19.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Great Portland Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Great Portland Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 10:23.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Great Portland Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Great Portland Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2025 at 11:19.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Weymouth Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Weymouth Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 11:26.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Weymouth Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Weymouth Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2025 at 09:23.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Hallam Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hallam Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 10:23.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Hallam Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hallam Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Sep 2025 at 08:49.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Hallam Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hallam Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2025 at 15:50.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Hallam Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hallam Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2025 at 12:25.

Transport for London (TfL) logo
Between
30 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Dundonald Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Dundonald Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 10:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
31 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Leopold Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Leopold Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2025 at 12:14.

London Borough Of Wandsworth logo
LONG TERM
Between
31 Oct 2025 and 10 Mar 2026
Details
View Map
Share
Follow
Totterdown Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Totterdown Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 10 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 1 Oct 2025 at 07:26.

London Borough Of Hammersmith & Fulham logo
Between
31 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Sep 2025 at 14:33.

Between
31 Oct and 29 Nov 2025
Details
View Map
Share
Follow
New Cross Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 30 Sep 2025 at 16:23.

City Of Westminster logo
Between
31 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 06:52.

City Of Westminster logo
Between
31 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 09:21.

City Of Westminster logo
Between
31 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Sep 2025 at 16:07.

UK Power Networks Eastern & London logo
Between
31 Oct and 7 Nov 2025
Details
View Map
Share
Bartlett Court

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Bartlett Court, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2025 at 14:03.

London Borough Of Lambeth logo
Between
2 and 6 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 6 November 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.

London Borough Of Wandsworth logo
Between
3 and 12 Nov 2025
Details
View Map
Share
Follow
Garratt Lane

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Garratt Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 8 Sep 2025 at 09:07.

London Borough Of Wandsworth logo
Between
3 and 12 Nov 2025
Details
View Map
Share
Follow
Garratt Lane

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Garratt Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 30 Sep 2025 at 12:35.

Thames Water logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Honor Oak Road

Thames Water are proposing to carry out Utility repair and maintenance works on Honor Oak Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 14:44.

Thames Water logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Honor Oak Road

Thames Water are proposing to carry out Utility repair and maintenance works on Honor Oak Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 11:35.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Atheldene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 14:45.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Farlton Road

Southern Gas Networks were proposing to carry out roadworks on Farlton Road, Earlsfield, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 10:53.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:35.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 14:22.

London Borough Of Lambeth logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Norwood Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Norwood Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 6 Oct 2025 at 08:48.

London Borough Of Lambeth logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Norwood Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Norwood Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 8 Oct 2025 at 14:02.

Southern Gas Networks logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Wilna Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 09:21.

Southern Gas Networks logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Inman Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Inman Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 09:21.

Southern Gas Networks logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Dingwall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dingwall Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 11:27.

Thames Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Gilkes Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:10.

Thames Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Gilkes Crescent

Thames Water were proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 07:23.

Thames Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Gilkes Crescent

Thames Water were proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 07:07.

Cadent Gas logo
LONG TERM
Between
3 Nov 2025 and 6 Mar 2026
Details
View Map
Share
Follow
Dover House Road

Cadent Gas are proposing to carry out Utility asset works on Dover House Road, Putney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 12:53.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Chesterfield Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chesterfield Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 08:27.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 22 Dec 2025
Details
View Map
Share
Chesterfield Grove

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chesterfield Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 22 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2025 at 12:42.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Holman Road

Thames Water are proposing to carry out Utility asset works on Holman Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 11:35.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Holman Road

Thames Water are proposing to carry out Utility asset works on Holman Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 14:16.

London Borough Of Lewisham logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Grinstead Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Grinstead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 17 Sep 2025 at 10:37.

London Borough Of Southwark logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Rotherhithe Old Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe Old Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 16:27.

London Borough Of Southwark logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Rotherhithe Old Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Rotherhithe Old Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Sep 2025 at 07:59.

London Borough Of Lambeth logo
LONG TERM
Between
3 Nov and 26 Dec 2025
Details
View Map
Share
Follow
Albert Embankment

London Borough Of Lambeth are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 26 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 16 Sep 2025 at 14:59.

London Borough Of Southwark logo
Between
3 and 26 Nov 2025
Details
View Map
Share
Cope Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Cope Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 26 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2025 at 09:34.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 8 Nov 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 3 Mar 2025 at 14:14.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 8 Nov 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Aug 2025 at 12:04.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Earl's Court Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Earl's Court Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 16:00.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Earl's Court Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Earl's Court Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 09:37.

Thames Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Hogarth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hogarth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 11:10.

Thames Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Hogarth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hogarth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 16:19.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Greencoat Row

Thames Water are proposing to carry out Utility asset works on Greencoat Row, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 06:07.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Greencoat Place

Thames Water are proposing to carry out Utility asset works on Greencoat Place, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 06:11.

BT logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Hertford Street

BT are proposing to carry out Utility repair and maintenance works on Hertford Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Aug 2025 at 15:16.

BT logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Hertford Street

BT are proposing to carry out Utility repair and maintenance works on Hertford Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2025 at 10:03.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Stanhope Row

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanhope Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 13:14.

Thames Water logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Mary Place

Thames Water are proposing to carry out Utility repair and maintenance works on Mary Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 11:33.

Thames Water logo
Between
3 and 9 Nov 2025
Details
View Map
Share
Follow
King William Street

Thames Water are proposing to carry out New service connection on King William Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 11:11.

Thames Water logo
Between
3 and 9 Nov 2025
Details
View Map
Share
Follow
King William Street

Thames Water are proposing to carry out New service connection on King William Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:38.

Thames Water logo
Between
3 and 9 Nov 2025
Details
View Map
Share
Follow
Abchurch Lane

Thames Water are proposing to carry out New service connection on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Aug 2025 at 21:48.

Thames Water logo
Between
3 and 9 Nov 2025
Details
View Map
Share
Follow
Abchurch Lane

Thames Water are proposing to carry out New service connection on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2025 at 08:14.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Drury Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Drury Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 09:32.

London Borough Of Hammersmith & Fulham logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:12.

London Borough Of Hammersmith & Fulham logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
West Central Street

Thames Water are proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 08:58.

Cadent Gas logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Middlesex Street

Cadent Gas are proposing to carry out Utility asset works on Middlesex Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 16:30.

Cadent Gas logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Middlesex Street

Cadent Gas are proposing to carry out Utility asset works on Middlesex Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 11:05.

Cadent Gas logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Middlesex Street

Cadent Gas are proposing to carry out Utility asset works on Middlesex Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 17:51.

Cadent Gas logo
Between
3 and 12 Nov 2025
Details
View Map
Share
Follow
Sandy's Row

Cadent Gas are proposing to carry out Utility asset works on Sandy's Row, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 16:30.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Berners Mews

Thames Water are proposing to carry out New service connection on Berners Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 08:26.

Cadent Gas logo
Between
3 and 12 Nov 2025
Details
View Map
Share
Follow
Widegate Street

Cadent Gas are proposing to carry out Utility asset works on Widegate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 16:30.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Moor Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Moor Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 11:43.

LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Finsbury Square

London Borough Of Islington are proposing to carry out Highway improvement works on Finsbury Square, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 18 Jul 2025 at 08:07.

LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
City Road

London Borough Of Islington are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 26 Jun 2025 at 10:35.

Thames Water logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Russell Square

Thames Water are proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 16:00.

Thames Water logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Russell Square

Thames Water were proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 23 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 08:52.

Thames Water logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Russell Square

Thames Water are proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 19:14.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Devonshire Row Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 11:26.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Devonshire Row Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 09:57.

Thames Water logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Old Street

Thames Water are proposing to carry out Statutory Infrastructure Works on Old Street, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 14:57.

Thames Water logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Old Street

Thames Water are proposing to carry out Statutory Infrastructure Works on Old Street, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 08:50.

London Borough Of Camden logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:50.

London Borough Of Camden logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Oct 2025 at 18:10.

London Borough Of Camden logo
LONG TERM
Between
3 Nov and 20 Dec 2025
Details
View Map
Share
Follow
Pancras Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Pancras Road, St Pancras And Somers Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 20 December 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Camden on 29 Sep 2025 at 15:39.

UK Power Networks Eastern & London logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Charles Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Charles Lane, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2025 at 08:38.

UK Power Networks Eastern & London logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Charles Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Charles Lane, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2025 at 13:56.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Greenland Street

Thames Water were proposing to carry out New service connection on Greenland Street, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 11:23.

Thames Water logo
Between
4 and 9 Nov 2025
Details
View Map
Share
Follow
Durward Street

Thames Water are proposing to carry out Utility repair and maintenance works on Durward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 18:33.

Thames Water logo
Between
4 and 9 Nov 2025
Details
View Map
Share
Follow
Durward Street

Thames Water are proposing to carry out Utility repair and maintenance works on Durward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 15:45.

Vodafone logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Northburgh Street

Vodafone are proposing to carry out New service connection on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 8 Aug 2025 at 14:01.

Thames Water logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Forthbridge Road

Thames Water are proposing to carry out Utility repair and maintenance works on Forthbridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 14:57.

Cadent Gas logo
LONG TERM
Between
5 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 17:23.

Vodafone logo
Between
5 and 11 Nov 2025
Details
View Map
Share
Follow
Waterloo Place

Vodafone are proposing to carry out Utility repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 28 Aug 2025 at 16:00.

City Of Westminster logo
Between
7 and 10 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2025 at 11:04.

City Of Westminster logo
Between
7 and 10 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Aug 2025 at 14:01.

City Of Westminster logo
LONG TERM
Between
7 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 09:42.

City Of Westminster logo
LONG TERM
Between
7 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Waterloo Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 Jun 2025 at 14:15.

UK Power Networks Eastern & London logo
Between
7 and 19 Nov 2025
Details
View Map
Share
Follow
Thavies Inn

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thavies Inn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 16:20.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Nov 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Ordnance Hill

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ordnance Hill, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jun 2025 at 13:34.

Thames Water logo
LONG TERM
Between
7 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 13:12.

Southern Gas Networks logo
LONG TERM
Between
7 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Chesterfield Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chesterfield Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:46.

London Borough Of Hammersmith & Fulham logo
Between
7 and 26 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 09:15.

UK Power Networks Eastern & London logo
Between
8 and 19 Nov 2025
Details
View Map
Share
Follow
Old Pye Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Old Pye Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 15:34.

UK Power Networks Eastern & London logo
Between
8 and 19 Nov 2025
Details
View Map
Share
Follow
Strutton Ground

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Strutton Ground, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 15:34.

Southern Gas Networks logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Heybridge Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heybridge Avenue, Streatham Common & Vale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2025 at 15:44.

Southern Gas Networks logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Heybridge Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heybridge Avenue, Streatham Common & Vale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2025 at 10:31.

Thames Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 16:26.

Southern Gas Networks logo
Between
10 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Dingwall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dingwall Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 09:21.

Thames Water logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Gilkes Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 09:36.

Southern Gas Networks logo
Between
10 and 18 Nov 2025
Details
View Map
Share
Follow
Colwell Road

Southern Gas Networks are proposing to carry out New service connection on Colwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 09:44.

Southern Gas Networks logo
Between
10 and 18 Nov 2025
Details
View Map
Share
Follow
Colwell Road

Southern Gas Networks are proposing to carry out New service connection on Colwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 09:13.

Thames Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Trundleys Road

Thames Water are proposing to carry out Utility repair and maintenance works on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 08:41.

London Borough Of Southwark logo
LONG TERM
Between
10 Nov 2025 and 17 Jan 2026
Details
View Map
Share
Aylesbury Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Aylesbury Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 17 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 Jun 2025 at 12:27.

London Borough Of Southwark logo
LONG TERM
Between
10 Nov 2025 and 17 Jan 2026
Details
View Map
Share
Follow
Aylesbury Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Aylesbury Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 17 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 18 Jul 2025 at 12:22.

Cadent Gas logo
Between
10 and 16 Nov 2025
Details
View Map
Share
Follow
Lower Sloane Street

Cadent Gas are proposing to carry out New service connection on Lower Sloane Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 6 Mar 2026
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 6 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 14:33.

BT logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Chiswick High Road

BT are proposing to carry out Utility repair and maintenance works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Aug 2025 at 14:40.

BT logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Chiswick High Road

BT are proposing to carry out Utility repair and maintenance works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Aug 2025 at 12:23.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Sloane Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 15:21.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Cadogan Place

Thames Water were proposing to carry out New service connection on Cadogan Place, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 13 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 15:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 13:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jun 2025 at 09:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Needleman Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 18 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Needleman Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 18 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 13:36.

UK Power Networks Eastern & London logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Jun 2025 at 13:03.

UK Power Networks Eastern & London logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 13:45.

UK Power Networks Eastern & London logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 07:38.

UK Power Networks Eastern & London logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 15:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jun 2025 at 16:50.

Between
10 and 25 Nov 2025
Details
View Map
Share
Treveris Street

Leep Utilities Electric were proposing to carry out Utility asset works on Treveris Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 25 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leep Utilities Electric on 14 Aug 2025 at 09:13.

ESP Electricity logo
Between
10 and 25 Nov 2025
Details
View Map
Share
Follow
Treveris Street

ESP Electricity are proposing to carry out Utility asset works on Treveris Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 10 Sep 2025 at 09:36.

ESP Electricity logo
Between
10 and 25 Nov 2025
Details
View Map
Share
Follow
Bear Lane

ESP Electricity are proposing to carry out Utility asset works on Bear Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 10 Sep 2025 at 09:36.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Blackburne's Mews

Thames Water were proposing to carry out Disconnection or alteration of supply on Blackburne's Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 13 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 11:47.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Brewer Street

Thames Water are proposing to carry out Utility repair and maintenance works on Brewer Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:00.

City Of Westminster logo
LONG TERM
Between
10 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 13:58.

City Of Westminster logo
LONG TERM
Between
10 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Oct 2025 at 07:01.

City Of Westminster logo
LONG TERM
Between
10 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 13:58.

City Of Westminster logo
LONG TERM
Between
10 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Oct 2025 at 07:13.

City Of Westminster logo
LONG TERM
Between
10 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Seymour Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Seymour Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2025 at 11:34.

City Of Westminster logo
LONG TERM
Between
10 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Seymour Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Seymour Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Oct 2025 at 15:13.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Newton Road

Thames Water are proposing to carry out New service connection on Newton Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 13:53.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Newton Road

Thames Water are proposing to carry out New service connection on Newton Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 15:31.

Transport for London (TfL) logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:13.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Du Cane Road

Cadent Gas are proposing to carry out Utility asset works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:00.

Transport for London (TfL) logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:08.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Nascot Street

Cadent Gas are proposing to carry out Utility asset works on Nascot Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:30.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Glenroy Street

Cadent Gas are proposing to carry out Utility asset works on Glenroy Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:30.

Virgin Media logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Cambridge Gardens

Virgin Media were proposing to carry out Utility repair and maintenance works on Cambridge Gardens, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 13 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Sep 2025 at 14:56.

Thames Water logo
Between
10 and 16 Nov 2025
Details
View Map
Share
Follow
West Smithfield

Thames Water are proposing to carry out New service connection on West Smithfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2025 at 16:44.

Thames Water logo
Between
10 and 16 Nov 2025
Details
View Map
Share
West Smithfield

Thames Water were proposing to carry out New service connection on West Smithfield, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 16 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 08:45.

Thames Water logo
Between
10 and 16 Nov 2025
Details
View Map
Share
Follow
West Smithfield

Thames Water are proposing to carry out Statutory Infrastructure Works on West Smithfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 08:47.

UK Power Networks Eastern & London logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Brick Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Brick Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 15:28.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:43.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 06:42.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Great Sutton Street

Thames Water are proposing to carry out New service connection on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 11:55.

UK Power Networks Eastern & London logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Abercorn Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Abercorn Close, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 09:48.

UK Power Networks Eastern & London logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Abercorn Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Abercorn Close, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2025 at 08:50.

UK Power Networks Eastern & London logo
Between
11 and 27 Nov 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2025 at 21:42.

Thames Water logo
Between
11 and 24 Nov 2025
Details
View Map
Share
Casewick Road

Thames Water were proposing to carry out Utility repair and maintenance works on Casewick Road, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 24 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 15:52.

London Borough Of Wandsworth logo
Between
12 and 17 Nov 2025
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Sep 2025 at 08:14.

Cadent Gas logo
LONG TERM
Between
12 Nov 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Ingrave Street

Cadent Gas are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:08.

Cadent Gas logo
LONG TERM
Between
12 Nov 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Wye Street

Cadent Gas are proposing to carry out Utility asset works on Wye Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:06.

City Of Westminster logo
Between
12 and 26 Nov 2025
Details
View Map
Share
Follow
Brewer Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Brewer Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 10 Oct 2025 at 09:36.

City Of Westminster logo
Between
12 and 26 Nov 2025
Details
View Map
Share
Follow
Lower James Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lower James Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 10 Oct 2025 at 12:47.

UK Power Networks Eastern & London logo
Between
13 and 26 Nov 2025
Details
View Map
Share
Underhill Passage

UK Power Networks Eastern & London were proposing to carry out New service connection on Underhill Passage, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 26 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2025 at 13:05.

UK Power Networks Eastern & London logo
Between
13 and 26 Nov 2025
Details
View Map
Share
Follow
Underhill Passage

UK Power Networks Eastern & London are proposing to carry out New service connection on Underhill Passage, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 26 November 2025. The works will impact the footpath only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2025 at 11:06.

Thames Water logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Wimbledon Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wimbledon Hill Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 08:18.

Thames Water logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Wimbledon Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wimbledon Hill Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 07:55.

London Borough Of Southwark logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 16:27.

Thames Water logo
LONG TERM
Between
13 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Shelgate Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Shelgate Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:06.

Thames Water logo
LONG TERM
Between
14 Nov 2025 and 29 Jan 2026
Details
View Map
Share
Follow
Marmion Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Marmion Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 29 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:06.

City Of Westminster logo
Between
14 and 17 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 06:52.

City Of Westminster logo
Between
14 and 17 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 09:20.

City Of Westminster logo
Between
14 and 17 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Sep 2025 at 16:07.

London Borough Of Hammersmith & Fulham logo
Between
14 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
Between
14 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 17:32.

Thames Water logo
Between
14 and 28 Nov 2025
Details
View Map
Share
Follow
Turner Street

Thames Water are proposing to carry out Utility asset works on Turner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 23:10.

Thames Water logo
Between
14 and 18 Nov 2025
Details
View Map
Share
Follow
New Oxford Street

Thames Water are proposing to carry out Disconnection or alteration of supply on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 18:13.

City Of London Corporation logo
Between
15 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Coleman Street

City Of London Corporation are proposing to carry out Highway improvement works on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 11 Aug 2025 at 11:00.

City Of London Corporation logo
Between
15 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Coleman Street

City Of London Corporation are proposing to carry out Highway improvement works on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 17 Aug 2025 at 16:30.

London Borough Of Camden logo
Between
15 and 28 Nov 2025
Details
View Map
Share
Follow
Delancey Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Delancey Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:47.

UK Power Networks Eastern & London logo
Between
16 and 25 Nov 2025
Details
View Map
Share
Follow
Cayton Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Cayton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2025 at 07:01.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Goodwin Road

Thames Water are proposing to carry out New service connection on Goodwin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 10:57.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Stanhope Row

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanhope Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 08:10.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Old Bond Street

Thames Water were proposing to carry out New service connection on Old Bond Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 15:21.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Upper Grosvenor Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Upper Grosvenor Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 08:45.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Upper Grosvenor Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Upper Grosvenor Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 20 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 12:06.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Blackburne's Mews

Thames Water were proposing to carry out Disconnection or alteration of supply on Blackburne's Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 20 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 15:24.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Blackburne's Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Blackburne's Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 13:20.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Blackburne's Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Blackburne's Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 11:45.

BT logo
Between
17 and 27 Nov 2025
Details
View Map
Share
Follow
Upper Thames Street

BT are proposing to carry out Utility repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Aug 2025 at 10:15.

Electricity Network Company logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Queensway

Electricity Network Company are proposing to carry out Utility asset works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Sep 2025 at 08:21.

UK Power Networks Eastern & London logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Chilworth Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Chilworth Mews, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2025 at 07:49.

UK Power Networks Eastern & London logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Chilworth Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Chilworth Mews, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2025 at 09:15.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 14:52.

City Of Westminster logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on George Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Jun 2025 at 11:48.

City Of Westminster logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Berners Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 20 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Oct 2025 at 16:46.

UK Power Networks Eastern & London logo
Between
17 and 27 Nov 2025
Details
View Map
Share
Follow
Rathbone Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Rathbone Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 15:19.

UK Power Networks Eastern & London logo
Between
17 and 27 Nov 2025
Details
View Map
Share
Follow
Rathbone Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Rathbone Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 14:04.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Mortimer Street

Thames Water are proposing to carry out New service connection on Mortimer Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 08:20.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Berners Mews

Thames Water were proposing to carry out New service connection on Berners Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 14:48.

City Of Westminster logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 May 2025 at 08:26.

City Of Westminster logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 31 Jul 2025 at 13:17.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Harcourt Street

Thames Water are proposing to carry out New service connection on Harcourt Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 09:34.

Thames Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Gray's Inn Road

Thames Water were proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 09:12.

Thames Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Gray's Inn Road

Thames Water were proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Sep 2025 at 15:19.

UK Power Networks Eastern & London logo
Between
17 and 25 Nov 2025
Details
View Map
Share
Follow
Mount Pleasant

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2025 at 18:34.

Eunetworks logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Great Sutton Street

Eunetworks are proposing to carry out Utility asset works on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Oct 2025 at 09:25.

Eunetworks logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Berry Street

Eunetworks are proposing to carry out Utility asset works on Berry Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Oct 2025 at 09:19.

Vodafone logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Northburgh Street

Vodafone are proposing to carry out New service connection on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 7 Oct 2025 at 11:47.

Vodafone logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Northburgh Street

Vodafone are proposing to carry out New service connection on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 9 Oct 2025 at 06:11.

Transport for London (TfL) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Euston Underpass

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Euston Underpass, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 13:04.

Transport for London (TfL) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Euston Underpass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Euston Underpass, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 11:51.

Transport for London (TfL) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Euston Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 11:51.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Camden Street

Transport for London (TfL) were proposing to carry out Section 58 on Camden Street, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:10.

London Borough Of Camden logo
LONG TERM
Between
17 Nov and 29 Dec 2025
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 1 Aug 2025 at 16:48.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Greenland Street

Thames Water were proposing to carry out New service connection on Greenland Street, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 14:47.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Pratt Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Pratt Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:58.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Pratt Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Pratt Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:19.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
St Martin's Close

Transport for London (TfL) are proposing to carry out Highway improvement works on St Martin's Close, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:59.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
St Martin's Close

Transport for London (TfL) are proposing to carry out Highway improvement works on St Martin's Close, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:21.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Greenland Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Greenland Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:42.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Greenland Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Greenland Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:21.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Georgiana Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:41.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Georgiana Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:21.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Carol Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Carol Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:41.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Carol Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Carol Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:22.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Camden Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2025 at 11:51.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Camden Street

Transport for London (TfL) were proposing to carry out Section 58 on Camden Street, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 09:51.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Camden Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2025 at 09:56.

Southern Gas Networks logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Tamworth Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Tamworth Lane, Mitcham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2025 at 10:10.

Southern Gas Networks logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Bond Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bond Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 15:58.

London Borough Of Wandsworth logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Atheldene Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Sep 2025 at 10:54.

Southern Gas Networks logo
Between
17 and 24 Nov 2025
Details
View Map
Share
Follow
Oakshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakshaw Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:34.

Southern Gas Networks logo
Between
17 and 24 Nov 2025
Details
View Map
Share
Follow
Waverton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:34.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 08:53.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 10:43.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 14:55.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Playfield Crescent

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2025 at 12:42.

London Borough Of Wandsworth logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 5 Sep 2025 at 12:42.

London Borough Of Southwark logo
LONG TERM
Between
17 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Everthorpe Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Everthorpe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Jul 2025 at 11:20.

London Borough Of Southwark logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Hanover Park

London Borough Of Southwark are proposing to carry out Highway improvement works on Hanover Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Sep 2025 at 11:39.

London Borough Of Southwark logo
LONG TERM
Between
17 Nov 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Cooks Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Cooks Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 18 Jul 2025 at 12:30.

Cadent Gas logo
Between
17 and 23 Nov 2025
Details
View Map
Share
Follow
Lower Sloane Street

Cadent Gas are proposing to carry out New service connection on Lower Sloane Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 14:55.

Thames Water logo
Between
17 and 23 Nov 2025
Details
View Map
Share
Follow
Regency Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Regency Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 10:03.

Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Eccleston Place

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Eccleston Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 9 Sep 2025 at 10:33.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Old Pye Street

Thames Water were proposing to carry out New service connection on Old Pye Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:57.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Old Pye Street

Thames Water are proposing to carry out New service connection on Old Pye Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 16:52.

Transport for London (TfL) logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Foxley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Foxley Road, Myatt's Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 14:02.

Transport for London (TfL) logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Foxley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Foxley Road, Myatt's Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2025 at 08:30.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 11 Jun 2025 at 09:20.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2025 and run through until 20 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Jun 2025 at 10:06.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Jun 2025 at 12:30.

UK Power Networks Eastern & London logo
Between
18 Nov and 16 Dec 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 16 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Sep 2025 at 08:04.

City Of Westminster logo
Between
18 and 25 Nov 2025
Details
View Map
Share
Follow
Cleveland Street

City Of Westminster are proposing to carry out Highway improvement works on Cleveland Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 25 November 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 3 Sep 2025 at 07:42.

UK Power Networks Eastern & London logo
Between
19 and 28 Nov 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 12:54.

UK Power Networks Eastern & London logo
Between
19 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Peterborough Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Jul 2025 at 13:38.

City Of Westminster logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Follow
Buckingham Gate

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Oct 2025 at 12:34.

Virgin Media logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Follow
Gedling Place

Virgin Media are proposing to carry out Utility asset works on Gedling Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 29 Aug 2025 at 15:05.

London Borough Of Wandsworth logo
Between
20 and 25 Nov 2025
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 5 Sep 2025 at 13:53.

Thames Water logo
Between
20 and 26 Nov 2025
Details
View Map
Share
Follow
Mortimer Street

Thames Water are proposing to carry out New service connection on Mortimer Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 10:44.

City Of Westminster logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 06:52.

City Of Westminster logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 09:21.

City Of Westminster logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Sep 2025 at 16:08.

Thames Water logo
Between
21 and 27 Nov 2025
Details
View Map
Share
Follow
New Oxford Street

Thames Water are proposing to carry out Disconnection or alteration of supply on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 20:13.

Cadent Gas logo
Between
21 Nov and 1 Dec 2025
Details
View Map
Share
Middlesex Street

Cadent Gas were proposing to carry out Remedial works on Middlesex Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 10:14.

Network Rail logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Half Moon Lane

Network Rail are proposing to carry out Works for Rail Purposes on Half Moon Lane, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Aug 2025 at 09:07.

Network Rail logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Shakespeare Road

Network Rail were proposing to carry out Works for Rail Purposes on Shakespeare Road, Herne Hill & Loughborough Junction, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Aug 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
22 Nov 2025 and 4 Mar 2026
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2025 and could run through until 4 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 12:26.

London Borough Of Southwark logo
LONG TERM
Between
24 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Elephant Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Elephant Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 20 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 Sep 2025 at 13:23.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Shad Thames

BT are proposing to carry out Utility repair and maintenance works on Shad Thames, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Sep 2025 at 10:03.

Virgin Media logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Dukes Lane

Virgin Media are proposing to carry out Utility asset works on Dukes Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Sep 2025 at 15:43.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Market Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 08:39.

Thames Water logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Follow
Aubrey Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Aubrey Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 16:58.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Old Bond Street

Thames Water are proposing to carry out New service connection on Old Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 10:45.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Old Bond Street

Thames Water are proposing to carry out New service connection on Old Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 08:35.

Vodafone logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Follow
Oxford Street

Vodafone are proposing to carry out Utility repair and maintenance works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 1 Sep 2025 at 13:28.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
High Holborn

Thames Water are proposing to carry out Disconnection or alteration of supply on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 09:36.

UK Power Networks Eastern & London logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Rathbone Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Rathbone Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 12:45.

London Borough Of Camden logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Great Russell Street

London Borough Of Camden are proposing to carry out Highway improvement works on Great Russell Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Oct 2025 at 13:55.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Great Russell Street

Thames Water are proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 13:01.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Great Russell Street

Thames Water were proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 11:52.

Thames Water logo
Between
24 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Wilson Street

Thames Water are proposing to carry out New service connection on Wilson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 13:05.

City Of Westminster logo
Between
24 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Cleveland Street

City Of Westminster are proposing to carry out Highway improvement works on Cleveland Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 1 December 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 7 Oct 2025 at 15:24.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Granary Street

Thames Water are proposing to carry out New service connection on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 18:12.

London Borough Of Wandsworth logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Sep 2025 at 12:02.

Southern Gas Networks logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 14:16.

Southern Gas Networks logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Lytcott Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lytcott Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 11:38.

Thames Water logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Costa Street

Thames Water are proposing to carry out New service connection on Costa Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Sep 2025 at 09:29.

Cadent Gas logo
Between
24 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Surrey Lane

Cadent Gas are proposing to carry out Utility asset works on Surrey Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 15:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Nov 2025 and 13 Mar 2026
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 13 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 14:28.

Thames Water logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Kynance Mews

Thames Water are proposing to carry out Remedial works on Kynance Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 15:15.

Between
25 and 28 Nov 2025
Details
View Map
Share
Hatcham Park Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out roadworks on Hatcham Park Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 3 Oct 2025 at 07:39.

City Of Westminster logo
Between
25 and 28 Nov 2025
Details
View Map
Share
John Islip Street

City Of Westminster were proposing to carry out Highway improvement works on John Islip Street, Vincent Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Jul 2025 at 11:24.

City Of Westminster logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
John Islip Street

City Of Westminster are proposing to carry out Highway improvement works on John Islip Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:52.

City Of Westminster logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
Dean Ryle Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Dean Ryle Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:51.

Cadent Gas logo
Between
25 and 30 Nov 2025
Details
View Map
Share
Follow
Aubrey Walk

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Aubrey Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 15:22.

Thames Water logo
Between
25 Nov and 1 Dec 2025
Details
View Map
Share
Follow
West Central Street

Thames Water are proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 15:57.

Thames Water logo
Between
25 Nov and 1 Dec 2025
Details
View Map
Share
West Central Street

Thames Water were proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 11:41.

Transport for London (TfL) logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 13:34.

Transport for London (TfL) logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
Norton Folgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Norton Folgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 13:35.

City Of Westminster logo
Between
27 and 29 Nov 2025
Details
View Map
Share
Follow
Exeter Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Exeter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Jun 2025 at 07:31.

London Borough Of Wandsworth logo
Between
27 and 29 Nov 2025
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Sep 2025 at 12:00.

London Borough Of Southwark logo
LONG TERM
Between
27 Nov 2025 and 19 Dec 2026
Details
View Map
Share
Follow
Lorrimore Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Lorrimore Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 19 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2025 at 09:20.

London Borough Of Southwark logo
LONG TERM
Between
27 Nov 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Lorrimore Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Lorrimore Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 26 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 16:42.

Thames Water logo
Between
28 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Aldensley Road

Thames Water are proposing to carry out New service connection on Aldensley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 14:19.

Thames Water logo
LONG TERM
Between
28 Nov 2025 and 6 Mar 2026
Details
View Map
Share
Follow
Ashfield Street

Thames Water are proposing to carry out Utility asset works on Ashfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 6 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jul 2025 at 14:46.

London Borough Of Camden logo
Between
29 Nov and 13 Dec 2025
Details
View Map
Share
Follow
Delancey Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Delancey Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 1 Aug 2025 at 16:47.

Network Rail logo
Between
29 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Ferndale Road

Network Rail are proposing to carry out Works for Rail Purposes on Ferndale Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Sep 2025 at 14:24.

Between
29 Nov and 5 Dec 2025
Details
View Map
Share
Hatcham Park Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out roadworks on Hatcham Park Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 November 2025 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 3 Oct 2025 at 08:48.

Between
29 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Hatcham Park Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Hatcham Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 3 Oct 2025 at 08:57.

Thames Water logo
Between
30 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Lower Green West

Thames Water are proposing to carry out Utility asset works on Lower Green West, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 15:36.

Thames Water logo
Between
30 Nov and 2 Dec 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility asset works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 15:35.

Thames Water logo
Between
30 Nov and 2 Dec 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility asset works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 05:50.

London Borough Of Lambeth logo
Between
30 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Hailsham Avenue

London Borough Of Lambeth are proposing to carry out Highway improvement works on Hailsham Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:44.

London Borough Of Lambeth logo
Between
30 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway improvement works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.

Network Rail logo
Between
30 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Mantle Road

Network Rail are proposing to carry out Works for Rail Purposes on Mantle Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Aug 2025 at 14:43.

Between
30 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Billington Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Billington Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 24 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 30 Sep 2025 at 12:59.

Southern Gas Networks logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Commonside East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Commonside East, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2025 at 14:25.

Southern Gas Networks logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Sep 2025 at 14:30.

Southern Gas Networks logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 15:16.

Thames Water logo
Between
1 and 6 Dec 2025
Details
View Map
Share
Follow
Summerstown

Thames Water are proposing to carry out New service connection on Summerstown, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 09:34.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:26.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Faygate Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Faygate Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:02.

Transport for London (TfL) logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Marius Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:49.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Palace Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
1 Dec 2025 and 22 Jan 2026
Details
View Map
Share
Lytcott Grove

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lytcott Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 22 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2025 at 12:43.

UK Power Networks Eastern & London logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Old York Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2025 at 08:38.

London Borough Of Wandsworth logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Howie Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Howie Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Oct 2025 at 14:38.

London Borough Of Wandsworth logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Howie Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Howie Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Oct 2025 at 14:48.

London Borough Of Wandsworth logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Elcho Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Elcho Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Oct 2025 at 14:38.

London Borough Of Wandsworth logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Elcho Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Elcho Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Oct 2025 at 14:48.

London Borough Of Southwark logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Peckham Park Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2025 at 09:21.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out Disconnection or alteration of supply on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 13:09.

London Borough Of Southwark logo
Between
1 and 4 Dec 2025
Details
View Map
Share
Follow
Ambergate Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Ambergate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 07:34.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
South Street

Thames Water were proposing to carry out Disconnection or alteration of supply on South Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 12:41.

Transport for London (TfL) logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Victoria Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 18 December 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 10:47.

Transport for London (TfL) logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Blackfriars Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 18 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 10:49.

Transport for London (TfL) logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Queen Victoria Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 18 December 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 10:45.

Transport for London (TfL) logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Victoria Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Victoria Embankment, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 18 December 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 10:43.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Queensway

Thames Water were proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 14:53.

City Of Westminster logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Sep 2025 at 09:58.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Museum Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Museum Street, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 15:55.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Greenland Street

Thames Water are proposing to carry out New service connection on Greenland Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 14:48.

Thames Water logo
Between
2 and 8 Dec 2025
Details
View Map
Share
Follow
Museum Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Museum Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 07:58.

Thames Water logo
Between
2 and 8 Dec 2025
Details
View Map
Share
Follow
Museum Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Museum Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 15:15.

BT logo
Between
3 and 5 Dec 2025
Details
View Map
Share
Follow
Tremadoc Road

BT are proposing to carry out Utility asset works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Sep 2025 at 10:11.

BT logo
Between
3 and 5 Dec 2025
Details
View Map
Share
Follow
Tremadoc Road

BT are proposing to carry out Utility asset works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Sep 2025 at 09:18.

Thames Water logo
LONG TERM
Between
5 Dec 2025 and 9 Apr 2026
Details
View Map
Share
Follow
Kelmscott Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kelmscott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 9 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 16:02.

Transport for London (TfL) logo
Between
5 and 8 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 12:52.

Transport for London (TfL) logo
Between
5 and 8 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 15:52.

Transport for London (TfL) logo
Between
5 and 8 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 14:17.

Transport for London (TfL) logo
Between
5 and 8 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 15:49.

Thames Water logo
Between
6 and 14 Dec 2025
Details
View Map
Share
Follow
Angel Street

Thames Water are proposing to carry out Utility repair and maintenance works on Angel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2025 and could run through until 14 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 13:14.

Thames Water logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Carteret Street

Thames Water were proposing to carry out New service connection on Carteret Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 09:41.

Thames Water logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Cornwall Road

Thames Water are proposing to carry out New service connection on Cornwall Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 08:17.

Cadent Gas logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Christian Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Christian Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 16:42.

London Borough Of Camden logo
Between
8 and 13 Dec 2025
Details
View Map
Share
Follow
New Oxford Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2025 at 16:30.

Cadent Gas logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Whetstone Park

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Whetstone Park, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Sep 2025 at 21:16.

Thames Water logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Pear Tree Street

Thames Water are proposing to carry out New service connection on Pear Tree Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 07:01.

Thames Water logo
Between
8 and 14 Dec 2025
Details
View Map
Share
Follow
Swinton Street

Thames Water are proposing to carry out New service connection on Swinton Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 14:56.

Southern Gas Networks logo
Between
8 and 24 Dec 2025
Details
View Map
Share
Follow
Codrington Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Codrington Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Sep 2025 at 11:29.

Thames Water logo
Between
8 and 19 Dec 2025
Details
View Map
Share
Follow
Clarence Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Clarence Crescent, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 10:22.

Thames Water logo
LONG TERM
Between
8 Dec 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Acanthus Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Acanthus Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 28 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Dec 2025 and 13 Mar 2026
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 13 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 13:25.

Thames Water logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Old Pye Street

Thames Water were proposing to carry out New service connection on Old Pye Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 09:44.

Southern Gas Networks logo
Between
10 and 18 Dec 2025
Details
View Map
Share
Colwell Road

Southern Gas Networks were proposing to carry out New service connection on Colwell Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2025 and run through until 18 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:34.

Transport for London (TfL) logo
Between
10 and 18 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 18 December 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 10:45.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

City Of Westminster logo
Between
11 Dec 2025 and 6 Jan 2026
Details
View Map
Share
Follow
Endell Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Endell Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2025 and could run through until 6 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 11:23.

Transport for London (TfL) logo
Between
12 and 15 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 13:01.

Transport for London (TfL) logo
Between
12 and 15 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 15:59.

Transport for London (TfL) logo
Between
12 and 15 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 14:14.

Transport for London (TfL) logo
Between
12 and 15 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 16:27.

Transport for London (TfL) logo
Between
13 and 15 Dec 2025
Details
View Map
Share
Follow
Foxley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Foxley Road, Myatt's Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 11:47.

Network Rail logo
Between
14 and 19 Dec 2025
Details
View Map
Share
Follow
Trundleys Road

Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Aug 2025 at 14:42.

Thames Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Falcon Terrace

Thames Water are proposing to carry out Utility asset works on Falcon Terrace, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 15:09.

Thames Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Manor Grove

Thames Water are proposing to carry out New service connection on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 10:07.

Thames Water logo
Between
15 and 28 Dec 2025
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 28 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 14:39.

Thames Water logo
Between
15 and 28 Dec 2025
Details
View Map
Share
Follow
Buckingham Gate

Thames Water are proposing to carry out New service connection on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 28 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 14:39.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Dec 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 06:40.

Thames Water logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Cornwall Road

Thames Water are proposing to carry out New service connection on Cornwall Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 14:57.

Transport for London (TfL) logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Upper Ground

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2025 at 11:19.

Vodafone logo
Between
15 and 21 Dec 2025
Details
View Map
Share
Follow
Gracechurch Street

Vodafone are proposing to carry out Utility repair and maintenance works on Gracechurch Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 21 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 Sep 2025 at 08:49.

Vodafone logo
Between
15 and 21 Dec 2025
Details
View Map
Share
Gracechurch Street

Vodafone were proposing to carry out Utility repair and maintenance works on Gracechurch Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 21 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 Sep 2025 at 08:35.

Vodafone logo
Between
15 and 21 Dec 2025
Details
View Map
Share
Gracechurch Street

Vodafone were proposing to carry out Utility repair and maintenance works on Gracechurch Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 21 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 Sep 2025 at 08:43.

Cadent Gas logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Christian Street

Cadent Gas are proposing to carry out New service connection on Christian Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 13:47.

UK Power Networks Eastern & London logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Calvin Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Calvin Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2025 at 17:58.

Transport for London (TfL) logo
Between
19 and 22 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 13:00.

Transport for London (TfL) logo
Between
19 and 22 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 15:56.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2025 and 24 Jan 2026
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2025 and could run through until 24 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 10:54.

Transport for London (TfL) logo
Between
19 and 22 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 14:16.

Transport for London (TfL) logo
Between
19 and 22 Dec 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 15:51.

Network Rail logo
LONG TERM
Between
20 Dec 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Leigham Vale

Network Rail are proposing to carry out Works for Rail Purposes on Leigham Vale, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2025 and could run through until 28 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Sep 2025 at 11:26.

Thames Water logo
Between
20 and 23 Dec 2025
Details
View Map
Share
Follow
Granary Street

Thames Water are proposing to carry out New service connection on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 11:15.

Transport for London (TfL) logo
Between
22 and 31 Dec 2025
Details
View Map
Share
Follow
Mitcham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mitcham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2025 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 14:42.

Transport for London (TfL) logo
Between
22 and 31 Dec 2025
Details
View Map
Share
Follow
Garratt Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Garratt Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2025 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 14:44.

Transport for London (TfL) logo
Between
22 and 31 Dec 2025
Details
View Map
Share
Follow
Tooting High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2025 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 15:30.

Thames Water logo
LONG TERM
Between
23 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Curlew Street

Thames Water are proposing to carry out Utility repair and maintenance works on Curlew Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 14:12.

Thames Water logo
Between
29 Dec 2025 and 2 Jan 2026
Details
View Map
Share
Newton Road

Thames Water were proposing to carry out New service connection on Newton Road, Bayswater, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 December 2025 and run through until 2 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 09:16.

Thames Water logo
Between
29 Dec 2025 and 1 Jan 2026
Details
View Map
Share
Malton Road

Thames Water were proposing to carry out New service connection on Malton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 December 2025 and run through until 1 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:42.

Network Rail logo
Between
29 and 31 Dec 2025
Details
View Map
Share
Follow
Ferndale Road

Network Rail are proposing to carry out Works for Rail Purposes on Ferndale Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 December 2025 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Sep 2025 at 08:37.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Jan and 3 Apr 2026
Details
View Map
Share
Follow
Acacia Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2026 and could run through until 3 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 09:33.

Thames Water logo
Between
2 and 8 Jan 2026
Details
View Map
Share
Follow
Pall Mall

Thames Water are proposing to carry out New service connection on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2026 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 16:51.

City Of London Telecomms logo
Between
3 and 20 Jan 2026
Details
View Map
Share
Follow
Belgrave Place

City Of London Telecomms are proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2026 and could run through until 20 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 15 Jul 2025 at 11:19.

City Of London Telecomms logo
Between
3 and 20 Jan 2026
Details
View Map
Share
Belgrave Place

City Of London Telecomms were proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2026 and run through until 20 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 3 Oct 2025 at 08:43.

Southern Gas Networks logo
Between
5 and 26 Jan 2026
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2025 at 16:11.

Electricity Network Company logo
Between
5 and 30 Jan 2026
Details
View Map
Share
Follow
Mitcham Road

Electricity Network Company are proposing to carry out Utility asset works on Mitcham Road, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 7 Aug 2025 at 08:18.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Bellamy Street

Thames Water are proposing to carry out Utility repair and maintenance works on Bellamy Street, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:23.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Bellamy Street

Thames Water are proposing to carry out Utility repair and maintenance works on Bellamy Street, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 14:35.

Southern Gas Networks logo
Between
5 Jan and 1 Feb 2026
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 1 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 14:14.

Southern Gas Networks logo
Between
5 Jan and 1 Feb 2026
Details
View Map
Share
Follow
Broomhill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Broomhill Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 1 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 14:13.

Southern Gas Networks logo
LONG TERM
Between
5 Jan and 9 Feb 2026
Details
View Map
Share
Follow
Chesterfield Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chesterfield Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2025 at 14:37.

UK Power Networks Eastern & London logo
LONG TERM
Between
5 Jan and 5 Feb 2026
Details
View Map
Share
Follow
Sudlow Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Sudlow Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2025 at 08:56.

UK Power Networks Eastern & London logo
Between
5 and 17 Jan 2026
Details
View Map
Share
Follow
South Worple Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on South Worple Avenue, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 17 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 09:15.

Transport for London (TfL) logo
LONG TERM
Between
5 Jan and 13 Feb 2026
Details
View Map
Share
Follow
Falcon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 14:17.

Transport for London (TfL) logo
LONG TERM
Between
5 Jan and 13 Feb 2026
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 13:04.

Transport for London (TfL) logo
LONG TERM
Between
5 Jan and 13 Feb 2026
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 13:03.

Transport for London (TfL) logo
LONG TERM
Between
5 Jan and 13 Feb 2026
Details
View Map
Share
Follow
Battersea High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea High Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 14:19.

Thames Water logo
Between
5 and 11 Jan 2026
Details
View Map
Share
Follow
Regency Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Regency Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 11 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 08:57.

Lumen Technologies logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
Victoria Street

Lumen Technologies are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 26 Sep 2025 at 16:00.

Thames Water logo
Between
5 and 12 Jan 2026
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 12 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 14:28.

Transport for London (TfL) logo
LONG TERM
Between
5 Jan and 31 Mar 2026
Details
View Map
Share
Follow
Bressenden Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Bressenden Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 14:24.

London Borough Of Southwark logo
LONG TERM
Between
5 Jan and 7 Mar 2026
Details
View Map
Share
Follow
Borough Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Borough Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 7 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 4 Sep 2025 at 11:39.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Pavilion Road

Thames Water are proposing to carry out New service connection on Pavilion Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 12:41.

Lumen Technologies logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
Victoria Street

Lumen Technologies are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 3 Oct 2025 at 14:39.

Lumen Technologies logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
Storey's Gate

Lumen Technologies are proposing to carry out Utility asset works on Storey's Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 3 Oct 2025 at 14:37.

Thames Water logo
Between
5 and 8 Jan 2026
Details
View Map
Share
Queen Elizabeth Street

Thames Water were proposing to carry out Utility repair and maintenance works on Queen Elizabeth Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2026 and run through until 8 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 10:28.

Southern Gas Networks logo
LONG TERM
Between
5 Jan and 1 Mar 2026
Details
View Map
Share
Follow
Waterloo Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waterloo Road, Waterloo & Southbank, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 1 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2025 at 15:00.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Grantham Place

Thames Water are proposing to carry out New service connection on Grantham Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 10:21.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Pall Mall

Thames Water are proposing to carry out New service connection on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 09:41.

UK Power Networks Eastern & London logo
Between
5 and 16 Jan 2026
Details
View Map
Share
Follow
Little St James's Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Little St James's Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Sep 2025 at 13:43.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
South Street

Thames Water were proposing to carry out Disconnection or alteration of supply on South Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2026 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:57.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Mar 2025 at 11:43.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 25 Apr 2025 at 11:07.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 15 May 2025 at 17:04.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Cable Street

Thames Water were proposing to carry out New service connection on Cable Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2026 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 14:51.

Cadent Gas logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Great Windmill Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Great Windmill Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 15:00.

Thames Water logo
Between
5 and 7 Jan 2026
Details
View Map
Share
Follow
Watney Street

Thames Water are proposing to carry out Utility repair and maintenance works on Watney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 7 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 07:26.

City Of London Corporation logo
Between
5 Jan and 1 Feb 2026
Details
View Map
Share
Follow
Tudor Street

City Of London Corporation are proposing to carry out Highway improvement works on Tudor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 1 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 11 Aug 2025 at 11:05.

City Of London Corporation logo
Between
5 Jan and 1 Feb 2026
Details
View Map
Share
Follow
Tudor Street

City Of London Corporation are proposing to carry out Highway improvement works on Tudor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 1 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 17 Aug 2025 at 16:17.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Queensway

Thames Water are proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 14:55.

London Borough Of Camden logo
LONG TERM
Between
5 Jan and 1 May 2026
Details
View Map
Share
Follow
Earlham Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Earlham Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 1 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 Sep 2025 at 15:09.

London Borough Of Camden logo
LONG TERM
Between
5 Jan and 1 May 2026
Details
View Map
Share
Follow
Earlham Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Earlham Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 1 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2025 at 12:38.

City Of Westminster logo
Between
5 and 30 Jan 2026
Details
View Map
Share
Follow
Stanhope Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Stanhope Place, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 14:04.

City Of Westminster logo
Between
5 and 30 Jan 2026
Details
View Map
Share
Follow
Stanhope Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Stanhope Place, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Oct 2025 at 07:12.

BT logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Oxford Street

BT are proposing to carry out Utility repair and maintenance works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Aug 2025 at 15:08.

City Of Westminster logo
Between
5 and 28 Jan 2026
Details
View Map
Share
Follow
Endell Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Endell Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 28 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 28 Aug 2025 at 16:18.

City Of Westminster logo
Between
5 and 28 Jan 2026
Details
View Map
Share
Follow
Endell Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Endell Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 28 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 30 Sep 2025 at 11:49.

City Of Westminster logo
Between
5 and 28 Jan 2026
Details
View Map
Share
Follow
Endell Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Endell Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 28 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 30 Sep 2025 at 16:32.

Thames Water logo
Between
5 and 21 Jan 2026
Details
View Map
Share
Follow
Wood Lane

Thames Water are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 21 January 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 15:07.

Cadent Gas logo
Between
5 and 13 Jan 2026
Details
View Map
Share
Follow
Brick Lane

Cadent Gas are proposing to carry out New service connection on Brick Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 15:30.

Cadent Gas logo
Between
5 and 16 Jan 2026
Details
View Map
Share
Follow
Bloomsbury Way

Cadent Gas are proposing to carry out Utility asset works on Bloomsbury Way, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 11:30.

London Borough Of Camden logo
LONG TERM
Between
5 Jan and 3 Apr 2026
Details
View Map
Share
Follow
Eagle Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Eagle Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 3 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 9 Oct 2025 at 22:21.

London Borough Of Camden logo
LONG TERM
Between
5 Jan and 3 Apr 2026
Details
View Map
Share
Follow
Sandland Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Sandland Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 3 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 9 Oct 2025 at 22:05.

Thames Water logo
Between
5 and 8 Jan 2026
Details
View Map
Share
Follow
Homer Street

Thames Water are proposing to carry out Remedial works on Homer Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 8 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 09:01.

London Borough Of Camden logo
LONG TERM
Between
5 Jan and 3 Apr 2026
Details
View Map
Share
Follow
Red Lion Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Red Lion Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 3 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 7 Oct 2025 at 10:17.

Thames Water logo
Between
5 and 14 Jan 2026
Details
View Map
Share
Follow
Crestfield Street

Thames Water are proposing to carry out New service connection on Crestfield Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 14 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 18:32.

Thames Water logo
LONG TERM
Between
5 Jan and 22 Jun 2026
Details
View Map
Share
Follow
Pentonville Road

Thames Water are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works will start on or after 5 January 2026 and could run through until 22 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 10:26.

Thames Water logo
LONG TERM
Between
5 Jan and 22 Jun 2026
Details
View Map
Share
Follow
Pentonville Road

Thames Water are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works will start on or after 5 January 2026 and could run through until 22 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 13:40.

Vodafone logo
Between
6 and 8 Jan 2026
Details
View Map
Share
Follow
Long Acre

Vodafone are proposing to carry out Remedial works on Long Acre, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 8 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 3 Oct 2025 at 14:18.

Cadent Gas logo
Between
6 Jan and 2 Feb 2026
Details
View Map
Share
Follow
Central Street

Cadent Gas are proposing to carry out Utility asset works on Central Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 2 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 13:49.

Transport for London (TfL) logo
Between
6 and 29 Jan 2026
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 29 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:59.

Transport for London (TfL) logo
Between
6 and 29 Jan 2026
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2026 and run through until 29 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:45.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 7 Feb 2026
Details
View Map
Share
Follow
Norwood Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Norwood Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 7 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 22 Sep 2025 at 16:35.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 7 Feb 2026
Details
View Map
Share
Follow
Brockwell Park Gardens

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Brockwell Park Gardens, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 7 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 23 Sep 2025 at 09:40.

City Of Westminster logo
Between
6 Jan and 2 Feb 2026
Details
View Map
Share
Follow
Tachbrook Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Tachbrook Street, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 2 February 2026. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:49.

BT logo
LONG TERM
Between
6 Jan and 13 Feb 2026
Details
View Map
Share
Follow
Chiswick High Road

BT are proposing to carry out Utility repair and maintenance works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Sep 2025 at 07:57.

BT logo
LONG TERM
Between
6 Jan and 13 Feb 2026
Details
View Map
Share
Follow
Goldhawk Road

BT are proposing to carry out Utility repair and maintenance works on Goldhawk Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Sep 2025 at 15:19.

BT logo
LONG TERM
Between
6 Jan and 13 Feb 2026
Details
View Map
Share
Goldhawk Road

BT were proposing to carry out Utility repair and maintenance works on Goldhawk Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2026 and run through until 13 February 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 2 Sep 2025 at 09:30.

Its Technology Group logo
Between
7 and 9 Jan 2026
Details
View Map
Share
Follow
College Street

Its Technology Group are proposing to carry out Utility repair and maintenance works on College Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 23 Sep 2025 at 23:57.

City Of Westminster logo
Between
7 Jan and 4 Feb 2026
Details
View Map
Share
Follow
Covent Garden

City Of Westminster are proposing to carry out Highway repair and maintenance works on Covent Garden, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2026 and could run through until 4 February 2026. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 9 Oct 2025 at 16:31.

City Of Westminster logo
Between
7 and 9 Jan 2026
Details
View Map
Share
Follow
Eastcastle Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Eastcastle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 08:35.

City Of Westminster logo
Between
7 and 9 Jan 2026
Details
View Map
Share
Follow
Eastcastle Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Eastcastle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 08:39.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Jan and 16 Mar 2026
Details
View Map
Share
Follow
Quebec Way

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Quebec Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2026 and could run through until 16 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 08:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Jan and 16 Mar 2026
Details
View Map
Share
Follow
Canada Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Canada Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2026 and could run through until 16 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 17:19.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Jan and 17 Apr 2026
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2026 and could run through until 17 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2025 at 13:57.


Roadworks Map near to Heath Road, LONDON, SW8 3BB (68 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
MarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarkerMarker
Last Updated: 11 Oct 2025 00:53
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Heath Road, LONDON, SW8 3BB (68 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
WANDSWORTH ROAD, CLAPHAM TOWN 
(0.2 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Cancelled
(Scheduled: 10 Oct 2025 - 13 Oct 2025)
0.2
Details
Share
2
Southern Gas Networks logo
MAJOR
  
BEAUFOY ROAD, BATTERSEA 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 12 Sep 2025 13:00
(Scheduled: 8 Sep 2025 - 13 Oct 2025)
0.3
Details
Share
Follow
3
Southern Gas Networks logo
MAJOR
  
ASHLEY CRESCENT, BATTERSEA 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 10 Sep 2025 10:00
(Scheduled: 8 Sep 2025 - 17 Oct 2025)
0.3
Details
Share
Follow
4
Thames Water logo
EMERGENCY
  
LARKHALL RISE, CLAPHAM TOWN 
(0.4 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 16 Sep 2025 10:00
(Scheduled: 16 Sep 2025 - 16 Oct 2025)
0.4
Details
Share
Follow
5
Thames Water logo
THE PAVEMENT, CLAPHAM TOWN 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 6 Oct 2025 - 17 Oct 2025)
0.5
Details
Share
6
Thames Water logo
MAJOR
  
THE PAVEMENT, CLAPHAM TOWN 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 6 Oct 2025 - 17 Oct 2025)
0.5
Details
Share
7
Thames Water logo
MAJOR
  
THE PAVEMENT, CLAPHAM TOWN 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 6 Oct 2025 - 17 Oct 2025
0.5
Details
Share
Follow
8
Thames Water logo
MAJOR
  
THE PAVEMENT, CLAPHAM TOWN 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 6 Oct 2025 10:21
(Scheduled: 6 Oct 2025 - 17 Oct 2025)
0.5
Details
Share
Follow
9
Thames Water logo
URGENT
  
CLAPHAM COMMON NORTH SIDE, CLAPHAM TOWN 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 9 Oct 2025 14:39
(Scheduled: 9 Oct 2025 - 13 Oct 2025)
0.5
Details
Share
Follow
10
Thames Water logo
MAJOR
  
JEDBURGH STREET, BATTERSEA 
(0.5 miles)
Thames Water
Disconnection or alteration of supply - Footway, Carriageway - Road closure
Planned
Scheduled: 5 Aug 2025 - 16 Oct 2025
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data