ROADWORKS SUMMARY
Kingston Road, LONDON, SW20 8LR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Kingston Road, SW20 8LR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Kingston Road, LONDON, SW20 8LR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kingston Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Wandsworth logo
LONG TERM
Until
27 Mar 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 27 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 08:43.

Southern Gas Networks logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Welham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Welham Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2026 at 10:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 08:15.

Thames Water logo
LONG TERM
Between
12 Jan and 6 Oct 2026
Details
View Map
Share
Follow
Willow Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Willow Lane, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Dec 2025 at 16:30.

Thames Water logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Balham High Road

Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 January 2026 at 13:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:14.

Network Rail logo
LONG TERM
Until
30 Aug 2027
Details
View Map
Share
Follow
Old York Road

Network Rail are carrying out Works for Rail Purposes on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 February 2026 at 07:00 and could run through until 30 August 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2026 at 13:37.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2026
Details
View Map
Share
Follow
Recreation Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Recreation Way, Mitcham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 February 2026 at 10:30 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 09:50.

Transport for London (TfL) logo
LONG TERM
Between
26 Mar 2026 and 25 Mar 2027
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are proposing to carry out roadworks on London Road, North Cheam.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 26 March 2026 and could run through until 25 March 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2026 at 15:22.

Network Rail logo
LONG TERM
Until
1 Nov 2026
Details
View Map
Share
Follow
Chiltern Drive

Network Rail are carrying out Works for Rail Purposes on Chiltern Drive, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 April 2026 at 08:00 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Apr 2026 at 08:54.

Thames Water logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Balham Park Road

Thames Water are carrying out Utility asset works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 April 2026 at 11:00 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 07:50.

Thames Water logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Wakehurst Road

Thames Water are carrying out Disconnection or alteration of supply on Wakehurst Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 08:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jun 2026 at 08:07.

LONG TERM
Between
20 Jul 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Beaconsfield Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Beaconsfield Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 May 2026 at 09:04.

LONG TERM
Between
20 Jul 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Hollyfield Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Hollyfield Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 May 2026 at 12:20.

LONG TERM
Until
25 Jan 2027
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:30 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 Jul 2026 at 09:30.

Southern Gas Networks logo
LONG TERM
Until
18 Oct 2026
Details
View Map
Share
Follow
Copse Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Copse Hill, Wimbledon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2026 at 08:28.

LONG TERM
Until
25 Jan 2027
Details
View Map
Share
Follow
Kingsdowne Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Kingsdowne Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:30 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Sep 2026 at 07:04.

Southern Gas Networks logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Bute Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bute Road, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 15:00 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 15:32.

Southern Gas Networks logo
LONG TERM
Until
1 Nov 2026
Details
View Map
Share
Follow
Orchard Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Orchard Way, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Aug 2026 at 12:36.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Erskine Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Erskine Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2026 at 17:12.

LONG TERM
Until
25 Jan 2027
Details
View Map
Share
Follow
Ditton Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Ditton Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:30 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 Jul 2026 at 09:32.

Thames Water logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Marmion Road

Thames Water are carrying out Disconnection or alteration of supply on Marmion Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 13:00 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:26.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Bridgend Road

London Borough Of Wandsworth are carrying out Highway improvement works on Bridgend Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:04.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

Surrey County Council logo
LONG TERM
Between
1 Aug 2026 and 1 Feb 2027
Details
View Map
Share
Follow
Horton Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horton Lane, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2026 and could run through until 1 February 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 28 Apr 2026 at 14:11.

Surrey County Council logo
LONG TERM
Between
1 Aug 2026 and 1 Feb 2027
Details
View Map
Share
Follow
Oakwood Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on Oakwood Avenue, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2026 and could run through until 1 February 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 28 Apr 2026 at 14:13.

Surrey County Council logo
LONG TERM
Between
1 Aug 2026 and 1 Feb 2027
Details
View Map
Share
Follow
Hook Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hook Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2026 and could run through until 1 February 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 28 Apr 2026 at 14:14.

Surrey County Council logo
LONG TERM
Between
1 Aug 2026 and 1 Feb 2027
Details
View Map
Share
Follow
Chessington Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chessington Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2026 and could run through until 1 February 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 28 Apr 2026 at 14:15.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Oakhill Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Oakhill Road, Sutton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 August 2026 at 08:00 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Aug 2026 at 12:21.

Southern Gas Networks logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Brunswick Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Brunswick Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2026 at 12:15 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Aug 2026 at 12:22.

Thames Water logo
LONG TERM
Until
23 Sep 2026
Details
View Map
Share
Follow
Wisley Road

Thames Water are carrying out Disconnection or alteration of supply on Wisley Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2026 at 09:00 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 09:13.

Southern Gas Networks logo
LONG TERM
Until
28 Sep 2026
Details
View Map
Share
Follow
Burnell Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Burnell Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 07:30 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Aug 2026 at 12:22.

Southern Gas Networks logo
LONG TERM
Until
28 Sep 2026
Details
View Map
Share
Follow
Carolina Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Carolina Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:00 and could run through until 28 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 09:12.

Finishing
Friday
Details
View Map
Share
Follow
Coombe Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Coombe Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2026 at 09:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Aug 2026 at 10:30.

Finishing
Friday
Details
View Map
Share
Follow
Galsworthy Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Galsworthy Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Aug 2026 at 10:29.

Thames Water logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Holmesdale Road

Thames Water are carrying out Disconnection or alteration of supply on Holmesdale Road, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 08:00 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 09:09.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Friday
Details
View Map
Share
Follow
Robin Hood Lane

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Robin Hood Lane, Sutton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2026 at 10:01 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Sep 2026 at 14:19.

Thames Water logo
LONG TERM
Between
26 Aug and 12 Oct 2026
Details
View Map
Share
Follow
Gowrie Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gowrie Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 12:59.

Thames Water logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Gowrie Road

Thames Water are carrying out Disconnection or alteration of supply on Gowrie Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 08:45 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 09:00.

Southern Gas Networks logo
LONG TERM
Until
13 Dec 2026
Details
View Map
Share
Follow
Mill Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Mill Lane, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:25 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2026 at 16:57.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Long Ditton, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jul 2026 at 09:12.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Union Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Union Street, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:30 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2026 at 09:54.

Southern Gas Networks logo
LONG TERM
Until
5 Oct 2026
Details
View Map
Share
Follow
Vale Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Vale Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:30 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2026 at 09:51.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Kingston Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Kingston Road, Tolworth.

The works should not impact the carriageway.

The works started on 1 September 2026 at 12:32 and could run through until 16 September 2026. The works will impact the cycleway only.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 16:03.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Marryat Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Marryat Road, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2026 at 09:24.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Marryat Road

UK Power Networks Eastern & London are carrying out New service connection on Marryat Road, Wimbledon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:50 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:42.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Burghley Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Burghley Road, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2026 at 09:28.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Burghley Road

UK Power Networks Eastern & London are carrying out New service connection on Burghley Road, Wimbledon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:50 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:41.

Transport for London (TfL) logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are carrying out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:12.

Transport for London (TfL) logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Morrish Road

Transport for London (TfL) are carrying out Highway improvement works on Morrish Road, Clapham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:12.

Transport for London (TfL) logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are carrying out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:11.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 13:24.

Transport for London (TfL) logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are carrying out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:10.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Clifton Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Clifton Road, Wallington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 21 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2026 at 15:55.

Southern Gas Networks logo
Until
4 Oct 2026
Details
View Map
Share
Follow
High Street

Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Sutton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 11:30 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2026 at 12:21.

UK Power Networks South Eastern logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Campbell Road

UK Power Networks South Eastern are carrying out Utility asset works on Campbell Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 10:15 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2026 at 12:08.

UK Power Networks South Eastern logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Sury Basin

UK Power Networks South Eastern are carrying out Utility asset works on Sury Basin, Kingston Upon Thames.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2026 at 09:55.

Transport for London (TfL) logo
LONG TERM
Between
7 Sep and 20 Nov 2026
Details
View Map
Share
Follow
High Street Collier's Wood

Transport for London (TfL) are proposing to carry out Highway improvement works on High Street Collier's Wood, Colliers Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2026 at 11:26.

Transport for London (TfL) logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
High Street Collier's Wood

Transport for London (TfL) are carrying out Highway improvement works on High Street Collier's Wood, Colliers Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 12:40.

Transport for London (TfL) logo
LONG TERM
Between
7 Sep 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 8 February 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:29.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Balham Hill

Transport for London (TfL) are carrying out Highway improvement works on Balham Hill, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:48.

Transport for London (TfL) logo
Between
7 and 24 Sep 2026
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:16.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are carrying out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 14:00.

Transport for London (TfL) logo
Between
7 and 24 Sep 2026
Details
View Map
Share
Follow
Yukon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Yukon Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:13.

Transport for London (TfL) logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Yukon Road

Transport for London (TfL) are carrying out Highway improvement works on Yukon Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 14:35.

Cadent Gas logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Berwyn Road

Cadent Gas are carrying out Utility asset works on Berwyn Road, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 10:34 and could run through until 1 October 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 11:04.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Coombe Lane West

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2026 and run through until 16 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2026 at 10:29.

Cadent Gas logo
Between
9 and 25 Sep 2026
Details
View Map
Share
Follow
Ham Common

Cadent Gas are proposing to carry out Utility asset works on Ham Common, Ham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jun 2026 at 11:59.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Eversley Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Eversley Road, Surbiton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 10:06 and could run through until 17 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2026 at 12:23.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Coombe Lane West

Southern Gas Networks are carrying out Utility repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 10:16 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2026 at 11:03.

Transport for London (TfL) logo
Between
10 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Rinaldo Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Rinaldo Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Apr 2026 at 12:52.

UK Power Networks South Eastern logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Villiers Road

UK Power Networks South Eastern are carrying out Utility asset works on Villiers Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 09:00 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2026 at 09:49.

UK Power Networks South Eastern logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Canbury Park Road

UK Power Networks South Eastern are carrying out Utility asset works on Canbury Park Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 08:30 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2026 at 08:39.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
South Park Road

Thames Water are carrying out Utility repair and maintenance works on South Park Road, Wimbledon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 12:34 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:35.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Church Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Church Lane, Tooting, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 05:43 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2026 at 10:18.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Nightingale Lane

Thames Water are carrying out Utility repair and maintenance works on Nightingale Lane, Richmond.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 10:18 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:43.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Wolfington Road

Thames Water were proposing to carry out Utility repair and maintenance works on Wolfington Road, Knight's Hill, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 10:36.

London Borough Of Sutton logo
Finishing
Today
Details
View Map
Share
Follow
Sutton Common Road

London Borough Of Sutton are carrying out Highway improvement works on Sutton Common Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 20:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 15 Sep 2026 at 07:01.

Transport for London (TfL) logo
Between
14 Sep and 13 Oct 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 13 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:17.

Finishing
Monday
Details
View Map
Share
Follow
Victoria Road

Royal Borough Of Kingston Upon Thames are carrying out Remedial works on Victoria Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Sep 2026 at 08:02.

Transport for London (TfL) logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
St Helier Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 12:59.

Between
14 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2026 at 10:07.

Until
5 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Sep 2026 at 08:02.

UK Power Networks South Eastern logo
Between
14 Sep and 4 Oct 2026
Details
View Map
Share
Villiers Road

UK Power Networks South Eastern were proposing to carry out Utility asset works on Villiers Road, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 4 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Aug 2026 at 08:59.

Thames Water logo
Between
14 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Burstow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Burstow Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 12:55.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Belvedere Drive

Southern Gas Networks are carrying out roadworks on Belvedere Drive, Wimbledon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:24 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 11:17.

Cadent Gas logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Ham Common

Cadent Gas are carrying out Utility asset works on Ham Common, Ham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:35 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 08:57.

Transport for London (TfL) logo
Between
14 and 28 Sep 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out roadworks on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:14.

Transport for London (TfL) logo
Between
14 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out roadworks on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Aug 2026 at 15:19.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Kingscliffe Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingscliffe Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:18.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Kingscliffe Gardens

Thames Water were proposing to carry out Disconnection or alteration of supply on Kingscliffe Gardens, Southfields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 08:23.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Southdean Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 10:46.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Morrish Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Morrish Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 May 2026 at 11:29.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Brixton Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 11:49.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lynn Road

Thames Water are carrying out Utility repair and maintenance works on Lynn Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:03.

Thames Water logo
Until
9 Oct 2026
Details
View Map
Share
Follow
Wroughton Road

Thames Water are carrying out Disconnection or alteration of supply on Wroughton Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:00 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:42.

T-Mobile (UK) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 24 Jul 2026 at 13:14.

T-Mobile (UK) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 21 Aug 2026 at 08:03.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 10 Sep 2026 at 10:17.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:14.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 8 Sep 2026 at 08:55.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Parkfields

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Parkfields, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 16:12.

London Borough Of Wandsworth logo
Finishing
Friday
Details
View Map
Share
Follow
Felsham Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Felsham Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 18 Aug 2026 at 08:59.

London Borough Of Wandsworth logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Felsham Road

London Borough Of Wandsworth are carrying out Highway improvement works on Felsham Road, Putney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 14 Sep 2026 at 08:20.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Brighton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Brighton Road, Sutton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 11:28 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 14:45.

UK Power Networks South Eastern logo
LONG TERM
Until
24 Oct 2026
Details
View Map
Share
Follow
Hook Road

UK Power Networks South Eastern are carrying out Utility asset works on Hook Road, Chessington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2026 at 08:28.

UK Power Networks South Eastern logo
LONG TERM
Until
24 Oct 2026
Details
View Map
Share
Follow
Hook Rise South

UK Power Networks South Eastern are carrying out Utility asset works on Hook Rise South, Chessington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2026 at 08:27.

UK Power Networks South Eastern logo
LONG TERM
Until
24 Oct 2026
Details
View Map
Share
Follow
Hook Road

UK Power Networks South Eastern are carrying out Utility asset works on Hook Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2026 at 08:26.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Sep and 24 Oct 2026
Details
View Map
Share
Follow
Hook Rise North

UK Power Networks South Eastern are proposing to carry out Utility asset works on Hook Rise North, Tolworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Aug 2026 at 14:03.

UK Power Networks South Eastern logo
LONG TERM
Until
24 Oct 2026
Details
View Map
Share
Follow
Hook Rise North

UK Power Networks South Eastern are carrying out Utility asset works on Hook Rise North, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2026 at 08:27.

Thames Water logo
LONG TERM
Between
15 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Dulka Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Dulka Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:56.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hurlingham Road

Thames Water are carrying out Utility repair and maintenance works on Hurlingham Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:04 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:19.

London Borough Of Sutton logo
Finishing
Saturday
Details
View Map
Share
Follow
Boundary Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Boundary Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 19 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 10 Jul 2026 at 13:20.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Sep and 25 Oct 2026
Details
View Map
Share
Hook Road

UK Power Networks South Eastern were proposing to carry out Utility asset works on Hook Road, Surbiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2026 and run through until 25 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Aug 2026 at 10:44.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Albert Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Albert Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 16:11.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Albert Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Albert Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2026 at 11:30.

UK Power Networks South Eastern logo
Between
20 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Albert Road

UK Power Networks South Eastern are proposing to carry out roadworks on Albert Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Aug 2026 at 09:27.

UK Power Networks South Eastern logo
Between
20 Sep and 10 Oct 2026
Details
View Map
Share
London Road

UK Power Networks South Eastern were proposing to carry out Utility asset works on London Road, Kingston Upon Thames.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 September 2026 and run through until 10 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Aug 2026 at 16:10.

UK Power Networks South Eastern logo
Between
20 Sep and 10 Oct 2026
Details
View Map
Share
Follow
London Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on London Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Aug 2026 at 09:35.

Southern Gas Networks logo
Between
21 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Belmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belmont Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 15:33.

Southern Gas Networks logo
LONG TERM
Between
21 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Clifton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 15:34.

Southern Gas Networks logo
LONG TERM
Between
21 Sep and 29 Oct 2026
Details
View Map
Share
Follow
Bridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridge Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 29 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2026 at 16:30.

Southern Gas Networks logo
Between
21 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Osmond Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Osmond Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 15:33.

Southern Gas Networks logo
Between
21 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Mill Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 15:29.

Southern Gas Networks logo
Between
21 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Mill Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 10:21.

Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Dickerage Lane

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Dickerage Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 6 Aug 2026 at 09:18.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Sep and 28 Oct 2026
Details
View Map
Share
Follow
Villiers Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Road, Kingston Upon Thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 16:17.

Southern Gas Networks logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2026 at 10:55.

Between
21 and 29 Sep 2026
Details
View Map
Share
Follow
Washington Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Washington Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 23 Jun 2026 at 11:09.

Southern Gas Networks logo
LONG TERM
Between
21 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 08:51.

Thames Water logo
Between
21 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Burstow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Burstow Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:22.

Thames Water logo
LONG TERM
Between
21 Sep and 22 Oct 2026
Details
View Map
Share
Follow
Greyhound Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Greyhound Lane, Streatham St Leonard's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 12:41.

London Borough Of Wandsworth logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Openview, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 16:07.

London Borough Of Wandsworth logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Openview, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Aug 2026 at 14:46.

Transport for London (TfL) logo
LONG TERM
Between
21 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2026 at 11:42.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Bridgend Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bridgend Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Jul 2026 at 15:27.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Jul 2026 at 15:25.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 13:45.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 15:06.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Wandsworth Bridge

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Wandsworth Bridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 30 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 12:49.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Aug 2026 at 08:45.

Thames Water logo
Between
22 and 27 Sep 2026
Details
View Map
Share
Follow
Ansell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:06.

Thames Water logo
Between
22 and 27 Sep 2026
Details
View Map
Share
Follow
Ansell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 14:45.

Cadent Gas logo
Between
22 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Novello Street

Cadent Gas are proposing to carry out Utility asset works on Novello Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

BT logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
Fairway

BT are proposing to carry out Utility asset works on Fairway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Jun 2026 at 09:53.

BT logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
Fairway

BT are proposing to carry out Utility asset works on Fairway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 1 Sep 2026 at 13:54.

BT logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
Corbet Close

BT are proposing to carry out Utility asset works on Corbet Close, Hackbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Jun 2026 at 12:28.

Thames Water logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
School Road

Thames Water are proposing to carry out Utility repair and maintenance works on School Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jul 2026 at 10:24.

Thames Water logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
School Road

Thames Water are proposing to carry out Utility repair and maintenance works on School Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 08:45.

Thames Water logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
Seymour Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seymour Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jul 2026 at 10:21.

Thames Water logo
Between
23 and 25 Sep 2026
Details
View Map
Share
Follow
Seymour Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seymour Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 08:44.

Thames Water logo
Between
23 Sep and 14 Oct 2026
Details
View Map
Share
Follow
Melbourne Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Melbourne Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 13:42.

London Borough Of Wandsworth logo
Between
23 Sep and 20 Oct 2026
Details
View Map
Share
Dulka Road

London Borough Of Wandsworth were proposing to carry out Utility repair and maintenance works on Dulka Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2026 and run through until 20 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Sep 2026 at 14:53.

Its Technology Group logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Balham Park Road

Its Technology Group are proposing to carry out New service connection on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 9 Sep 2026 at 08:39.

Transport for London (TfL) logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 13:49.

Transport for London (TfL) logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 16:23.

Thames Water logo
LONG TERM
Between
24 Sep and 28 Oct 2026
Details
View Map
Share
Follow
Freke Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Freke Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:35.

Cadent Gas logo
Between
24 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Parsons Green

Cadent Gas are proposing to carry out Utility asset works on Parsons Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

Cadent Gas logo
Between
24 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Parsons Green Lane

Cadent Gas are proposing to carry out Utility asset works on Parsons Green Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

London Borough Of Wandsworth logo
Between
25 and 29 Sep 2026
Details
View Map
Share
Follow
Battersea High Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Battersea High Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:04.

T-Mobile (UK) logo
Between
27 and 30 Sep 2026
Details
View Map
Share
Follow
Longley Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 30 Jun 2026 at 05:53.

Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Market Place

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Market Place, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 4 Sep 2026 at 16:04.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Southdean Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 13:09.

Transport for London (TfL) logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 10:00.

Transport for London (TfL) logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:29.

Transport for London (TfL) logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2026 at 13:42.

Transport for London (TfL) logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.

Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Burney Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Burney Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 9 Sep 2026 at 15:51.

Thames Water logo
Between
29 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Dennis Park Crescent

Thames Water are proposing to carry out Disconnection or alteration of supply on Dennis Park Crescent, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 12:58.

Thames Water logo
LONG TERM
Between
29 Sep and 2 Nov 2026
Details
View Map
Share
Follow
King Edwards Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on King Edwards Grove, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 10:33.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:16.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Bedford Hill

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bedford Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 11:56.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Bolingbroke Grove

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bolingbroke Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 11:52.

Southern Gas Networks logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Rectory Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rectory Lane, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2026 at 12:07.

Southern Gas Networks logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Rectory Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rectory Lane, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2026 at 11:00.

LONG TERM
Between
30 Sep and 1 Dec 2026
Details
View Map
Share
Follow
Washington Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Washington Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 7 Sep 2026 at 16:11.

Surrey County Council logo
LONG TERM
Between
1 Oct 2026 and 1 Mar 2027
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 1 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Aug 2026 at 09:55.

UK Power Networks South Eastern logo
LONG TERM
Between
2 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Villiers Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 16:06.

UK Power Networks South Eastern logo
LONG TERM
Between
2 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Cheyne Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on Cheyne Hill, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2026 at 11:12.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Balham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:30.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 May 2026 at 11:49.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Alderbrook Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 09:06.

Thames Water logo
LONG TERM
Between
2 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Burland Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Burland Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:14.

UK Power Networks South Eastern logo
LONG TERM
Between
5 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Purley Way

UK Power Networks South Eastern are proposing to carry out New service connection on Purley Way, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Sep 2026 at 11:37.

UK Power Networks South Eastern logo
LONG TERM
Between
5 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Purley Way

UK Power Networks South Eastern are proposing to carry out New service connection on Purley Way, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Sep 2026 at 11:41.

UK Power Networks South Eastern logo
LONG TERM
Between
5 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Waddon Road

UK Power Networks South Eastern are proposing to carry out New service connection on Waddon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 May 2026 at 16:32.

Surrey County Council logo
Between
5 and 10 Oct 2026
Details
View Map
Share
Follow
Kingston Bypass

Surrey County Council are proposing to carry out Highway improvement works on Kingston Bypass, Long Ditton, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 10 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 4 Sep 2026 at 07:35.

Southern Gas Networks logo
LONG TERM
Between
5 Oct and 19 Nov 2026
Details
View Map
Share
Follow
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jul 2026 at 16:22.

Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Maple Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Maple Road, Surbiton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 24 Aug 2026 at 10:05.

Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Dickerage Lane

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Dickerage Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 Aug 2026 at 11:52.

Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2026 at 16:45.

Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 9 Sep 2026 at 07:36.

Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Union Street

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Union Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 4 Sep 2026 at 16:05.

Southern Gas Networks logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Worple Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worple Road, Raynes Park.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 09:38.

Southern Gas Networks logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Worple Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worple Road, Raynes Park.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2026 at 11:12.

Southern Gas Networks logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Maryland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maryland Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 08:53.

Southern Gas Networks logo
LONG TERM
Between
5 Oct and 13 Dec 2026
Details
View Map
Share
Follow
Thames Side

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thames Side, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 12:00.

Southern Gas Networks logo
LONG TERM
Between
5 Oct and 13 Dec 2026
Details
View Map
Share
Follow
Thames Side

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thames Side, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 16:19.

Thames Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Trevelyan Road

Thames Water were proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 7 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 07:31.

Thames Water logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Morrish Road

Thames Water were proposing to carry out New service connection on Morrish Road, Clapham Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 12 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 11:25.

Thames Water logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Morrish Road

Thames Water were proposing to carry out New service connection on Morrish Road, Clapham Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 12 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 11:36.

T-Mobile (UK) logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 14 Sep 2026 at 14:35.

Thames Water logo
LONG TERM
Between
5 Oct 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Northcote Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northcote Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:15.

London Borough Of Wandsworth logo
Between
5 and 31 Oct 2026
Details
View Map
Share
Follow
Putney High Street

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Putney High Street, Putney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2026 at 08:57.

Thames Water logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Perrymead Street

Thames Water are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:05.

Thames Water logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Perrymead Street

Thames Water are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:34.

Thames Water logo
LONG TERM
Between
5 Oct and 7 Dec 2026
Details
View Map
Share
Follow
Studdridge Street

Thames Water are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:54.

Thames Water logo
LONG TERM
Between
5 Oct and 7 Dec 2026
Details
View Map
Share
Follow
Studdridge Street

Thames Water are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:34.

Network Rail logo
Between
6 and 9 Oct 2026
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Mar 2026 at 11:50.

Network Rail logo
Between
6 and 9 Oct 2026
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Sep 2026 at 08:34.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Lamberts Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Lamberts Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2026 at 12:10.

Thames Water logo
Between
7 and 30 Oct 2026
Details
View Map
Share
Follow
Dennis Park Crescent

Thames Water are proposing to carry out Disconnection or alteration of supply on Dennis Park Crescent, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:33.

Thames Water logo
Between
7 and 22 Oct 2026
Details
View Map
Share
Follow
Trowlock Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Trowlock Avenue, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 15:37.

UK Power Networks South Eastern logo
Between
9 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Hook Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Hook Road, Chessington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Sep 2026 at 09:49.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Ewell Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Ewell Road, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 15:13.

Transport for London (TfL) logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Kingston Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2026 at 13:31.

Transport for London (TfL) logo
Between
12 and 20 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Kingston Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 10:30.

Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
The Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on The Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 15 Jul 2026 at 14:57.

Between
12 Oct and 2 Nov 2026
Details
View Map
Share
Fife Road

Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Fife Road, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 2 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 4 Sep 2026 at 07:02.

Thames Water logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Manorgate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manorgate Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 09:55.

Thames Water logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Clifton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clifton Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 09:55.

Cadent Gas logo
LONG TERM
Between
12 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Ham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:37.

BT logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Carminia Road

BT are proposing to carry out Utility asset works on Carminia Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Aug 2026 at 16:07.

BT logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Carminia Road

BT are proposing to carry out Utility asset works on Carminia Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 Sep 2026 at 07:09.

Thames Water logo
LONG TERM
Between
12 Oct and 14 Dec 2026
Details
View Map
Share
Follow
Chivalry Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Chivalry Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:35.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 25 Nov 2026
Details
View Map
Share
Arras Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Arras Avenue, Morden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2026 and run through until 25 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:17.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 25 Nov 2026
Details
View Map
Share
Connaught Gardens

Transport for London (TfL) were proposing to carry out Highway improvement works on Connaught Gardens, Morden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2026 and run through until 25 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:17.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 25 Nov 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2026 and run through until 25 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:18.

London Borough Of Wandsworth logo
Between
13 and 16 Oct 2026
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:12.

London Borough Of Wandsworth logo
Between
13 and 20 Oct 2026
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 08:57.

UK Power Networks South Eastern logo
Between
14 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Hook Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Hook Road, Chessington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2026 at 14:08.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Oct and 28 Nov 2026
Details
View Map
Share
Follow
Ewell Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Ewell Road, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 28 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 15:06.

LONG TERM
Between
14 Oct and 20 Nov 2026
Details
View Map
Share
Cambridge Road

Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2026 and run through until 20 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 Aug 2026 at 11:32.

LONG TERM
Between
14 Oct and 20 Nov 2026
Details
View Map
Share
Gloucester Road

Royal Borough Of Kingston Upon Thames were proposing to carry out roadworks on Gloucester Road, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2026 and run through until 20 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 Aug 2026 at 11:27.

BT logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2026 at 08:43.

BT logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2026 at 14:22.

Between
15 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Turners Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Turners Way, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Sep 2026 at 11:03.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Oct and 14 Dec 2026
Details
View Map
Share
St Julian's Farm Road

UK Power Networks Eastern & London were proposing to carry out New service connection on St Julian's Farm Road, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2026 and run through until 14 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 09:07.

Transport for London (TfL) logo
Between
16 and 17 Oct 2026
Details
View Map
Share
Follow
Hook Rise South

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hook Rise South, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2026 at 12:50.

Surrey County Council logo
Between
17 and 23 Oct 2026
Details
View Map
Share
Follow
Longmead Road

Surrey County Council are proposing to carry out Highway improvement works on Longmead Road, Epsom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 7 Jul 2026 at 16:33.

UK Power Networks South Eastern logo
Between
17 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Oldfields Road

UK Power Networks South Eastern are proposing to carry out New service connection on Oldfields Road, Sutton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Aug 2026 at 09:50.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Oct and 29 Nov 2026
Details
View Map
Share
Follow
Ditton Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Ditton Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2026 and could run through until 29 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 11:20.

Thames Water logo
Between
18 and 22 Oct 2026
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 09:16.

Southern Gas Networks logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Chesterfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chesterfield Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Jul 2026 at 17:11.

Southern Gas Networks logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Poole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Poole Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2026 at 17:57.

Southern Gas Networks logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Poole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Poole Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 10:24.

Southern Gas Networks logo
Between
19 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Waddon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waddon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 7 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Jul 2026 at 11:28.

Southern Gas Networks logo
Between
19 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Waddon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waddon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 7 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2026 at 09:44.

Southern Gas Networks logo
Between
19 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Mill Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 7 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Jul 2026 at 11:30.

Southern Gas Networks logo
Between
19 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Mill Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 7 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2026 at 09:44.

Southern Gas Networks logo
Between
19 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Purley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Way, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 7 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2026 at 13:51.

Southern Gas Networks logo
Between
19 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Purley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Way, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 7 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 11:45.

UK Power Networks South Eastern logo
LONG TERM
Between
19 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Hook Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Hook Road, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 16:09.

Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Cambridge Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 9 Sep 2026 at 14:28.

Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Cambridge Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 15 Sep 2026 at 10:27.

Thames Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Rectory Lane

Thames Water are proposing to carry out Remedial works on Rectory Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 14:59.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out New service connection on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 08:55.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out New service connection on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 10:23.

Thames Water logo
Between
19 and 27 Oct 2026
Details
View Map
Share
Princes Way

Thames Water were proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 27 October 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 07:43.

Thames Water logo
Between
19 and 24 Oct 2026
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 10:22.

ESP Electricity logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Bridges Court Road

ESP Electricity are proposing to carry out Utility asset works on Bridges Court Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 6 Aug 2026 at 11:36.

London Borough Of Wandsworth logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Bridges Court Road

London Borough Of Wandsworth are proposing to carry out Utility repair and maintenance works on Bridges Court Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 19 Aug 2026 at 13:52.

Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
The Terrace

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on The Terrace, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Jun 2026 at 12:03.

Transport for London (TfL) logo
Between
20 and 22 Oct 2026
Details
View Map
Share
Follow
Stonecot Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stonecot Hill, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 13:24.

London Borough Of Wandsworth logo
Between
20 and 23 Oct 2026
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 09:55.

Thames Water logo
LONG TERM
Between
20 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Keildon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Keildon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Oct and 21 Dec 2026
Details
View Map
Share
Follow
St Julian's Farm Road

UK Power Networks Eastern & London are proposing to carry out New service connection on St Julian's Farm Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 09:59.

Between
24 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Cadogan Road

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Cadogan Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 26 Aug 2026 at 10:41.

Southern Gas Networks logo
Between
24 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Tamworth Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tamworth Lane, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2026 at 08:54.

Thames Water logo
Between
24 and 30 Oct 2026
Details
View Map
Share
Princes Way

Thames Water were proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2026 and run through until 30 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 11:55.

Thames Water logo
Between
24 and 30 Oct 2026
Details
View Map
Share
Follow
Princes Way

Thames Water are proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 12:23.

Transport for London (TfL) logo
Between
24 Oct and 12 Nov 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.

UK Power Networks South Eastern logo
Between
25 and 31 Oct 2026
Details
View Map
Share
Follow
Hook Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Hook Road, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Aug 2026 at 11:54.

UK Power Networks South Eastern logo
Between
25 and 31 Oct 2026
Details
View Map
Share
Follow
Hook Rise South

UK Power Networks South Eastern are proposing to carry out Utility asset works on Hook Rise South, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Aug 2026 at 11:54.

Southern Gas Networks logo
Between
26 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Stanley Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Park Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2026 at 15:13.

Southern Gas Networks logo
Between
26 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Windborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Windborough Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2026 at 15:11.

Southern Gas Networks logo
Between
26 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Anglesey Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Anglesey Gardens, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2026 at 15:12.

Southern Gas Networks logo
LONG TERM
Between
26 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Carew Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carew Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Aug 2026 at 15:45.

Transport for London (TfL) logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Carshalton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Carshalton Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 20:31.

Transport for London (TfL) logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Carshalton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Carshalton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 20:32.

Southern Gas Networks logo
Between
26 Oct and 18 Nov 2026
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 18 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 15:35.

Southern Gas Networks logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Wandle Side

Southern Gas Networks are proposing to carry out New service connection on Wandle Side, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2026 at 14:04.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Farmington Avenue

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out roadworks on Farmington Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 22 Jun 2026 at 12:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Fellowes Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out roadworks on Fellowes Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 22 Jun 2026 at 12:35.

Transport for London (TfL) logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Hook Rise South

Transport for London (TfL) are proposing to carry out Highway improvement works on Hook Rise South, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Apr 2026 at 15:52.

Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
London Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on London Road, North Cheam.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Aug 2026 at 14:22.

Transport for London (TfL) logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Hook Rise North

Transport for London (TfL) are proposing to carry out Highway improvement works on Hook Rise North, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Apr 2026 at 15:49.

London Borough Of Sutton logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Winchcombe Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Winchcombe Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 27 Mar 2026 at 11:50.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Combermere Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Disconnection or alteration of supply on Combermere Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Aug 2026 at 15:36.

UK Power Networks South Eastern logo
LONG TERM
Between
26 Oct 2026 and 3 Mar 2027
Details
View Map
Share
Follow
London Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on London Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 3 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 13:51.

Hutchinson 3G logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Coombe Lane West

Hutchinson 3G are proposing to carry out Utility asset works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 11 Aug 2026 at 10:40.

Hutchinson 3G logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Coombe Lane West

Hutchinson 3G are proposing to carry out Utility asset works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 26 Aug 2026 at 16:19.

Hutchinson 3G logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Robin Hood Way

Hutchinson 3G are proposing to carry out Utility asset works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 4 Aug 2026 at 14:18.

Hutchinson 3G logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Robin Hood Way

Hutchinson 3G are proposing to carry out Utility asset works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Hutchinson 3G on 14 Sep 2026 at 11:31.

Southern Gas Networks logo
LONG TERM
Between
26 Oct and 29 Nov 2026
Details
View Map
Share
Follow
Valley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Road, Streatham Wells, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:06.

Southern Gas Networks logo
Between
26 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Wellfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellfield Road, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:06.

Cadent Gas logo
Between
26 Oct and 25 Nov 2026
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Ham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 11:19.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct and 4 Dec 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2026 at 11:54.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 15:08.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 11:05.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Rinaldo Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Rinaldo Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 08:14.

Thames Water logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Cavendish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2026 at 12:14.

BT logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Solna Avenue

BT are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Jul 2026 at 08:45.

BT logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Jul 2026 at 08:06.

Thames Water logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Wymond Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Wymond Street, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:05.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Munster Road

Thames Water are proposing to carry out New service connection on Munster Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 07:48.

Transport for London (TfL) logo
Between
27 and 29 Oct 2026
Details
View Map
Share
Follow
Cheam Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 18:23.

Transport for London (TfL) logo
Between
27 and 29 Oct 2026
Details
View Map
Share
Follow
Ewell Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ewell Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 20:03.

UK Power Networks South Eastern logo
Between
27 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Wickham Avenue

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Wickham Avenue, North Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2026 at 07:39.

Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
Fullers Way North

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Fullers Way North, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 17 Jun 2026 at 15:49.

Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
Red Lion Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Red Lion Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 17 Jun 2026 at 13:22.

London Borough Of Croydon logo
Between
28 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Manor Farm Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Manor Farm Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 5 Jun 2026 at 14:43.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
New King's Road

Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 12:39.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
New King's Road

Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 07:44.

Transport for London (TfL) logo
Between
1 and 30 Nov 2026
Details
View Map
Share
Follow
Cheam Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 30 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2026 at 18:41.

UK Power Networks South Eastern logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Selwood Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Selwood Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2026 at 17:20.

UK Power Networks South Eastern logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Church Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Aug 2026 at 12:04.

Between
2 and 23 Nov 2026
Details
View Map
Share
Follow
Clarence Street

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Clarence Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 24 Jun 2026 at 15:08.

Thames Water logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grenfell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grenfell Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2026 at 05:59.

London Borough Of Wandsworth logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 09:55.

Thames Water logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grayshott Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grayshott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2026 at 13:25.

London Borough Of Wandsworth logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grayshott Road

London Borough Of Wandsworth are proposing to carry out Utility repair and maintenance works on Grayshott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 19 Aug 2026 at 14:47.

Thames Water logo
Between
3 and 4 Nov 2026
Details
View Map
Share
Follow
Coval Passage

Thames Water are proposing to carry out Utility repair and maintenance works on Coval Passage, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 12:48.

UK Power Networks South Eastern logo
LONG TERM
Between
5 Nov and 24 Dec 2026
Details
View Map
Share
Follow
Cameron Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Cameron Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 24 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2026 at 11:24.

Transport for London (TfL) logo
Between
5 and 7 Nov 2026
Details
View Map
Share
Follow
Oaklands Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Oaklands Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 09:15.

Transport for London (TfL) logo
Between
5 and 7 Nov 2026
Details
View Map
Share
Follow
Headcorn Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Headcorn Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 09:28.

On
8 Nov 2026
Details
View Map
Share
Follow
Unnamed Footpath - Petersham Road To Petersham Meadows

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Unnamed Footpath - Petersham Road To Petersham Meadows, Petersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 8 November 2026 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 15 Sep 2026 at 16:11.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Pine Walk

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Disconnection or alteration of supply on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 30 Jul 2026 at 14:19.

Transport for London (TfL) logo
Between
9 and 18 Nov 2026
Details
View Map
Share
Follow
Cheam Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2026 at 15:24.

Thames Water logo
Between
9 and 27 Nov 2026
Details
View Map
Share
Follow
Benhill Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Benhill Avenue, Sutton.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 9 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Aug 2026 at 09:18.

Southern Gas Networks logo
LONG TERM
Between
9 Nov and 13 Dec 2026
Details
View Map
Share
Follow
West Street Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2026 at 16:06.

Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Ewell Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 5 Aug 2026 at 10:27.

Thames Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Dolphin Street

Thames Water were proposing to carry out Remedial works on Dolphin Street, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 13:53.

Thames Water logo
Between
9 and 26 Nov 2026
Details
View Map
Share
Follow
Broom Water West

Thames Water are proposing to carry out Disconnection or alteration of supply on Broom Water West, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:35.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Glenburnie Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenburnie Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2026 at 12:53.

Southern Gas Networks logo
Between
12 and 29 Nov 2026
Details
View Map
Share
Follow
Gleneldon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gleneldon Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:07.

Cadent Gas logo
Between
12 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Temple Sheen

Cadent Gas are proposing to carry out Utility asset works on Temple Sheen, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 13:30.

Thames Water logo
Between
14 and 22 Nov 2026
Details
View Map
Share
Lower Richmond Road

Thames Water were proposing to carry out New service connection on Lower Richmond Road, Putney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2026 and run through until 22 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 16:51.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:16.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:25.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 13:13.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 15:56.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:25.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:23.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Putney Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Putney Bridge Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:32.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Wandsworth Plain

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Plain, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:35.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Ram Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Ram Street, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:40.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Fairfield Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Fairfield Street, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:43.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Frogmore

Transport for London (TfL) are proposing to carry out Highway improvement works on Frogmore, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 09:08.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Old York Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:29.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Dormay Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Dormay Street, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 09:09.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Armoury Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Armoury Way, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:24.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Putney Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Putney Bridge Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 08:59.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Swandon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Swandon Way, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:45.

Southern Gas Networks logo
Between
16 Nov and 3 Dec 2026
Details
View Map
Share
Follow
Clyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clyde Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 3 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Aug 2026 at 16:06.

Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2026 at 16:32.

Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 9 Sep 2026 at 15:18.

Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2026 at 11:42.

Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Cambridge Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2026 at 11:31.

T-Mobile (UK) logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Longley Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 4 Sep 2026 at 08:08.

Transport for London (TfL) logo
LONG TERM
Between
16 Nov 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 25 January 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:52.

Network Rail logo
Between
16 and 18 Nov 2026
Details
View Map
Share
Follow
Bedford Hill

Network Rail are proposing to carry out Works for Rail Purposes on Bedford Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Mar 2026 at 09:00.

Thames Water logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Pickets Street

Thames Water are proposing to carry out New service connection on Pickets Street, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:11.

Thames Water logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Winthorpe Road

Thames Water were proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2026 and run through until 11 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 11:10.

Thames Water logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Winthorpe Road

Thames Water are proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 11:16.

Cadent Gas logo
Between
16 and 26 Nov 2026
Details
View Map
Share
Follow
Cumberland Road

Cadent Gas are proposing to carry out Utility asset works on Cumberland Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
17 Nov 2026 and 14 Jan 2027
Details
View Map
Share
Follow
Balham Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 14 January 2027. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 11 May 2026 at 11:49.

UK Power Networks South Eastern logo
Between
18 and 24 Nov 2026
Details
View Map
Share
Follow
Albion Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Albion Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 24 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Sep 2026 at 15:30.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:38.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:27.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:42.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:28.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:38.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:28.

Transport for London (TfL) logo
Between
20 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Tooting High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Tooting High Street, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:26.

Transport for London (TfL) logo
Between
20 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Tooting High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Tooting High Street, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:54.

Transport for London (TfL) logo
Between
20 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Aldis Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Aldis Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 14:35.

Network Rail logo
Between
21 and 23 Nov 2026
Details
View Map
Share
Follow
Vine Road

Network Rail are proposing to carry out Works for Rail Purposes on Vine Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2026 at 14:20.

Southern Gas Networks logo
Between
23 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Purley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Way, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 2 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2026 at 11:16.

Thames Water logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Kingsley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kingsley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 11:01.

Southern Gas Networks logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Crescent Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Lane, Clapham Common & Abbeville, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2026 at 14:44.

Transport for London (TfL) logo
Between
25 Nov and 7 Dec 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2026 and run through until 7 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:18.

UK Power Networks South Eastern logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Bramblewood Close

UK Power Networks South Eastern are proposing to carry out Utility asset works on Bramblewood Close, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Sep 2026 at 15:50.

UK Power Networks South Eastern logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Tweeddale Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Tweeddale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Sep 2026 at 15:52.

UK Power Networks South Eastern logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Tweeddale Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Tweeddale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2026 at 14:09.

Southern Gas Networks logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Warren Drive South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Drive South, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2026 at 07:26.

Southern Gas Networks logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Tolworth Rise South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tolworth Rise South, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2026 at 13:42.

Thames Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Knollys Road

Thames Water are proposing to carry out Utility repair and maintenance works on Knollys Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 09:20.

Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Lebanon Road

GRID LINE POWER NETWORKS LIMITED are proposing to carry out New service connection on Lebanon Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by GRID LINE POWER NETWORKS LIMITED on 27 Aug 2026 at 09:06.

BT logo
Between
1 and 3 Dec 2026
Details
View Map
Share
Fountain Drive

BT were proposing to carry out Utility asset works on Fountain Drive, Carshalton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2026 and run through until 3 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2026 at 12:58.

Transport for London (TfL) logo
Between
1 and 20 Dec 2026
Details
View Map
Share
Follow
Croydon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Croydon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 20 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Jul 2026 at 12:30.

Transport for London (TfL) logo
Between
1 and 20 Dec 2026
Details
View Map
Share
Follow
Croydon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Croydon Road, Beddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 20 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2026 at 17:20.

Transport for London (TfL) logo
Between
1 and 20 Dec 2026
Details
View Map
Share
Follow
Croydon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Croydon Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 20 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2026 at 17:22.

Transport for London (TfL) logo
LONG TERM
Between
3 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Follow
Slip Road Leading From Atkins Road To Poynders Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Slip Road Leading From Atkins Road To Poynders Road, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 15:24.

Transport for London (TfL) logo
LONG TERM
Between
3 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Follow
Poynders Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Poynders Road, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2026 at 17:31.

UK Power Networks South Eastern logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Poulton Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Poulton Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2026 at 07:43.

UK Power Networks South Eastern logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Tewkesbury Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Tewkesbury Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2026 at 14:40.

Transport for London (TfL) logo
Between
7 and 19 Dec 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 19 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:18.

Southern Gas Networks logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Cromwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 15:04.

Southern Gas Networks logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Kingston Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingston Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 15:03.

Transport for London (TfL) logo
LONG TERM
Between
7 Dec 2026 and 25 Jan 2027
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 25 January 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 12:53.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Peterborough Road

Cadent Gas are proposing to carry out Utility asset works on Peterborough Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:34.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Coniger Road

Cadent Gas are proposing to carry out Utility asset works on Coniger Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Bradbourne Street

Cadent Gas are proposing to carry out Utility asset works on Bradbourne Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:49.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Chiddingstone Street

Cadent Gas are proposing to carry out Utility asset works on Chiddingstone Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Quarrendon Street

Cadent Gas are proposing to carry out Utility asset works on Quarrendon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Chipstead Street

Cadent Gas are proposing to carry out Utility asset works on Chipstead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Perrymead Street

Cadent Gas are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:49.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 7 Feb 2027
Details
View Map
Share
Follow
Studdridge Street

Cadent Gas are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 7 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Bowerdean Street

Cadent Gas are proposing to carry out Utility asset works on Bowerdean Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Thames Water logo
Between
8 and 10 Dec 2026
Details
View Map
Share
Follow
Lyham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lyham Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2026 and could run through until 10 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 08:21.

BT logo
Between
14 and 16 Dec 2026
Details
View Map
Share
Follow
Fairway

BT are proposing to carry out Utility asset works on Fairway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 Sep 2026 at 14:01.

BT logo
Between
14 and 16 Dec 2026
Details
View Map
Share
Follow
Fairway

BT are proposing to carry out Utility asset works on Fairway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Sep 2026 at 14:42.

UK Power Networks South Eastern logo
Between
14 and 20 Dec 2026
Details
View Map
Share
Follow
Albion Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Albion Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 20 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2026 at 12:50.

UK Power Networks Eastern & London logo
Between
14 and 22 Dec 2026
Details
View Map
Share
Follow
Petersfield Rise

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Petersfield Rise, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 14:16.

Cadent Gas logo
Between
14 and 21 Dec 2026
Details
View Map
Share
Follow
Woodlawn Road

Cadent Gas are proposing to carry out Utility asset works on Woodlawn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 10:00.

Cadent Gas logo
Between
14 and 21 Dec 2026
Details
View Map
Share
Follow
Harbord Street

Cadent Gas are proposing to carry out Utility asset works on Harbord Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 10:00.


Roadworks Map near to Kingston Road, LONDON, SW20 8LR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 01:08
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Kingston Road, LONDON, SW20 8LR (66 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks Eastern & London logo
URGENT
  
BOTSFORD ROAD 
(0.0 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 11 Sep 2026 08:59
(Scheduled: 11 Sep 2026 - 17 Sep 2026)
0.0
Details
Share
Follow
2
UK Power Networks Eastern & London logo
URGENT
  
BOTSFORD ROAD 
(0.0 miles)
UK Power Networks Eastern & London
Optional permit (no fee) e.g. for traffic management etc - Verge - No carriageway incursion
In Progress
Since: 15 Sep 2026 06:30
(Scheduled: 15 Sep 2026 - 21 Sep 2026)
0.0
Details
Share
Follow
3
London Borough Of Merton logo
MAJOR
  
HAYNT WALK 
(0.2 miles)
London Borough Of Merton
Highway improvement works - Footway - Some carriageway incursion
In Progress
Since: 27 Jul 2026 09:30
(Scheduled: 27 Jul 2026 - 18 Sep 2026)
0.2
Details
Share
Follow
4
Thames Water logo
MAJOR
  
QUINTIN AVENUE 
(0.3 miles)
Thames Water
Disconnection or alteration of supply - Footway, Carriageway - Give and take
Planned
Scheduled: 16 Sep 2026 - 9 Oct 2026
0.3
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
CANNON HILL LANE 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Complete
28 Aug 2026 09:08 - 15 Sep 2026 08:23
0.3
Details
Share
6
London Borough Of Merton logo
BURSTOW ROAD 
(0.3 miles)
London Borough Of Merton
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
14 Sep 2026 11:54 - 12:00
0.3
Details
Share
7
London Borough Of Merton logo
MAJOR
  
THE QUADRANT 
(0.4 miles)
London Borough Of Merton
Highway improvement works - Footway - Some carriageway incursion
In Progress
Since: 6 Jul 2026 10:30
(Scheduled: 6 Jul 2026 - 18 Sep 2026)
0.4
Details
Share
Follow
8
Southern Gas Networks logo
MAJOR
  
MONKLEIGH ROAD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Complete
28 Aug 2026 09:10 - 15 Sep 2026 08:21
0.4
Details
Share
9
Thames Water logo
MAJOR
  
BURSTOW ROAD 
(0.4 miles)
Thames Water
Disconnection or alteration of supply - Footway, Carriageway - Road closure
Planned
Scheduled: 14 Sep 2026 - 5 Oct 2026
0.4
Details
Share
Follow
10
Thames Water logo
MIDMOOR ROAD 
(0.4 miles)
Thames Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 15 Sep 2026 05:56
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data