ROADWORKS SUMMARY
Navy Street, LONDON, SW4 6EY
Introduction
View current and future planned roadworks and road closures for Navy Street, SW4 6EY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Navy Street, LONDON, SW4 6EY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Navy Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
22 Aug 2202
Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.
31 Jan 2027
Network Rail are carrying out Works for Rail Purposes on Tanner Lane, Westminster, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2022 at 07:30 and could run through until 31 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 21 Aug 2026 at 08:24.
31 Jan 2027
Network Rail are carrying out Works for Rail Purposes on South Wharf Road, Hyde Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 October 2022 at 07:30 and could run through until 31 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Aug 2026 at 13:25.
27 Mar 2027
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 October 2024 at 08:00 and could run through until 27 March 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 08:43.
3 Nov 2026
London Borough Of Southwark are carrying out Highway improvement works on Montague Close, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 October 2024 at 00:00 and could run through until 3 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Apr 2026 at 14:38.
3 Feb 2027
Transport for London (TfL) are carrying out Highway improvement works on Cringle Street, Battersea, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:06.
3 Feb 2027
Transport for London (TfL) are carrying out Highway improvement works on Kirtling Street, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:06.
3 Feb 2027
Transport for London (TfL) are carrying out Highway improvement works on Ponton Road, Battersea, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:11.
30 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.
16 Jun 2025 and 15 Dec 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Stockholm Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 15 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 12 Feb 2026 at 10:03.
23 Jun 2025 and 23 Jun 2027
Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 23 June 2027. The works will impact the footway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 Jun 2025 at 17:32.
3 Feb 2027
Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 June 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2026 at 12:19.
3 Feb 2027
Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Vauxhall, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 June 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:50.
14 Jul 2025 and 12 Jul 2027
Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 July 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 12:41.
14 Jul 2025 and 12 Jul 2027
Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 July 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 14:21.
28 Sep 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 09:00 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2026 at 12:30.
Today
Transport for London (TfL) are proposing to carry out roadworks on Park Lane, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 16 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2026 at 10:37.
27 Oct 2025 and 26 Oct 2026
Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 27 October 2025 and could run through until 26 October 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2025 at 13:22.
29 Nov 2025 and 30 Oct 2027
Transport for London (TfL) are proposing to carry out roadworks on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2025 and could run through until 30 October 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2025 at 13:25.
26 Dec 2025 and 27 Nov 2026
Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 December 2025 and could run through until 27 November 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 10 Aug 2026 at 14:44.
25 Sep 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Welham Road, Tooting, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 January 2026 at 10:00 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 08:15.
11 Jan 2027
London Borough Of Southwark are carrying out Highway improvement works on Griggs Place, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 January 2026 at 08:00 and could run through until 11 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Apr 2026 at 09:01.
Saturday
Transport for London (TfL) are proposing to carry out roadworks on Grosvenor Gardens, Warwick, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2026 and could run through until 19 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2026 at 11:24.
12 Jan and 6 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Willow Lane, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 January 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 2 Dec 2025 at 16:30.
12 Jan 2026 and 28 Feb 2027
London Borough Of Southwark are proposing to carry out Highway improvement works on Holly Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 January 2026 and could run through until 28 February 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 7 Jan 2026 at 16:30.
Friday
City Of London Corporation are carrying out Highway improvement works on Ludgate Broadway, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 January 2026 at 08:00 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 20 Jul 2026 at 13:34.
15 Jan 2026 and 14 Jan 2027
Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2026 and could run through until 14 January 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 2 Feb 2026 at 15:06.
4 Oct 2026
Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 January 2026 at 13:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:14.
Tomorrow
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Southwark Park Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 January 2026 at 14:00 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 13:35.
30 Aug 2027
Network Rail are carrying out Works for Rail Purposes on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 February 2026 at 07:00 and could run through until 30 August 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 16 Jul 2026 at 13:37.
20 Dec 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Recreation Way, Mitcham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 February 2026 at 10:30 and could run through until 20 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 09:50.
19 Oct 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Needleman Street, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 February 2026 at 10:30 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 13:25.
9 Feb 2026 and 8 Feb 2027
Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 February 2026 and could run through until 8 February 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2026 at 14:20.
1 Mar 2027
London Borough Of Southwark are carrying out Highway improvement works on Tarn Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 March 2026 at 00:00 and could run through until 1 March 2027. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 3 Mar 2026 at 12:14.
1 Mar 2027
London Borough Of Southwark are carrying out Highway improvement works on Tarn Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 March 2026 at 00:00 and could run through until 1 March 2027. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 3 Mar 2026 at 12:13.
2 Mar 2027
London Borough Of Southwark are carrying out Highway improvement works on Tarn Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2026 at 11:30 and could run through until 2 March 2027. The works will impact the carriageway and footpath.
This roadwork event was last updated by London Borough Of Southwark on 3 Mar 2026 at 11:36.
16 Mar 2026 and 15 Sep 2027
London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 March 2026 and could run through until 15 September 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2026 at 08:28.
21 Mar 2026 and 20 Mar 2027
Transport for London (TfL) are proposing to carry out roadworks on Gracechurch Street, London.
These works are categorised as Major.
The works will start on or after 21 March 2026 and could run through until 20 March 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 Mar 2026 at 15:57.
30 Mar 2026 and 3 Jan 2028
Transport for London (TfL) are proposing to carry out roadworks on Blackfriars Bridge, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 March 2026 and could run through until 3 January 2028. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2026 at 14:56.
30 Mar 2026 and 3 Jan 2028
Transport for London (TfL) are proposing to carry out roadworks on Blackfriars Bridge, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 March 2026 and could run through until 3 January 2028. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2026 at 15:01.
1 Jan 2027
London Borough Of Southwark are carrying out Highway improvement works on Union Street, London.
These works are categorised as Major.
The works started on 3 April 2026 at 00:00 and could run through until 1 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 25 Aug 2026 at 11:27.
16 Nov 2026
Thames Water are carrying out Disconnection or alteration of supply on Somerleyton Road, Brixton Windrush, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 April 2026 at 10:00 and could run through until 16 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2026 at 10:24.
14 Nov 2026
Thames Water are carrying out Disconnection or alteration of supply on Moorland Road, Brixton Windrush, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2026 at 09:30 and could run through until 14 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2026 at 09:43.
16 Nov 2026
Thames Water are carrying out Disconnection or alteration of supply on Loughborough Park, Brixton Windrush, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 April 2026 at 10:00 and could run through until 16 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2026 at 10:24.
30 Oct 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2026 at 14:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:34.
4 Oct 2026
Thames Water are carrying out Utility asset works on Balham Park Road, Balham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 April 2026 at 11:00 and could run through until 4 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 07:50.
6 Oct 2026
London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 April 2026 at 07:00 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2026 at 08:25.
28 Feb 2027
Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Albert Bridge Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2026 at 00:00 and could run through until 28 February 2027. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 28 Apr 2026 at 16:31.
28 Apr and 8 Dec 2026
Transport for London (TfL) are proposing to carry out roadworks on Gracechurch Street, London.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 28 April 2026 and could run through until 8 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2026 at 17:21.
26 Oct 2026
HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 May 2026 at 08:00 and could run through until 26 October 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by HS2 on 30 Jun 2026 at 09:19.
26 Oct 2026
HS2 are carrying out Utility asset works on Varndell Street, Regent's Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 May 2026 at 08:00 and could run through until 26 October 2026. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 10 Jun 2026 at 11:17.
4 May 2026 and 28 Jan 2027
London Borough Of Camden are proposing to carry out Highway improvement works on Granary Street, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2026 and could run through until 28 January 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 28 Apr 2026 at 19:33.
27 Nov 2026
Thames Water are carrying out Utility asset works on Amwell Street, Islington, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 May 2026 at 08:44 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Aug 2026 at 12:35.
10 Nov 2026
London Borough Of Southwark are carrying out Highway improvement works on Joan Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 May 2026 at 05:58 and could run through until 10 November 2026. The works will impact the carriageway and footpath.
This roadwork event was last updated by London Borough Of Southwark on 11 May 2026 at 06:04.
25 Sep 2026
London Borough Of Lambeth are carrying out Highway improvement works on Carson Road, West Dulwich, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 8 Sep 2026 at 13:15.
9 Oct 2026
London Borough Of Lambeth are carrying out Highway improvement works on Rosendale Road, West Dulwich, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2026 at 08:00 and could run through until 9 October 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 12 May 2026 at 08:38.
14 May 2026 and 1 Mar 2027
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Fulbourne Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2026 and could run through until 1 March 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Apr 2026 at 12:37.
30 Oct 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lawrie Park Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 May 2026 at 13:30 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:37.
5 Oct 2026
London Borough Of Southwark are carrying out Highway improvement works on Naylor Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 July 2026 at 00:00 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2026 at 18:43.
23 Sep 2026
London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Macfarlane Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2026 at 07:00 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Jun 2026 at 11:43.
19 Oct 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 May 2026 at 14:00 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 13:35.
30 Oct 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Jews Walk, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 May 2026 at 09:44 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:35.
30 Sep 2026
London Borough Of Southwark are carrying out Highway improvement works on Studholme Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 May 2026 at 00:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 13 Jul 2026 at 11:37.
Today
Cadent Gas are carrying out Utility asset works on Onslow Gardens, London.
These works are categorised as Major.
The works started on 26 May 2026 at 10:27 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:57.
25 Sep 2026
London Borough Of Lambeth are carrying out Highway improvement works on Idmiston Road, West Dulwich, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 May 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 8 Sep 2026 at 12:55.
30 Sep 2026
London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Shepherd's Bush Green, London.
These works are categorised as Major.
The works started on 4 June 2026 at 22:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Aug 2026 at 12:20.
1 Oct 2026
Transport for London (TfL) are carrying out Highway repair and maintenance works on Tower Bridge Road, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 June 2026 at 11:59 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 11:31.
12 Oct 2026
Thames Water are carrying out Disconnection or alteration of supply on Wakehurst Road, Battersea, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 June 2026 at 08:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Jun 2026 at 08:07.
30 Nov 2026
Network Rail are carrying out Works for Rail Purposes on Sail Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 June 2026 at 08:00 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Jun 2026 at 08:44.
30 Nov 2026
Network Rail are carrying out Works for Rail Purposes on Lambeth Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 June 2026 at 06:00 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Jun 2026 at 08:43.
Today
City Of Westminster are carrying out Highway repair and maintenance works on Paddington Street, Marylebone High Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 June 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 12:06.
Tomorrow
City Of Westminster are carrying out Highway repair and maintenance works on Chiltern Street, Marylebone High Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 June 2026 at 08:00 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 12:08.
14 Dec 2026
City Of Westminster are carrying out Highway improvement works on Bernhardt Crescent, Church Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 June 2026 at 08:00 and could run through until 14 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 Jun 2026 at 08:53.
30 Sep 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 June 2026 at 09:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:51.
30 Sep 2026
Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, Harrow Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 June 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 11:05.
25 Sep 2026
London Borough Of Lambeth are carrying out Highway improvement works on Park Hall Road, West Dulwich, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 8 Sep 2026 at 12:59.
31 Oct 2026
City Of London Corporation are carrying out Highway improvement works on King William Street, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 08:00 and could run through until 31 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 11 Sep 2026 at 13:08.
6 Jul 2026 and 5 Jul 2027
Transport for London (TfL) are proposing to carry out roadworks on Harleyford Street, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 July 2026 and could run through until 5 July 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2026 at 13:40.
12 Oct 2026
HS2 are carrying out Works for Rail Purposes on North Gower Street, Regent's Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 July 2026 at 08:00 and could run through until 12 October 2026. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 25 Aug 2026 at 10:17.
25 Sep 2026
Cadent Gas are carrying out Utility asset works on Chapter Street, Vincent Square, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 July 2026 at 10:13 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 10:19.
Today
Thames Water are carrying out Disconnection or alteration of supply on Crownstone Road, Brixton Rush Common, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 July 2026 at 15:30 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 13:53.
27 Nov 2026
Thames Water are carrying out Utility repair and maintenance works on Albyn Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 July 2026 at 16:00 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Aug 2026 at 16:31.
24 Sep 2026
London Borough Of Southwark are carrying out Highway improvement works on Homestall Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 July 2026 at 08:00 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 10:53.
4 Oct 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Sydenham Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 08:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2026 at 15:40.
4 Oct 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Kirkdale, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 08:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2026 at 15:41.
4 Oct 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Sheenewood, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 08:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Jul 2026 at 09:00.
4 Oct 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Westwood Hill, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 08:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2026 at 15:41.
29 Sep 2026
Thames Water are carrying out Disconnection or alteration of supply on Marmion Road, Battersea, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 13:00 and could run through until 29 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:26.
Monday
London Borough Of Wandsworth are carrying out Highway improvement works on Bridgend Road, Wandsworth, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.
Monday
London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge, Wandsworth, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.
Monday
London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:04.
Monday
London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.
27 Jul and 28 Sep 2026
London Borough Of Wandsworth are proposing to carry out Section 50 on Pump House Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Wandsworth on 14 Aug 2026 at 11:01.
27 Jul and 28 Sep 2026
London Borough Of Wandsworth are proposing to carry out Section 50 on Kirtling Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Wandsworth on 30 Jun 2026 at 10:40.
16 Oct 2026
UK Power Networks Eastern & London are carrying out Utility asset works on Kensington Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 11:00 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jul 2026 at 15:37.
27 Jul and 29 Sep 2026
Transport for London (TfL) are proposing to carry out Section 50 on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2026 and could run through until 29 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 Jun 2026 at 10:26.
18 Dec 2026
Thames Water are carrying out Utility asset works on Pentonville Road, Islington, London.
These works are categorised as Major.
The works started on 27 July 2026 at 12:03 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 15:35.
25 Sep 2026
City Of Westminster are carrying out Highway repair and maintenance works on Cleveland Street, Bloomsbury, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 July 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 Aug 2026 at 21:19.
3 Aug 2026 and 10 May 2027
Transport for London (TfL) are proposing to carry out roadworks on Commercial Street, London.
These works are categorised as Major.
The works will start on or after 3 August 2026 and could run through until 10 May 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Aug 2026 at 15:53.
3 Aug 2026 and 10 May 2027
Transport for London (TfL) are proposing to carry out roadworks on Commercial Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2026 and could run through until 10 May 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Aug 2026 at 15:51.
17 Oct 2026
Thames Water are carrying out Utility asset works on Commercial Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2026 at 10:00 and could run through until 17 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2026 at 09:13.
10 Aug 2026 and 10 Aug 2028
London Borough Of Lambeth are proposing to carry out roadworks on Somerleyton Road, Brixton Windrush, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 August 2026 and could run through until 10 August 2028. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 31 Jul 2026 at 10:29.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Hanover Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 13:38.
Friday
Transport for London (TfL) are carrying out Highway improvement works on Hanover Park, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2026 at 11:43.
11 Dec 2026
Thames Water are carrying out Utility asset works on Inglebert Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 August 2026 at 16:00 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Aug 2026 at 17:06.
Friday
London Borough Of Hackney are carrying out Utility asset works on Murray Grove, Hackney, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 August 2026 at 09:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 21 Aug 2026 at 14:15.
Friday
HS2 are carrying out Works for Rail Purposes on Stanhope Street, Regent's Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 August 2026 at 08:00 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 26 Aug 2026 at 14:14.
25 Sep 2026
London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Wood Lane, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 August 2026 at 09:15 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2026 at 08:36.
23 Sep 2026
Thames Water are carrying out Disconnection or alteration of supply on Wisley Road, Balham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 August 2026 at 09:00 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 09:13.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on St Giles High Street, Holborn And Covent Garden, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 August 2026 at 04:47 and could run through until 22 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 09:01.
16 Aug and 20 Dec 2026
Transport for London (TfL) are proposing to carry out roadworks on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2026 at 17:33.
Friday
Thames Water are carrying out Utility repair and maintenance works on Old Compton Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 August 2026 at 14:00 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 09:14.
23 Nov 2026
Transport for London (TfL) are carrying out Highway improvement works on Marylebone Road, Marylebone High Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 August 2026 at 08:00 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Aug 2026 at 09:55.
18 Aug and 27 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Salamanca Place, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 May 2026 at 09:29.
19 Aug and 28 Oct 2026
London Borough Of Southwark are proposing to carry out Remedial works on Fenning Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 18 Aug 2026 at 14:50.
13 Oct 2026
City Of Westminster are carrying out Highway repair and maintenance works on Pall Mall, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2026 at 09:00 and could run through until 13 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 19 Aug 2026 at 09:56.
13 Oct 2026
City Of Westminster are carrying out Highway repair and maintenance works on Waterloo Place, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 13:00 and could run through until 13 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 10 Sep 2026 at 14:31.
Monday
City Of Westminster are carrying out Highway repair and maintenance works on Sherlock Mews, Marylebone High Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:00 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 7 Sep 2026 at 08:46.
16 Oct 2026
UK Power Networks Eastern & London are carrying out Utility asset works on Kensington High Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 August 2026 at 08:00 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2026 at 09:25.
28 Sep 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Carolina Road, Croydon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 09:00 and could run through until 28 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 09:12.
Sunday
London Borough Of Southwark are proposing to carry out Highway improvement works on Camberwell New Road, London.
These works are categorised as Major.
The works will start on or after 24 August 2026 and could run through until 20 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2026 at 10:41.
Sunday
London Borough Of Southwark were proposing to carry out Highway improvement works on Camberwell New Road, London.
These works were categorised as Major.
The works were originally planned to start 24 August 2026 and run through until 20 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2026 at 11:30.
Sunday
London Borough Of Southwark are proposing to carry out Highway improvement works on Camberwell New Road, London.
These works are categorised as Major.
The works will start on or after 24 August 2026 and could run through until 20 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2026 at 11:30.
Sunday
London Borough Of Southwark are proposing to carry out Highway improvement works on Camberwell New Road, London.
These works are categorised as Major.
The works will start on or after 24 August 2026 and could run through until 20 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2026 at 11:30.
Monday
Cadent Gas are carrying out Utility asset works on Rampayne Street, Tachbrook, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 09:32 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 09:32.
24 Aug and 26 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Kennington Road, Kennington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 26 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Jun 2026 at 15:29.
1 Oct 2026
London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Grove, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 07:30 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 16:35.
13 Oct 2026
City Of Westminster are carrying out Highway repair and maintenance works on Pall Mall, St James's, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 08:00 and could run through until 13 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Aug 2026 at 08:53.
26 Sep 2026
London Borough Of Islington are carrying out Highway repair and maintenance works on Colebrooke Row, Islington, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 08:00 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 7 Sep 2026 at 11:19.
19 Oct 2026
UK Power Networks Eastern & London are carrying out Utility asset works on Stonecutter Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 August 2026 at 08:00 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 12:01.
25 Aug and 14 Dec 2026
G2 Energy IDNO are proposing to carry out New service connection on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by G2 Energy IDNO on 12 Aug 2026 at 14:28.
23 Sep 2026
Thames Water are carrying out Statutory Infrastructure Works on Marylebone Road, Marylebone High Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 14:21.
26 Aug and 12 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Gowrie Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 12:59.
12 Oct 2026
Thames Water are carrying out Disconnection or alteration of supply on Gowrie Road, Battersea, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 August 2026 at 08:45 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2026 at 09:00.
Friday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Tower Bridge Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2026 at 22:00 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 22:08.
28 Sep 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Circus Road, Abbey Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2026 at 09:00 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2026 at 10:43.
Monday
HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 9 Sep 2026 at 11:38.
Monday
HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 August 2026 at 18:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 9 Sep 2026 at 12:12.
28 Aug and 2 Oct 2026
HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 9 Sep 2026 at 11:06.
28 Aug and 2 Oct 2026
HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 9 Sep 2026 at 11:49.
2 Oct 2026
HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2026 at 18:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 9 Sep 2026 at 12:10.
5 Oct 2026
Cadent Gas are carrying out Utility asset works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2026 at 09:51 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 10:27.
Saturday
Thames Water are proposing to carry out Utility asset works on New Bridge Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2026 and could run through until 19 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:27.
3 Oct 2026
Thames Water are carrying out Utility asset works on New Bridge Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2026 at 21:00 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 16:43.
28 Aug and 3 Oct 2026
Thames Water are proposing to carry out Utility asset works on Queen Victoria Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:27.
Monday
Cadent Gas are carrying out Utility asset works on Crabtree Lane, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 10:21 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:56.
30 Oct 2026
HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 08:00 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 14 Sep 2026 at 10:43.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 15:22.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 14:50.
1 Sep and 20 Dec 2026
City Of London Corporation are proposing to carry out roadworks on Finsbury Circus, London.
These works are categorised as Major.
The works will start on or after 1 September 2026 and could run through until 20 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 7 Sep 2026 at 13:38.
Tomorrow
UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Finsbury Circus, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2026 and run through until 17 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 09:30.
1 Sep and 30 Oct 2026
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Whitechapel Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Aug 2026 at 09:48.
Today
City Of Westminster are carrying out Highway repair and maintenance works on Langham Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 14 Sep 2026 at 15:36.
26 Sep 2026
Thames Water are carrying out Utility asset works on Cramer Street, Marylebone High Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 26 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:35.
17 Oct 2026
G2 Energy IDNO are carrying out New service connection on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 12:30 and could run through until 17 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 14 Sep 2026 at 12:55.
23 Sep 2026
Transport for London (TfL) are carrying out Section 50 on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:10 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 14:05.
1 and 25 Sep 2026
HS2 are proposing to carry out Works for Rail Purposes on Delancey Street, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 13 Aug 2026 at 11:11.
28 Sep 2026
HS2 are carrying out Works for Rail Purposes on Delancey Street, Camden Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 10:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 3 Sep 2026 at 13:42.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Crystal Palace Parade, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Aug 2026 at 12:36.
Friday
UK Power Networks Eastern & London are carrying out New service connection on Crystal Palace Parade, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 09:08.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Crystal Palace Parade, Anerley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2026 at 13:54.
Friday
UK Power Networks Eastern & London were proposing to carry out New service connection on Crystal Palace Parade, Anerley.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2026 at 09:58.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Marryat Road, Wimbledon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2026 at 09:24.
Friday
UK Power Networks Eastern & London are carrying out New service connection on Marryat Road, Wimbledon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 09:50 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:42.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Burghley Road, Wimbledon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2026 at 09:28.
Friday
UK Power Networks Eastern & London are carrying out New service connection on Burghley Road, Wimbledon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 09:50 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:41.
23 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Streatham Place, Clapham Park, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:12.
27 Sep 2026
Transport for London (TfL) are carrying out Highway improvement works on Morrish Road, Clapham Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:12.
27 Sep 2026
Transport for London (TfL) are carrying out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:11.
1 Sep and 23 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 13:24.
23 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Holmewood Road, Brixton Rush Common, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:10.
2 Nov 2026
London Borough Of Southwark are carrying out Highway improvement works on Havil Street, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 08:48.
2 Oct 2026
London Borough Of Lambeth are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 10:10 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 1 Sep 2026 at 12:06.
2 Oct 2026
London Borough Of Lambeth are carrying out Highway improvement works on Salamanca Street, Vauxhall, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 10:10 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 1 Sep 2026 at 12:05.
12 Oct 2026
Thames Water are carrying out Utility asset works on Thirleby Road, Vincent Square, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2026 at 08:37.
30 Sep 2026
Transport for London (TfL) are carrying out roadworks on Druid Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 07:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 10:27.
2 Sep and 7 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Tyers Terrace, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Jun 2026 at 08:34.
2 Sep and 1 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Queen Elizabeth Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 18 Aug 2026 at 20:48.
2 Sep and 1 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Queen Elizabeth Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2026 at 06:34.
2 Sep and 1 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Queen Elizabeth Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2026 at 06:34.
2 Sep and 5 Nov 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Henrietta Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 3 Oct 2025 at 14:27.
5 Nov 2026
City Of Westminster are carrying out Highway repair and maintenance works on Henrietta Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 08:00 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Sep 2026 at 09:42.
2 Sep and 5 Nov 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bedford Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 3 Oct 2025 at 14:34.
5 Nov 2026
City Of Westminster are carrying out Highway repair and maintenance works on Bedford Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 08:00 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Sep 2026 at 09:42.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:07.
Today
Transport for London (TfL) were proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2026 and run through until 16 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 12:34.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:06.
Today
Transport for London (TfL) were proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2026 and run through until 16 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 12:34.
2 and 27 Sep 2026
G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2026 and could run through until 27 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 1 Sep 2026 at 12:14.
3 Sep and 5 Oct 2026
G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 7 Aug 2026 at 11:40.
3 and 25 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 23:03.
25 Sep 2026
Transport for London (TfL) are carrying out Highway improvement works on Gracechurch Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2026 at 09:30 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 13:31.
3 and 25 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2026 at 19:52.
Today
City Of Westminster are carrying out Highway improvement works on St Margaret Street, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2026 at 16:00 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 14 Sep 2026 at 09:57.
13 Nov 2026
City Of Westminster are carrying out Highway repair and maintenance works on Jerome Crescent, Church Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2026 at 14:00 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 4 Sep 2026 at 14:11.
Friday
UK Power Networks Eastern & London are carrying out New service connection on Cruikshank Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 09:16 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 09:29.
7 Sep and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on High Street Collier's Wood, Colliers Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2026 at 11:26.
20 Nov 2026
Transport for London (TfL) are carrying out Highway improvement works on High Street Collier's Wood, Colliers Wood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 12:40.
4 Oct 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Lawrie Park Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:45 and could run through until 4 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Sep 2026 at 09:04.
7 Sep 2026 and 8 Feb 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 8 February 2027. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:29.
3 Nov 2026
London Borough Of Southwark are carrying out Highway improvement works on Melford Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:00 and could run through until 3 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Sep 2026 at 08:06.
7 Sep and 3 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Wood Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 3 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2026 at 15:03.
23 Sep 2026
Transport for London (TfL) are carrying out Highway improvement works on Balham Hill, Balham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:48.
7 and 24 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:16.
23 Sep 2026
Transport for London (TfL) are carrying out Highway improvement works on Alderbrook Road, Balham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 09:51.
7 and 24 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Yukon Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:13.
23 Sep 2026
Transport for London (TfL) are carrying out Highway improvement works on Yukon Road, Balham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 14:35.
7 Sep and 21 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Trelawn Road, Brixton Rush Common, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 May 2026 at 13:08.
26 Sep 2026
Thames Water are carrying out Utility repair and maintenance works on Mauleverer Road, Brixton Acre Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 13:00 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 14:04.
7 and 25 Sep 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Linden Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 14:50.
29 Sep 2026
Thames Water are carrying out Utility repair and maintenance works on Elcot Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 10:00 and could run through until 29 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 10:04.
Today
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:00.
Today
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 09:43.
Monday
Cadent Gas are carrying out Utility asset works on Rampayne Street, Tachbrook, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 09:45 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:53.
7 Sep and 17 Oct 2026
Leep Utilities Electric were proposing to carry out New service connection on Southwark Park Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 September 2026 and run through until 17 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leep Utilities Electric on 3 Sep 2026 at 15:06.
7 Sep and 20 Nov 2026
BT are proposing to carry out Utility repair and maintenance works on Redriff Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 13 Aug 2026 at 16:19.
7 Sep and 20 Nov 2026
BT are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 13 Aug 2026 at 11:25.
9 Oct 2026
ESP Electricity are carrying out Utility asset works on Aubrey Walk, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 11:10 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 11:16.
9 Oct 2026
ESP Electricity are carrying out Utility asset works on Aubrey Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 11:10 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 11:15.
7 Sep 2026 and 6 Jan 2027
London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 15:22.
7 Sep 2026 and 6 Jan 2027
London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 15:23.
Tuesday
UK Power Networks Eastern & London are carrying out Disconnection or alteration of supply on Lower Thames Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:19 and could run through until 22 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Sep 2026 at 10:41.
Friday
UK Power Networks Eastern & London are carrying out Disconnection or alteration of supply on St George's Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:00 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2026 at 13:21.
30 Sep 2026
Thames Water are carrying out Utility repair and maintenance works on King William Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 10:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 10:36.
27 Sep 2026
Transport for London (TfL) are carrying out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 08:30 and could run through until 27 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:20.
Tuesday
Transport for London (TfL) are carrying out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 08:30 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:19.
9 and 27 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2026 and could run through until 27 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 13:00.
27 Sep 2026
Transport for London (TfL) are carrying out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 08:30 and could run through until 27 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:18.
Tuesday
Transport for London (TfL) are carrying out Highway improvement works on Great Castle Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 08:30 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:19.
Tuesday
Electricity Network Company are carrying out Utility asset works on Great Portland Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 09:45 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 9 Sep 2026 at 10:11.
Today
Thames Water are carrying out Utility repair and maintenance works on Wellington Road, Regent's Park, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 11:57 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 10:58.
Today
Thames Water are carrying out roadworks on Wellington Place, Regent's Park, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 11:57 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:52.
Today
Thames Water are carrying out roadworks on Wellington Place, Regent's Park, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 11:57 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:52.
10 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Rinaldo Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Apr 2026 at 12:52.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 09:45 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 14:19.
10 and 23 Sep 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 13 Aug 2026 at 12:01.
10 and 23 Sep 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Rye Hill Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 18 Aug 2026 at 09:13.
10 and 23 Sep 2026
London Borough Of Southwark were proposing to carry out Highway improvement works on Rye Hill Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 September 2026 and run through until 23 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 06:53.
24 Sep 2026
City Of Westminster are carrying out Highway repair and maintenance works on Waterloo Place, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 13:00 and could run through until 24 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 10 Sep 2026 at 14:31.
Tuesday
Thames Water are proposing to carry out Utility asset works on Whitefriars Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Aug 2026 at 14:25.
23 Sep 2026
Thames Water are carrying out Utility asset works on Whitefriars Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 13:55 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 14:04.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on South Park Road, Wimbledon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 12:34 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:35.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Church Lane, Tooting, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 05:43 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2026 at 10:18.
2 Oct 2026
Royal Borough Of Kensington And Chelsea are carrying out roadworks on Fulham Road, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 17:00 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Sep 2026 at 15:26.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Lumley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:10.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Lane, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:10.
25 Sep 2026
UK Power Networks Eastern & London are carrying out New service connection on Duke Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 09:31.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Rodney Street, Islington, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 10:55 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 14:43.
Friday
Thames Water are carrying out Utility repair and maintenance works on Charles Lane, Regent's Park, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2026 at 14:15 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:10.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Eliot Bank, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2026 at 03:34 and could run through until 17 September 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:47.
Today
London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Albany Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 September 2026 and run through until 16 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2026 at 06:49.
12 and 25 Sep 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Courtfield Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Aug 2026 at 16:23.
25 Sep 2026
UK Power Networks Eastern & London are carrying out New service connection on Courtfield Gardens, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2026 at 08:30 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2026 at 08:30.
Friday
Thames Water were proposing to carry out Utility repair and maintenance works on Wolfington Road, Knight's Hill, London.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 10:36.
Friday
Thames Water were proposing to carry out Utility repair and maintenance works on Clapham Park Road, Clapham East, London.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:07.
Friday
Thames Water are carrying out Utility repair and maintenance works on St James's Place, St James's, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2026 at 12:30 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2026 at 09:57.
Friday
Thames Water are carrying out Utility repair and maintenance works on Hay's Mews, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2026 at 15:30 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:09.
14 Sep and 18 Oct 2026
London Borough Of Bromley are proposing to carry out Highway improvement works on Anerley Road, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2026 at 08:28.
14 Sep and 5 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Burstow Road, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Jul 2026 at 12:55.
14 Sep and 26 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colby Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 08:21.
26 Oct 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Dulwich Wood Avenue, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 08:00 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 08:46.
14 Sep and 26 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farquhar Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 26 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2026 at 16:10.
Monday
Southern Gas Networks are carrying out roadworks on Belvedere Drive, Wimbledon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 12:24 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 11:17.
14 and 28 Sep 2026
Transport for London (TfL) are proposing to carry out roadworks on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:14.
14 Sep and 12 Oct 2026
Transport for London (TfL) are proposing to carry out roadworks on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Aug 2026 at 15:19.
Friday
Thames Water are proposing to carry out Disconnection or alteration of supply on Kingscliffe Gardens, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:18.
Friday
Thames Water were proposing to carry out Disconnection or alteration of supply on Kingscliffe Gardens, Southfields, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 08:23.
Friday
Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 10:46.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Morrish Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 May 2026 at 11:29.
Friday
Transport for London (TfL) were proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 11:49.
Friday
Thames Water are carrying out Utility repair and maintenance works on Lynn Road, Balham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:00 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:03.
9 Oct 2026
Thames Water are carrying out Disconnection or alteration of supply on Wroughton Road, Battersea, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 12:00 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:42.
12 Nov 2026
Thames Water are carrying out Disconnection or alteration of supply on Trelawn Road, Brixton Rush Common, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:30 and could run through until 12 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:47.
Tomorrow
T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 24 Jul 2026 at 13:14.
Tomorrow
T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 21 Aug 2026 at 08:03.
14 and 23 Sep 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Barry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 19 Aug 2026 at 15:52.
14 Sep and 13 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 19 Aug 2026 at 15:52.
14 Sep 2026 and 4 Apr 2027
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 10 Sep 2026 at 10:17.
14 Sep and 16 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Loughborough Park, Brixton Windrush, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 14:41.
14 Sep 2026 and 4 Apr 2027
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:14.
14 Sep 2026 and 4 Apr 2027
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 8 Sep 2026 at 08:55.
Friday
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Parkfields, Putney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 16:12.
14 Sep and 13 Nov 2026
London Borough Of Southwark were proposing to carry out Highway improvement works on Peckham Rye, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 13 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 14 Sep 2026 at 12:38.
14 Sep and 2 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Linden Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2026 at 08:48.
Friday
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Felsham Road, Putney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 18 Aug 2026 at 08:59.
25 Sep 2026
London Borough Of Wandsworth are carrying out Highway improvement works on Felsham Road, Putney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 14 Sep 2026 at 08:20.
14 Sep and 2 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Parke Road, Barnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 12:46.
2 Oct 2026
Cadent Gas are carrying out Utility asset works on Rainville Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 10:02 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:42.
2 Oct 2026
Thames Water are carrying out Utility asset works on Glengall Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:45 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:37.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Ifield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 14:55.
Today
Thames Water are carrying out Utility repair and maintenance works on Ifield Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:48 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:48.
Today
Thames Water were proposing to carry out Utility repair and maintenance works on Ifield Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 16 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 13:47.
Monday
Thames Water are proposing to carry out New service connection on Redesdale Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Jul 2026 at 16:38.
Monday
Thames Water are carrying out New service connection on Redesdale Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 11:49 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:13.
14 Sep and 9 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Wooler Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 29 Jul 2026 at 08:22.
12 Oct 2026
London Borough Of Southwark are carrying out Highway improvement works on Wooler Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 16:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 15 Sep 2026 at 16:18.
14 Sep and 9 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Portland Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 29 Jul 2026 at 08:22.
12 Oct 2026
London Borough Of Southwark are carrying out Highway improvement works on Portland Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 16:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 15 Sep 2026 at 16:22.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Lupus Street, Warwick, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 12:18 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 13:43.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on St George's Square, Tachbrook, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 12:21 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 13:43.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Chancellors Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2026 at 13:02.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Chancellors Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 09:40 and could run through until 17 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 11:26.
14 Sep and 11 Nov 2026
London Borough Of Lambeth are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 10 Jun 2026 at 09:05.
14 Sep and 11 Nov 2026
London Borough Of Lambeth are proposing to carry out Highway improvement works on Salamanca Street, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 10 Jun 2026 at 09:05.
Saturday
Vodafone were proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 19 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Vodafone on 1 Sep 2026 at 09:26.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Trinity Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 17:16 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 09:27.
14 Sep and 4 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Whitehall, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 11:24.
16 Oct 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Salter Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 10:00 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 10:20.
Friday
Vodafone were proposing to carry out Utility asset works on Pall Mall, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Vodafone on 15 Sep 2026 at 09:08.
14 Sep and 23 Oct 2026
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 3 Sep 2026 at 12:19.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Romilly Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Jul 2026 at 08:20.
Tuesday
Thames Water are carrying out Disconnection or alteration of supply on Queensway, Lancaster Gate, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:28 and could run through until 22 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 09:43.
27 Sep 2026
Thames Water are carrying out Statutory Infrastructure Works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 16:47 and could run through until 27 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 06:40.
14 Sep 2026 and 8 Jul 2027
HS2 are proposing to carry out Works for Rail Purposes on Eversholt Street, St Pancras And Somers Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 8 July 2027. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 17 Aug 2026 at 14:50.
16 Nov 2026
London Borough Of Hackney are carrying out Highway improvement works on Nile Street, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:00 and could run through until 16 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 14 Sep 2026 at 08:09.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Randolph Avenue, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Jul 2026 at 09:39.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Randolph Avenue, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 12:40.
Friday
Thames Water are carrying out Utility repair and maintenance works on Randolph Avenue, Maida Vale, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:35.
14 and 28 Sep 2026
UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Murray Grove, Hackney, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2026 at 12:30.
14 Sep and 17 Dec 2026
HS2 were proposing to carry out Works for Rail Purposes on Mornington Street, Regent's Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 17 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by HS2 on 8 Sep 2026 at 10:18.
15 and 25 Sep 2026
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thavies Inn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jun 2026 at 12:02.
25 Sep 2026
UK Power Networks Eastern & London are carrying out Utility asset works on Thavies Inn, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 14:41.
Tomorrow
City Of Westminster are carrying out Highway repair and maintenance works on Great Titchfield Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 08:00 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 09:12.
Monday
Thames Water are carrying out Utility repair and maintenance works on Upper Wimpole Street, Marylebone High Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 08:04 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:06.
15 Sep and 20 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Dulka Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2026 at 11:56.
Monday
Thames Water are carrying out Utility repair and maintenance works on Whitbread Road, Crofton Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 08:26 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:33.
Saturday
Thames Water are proposing to carry out Utility repair and maintenance works on Deerdale Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 19 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Jul 2026 at 13:26.
Thames Water carried out Utility repair and maintenance works on Hurlingham Road, London.
The road was closed for some or all of the period.
The works were originally planned between 15 Sep 2026 and 21 Sep 2026 and were actually completed between 15 Sep 2026 (08:04) and 16 Sep 2026 (08:29). The works impacted the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2026 at 08:48.
Tuesday
UK Power Networks Eastern & London are proposing to carry out New service connection on Peckham Park Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 22 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Aug 2026 at 16:04.
Monday
Thames Water are carrying out Utility repair and maintenance works on Cromwell Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 20:30 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 20:49.
Tomorrow
Thames Water are proposing to carry out Utility repair and maintenance works on Gordon Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Aug 2026 at 12:25.
15 Sep and 7 Oct 2026
City Of Westminster are proposing to carry out Highway improvement works on Northumberland Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 20 Aug 2026 at 09:26.
7 Oct 2026
City Of Westminster are carrying out Highway improvement works on Northumberland Avenue, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 08:00 and could run through until 7 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 15 Sep 2026 at 09:13.
23 Sep 2026
Cadent Gas are carrying out Utility repair and maintenance works on Berkeley Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 13:34 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 16:59.
Friday
Thames Water are proposing to carry out New service connection on Lexington Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 08:19.
Friday
Thames Water are carrying out New service connection on Lexington Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 10:07 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 10:48.
16 and 25 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:00.
16 and 25 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 10:11.
Friday
Virgin Media were proposing to carry out Utility asset works on Strand, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 7 Sep 2026 at 10:07.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:08.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2026 at 13:19.
Monday
Transport for London (TfL) were proposing to carry out Highway improvement works on Great Castle Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2026 and run through until 21 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:18.
Friday
City Of London Telecomms are carrying out Utility asset works on Lincoln's Inn Fields, Holborn And Covent Garden, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 16 Sep 2026 at 08:10.
16 and 29 Sep 2026
City Of Westminster are proposing to carry out Highway improvement works on Duchess Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 20 Jul 2026 at 15:35.
16 and 23 Sep 2026
Thames Water are proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:23.
16 Sep and 11 Nov 2026
Transport for London (TfL) are proposing to carry out roadworks on Old Street, Islington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 16:22.
17 Sep and 12 Oct 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Peter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 7 Sep 2026 at 14:52.
Tuesday
Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Lane, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2026 and could run through until 22 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:11.
18 and 24 Sep 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 08:50.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2026 at 14:28.
19 Sep and 15 Dec 2026
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Abchurch Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2026 and could run through until 15 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 14 Sep 2026 at 10:53.
19 Sep and 15 Dec 2026
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Abchurch Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2026 and could run through until 15 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 15 Sep 2026 at 11:13.
19 and 25 Sep 2026
City Of London Corporation are proposing to carry out Highway improvement works on Carter Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 15 Sep 2026 at 14:06.
30 Oct 2026
HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 14 Sep 2026 at 10:58.
24 Sep 2026
Thames Water are carrying out Utility repair and maintenance works on Gordon Place, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 13:08 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 13:10.
20 and 24 Sep 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Sandgate Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2026 at 11:43.
20 and 27 Sep 2026
Network Rail are proposing to carry out Works for Rail Purposes on Dowgate Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Aug 2026 at 15:10.
20 and 25 Sep 2026
Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:49.
20 and 25 Sep 2026
Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:51.
21 Sep and 9 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2026 at 10:55.
21 Sep and 23 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 08:51.
21 Sep and 16 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Burstow Road, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:22.
21 Sep and 22 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Greyhound Lane, Streatham St Leonard's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 22 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 12:41.
21 and 23 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Openview, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 16:07.
21 and 23 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Openview, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 27 Aug 2026 at 14:46.
21 Sep and 23 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 May 2026 at 11:42.
21 Sep and 20 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Barry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 14 Sep 2026 at 12:54.
21 Sep and 20 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 14 Sep 2026 at 15:31.
21 Sep and 20 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 15 Sep 2026 at 15:23.
21 and 30 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bridgend Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 17 Jul 2026 at 15:27.
21 and 30 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 17 Jul 2026 at 15:25.
21 and 30 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 13:45.
21 and 30 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 15:06.
21 and 30 Sep 2026
London Borough Of Wandsworth were proposing to carry out Highway improvement works on Wandsworth Bridge, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 30 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 12:49.
21 and 30 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 17 Aug 2026 at 08:45.
21 Sep and 6 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 14:44.
21 Sep and 6 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 15:58.
21 Sep and 6 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on New Cross Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 14:40.
21 Sep and 6 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on New Cross Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 15:58.
21 Sep and 6 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2026 at 18:10.
21 Sep and 11 Oct 2026
ESP Electricity are proposing to carry out Utility asset works on Evelyn Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 14 Sep 2026 at 15:32.
21 and 29 Sep 2026
Cadent Gas are proposing to carry out Utility asset works on Mallord Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 14:54.
21 and 26 Sep 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Rolls Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 26 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 15 Sep 2026 at 15:23.
21 Sep and 4 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Crampton Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Jul 2026 at 06:33.
21 Sep and 4 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Crampton Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 11:35.
21 Sep and 20 Dec 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Jonathan Street, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Jul 2026 at 11:10.
21 Sep and 27 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Salamanca Street, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 May 2026 at 09:29.
21 and 24 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Warwick Way, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Aug 2026 at 10:37.
21 and 24 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Warwick Way, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 12:54.
21 and 25 Sep 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Queensberry Mews West, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 15:32.
21 and 25 Sep 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Queensberry Mews West, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 17:53.
21 Sep and 10 Oct 2026
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:02.
21 and 23 Sep 2026
Virgin Media are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Aug 2026 at 16:04.
21 and 23 Sep 2026
Virgin Media are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 16 Sep 2026 at 09:47.
21 Sep and 20 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Long Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 6 Aug 2026 at 11:25.
21 and 23 Sep 2026
Virgin Media are proposing to carry out Utility asset works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 24 Aug 2026 at 07:40.
21 and 23 Sep 2026
Virgin Media are proposing to carry out Utility asset works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 16 Sep 2026 at 09:46.
21 and 23 Sep 2026
BT are proposing to carry out Utility asset works on Lime Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 6 Jul 2026 at 15:24.
21 and 23 Sep 2026
BT are proposing to carry out Utility asset works on Lime Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 14 Sep 2026 at 20:23.
21 Sep and 30 Oct 2026
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Sep 2026 at 11:42.
21 and 23 Sep 2026
Thames Water are proposing to carry out Utility asset works on North Row, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Jul 2026 at 10:38.
21 Sep and 2 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lombard Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Jul 2026 at 14:27.
21 Sep and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Section 50 on Oxford Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 16:08.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Rampart Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:56.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Back Church Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 12:01.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Cannon Street Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:11.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hessel Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:58.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Batty Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:51.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Gowers Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:59.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Umberston Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:18.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Alie Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:53.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Christian Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:46.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Rope Walk Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:13.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Henriques Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:53.
21 and 23 Sep 2026
G. Network Communications are proposing to carry out New service connection on Berwick Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 3 Aug 2026 at 10:40.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Commercial Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:40.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Weyhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:59.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Greenfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:52.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Settles Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:48.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Myrdle Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:17.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:56.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Manningtree Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:57.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on White Church Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 11:21.
21 and 24 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Argyll Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:50.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Adler Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 12:01.
21 and 24 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:52.
21 and 24 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:53.
21 and 24 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:50.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Whitechapel High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:43.
21 and 26 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:42.
21 and 23 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Market Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 10:48.
21 and 23 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Market Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 15:56.
21 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Great Castle Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 08:45.
21 and 24 Sep 2026
Vodafone are proposing to carry out Utility asset works on Norwich Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Vodafone on 19 Jun 2026 at 11:34.
21 and 24 Sep 2026
Vodafone are proposing to carry out Utility asset works on Norwich Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Vodafone on 28 Aug 2026 at 09:18.
21 Sep and 2 Oct 2026
London Borough Of Hackney are proposing to carry out New service connection on Hoxton Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 11 Jun 2026 at 22:27.
22 and 27 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:06.
22 and 27 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 14:45.
22 Sep and 20 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Novello Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.
22 and 24 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Symons Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 17:28.
22 and 24 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Symons Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 19:19.
22 and 24 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Standish Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Aug 2026 at 15:05.
22 and 24 Sep 2026
Vodafone are proposing to carry out Utility asset works on Derry Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 19 Jun 2026 at 10:39.
22 and 24 Sep 2026
Vodafone are proposing to carry out Utility asset works on Derry Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 11 Sep 2026 at 14:12.
23 Sep and 20 Oct 2026
London Borough Of Wandsworth were proposing to carry out Utility repair and maintenance works on Dulka Road, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2026 and run through until 20 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 4 Sep 2026 at 14:53.
23 and 25 Sep 2026
Network Rail were proposing to carry out Works for Rail Purposes on Sandell Street, Waterloo & Southbank, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Sep 2026 at 14:36.
23 and 25 Sep 2026
Network Rail were proposing to carry out Works for Rail Purposes on Cornwall Road, Waterloo & Southbank, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Sep 2026 at 14:33.
23 and 30 Sep 2026
Thames Water are proposing to carry out New service connection on Queensway, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Aug 2026 at 15:13.
23 and 29 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Binney Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:09.
23 and 29 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Gilbert Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:09.
23 and 29 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on James Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:09.
23 Sep and 30 Oct 2026
Transport for London (TfL) are proposing to carry out Section 50 on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2026 at 16:06.
23 Sep and 30 Oct 2026
Transport for London (TfL) are proposing to carry out Section 50 on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 10:26.
24 Sep and 4 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:05.
24 Sep and 4 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 13:05.
24 Sep and 5 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on New Street Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jun 2026 at 11:59.
24 and 26 Sep 2026
Its Technology Group are proposing to carry out New service connection on Balham Park Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Its Technology Group on 9 Sep 2026 at 08:39.
24 and 28 Sep 2026
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Balham High Road, Balham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 13:49.
24 and 28 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 16:23.
24 Sep and 28 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Freke Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2026 at 11:35.
24 Sep and 5 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Parsons Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.
24 Sep and 8 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Parsons Green Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.
24 and 26 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Jul 2026 at 09:29.
25 Sep and 8 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 10 Sep 2026 at 10:46.
25 Sep and 8 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Rye Hill Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 10 Sep 2026 at 10:55.
25 and 29 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Battersea High Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:04.
25 and 29 Sep 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Battersea High Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 09:41.
25 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:56.
25 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:48.
26 Sep and 14 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Manchester Square, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 19:35.
26 Sep and 11 Oct 2026
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Moorgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 5 Aug 2026 at 13:16.
26 Sep and 11 Oct 2026
City Of London Corporation are proposing to carry out Highway improvement works on Moorgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 12 Feb 2026 at 13:37.
26 Sep and 9 Nov 2026
Thames Water are proposing to carry out Utility asset works on Moxon Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:34.
27 and 30 Sep 2026
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Longley Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 30 Jun 2026 at 05:53.
27 Sep and 2 Oct 2026
Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 12:14.
27 Sep and 2 Oct 2026
Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 09:52.
28 Sep and 16 Dec 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penrith Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 16 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2026 at 09:42.
28 Sep and 15 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrook Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2026 at 06:18.
28 Sep and 16 Dec 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranbrook Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 16 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2026 at 09:41.
28 Sep and 9 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Park Hall Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 14:46.
28 Sep and 2 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 13:09.
28 Sep and 2 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2026 at 08:29.
28 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 10:00.
28 Sep and 23 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:29.
28 Sep and 23 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2026 at 13:42.
28 Sep and 23 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.
28 Sep and 19 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Concanon Road, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Jul 2026 at 14:58.
28 Sep and 9 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Santley Street, Brixton Acre Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Jul 2026 at 13:21.
28 Sep and 9 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Santley Street, Brixton Acre Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2026 at 15:19.
28 Sep and 5 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Jun 2026 at 14:51.
28 Sep and 5 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 1 Sep 2026 at 11:56.
28 Sep and 2 Oct 2026
Cadent Gas are proposing to carry out New service connection on Dawes Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 12:07.
28 Sep and 2 Oct 2026
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Winslow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 08:10.
28 Sep and 2 Oct 2026
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Chancellors Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 14:13.
28 Sep and 2 Oct 2026
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Distillery Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 14:13.
28 Sep and 7 Dec 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Glasshouse Walk, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:01.
28 Sep and 6 Oct 2026
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Stewart's Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Sep 2026 at 13:15.
28 Sep and 9 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Millbank, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jul 2026 at 14:13.
28 Sep and 11 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Aug 2026 at 11:04.
28 Sep and 11 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shand Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Aug 2026 at 11:04.
28 Sep and 2 Oct 2026
Thames Water are proposing to carry out New service connection on White Horse Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2026 at 15:34.
28 Sep and 1 Oct 2026
Thames Water are proposing to carry out New service connection on Lower John Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 09:08.
28 Sep and 6 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Back Church Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2026 at 11:13.
28 Sep and 6 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Back Church Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 13:10.
28 Sep and 6 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Back Church Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 08:50.
28 Sep and 1 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Rupert Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Jul 2026 at 10:01.
28 Sep and 1 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Rupert Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 10:23.
28 Sep and 2 Oct 2026
Thames Water are proposing to carry out New service connection on Bark Place, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 08:00.
28 Sep and 3 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bishopsgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:52.
28 Sep and 11 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:39.
28 Sep and 11 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:40.
28 Sep and 2 Oct 2026
Thames Water are proposing to carry out Utility asset works on Whetstone Park, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 16:35.
28 Sep and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 11:59.
28 Sep and 3 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bishopsgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 13:15.
28 Sep and 3 Oct 2026
Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Aug 2026 at 19:36.
28 Sep and 2 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Bishopsgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Aug 2026 at 16:55.
28 Sep and 1 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Bishopsgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 16:10.
28 Sep and 4 Oct 2026
Thames Water are proposing to carry out New service connection on Wilson Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 13:37.
28 Sep and 3 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Norton Folgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:10.
28 Sep and 3 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Norton Folgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:52.
28 Sep and 3 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shoreditch High Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 13:16.
28 Sep and 3 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shoreditch High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 10:09.
28 and 30 Sep 2026
London Borough Of Camden are proposing to carry out Highway improvement works on Clerkenwell Road, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Aug 2026 at 16:41.
28 and 30 Sep 2026
London Borough Of Camden are proposing to carry out Highway improvement works on Rosebery Avenue, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Aug 2026 at 15:55.
28 and 30 Sep 2026
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Aug 2026 at 16:40.
28 Sep and 2 Oct 2026
Vodafone are proposing to carry out New service connection on Hearn Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Vodafone on 6 Jul 2026 at 17:28.
28 Sep and 2 Oct 2026
Vodafone are proposing to carry out New service connection on Hearn Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Vodafone on 14 Sep 2026 at 09:30.
28 Sep and 23 Oct 2026
HS2 are proposing to carry out Works for Rail Purposes on Lidlington Place, Camden Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 14 Sep 2026 at 09:50.
28 Sep and 23 Oct 2026
HS2 are proposing to carry out Works for Rail Purposes on Lidlington Place, Camden Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 14 Sep 2026 at 10:56.
29 Sep and 12 Oct 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Foley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 4 Aug 2026 at 14:37.
29 Sep and 2 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Dorset Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Aug 2026 at 16:33.
29 Sep and 5 Oct 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Longley Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:16.
29 Sep and 5 Oct 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bedford Hill, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 11:56.
29 Sep and 5 Oct 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bolingbroke Grove, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 11:52.
29 Sep and 1 Oct 2026
Thames Water are proposing to carry out Remedial works on Broadwick Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jun 2026 at 10:16.
29 Sep and 10 Nov 2026
Thames Water are proposing to carry out Utility asset works on Nelson Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2026 at 16:00.
29 Sep and 10 Nov 2026
Thames Water are proposing to carry out Utility asset works on Nelson Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 14:13.
29 Sep and 27 Oct 2026
Thames Water are proposing to carry out Utility asset works on Turner Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2026 at 15:55.
30 Sep and 9 Oct 2026
London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Peckham Rye, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2026 and run through until 9 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 06:44.
30 Sep and 21 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Studholme Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Jul 2026 at 10:05.
30 Sep and 6 Nov 2026
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Lambeth on 12 Aug 2026 at 16:01.
30 Sep and 6 Oct 2026
Thames Water are proposing to carry out New service connection on Redan Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2026 at 09:34.
30 Sep and 6 Oct 2026
Thames Water are proposing to carry out New service connection on Redan Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:09.
1 and 16 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 10:44.
1 and 16 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Ilderton Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 16:14.
1 and 16 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Ilderton Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 16:37.
1 and 6 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:53.
1 and 6 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:51.
2 and 19 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Balham Hill, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:30.
2 and 19 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 May 2026 at 11:49.
2 and 19 Oct 2026
Transport for London (TfL) were proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 09:06.
2 Oct and 5 Nov 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Burland Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2026 at 12:14.
2 and 4 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Kensington Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 4 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 12:18.
2 and 5 Oct 2026
Transport for London (TfL) were proposing to carry out roadworks on Oxford Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2026 and run through until 5 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 10:30.
2 and 19 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Flyover, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2026 at 12:11.
2 and 19 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Flyover, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 14:37.
2 and 5 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Finsbury Square, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2026 at 13:08.
2 and 5 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Finsbury Square, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 09:07.
2 and 19 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:40.
2 and 19 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 11:28.
4 and 6 Oct 2026
Transport for London (TfL) were proposing to carry out roadworks on Oxford Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 October 2026 and run through until 6 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 11:26.
4 and 6 Oct 2026
Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 12:11.
5 and 23 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maryland Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 08:53.
5 and 7 Oct 2026
Thames Water were proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 7 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 07:31.
5 and 12 Oct 2026
Thames Water were proposing to carry out New service connection on Morrish Road, Clapham Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 12 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 11:25.
5 and 12 Oct 2026
Thames Water were proposing to carry out New service connection on Morrish Road, Clapham Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 12 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 11:36.
5 and 8 Oct 2026
T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 14 Sep 2026 at 14:35.
5 and 19 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 May 2026 at 10:27.
5 and 19 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2026 at 08:24.
5 Oct 2026 and 15 Feb 2027
Thames Water are proposing to carry out Disconnection or alteration of supply on Northcote Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2026 at 12:15.
5 and 12 Oct 2026
Thames Water are proposing to carry out New service connection on Meretone Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Jul 2026 at 09:25.
5 and 12 Oct 2026
Thames Water are proposing to carry out New service connection on Meretone Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2026 at 12:50.
5 and 31 Oct 2026
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Putney High Street, Putney, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2026 at 08:57.
5 and 26 Oct 2026
Thames Water are proposing to carry out Utility asset works on Perrymead Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:05.
5 and 26 Oct 2026
Thames Water are proposing to carry out Utility asset works on Perrymead Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:34.
5 Oct and 7 Dec 2026
Thames Water are proposing to carry out Utility asset works on Studdridge Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:54.
5 Oct and 7 Dec 2026
Thames Water are proposing to carry out Utility asset works on Studdridge Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:34.
5 and 14 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Barnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 14:13.
5 and 14 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Barnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:37.
5 and 9 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Farm Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2026 at 15:50.
5 and 9 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Farm Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:08.
5 and 8 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Hyndman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 10:14.
5 and 23 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Star Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:35.
5 Oct and 6 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Vereker Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jul 2026 at 16:11.
5 Oct and 4 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on North End Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:47.
5 and 7 Oct 2026
Thames Water are proposing to carry out Utility asset works on Whitgift Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Jul 2026 at 09:00.
5 and 31 Oct 2026
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:07.
5 and 7 Oct 2026
BT are proposing to carry out Utility asset works on Beauclerc Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Jul 2026 at 12:03.
5 and 24 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Goldhawk Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:03.
5 and 24 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Pennard Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:07.
5 and 7 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on William Iv Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 16:59.
5 and 7 Oct 2026
Thames Water are proposing to carry out Remedial works on Regent Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Jun 2026 at 15:11.
5 and 16 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Haunch Of Venison Yard, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jun 2026 at 10:29.
5 and 16 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Haunch Of Venison Yard, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2026 at 14:04.
5 and 30 Oct 2026
Vodafone are proposing to carry out Utility repair and maintenance works on Cornhill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 23 Mar 2026 at 13:58.
5 and 19 Oct 2026
Aurora Utilities Limited are proposing to carry out New service connection on Porchester Gardens, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Aurora Utilities Limited on 17 Aug 2026 at 07:51.
5 and 7 Oct 2026
Cadent Gas are proposing to carry out New service connection on Bainbridge Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 10:33.
5 and 9 Oct 2026
Thames Water are proposing to carry out New service connection on Berners Mews, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2026 at 09:06.
5 and 18 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Hosier Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 18 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Jul 2026 at 11:49.
5 and 8 Oct 2026
London Borough Of Camden are proposing to carry out Highway improvement works on Theobald's Road, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 17:45.
5 and 8 Oct 2026
London Borough Of Camden are proposing to carry out Highway improvement works on Clerkenwell Road, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 17:44.
5 and 8 Oct 2026
London Borough Of Camden are proposing to carry out Highway improvement works on Rosebery Avenue, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 17:45.
5 and 16 Oct 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Carburton Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 4 Aug 2026 at 11:23.
5 and 8 Oct 2026
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 17:44.
5 Oct and 12 Dec 2026
G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 15 Sep 2026 at 12:07.
5 Oct 2026 and 23 Jan 2027
G2 Energy IDNO are proposing to carry out New service connection on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:20.
5 Oct and 23 Nov 2026
G2 Energy IDNO are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 21:06.
5 Oct and 6 Nov 2026
HS2 were proposing to carry out Works for Rail Purposes on Lidlington Place, Camden Town, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 6 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by HS2 on 14 Sep 2026 at 09:51.
7 and 11 Oct 2026
Eunetworks are proposing to carry out Utility asset works on Cambridge Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Eunetworks on 19 Aug 2026 at 10:49.
7 Oct and 6 Nov 2026
ESP Electricity are proposing to carry out New service connection on Broadway, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 13:14.
7 and 10 Oct 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Sep 2026 at 13:01.
7 and 12 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:48.
7 and 12 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:50.
8 Oct and 30 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2026 and could run through until 30 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2026 at 16:44.
8 and 30 Oct 2026
City Of Westminster are proposing to carry out Highway improvement works on Northumberland Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 19 Aug 2026 at 09:49.
8 and 30 Oct 2026
City Of Westminster are proposing to carry out Highway improvement works on Northumberland Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 26 Aug 2026 at 08:07.
8 Oct and 2 Nov 2026
City Of Westminster are proposing to carry out Highway improvement works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 14 Aug 2026 at 14:20.
9 and 29 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 9 Sep 2026 at 10:07.
9 and 11 Oct 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street St James's, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 11 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 20 Aug 2026 at 11:01.
10 and 25 Oct 2026
City Of London Corporation are proposing to carry out Highway improvement works on Basinghall Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 October 2026 and could run through until 25 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 12 Feb 2026 at 13:37.
12 and 14 Oct 2026
BT are proposing to carry out Utility asset works on Carminia Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 25 Aug 2026 at 16:07.
12 and 14 Oct 2026
BT are proposing to carry out Utility asset works on Carminia Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 8 Sep 2026 at 07:09.
12 Oct and 14 Dec 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Chivalry Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2026 at 11:35.
12 and 16 Oct 2026
Thames Water are proposing to carry out New service connection on Oscar Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2026 at 05:40.
12 Oct and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on King's Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 12:23.
12 Oct and 5 Dec 2026
Leep Utilities Electric were proposing to carry out New service connection on Raymouth Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2026 and run through until 5 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 3 Sep 2026 at 15:06.
12 and 15 Oct 2026
Thames Water were proposing to carry out Utility repair and maintenance works on Rodney Place, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2026 and run through until 15 October 2026. The works were due to impact the cycleway only.
This roadwork event was last updated by Thames Water on 27 Aug 2026 at 14:41.
12 Oct and 23 Nov 2026
Thames Water are proposing to carry out Utility asset works on Stillington Street, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2026 at 11:02.
12 and 31 Oct 2026
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:59.
12 and 14 Oct 2026
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Caxton Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 6 Aug 2026 at 08:34.
12 and 16 Oct 2026
Thames Water are proposing to carry out Remedial works on Sinclair Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Aug 2026 at 09:12.
12 and 16 Oct 2026
Thames Water were proposing to carry out Utility asset works on Brick Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 10:29.
12 and 16 Oct 2026
Thames Water were proposing to carry out Utility asset works on Brick Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 17:26.
12 Oct and 5 Dec 2026
Transport for London (TfL) were proposing to carry out roadworks on Blackfriars Underpass, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2026 and run through until 5 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 11:47.
12 Oct and 5 Dec 2026
Transport for London (TfL) were proposing to carry out roadworks on Blackfriars Underpass, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2026 and run through until 5 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 12:12.
12 Oct and 5 Dec 2026
Transport for London (TfL) are proposing to carry out roadworks on Blackfriars Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 16:07.
12 Oct and 5 Dec 2026
Transport for London (TfL) are proposing to carry out roadworks on Blackfriars Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 16:08.
12 Oct and 5 Dec 2026
Transport for London (TfL) were proposing to carry out roadworks on Blackfriars Underpass, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2026 and run through until 5 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2026 at 13:13.
12 and 19 Oct 2026
Vodafone are proposing to carry out Utility repair and maintenance works on Fleet Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 27 Aug 2026 at 14:35.
12 and 19 Oct 2026
Vodafone are proposing to carry out Utility repair and maintenance works on Fleet Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 28 Aug 2026 at 15:27.
12 and 19 Oct 2026
Vodafone are proposing to carry out Utility repair and maintenance works on Fleet Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 1 Sep 2026 at 08:39.
12 and 16 Oct 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Hanover Square, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 17 Jul 2026 at 08:33.
12 and 14 Oct 2026
Electricity Network Company are proposing to carry out Utility asset works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 7 Sep 2026 at 16:35.
12 and 15 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:17.
12 and 15 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:50.
12 and 15 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Great Castle Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 11:32.
12 and 18 Oct 2026
Thames Water are proposing to carry out New service connection on Southampton Row, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2026 at 15:10.
12 and 14 Oct 2026
Virgin Media are proposing to carry out Utility asset works on Saffron Hill, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Jul 2026 at 22:03.
12 and 14 Oct 2026
Virgin Media are proposing to carry out Utility asset works on Epworth Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 7 Jul 2026 at 09:49.
12 and 16 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Guilford Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2026 at 10:13.
13 Oct and 11 Nov 2026
T-Mobile (UK) are proposing to carry out Utility asset works on Appold Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 10 Sep 2026 at 09:31.
13 Oct and 11 Nov 2026
T-Mobile (UK) are proposing to carry out Utility asset works on Primrose Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 10 Sep 2026 at 09:29.
13 and 15 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Drummond Crescent, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 22:03.
13 and 16 Oct 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Blackshaw Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:12.
13 and 20 Oct 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Merton Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 08:57.
13 Oct and 11 Dec 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Hinton Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2026 at 13:55.
13 and 18 Oct 2026
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 18 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 27 May 2025 at 19:49.
13 and 18 Oct 2026
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 18 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 19 Mar 2026 at 15:16.
13 and 17 Oct 2026
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 25 Mar 2026 at 13:17.
13 and 15 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Tunis Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 15:35.
13 and 31 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Gracechurch Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Jul 2026 at 13:45.
13 and 16 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:49.
13 and 16 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:56.
14 Oct and 11 Dec 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Regent Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Jul 2026 at 14:19.
14 Oct 2026 and 16 Apr 2027
Thames Water are proposing to carry out Disconnection or alteration of supply on St Matthew's Road, Brixton Rush Common, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 16 April 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Jun 2026 at 10:31.
14 and 20 Oct 2026
Thames Water are proposing to carry out Utility asset works on Brick Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 17:27.
14 Oct and 3 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on New Bond Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 08:34.
15 Oct and 14 Dec 2026
UK Power Networks Eastern & London were proposing to carry out New service connection on St Julian's Farm Road, Knight's Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 October 2026 and run through until 14 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 09:07.
15 and 28 Oct 2026
UK Power Distribution are proposing to carry out Utility asset works on Redcross Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Distribution on 18 Aug 2026 at 15:00.
15 and 19 Oct 2026
Virgin Media are proposing to carry out Utility asset works on Dean's Court, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 17 Jul 2026 at 13:02.
16 and 29 Oct 2026
Electricity Network Company are proposing to carry out Utility asset works on Wyvil Road, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 31 Jul 2026 at 09:02.
17 and 19 Oct 2026
Cadent Gas are proposing to carry out New service connection on Dawes Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 12:00.
18 and 22 Oct 2026
Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Jul 2026 at 09:16.
19 and 21 Oct 2026
Thames Water are proposing to carry out Remedial works on Rectory Lane, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Aug 2026 at 14:59.
19 and 27 Oct 2026
Thames Water were proposing to carry out Utility asset works on Princes Way, Southfields, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2026 and run through until 27 October 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 07:43.
19 and 26 Oct 2026
Southern Gas Networks are proposing to carry out New service connection on Faversham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2026 at 10:11.
19 and 26 Oct 2026
Southern Gas Networks are proposing to carry out New service connection on Faversham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 08:33.
19 Oct and 2 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Wood Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2026 at 13:13.
19 and 24 Oct 2026
Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 24 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2026 at 10:22.
19 and 30 Oct 2026
ESP Electricity are proposing to carry out Utility asset works on Bridges Court Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 6 Aug 2026 at 11:36.
19 and 30 Oct 2026
London Borough Of Wandsworth are proposing to carry out Utility repair and maintenance works on Bridges Court Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 19 Aug 2026 at 13:52.
19 and 23 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Sumner Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Aug 2026 at 07:56.
19 and 23 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Furley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 13 Aug 2026 at 12:18.
19 and 23 Oct 2026
Thames Water are proposing to carry out Remedial works on Grosvenor Terrace, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Jul 2026 at 09:21.
19 and 21 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Aug 2026 at 08:45.
19 and 21 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Aug 2026 at 15:45.
19 Oct and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Star Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:35.
19 and 30 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Vereker Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:16.
19 and 23 Oct 2026
Cadent Gas are proposing to carry out New service connection on Dartmouth Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 10:52.
19 and 21 Oct 2026
London Borough Of Southwark were proposing to carry out Highway improvement works on Salter Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2026 and run through until 21 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 07:27.
19 Oct and 6 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on St Pauls Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2026 at 18:52.
19 and 27 Oct 2026
BT are proposing to carry out Utility repair and maintenance works on Berkeley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 27 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Jul 2026 at 10:01.
19 and 31 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Kensington Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 12:17.
19 and 22 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:55.
19 and 22 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:52.
19 Oct and 15 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Middlesex Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 15 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 13:50.
19 and 24 Oct 2026
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Brick Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 23 Jul 2026 at 11:46.
19 and 22 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Dorset Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 11:31.
19 and 21 Oct 2026
Vodafone are proposing to carry out New service connection on St John Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 21 Jul 2026 at 14:25.
20 and 23 Oct 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Blackshaw Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 09:55.
20 Oct and 23 Nov 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Keildon Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2026 at 12:15.
21 and 23 Oct 2026
London Borough Of Southwark were proposing to carry out Highway improvement works on Salter Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 07:28.
21 and 23 Oct 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Aug 2026 at 14:04.
22 Oct and 21 Dec 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on St Julian's Farm Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 09:59.
22 Oct and 27 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Asylum Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 11:11.
22 and 24 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2026 at 14:32.
22 and 27 Oct 2026
London Borough Of Islington were proposing to carry out Highway repair and maintenance works on Corporation Row, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 October 2026 and run through until 27 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 11 Sep 2026 at 12:06.
22 and 26 Oct 2026
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Rivington Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 3 Aug 2026 at 15:46.
23 and 26 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 13:19.
23 Oct and 2 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:42.
23 Oct and 2 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Flyover, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2026 at 18:41.
23 Oct and 2 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2026 at 18:42.
23 Oct and 2 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:51.
23 and 28 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:52.
23 and 28 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:51.
23 and 28 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on John Prince's Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2026 at 14:49.
24 Oct and 1 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tamworth Lane, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Jul 2026 at 08:54.
24 and 30 Oct 2026
Thames Water were proposing to carry out Utility asset works on Princes Way, Southfields, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 October 2026 and run through until 30 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 11:55.
24 and 30 Oct 2026
Thames Water are proposing to carry out Utility asset works on Princes Way, Southfields, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 12:23.
24 Oct and 12 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.
24 and 26 Oct 2026
Vodafone are proposing to carry out Utility repair and maintenance works on Old Court Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 1 Sep 2026 at 15:47.
24 and 26 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:44.
26 Oct and 6 Nov 2026
City Of Westminster are proposing to carry out Highway improvement works on Portland Place, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 23 Jun 2026 at 09:30.
26 Oct and 30 Nov 2026
Thames Water are proposing to carry out roadworks on Ashbridge Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jul 2026 at 16:31.
26 Oct and 30 Nov 2026
Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Jul 2026 at 06:28.
26 Oct and 30 Nov 2026
Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2026 at 06:30.
26 and 28 Oct 2026
Thames Water are proposing to carry out Utility asset works on Pratt Mews, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 16:57.
26 Oct and 15 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burlington Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Apr 2026 at 07:12.
26 Oct and 29 Nov 2026
London Borough Of Bromley are proposing to carry out Highway improvement works on Anerley Road, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 29 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2026 at 08:28.
26 Oct and 29 Nov 2026
West Sussex County Council were proposing to carry out Highway improvement works on Anerley Road, Penge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2026 and run through until 29 November 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 1 Sep 2026 at 14:35.
26 Oct and 29 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Road, Streatham Wells, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:06.
26 Oct and 11 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellfield Road, Streatham Wells, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:06.
26 Oct and 2 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tulsemere Road, West Dulwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Jun 2026 at 13:43.
26 Oct and 4 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 May 2026 at 11:54.
26 Oct and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 15:08.
26 Oct and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 11:05.
26 Oct and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Rinaldo Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 09:51.
26 Oct and 1 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Jun 2026 at 12:14.
26 and 28 Oct 2026
BT are proposing to carry out Utility asset works on Solna Avenue, Putney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 22 Jul 2026 at 08:45.
26 and 30 Oct 2026
Thames Water are proposing to carry out Utility asset works on Hinton Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Jul 2026 at 08:58.
26 and 30 Oct 2026
Thames Water are proposing to carry out Utility asset works on Hinton Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 14:02.
26 and 31 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Wymond Street, Putney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:05.
26 and 31 Oct 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wickersley Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 12 Aug 2026 at 11:17.
26 and 31 Oct 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wickersley Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 09:41.
26 and 30 Oct 2026
Thames Water are proposing to carry out New service connection on Munster Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2026 at 07:48.
26 Oct and 2 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 9 Sep 2026 at 16:20.
26 Oct and 2 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2026 at 18:22.
26 Oct and 2 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 20:05.
26 Oct and 2 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2026 at 09:23.
26 and 30 Oct 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Shorncliffe Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Sep 2026 at 12:36.
26 Oct and 14 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Hyson Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 14 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 20 Jul 2026 at 09:41.
26 Oct and 14 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Galleywall Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 6 Aug 2026 at 14:42.
26 and 30 Oct 2026
Cadent Gas are proposing to carry out New service connection on Onslow Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 13:30.
26 and 29 Oct 2026
Thames Water are proposing to carry out New service connection on Wilton Road, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2026 at 10:25.
26 and 30 Oct 2026
Thames Water are proposing to carry out New service connection on Wilton Road, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2026 at 09:19.
26 Oct and 21 Nov 2026
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 21 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:58.
26 and 28 Oct 2026
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Sep 2026 at 13:03.
26 and 30 Oct 2026
Cadent Gas are proposing to carry out New service connection on Dartmouth Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 17:30.
26 and 30 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Wright's Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:31.
26 and 30 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:29.
26 and 30 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:09.
26 and 28 Oct 2026
Thames Water are proposing to carry out Utility asset works on Sudrey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2026 at 11:53.
26 and 30 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Hornton Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 11:11.
26 Oct and 13 Nov 2026
Thames Water are proposing to carry out Utility asset works on Kensington Church Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:05.
26 Oct and 13 Nov 2026
Thames Water are proposing to carry out Utility asset works on Notting Hill Gate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:07.
26 and 30 Oct 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 12:28.
26 Oct and 25 Nov 2026
City Of Westminster are proposing to carry out Highway improvement works on Lexington Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 3 Sep 2026 at 13:36.
27 and 29 Oct 2026
Abovenet Communications UK are proposing to carry out Utility asset works on Piccadilly, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Abovenet Communications UK on 19 Aug 2026 at 06:54.
27 and 29 Oct 2026
City Of London Telecomms are proposing to carry out Utility repair and maintenance works on Rivington Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 7 Aug 2026 at 16:56.
27 and 30 Oct 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Warrington Crescent, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 14 Aug 2026 at 12:42.
27 and 30 Oct 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Warrington Crescent, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 14 Sep 2026 at 16:13.
28 Oct and 3 Nov 2026
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Manor Farm Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2026 and could run through until 3 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 5 Jun 2026 at 14:43.
28 and 30 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2026 at 12:39.
28 and 30 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 07:44.
30 Oct and 2 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Ranelagh Bridge, Bayswater, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:17.
30 Oct and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 13:45.
1 and 3 Nov 2026
Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2026 and could run through until 3 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 12:03.
1 and 3 Nov 2026
Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2026 and could run through until 3 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:08.
2 and 8 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Grenfell Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2026 at 05:59.
2 and 6 Nov 2026
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Longley Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 09:55.
2 and 13 Nov 2026
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Peckham Rye, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 06:46.
2 and 11 Nov 2026
Thames Water are proposing to carry out Utility asset works on Linden Grove, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 10:25.
2 and 8 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Grayshott Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Jul 2026 at 13:25.
2 and 8 Nov 2026
London Borough Of Wandsworth are proposing to carry out Utility repair and maintenance works on Grayshott Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 19 Aug 2026 at 14:47.
2 and 20 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Parke Road, Barnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:00.
2 and 6 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Fielding Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Aug 2026 at 10:14.
2 and 8 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Manor Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 10:25.
2 and 7 Nov 2026
BT are proposing to carry out Utility asset works on Colet Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Aug 2026 at 13:48.
2 and 20 Nov 2026
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tanner Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Southwark on 15 Jul 2026 at 08:05.
2 and 6 Nov 2026
Thames Water were proposing to carry out New service connection on Great George Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 November 2026 and run through until 6 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 11:22.
2 and 4 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Jul 2026 at 10:16.
2 and 4 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:52.
2 and 6 Nov 2026
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Agar Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 November 2026 and run through until 6 November 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 15:19.
2 and 6 Nov 2026
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Agar Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 15:30.
2 and 5 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Christian Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Aug 2026 at 14:29.
2 and 5 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Christian Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 1 Sep 2026 at 11:07.
2 and 20 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on New Bond Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:54.
2 and 10 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Lincoln's Inn Fields, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2026 at 21:24.
2 and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 15:18.
2 and 4 Nov 2026
Thames Water are proposing to carry out roadworks on Coptic Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 10:43.
2 and 5 Nov 2026
Thames Water are proposing to carry out Utility asset works on Blandford Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 15:54.
2 and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Road, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 10:38.
2 and 27 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Road, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 16:51.
2 and 23 Nov 2026
Thames Water are proposing to carry out Utility asset works on Garbutt Place, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2026 at 11:30.
2 and 13 Nov 2026
G2 Energy IDNO were proposing to carry out New service connection on Foscote Mews, Westbourne, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 November 2026 and run through until 13 November 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:49.
2 and 13 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 10:02.
2 Nov 2026 and 9 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Square, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 9 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2026 at 15:48.
2 Nov 2026 and 9 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 9 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2026 at 13:57.
2 Nov and 4 Dec 2026
Network Rail are proposing to carry out Works for Rail Purposes on Pancras Road, St Pancras And Somers Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Aug 2026 at 15:36.
2 Nov 2026 and 9 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Penton Street, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 9 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2026 at 15:47.
2 and 5 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Sep 2026 at 11:17.
3 and 6 Nov 2026
Thames Water are proposing to carry out New service connection on Devonshire Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 18:47.
3 and 24 Nov 2026
Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 24 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 14:17.
3 and 19 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on St John's Wood Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jun 2026 at 11:42.
3 Nov and 22 Dec 2026
G2 Energy IDNO are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 22 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 31 Jul 2026 at 12:36.
4 and 6 Nov 2026
Virgin Media are proposing to carry out Utility asset works on Strand, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 7 Sep 2026 at 11:48.
4 and 27 Nov 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Broadwick Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 3 Sep 2026 at 13:32.
5 and 7 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Oaklands Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 09:15.
5 and 7 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Headcorn Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 09:28.
5 and 9 Nov 2026
Transport for London (TfL) are proposing to carry out roadworks on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 9 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 15:49.
6 and 12 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Amersham Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 15:33.
9 and 12 Nov 2026
BT are proposing to carry out Utility asset works on Lansdowne Place, Anerley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Aug 2026 at 10:15.
9 and 23 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 09:26.
9 and 13 Nov 2026
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Anderson Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 17:42.
9 and 13 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Petersham Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 09:40.
9 and 11 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Pavilion Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2026 at 11:20.
9 and 13 Nov 2026
Thames Water are proposing to carry out New service connection on Audley Square, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Aug 2026 at 10:35.
9 and 20 Nov 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Haymarket, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Aug 2026 at 13:54.
9 and 20 Nov 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Haymarket, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 Aug 2026 at 13:40.
9 and 12 Nov 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Duke Street St James's, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Aug 2026 at 16:40.
9 and 11 Nov 2026
Thames Water were proposing to carry out Utility repair and maintenance works on Pembridge Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 13:28.
9 and 20 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Arne Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Sep 2026 at 20:17.
9 and 20 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Dryden Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Sep 2026 at 20:16.
9 and 13 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Remedial works on Catton Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Aug 2026 at 15:55.
9 Nov and 8 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2026 at 19:59.
9 Nov and 8 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Road, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2026 at 20:00.
9 and 12 Nov 2026
Thames Water are proposing to carry out New service connection on Torrington Place, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 15:38.
9 Nov and 7 Dec 2026
City Of Westminster are proposing to carry out Highway improvement works on Portland Place, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 23 Jun 2026 at 09:40.
9 and 14 Nov 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Corporation Row, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 11 Sep 2026 at 15:42.
9 and 14 Nov 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Corporation Row, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 14 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 14 Sep 2026 at 10:29.
10 and 12 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Glenburnie Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Aug 2026 at 12:53.
10 and 14 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Raymouth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 09:25.
10 and 12 Nov 2026
City Of London Telecomms are proposing to carry out Utility asset works on Thorney Street, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 26 Aug 2026 at 08:39.
10 and 12 Nov 2026
Thames Water are proposing to carry out Utility asset works on Murphy Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Aug 2026 at 08:46.
11 and 13 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Bromfelde Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Aug 2026 at 09:04.
12 and 29 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gleneldon Road, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:07.
12 and 27 Nov 2026
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 28 Aug 2026 at 09:48.
12 and 27 Nov 2026
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 1 Sep 2026 at 15:07.
14 and 22 Nov 2026
Thames Water were proposing to carry out New service connection on Lower Richmond Road, Putney, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 November 2026 and run through until 22 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 16:51.
15 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:16.
15 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:25.
15 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 13:13.
15 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.
15 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 15:56.
15 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:25.
15 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:23.
15 and 26 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Putney Bridge Road, Wandsworth, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:32.
15 and 26 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Plain, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:35.
15 and 26 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Ram Street, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:40.
15 and 26 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Fairfield Street, Wandsworth, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:43.
15 and 26 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Frogmore, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 09:08.
15 and 26 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:29.
15 and 26 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Dormay Street, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 09:09.
15 and 26 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Armoury Way, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:24.
15 and 26 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Putney Bridge Road, Wandsworth, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 08:59.
15 and 26 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Swandon Way, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:45.
15 and 18 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Pancras Road, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Aug 2026 at 16:08.
16 Nov and 23 Dec 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 23 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 13:01.
16 Nov and 23 Dec 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 13:41.
16 and 27 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Farringdon Road, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 15:30.
16 and 20 Nov 2026
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Longley Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 4 Sep 2026 at 08:08.
16 Nov 2026 and 25 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 25 January 2027. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:52.
16 and 18 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Bedford Hill, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Mar 2026 at 09:00.
16 and 20 Nov 2026
Thames Water are proposing to carry out New service connection on Pickets Street, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:11.
16 Nov and 11 Dec 2026
Thames Water were proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 November 2026 and run through until 11 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 11:10.
16 Nov and 11 Dec 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2026 at 09:48.
16 and 26 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Cumberland Road, Barnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:00.
16 and 30 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Rainville Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 14:28.
16 and 29 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 16:00.
16 and 19 Nov 2026
Thames Water are proposing to carry out New service connection on Great George Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 11:25.
16 and 27 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Great Guildford Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 15:23.
16 and 21 Nov 2026
Vodafone are proposing to carry out Utility repair and maintenance works on St Thomas Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 25 Aug 2026 at 16:11.
16 and 21 Nov 2026
Vodafone are proposing to carry out Utility repair and maintenance works on St Thomas Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 9 Sep 2026 at 14:08.
16 and 23 Nov 2026
Southern Gas Networks are proposing to carry out New service connection on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2026 at 09:38.
16 and 23 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Park Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 13:54.
16 and 20 Nov 2026
Thames Water are proposing to carry out New service connection on Sackville Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Aug 2026 at 09:23.
16 and 19 Nov 2026
Thames Water are proposing to carry out Utility asset works on Berchmans Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:27.
16 Nov and 23 Dec 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Cheapside, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 13:58.
17 Nov 2026 and 14 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Balham Park Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2026 and could run through until 14 January 2027. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 11 May 2026 at 11:49.
17 Nov and 2 Dec 2026
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Pleydell Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2026 and could run through until 2 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Aug 2026 at 13:19.
18 and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:38.
18 and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:27.
18 and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:42.
18 and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:28.
18 and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:38.
18 and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:28.
19 and 21 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 15:09.
19 and 21 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 15:09.
20 Nov and 11 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Tooting High Street, Tooting, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:26.
20 Nov and 11 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Tooting High Street, Tooting, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:54.
20 Nov and 11 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Aldis Street, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 14:35.
20 Nov and 22 Dec 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Clifton Crescent, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 22 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2026 at 11:11.
20 Nov and 5 Dec 2026
Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 13:54.
20 Nov and 5 Dec 2026
Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 14:22.
21 and 23 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Vine Road, Barnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 16 Jul 2026 at 14:20.
23 and 27 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Fountain Drive, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 15:04.
23 and 27 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Crystal Palace Parade, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 14:51.
23 and 27 Nov 2026
Thames Water were proposing to carry out Utility asset works on Camberwell Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 November 2026 and run through until 27 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:47.
23 and 27 Nov 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Wyvil Road, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 09:04.
23 and 27 Nov 2026
Thames Water are proposing to carry out Utility asset works on Ethnard Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2026 at 17:05.
23 and 28 Nov 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 15:09.
23 Nov and 16 Dec 2026
City Of Westminster are proposing to carry out Highway improvement works on Eccleston Place, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 16 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Jun 2026 at 08:10.
23 and 27 Nov 2026
Vodafone are proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 1 Sep 2026 at 10:28.
23 and 26 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Virgil Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 30 Jul 2026 at 13:24.
23 and 26 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Virgil Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 2 Sep 2026 at 08:39.
23 and 27 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Foster Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2026 at 15:38.
23 Nov 2026 and 29 Jan 2027
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 29 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2026 at 14:13.
24 and 26 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Underhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2026 at 08:38.
24 and 26 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:00.
25 and 27 Nov 2026
BT are proposing to carry out Utility asset works on Colet Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 8 Sep 2026 at 08:55.
27 Nov and 1 Dec 2026
Thames Water were proposing to carry out Utility repair and maintenance works on Crystal Palace Parade, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2026 and run through until 1 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 14:50.
27 Nov and 1 Dec 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Seymour Mews, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 May 2026 at 10:14.
27 and 29 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Calthorpe Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2026 and could run through until 29 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Aug 2026 at 16:29.
28 Nov and 4 Dec 2026
Cellnex OT UK are proposing to carry out Utility asset works on Merrow Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cellnex OT UK on 2 Sep 2026 at 13:24.
30 Nov and 13 Dec 2026
West Sussex County Council were proposing to carry out Highway improvement works on Anerley Road, Penge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 November 2026 and run through until 13 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 1 Sep 2026 at 14:34.
30 Nov and 13 Dec 2026
London Borough Of Bromley are proposing to carry out Highway improvement works on Anerley Road, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 13 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2026 at 08:28.
30 Nov and 20 Dec 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Founders Gardens, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2026 at 16:06.
30 Nov and 2 Dec 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Knollys Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Aug 2026 at 09:20.
30 Nov and 8 Dec 2026
GRID LINE POWER NETWORKS LIMITED are proposing to carry out New service connection on Lebanon Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by GRID LINE POWER NETWORKS LIMITED on 27 Aug 2026 at 09:06.
30 Nov and 2 Dec 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Bromfelde Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 12:07.
30 Nov and 19 Dec 2026
Leep Utilities Electric were proposing to carry out New service connection on Rotherhithe New Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 November 2026 and run through until 19 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 3 Sep 2026 at 15:06.
30 Nov and 8 Dec 2026
BT were proposing to carry out Utility asset works on Lime Grove, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 November 2026 and run through until 8 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 3 Sep 2026 at 08:20.
30 Nov and 4 Dec 2026
Thames Water are proposing to carry out Utility asset works on Mercer Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2026 at 16:19.
30 Nov and 2 Dec 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Harewood Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Aug 2026 at 10:56.
30 Nov 2026 and 11 Jan 2027
Thames Water are proposing to carry out roadworks on Salisbury Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 11 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Jul 2026 at 16:31.
30 Nov 2026 and 11 Jan 2027
Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 11 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Jul 2026 at 06:32.
30 Nov 2026 and 18 Jan 2027
Thames Water are proposing to carry out Utility asset works on Broadley Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 18 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2026 at 06:30.
30 Nov 2026 and 19 Apr 2027
Thames Water are proposing to carry out Utility asset works on Pentonville Road, Islington, London.
These works are categorised as Major.
The works will start on or after 30 November 2026 and could run through until 19 April 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Apr 2026 at 10:16.
1 and 4 Dec 2026
Vodafone are proposing to carry out Utility asset works on Pentonville Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Vodafone on 24 Jul 2026 at 13:04.
3 Dec 2026 and 6 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Slip Road Leading From Atkins Road To Poynders Road, Clapham Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 15:24.
3 Dec 2026 and 6 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Poynders Road, Clapham Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2026 at 17:31.
3 and 5 Dec 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Trafalgar Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2026 at 15:09.
7 Dec 2026 and 25 Jan 2027
Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2026 and run through until 25 January 2027. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 12:53.
7 and 28 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Peterborough Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:34.
7 and 28 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Coniger Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.
7 and 28 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Bradbourne Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:49.
7 and 21 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Chiddingstone Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.
7 and 21 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Quarrendon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.
7 and 28 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Chipstead Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.
7 and 21 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Perrymead Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:49.
7 Dec 2026 and 7 Feb 2027
Cadent Gas are proposing to carry out Utility asset works on Studdridge Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 7 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.
7 and 28 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Bowerdean Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.
7 and 9 Dec 2026
Thames Water are proposing to carry out Utility asset works on East Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 09:21.
7 and 14 Dec 2026
Thames Water are proposing to carry out New service connection on Maddox Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:24.
7 and 10 Dec 2026
BT are proposing to carry out Utility asset works on Clipstone Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 10 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Sep 2026 at 08:39.
7 and 10 Dec 2026
BT were proposing to carry out Utility asset works on Maple Street, Bloomsbury, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2026 and run through until 10 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 14 Sep 2026 at 07:17.
7 and 10 Dec 2026
BT were proposing to carry out Utility asset works on Cleveland Street, Bloomsbury, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2026 and run through until 10 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 14 Sep 2026 at 07:10.
7 and 14 Dec 2026
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Paul Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 14 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 7 Sep 2026 at 14:14.
8 Dec 2026 and 29 Jan 2027
City Of Westminster are proposing to carry out Highway improvement works on Portland Place, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 23 Jun 2026 at 09:31.
8 and 10 Dec 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Lyham Road, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2026 and could run through until 10 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2026 at 08:21.
9 and 11 Dec 2026
BT are proposing to carry out Diversionary works on Belgrove Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Sep 2026 at 10:32.
14 and 22 Dec 2026
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Petersfield Rise, Roehampton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 14:16.
14 and 18 Dec 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Deerdale Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Sep 2026 at 13:23.
14 and 21 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Woodlawn Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 10:00.
14 and 21 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Harbord Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 10:00.
14 and 19 Dec 2026
Thames Water are proposing to carry out Utility asset works on Pocock Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 19 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:25.
Roadworks Map near to Navy Street, LONDON, SW4 6EY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Navy Street, LONDON, SW4 6EY (54 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Sep 2026 - 18 Sep 2026)
(Scheduled: 12 Sep 2026 - 19 Sep 2026)
(Scheduled: 11 Sep 2026 - 17 Sep 2026)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data