ROADWORKS SUMMARY
Evelyn Road, LONDON, SW19 8NU
Introduction

View current and future planned roadworks and road closures for Evelyn Road, SW19 8NU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Evelyn Road, LONDON, SW19 8NU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Evelyn Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Carrington Road, Richmond.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:54.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Meadlands Drive, Petersham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.
Thames Tideway Tunnel carried out Utility asset works on Trinity Road, Wandsworth, London.
These works were categorised as Major.
A lane was closed for some or all of the period.
The works were originally planned between 15 Feb 2021 and 21 Sep 2025 and were actually completed between 5 Mar 2021 (14:50) and 18 Sep 2025 (10:00). The works impacted the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 18 Sep 2025 at 10:29.
24 Feb 2026
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.
1 Jul 2024 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Princes Avenue, Tolworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
1 Jul 2024 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
1 Jul 2024 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Elgar Avenue, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
31 Jul 2026
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Ewell Road, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2025 at 08:00 and could run through until 31 July 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 12 Mar 2025 at 08:01.
31 Dec 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Derby Road, Tolworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:26.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Streatham Road, Streatham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 05:40.
27 Mar 2027
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 October 2024 at 08:00 and could run through until 27 March 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 08:43.
28 Oct 2024 and 31 Jan 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.
3 Mar and 1 Oct 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:42.
3 Mar and 1 Oct 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:42.
3 Mar and 1 Oct 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:41.
Monday
Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Park Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:58.
30 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Cringle Street, Battersea, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:15.
28 Apr 2025 and 30 Oct 2026
Transport for London (TfL) were proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 30 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Jan 2025 at 10:43.
28 Apr 2025 and 30 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 October 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 26 Jan 2025 at 18:59.
30 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Kirtling Street, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.
30 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Ponton Road, Battersea, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.
31 Oct 2025
London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 April 2025 at 10:05 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 Aug 2025 at 11:20.
12 May and 9 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 9 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 08:13.
12 May and 16 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 15:02.
Today
Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Court Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 4 Jun 2025 at 06:46.
11 Jun 2025 and 10 Apr 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 11:31.
3 Oct 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Cheyne Walk, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 June 2025 at 09:00 and could run through until 3 October 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2025 at 10:33.
3 Oct 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Battersea Bridge Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 June 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2025 at 10:27.
3 Oct 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Beaufort Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 June 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2025 at 09:26.
20 Jun 2026
Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 June 2025 at 08:00 and could run through until 20 June 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 15:32.
14 Jul and 14 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on West Street, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 15 Apr 2025 at 12:25.
14 Jul and 12 Dec 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Wandsworth on 22 May 2025 at 08:21.
19 Jul and 18 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.
19 Jul and 18 Oct 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 14:00.
19 Jul and 18 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.
19 Jul and 18 Oct 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 11:21.
19 Jul and 18 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.
19 Jul and 18 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.
21 Jul and 26 Sep 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Saxon Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Jul 2025 at 11:44.
6 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Fishponds Road, Tooting, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 08:53 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 08:37.
12 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 08:00 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 08:51.
12 Dec 2025
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Falcon Road, Battersea, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 08:00 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 09:33.
Sunday
Cadent Gas are carrying out Utility asset works on Lonsdale Road, Barnes.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 July 2025 at 08:14 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Sep 2025 at 15:07.
Sunday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Belmont Rise, Cheam.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 21 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 11:03.
31 Oct 2025
UK Power Networks South Eastern are carrying out New service connection on Springfield Road, Wallington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 28 Jul 2025 at 09:41.
28 Jul 2025 and 30 Jan 2026
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 30 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2025 at 16:54.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Vectis Road, Tooting, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 08:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 05:41.
31 Jul 2025 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 20 Jun 2025 at 12:54.
31 Jul 2025 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 20 Jun 2025 at 12:53.
31 Jul 2025 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 20 Jun 2025 at 12:54.
3 Aug and 2 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:07.
26 Oct 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.
3 Aug and 2 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:02.
3 Aug and 26 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 10:17.
27 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2025 at 22:00 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:07.
3 Aug and 1 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:04.
26 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.
3 Aug and 1 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:06.
26 Oct 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.
28 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Mitcham Road, Croydon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:32 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 10:31.
4 Aug and 26 Sep 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on High Trees, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 7 May 2025 at 09:59.
4 Aug and 26 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:28.
5 Aug 2025 and 5 Jan 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 5 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.
5 Aug and 16 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.
11 Aug and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochford Way, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:00.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 08:34.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:49.
11 Aug 2025 and 17 Jul 2026
Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Kingston Road, New Malden.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 17 July 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Sep 2025 at 07:32.
11 Aug 2025 and 17 Jul 2026
Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Kingston Road, Kingston Upon Thames.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 17 July 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Sep 2025 at 07:31.
11 Aug 2025 and 17 Jul 2026
Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 17 July 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Sep 2025 at 07:31.
12 Aug and 8 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:39.
12 Aug and 14 Nov 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:39.
13 Aug and 31 Oct 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Springfield Road, Wallington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Jun 2025 at 11:15.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Harbut Road, Battersea, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 August 2025 at 10:00 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2025 at 14:57.
Today
London Borough Of Richmond Upon Thames are carrying out Permanent reinstatement on Christchurch Road, East Sheen.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 August 2025 at 08:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 15 Sep 2025 at 09:04.
Today
London Borough Of Sutton are proposing to carry out Highway improvement works on Richmond Road, Beddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Sutton on 3 Jul 2025 at 15:13.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:03.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 14:47.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:46.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 12:36.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 14:30.
26 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Banstead Road, Carshalton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 08:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 07:22.
18 Aug and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 15 Aug 2025 at 09:49.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:18.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:10.
2 Nov 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Burdon Lane, Cheam.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 August 2025 at 09:30 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:02.
24 Aug and 9 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 13:43.
24 Aug and 9 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, West Dulwich, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 16:32.
24 Aug and 9 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 14:36.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Fullbrooks Avenue, Worcester Park.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2025 at 12:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 12:49.
25 Aug and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Stephen's Crescent, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 11:59.
Tomorrow
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 20 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Aug 2025 at 09:11.
26 Aug and 24 Nov 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:08.
14 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Hawkes Road, Mitcham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2025 at 11:47 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:50.
Tuesday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lansdowne Hill, Knight's Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 23 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 13:31.
28 Aug and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 10:05.
29 Aug and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prior Avenue, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 10:13.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ardrossan Gardens, Worcester Park.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 11:48.
Sunday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ardrossan Gardens, Worcester Park.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 21 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 11:52.
1 Sep and 7 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 7 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jul 2025 at 10:06.
1 Sep and 7 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:56.
1 Sep and 7 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 09:02.
1 Sep and 7 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:23.
7 Dec 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Factory Lane, Croydon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:00 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 08:53.
Today
UK Power Networks South Eastern were proposing to carry out New service connection on Kingsley Road, Croydon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Jul 2025 at 14:11.
1 Sep and 31 Oct 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 10 Jun 2025 at 09:48.
1 Sep and 28 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 18 Jun 2025 at 10:13.
1 and 28 Sep 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 10:00.
28 Sep 2025
London Borough Of Croydon are carrying out Highway repair and maintenance works on Ampere Way, Croydon.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 1 Sep 2025 at 08:01.
2 Nov 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Rochford Way, Croydon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:15 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:05.
1 and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boxley Road, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 08:06.
1 and 29 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Boxley Road, Morden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 29 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 08:33.
1 Sep and 2 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 16:32.
1 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldend Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:43.
1 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenock Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:26.
1 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchmore Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:41.
1 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockport Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.
1 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.
1 Sep and 5 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seely Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 12:58.
1 Sep and 14 Nov 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 27 May 2025 at 14:20.
1 and 26 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Poynders Road, Clapham Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 17:50.
1 Sep and 23 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 13:04.
23 Nov 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 07:30 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 07:58.
Monday
Cadent Gas are proposing to carry out Utility asset works on Strasburg Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 15:26.
Monday
Cadent Gas are proposing to carry out Utility asset works on Ravenet Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 15:27.
Monday
Cadent Gas are proposing to carry out Utility asset works on Newtown Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 15:27.
2 Sep and 30 Nov 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 23 May 2025 at 14:25.
2 Sep and 1 Nov 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 30 May 2025 at 11:00.
29 Sep 2025
London Borough Of Richmond Upon Thames are carrying out Section 50 on South Worple Way, East Sheen.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 10:19 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 8 Sep 2025 at 08:43.
3 Sep and 3 Nov 2025
BT are proposing to carry out Utility repair and maintenance works on Queenstown Road, Wandsworth, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Aug 2025 at 08:07.
Today
Southern Gas Networks are carrying out Utility repair and maintenance works on Traps Lane, New Malden.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2025 at 23:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 08:40.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Fernhurst Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2025 at 12:30 and could run through until 23 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2025 at 08:49.
5 Sep and 6 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 12:01.
5 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Avenue, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:56.
5 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Avenue, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 09:55.
8 Sep 2025 and 30 Apr 2026
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Aug 2025 at 13:18.
8 and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 11:59.
Today
Thames Water are carrying out Utility repair and maintenance works on Kings Road, Kingston Upon Thames.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2025 at 10:23.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:07.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 15:14.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:11.
Tuesday
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Openview, Wandsworth, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 08:00 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 10 Sep 2025 at 16:37.
8 Sep and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:35.
8 Sep and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:36.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:02.
8 Sep and 4 Oct 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Sudlow Road, Wandsworth, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 4 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2025 at 15:18.
Tuesday
Thames Water are proposing to carry out Utility repair and maintenance works on Plough Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:25.
8 and 29 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Strasburg Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:02.
8 and 29 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Ravenet Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:00.
8 and 29 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Newtown Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:00.
3 Nov 2025
BT are carrying out Utility repair and maintenance works on Queenstown Road, Wandsworth, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2025 at 10:04 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Sep 2025 at 10:15.
29 Sep 2025
Thames Water are carrying out Utility repair and maintenance works on Hartismere Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2025 at 13:00 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2025 at 12:57.
9 Sep and 6 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Ashburn Place, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Jun 2025 at 14:43.
9 Sep and 6 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility asset works on Ashburn Place, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2025 and run through until 6 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 8 Aug 2025 at 12:57.
Today
Thames Water are carrying out Utility repair and maintenance works on Carslake Road, Putney, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2025 at 18:00 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2025 at 14:49.
12 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:22.
12 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:55.
12 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:21.
12 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:53.
12 Sep and 11 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Streatham Hill West & Thornton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 11:16.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Harwood Terrace, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 September 2025 at 07:45 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Sep 2025 at 13:54.
15 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Way, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 17:11.
15 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fir Tree Grove, Carshalton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 17:03.
15 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 07:45.
Today
UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Cedar Road, Sutton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 17 Sep 2025 at 07:08.
15 Sep and 12 Oct 2025
London Borough Of Croydon were proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 21 Aug 2025 at 08:11.
15 Sep 2025 and 12 Feb 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on King Charles Road, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.
12 Feb 2026
UK Power Networks South Eastern are carrying out Utility asset works on King Charles Road, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:50 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:19.
15 Sep 2025 and 12 Feb 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Burney Avenue, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 10:37.
12 Feb 2026
UK Power Networks South Eastern are carrying out Utility asset works on Burney Avenue, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:51 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:19.
15 Sep 2025 and 12 Feb 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Eversley Road, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.
12 Feb 2026
UK Power Networks South Eastern are carrying out Utility asset works on Eversley Road, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:55 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:20.
15 Sep 2025 and 12 Feb 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Cheyne Hill, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 10:36.
12 Feb 2026
UK Power Networks South Eastern are carrying out Utility asset works on Cheyne Hill, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:58 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:20.
16 Oct 2025
UK Power Networks South Eastern are carrying out Utility asset works on Villiers Avenue, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:47 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:07.
15 and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 13:02.
15 Sep and 27 Oct 2025
London Borough Of Croydon are proposing to carry out Section 50 on Beulah Crescent, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 10 Sep 2025 at 12:47.
27 Oct 2025
London Borough Of Croydon are carrying out Section 50 on Beulah Crescent, Croydon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 09:00 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 15 Sep 2025 at 10:50.
15 and 26 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldgate Lane, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footpath only.
This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 05:49.
17 Oct 2025
Thames Water are carrying out Disconnection or alteration of supply on Western Road, Mitcham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 08:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2025 at 08:28.
15 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westminster Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:59.
15 Sep and 20 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 12:54.
29 Oct 2025
UK Power Networks South Eastern are carrying out Utility asset works on Sury Basin, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:45 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:03.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belvedere Road, Anerley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:49.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belvedere Road, Anerley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 14:26.
Today
Southern Gas Networks are carrying out Utility repair and maintenance works on Belvedere Road, Anerley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 10:20 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 10:38.
15 and 18 Sep 2025
London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 1 Jul 2025 at 07:50.
15 and 18 Sep 2025
London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 9 Jul 2025 at 08:30.
Today
London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 15 Jul 2025 at 10:46.
Today
London Borough Of Merton are carrying out Statutory Infrastructure Works on The Broadway, Wimbledon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 20:00 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 16 Sep 2025 at 08:07.
15 and 26 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 15:24.
15 Sep and 3 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 08:11.
15 and 26 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 09:26.
15 Sep and 3 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 14:42.
15 Sep and 3 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 15:24.
2 Nov 2025
Thames Water are carrying out Disconnection or alteration of supply on Palace Road, St Martin's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 11:00 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2025 at 12:07.
15 Sep and 6 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Strasburg Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 15:23.
15 Sep and 6 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Ravenet Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 15:21.
15 Sep and 6 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Newtown Street, Battersea, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 6 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 10:50.
15 Sep and 1 Oct 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Aug 2025 at 15:23.
15 Sep and 12 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Guildford Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jun 2025 at 14:59.
15 and 26 Sep 2025
Thames Water were proposing to carry out New service connection on Wilcox Road, Oval, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Jul 2025 at 12:47.
15 and 18 Sep 2025
Thames Water are proposing to carry out New service connection on Elm Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jul 2025 at 16:35.
18 Sep 2025
Thames Water are carrying out New service connection on Elm Park Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 15:08 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2025 at 07:54.
Today
Thames Water are carrying out Remedial works on Hollywood Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 09:05 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:21.
Tuesday
Thames Water are proposing to carry out Utility repair and maintenance works on Cale Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Jun 2025 at 13:52.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Cale Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:30 and could run through until 23 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:11.
Monday
Thames Water are carrying out Utility repair and maintenance works on Buckingham Avenue, Croydon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 21:09 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Sep 2025 at 08:37.
18 Sep 2025
London Borough Of Croydon are carrying out Highway repair and maintenance works on Rockmount Road, Croydon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 09:30 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 16 Sep 2025 at 09:43.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on St Mary's Road, Wimbledon.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 17:30 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 09:54.
Tuesday
Southern Gas Networks are carrying out roadworks on Belvedere Drive, Wimbledon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 17:30 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 09:55.
18 Sep 2025
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Queensmere Road, Southfields, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 08:00 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 18 Sep 2025 at 16:00.
14 Oct 2025
Thames Water are carrying out Utility repair and maintenance works on Larkhall Rise, Clapham Town, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 10:00 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2025 at 11:33.
7 Oct 2025
Thames Water are carrying out Utility repair and maintenance works on Malden Way, New Malden.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 08:35 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Sep 2025 at 09:59.
Thursday
Southern Gas Networks are proposing to carry out New service connection on Croxden Walk, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2025 at 08:27.
Thursday
Southern Gas Networks are proposing to carry out New service connection on Croxden Walk, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 07:58.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on King's Road, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 21:00 and could run through until 20 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:06.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 13:23.
Monday
Transport for London (TfL) are carrying out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2025 at 08:00 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 08:02.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 13:24.
Monday
Transport for London (TfL) are carrying out Highway improvement works on Cambridge Road, Battersea, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2025 at 08:00 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 08:02.
19 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Martin Way, Morden.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 11:27.
19 Sep and 4 Oct 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 14:54.
19 Sep and 4 Oct 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 15:40.
19 Sep and 20 Nov 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 09:25.
19 Sep and 20 Nov 2025
London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 September 2025 and run through until 20 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 14:58.
19 Sep and 20 Nov 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 09:25.
Sunday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on North End Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 11:30.
Sunday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on North End Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 09:28.
Sunday
Cadent Gas were proposing to carry out Disconnection or alteration of supply on North End Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 September 2025 and run through until 21 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 11:38.
Sunday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Anselm Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 12:00.
Sunday
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Anselm Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 September 2025 and run through until 21 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 14:00.
Sunday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Anselm Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 14:30.
Sunday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Anselm Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 09:32.
21 Sep and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdon Lane, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2025 and could run through until 1 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 10:35.
22 Sep and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glebe Road, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 09:41.
22 Sep and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Lane, Cheam.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Jun 2025 at 07:16.
22 and 26 Sep 2025
London Borough Of Croydon were proposing to carry out Highway improvement works on Wentworth Road, Croydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:29.
22 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 12:18.
Wednesday
Thames Water are proposing to carry out New service connection on Church Place, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Aug 2025 at 07:11.
Wednesday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bond Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 15:56.
22 and 26 Sep 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Amen Corner, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 20 Jun 2025 at 09:31.
22 and 26 Sep 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Amen Corner, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Jun 2025 at 08:04.
22 Sep and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:01.
Wednesday
BT are proposing to carry out Utility asset works on Dover House Road, Putney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Jun 2025 at 14:11.
22 Sep and 13 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Jun 2025 at 13:52.
Wednesday
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Carrington Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 4 Sep 2025 at 09:45.
Wednesday
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Carrington Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 4 Sep 2025 at 12:50.
Wednesday
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Worple Street, Mortlake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 4 Sep 2025 at 09:45.
Wednesday
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Worple Street, Mortlake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 5 Sep 2025 at 07:55.
22 Sep and 6 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bagley's Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 12:29.
22 Sep and 6 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bagley's Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 13:17.
22 Sep and 6 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bagley's Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 09:43.
22 Sep and 8 Oct 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Aug 2025 at 09:11.
22 and 26 Sep 2025
Thames Water were proposing to carry out New service connection on Courtfield Gardens, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2025 at 08:38.
23 Sep 2025 and 12 Jan 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Alton Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 12 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:54.
23 Sep and 27 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Adderley Grove, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:46.
Thursday
Thames Water are proposing to carry out Utility repair and maintenance works on Stephendale Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2025 at 14:55.
Thursday
Thames Water are proposing to carry out Utility repair and maintenance works on Stephendale Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2025 at 08:41.
24 Sep and 7 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jun 2025 at 14:41.
26 Sep and 31 Oct 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Whitehorse Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Aug 2025 at 11:23.
26 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 08:39.
26 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 08:39.
26 Sep and 2 Oct 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Mitcham Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 20 Jun 2025 at 09:31.
26 Sep and 2 Oct 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Mitcham Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Jun 2025 at 08:02.
26 and 29 Sep 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Hoyle Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 4 Sep 2025 at 08:41.
26 and 29 Sep 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Hoyle Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 4 Sep 2025 at 09:35.
26 and 29 Sep 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Murphy Power Distribution on 3 Sep 2025 at 14:21.
26 and 29 Sep 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Murphy Power Distribution on 16 Sep 2025 at 13:27.
27 Sep and 14 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:34.
27 Sep and 14 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 09:12.
28 Sep and 13 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2025 and run through until 13 October 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 12:05.
28 Sep and 2 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Bridge, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 11:51.
28 Sep and 2 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Bridge Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 11:42.
28 Sep and 2 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Cheyne Walk, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 11:40.
29 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Arundel Road, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:22.
29 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Arundel Road, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 07:24.
29 Sep and 13 Oct 2025
London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Sutton on 1 Jul 2025 at 11:55.
29 Sep and 13 Oct 2025
London Borough Of Sutton were proposing to carry out Highway improvement works on Langley Park Road, Sutton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 13 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Sutton on 8 Sep 2025 at 10:53.
29 Sep and 6 Oct 2025
London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Sutton on 11 Sep 2025 at 15:12.
29 Sep and 3 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Vincent Avenue, Tolworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Jul 2025 at 17:25.
29 Sep and 21 Oct 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 22 Aug 2025 at 11:02.
29 Sep and 21 Oct 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 16:09.
29 Sep and 17 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peterborough Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 15:29.
29 Sep and 13 Oct 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagnall Park, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Aug 2025 at 11:40.
29 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 13:18.
29 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:44.
29 Sep and 14 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 10:21.
29 Sep and 28 Nov 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Waters Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2025 at 12:15.
29 Sep and 28 Nov 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Waters Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Sep 2025 at 10:00.
29 Sep and 26 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 13:01.
29 Sep and 3 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 13:02.
29 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gateside Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 09:59.
29 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 08:15.
29 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 07:45.
29 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:56.
29 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 09:46.
29 Sep and 15 Oct 2025
Electricity Network Company are proposing to carry out Utility asset works on Oakshaw Road, Wandsworth, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 3 Jul 2025 at 08:19.
29 Sep and 15 Oct 2025
Electricity Network Company are proposing to carry out Utility asset works on Oakshaw Road, Wandsworth, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 7 Jul 2025 at 10:13.
29 Sep and 23 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:45.
29 Sep and 23 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 11:04.
29 Sep and 3 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on West Hill Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jun 2025 at 15:07.
29 Sep and 26 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:47.
29 Sep and 26 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 11:03.
29 Sep and 17 Oct 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Harbut Road, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Aug 2025 at 10:24.
29 Sep 2025 and 18 Jan 2026
Thames Water are proposing to carry out Utility asset works on Yelverton Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 11:35.
29 Sep 2025 and 18 Jan 2026
Thames Water are proposing to carry out Utility asset works on Yelverton Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Sep 2025 at 14:18.
30 Sep and 3 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 16 May 2025 at 09:03.
30 Sep and 3 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Aug 2025 at 22:28.
30 Sep and 2 Oct 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:57.
30 Sep and 6 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on St Julian's Farm Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jun 2025 at 10:00.
30 Sep and 6 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Casewick Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jun 2025 at 09:59.
30 Sep and 2 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Ferndale Road, Brixton North, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Jul 2025 at 10:32.
30 Sep and 2 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Glenrosa Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2025 at 14:55.
30 Sep and 2 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Glenrosa Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2025 at 08:41.
30 Sep and 28 Oct 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Townmead Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 28 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 17 Sep 2025 at 10:26.
30 Sep and 2 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Cremorne Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 11:55.
1 and 15 Oct 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Dagmar Road, Croydon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Feb 2025 at 14:56.
1 and 3 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Colwith Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2025 at 12:21.
1 and 3 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Colwith Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2025 at 15:23.
2 and 16 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:40.
2 and 16 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2025 at 10:16.
2 Oct and 28 Nov 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Tregarvon Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:48.
2 and 6 Oct 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Grant Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 19 Jun 2025 at 08:42.
2 and 30 Oct 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Sep 2025 at 14:33.
2 and 13 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2025 and run through until 13 October 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 12:08.
2 and 9 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2025 and run through until 9 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 12:20.
2 and 6 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Prince Of Wales Drive, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2025 and run through until 6 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 12:16.
3 Oct and 4 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on East Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.
3 and 11 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Gibbon Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 10 Aug 2025 at 11:26.
3 and 6 Oct 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Hoyle Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 4 Sep 2025 at 08:40.
3 and 6 Oct 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Hoyle Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 4 Sep 2025 at 09:36.
3 and 6 Oct 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Murphy Power Distribution on 3 Sep 2025 at 14:22.
3 and 6 Oct 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Murphy Power Distribution on 16 Sep 2025 at 13:26.
5 and 14 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Colestown Street, Battersea, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2025 and run through until 14 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 11:34.
5 and 14 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2025 and run through until 14 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 11:39.
5 and 14 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:15.
5 and 14 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:30.
5 and 8 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Hyde Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:13.
5 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Hyde Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:50.
5 and 8 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Ethelburga Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 14:24.
5 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Ethelburga Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:52.
5 and 7 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westbridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:09.
5 and 7 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westbridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:34.
5 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Parkgate Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:48.
5 and 8 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Parkgate Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:16.
5 and 8 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Church Road, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 09:43.
5 and 8 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Church Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 14:25.
5 and 8 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Church Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:32.
5 and 8 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Howie Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:17.
5 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Howie Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:47.
5 and 22 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:54.
5 and 22 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:50.
5 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 13:24.
5 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:49.
5 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 11:25.
5 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:47.
5 and 9 Oct 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Cheyne Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 17 Sep 2025 at 11:35.
5 and 7 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Beaufort Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 15:11.
5 and 7 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Beaufort Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:10.
5 and 7 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Danvers Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 15:11.
5 and 7 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Danvers Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:16.
5 and 7 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 15:11.
5 and 7 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:15.
5 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cheyne Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 11:26.
5 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cheyne Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:46.
6 and 13 Oct 2025
London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Sutton on 10 Sep 2025 at 14:45.
6 and 13 Oct 2025
London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Sutton on 11 Sep 2025 at 15:12.
6 Oct and 12 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Howard Road, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:32.
6 and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 12:44.
6 and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 11:30.
6 and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 16:26.
6 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Melrose Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:33.
6 and 10 Oct 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Westow Hill, Gipsy Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 09:56.
6 and 17 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Jun 2025 at 16:29.
6 and 17 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:10.
6 and 17 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:35.
6 and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverton Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:55.
6 Oct and 16 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 12:34.
6 Oct and 16 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:42.
6 and 10 Oct 2025
Thames Water are proposing to carry out New service connection on Southfields Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jul 2025 at 12:32.
6 and 17 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 May 2025 at 09:43.
6 and 17 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Jul 2025 at 08:57.
6 and 17 Oct 2025
Thames Water were proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 15:28.
6 and 10 Oct 2025
Thames Water are proposing to carry out New service connection on Stephendale Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Jul 2025 at 07:51.
6 and 21 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bagley's Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 15:35.
6 and 21 Oct 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Bagley's Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2025 at 13:10.
6 and 21 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bagley's Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2025 at 09:50.
6 and 21 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bagley's Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2025 at 08:41.
6 and 10 Oct 2025
Thames Water were proposing to carry out New service connection on Courtfield Gardens, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 15:09.
6 and 10 Oct 2025
Thames Water are proposing to carry out New service connection on Courtfield Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:05.
6 and 10 Oct 2025
Thames Water are proposing to carry out New service connection on Courtfield Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2025 at 11:28.
7 Oct 2025 and 30 Apr 2026
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 14:44.
7 and 13 Oct 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Woodland Way, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Jul 2025 at 23:34.
7 and 13 Oct 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Woodland Way, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 5 Aug 2025 at 09:57.
7 and 18 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 18 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:00.
7 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cremorne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 11:25.
7 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cremorne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:58.
7 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lots Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 15:11.
7 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lots Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:10.
7 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Danvers Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 15:11.
7 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Danvers Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:11.
7 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Beaufort Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 15:11.
7 and 9 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Beaufort Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:12.
7 and 9 Oct 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Beaufort Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 17 Sep 2025 at 09:09.
7 and 10 Oct 2025
Thames Water were proposing to carry out New service connection on Elm Park Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jul 2025 at 15:29.
9 Oct and 6 Nov 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 09:15.
9 and 18 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 18 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:54.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Colestown Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:09.
9 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Colestown Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:18.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Banbury Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:10.
9 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Banbury Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:16.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Bridge Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:17.
9 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Bridge Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:14.
9 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:41.
9 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:20.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Rosenau Crescent, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:16.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Rosenau Crescent, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:10.
9 and 16 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:56.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Kersley Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 14:24.
9 and 16 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Kersley Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 15:58.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 12:51.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Surrey Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:09.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Surrey Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 17:09.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Prince Of Wales Drive, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:52.
9 and 15 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Prince Of Wales Drive, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:01.
10 Oct and 28 Nov 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Bowood Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:01.
11 and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:02.
11 and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 12:33.
11 and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:12.
11 and 13 Oct 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 October 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:16.
11 Oct and 17 Nov 2025
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 12:31.
11 and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 13:57.
11 and 19 Oct 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 14 Jul 2025 at 13:19.
12 and 16 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Balham Station Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2025 at 12:24.
13 Oct and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Laburnum Avenue, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 14:57.
13 Oct and 14 Nov 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Emmanuel Road, Streatham Hill West & Thornton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 3 Jul 2025 at 11:26.
13 and 31 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 14:42.
13 and 31 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 14:10.
13 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:55.
13 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 07:23.
13 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Inman Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:56.
13 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Inman Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 14:41.
13 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dingwall Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 14:04.
13 Oct and 3 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 09:00.
13 Oct and 3 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2025 at 07:11.
13 Oct and 3 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 07:17.
13 Oct and 2 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 07:31.
13 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 17:21.
13 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 08:30.
13 and 15 Oct 2025
London Borough Of Lambeth are proposing to carry out Core Sampling on Cottage Grove, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 9 Jul 2025 at 15:59.
13 and 16 Oct 2025
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Howie Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 12 Sep 2025 at 12:43.
13 and 16 Oct 2025
London Borough Of Wandsworth are proposing to carry out Highway improvement works on Elcho Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 12 Sep 2025 at 12:52.
14 and 16 Oct 2025
BT are proposing to carry out Utility asset works on Kings Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 15 Jul 2025 at 10:05.
14 and 16 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 14:37.
14 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 17:21.
14 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 08:33.
15 and 28 Oct 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Red Lion Road, Tolworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 17 Jun 2025 at 16:11.
15 and 18 Oct 2025
Transport for London (TfL) are proposing to carry out roadworks on Malden Way, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 15:37.
15 Oct and 18 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 18 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:40.
15 Oct and 18 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 18 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2025 at 10:15.
15 Oct and 8 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Cowleaze Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.
15 Oct and 4 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Acre Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.
15 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:54.
15 Oct and 2 Nov 2025
Electricity Network Company are proposing to carry out Utility asset works on Garratt Lane, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 3 Jul 2025 at 08:31.
16 and 24 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 12:31.
16 and 18 Oct 2025
London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Sheen Lane, Mortlake, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 20 May 2025 at 13:06.
16 and 18 Oct 2025
London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Sheen Lane, Mortlake, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 20 May 2025 at 14:17.
16 and 18 Oct 2025
London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Sheen Lane, Mortlake, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 22 May 2025 at 11:53.
18 and 20 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:00.
18 and 20 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:13.
18 and 20 Oct 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 October 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:16.
18 and 20 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:00.
19 Oct 2025 and 8 Feb 2026
Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 10:09.
20 and 31 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 16:05.
20 and 31 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 12:19.
20 Oct and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 16:12.
20 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 19:09.
20 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 09:32.
20 Oct and 3 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Latchmere Lane, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 14:37.
20 Oct and 13 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Latchmere Lane, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 16:07.
20 Oct and 28 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Leopold Road, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Aug 2025 at 14:19.
20 Oct and 28 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Leopold Road, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 08:39.
20 and 22 Oct 2025
London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:13.
20 and 22 Oct 2025
London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:16.
20 and 22 Oct 2025
London Borough Of Lambeth are proposing to carry out Works for road purposes on Gleneldon Road, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:22.
20 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 14:10.
20 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:36.
20 Oct and 28 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:10.
20 Oct and 28 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 15:50.
20 Oct and 28 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 15:02.
20 Oct and 28 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2025 at 14:59.
20 Oct and 28 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2025 at 15:02.
20 Oct and 28 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 14:56.
20 Oct and 28 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2025 at 14:58.
20 Oct and 28 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2025 at 14:27.
20 Oct and 28 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea High Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:09.
20 Oct and 28 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea High Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 15:50.
20 and 24 Oct 2025
Thames Water are proposing to carry out New service connection on Barkston Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 11:08.
21 Oct and 3 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2025 at 15:28.
21 Oct and 3 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2025 at 10:25.
21 Oct and 3 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2025 at 12:44.
22 Oct and 10 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 16 Sep 2025 at 15:24.
22 Oct and 10 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 17 Sep 2025 at 07:26.
22 and 24 Oct 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 10 Sep 2025 at 09:15.
22 and 24 Oct 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 10 Sep 2025 at 10:19.
24 and 31 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Down Hall Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Aug 2025 at 14:11.
24 and 31 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Skerne Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Aug 2025 at 14:10.
24 Oct and 2 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Aug 2025 at 13:48.
25 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Gardens, Wallington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:42.
25 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Gardens, Wallington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:26.
25 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Gardens, Wallington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 13:08.
25 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Gardens, Wallington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:23.
25 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Road, Wallington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:36.
25 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Road, Wallington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:27.
25 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stafford Road, Wallington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:33.
25 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stafford Road, Wallington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:20.
25 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bert Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:57.
25 and 27 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:01.
25 and 27 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:14.
25 and 27 Oct 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:16.
25 and 27 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:01.
25 Oct and 1 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Long Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Aug 2025 at 14:56.
25 Oct and 7 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 11:59.
25 Oct and 7 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Rosedew Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 12:21.
25 Oct and 7 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Rosedew Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2025 at 14:41.
26 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.
26 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 10:46.
26 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 13:15.
26 and 29 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lillie Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2025 at 14:37.
26 and 29 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lillie Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2025 at 13:52.
27 Oct and 7 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2025 at 12:13.
27 Oct and 14 Nov 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Cricket Green, Mitcham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 29 Oct 2024 at 16:15.
27 Oct and 14 Nov 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Cricket Green, Mitcham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 13 Dec 2024 at 07:46.
27 Oct and 2 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Fernhill Gardens, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 12:18.
27 and 30 Oct 2025
Thames Water are proposing to carry out New service connection on Summerstown, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Sep 2025 at 08:22.
27 Oct 2025 and 8 Feb 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:28.
27 Oct 2025 and 8 Feb 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:38.
27 Oct 2025 and 17 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 22:40.
27 Oct 2025 and 17 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:35.
27 Oct 2025 and 17 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 13:41.
27 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.
27 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 11:52.
27 Oct and 1 Nov 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Balham Park Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 4 Aug 2025 at 12:26.
27 Oct and 1 Nov 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Balham Park Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 31 Jul 2025 at 15:16.
27 Oct 2025 and 8 Feb 2026
Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 13:01.
27 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:18.
27 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:36.
27 Oct and 28 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 08:41.
27 Oct and 23 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:46.
27 Oct and 7 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Marcilly Road, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Sep 2025 at 10:42.
27 and 31 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:30.
27 and 29 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 12:44.
27 Oct 2025 and 27 Mar 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Richmond Road West, East Sheen.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 13:02.
27 and 29 Oct 2025
Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Sep 2025 at 16:16.
27 and 30 Oct 2025
Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2025 at 12:55.
27 and 31 Oct 2025
Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 15:49.
27 and 31 Oct 2025
Cadent Gas are proposing to carry out New service connection on Anselm Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 08:59.
27 and 31 Oct 2025
Thames Water are proposing to carry out New service connection on Carlyle Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Aug 2025 at 14:00.
27 and 31 Oct 2025
Thames Water are proposing to carry out Utility asset works on Kenway Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Jun 2025 at 16:49.
27 and 31 Oct 2025
Thames Water are proposing to carry out Utility asset works on Kenway Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Jul 2025 at 14:30.
27 and 31 Oct 2025
Thames Water are proposing to carry out Utility asset works on Kenway Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Jul 2025 at 15:30.
27 and 31 Oct 2025
Thames Water are proposing to carry out Utility asset works on Kenway Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Jul 2025 at 14:32.
27 Oct and 3 Nov 2025
Thames Water are proposing to carry out New service connection on Old Brompton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jul 2025 at 15:35.
28 Oct 2025 and 4 Feb 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Canbury Park Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 4 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Aug 2025 at 10:52.
28 Oct 2025 and 8 Jan 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Marjorie Grove, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:46.
28 and 31 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Road, Oval, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:47.
28 and 30 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gilstead Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 09:14.
29 Oct and 12 Dec 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagmar Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 12:07.
29 and 31 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:52.
29 and 31 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:55.
29 and 31 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wardo Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Sep 2025 at 08:11.
29 and 31 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wardo Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Sep 2025 at 14:10.
30 Oct and 3 Nov 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Birkenhead Avenue, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 26 Mar 2025 at 11:51.
30 Oct and 3 Nov 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Birkenhead Avenue, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 1 Apr 2025 at 10:52.
30 Oct and 8 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Canbury Park Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.
31 Oct and 19 Nov 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 19 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Sep 2025 at 14:33.
1 and 3 Nov 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:17.
1 and 3 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 15:59.
1 and 3 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:14.
1 and 3 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:02.
2 Nov and 20 Dec 2025
Network Rail are proposing to carry out Works for Rail Purposes on Chiltern Drive, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 25 Jul 2025 at 09:47.
2 Nov and 20 Dec 2025
Network Rail are proposing to carry out Works for Rail Purposes on Chiltern Drive, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2025 and could run through until 20 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 19 May 2025 at 11:25.
2 Nov and 20 Dec 2025
Network Rail are proposing to carry out Works for Rail Purposes on Lower Marsh Lane, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2025 and could run through until 20 December 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Network Rail on 19 May 2025 at 10:56.
2 and 6 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 14:27.
2 and 6 Nov 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2025 and could run through until 6 November 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.
3 Nov and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kayemoor Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 13:28.
3 Nov and 29 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Avenue, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 29 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 13:28.
3 and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alberta Avenue, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:24.
3 and 7 Nov 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Lower Road, Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Jul 2025 at 08:22.
3 and 7 Nov 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Trent Way, Worcester Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Jul 2025 at 16:12.
3 and 7 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Leighton Street, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2025 at 11:28.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 8 Sep 2025 at 11:58.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 25 Jun 2025 at 11:05.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 23 Jul 2025 at 07:32.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 30 Jul 2025 at 12:57.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 7 Aug 2025 at 11:44.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 15 Aug 2025 at 15:06.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 21 Aug 2025 at 16:37.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 24 Jun 2025 at 12:53.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 22 Jul 2025 at 14:11.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 11 Sep 2025 at 11:51.
3 and 7 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Jun 2025 at 09:05.
3 and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Albany Park Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 12:19.
3 and 12 Nov 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Garratt Lane, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 8 Sep 2025 at 09:07.
3 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 14:45.
3 and 17 Nov 2025
Southern Gas Networks were proposing to carry out roadworks on Farlton Road, Earlsfield, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 10:53.
3 and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:35.
3 Nov and 19 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 14:22.
3 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dingwall Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 11:27.
3 Nov 2025 and 18 Jan 2026
Thames Water are proposing to carry out Utility asset works on Holman Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 11:35.
3 Nov 2025 and 18 Jan 2026
Thames Water are proposing to carry out Utility asset works on Holman Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 08:04.
3 and 7 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Earl's Court Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2025 at 16:00.
3 and 5 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hogarth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jul 2025 at 11:10.
4 and 20 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Princess Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2025 at 12:26.
4 and 18 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:40.
4 and 18 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2025 at 10:16.
4 and 6 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Forthbridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Aug 2025 at 14:57.
5 Nov 2025 and 21 Mar 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Lamberts Road, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 21 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2025 at 15:20.
5 Nov 2025 and 21 Mar 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 21 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2025 at 15:24.
5 Nov 2025 and 20 Feb 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Sury Basin, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 20 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2025 at 15:03.
5 Nov 2025 and 19 Jan 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Henry Macaulay Avenue, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 19 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2025 at 15:05.
7 Nov and 24 Dec 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Aug 2025 at 13:12.
7 and 26 Nov 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 09:15.
8 Nov 2025 and 7 May 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Ewell Road, Surbiton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2025 and could run through until 7 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Aug 2025 at 15:18.
8 and 10 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 15:59.
8 and 10 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:16.
8 and 10 Nov 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 November 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:17.
8 and 10 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:03.
10 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 13:16.
10 Nov and 20 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Thorndon Gardens, Ewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 20 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 May 2025 at 06:23.
10 Nov and 20 Dec 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Thorndon Gardens, Ewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 20 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Jun 2025 at 14:56.
10 and 15 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Shorts Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 25 Jul 2025 at 14:01.
10 and 15 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Shorts Road, Carshalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 1 Aug 2025 at 12:09.
10 Nov 2025 and 7 May 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Ewell Road, Surbiton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 7 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 12:14.
10 Nov 2025 and 7 May 2026
UK Power Networks South Eastern are proposing to carry out Utility asset works on Ewell Road, Surbiton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 7 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Sep 2025 at 09:55.
10 and 21 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Aug 2025 at 16:26.
10 and 16 Nov 2025
Cadent Gas are proposing to carry out New service connection on Lower Sloane Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:41.
11 Nov 2025 and 27 Mar 2026
UK Power Networks South Eastern were proposing to carry out Utility asset works on Lamberts Road, Surbiton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 27 March 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2025 at 13:52.
11 Nov 2025 and 27 Mar 2026
UK Power Networks South Eastern were proposing to carry out Utility asset works on Villiers Avenue, Surbiton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 27 March 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2025 at 13:31.
11 and 24 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Casewick Road, Knight's Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 24 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Aug 2025 at 15:52.
12 and 14 Nov 2025
Thames Water are proposing to carry out Remedial works on Willett Place, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:14.
12 and 17 Nov 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Blackshaw Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 4 Sep 2025 at 08:14.
12 Nov 2025 and 2 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:08.
12 Nov 2025 and 2 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Wye Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:06.
13 and 15 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wimbledon Hill Road, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Aug 2025 at 08:18.
13 Nov 2025 and 19 Jan 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Shelgate Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:06.
14 Nov 2025 and 29 Jan 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Marmion Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2025 and could run through until 29 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:06.
15 and 17 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:00.
15 and 17 Nov 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:17.
15 and 17 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:17.
15 and 17 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2025 at 14:04.
17 Nov and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glebe Road, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:15.
17 Nov and 12 Dec 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Newhaven Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2025 at 12:43.
17 Nov and 12 Dec 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Newhaven Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Sep 2025 at 12:54.
17 Nov and 5 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tamworth Lane, Mitcham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 11:59.
17 and 19 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bond Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 15:58.
17 and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakshaw Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:34.
17 and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverton Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:34.
17 and 20 Nov 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 5 Sep 2025 at 12:42.
17 and 23 Nov 2025
Cadent Gas are proposing to carry out New service connection on Lower Sloane Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 13:00.
19 Nov and 2 Dec 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Jul 2025 at 13:38.
20 and 25 Nov 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 5 Sep 2025 at 13:53.
21 Nov 2025 and 23 Jan 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on King Henrys Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 23 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2025 at 13:30.
21 Nov 2025 and 23 Jan 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on King Henrys Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 23 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Sep 2025 at 10:00.
21 and 24 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Half Moon Lane, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Aug 2025 at 09:07.
21 and 24 Nov 2025
Network Rail were proposing to carry out Works for Rail Purposes on Shakespeare Road, Herne Hill & Loughborough Junction, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Aug 2025 at 15:45.
24 Nov and 14 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ardrossan Gardens, Worcester Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:16.
24 Nov and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 14:16.
25 Nov 2025 and 19 Jan 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Close, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:58.
25 and 27 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:03.
25 and 27 Nov 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2025 and run through until 27 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 17:31.
29 Nov and 1 Dec 2025
Network Rail are proposing to carry out Works for Rail Purposes on Ferndale Road, Brixton North, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2025 and could run through until 1 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 15 Sep 2025 at 14:24.
30 Nov and 7 Dec 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Hailsham Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:44.
30 Nov and 7 Dec 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.
1 and 19 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Commonside East, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 11:53.
1 and 12 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 12:41.
1 Dec 2025 and 23 Feb 2026
Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 12:13.
1 and 6 Dec 2025
Thames Water are proposing to carry out New service connection on Summerstown, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Aug 2025 at 09:34.
1 and 18 Dec 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:26.
1 and 18 Dec 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Faygate Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:02.
1 and 3 Dec 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Marius Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:49.
1 and 18 Dec 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:46.
3 and 24 Dec 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Newhaven Road, Croydon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2025 and run through until 24 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Feb 2025 at 15:02.
3 and 5 Dec 2025
BT are proposing to carry out Utility asset works on Tremadoc Road, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Sep 2025 at 10:11.
4 and 6 Dec 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Roman Way, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:49.
4 and 6 Dec 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Roman Way, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 1 Apr 2025 at 06:34.
4 and 6 Dec 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Mitcham Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:54.
4 and 6 Dec 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Mitcham Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 1 Apr 2025 at 06:35.
5 Dec 2025 and 9 Apr 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Kelmscott Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2025 and could run through until 9 April 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 16:02.
8 and 16 Dec 2025
Thames Water are proposing to carry out New service connection on Hollyfield Road, Surbiton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 16 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 07:35.
8 and 19 Dec 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Clarence Crescent, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2025 at 10:22.
8 Dec 2025 and 28 Jan 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Acanthus Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 28 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:02.
10 and 24 Dec 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagnall Park, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2025 and could run through until 24 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 16:21.
10 Dec 2025 and 10 Jan 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Wimpole Close, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2025 and could run through until 10 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 15 Sep 2025 at 10:13.
15 and 19 Dec 2025
Thames Water are proposing to carry out Utility asset works on Falcon Terrace, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Aug 2025 at 15:09.
Roadworks Map near to Evelyn Road, LONDON, SW19 8NU (51 Events)



























































































- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Evelyn Road, LONDON, SW19 8NU (51 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Sep 2025 - 8 Oct 2025)
(Scheduled: 17 Sep 2025 - 23 Sep 2025)
(Scheduled: 25 Jun 2025 - 10 Oct 2025)
(Scheduled: 17 Sep 2025 - 24 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data