ROADWORKS SUMMARY
Carpenters Place, LONDON, SW4 7TD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Carpenters Place, SW4 7TD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Carpenters Place, LONDON, SW4 7TD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Carpenters Place are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.

Network Rail logo
LONG TERM
Until
31 Jan 2027
Details
View Map
Share
Follow
Tanner Lane

Network Rail are carrying out Works for Rail Purposes on Tanner Lane, Westminster, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2022 at 07:30 and could run through until 31 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Aug 2026 at 08:24.

Network Rail logo
LONG TERM
Until
31 Jan 2027
Details
View Map
Share
Follow
South Wharf Road

Network Rail are carrying out Works for Rail Purposes on South Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 07:30 and could run through until 31 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Aug 2026 at 13:25.

London Borough Of Wandsworth logo
LONG TERM
Until
27 Mar 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 27 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 08:43.

London Borough Of Southwark logo
LONG TERM
Until
3 Nov 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are carrying out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 00:00 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Apr 2026 at 14:38.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are carrying out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:06.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are carrying out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:06.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are carrying out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:11.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are carrying out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

London Borough Of Southwark logo
LONG TERM
Between
16 Jun 2025 and 15 Dec 2026
Details
View Map
Share
Follow
Stockholm Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Stockholm Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 15 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 12 Feb 2026 at 10:03.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun 2025 and 23 Jun 2027
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 23 June 2027. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Jun 2025 at 17:32.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 June 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2026 at 12:19.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 June 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:50.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul 2025 and 12 Jul 2027
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 12:41.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul 2025 and 12 Jul 2027
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 July 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 14:21.

UK Power Networks Eastern & London logo
LONG TERM
Until
28 Sep 2026
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:00 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2026 at 12:30.

Transport for London (TfL) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out roadworks on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 16 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2026 at 10:37.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 26 Oct 2026
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 27 October 2025 and could run through until 26 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2025 at 13:22.

Transport for London (TfL) logo
LONG TERM
Between
29 Nov 2025 and 30 Oct 2027
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out roadworks on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2025 and could run through until 30 October 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2025 at 13:25.

Transport for London (TfL) logo
LONG TERM
Between
26 Dec 2025 and 27 Nov 2026
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2025 and could run through until 27 November 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Aug 2026 at 14:44.

Southern Gas Networks logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Welham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Welham Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2026 at 10:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 08:15.

London Borough Of Southwark logo
LONG TERM
Until
11 Jan 2027
Details
View Map
Share
Follow
Griggs Place

London Borough Of Southwark are carrying out Highway improvement works on Griggs Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2026 at 08:00 and could run through until 11 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 7 Apr 2026 at 09:01.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Grosvenor Gardens

Transport for London (TfL) are proposing to carry out roadworks on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2026 and could run through until 19 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2026 at 11:24.

Thames Water logo
LONG TERM
Between
12 Jan and 6 Oct 2026
Details
View Map
Share
Follow
Willow Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Willow Lane, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Dec 2025 at 16:30.

London Borough Of Southwark logo
LONG TERM
Between
12 Jan 2026 and 28 Feb 2027
Details
View Map
Share
Follow
Holly Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Holly Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2026 and could run through until 28 February 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 7 Jan 2026 at 16:30.

City Of London Corporation logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ludgate Broadway

City Of London Corporation are carrying out Highway improvement works on Ludgate Broadway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 January 2026 at 08:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 20 Jul 2026 at 13:34.

Transport for London (TfL) logo
LONG TERM
Between
15 Jan 2026 and 14 Jan 2027
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2026 and could run through until 14 January 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 2 Feb 2026 at 15:06.

Thames Water logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Balham High Road

Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 January 2026 at 13:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:14.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 January 2026 at 14:00 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 13:35.

Network Rail logo
LONG TERM
Until
30 Aug 2027
Details
View Map
Share
Follow
Old York Road

Network Rail are carrying out Works for Rail Purposes on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 February 2026 at 07:00 and could run through until 30 August 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2026 at 13:37.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2026
Details
View Map
Share
Follow
Recreation Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Recreation Way, Mitcham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 February 2026 at 10:30 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 09:50.

UK Power Networks Eastern & London logo
LONG TERM
Until
19 Oct 2026
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 February 2026 at 10:30 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 13:25.

Transport for London (TfL) logo
LONG TERM
Between
9 Feb 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 February 2026 and could run through until 8 February 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2026 at 14:20.

London Borough Of Southwark logo
LONG TERM
Until
1 Mar 2027
Details
View Map
Share
Follow
Tarn Street

London Borough Of Southwark are carrying out Highway improvement works on Tarn Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 March 2026 at 00:00 and could run through until 1 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Mar 2026 at 12:14.

London Borough Of Southwark logo
LONG TERM
Until
1 Mar 2027
Details
View Map
Share
Follow
Tarn Street

London Borough Of Southwark are carrying out Highway improvement works on Tarn Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 March 2026 at 00:00 and could run through until 1 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Mar 2026 at 12:13.

London Borough Of Southwark logo
LONG TERM
Until
2 Mar 2027
Details
View Map
Share
Follow
Tarn Street

London Borough Of Southwark are carrying out Highway improvement works on Tarn Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2026 at 11:30 and could run through until 2 March 2027. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 3 Mar 2026 at 11:36.

London Borough Of Southwark logo
LONG TERM
Between
16 Mar 2026 and 15 Sep 2027
Details
View Map
Share
Follow
Stoney Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2026 and could run through until 15 September 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2026 at 08:28.

Transport for London (TfL) logo
LONG TERM
Between
21 Mar 2026 and 20 Mar 2027
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are proposing to carry out roadworks on Gracechurch Street, London.

These works are categorised as Major.

The works will start on or after 21 March 2026 and could run through until 20 March 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Mar 2026 at 15:57.

Transport for London (TfL) logo
LONG TERM
Between
30 Mar 2026 and 3 Jan 2028
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out roadworks on Blackfriars Bridge, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2026 and could run through until 3 January 2028. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2026 at 14:56.

Transport for London (TfL) logo
LONG TERM
Between
30 Mar 2026 and 3 Jan 2028
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out roadworks on Blackfriars Bridge, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2026 and could run through until 3 January 2028. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2026 at 15:01.

London Borough Of Southwark logo
LONG TERM
Until
1 Jan 2027
Details
View Map
Share
Follow
Union Street

London Borough Of Southwark are carrying out Highway improvement works on Union Street, London.

These works are categorised as Major.

The works started on 3 April 2026 at 00:00 and could run through until 1 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 25 Aug 2026 at 11:27.

Thames Water logo
LONG TERM
Until
16 Nov 2026
Details
View Map
Share
Follow
Somerleyton Road

Thames Water are carrying out Disconnection or alteration of supply on Somerleyton Road, Brixton Windrush, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2026 at 10:00 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2026 at 10:24.

Thames Water logo
LONG TERM
Until
14 Nov 2026
Details
View Map
Share
Follow
Moorland Road

Thames Water are carrying out Disconnection or alteration of supply on Moorland Road, Brixton Windrush, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2026 at 09:30 and could run through until 14 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2026 at 09:43.

Thames Water logo
LONG TERM
Until
16 Nov 2026
Details
View Map
Share
Follow
Loughborough Park

Thames Water are carrying out Disconnection or alteration of supply on Loughborough Park, Brixton Windrush, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2026 at 10:00 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2026 at 10:24.

UK Power Networks Eastern & London logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Sydenham Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2026 at 14:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:34.

Thames Water logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Balham Park Road

Thames Water are carrying out Utility asset works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 April 2026 at 11:00 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 07:50.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 April 2026 at 07:00 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2026 at 08:25.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
28 Feb 2027
Details
View Map
Share
Follow
Albert Bridge Road

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Albert Bridge Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2026 at 00:00 and could run through until 28 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 28 Apr 2026 at 16:31.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr and 8 Dec 2026
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are proposing to carry out roadworks on Gracechurch Street, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 28 April 2026 and could run through until 8 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2026 at 17:21.

HS2 logo
LONG TERM
Until
26 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 08:00 and could run through until 26 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by HS2 on 30 Jun 2026 at 09:19.

HS2 logo
LONG TERM
Until
26 Oct 2026
Details
View Map
Share
Follow
Varndell Street

HS2 are carrying out Utility asset works on Varndell Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 08:00 and could run through until 26 October 2026. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 10 Jun 2026 at 11:17.

Thames Water logo
LONG TERM
Until
27 Nov 2026
Details
View Map
Share
Follow
Amwell Street

Thames Water are carrying out Utility asset works on Amwell Street, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 May 2026 at 08:44 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Aug 2026 at 12:35.

London Borough Of Southwark logo
LONG TERM
Until
10 Nov 2026
Details
View Map
Share
Follow
Joan Street

London Borough Of Southwark are carrying out Highway improvement works on Joan Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 May 2026 at 05:58 and could run through until 10 November 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 11 May 2026 at 06:04.

London Borough Of Lambeth logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Carson Road

London Borough Of Lambeth are carrying out Highway improvement works on Carson Road, West Dulwich, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 8 Sep 2026 at 13:15.

London Borough Of Lambeth logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Rosendale Road

London Borough Of Lambeth are carrying out Highway improvement works on Rosendale Road, West Dulwich, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2026 at 08:00 and could run through until 9 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 12 May 2026 at 08:38.

UK Power Networks Eastern & London logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Lawrie Park Avenue

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lawrie Park Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 May 2026 at 13:30 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:37.

London Borough Of Southwark logo
LONG TERM
Until
5 Oct 2026
Details
View Map
Share
Follow
Naylor Road

London Borough Of Southwark are carrying out Highway improvement works on Naylor Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 00:00 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2026 at 18:43.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
23 Sep 2026
Details
View Map
Share
Follow
Macfarlane Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Macfarlane Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2026 at 07:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Jun 2026 at 11:43.

UK Power Networks Eastern & London logo
LONG TERM
Until
19 Oct 2026
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 May 2026 at 14:00 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 13:35.

UK Power Networks Eastern & London logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Jews Walk

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Jews Walk, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 May 2026 at 09:44 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:35.

London Borough Of Southwark logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Studholme Street

London Borough Of Southwark are carrying out Highway improvement works on Studholme Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 May 2026 at 00:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Jul 2026 at 11:37.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Onslow Gardens

Cadent Gas are carrying out Utility asset works on Onslow Gardens, London.

These works are categorised as Major.

The works started on 26 May 2026 at 10:27 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:57.

London Borough Of Lambeth logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Idmiston Road

London Borough Of Lambeth are carrying out Highway improvement works on Idmiston Road, West Dulwich, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 8 Sep 2026 at 12:55.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

The works started on 4 June 2026 at 22:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Aug 2026 at 12:20.

Transport for London (TfL) logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Tower Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Tower Bridge Road, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 June 2026 at 11:59 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 11:31.

Thames Water logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Wakehurst Road

Thames Water are carrying out Disconnection or alteration of supply on Wakehurst Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 08:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jun 2026 at 08:07.

Network Rail logo
LONG TERM
Until
30 Nov 2026
Details
View Map
Share
Follow
Sail Street

Network Rail are carrying out Works for Rail Purposes on Sail Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 08:00 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Jun 2026 at 08:44.

Network Rail logo
LONG TERM
Until
30 Nov 2026
Details
View Map
Share
Follow
Lambeth Road

Network Rail are carrying out Works for Rail Purposes on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 06:00 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Jun 2026 at 08:43.

City Of Westminster logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Paddington Street

City Of Westminster are carrying out Highway repair and maintenance works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 12:06.

City Of Westminster logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Chiltern Street

City Of Westminster are carrying out Highway repair and maintenance works on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 08:00 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 12:08.

City Of Westminster logo
LONG TERM
Until
14 Dec 2026
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are carrying out Highway improvement works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 June 2026 at 08:00 and could run through until 14 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jun 2026 at 08:53.

UK Power Networks Eastern & London logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 09:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:51.

Transport for London (TfL) logo
LONG TERM
Until
4 Jan 2027
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, Harrow Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2026 at 08:00 and could run through until 4 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 11:11.

London Borough Of Lambeth logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Park Hall Road

London Borough Of Lambeth are carrying out Highway improvement works on Park Hall Road, West Dulwich, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 8 Sep 2026 at 12:59.

City Of London Corporation logo
LONG TERM
Until
31 Oct 2026
Details
View Map
Share
Follow
King William Street

City Of London Corporation are carrying out Highway improvement works on King William Street, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2026 at 08:00 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 11 Sep 2026 at 13:08.

Transport for London (TfL) logo
LONG TERM
Between
6 Jul 2026 and 5 Jul 2027
Details
View Map
Share
Follow
Harleyford Street

Transport for London (TfL) are proposing to carry out roadworks on Harleyford Street, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2026 and could run through until 5 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2026 at 13:40.

HS2 logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
North Gower Street

HS2 are carrying out Works for Rail Purposes on North Gower Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2026 at 08:00 and could run through until 12 October 2026. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 25 Aug 2026 at 10:17.

Cadent Gas logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Chapter Street

Cadent Gas are carrying out Utility asset works on Chapter Street, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 July 2026 at 10:13 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 10:19.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Crownstone Road

Thames Water are carrying out Disconnection or alteration of supply on Crownstone Road, Brixton Rush Common, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2026 at 15:30 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 13:53.

Thames Water logo
LONG TERM
Until
27 Nov 2026
Details
View Map
Share
Follow
Albyn Road

Thames Water are carrying out Utility repair and maintenance works on Albyn Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2026 at 16:00 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 16:31.

London Borough Of Southwark logo
LONG TERM
Until
24 Sep 2026
Details
View Map
Share
Follow
Homestall Road

London Borough Of Southwark are carrying out Highway improvement works on Homestall Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 10:53.

Southern Gas Networks logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Sydenham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Sydenham Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2026 at 15:40.

Southern Gas Networks logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Kirkdale

Southern Gas Networks are carrying out Utility repair and maintenance works on Kirkdale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2026 at 15:41.

Southern Gas Networks logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Sheenewood

Southern Gas Networks are carrying out Utility repair and maintenance works on Sheenewood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Jul 2026 at 09:00.

Southern Gas Networks logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Westwood Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Westwood Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2026 at 15:41.

Thames Water logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Marmion Road

Thames Water are carrying out Disconnection or alteration of supply on Marmion Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 13:00 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:26.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Bridgend Road

London Borough Of Wandsworth are carrying out Highway improvement works on Bridgend Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:04.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Between
27 Jul and 28 Sep 2026
Details
View Map
Share
Follow
Pump House Lane

London Borough Of Wandsworth are proposing to carry out Section 50 on Pump House Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 Aug 2026 at 11:01.

London Borough Of Wandsworth logo
LONG TERM
Between
27 Jul and 28 Sep 2026
Details
View Map
Share
Follow
Kirtling Street

London Borough Of Wandsworth are proposing to carry out Section 50 on Kirtling Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 30 Jun 2026 at 10:40.

UK Power Networks Eastern & London logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Kensington Road

UK Power Networks Eastern & London are carrying out Utility asset works on Kensington Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 11:00 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jul 2026 at 15:37.

Transport for London (TfL) logo
LONG TERM
Between
27 Jul and 29 Sep 2026
Details
View Map
Share
Follow
Hampstead Road

Transport for London (TfL) are proposing to carry out Section 50 on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Jun 2026 at 10:26.

Thames Water logo
LONG TERM
Until
18 Dec 2026
Details
View Map
Share
Follow
Pentonville Road

Thames Water are carrying out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works started on 27 July 2026 at 12:03 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 15:35.

City Of Westminster logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Cleveland Street

City Of Westminster are carrying out Highway repair and maintenance works on Cleveland Street, Bloomsbury, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Aug 2026 at 21:19.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug 2026 and 10 May 2027
Details
View Map
Share
Follow
Commercial Street

Transport for London (TfL) are proposing to carry out roadworks on Commercial Street, London.

These works are categorised as Major.

The works will start on or after 3 August 2026 and could run through until 10 May 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Aug 2026 at 15:53.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug 2026 and 10 May 2027
Details
View Map
Share
Follow
Commercial Street

Transport for London (TfL) are proposing to carry out roadworks on Commercial Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 10 May 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Aug 2026 at 15:51.

Thames Water logo
LONG TERM
Until
17 Oct 2026
Details
View Map
Share
Follow
Commercial Road

Thames Water are carrying out Utility asset works on Commercial Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 10:00 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 09:13.

London Borough Of Lambeth logo
LONG TERM
Between
10 Aug 2026 and 10 Aug 2028
Details
View Map
Share
Follow
Somerleyton Road

London Borough Of Lambeth are proposing to carry out roadworks on Somerleyton Road, Brixton Windrush, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2026 and could run through until 10 August 2028. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 31 Jul 2026 at 10:29.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hanover Park

Transport for London (TfL) are proposing to carry out Highway improvement works on Hanover Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 13:38.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hanover Park

Transport for London (TfL) are carrying out Highway improvement works on Hanover Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2026 at 11:43.

Thames Water logo
LONG TERM
Until
11 Dec 2026
Details
View Map
Share
Follow
Inglebert Street

Thames Water are carrying out Utility asset works on Inglebert Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 16:00 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Aug 2026 at 17:06.

HS2 logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Stanhope Street

HS2 are carrying out Works for Rail Purposes on Stanhope Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 08:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 26 Aug 2026 at 14:14.

Thames Water logo
LONG TERM
Until
23 Sep 2026
Details
View Map
Share
Follow
Wisley Road

Thames Water are carrying out Disconnection or alteration of supply on Wisley Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2026 at 09:00 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 09:13.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
St Giles High Street

Cadent Gas are carrying out Utility repair and maintenance works on St Giles High Street, Holborn And Covent Garden, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 August 2026 at 04:47 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 09:01.

Transport for London (TfL) logo
LONG TERM
Between
16 Aug and 20 Dec 2026
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out roadworks on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2026 at 17:33.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Old Compton Street

Thames Water are carrying out Utility repair and maintenance works on Old Compton Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 14:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 09:14.

Transport for London (TfL) logo
LONG TERM
Until
23 Nov 2026
Details
View Map
Share
Follow
Marylebone Road

Transport for London (TfL) are carrying out Highway improvement works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:00 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Aug 2026 at 09:55.

Thames Water logo
LONG TERM
Between
18 Aug and 27 Oct 2026
Details
View Map
Share
Follow
Salamanca Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Salamanca Place, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2026 at 09:29.

London Borough Of Southwark logo
LONG TERM
Between
19 Aug and 28 Oct 2026
Details
View Map
Share
Follow
Fenning Street

London Borough Of Southwark are proposing to carry out Remedial works on Fenning Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 18 Aug 2026 at 14:50.

City Of Westminster logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are carrying out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2026 at 09:00 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 Aug 2026 at 09:56.

City Of Westminster logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Waterloo Place

City Of Westminster are carrying out Highway repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 13:00 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 10 Sep 2026 at 14:31.

City Of Westminster logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Sherlock Mews

City Of Westminster are carrying out Highway repair and maintenance works on Sherlock Mews, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Sep 2026 at 08:46.

UK Power Networks Eastern & London logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Kensington High Street

UK Power Networks Eastern & London are carrying out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2026 at 08:00 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2026 at 09:25.

Southern Gas Networks logo
LONG TERM
Until
28 Sep 2026
Details
View Map
Share
Follow
Carolina Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Carolina Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:00 and could run through until 28 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 09:12.

London Borough Of Southwark logo
Finishing
Sunday
Details
View Map
Share
Follow
Camberwell New Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Camberwell New Road, London.

These works are categorised as Major.

The works will start on or after 24 August 2026 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2026 at 10:41.

London Borough Of Southwark logo
Finishing
Sunday
Details
View Map
Share
Camberwell New Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Camberwell New Road, London.

These works were categorised as Major.

The works were originally planned to start 24 August 2026 and run through until 20 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2026 at 11:30.

London Borough Of Southwark logo
Finishing
Sunday
Details
View Map
Share
Follow
Camberwell New Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Camberwell New Road, London.

These works are categorised as Major.

The works will start on or after 24 August 2026 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2026 at 11:30.

London Borough Of Southwark logo
Finishing
Sunday
Details
View Map
Share
Follow
Camberwell New Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Camberwell New Road, London.

These works are categorised as Major.

The works will start on or after 24 August 2026 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2026 at 11:30.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Rampayne Street

Cadent Gas are carrying out Utility asset works on Rampayne Street, Tachbrook, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:32 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 09:32.

Thames Water logo
LONG TERM
Between
24 Aug and 26 Oct 2026
Details
View Map
Share
Follow
Kennington Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kennington Road, Kennington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Jun 2026 at 15:29.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 07:30 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 16:35.

City Of Westminster logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are carrying out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 08:00 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Aug 2026 at 08:53.

UK Power Networks Eastern & London logo
LONG TERM
Until
19 Oct 2026
Details
View Map
Share
Follow
Stonecutter Street

UK Power Networks Eastern & London are carrying out Utility asset works on Stonecutter Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 08:00 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 11:24.

G2 Energy IDNO logo
LONG TERM
Between
25 Aug and 14 Dec 2026
Details
View Map
Share
Follow
Sutherland Avenue

G2 Energy IDNO are proposing to carry out New service connection on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by G2 Energy IDNO on 12 Aug 2026 at 14:28.

Thames Water logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Marylebone Road

Thames Water are carrying out Statutory Infrastructure Works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 14:21.

Thames Water logo
LONG TERM
Between
26 Aug and 12 Oct 2026
Details
View Map
Share
Follow
Gowrie Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gowrie Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 12:59.

Thames Water logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Gowrie Road

Thames Water are carrying out Disconnection or alteration of supply on Gowrie Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 08:45 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 09:00.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Tower Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Tower Bridge Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 22:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 22:08.

Cadent Gas logo
LONG TERM
Until
5 Oct 2026
Details
View Map
Share
Follow
Nine Elms Lane

Cadent Gas are carrying out Utility asset works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 09:51 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 10:27.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
New Bridge Street

Thames Water are proposing to carry out Utility asset works on New Bridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 19 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:27.

Thames Water logo
LONG TERM
Until
3 Oct 2026
Details
View Map
Share
Follow
New Bridge Street

Thames Water are carrying out Utility asset works on New Bridge Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 21:00 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 16:43.

Thames Water logo
LONG TERM
Between
28 Aug and 3 Oct 2026
Details
View Map
Share
Follow
Queen Victoria Street

Thames Water are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:27.

Thames Water logo
LONG TERM
Between
28 Aug and 3 Oct 2026
Details
View Map
Share
Follow
Queen Victoria Street

Thames Water are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 12:32.

HS2 logo
Finishing
Monday
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 9 Sep 2026 at 11:38.

HS2 logo
Finishing
Monday
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 18:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 9 Sep 2026 at 12:12.

HS2 logo
LONG TERM
Between
28 Aug and 2 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 9 Sep 2026 at 11:06.

HS2 logo
LONG TERM
Between
28 Aug and 2 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 9 Sep 2026 at 11:49.

HS2 logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 18:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 9 Sep 2026 at 12:10.

HS2 logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 08:00 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 14 Sep 2026 at 10:43.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Crabtree Lane

Cadent Gas are carrying out Utility asset works on Crabtree Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:21 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:56.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Crystal Palace Parade

UK Power Networks Eastern & London are proposing to carry out New service connection on Crystal Palace Parade, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Aug 2026 at 12:36.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
Crystal Palace Parade

UK Power Networks Eastern & London are carrying out New service connection on Crystal Palace Parade, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:30 and could run through until 19 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 12:14.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Crystal Palace Parade

UK Power Networks Eastern & London are proposing to carry out New service connection on Crystal Palace Parade, Anerley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2026 at 13:54.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Crystal Palace Parade

UK Power Networks Eastern & London were proposing to carry out New service connection on Crystal Palace Parade, Anerley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2026 at 09:58.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Marryat Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Marryat Road, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2026 at 09:24.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Marryat Road

UK Power Networks Eastern & London are carrying out New service connection on Marryat Road, Wimbledon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:50 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:42.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Burghley Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Burghley Road, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2026 at 09:28.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Burghley Road

UK Power Networks Eastern & London are carrying out New service connection on Burghley Road, Wimbledon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:50 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:41.

Transport for London (TfL) logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are carrying out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:12.

Transport for London (TfL) logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Morrish Road

Transport for London (TfL) are carrying out Highway improvement works on Morrish Road, Clapham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:12.

Transport for London (TfL) logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are carrying out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:11.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 13:24.

Transport for London (TfL) logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are carrying out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:10.

London Borough Of Southwark logo
LONG TERM
Until
2 Nov 2026
Details
View Map
Share
Follow
Havil Street

London Borough Of Southwark are carrying out Highway improvement works on Havil Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 08:48.

London Borough Of Lambeth logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Albert Embankment

London Borough Of Lambeth are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:10 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 1 Sep 2026 at 12:06.

London Borough Of Lambeth logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Salamanca Street

London Borough Of Lambeth are carrying out Highway improvement works on Salamanca Street, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:10 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 1 Sep 2026 at 12:05.

Thames Water logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Thirleby Road

Thames Water are carrying out Utility asset works on Thirleby Road, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 08:37.

Transport for London (TfL) logo
Until
30 Sep 2026
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 07:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 10:27.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 15:22.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 14:50.

City Of London Corporation logo
LONG TERM
Between
1 Sep and 20 Dec 2026
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out roadworks on Finsbury Circus, London.

These works are categorised as Major.

The works will start on or after 1 September 2026 and could run through until 20 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 7 Sep 2026 at 13:38.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Finsbury Circus

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Finsbury Circus, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2026 and run through until 17 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 09:30.

City Of Westminster logo
Finishing
Today
Details
View Map
Share
Follow
Langham Street

City Of Westminster are carrying out Highway repair and maintenance works on Langham Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Sep 2026 at 15:36.

Thames Water logo
Until
26 Sep 2026
Details
View Map
Share
Follow
Cramer Street

Thames Water are carrying out Utility asset works on Cramer Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 26 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:35.

G2 Energy IDNO logo
LONG TERM
Until
17 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are carrying out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 12:30 and could run through until 17 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 14 Sep 2026 at 12:55.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Hampstead Road

Transport for London (TfL) are carrying out Section 50 on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:10 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 14:05.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:07.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Oxford Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2026 and run through until 16 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 12:34.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:06.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Great Portland Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2026 and run through until 16 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 12:34.

G2 Energy IDNO logo
Between
2 and 27 Sep 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 27 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 1 Sep 2026 at 12:14.

Thames Water logo
LONG TERM
Between
2 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Tyers Terrace

Thames Water are proposing to carry out Disconnection or alteration of supply on Tyers Terrace, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jun 2026 at 08:34.

London Borough Of Southwark logo
Between
2 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Queen Elizabeth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Queen Elizabeth Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 18 Aug 2026 at 20:48.

London Borough Of Southwark logo
Between
2 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Queen Elizabeth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Queen Elizabeth Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2026 at 06:34.

London Borough Of Southwark logo
Between
2 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Queen Elizabeth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Queen Elizabeth Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2026 at 06:34.

City Of Westminster logo
LONG TERM
Between
2 Sep and 5 Nov 2026
Details
View Map
Share
Follow
Henrietta Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Henrietta Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Oct 2025 at 14:27.

City Of Westminster logo
LONG TERM
Until
5 Nov 2026
Details
View Map
Share
Follow
Henrietta Street

City Of Westminster are carrying out Highway repair and maintenance works on Henrietta Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Sep 2026 at 09:42.

City Of Westminster logo
LONG TERM
Between
2 Sep and 5 Nov 2026
Details
View Map
Share
Follow
Bedford Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bedford Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Oct 2025 at 14:34.

City Of Westminster logo
LONG TERM
Until
5 Nov 2026
Details
View Map
Share
Follow
Bedford Street

City Of Westminster are carrying out Highway repair and maintenance works on Bedford Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Sep 2026 at 09:42.

Transport for London (TfL) logo
Between
3 and 25 Sep 2026
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 23:03.

Transport for London (TfL) logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are carrying out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 09:30 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 13:31.

Transport for London (TfL) logo
Between
3 and 25 Sep 2026
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2026 at 19:52.

City Of Westminster logo
Finishing
Today
Details
View Map
Share
Follow
St Margaret Street

City Of Westminster are carrying out Highway improvement works on St Margaret Street, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 16:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Sep 2026 at 09:57.

City Of Westminster logo
LONG TERM
Until
13 Nov 2026
Details
View Map
Share
Follow
Jerome Crescent

City Of Westminster are carrying out Highway repair and maintenance works on Jerome Crescent, Church Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 14:00 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Sep 2026 at 14:11.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Cruikshank Street

UK Power Networks Eastern & London are carrying out New service connection on Cruikshank Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:16 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 09:29.

Transport for London (TfL) logo
LONG TERM
Between
7 Sep and 20 Nov 2026
Details
View Map
Share
Follow
High Street Collier's Wood

Transport for London (TfL) are proposing to carry out Highway improvement works on High Street Collier's Wood, Colliers Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2026 at 11:26.

Transport for London (TfL) logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
High Street Collier's Wood

Transport for London (TfL) are carrying out Highway improvement works on High Street Collier's Wood, Colliers Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 12:40.

Southern Gas Networks logo
Until
4 Oct 2026
Details
View Map
Share
Follow
Lawrie Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lawrie Park Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:45 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Sep 2026 at 09:04.

Transport for London (TfL) logo
LONG TERM
Between
7 Sep 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 8 February 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:29.

London Borough Of Southwark logo
LONG TERM
Until
3 Nov 2026
Details
View Map
Share
Follow
Melford Road

London Borough Of Southwark are carrying out Highway improvement works on Melford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Sep 2026 at 08:06.

London Borough Of Southwark logo
LONG TERM
Between
7 Sep and 3 Nov 2026
Details
View Map
Share
Follow
Wood Vale

London Borough Of Southwark are proposing to carry out Highway improvement works on Wood Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2026 at 15:03.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Balham Hill

Transport for London (TfL) are carrying out Highway improvement works on Balham Hill, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:48.

Transport for London (TfL) logo
Between
7 and 24 Sep 2026
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:16.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are carrying out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 09:51.

Transport for London (TfL) logo
Between
7 and 24 Sep 2026
Details
View Map
Share
Follow
Yukon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Yukon Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:13.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Yukon Road

Transport for London (TfL) are carrying out Highway improvement works on Yukon Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 14:35.

Thames Water logo
LONG TERM
Between
7 Sep and 21 Oct 2026
Details
View Map
Share
Follow
Trelawn Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Trelawn Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 May 2026 at 13:08.

Thames Water logo
Until
26 Sep 2026
Details
View Map
Share
Follow
Mauleverer Road

Thames Water are carrying out Utility repair and maintenance works on Mauleverer Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 13:00 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 14:04.

London Borough Of Southwark logo
Between
7 and 25 Sep 2026
Details
View Map
Share
Follow
Linden Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Linden Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 14:50.

Thames Water logo
Until
29 Sep 2026
Details
View Map
Share
Follow
Elcot Avenue

Thames Water are carrying out Utility repair and maintenance works on Elcot Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 10:00 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 10:04.

London Borough Of Wandsworth logo
Finishing
Today
Details
View Map
Share
Follow
Albert Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:00.

London Borough Of Wandsworth logo
Finishing
Today
Details
View Map
Share
Follow
Albert Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 09:43.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Rampayne Street

Cadent Gas are carrying out Utility asset works on Rampayne Street, Tachbrook, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:45 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:53.

LONG TERM
Between
7 Sep and 17 Oct 2026
Details
View Map
Share
Southwark Park Road

Leep Utilities Electric were proposing to carry out New service connection on Southwark Park Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 17 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leep Utilities Electric on 3 Sep 2026 at 15:06.

BT logo
LONG TERM
Between
7 Sep and 20 Nov 2026
Details
View Map
Share
Follow
Redriff Road

BT are proposing to carry out Utility repair and maintenance works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Aug 2026 at 16:19.

BT logo
LONG TERM
Between
7 Sep and 20 Nov 2026
Details
View Map
Share
Follow
Surrey Quays Road

BT are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Aug 2026 at 11:25.

ESP Electricity logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Aubrey Walk

ESP Electricity are carrying out Utility asset works on Aubrey Walk, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:10 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 11:16.

ESP Electricity logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Aubrey Road

ESP Electricity are carrying out Utility asset works on Aubrey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:10 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 11:15.

London Borough Of Southwark logo
LONG TERM
Between
7 Sep 2026 and 6 Jan 2027
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 15:22.

London Borough Of Southwark logo
LONG TERM
Between
7 Sep 2026 and 6 Jan 2027
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 15:23.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lower Thames Street

UK Power Networks Eastern & London are carrying out Disconnection or alteration of supply on Lower Thames Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:19 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Sep 2026 at 10:41.

UK Power Networks Eastern & London logo
Until
25 Sep 2026
Details
View Map
Share
Follow
St George's Lane

UK Power Networks Eastern & London are carrying out Disconnection or alteration of supply on St George's Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 10:53.

Thames Water logo
Until
30 Sep 2026
Details
View Map
Share
Follow
King William Street

Thames Water are carrying out Utility repair and maintenance works on King William Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 10:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 10:36.

Transport for London (TfL) logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are carrying out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:30 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:20.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are carrying out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:30 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:19.

Transport for London (TfL) logo
Between
9 and 27 Sep 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2026 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 13:00.

Transport for London (TfL) logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are carrying out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:30 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:18.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Great Castle Street

Transport for London (TfL) are carrying out Highway improvement works on Great Castle Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:30 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:19.

Electricity Network Company logo
Finishing
Tuesday
Details
View Map
Share
Follow
Great Portland Street

Electricity Network Company are carrying out Utility asset works on Great Portland Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 09:45 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 9 Sep 2026 at 10:11.

Transport for London (TfL) logo
Between
10 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Rinaldo Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Rinaldo Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Apr 2026 at 12:52.

Southern Gas Networks logo
Until
24 Sep 2026
Details
View Map
Share
Follow
Brixton Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 09:45 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 12:48.

London Borough Of Southwark logo
Between
10 and 23 Sep 2026
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 13 Aug 2026 at 12:01.

London Borough Of Southwark logo
Between
10 and 23 Sep 2026
Details
View Map
Share
Follow
Rye Hill Park

London Borough Of Southwark are proposing to carry out Highway improvement works on Rye Hill Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 18 Aug 2026 at 09:13.

London Borough Of Southwark logo
Between
10 and 23 Sep 2026
Details
View Map
Share
Rye Hill Park

London Borough Of Southwark were proposing to carry out Highway improvement works on Rye Hill Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2026 and run through until 23 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 06:53.

City Of Westminster logo
Until
24 Sep 2026
Details
View Map
Share
Follow
Waterloo Place

City Of Westminster are carrying out Highway repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 13:00 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 10 Sep 2026 at 14:31.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Whitefriars Street

Thames Water are proposing to carry out Utility asset works on Whitefriars Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 14:25.

Thames Water logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Whitefriars Street

Thames Water are carrying out Utility asset works on Whitefriars Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 13:55 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 14:04.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
South Park Road

Thames Water are carrying out Utility repair and maintenance works on South Park Road, Wimbledon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 12:34 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:35.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Church Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Church Lane, Tooting, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 05:43 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2026 at 10:18.

Royal Borough Of Kensington And Chelsea logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Fulham Road

Royal Borough Of Kensington And Chelsea are carrying out roadworks on Fulham Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 17:00 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Sep 2026 at 15:26.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Lumley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Lumley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:10.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Marylebone Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Lane, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:10.

UK Power Networks Eastern & London logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Duke Street

UK Power Networks Eastern & London are carrying out New service connection on Duke Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 09:31.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Rodney Street

Cadent Gas are carrying out Utility repair and maintenance works on Rodney Street, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 10:55 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 14:43.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Eliot Bank

Thames Water are carrying out Utility repair and maintenance works on Eliot Bank, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 03:34 and could run through until 17 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:47.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Albany Road

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Albany Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 September 2026 and run through until 16 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2026 at 06:49.

UK Power Networks Eastern & London logo
Between
12 and 25 Sep 2026
Details
View Map
Share
Follow
Courtfield Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Courtfield Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Aug 2026 at 16:23.

UK Power Networks Eastern & London logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Courtfield Gardens

UK Power Networks Eastern & London are carrying out New service connection on Courtfield Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 08:30 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2026 at 08:30.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Wolfington Road

Thames Water were proposing to carry out Utility repair and maintenance works on Wolfington Road, Knight's Hill, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 10:36.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Clapham Park Road

Thames Water were proposing to carry out Utility repair and maintenance works on Clapham Park Road, Clapham East, London.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:07.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
St James's Place

Thames Water are carrying out Utility repair and maintenance works on St James's Place, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 12:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 09:57.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hay's Mews

Thames Water are carrying out Utility repair and maintenance works on Hay's Mews, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 15:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:09.

Transport for London (TfL) logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
St Helier Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 12:59.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Oak Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 10:38.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Oak Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 09:16.

London Borough Of Bromley logo
LONG TERM
Between
14 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Anerley Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2026 at 08:28.

Thames Water logo
Between
14 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Burstow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Burstow Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 12:55.

Southern Gas Networks logo
LONG TERM
Between
14 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Colby Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colby Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 08:21.

Southern Gas Networks logo
LONG TERM
Until
26 Oct 2026
Details
View Map
Share
Follow
Dulwich Wood Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Dulwich Wood Avenue, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 08:46.

Southern Gas Networks logo
LONG TERM
Between
14 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Farquhar Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farquhar Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2026 at 16:10.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Belvedere Drive

Southern Gas Networks are carrying out roadworks on Belvedere Drive, Wimbledon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:24 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 11:17.

Transport for London (TfL) logo
Between
14 and 28 Sep 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out roadworks on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:14.

Transport for London (TfL) logo
Between
14 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out roadworks on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Aug 2026 at 15:19.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Kingscliffe Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingscliffe Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:18.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Kingscliffe Gardens

Thames Water were proposing to carry out Disconnection or alteration of supply on Kingscliffe Gardens, Southfields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 08:23.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Southdean Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 10:46.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Morrish Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Morrish Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 May 2026 at 11:29.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Brixton Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 11:49.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lynn Road

Thames Water are carrying out Utility repair and maintenance works on Lynn Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:03.

Thames Water logo
Until
9 Oct 2026
Details
View Map
Share
Follow
Wroughton Road

Thames Water are carrying out Disconnection or alteration of supply on Wroughton Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:00 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:42.

Thames Water logo
LONG TERM
Until
12 Nov 2026
Details
View Map
Share
Follow
Trelawn Road

Thames Water are carrying out Disconnection or alteration of supply on Trelawn Road, Brixton Rush Common, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:30 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:47.

T-Mobile (UK) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 24 Jul 2026 at 13:14.

T-Mobile (UK) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 21 Aug 2026 at 08:03.

London Borough Of Southwark logo
Between
14 and 23 Sep 2026
Details
View Map
Share
Follow
Barry Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Barry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Aug 2026 at 15:52.

London Borough Of Southwark logo
LONG TERM
Between
14 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Aug 2026 at 15:52.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 10 Sep 2026 at 10:17.

Southern Gas Networks logo
LONG TERM
Between
14 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Loughborough Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Loughborough Park, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 14:41.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:14.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 8 Sep 2026 at 08:55.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Parkfields

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Parkfields, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 16:12.

London Borough Of Southwark logo
LONG TERM
Between
14 Sep and 13 Nov 2026
Details
View Map
Share
Peckham Rye

London Borough Of Southwark were proposing to carry out Highway improvement works on Peckham Rye, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 13 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 14 Sep 2026 at 12:38.

London Borough Of Southwark logo
Between
14 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Linden Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Linden Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2026 at 08:48.

London Borough Of Wandsworth logo
Finishing
Friday
Details
View Map
Share
Follow
Felsham Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Felsham Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 18 Aug 2026 at 08:59.

London Borough Of Wandsworth logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Felsham Road

London Borough Of Wandsworth are carrying out Highway improvement works on Felsham Road, Putney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 14 Sep 2026 at 08:20.

Cadent Gas logo
Between
14 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Parke Road

Cadent Gas are proposing to carry out Utility asset works on Parke Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 12:46.

Cadent Gas logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Rainville Road

Cadent Gas are carrying out Utility asset works on Rainville Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 10:02 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:42.

Thames Water logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Glengall Road

Thames Water are carrying out Utility asset works on Glengall Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:45 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:37.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Ifield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ifield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 14:55.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Ifield Road

Thames Water are carrying out Utility repair and maintenance works on Ifield Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:48 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:48.

Thames Water logo
Finishing
Today
Details
View Map
Share
Ifield Road

Thames Water were proposing to carry out Utility repair and maintenance works on Ifield Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 16 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 13:47.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Redesdale Street

Thames Water are proposing to carry out New service connection on Redesdale Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jul 2026 at 16:38.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Redesdale Street

Thames Water are carrying out New service connection on Redesdale Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 11:49 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:13.

London Borough Of Southwark logo
Between
14 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Wooler Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Wooler Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 29 Jul 2026 at 08:22.

London Borough Of Southwark logo
Until
12 Oct 2026
Details
View Map
Share
Follow
Wooler Street

London Borough Of Southwark are carrying out Highway improvement works on Wooler Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 16:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Sep 2026 at 16:18.

London Borough Of Southwark logo
Between
14 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Portland Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Portland Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 29 Jul 2026 at 08:22.

London Borough Of Southwark logo
Until
12 Oct 2026
Details
View Map
Share
Follow
Portland Street

London Borough Of Southwark are carrying out Highway improvement works on Portland Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 16:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Sep 2026 at 16:22.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lupus Street

Cadent Gas are carrying out Utility repair and maintenance works on Lupus Street, Warwick, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:18 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 13:43.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
St George's Square

Cadent Gas are carrying out Utility repair and maintenance works on St George's Square, Tachbrook, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:21 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 13:43.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Chancellors Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 13:02.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chancellors Road

Thames Water are carrying out Utility repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 09:40 and could run through until 17 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 11:26.

London Borough Of Lambeth logo
LONG TERM
Between
14 Sep and 11 Nov 2026
Details
View Map
Share
Follow
Albert Embankment

London Borough Of Lambeth are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Jun 2026 at 09:05.

London Borough Of Lambeth logo
LONG TERM
Between
14 Sep and 11 Nov 2026
Details
View Map
Share
Follow
Salamanca Street

London Borough Of Lambeth are proposing to carry out Highway improvement works on Salamanca Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Jun 2026 at 09:05.

Vodafone logo
Finishing
Saturday
Details
View Map
Share
Victoria Street

Vodafone were proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 19 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 1 Sep 2026 at 09:26.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Trinity Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Trinity Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 17:16 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 09:27.

UK Power Networks Eastern & London logo
Between
14 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Whitehall

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Whitehall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 11:24.

Southern Gas Networks logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Salter Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Salter Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 10:00 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 10:20.

Vodafone logo
Finishing
Friday
Details
View Map
Share
Pall Mall

Vodafone were proposing to carry out Utility asset works on Pall Mall, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 15 Sep 2026 at 09:08.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Romilly Street

Thames Water are proposing to carry out Utility repair and maintenance works on Romilly Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Jul 2026 at 08:20.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Queensway

Thames Water are carrying out Disconnection or alteration of supply on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:28 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 09:43.

Thames Water logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are carrying out Statutory Infrastructure Works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 16:47 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 06:40.

HS2 logo
LONG TERM
Between
14 Sep 2026 and 8 Jul 2027
Details
View Map
Share
Follow
Eversholt Street

HS2 are proposing to carry out Works for Rail Purposes on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 8 July 2027. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 17 Aug 2026 at 14:50.

HS2 logo
LONG TERM
Between
14 Sep and 17 Dec 2026
Details
View Map
Share
Mornington Street

HS2 were proposing to carry out Works for Rail Purposes on Mornington Street, Regent's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 17 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by HS2 on 8 Sep 2026 at 10:18.

UK Power Networks Eastern & London logo
Between
15 and 25 Sep 2026
Details
View Map
Share
Follow
Thavies Inn

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thavies Inn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jun 2026 at 12:02.

UK Power Networks Eastern & London logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Thavies Inn

UK Power Networks Eastern & London are carrying out Utility asset works on Thavies Inn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 14:41.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Great Titchfield Street

City Of Westminster are carrying out Highway repair and maintenance works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 09:12.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Upper Wimpole Street

Thames Water are carrying out Utility repair and maintenance works on Upper Wimpole Street, Marylebone High Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:04 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:06.

Thames Water logo
LONG TERM
Between
15 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Dulka Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Dulka Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:56.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Whitbread Road

Thames Water are carrying out Utility repair and maintenance works on Whitbread Road, Crofton Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:26 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:33.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Deerdale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Deerdale Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 19 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Jul 2026 at 13:26.

Thames Water logo
Monday
Details
View Map
Share
Hurlingham Road

Thames Water carried out Utility repair and maintenance works on Hurlingham Road, London.

The road was closed for some or all of the period.

The works were originally planned between 15 Sep 2026 and 21 Sep 2026 and were actually completed between 15 Sep 2026 (08:04) and 16 Sep 2026 (08:29). The works impacted the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 08:48.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Peckham Park Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Peckham Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2026 at 16:04.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Cromwell Road

Thames Water are carrying out Utility repair and maintenance works on Cromwell Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 20:30 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 20:49.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Gordon Place

Thames Water are proposing to carry out Utility repair and maintenance works on Gordon Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 12:25.

City Of Westminster logo
Between
15 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Northumberland Avenue

City Of Westminster are proposing to carry out Highway improvement works on Northumberland Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2026 at 09:26.

City Of Westminster logo
Until
7 Oct 2026
Details
View Map
Share
Follow
Northumberland Avenue

City Of Westminster are carrying out Highway improvement works on Northumberland Avenue, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 09:13.

Cadent Gas logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Berkeley Street

Cadent Gas are carrying out Utility repair and maintenance works on Berkeley Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 13:34 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 16:59.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lexington Street

Thames Water are proposing to carry out New service connection on Lexington Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 08:19.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lexington Street

Thames Water are carrying out New service connection on Lexington Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:07 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 10:48.

London Borough Of Wandsworth logo
Between
16 and 25 Sep 2026
Details
View Map
Share
Follow
Albert Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:00.

London Borough Of Wandsworth logo
Between
16 and 25 Sep 2026
Details
View Map
Share
Follow
Albert Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 10:11.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Strand

Virgin Media were proposing to carry out Utility asset works on Strand, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 7 Sep 2026 at 10:07.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:08.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2026 at 13:19.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Great Castle Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Great Castle Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2026 and run through until 21 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:18.

City Of London Telecomms logo
Finishing
Friday
Details
View Map
Share
Follow
Lincoln's Inn Fields

City Of London Telecomms are carrying out Utility asset works on Lincoln's Inn Fields, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 16 Sep 2026 at 08:10.

City Of Westminster logo
Between
16 and 29 Sep 2026
Details
View Map
Share
Follow
Duchess Street

City Of Westminster are proposing to carry out Highway improvement works on Duchess Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 20 Jul 2026 at 15:35.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Leonard Street

Thames Water are carrying out Utility repair and maintenance works on Leonard Street, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 12:01 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 13:07.

Thames Water logo
Between
16 and 23 Sep 2026
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:23.

Transport for London (TfL) logo
LONG TERM
Between
16 Sep and 11 Nov 2026
Details
View Map
Share
Follow
Old Street

Transport for London (TfL) are proposing to carry out roadworks on Old Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 16:22.

City Of Westminster logo
Between
17 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Great Peter Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Sep 2026 at 14:52.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Marylebone Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Lane, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:11.

London Borough Of Southwark logo
Between
18 and 24 Sep 2026
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 08:50.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Blackfriars Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2026 at 14:28.

City Of London Corporation logo
LONG TERM
Between
19 Sep and 15 Dec 2026
Details
View Map
Share
Follow
Abchurch Lane

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 15 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 14 Sep 2026 at 10:53.

City Of London Corporation logo
LONG TERM
Between
19 Sep and 15 Dec 2026
Details
View Map
Share
Follow
Abchurch Lane

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 15 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 16 Sep 2026 at 10:56.

City Of London Corporation logo
Between
19 and 25 Sep 2026
Details
View Map
Share
Follow
Carter Lane

City Of London Corporation are proposing to carry out Highway improvement works on Carter Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 15 Sep 2026 at 14:06.

HS2 logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 14 Sep 2026 at 10:58.

Thames Water logo
Until
24 Sep 2026
Details
View Map
Share
Follow
Gordon Place

Thames Water are carrying out Utility repair and maintenance works on Gordon Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 13:08 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 13:10.

UK Power Networks Eastern & London logo
Between
20 and 24 Sep 2026
Details
View Map
Share
Follow
Sandgate Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sandgate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2026 at 11:43.

Network Rail logo
Between
20 and 27 Sep 2026
Details
View Map
Share
Follow
Dowgate Hill

Network Rail are proposing to carry out Works for Rail Purposes on Dowgate Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Aug 2026 at 15:10.

Transport for London (TfL) logo
Between
20 and 25 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:49.

Transport for London (TfL) logo
Between
20 and 25 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:51.

Southern Gas Networks logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2026 at 10:55.

Southern Gas Networks logo
LONG TERM
Between
21 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 08:51.

Thames Water logo
Between
21 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Burstow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Burstow Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:22.

Thames Water logo
LONG TERM
Between
21 Sep and 22 Oct 2026
Details
View Map
Share
Follow
Greyhound Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Greyhound Lane, Streatham St Leonard's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 12:41.

London Borough Of Wandsworth logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Openview, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 16:07.

London Borough Of Wandsworth logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Openview, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Aug 2026 at 14:46.

Transport for London (TfL) logo
LONG TERM
Between
21 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2026 at 11:42.

London Borough Of Southwark logo
LONG TERM
Between
21 Sep and 20 Nov 2026
Details
View Map
Share
Follow
Barry Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Barry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 14 Sep 2026 at 12:54.

London Borough Of Southwark logo
LONG TERM
Between
21 Sep and 20 Nov 2026
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 14 Sep 2026 at 15:31.

London Borough Of Southwark logo
LONG TERM
Between
21 Sep and 20 Nov 2026
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Sep 2026 at 15:23.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Bridgend Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bridgend Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Jul 2026 at 15:27.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Jul 2026 at 15:25.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 13:45.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 15:06.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Wandsworth Bridge

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Wandsworth Bridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 30 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 12:49.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Aug 2026 at 08:45.

Transport for London (TfL) logo
LONG TERM
Between
21 Sep and 6 Nov 2026
Details
View Map
Share
Follow
Lewisham Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 14:44.

Transport for London (TfL) logo
LONG TERM
Between
21 Sep and 6 Nov 2026
Details
View Map
Share
Follow
Lewisham Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 15:58.

Transport for London (TfL) logo
LONG TERM
Between
21 Sep and 6 Nov 2026
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Cross Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 14:40.

Transport for London (TfL) logo
LONG TERM
Between
21 Sep and 6 Nov 2026
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Cross Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 15:58.

UK Power Networks Eastern & London logo
Between
21 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Old Kent Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2026 at 18:10.

ESP Electricity logo
Between
21 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Evelyn Street

ESP Electricity are proposing to carry out Utility asset works on Evelyn Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 14 Sep 2026 at 15:32.

Cadent Gas logo
Between
21 and 29 Sep 2026
Details
View Map
Share
Follow
Mallord Street

Cadent Gas are proposing to carry out Utility asset works on Mallord Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 14:54.

London Borough Of Southwark logo
Between
21 and 26 Sep 2026
Details
View Map
Share
Follow
Rolls Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Rolls Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 26 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Sep 2026 at 15:23.

Thames Water logo
Between
21 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Crampton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Crampton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jul 2026 at 06:33.

Thames Water logo
Between
21 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Crampton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Crampton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 11:35.

Thames Water logo
LONG TERM
Between
21 Sep and 20 Dec 2026
Details
View Map
Share
Follow
Jonathan Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jonathan Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Jul 2026 at 11:10.

Thames Water logo
LONG TERM
Between
21 Sep and 27 Oct 2026
Details
View Map
Share
Follow
Salamanca Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Salamanca Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2026 at 09:29.

Thames Water logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Warwick Way

Thames Water are proposing to carry out Utility repair and maintenance works on Warwick Way, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2026 at 10:37.

Thames Water logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Warwick Way

Thames Water are proposing to carry out Utility repair and maintenance works on Warwick Way, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 12:54.

Thames Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Queensberry Mews West

Thames Water are proposing to carry out Disconnection or alteration of supply on Queensberry Mews West, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 15:32.

Thames Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Queensberry Mews West

Thames Water are proposing to carry out Disconnection or alteration of supply on Queensberry Mews West, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 17:53.

London Borough Of Hammersmith & Fulham logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:02.

Virgin Media logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Abbey Orchard Street

Virgin Media are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Aug 2026 at 16:04.

Virgin Media logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Abbey Orchard Street

Virgin Media are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2026 at 09:47.

London Borough Of Southwark logo
LONG TERM
Between
21 Sep and 20 Nov 2026
Details
View Map
Share
Follow
Long Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Long Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 6 Aug 2026 at 11:25.

Virgin Media logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Victoria Street

Virgin Media are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 24 Aug 2026 at 07:40.

Virgin Media logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Victoria Street

Virgin Media are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 16 Sep 2026 at 09:46.

Thames Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
North Row

Thames Water are proposing to carry out Utility asset works on North Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2026 at 10:38.

UK Power Networks Eastern & London logo
Between
21 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Lombard Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lombard Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Jul 2026 at 14:27.

Transport for London (TfL) logo
LONG TERM
Between
21 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Section 50 on Oxford Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 16:08.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Rampart Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Rampart Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:56.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Back Church Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Back Church Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 12:01.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Cannon Street Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cannon Street Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:11.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Hessel Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Hessel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:58.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Batty Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Batty Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:51.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Gowers Walk

Transport for London (TfL) are proposing to carry out Highway improvement works on Gowers Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:59.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Umberston Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Umberston Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:18.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Alie Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Alie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:53.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Christian Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Christian Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:46.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Rope Walk Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Rope Walk Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:13.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Henriques Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Henriques Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:53.

Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Berwick Street

G. Network Communications are proposing to carry out New service connection on Berwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 3 Aug 2026 at 10:40.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Commercial Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Commercial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:40.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Weyhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Weyhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:59.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Greenfield Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Greenfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:52.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Settles Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Settles Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:48.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Myrdle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Myrdle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:17.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
New Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:56.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Manningtree Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Manningtree Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:57.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
White Church Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on White Church Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:21.

Transport for London (TfL) logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Argyll Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Argyll Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:50.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Adler Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Adler Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 12:01.

Transport for London (TfL) logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:52.

Transport for London (TfL) logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:53.

Transport for London (TfL) logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:50.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Whitechapel High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Whitechapel High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:43.

Transport for London (TfL) logo
Between
21 and 26 Sep 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:42.

Transport for London (TfL) logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Market Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Market Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 10:48.

Transport for London (TfL) logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Market Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Market Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 15:56.

Transport for London (TfL) logo
Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Great Castle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Castle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 08:45.

Vodafone logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Norwich Street

Vodafone are proposing to carry out Utility asset works on Norwich Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 19 Jun 2026 at 11:34.

Vodafone logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Norwich Street

Vodafone are proposing to carry out Utility asset works on Norwich Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 28 Aug 2026 at 09:18.

Thames Water logo
Between
22 and 27 Sep 2026
Details
View Map
Share
Follow
Ansell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:06.

Thames Water logo
Between
22 and 27 Sep 2026
Details
View Map
Share
Follow
Ansell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 14:45.

Cadent Gas logo
Between
22 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Novello Street

Cadent Gas are proposing to carry out Utility asset works on Novello Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

Thames Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Symons Street

Thames Water are proposing to carry out Utility repair and maintenance works on Symons Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 17:28.

Thames Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Symons Street

Thames Water are proposing to carry out Utility repair and maintenance works on Symons Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 19:19.

Vodafone logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Derry Street

Vodafone are proposing to carry out Utility asset works on Derry Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 19 Jun 2026 at 10:39.

Vodafone logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Derry Street

Vodafone are proposing to carry out Utility asset works on Derry Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 11 Sep 2026 at 14:12.

London Borough Of Wandsworth logo
Between
23 Sep and 20 Oct 2026
Details
View Map
Share
Dulka Road

London Borough Of Wandsworth were proposing to carry out Utility repair and maintenance works on Dulka Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2026 and run through until 20 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Sep 2026 at 14:53.

Network Rail logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Sandell Street

Network Rail were proposing to carry out Works for Rail Purposes on Sandell Street, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Sep 2026 at 14:36.

Network Rail logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Cornwall Road

Network Rail were proposing to carry out Works for Rail Purposes on Cornwall Road, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Sep 2026 at 14:33.

Thames Water logo
Between
23 and 30 Sep 2026
Details
View Map
Share
Follow
Queensway

Thames Water are proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Aug 2026 at 15:13.

Transport for London (TfL) logo
Between
23 and 29 Sep 2026
Details
View Map
Share
Follow
Binney Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Binney Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:09.

Transport for London (TfL) logo
Between
23 and 29 Sep 2026
Details
View Map
Share
Follow
Gilbert Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gilbert Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:09.

Transport for London (TfL) logo
Between
23 and 29 Sep 2026
Details
View Map
Share
Follow
James Street

Transport for London (TfL) are proposing to carry out Highway improvement works on James Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:09.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

Transport for London (TfL) are proposing to carry out Section 50 on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2026 at 16:06.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Hampstead Road

Transport for London (TfL) are proposing to carry out Section 50 on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 10:26.

Transport for London (TfL) logo
Between
24 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:05.

Transport for London (TfL) logo
Between
24 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:05.

UK Power Networks Eastern & London logo
Between
24 Sep and 5 Oct 2026
Details
View Map
Share
Follow
New Street Square

UK Power Networks Eastern & London are proposing to carry out New service connection on New Street Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jun 2026 at 11:59.

Its Technology Group logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Balham Park Road

Its Technology Group are proposing to carry out New service connection on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 9 Sep 2026 at 08:39.

Transport for London (TfL) logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 13:49.

Transport for London (TfL) logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 16:23.

Thames Water logo
LONG TERM
Between
24 Sep and 28 Oct 2026
Details
View Map
Share
Follow
Freke Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Freke Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:35.

Cadent Gas logo
Between
24 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Parsons Green

Cadent Gas are proposing to carry out Utility asset works on Parsons Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

Cadent Gas logo
Between
24 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Parsons Green Lane

Cadent Gas are proposing to carry out Utility asset works on Parsons Green Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

Thames Water logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jul 2026 at 09:29.

London Borough Of Southwark logo
Between
25 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 10 Sep 2026 at 10:46.

London Borough Of Southwark logo
Between
25 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Rye Hill Park

London Borough Of Southwark are proposing to carry out Highway improvement works on Rye Hill Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 10 Sep 2026 at 10:55.

London Borough Of Wandsworth logo
Between
25 and 29 Sep 2026
Details
View Map
Share
Follow
Battersea High Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Battersea High Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:04.

London Borough Of Wandsworth logo
Between
25 and 29 Sep 2026
Details
View Map
Share
Follow
Battersea High Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Battersea High Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 09:41.

Transport for London (TfL) logo
Between
25 and 30 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:56.

Transport for London (TfL) logo
Between
25 and 30 Sep 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:48.

UK Power Networks Eastern & London logo
Between
26 Sep and 14 Oct 2026
Details
View Map
Share
Follow
Manchester Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Manchester Square, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 19:35.

City Of London Corporation logo
Between
26 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Moorgate

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Moorgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 5 Aug 2026 at 13:16.

City Of London Corporation logo
Between
26 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Moorgate

City Of London Corporation are proposing to carry out Highway improvement works on Moorgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 12 Feb 2026 at 13:37.

Thames Water logo
LONG TERM
Between
26 Sep and 9 Nov 2026
Details
View Map
Share
Follow
Moxon Street

Thames Water are proposing to carry out Utility asset works on Moxon Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:34.

T-Mobile (UK) logo
Between
27 and 30 Sep 2026
Details
View Map
Share
Follow
Longley Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 30 Jun 2026 at 05:53.

Transport for London (TfL) logo
Between
27 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 12:14.

Transport for London (TfL) logo
Between
27 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:52.

Southern Gas Networks logo
LONG TERM
Between
28 Sep and 16 Dec 2026
Details
View Map
Share
Follow
Penrith Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penrith Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2026 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
28 Sep and 15 Nov 2026
Details
View Map
Share
Follow
Westbrook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrook Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2026 at 06:18.

Southern Gas Networks logo
LONG TERM
Between
28 Sep and 16 Dec 2026
Details
View Map
Share
Follow
Cranbrook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranbrook Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2026 at 09:41.

London Borough Of Southwark logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Park Hall Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Park Hall Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 14:46.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Southdean Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 13:09.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Southdean Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 08:29.

Transport for London (TfL) logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 10:00.

Transport for London (TfL) logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:29.

Transport for London (TfL) logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2026 at 13:42.

Transport for London (TfL) logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.

Southern Gas Networks logo
Between
28 Sep and 19 Oct 2026
Details
View Map
Share
Follow
Concanon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Concanon Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Jul 2026 at 14:58.

Southern Gas Networks logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Santley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Santley Street, Brixton Acre Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jul 2026 at 13:21.

Southern Gas Networks logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Santley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Santley Street, Brixton Acre Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2026 at 15:19.

Network Rail logo
Between
28 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Edward Street

Network Rail are proposing to carry out Works for Rail Purposes on Edward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Jun 2026 at 14:51.

Network Rail logo
Between
28 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Edward Street

Network Rail are proposing to carry out Works for Rail Purposes on Edward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Sep 2026 at 11:56.

Cadent Gas logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Dawes Road

Cadent Gas are proposing to carry out New service connection on Dawes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 12:07.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Winslow Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Winslow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 08:10.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Chancellors Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 14:13.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Distillery Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Distillery Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 14:13.

Thames Water logo
LONG TERM
Between
28 Sep and 7 Dec 2026
Details
View Map
Share
Follow
Glasshouse Walk

Thames Water are proposing to carry out Disconnection or alteration of supply on Glasshouse Walk, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:01.

Royal Borough Of Kensington And Chelsea logo
Between
28 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Stewart's Grove

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Stewart's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Sep 2026 at 13:15.

UK Power Networks Eastern & London logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Millbank

UK Power Networks Eastern & London are proposing to carry out New service connection on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jul 2026 at 14:13.

Southern Gas Networks logo
Between
28 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Barnham Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2026 at 11:04.

Southern Gas Networks logo
Between
28 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Shand Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shand Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2026 at 11:04.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
White Horse Street

Thames Water are proposing to carry out New service connection on White Horse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 15:34.

Thames Water logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Lower John Street

Thames Water are proposing to carry out New service connection on Lower John Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 09:08.

UK Power Networks Eastern & London logo
Between
28 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Back Church Lane

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Back Church Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2026 at 11:13.

UK Power Networks Eastern & London logo
Between
28 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Back Church Lane

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Back Church Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 13:10.

UK Power Networks Eastern & London logo
Between
28 Sep and 6 Oct 2026
Details
View Map
Share
Back Church Lane

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Back Church Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 6 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 11:59.

Thames Water logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Rupert Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rupert Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Jul 2026 at 10:01.

Thames Water logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Rupert Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rupert Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 10:23.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Bark Place

Thames Water are proposing to carry out New service connection on Bark Place, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 08:00.

Transport for London (TfL) logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:52.

Transport for London (TfL) logo
Between
28 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:39.

Transport for London (TfL) logo
Between
28 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:40.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Whetstone Park

Thames Water are proposing to carry out Utility asset works on Whetstone Park, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 16:35.

Transport for London (TfL) logo
LONG TERM
Between
28 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Farringdon Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 11:59.

Transport for London (TfL) logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 13:15.

Thames Water logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 19:36.

Transport for London (TfL) logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Aug 2026 at 16:55.

Transport for London (TfL) logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 16:10.

Thames Water logo
Between
28 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Wilson Street

Thames Water are proposing to carry out New service connection on Wilson Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 13:37.

Transport for London (TfL) logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Norton Folgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Norton Folgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:10.

Transport for London (TfL) logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Norton Folgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Norton Folgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:52.

Transport for London (TfL) logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Shoreditch High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shoreditch High Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 13:16.

Transport for London (TfL) logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Shoreditch High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shoreditch High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:09.

London Borough Of Camden logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Clerkenwell Road

London Borough Of Camden are proposing to carry out Highway improvement works on Clerkenwell Road, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Aug 2026 at 16:41.

London Borough Of Camden logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Rosebery Avenue

London Borough Of Camden are proposing to carry out Highway improvement works on Rosebery Avenue, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Aug 2026 at 15:55.

London Borough Of Camden logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Aug 2026 at 16:40.

Vodafone logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Hearn Street

Vodafone are proposing to carry out New service connection on Hearn Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 6 Jul 2026 at 17:28.

Vodafone logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Hearn Street

Vodafone are proposing to carry out New service connection on Hearn Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 14 Sep 2026 at 09:30.

HS2 logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Lidlington Place

HS2 are proposing to carry out Works for Rail Purposes on Lidlington Place, Camden Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 14 Sep 2026 at 09:50.

HS2 logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Lidlington Place

HS2 are proposing to carry out Works for Rail Purposes on Lidlington Place, Camden Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 14 Sep 2026 at 10:56.

City Of Westminster logo
Between
29 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Foley Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Foley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Aug 2026 at 14:37.

Thames Water logo
Between
29 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Dorset Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Dorset Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Aug 2026 at 16:33.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:16.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Bedford Hill

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bedford Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 11:56.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Bolingbroke Grove

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bolingbroke Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 11:52.

Thames Water logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Broadwick Street

Thames Water are proposing to carry out Remedial works on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jun 2026 at 10:16.

Thames Water logo
LONG TERM
Between
29 Sep and 10 Nov 2026
Details
View Map
Share
Follow
Nelson Street

Thames Water are proposing to carry out Utility asset works on Nelson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2026 at 16:00.

Thames Water logo
LONG TERM
Between
29 Sep and 10 Nov 2026
Details
View Map
Share
Follow
Nelson Street

Thames Water are proposing to carry out Utility asset works on Nelson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 14:13.

Thames Water logo
Between
29 Sep and 27 Oct 2026
Details
View Map
Share
Follow
Turner Street

Thames Water are proposing to carry out Utility asset works on Turner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2026 at 15:55.

London Borough Of Southwark logo
Between
30 Sep and 9 Oct 2026
Details
View Map
Share
Peckham Rye

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Peckham Rye, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2026 and run through until 9 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 06:44.

London Borough Of Southwark logo
Between
30 Sep and 21 Oct 2026
Details
View Map
Share
Follow
Studholme Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Studholme Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Jul 2026 at 10:05.

London Borough Of Lambeth logo
LONG TERM
Between
30 Sep and 6 Nov 2026
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 12 Aug 2026 at 16:01.

Thames Water logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Redan Street

Thames Water are proposing to carry out New service connection on Redan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 09:34.

Thames Water logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Redan Street

Thames Water are proposing to carry out New service connection on Redan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:09.

UK Power Networks Eastern & London logo
Between
1 and 16 Oct 2026
Details
View Map
Share
Follow
Old Kent Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 10:44.

UK Power Networks Eastern & London logo
Between
1 and 16 Oct 2026
Details
View Map
Share
Follow
Ilderton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Ilderton Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 16:14.

UK Power Networks Eastern & London logo
Between
1 and 16 Oct 2026
Details
View Map
Share
Follow
Ilderton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 16:37.

Transport for London (TfL) logo
Between
1 and 6 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:53.

Transport for London (TfL) logo
Between
1 and 6 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:51.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Balham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:30.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 May 2026 at 11:49.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Alderbrook Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 09:06.

Thames Water logo
LONG TERM
Between
2 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Burland Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Burland Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:14.

UK Power Networks Eastern & London logo
Between
2 and 4 Oct 2026
Details
View Map
Share
Follow
Kensington Church Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Kensington Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 12:18.

Transport for London (TfL) logo
Between
2 and 5 Oct 2026
Details
View Map
Share
Oxford Street

Transport for London (TfL) were proposing to carry out roadworks on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 5 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 10:30.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2026 at 12:11.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 14:37.

Thames Water logo
Between
2 and 5 Oct 2026
Details
View Map
Share
Follow
Finsbury Square

Thames Water are proposing to carry out Utility repair and maintenance works on Finsbury Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 13:08.

Thames Water logo
Between
2 and 5 Oct 2026
Details
View Map
Share
Follow
Finsbury Square

Thames Water are proposing to carry out Utility repair and maintenance works on Finsbury Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 09:07.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:40.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 11:28.

Transport for London (TfL) logo
Between
4 and 6 Oct 2026
Details
View Map
Share
Oxford Street

Transport for London (TfL) were proposing to carry out roadworks on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2026 and run through until 6 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 11:26.

Transport for London (TfL) logo
Between
4 and 6 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 12:11.

Southern Gas Networks logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Maryland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maryland Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 08:53.

Thames Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Trevelyan Road

Thames Water were proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 7 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 07:31.

Thames Water logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Morrish Road

Thames Water were proposing to carry out New service connection on Morrish Road, Clapham Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 12 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 11:25.

Thames Water logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Morrish Road

Thames Water were proposing to carry out New service connection on Morrish Road, Clapham Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 12 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 11:36.

T-Mobile (UK) logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 14 Sep 2026 at 14:35.

Southern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Acre Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2026 at 10:27.

Southern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Acre Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2026 at 08:24.

Thames Water logo
LONG TERM
Between
5 Oct 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Northcote Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northcote Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:15.

Thames Water logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Follow
Meretone Close

Thames Water are proposing to carry out New service connection on Meretone Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jul 2026 at 09:25.

Thames Water logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Follow
Meretone Close

Thames Water are proposing to carry out New service connection on Meretone Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 12:50.

London Borough Of Wandsworth logo
Between
5 and 31 Oct 2026
Details
View Map
Share
Follow
Putney High Street

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Putney High Street, Putney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2026 at 08:57.

Thames Water logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Perrymead Street

Thames Water are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:05.

Thames Water logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Perrymead Street

Thames Water are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:34.

Thames Water logo
LONG TERM
Between
5 Oct and 7 Dec 2026
Details
View Map
Share
Follow
Studdridge Street

Thames Water are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:54.

Thames Water logo
LONG TERM
Between
5 Oct and 7 Dec 2026
Details
View Map
Share
Follow
Studdridge Street

Thames Water are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:34.

Cadent Gas logo
Between
5 and 14 Oct 2026
Details
View Map
Share
Follow
Lowther Road

Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 14:13.

Cadent Gas logo
Between
5 and 14 Oct 2026
Details
View Map
Share
Follow
Lowther Road

Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:37.

Thames Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Farm Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Farm Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2026 at 15:50.

Thames Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Farm Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Farm Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:08.

UK Power Networks Eastern & London logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Hyndman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hyndman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 10:14.

Cadent Gas logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Star Road

Cadent Gas are proposing to carry out Utility asset works on Star Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:35.

Cadent Gas logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Vereker Road

Cadent Gas are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2026 at 16:11.

Cadent Gas logo
LONG TERM
Between
5 Oct and 4 Dec 2026
Details
View Map
Share
Follow
North End Road

Cadent Gas are proposing to carry out Utility asset works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:47.

Thames Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Whitgift Street

Thames Water are proposing to carry out Utility asset works on Whitgift Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jul 2026 at 09:00.

London Borough Of Hammersmith & Fulham logo
Between
5 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:07.

BT logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Beauclerc Road

BT are proposing to carry out Utility asset works on Beauclerc Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Jul 2026 at 12:03.

Thames Water logo
Between
5 and 24 Oct 2026
Details
View Map
Share
Follow
Goldhawk Road

Thames Water are proposing to carry out Utility repair and maintenance works on Goldhawk Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:03.

Thames Water logo
Between
5 and 24 Oct 2026
Details
View Map
Share
Follow
Pennard Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pennard Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:07.

Thames Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
William Iv Street

Thames Water are proposing to carry out Utility repair and maintenance works on William Iv Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 16:59.

Thames Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Regent Street

Thames Water are proposing to carry out Remedial works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jun 2026 at 15:11.

UK Power Networks Eastern & London logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Haunch Of Venison Yard

UK Power Networks Eastern & London are proposing to carry out New service connection on Haunch Of Venison Yard, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jun 2026 at 10:29.

UK Power Networks Eastern & London logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Haunch Of Venison Yard

UK Power Networks Eastern & London are proposing to carry out New service connection on Haunch Of Venison Yard, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2026 at 14:04.

Vodafone logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Cornhill

Vodafone are proposing to carry out Utility repair and maintenance works on Cornhill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 23 Mar 2026 at 13:58.

Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Porchester Gardens

Aurora Utilities Limited are proposing to carry out New service connection on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 17 Aug 2026 at 07:51.

Cadent Gas logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Bainbridge Street

Cadent Gas are proposing to carry out New service connection on Bainbridge Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 10:33.

Thames Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Berners Mews

Thames Water are proposing to carry out New service connection on Berners Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 09:06.

UK Power Networks Eastern & London logo
Between
5 and 18 Oct 2026
Details
View Map
Share
Follow
Hosier Lane

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Hosier Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 18 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Jul 2026 at 11:49.

London Borough Of Camden logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Theobald's Road

London Borough Of Camden are proposing to carry out Highway improvement works on Theobald's Road, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 17:45.

London Borough Of Camden logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Clerkenwell Road

London Borough Of Camden are proposing to carry out Highway improvement works on Clerkenwell Road, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 17:44.

London Borough Of Camden logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Rosebery Avenue

London Borough Of Camden are proposing to carry out Highway improvement works on Rosebery Avenue, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 17:45.

City Of Westminster logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Carburton Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Aug 2026 at 11:23.

London Borough Of Camden logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 17:44.

G2 Energy IDNO logo
LONG TERM
Between
5 Oct 2026 and 23 Jan 2027
Details
View Map
Share
Follow
Sutherland Avenue

G2 Energy IDNO are proposing to carry out New service connection on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:20.

HS2 logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Lidlington Place

HS2 were proposing to carry out Works for Rail Purposes on Lidlington Place, Camden Town, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 6 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by HS2 on 14 Sep 2026 at 09:51.

ESP Electricity logo
LONG TERM
Between
7 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Broadway

ESP Electricity are proposing to carry out New service connection on Broadway, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 13:14.

City Of Westminster logo
Between
7 and 10 Oct 2026
Details
View Map
Share
Follow
Jermyn Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Sep 2026 at 13:01.

Transport for London (TfL) logo
Between
7 and 12 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:48.

Transport for London (TfL) logo
Between
7 and 12 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:50.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 30 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2026 at 16:44.

City Of Westminster logo
Between
8 and 30 Oct 2026
Details
View Map
Share
Follow
Northumberland Avenue

City Of Westminster are proposing to carry out Highway improvement works on Northumberland Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 Aug 2026 at 09:49.

City Of Westminster logo
Between
8 and 30 Oct 2026
Details
View Map
Share
Follow
Northumberland Avenue

City Of Westminster are proposing to carry out Highway improvement works on Northumberland Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 26 Aug 2026 at 08:07.

City Of Westminster logo
Between
8 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Dean Street

City Of Westminster are proposing to carry out Highway improvement works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2026 at 14:20.

London Borough Of Southwark logo
Between
9 and 29 Oct 2026
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 9 Sep 2026 at 10:07.

City Of Westminster logo
Between
9 and 11 Oct 2026
Details
View Map
Share
Follow
Regent Street St James's

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2026 at 11:01.

City Of London Corporation logo
Between
10 and 25 Oct 2026
Details
View Map
Share
Follow
Basinghall Street

City Of London Corporation are proposing to carry out Highway improvement works on Basinghall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 25 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 12 Feb 2026 at 13:37.

BT logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Carminia Road

BT are proposing to carry out Utility asset works on Carminia Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Aug 2026 at 16:07.

BT logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Carminia Road

BT are proposing to carry out Utility asset works on Carminia Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 Sep 2026 at 07:09.

Thames Water logo
LONG TERM
Between
12 Oct and 14 Dec 2026
Details
View Map
Share
Follow
Chivalry Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Chivalry Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:35.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Oscar Street

Thames Water are proposing to carry out New service connection on Oscar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 05:40.

Transport for London (TfL) logo
LONG TERM
Between
12 Oct and 20 Nov 2026
Details
View Map
Share
Follow
King's Road

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 12:23.

LONG TERM
Between
12 Oct and 5 Dec 2026
Details
View Map
Share
Raymouth Road

Leep Utilities Electric were proposing to carry out New service connection on Raymouth Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 5 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 3 Sep 2026 at 15:06.

Thames Water logo
Between
12 and 15 Oct 2026
Details
View Map
Share
Rodney Place

Thames Water were proposing to carry out Utility repair and maintenance works on Rodney Place, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 15 October 2026. The works were due to impact the cycleway only.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 14:41.

Thames Water logo
LONG TERM
Between
12 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Stillington Street

Thames Water are proposing to carry out Utility asset works on Stillington Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 11:02.

London Borough Of Hammersmith & Fulham logo
Between
12 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:59.

Cadent Gas logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Caxton Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Caxton Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Aug 2026 at 08:34.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Sinclair Gardens

Thames Water are proposing to carry out Remedial works on Sinclair Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 09:12.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Brick Street

Thames Water were proposing to carry out Utility asset works on Brick Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 10:29.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Brick Street

Thames Water were proposing to carry out Utility asset works on Brick Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 17:26.

Transport for London (TfL) logo
LONG TERM
Between
12 Oct and 5 Dec 2026
Details
View Map
Share
Blackfriars Underpass

Transport for London (TfL) were proposing to carry out roadworks on Blackfriars Underpass, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 5 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 11:47.

Transport for London (TfL) logo
LONG TERM
Between
12 Oct and 5 Dec 2026
Details
View Map
Share
Blackfriars Underpass

Transport for London (TfL) were proposing to carry out roadworks on Blackfriars Underpass, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 5 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 12:12.

Transport for London (TfL) logo
LONG TERM
Between
12 Oct and 5 Dec 2026
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out roadworks on Blackfriars Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 16:07.

Transport for London (TfL) logo
LONG TERM
Between
12 Oct and 5 Dec 2026
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out roadworks on Blackfriars Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 16:08.

Transport for London (TfL) logo
LONG TERM
Between
12 Oct and 5 Dec 2026
Details
View Map
Share
Blackfriars Underpass

Transport for London (TfL) were proposing to carry out roadworks on Blackfriars Underpass, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 5 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2026 at 13:13.

Vodafone logo
Between
12 and 19 Oct 2026
Details
View Map
Share
Follow
Fleet Street

Vodafone are proposing to carry out Utility repair and maintenance works on Fleet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 27 Aug 2026 at 14:35.

Vodafone logo
Between
12 and 19 Oct 2026
Details
View Map
Share
Follow
Fleet Street

Vodafone are proposing to carry out Utility repair and maintenance works on Fleet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 28 Aug 2026 at 15:27.

Vodafone logo
Between
12 and 19 Oct 2026
Details
View Map
Share
Follow
Fleet Street

Vodafone are proposing to carry out Utility repair and maintenance works on Fleet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 1 Sep 2026 at 08:39.

City Of Westminster logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Hanover Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Hanover Square, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Jul 2026 at 08:33.

Electricity Network Company logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Electricity Network Company are proposing to carry out Utility asset works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 7 Sep 2026 at 16:35.

Transport for London (TfL) logo
Between
12 and 15 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:17.

Transport for London (TfL) logo
Between
12 and 15 Oct 2026
Details
View Map
Share
Follow
Great Portland Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:50.

Transport for London (TfL) logo
Between
12 and 15 Oct 2026
Details
View Map
Share
Follow
Great Castle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Great Castle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 11:32.

Thames Water logo
Between
12 and 18 Oct 2026
Details
View Map
Share
Follow
Southampton Row

Thames Water are proposing to carry out New service connection on Southampton Row, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 15:10.

Virgin Media logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Saffron Hill

Virgin Media are proposing to carry out Utility asset works on Saffron Hill, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 19 Jul 2026 at 22:03.

Virgin Media logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Epworth Street

Virgin Media are proposing to carry out Utility asset works on Epworth Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Jul 2026 at 09:49.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Guilford Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Guilford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2026 at 10:13.

T-Mobile (UK) logo
Between
13 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Appold Street

T-Mobile (UK) are proposing to carry out Utility asset works on Appold Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 10 Sep 2026 at 09:31.

T-Mobile (UK) logo
Between
13 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Primrose Street

T-Mobile (UK) are proposing to carry out Utility asset works on Primrose Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 10 Sep 2026 at 09:29.

Thames Water logo
Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
Drummond Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Drummond Crescent, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 22:03.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 25 Nov 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2026 and run through until 25 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:18.

London Borough Of Wandsworth logo
Between
13 and 16 Oct 2026
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:12.

London Borough Of Wandsworth logo
Between
13 and 20 Oct 2026
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 08:57.

Thames Water logo
LONG TERM
Between
13 Oct and 11 Dec 2026
Details
View Map
Share
Follow
Hinton Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Hinton Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2026 at 13:55.

City Of London Corporation logo
Between
13 and 18 Oct 2026
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 18 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 27 May 2025 at 19:49.

City Of London Corporation logo
Between
13 and 18 Oct 2026
Details
View Map
Share
Follow
Tower Bridge

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 18 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 19 Mar 2026 at 15:16.

City Of London Corporation logo
Between
13 and 17 Oct 2026
Details
View Map
Share
Follow
Tower Bridge Approach

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 25 Mar 2026 at 13:17.

UK Power Networks Eastern & London logo
Between
13 and 31 Oct 2026
Details
View Map
Share
Follow
Gracechurch Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Gracechurch Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Jul 2026 at 13:45.

Transport for London (TfL) logo
Between
13 and 16 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:49.

Transport for London (TfL) logo
Between
13 and 16 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:56.

Thames Water logo
LONG TERM
Between
14 Oct and 11 Dec 2026
Details
View Map
Share
Follow
Regent Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Regent Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 14:19.

Thames Water logo
LONG TERM
Between
14 Oct 2026 and 16 Apr 2027
Details
View Map
Share
Follow
St Matthew's Road

Thames Water are proposing to carry out Disconnection or alteration of supply on St Matthew's Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jun 2026 at 10:31.

Thames Water logo
Between
14 and 20 Oct 2026
Details
View Map
Share
Follow
Brick Street

Thames Water are proposing to carry out Utility asset works on Brick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 17:27.

UK Power Networks Eastern & London logo
Between
14 Oct and 3 Nov 2026
Details
View Map
Share
Follow
New Bond Street

UK Power Networks Eastern & London are proposing to carry out New service connection on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 08:34.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Oct and 14 Dec 2026
Details
View Map
Share
St Julian's Farm Road

UK Power Networks Eastern & London were proposing to carry out New service connection on St Julian's Farm Road, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2026 and run through until 14 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 09:07.

Between
15 and 28 Oct 2026
Details
View Map
Share
Follow
Redcross Way

UK Power Distribution are proposing to carry out Utility asset works on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Distribution on 18 Aug 2026 at 15:00.

Virgin Media logo
Between
15 and 19 Oct 2026
Details
View Map
Share
Follow
Dean's Court

Virgin Media are proposing to carry out Utility asset works on Dean's Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 17 Jul 2026 at 13:02.

Electricity Network Company logo
Between
16 and 29 Oct 2026
Details
View Map
Share
Follow
Wyvil Road

Electricity Network Company are proposing to carry out Utility asset works on Wyvil Road, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 31 Jul 2026 at 09:02.

Cadent Gas logo
Between
17 and 19 Oct 2026
Details
View Map
Share
Follow
Dawes Road

Cadent Gas are proposing to carry out New service connection on Dawes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 12:00.

Thames Water logo
Between
18 and 22 Oct 2026
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 09:16.

Thames Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Rectory Lane

Thames Water are proposing to carry out Remedial works on Rectory Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 14:59.

Thames Water logo
Between
19 and 27 Oct 2026
Details
View Map
Share
Princes Way

Thames Water were proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 27 October 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 07:43.

Southern Gas Networks logo
Between
19 and 26 Oct 2026
Details
View Map
Share
Follow
Faversham Road

Southern Gas Networks are proposing to carry out New service connection on Faversham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2026 at 10:11.

Southern Gas Networks logo
Between
19 and 26 Oct 2026
Details
View Map
Share
Follow
Faversham Road

Southern Gas Networks are proposing to carry out New service connection on Faversham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 08:33.

London Borough Of Southwark logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Wood Vale

London Borough Of Southwark are proposing to carry out Highway improvement works on Wood Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2026 at 13:13.

Thames Water logo
Between
19 and 24 Oct 2026
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 10:22.

ESP Electricity logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Bridges Court Road

ESP Electricity are proposing to carry out Utility asset works on Bridges Court Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 6 Aug 2026 at 11:36.

London Borough Of Wandsworth logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Bridges Court Road

London Borough Of Wandsworth are proposing to carry out Utility repair and maintenance works on Bridges Court Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 19 Aug 2026 at 13:52.

London Borough Of Southwark logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Sumner Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Sumner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Aug 2026 at 07:56.

London Borough Of Southwark logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Furley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Furley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Aug 2026 at 12:18.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Grosvenor Terrace

Thames Water are proposing to carry out Remedial works on Grosvenor Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jul 2026 at 09:21.

Thames Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
North End Road

Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Aug 2026 at 08:45.

Thames Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
North End Road

Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 15:45.

Cadent Gas logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Star Road

Cadent Gas are proposing to carry out Utility asset works on Star Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:35.

Cadent Gas logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Vereker Road

Cadent Gas are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:16.

Cadent Gas logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Dartmouth Street

Cadent Gas are proposing to carry out New service connection on Dartmouth Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 10:52.

London Borough Of Southwark logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
St Pauls Avenue

London Borough Of Southwark are proposing to carry out Highway improvement works on St Pauls Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2026 at 18:52.

BT logo
Between
19 and 27 Oct 2026
Details
View Map
Share
Follow
Berkeley Street

BT are proposing to carry out Utility repair and maintenance works on Berkeley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Jul 2026 at 10:01.

UK Power Networks Eastern & London logo
Between
19 and 31 Oct 2026
Details
View Map
Share
Follow
Kensington Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 12:17.

Transport for London (TfL) logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:55.

Transport for London (TfL) logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:52.

Thames Water logo
Between
19 Oct and 15 Nov 2026
Details
View Map
Share
Follow
Middlesex Street

Thames Water are proposing to carry out Utility repair and maintenance works on Middlesex Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 15 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 11:37.

Thames Water logo
Between
19 Oct and 15 Nov 2026
Details
View Map
Share
Middlesex Street

Thames Water were proposing to carry out Utility repair and maintenance works on Middlesex Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 15 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 11:30.

Between
19 and 24 Oct 2026
Details
View Map
Share
Follow
Brick Lane

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Brick Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 23 Jul 2026 at 11:46.

Thames Water logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Dorset Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Dorset Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 11:31.

Vodafone logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
St John Street

Vodafone are proposing to carry out New service connection on St John Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 21 Jul 2026 at 14:25.

London Borough Of Wandsworth logo
Between
20 and 23 Oct 2026
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 09:55.

Thames Water logo
LONG TERM
Between
20 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Keildon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Keildon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:15.

City Of Westminster logo
Between
21 and 23 Oct 2026
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Aug 2026 at 14:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Oct and 21 Dec 2026
Details
View Map
Share
Follow
St Julian's Farm Road

UK Power Networks Eastern & London are proposing to carry out New service connection on St Julian's Farm Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 09:59.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Asylum Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Asylum Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 11:11.

Transport for London (TfL) logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 14:32.

Between
22 and 27 Oct 2026
Details
View Map
Share
Corporation Row

London Borough Of Islington were proposing to carry out Highway repair and maintenance works on Corporation Row, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2026 and run through until 27 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 11 Sep 2026 at 12:06.

Transport for London (TfL) logo
Between
23 and 26 Oct 2026
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 13:19.

Transport for London (TfL) logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:42.

Transport for London (TfL) logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2026 at 18:41.

Transport for London (TfL) logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Marylebone Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2026 at 18:42.

Transport for London (TfL) logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:51.

Transport for London (TfL) logo
Between
23 and 28 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:52.

Transport for London (TfL) logo
Between
23 and 28 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:51.

Transport for London (TfL) logo
Between
23 and 28 Oct 2026
Details
View Map
Share
Follow
John Prince's Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Prince's Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:49.

Southern Gas Networks logo
Between
24 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Tamworth Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tamworth Lane, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2026 at 08:54.

Thames Water logo
Between
24 and 30 Oct 2026
Details
View Map
Share
Princes Way

Thames Water were proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2026 and run through until 30 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 11:55.

Thames Water logo
Between
24 and 30 Oct 2026
Details
View Map
Share
Follow
Princes Way

Thames Water are proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 12:23.

Transport for London (TfL) logo
Between
24 Oct and 12 Nov 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.

Vodafone logo
Between
24 and 26 Oct 2026
Details
View Map
Share
Follow
Old Court Place

Vodafone are proposing to carry out Utility repair and maintenance works on Old Court Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 1 Sep 2026 at 15:47.

Transport for London (TfL) logo
Between
24 and 26 Oct 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:44.

City Of Westminster logo
Between
26 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Portland Place

City Of Westminster are proposing to carry out Highway improvement works on Portland Place, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 Jun 2026 at 09:30.

Thames Water logo
LONG TERM
Between
26 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Ashbridge Street

Thames Water are proposing to carry out roadworks on Ashbridge Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jul 2026 at 16:31.

Thames Water logo
LONG TERM
Between
26 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 06:28.

Thames Water logo
LONG TERM
Between
26 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 06:30.

Southern Gas Networks logo
Between
26 Oct and 15 Nov 2026
Details
View Map
Share
Follow
Burlington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burlington Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2026 at 07:12.

London Borough Of Bromley logo
LONG TERM
Between
26 Oct and 29 Nov 2026
Details
View Map
Share
Follow
Anerley Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Anerley Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2026 at 08:28.

West Sussex County Council logo
LONG TERM
Between
26 Oct and 29 Nov 2026
Details
View Map
Share
Anerley Road

West Sussex County Council were proposing to carry out Highway improvement works on Anerley Road, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 29 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 1 Sep 2026 at 14:35.

Southern Gas Networks logo
LONG TERM
Between
26 Oct and 29 Nov 2026
Details
View Map
Share
Follow
Valley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Road, Streatham Wells, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:06.

Southern Gas Networks logo
Between
26 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Wellfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellfield Road, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:06.

Southern Gas Networks logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Tulsemere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tulsemere Road, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jun 2026 at 13:43.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct and 4 Dec 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2026 at 11:54.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 15:08.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 11:05.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Rinaldo Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Rinaldo Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 09:51.

Thames Water logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Cavendish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2026 at 12:14.

BT logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Solna Avenue

BT are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Jul 2026 at 08:45.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Hinton Road

Thames Water are proposing to carry out Utility asset works on Hinton Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Jul 2026 at 08:58.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Hinton Road

Thames Water are proposing to carry out Utility asset works on Hinton Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 14:02.

Thames Water logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Wymond Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Wymond Street, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:05.

London Borough Of Wandsworth logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Wickersley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wickersley Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 12 Aug 2026 at 11:17.

London Borough Of Wandsworth logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Wickersley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wickersley Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 09:41.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Munster Road

Thames Water are proposing to carry out New service connection on Munster Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 07:48.

Network Rail logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Edward Street

Network Rail are proposing to carry out Works for Rail Purposes on Edward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 9 Sep 2026 at 16:20.

UK Power Networks Eastern & London logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Old Kent Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2026 at 18:22.

UK Power Networks Eastern & London logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Old Kent Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 20:05.

UK Power Networks Eastern & London logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Old Kent Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2026 at 09:23.

London Borough Of Southwark logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Shorncliffe Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Shorncliffe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Sep 2026 at 12:36.

London Borough Of Southwark logo
Between
26 Oct and 14 Nov 2026
Details
View Map
Share
Follow
Hyson Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Hyson Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 14 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 20 Jul 2026 at 09:41.

London Borough Of Southwark logo
Between
26 Oct and 14 Nov 2026
Details
View Map
Share
Follow
Galleywall Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Galleywall Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Aug 2026 at 14:42.

Cadent Gas logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Onslow Square

Cadent Gas are proposing to carry out New service connection on Onslow Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 13:30.

Thames Water logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Wilton Road

Thames Water are proposing to carry out New service connection on Wilton Road, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 10:25.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Wilton Road

Thames Water are proposing to carry out New service connection on Wilton Road, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 09:19.

London Borough Of Hammersmith & Fulham logo
Between
26 Oct and 21 Nov 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:58.

London Borough Of Hammersmith & Fulham logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Shepherd's Bush Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Sep 2026 at 13:03.

Cadent Gas logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Dartmouth Street

Cadent Gas are proposing to carry out New service connection on Dartmouth Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 17:30.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Wright's Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Wright's Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:31.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:29.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:09.

Thames Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Sudrey Street

Thames Water are proposing to carry out Utility asset works on Sudrey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 11:53.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Hornton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Hornton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 11:11.

Thames Water logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Kensington Church Street

Thames Water are proposing to carry out Utility asset works on Kensington Church Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:05.

Thames Water logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Notting Hill Gate

Thames Water are proposing to carry out Utility asset works on Notting Hill Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:07.

City Of Westminster logo
LONG TERM
Between
26 Oct and 25 Nov 2026
Details
View Map
Share
Follow
Lexington Street

City Of Westminster are proposing to carry out Highway improvement works on Lexington Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 3 Sep 2026 at 13:36.

Between
27 and 29 Oct 2026
Details
View Map
Share
Follow
Piccadilly

Abovenet Communications UK are proposing to carry out Utility asset works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 19 Aug 2026 at 06:54.

City Of London Telecomms logo
Between
27 and 29 Oct 2026
Details
View Map
Share
Follow
Rivington Street

City Of London Telecomms are proposing to carry out Utility repair and maintenance works on Rivington Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 7 Aug 2026 at 16:56.

City Of Westminster logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Warrington Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warrington Crescent, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2026 at 12:42.

City Of Westminster logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Warrington Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warrington Crescent, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Sep 2026 at 16:13.

London Borough Of Croydon logo
Between
28 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Manor Farm Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Manor Farm Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 5 Jun 2026 at 14:43.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
New King's Road

Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 12:39.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
New King's Road

Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 07:44.

Transport for London (TfL) logo
Between
30 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:17.

Transport for London (TfL) logo
Between
30 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 13:45.

Transport for London (TfL) logo
Between
1 and 3 Nov 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 12:03.

Transport for London (TfL) logo
Between
1 and 3 Nov 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:08.

Thames Water logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grenfell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grenfell Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2026 at 05:59.

London Borough Of Wandsworth logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 09:55.

London Borough Of Southwark logo
Between
2 and 13 Nov 2026
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 06:46.

Thames Water logo
Between
2 and 11 Nov 2026
Details
View Map
Share
Follow
Linden Grove

Thames Water are proposing to carry out Utility asset works on Linden Grove, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 10:25.

Thames Water logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grayshott Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grayshott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2026 at 13:25.

London Borough Of Wandsworth logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grayshott Road

London Borough Of Wandsworth are proposing to carry out Utility repair and maintenance works on Grayshott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 19 Aug 2026 at 14:47.

Cadent Gas logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Parke Road

Cadent Gas are proposing to carry out Utility asset works on Parke Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:00.

Thames Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Fielding Street

Thames Water are proposing to carry out Utility repair and maintenance works on Fielding Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 10:14.

Thames Water logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Manor Place

Thames Water are proposing to carry out Utility repair and maintenance works on Manor Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 10:25.

BT logo
Between
2 and 7 Nov 2026
Details
View Map
Share
Follow
Colet Gardens

BT are proposing to carry out Utility asset works on Colet Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Aug 2026 at 13:48.

London Borough Of Southwark logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Tanner Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tanner Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Southwark on 15 Jul 2026 at 08:05.

Thames Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Great George Street

Thames Water were proposing to carry out New service connection on Great George Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 6 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 11:22.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jul 2026 at 10:16.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:52.

Cadent Gas logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Agar Street

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Agar Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 6 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 15:19.

Cadent Gas logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Agar Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Agar Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 15:30.

Network Rail logo
Between
2 and 5 Nov 2026
Details
View Map
Share
Follow
Christian Street

Network Rail are proposing to carry out Works for Rail Purposes on Christian Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Aug 2026 at 14:29.

Network Rail logo
Between
2 and 5 Nov 2026
Details
View Map
Share
Follow
Christian Street

Network Rail are proposing to carry out Works for Rail Purposes on Christian Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Sep 2026 at 11:07.

UK Power Networks Eastern & London logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
New Bond Street

UK Power Networks Eastern & London are proposing to carry out New service connection on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:54.

UK Power Networks Eastern & London logo
Between
2 and 10 Nov 2026
Details
View Map
Share
Follow
Lincoln's Inn Fields

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Lincoln's Inn Fields, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2026 at 21:24.

Transport for London (TfL) logo
Between
2 and 13 Nov 2026
Details
View Map
Share
Follow
Farringdon Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 15:18.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Coptic Street

Thames Water are proposing to carry out roadworks on Coptic Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 10:43.

Thames Water logo
Between
2 and 5 Nov 2026
Details
View Map
Share
Follow
Blandford Street

Thames Water are proposing to carry out Utility asset works on Blandford Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 15:54.

Transport for London (TfL) logo
Between
2 and 13 Nov 2026
Details
View Map
Share
Follow
Farringdon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Road, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 10:38.

Transport for London (TfL) logo
Between
2 and 27 Nov 2026
Details
View Map
Share
Follow
Farringdon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Road, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 16:51.

Thames Water logo
Between
2 and 23 Nov 2026
Details
View Map
Share
Follow
Garbutt Place

Thames Water are proposing to carry out Utility asset works on Garbutt Place, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 11:30.

G2 Energy IDNO logo
Between
2 and 13 Nov 2026
Details
View Map
Share
Foscote Mews

G2 Energy IDNO were proposing to carry out New service connection on Foscote Mews, Westbourne, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 13 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:49.

Thames Water logo
Between
2 and 13 Nov 2026
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 10:02.

Transport for London (TfL) logo
LONG TERM
Between
2 Nov 2026 and 9 Jan 2027
Details
View Map
Share
Follow
Claremont Square

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Square, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 9 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2026 at 15:48.

Transport for London (TfL) logo
LONG TERM
Between
2 Nov 2026 and 9 Jan 2027
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 9 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2026 at 13:57.

Network Rail logo
LONG TERM
Between
2 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Pancras Road

Network Rail are proposing to carry out Works for Rail Purposes on Pancras Road, St Pancras And Somers Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Aug 2026 at 15:36.

Transport for London (TfL) logo
LONG TERM
Between
2 Nov 2026 and 9 Jan 2027
Details
View Map
Share
Follow
Penton Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Penton Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 9 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2026 at 15:47.

Thames Water logo
Between
3 and 6 Nov 2026
Details
View Map
Share
Follow
Devonshire Street

Thames Water are proposing to carry out New service connection on Devonshire Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 18:47.

Transport for London (TfL) logo
Between
3 and 24 Nov 2026
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 24 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 14:17.

UK Power Networks Eastern & London logo
Between
3 and 19 Nov 2026
Details
View Map
Share
Follow
St John's Wood Road

UK Power Networks Eastern & London are proposing to carry out New service connection on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jun 2026 at 11:42.

Virgin Media logo
Between
4 and 6 Nov 2026
Details
View Map
Share
Follow
Strand

Virgin Media are proposing to carry out Utility asset works on Strand, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 7 Sep 2026 at 11:48.

City Of Westminster logo
Between
4 and 27 Nov 2026
Details
View Map
Share
Follow
Broadwick Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Sep 2026 at 13:32.

Transport for London (TfL) logo
Between
5 and 7 Nov 2026
Details
View Map
Share
Follow
Oaklands Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Oaklands Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 09:15.

Transport for London (TfL) logo
Between
5 and 7 Nov 2026
Details
View Map
Share
Follow
Headcorn Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Headcorn Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 09:28.

Transport for London (TfL) logo
Between
5 and 9 Nov 2026
Details
View Map
Share
Follow
Oxford Street

Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:49.

UK Power Networks Eastern & London logo
Between
6 and 12 Nov 2026
Details
View Map
Share
Follow
Amersham Vale

UK Power Networks Eastern & London are proposing to carry out New service connection on Amersham Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 15:33.

BT logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Follow
Lansdowne Place

BT are proposing to carry out Utility asset works on Lansdowne Place, Anerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Aug 2026 at 10:15.

Southern Gas Networks logo
Between
9 and 23 Nov 2026
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 09:26.

Cadent Gas logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Anderson Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Anderson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 17:42.

UK Power Networks Eastern & London logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Petersham Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Petersham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 09:40.

Thames Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
Pavilion Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pavilion Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 11:20.

Thames Water logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Audley Square

Thames Water are proposing to carry out New service connection on Audley Square, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Aug 2026 at 10:35.

City Of Westminster logo
Between
9 and 20 Nov 2026
Details
View Map
Share
Follow
Haymarket

City Of Westminster are proposing to carry out Highway repair and maintenance works on Haymarket, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Aug 2026 at 13:54.

City Of Westminster logo
Between
9 and 20 Nov 2026
Details
View Map
Share
Follow
Haymarket

City Of Westminster are proposing to carry out Highway repair and maintenance works on Haymarket, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Aug 2026 at 13:40.

Thames Water logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Follow
Duke Street St James's

Thames Water are proposing to carry out Disconnection or alteration of supply on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 16:40.

Thames Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Pembridge Road

Thames Water were proposing to carry out Utility repair and maintenance works on Pembridge Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 13:28.

UK Power Networks Eastern & London logo
Between
9 and 20 Nov 2026
Details
View Map
Share
Follow
Arne Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Arne Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Sep 2026 at 20:17.

UK Power Networks Eastern & London logo
Between
9 and 20 Nov 2026
Details
View Map
Share
Follow
Dryden Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Dryden Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Sep 2026 at 20:16.

UK Power Networks Eastern & London logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Catton Street

UK Power Networks Eastern & London are proposing to carry out Remedial works on Catton Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:55.

Transport for London (TfL) logo
Between
9 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Farringdon Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2026 at 19:59.

Transport for London (TfL) logo
Between
9 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Farringdon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Road, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2026 at 20:00.

Thames Water logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Follow
Torrington Place

Thames Water are proposing to carry out New service connection on Torrington Place, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 15:38.

City Of Westminster logo
Between
9 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Portland Place

City Of Westminster are proposing to carry out Highway improvement works on Portland Place, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jun 2026 at 09:40.

Between
9 and 14 Nov 2026
Details
View Map
Share
Follow
Corporation Row

London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Corporation Row, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 11 Sep 2026 at 15:42.

Between
9 and 14 Nov 2026
Details
View Map
Share
Follow
Corporation Row

London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Corporation Row, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 14 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 14 Sep 2026 at 10:29.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Glenburnie Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenburnie Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2026 at 12:53.

London Borough Of Southwark logo
Between
10 and 14 Nov 2026
Details
View Map
Share
Follow
Raymouth Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Raymouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 09:25.

City Of London Telecomms logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Thorney Street

City Of London Telecomms are proposing to carry out Utility asset works on Thorney Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 26 Aug 2026 at 08:39.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Murphy Street

Thames Water are proposing to carry out Utility asset works on Murphy Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Aug 2026 at 08:46.

Thames Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
Bromfelde Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bromfelde Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2026 at 09:04.

Southern Gas Networks logo
Between
12 and 29 Nov 2026
Details
View Map
Share
Follow
Gleneldon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gleneldon Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:07.

Cornerstone Telecommunications Infrastructure logo
Between
12 and 27 Nov 2026
Details
View Map
Share
Follow
Hatton Garden

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 28 Aug 2026 at 09:48.

Cornerstone Telecommunications Infrastructure logo
Between
12 and 27 Nov 2026
Details
View Map
Share
Follow
Hatton Garden

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 1 Sep 2026 at 15:07.

Thames Water logo
Between
14 and 22 Nov 2026
Details
View Map
Share
Lower Richmond Road

Thames Water were proposing to carry out New service connection on Lower Richmond Road, Putney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2026 and run through until 22 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 16:51.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:16.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:25.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 13:13.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 15:56.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:25.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:23.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Putney Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Putney Bridge Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:32.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Wandsworth Plain

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Plain, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:35.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Ram Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Ram Street, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:40.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Fairfield Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Fairfield Street, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:43.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Frogmore

Transport for London (TfL) are proposing to carry out Highway improvement works on Frogmore, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 09:08.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Old York Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:29.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Dormay Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Dormay Street, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 09:09.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Armoury Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Armoury Way, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:24.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Putney Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Putney Bridge Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 08:59.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Swandon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Swandon Way, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:45.

Network Rail logo
Between
15 and 18 Nov 2026
Details
View Map
Share
Follow
Pancras Road

Network Rail are proposing to carry out Works for Rail Purposes on Pancras Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Aug 2026 at 16:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 Nov and 23 Dec 2026
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 13:01.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 Nov and 23 Dec 2026
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 11:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 Nov and 23 Dec 2026
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 13:41.

Transport for London (TfL) logo
Between
16 and 27 Nov 2026
Details
View Map
Share
Follow
Farringdon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Road, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 15:30.

T-Mobile (UK) logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Longley Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 4 Sep 2026 at 08:08.

Transport for London (TfL) logo
LONG TERM
Between
16 Nov 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 25 January 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:52.

Network Rail logo
Between
16 and 18 Nov 2026
Details
View Map
Share
Follow
Bedford Hill

Network Rail are proposing to carry out Works for Rail Purposes on Bedford Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Mar 2026 at 09:00.

Thames Water logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Pickets Street

Thames Water are proposing to carry out New service connection on Pickets Street, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:11.

Thames Water logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Winthorpe Road

Thames Water were proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2026 and run through until 11 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 11:10.

Thames Water logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Winthorpe Road

Thames Water are proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 09:48.

Cadent Gas logo
Between
16 and 26 Nov 2026
Details
View Map
Share
Follow
Cumberland Road

Cadent Gas are proposing to carry out Utility asset works on Cumberland Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:00.

Cadent Gas logo
Between
16 and 30 Nov 2026
Details
View Map
Share
Follow
Rainville Road

Cadent Gas are proposing to carry out Utility asset works on Rainville Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 14:28.

Cadent Gas logo
Between
16 and 29 Nov 2026
Details
View Map
Share
Follow
Monck Street

Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 16:00.

Thames Water logo
Between
16 and 19 Nov 2026
Details
View Map
Share
Follow
Great George Street

Thames Water are proposing to carry out New service connection on Great George Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 11:25.

UK Power Networks Eastern & London logo
Between
16 and 27 Nov 2026
Details
View Map
Share
Follow
Great Guildford Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Great Guildford Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 15:23.

Vodafone logo
Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
St Thomas Street

Vodafone are proposing to carry out Utility repair and maintenance works on St Thomas Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 25 Aug 2026 at 16:11.

Vodafone logo
Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
St Thomas Street

Vodafone are proposing to carry out Utility repair and maintenance works on St Thomas Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 9 Sep 2026 at 14:08.

Southern Gas Networks logo
Between
16 and 23 Nov 2026
Details
View Map
Share
Follow
Concert Hall Approach

Southern Gas Networks are proposing to carry out New service connection on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2026 at 09:38.

UK Power Networks Eastern & London logo
Between
16 and 23 Nov 2026
Details
View Map
Share
Follow
Park Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 13:54.

Thames Water logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Sackville Street

Thames Water are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 09:23.

Thames Water logo
Between
16 and 19 Nov 2026
Details
View Map
Share
Follow
Berchmans Close

Thames Water are proposing to carry out Utility asset works on Berchmans Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 Nov and 23 Dec 2026
Details
View Map
Share
Follow
Cheapside

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Cheapside, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 13:58.

Transport for London (TfL) logo
LONG TERM
Between
17 Nov 2026 and 14 Jan 2027
Details
View Map
Share
Follow
Balham Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 14 January 2027. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 11 May 2026 at 11:49.

UK Power Networks Eastern & London logo
Between
17 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Pleydell Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Pleydell Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 2 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Aug 2026 at 13:19.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:38.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:27.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:42.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:28.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:38.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:28.

London Borough Of Southwark logo
Between
19 and 21 Nov 2026
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 15:09.

London Borough Of Southwark logo
Between
19 and 21 Nov 2026
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 15:09.

Transport for London (TfL) logo
Between
20 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Tooting High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Tooting High Street, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:26.

Transport for London (TfL) logo
Between
20 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Tooting High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Tooting High Street, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:54.

Transport for London (TfL) logo
Between
20 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Aldis Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Aldis Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 14:35.

London Borough Of Southwark logo
LONG TERM
Between
20 Nov and 22 Dec 2026
Details
View Map
Share
Follow
Clifton Crescent

London Borough Of Southwark are proposing to carry out Highway improvement works on Clifton Crescent, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 22 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 11:11.

Transport for London (TfL) logo
Between
20 Nov and 5 Dec 2026
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 13:54.

Transport for London (TfL) logo
Between
20 Nov and 5 Dec 2026
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 14:22.

Network Rail logo
Between
21 and 23 Nov 2026
Details
View Map
Share
Follow
Vine Road

Network Rail are proposing to carry out Works for Rail Purposes on Vine Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2026 at 14:20.

Thames Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Fountain Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Fountain Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 15:04.

Thames Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Crystal Palace Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Crystal Palace Parade, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 14:51.

Thames Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Camberwell Road

Thames Water were proposing to carry out Utility asset works on Camberwell Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2026 and run through until 27 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:47.

Thames Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Wyvil Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Wyvil Road, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 09:04.

Thames Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Ethnard Road

Thames Water are proposing to carry out Utility asset works on Ethnard Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2026 at 17:05.

London Borough Of Southwark logo
Between
23 and 28 Nov 2026
Details
View Map
Share
Follow
Rotherhithe New Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 15:09.

City Of Westminster logo
Between
23 Nov and 16 Dec 2026
Details
View Map
Share
Follow
Eccleston Place

City Of Westminster are proposing to carry out Highway improvement works on Eccleston Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2026 at 08:10.

Vodafone logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Victoria Street

Vodafone are proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 1 Sep 2026 at 10:28.

Network Rail logo
Between
23 and 26 Nov 2026
Details
View Map
Share
Follow
Virgil Street

Network Rail are proposing to carry out Works for Rail Purposes on Virgil Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jul 2026 at 13:24.

Network Rail logo
Between
23 and 26 Nov 2026
Details
View Map
Share
Follow
Virgil Street

Network Rail are proposing to carry out Works for Rail Purposes on Virgil Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Sep 2026 at 08:39.

UK Power Networks Eastern & London logo
Between
23 Nov and 1 Dec 2026
Details
View Map
Share
Follow
Back Church Lane

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Back Church Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 1 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 12:04.

UK Power Networks Eastern & London logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Foster Lane

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Foster Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2026 at 15:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Nov 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 29 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2026 at 14:13.

Thames Water logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Underhill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Underhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2026 at 08:38.

Thames Water logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:00.

Transport for London (TfL) logo
Between
25 Nov and 7 Dec 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2026 and run through until 7 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:18.

BT logo
Between
25 and 27 Nov 2026
Details
View Map
Share
Follow
Colet Gardens

BT are proposing to carry out Utility asset works on Colet Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2026 at 08:55.

Thames Water logo
Between
27 Nov and 1 Dec 2026
Details
View Map
Share
Crystal Palace Parade

Thames Water were proposing to carry out Utility repair and maintenance works on Crystal Palace Parade, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2026 and run through until 1 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 14:50.

UK Power Networks Eastern & London logo
Between
27 Nov and 1 Dec 2026
Details
View Map
Share
Follow
Seymour Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Seymour Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2026 and could run through until 1 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 May 2026 at 10:14.

Thames Water logo
Between
27 and 29 Nov 2026
Details
View Map
Share
Follow
Calthorpe Street

Thames Water are proposing to carry out Utility repair and maintenance works on Calthorpe Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2026 and could run through until 29 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 16:29.

Thames Water logo
Between
28 and 30 Nov 2026
Details
View Map
Share
Follow
Devonshire Place Mews

Thames Water are proposing to carry out Utility asset works on Devonshire Place Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 11:25.

Cellnex OT UK logo
Between
28 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Merrow Street

Cellnex OT UK are proposing to carry out Utility asset works on Merrow Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 2 Sep 2026 at 13:24.

West Sussex County Council logo
Between
30 Nov and 13 Dec 2026
Details
View Map
Share
Anerley Road

West Sussex County Council were proposing to carry out Highway improvement works on Anerley Road, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 13 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 1 Sep 2026 at 14:34.

London Borough Of Bromley logo
Between
30 Nov and 13 Dec 2026
Details
View Map
Share
Follow
Anerley Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Anerley Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 13 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2026 at 08:28.

Southern Gas Networks logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Founders Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Founders Gardens, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2026 at 16:06.

Thames Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Knollys Road

Thames Water are proposing to carry out Utility repair and maintenance works on Knollys Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 09:20.

Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Lebanon Road

GRID LINE POWER NETWORKS LIMITED are proposing to carry out New service connection on Lebanon Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by GRID LINE POWER NETWORKS LIMITED on 27 Aug 2026 at 09:06.

Thames Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Bromfelde Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bromfelde Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 12:07.

Between
30 Nov and 19 Dec 2026
Details
View Map
Share
Rotherhithe New Road

Leep Utilities Electric were proposing to carry out New service connection on Rotherhithe New Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 19 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 3 Sep 2026 at 15:06.

Thames Water logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Mercer Street

Thames Water are proposing to carry out Utility asset works on Mercer Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 16:19.

Thames Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Harewood Place

Thames Water are proposing to carry out Utility repair and maintenance works on Harewood Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 10:56.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 11 Jan 2027
Details
View Map
Share
Follow
Salisbury Street

Thames Water are proposing to carry out roadworks on Salisbury Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2026 at 16:31.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 11 Jan 2027
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 06:32.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 18 Jan 2027
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 18 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 06:30.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 19 Apr 2027
Details
View Map
Share
Follow
Pentonville Road

Thames Water are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works will start on or after 30 November 2026 and could run through until 19 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Apr 2026 at 10:16.

Vodafone logo
Between
1 and 4 Dec 2026
Details
View Map
Share
Follow
Pentonville Road

Vodafone are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 24 Jul 2026 at 13:04.

Transport for London (TfL) logo
LONG TERM
Between
3 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Follow
Slip Road Leading From Atkins Road To Poynders Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Slip Road Leading From Atkins Road To Poynders Road, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 15:24.

Transport for London (TfL) logo
LONG TERM
Between
3 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Follow
Poynders Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Poynders Road, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2026 at 17:31.

London Borough Of Southwark logo
Between
3 and 5 Dec 2026
Details
View Map
Share
Follow
Trafalgar Avenue

London Borough Of Southwark are proposing to carry out Highway improvement works on Trafalgar Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 15:09.

Transport for London (TfL) logo
Between
7 and 19 Dec 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 19 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:18.

Transport for London (TfL) logo
LONG TERM
Between
7 Dec 2026 and 25 Jan 2027
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 25 January 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 12:53.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Peterborough Road

Cadent Gas are proposing to carry out Utility asset works on Peterborough Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:34.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Coniger Road

Cadent Gas are proposing to carry out Utility asset works on Coniger Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Bradbourne Street

Cadent Gas are proposing to carry out Utility asset works on Bradbourne Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:49.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Chiddingstone Street

Cadent Gas are proposing to carry out Utility asset works on Chiddingstone Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Quarrendon Street

Cadent Gas are proposing to carry out Utility asset works on Quarrendon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Chipstead Street

Cadent Gas are proposing to carry out Utility asset works on Chipstead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Perrymead Street

Cadent Gas are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:49.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 7 Feb 2027
Details
View Map
Share
Follow
Studdridge Street

Cadent Gas are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 7 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Bowerdean Street

Cadent Gas are proposing to carry out Utility asset works on Bowerdean Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Thames Water logo
Between
7 and 9 Dec 2026
Details
View Map
Share
Follow
East Street

Thames Water are proposing to carry out Utility asset works on East Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 09:21.

Thames Water logo
Between
7 and 14 Dec 2026
Details
View Map
Share
Follow
Maddox Street

Thames Water are proposing to carry out New service connection on Maddox Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:24.

BT logo
Between
7 and 10 Dec 2026
Details
View Map
Share
Follow
Clipstone Street

BT are proposing to carry out Utility asset works on Clipstone Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 10 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Sep 2026 at 08:39.

BT logo
Between
7 and 10 Dec 2026
Details
View Map
Share
Maple Street

BT were proposing to carry out Utility asset works on Maple Street, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 10 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 14 Sep 2026 at 07:17.

BT logo
Between
7 and 10 Dec 2026
Details
View Map
Share
Cleveland Street

BT were proposing to carry out Utility asset works on Cleveland Street, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 10 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 14 Sep 2026 at 07:10.

London Borough Of Hackney logo
Between
7 and 14 Dec 2026
Details
View Map
Share
Follow
Paul Street

London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Paul Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 14 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Sep 2026 at 14:14.

City Of Westminster logo
LONG TERM
Between
8 Dec 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Portland Place

City Of Westminster are proposing to carry out Highway improvement works on Portland Place, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 Jun 2026 at 09:31.

Thames Water logo
Between
8 and 10 Dec 2026
Details
View Map
Share
Follow
Lyham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lyham Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2026 and could run through until 10 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 08:21.

BT logo
Between
9 and 11 Dec 2026
Details
View Map
Share
Follow
Belgrove Street

BT are proposing to carry out Diversionary works on Belgrove Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Sep 2026 at 10:32.

UK Power Networks Eastern & London logo
Between
14 and 22 Dec 2026
Details
View Map
Share
Follow
Petersfield Rise

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Petersfield Rise, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 14:16.

Thames Water logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Deerdale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Deerdale Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 13:23.

Cadent Gas logo
Between
14 and 21 Dec 2026
Details
View Map
Share
Follow
Woodlawn Road

Cadent Gas are proposing to carry out Utility asset works on Woodlawn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 12:15.

Cadent Gas logo
Between
14 and 21 Dec 2026
Details
View Map
Share
Follow
Harbord Street

Cadent Gas are proposing to carry out Utility asset works on Harbord Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 12:15.

Thames Water logo
Between
14 and 19 Dec 2026
Details
View Map
Share
Follow
Pocock Street

Thames Water are proposing to carry out Utility asset works on Pocock Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 19 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:25.


Roadworks Map near to Carpenters Place, LONDON, SW4 7TD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 12:51
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Carpenters Place, LONDON, SW4 7TD (56 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Transport for London (TfL) logo
MAJOR
  
CLAPHAM HIGH STREET, CLAPHAM TOWN 
(0.1 miles)
Transport for London (TfL)
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 14 Sep 2026 - 12 Oct 2026
0.1
Details
Share
Follow
2
ES Pipelines logo
TRIANGLE PLACE, CLAPHAM EAST 
(0.1 miles)
ES Pipelines
Utility asset works - Footway - Give and take
Cancelled
(Scheduled: 7 Sep 2026 - 18 Sep 2026)
0.1
Details
Share
3
Thames Water logo
URGENT
  
CLAPHAM PARK ROAD, CLAPHAM EAST 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 12 Sep 2026 04:11
(Scheduled: 12 Sep 2026 - 19 Sep 2026)
0.2
Details
Share
Follow
4
Thames Water logo
EMERGENCY
  
CLAPHAM PARK ROAD, CLAPHAM EAST 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Two-way signals
Cancelled
(Scheduled: 13 Sep 2026 - 18 Sep 2026)
0.2
Details
Share
5
Hyperoptic logo
CLAPHAM PARK ROAD, CLAPHAM EAST 
(0.3 miles)
Hyperoptic
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 17 Sep 2026 - 18 Sep 2026
0.3
Details
Share
Follow
6
Hyperoptic logo
CLAPHAM PARK ROAD, CLAPHAM EAST 
(0.3 miles)
Hyperoptic
New service connection - Footway - No carriageway incursion
Complete
15 Sep 2026 10:00 - 11:00
0.3
Details
Share
7
UK Power Networks Eastern & London logo
URGENT
  
PARK HILL, CLAPHAM COMMON & ABBEVILLE 
(0.3 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 2 Sep 2026 09:51
(Scheduled: 2 Sep 2026 - 16 Sep 2026)
0.3
Details
Share
Follow
8
Thames Water logo
CRESCENT LANE, CLAPHAM COMMON & ABBEVILLE 
(0.4 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Give and take
In Progress
Since: 15 Sep 2026 10:20
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
0.4
Details
Share
Follow
9
BT logo
ORLANDO ROAD, CLAPHAM TOWN 
(0.4 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 17 Sep 2026 - 18 Sep 2026)
0.4
Details
Share
10
Thames Water logo
ACRE LANE, BRIXTON ACRE LANE 
(0.4 miles)
Thames Water
New service connection - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 21 Sep 2026
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data